Division 10 - STATE TRANSPORTATION IMPROVEMENT PROGRAM - Anson Cabarrus Mecklenburg Stanly Union - Connect NCDOT
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
STATE TRANSPORTATION IMPROVEMENT PROGRAM Division 10 10 Anson Cabarrus Mecklenburg Stanly Union
Davidson DRAFT STIP FY 2015-2025 Cornelius I-3802B 77 3 STI Projects U-3440 U-5761 R-2555B 85 R-2632AB Kannapolis R-5721B U-5767 B-5793 49 52 I-5715 I-3802A 73 R-5706 DIVISION 10 U-5765 U-5773 B-5548 U-5771 AV-5756 U-5807 B-5814 I-3803BA I-5714 740 Huntersville U-5114 P-5703 AV-5732 Concord 73 R-2248EA 29 BRIDGES FUNDED THROUGH STI 115 EB-5732 I-5861 U-5806 Albemarle STATEWIDE AVIATION U-5772 B-5375 I-5860 R-2248EA 21 16 I-5826 U-2507A B-4972 REGIONAL AVIATION R-2248G I-5798 U-2507AA 24 R-2530B 485 I-5405 I-5747 200 B-5800 DIVISION AVIATION EB-5749 U-5768 27 85 I-5797 CABARRUS DIVISION FERRY I-5837 I-5796 24 I-5770 P-5702 EB-5710 STANLY REGIONAL RAIL I-5718E 29 U-5008 U-5803 DIVISION RAIL I-5838 138 I-5825 U-5526A REGIONAL TRANSIT U-5714 I-5718D I-5718C 601 DIVISION TRANSIT I-5746 U-5712 I-5769 74 485 SAFETY I-5718B Charlotte U-5805 Mint TRANSITION * U-2509A Hill 160 77 TRANSITION * U-5007 U-2509B INTERSTATE MAINTENANCE I-5718A 218 STATEWIDE HIGHWAY U-5766 U-5763 Stallings I-5828 16 U-4714A REGIONAL HIGHWAY B-5795 Matthews DIVISON HIGHWAY I-5768 I-5827 742 52 DIVISION BIKE/PEDESTRIAN U-5804B U-5762 B-5105 U-5808 EB-5723 INTERSTATE ROUTE R-4902A I-5507 U-4714B W-5520 B-2506 MECKLENBURG 218 109 US ROUTE Indian P-5704 I-5748 Trail B-5243 200 205 I-5800 NC ROUTE 74 B-5376 U-5703 SECONDARY ROAD U-5764 Weddington MUNICIPAL BOUNDARIES U-3467A U-2549 MILITARY BASE 84 74 NCDOT DIVISION BOUNDARY U-3467B U-5769 U-5723 Monroe R-5708 COUNTY BOUNDARY ANSON B-5009 WATER FEATURES 74 B-5791 75 B-5515 * Note: Reflects 108 of the Major Transition Projects Note: FY 2015 projects represent major projects not let as of November 2014 207 601 UNION 742 52 145 B-5377 200 B-5374 522 B-5801 0 2.5 5 10 Miles
DIVISION 00 HIGHWAY PROGRAM TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS TOTAL PRIOR FUNDS COUNTY ROUTE/CITY ID LOCATION / DESCRIPTION LENGTH PROJECT YEARS STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED NUMBER (MILES) COST COST (THOU) (THOU) FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FUTURE YEARS WAKE NC 00 R-0000 I-40 TO NC 96 EAST OF HOMETOWN. 7.3 63,450 250 NHP R 4000 A WIDEN TO A FOUR-LANE FACILITY NHP M 700 ROUTE/CITY WITH A BYPASS OF HOMETOWN NHP U 1500 I - Interstate SW ON NEW LOCATION. NHP C 9000 A US or NC Routes NHP R 3000 B LOCATION / DESCRIPTION SR - Secondary Road NHP U 5000 B C 5000 B C 5000 B C 5000 B Project termini and a general Various - multiple routes NHP R 10000 C work description. NEW ROUTE or City NHP C 20000 C FUNDING SOURCE (2) SW A I-40 TO NC 3 See Highway Funding Key SW B NC 3 TO SR 1003 IDENTIFICATION NUMBER for an explanation of funding categories SW C SR 1003 TO NC 96 Assigned to each project at used for each project phase. conception and remains with PROJECT BREAKS WORK TYPE (ACTIVITY) (3) ESTIMATED COST Preliminary engineering, right of project until completion. One or two letter Phases of implementation: way, utility, mitigation and construction cost estimates FUNDING CATEGORY (1) designation for project Preliminary engineering, Right of Way, by funding category in current dollars. Cost may UNFUNDED Identifies the "STI" Funding break. Mitigation, Utilities or Construction. include one or more funding types. Multi-year funding FFUTURE Category for the project and For other work types or activities see of a project segment indicates (Cash-Flow Funding) COMMITMENTS any project breaks. Work Type (Activity) box below. with proposed work type or activity beginning in the initial scheduled year. (Estimates are in thousand of dollars.) (1) FUNDING CATEGORY (2) FUNDING KEY FOR HIGHWAY FUNDING SOURCES (3) WORK TYPE (ACTIVITY) DIV - Division APD - Appalachian Development NHPB - National Highway Performance Program (Bridge) A - Acquisition EX - Exempt BOND (R) - Revenue Bond NHPIM - National Highway Performance Program (Interstate Maintenance) C - Construction HF - State Dollars (Non-STI) CMAQ - Congestion Mitigation O - Others CG - Construction (GARVEE) REG - Regional DP - Discretionary or Demonstration RR - Rail-Highway Safety F - Feasibility Study SW - Statewide ER - Emergency Relief Funds S (M) - State Match G - Grading and Structures TRN -Transition Project FED - Federal Rail Funds SRTS - Safe Routes to School I - Implementation FLPI - Federal Lands Program (Indian Reservation Roads) STP - Surface Transportation Program L - Landscaping HFB - Highway Fund Bridge Replacement Program STPDA - Surface Transportation Program - Direct Attributable M - Mitigation HP - Federal-Aid High Priority STPEB - Surface Transportation Program, Enhancements (Bike) O - Operations HRRR - High Risk Rural Roads STPON - Surface Transportation Program Bridge (On System Bridge) P - Paving HSIP - Highway Safety Improvement Program STPOFF -Surface Transportation Program (Off System Bridge) PE - Preliminary Engineering L - Local T - State Highway Trust Funds R - Right of Way NHP - National Highway Performance Program TAP - Transportation Alternatives Program RG - Right of Way (GARVEE) S - Structure U - Utilities
HIGHWAY PROGRAM DIVISION 10 TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS TOTAL PRIOR PROJ YEARS STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED ID COST COST COUNTY ROUTE/CITY NUMBER LOCATION / DESCRIPTION LENGTH (THOU) (THOU) FUNDS FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FUTURE YEARS RURAL PROJECTS ANSON US 74 R-5708 INTERSECTION OF US 74 AND SR 1714 1550 T R 300 (STANBACK FERRY ROAD). CONSTRUCT T C 1250 REG INTERSECTION IMPROVEMENTS. FEDERAL BRIDGE PROJECTS ANSON US 52 B-4407 REPLACE BRIDGE NO. 70 OVER ROCKY 7147 37 HFB R 610 RIVER. HFB C 6500 HF ANSON NC 109 B-5818 REPLACE BRIDGE NO. 11 OVER DEADFALL 1650 HFB R 150 CREEK. HFB C 1500 HF ANSON SR 1127 B-5169 REMOVE BRIDGE NO. 309 OVER NORTH 146 146 (OLD US 52) FORK JONES CREEK. DIV UNDER CONSTRUCTION ANSON SR 1142 B-5809 REPLACE BRIDGE NO. 75 OVER NORTH 1430 HFB R 130 (CITY POND ROAD) FORK JONES. HFB C 1300 HF ANSON SR 1627 B-2506 REPLACE BRIDGE NO. 8 OVER BROWN 1477 397 STPOFF R 30 (PINKSTON-RIVER) CREEK. STPOFF C 1050 DIV ANSON SR 1634 B-5817 REPLACE BRIDGE NO. 7 OVER BROWN 2750 HFB R 250 (GRASSY ISLAND CREEK. HFB C 2500 ROAD) HF ANSON SR 1654 B-5795 REPLACE BRIDGE NO. 217 OVER LANES 840 STPOFF R 40 (MORTON ROAD) CREEK. STPOFF C 800 DIV ANSON SR 1811 B-5927 REPLACE BRIDGE NO. 44 OVER REEDY 715 HFB R 65 (GATEWOOD ROAD) FORK CREEK. HFB C 650 HF ANSON VARIOUS BD-5110 DIVISION 10 PURCHASE ORDER CONTRACT 18292 16292 STPOFF R 200 CABARRUS BRIDGE REPLACEMENT PROJECTS AT STPOFF C 1800 SELECTED LOCATIONS. MECKLENBURG STANLY UNION DIV PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC) MUNICIPAL BRIDGE PROJECTS ANSON ANSONVILLE B-4861 REPLACE BRIDGE NO. 88 OVER WINSTON- 1955 1955 RIDGE STREET SALEM SOUTHBOUND RAILROAD. DIV UNDER CONSTRUCTION - PROJECT ADMINISTERED BY THE TOWN OF ANSONVILLE - MUNICIPAL BRIDGE ANSON WADESBORO B-5009 REPLACE BRIDGE NO. 90 OVER 582 107 STPOFF C 380 (EAST WADE STREET) MOSS CREEK. L C 95 DIV RIGHT OF WAY IN PROGRESS - PROJECT ADMINISTERED BY THE TOWN OF WADESBORO - MUNICIPAL BRIDGE MITIGATION PROJECTS ANSON VARIOUS EE-4910 ECOSYSTEM ENHANCEMENT PROGRAM FOR 29356 29356 CABARRUS DIVISION 10 PROJECT MITIGATION. MECKLENBURG STANLY UNION IN PROGRESS DIV - Division Category EX - Exempt Category 10-7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO HF - State Dollars (Non STI) REG - Regional Category SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES SW - Statewide Category TRN - Transition Project AVAILABLE
HIGHWAY PROGRAM DIVISION 10 TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS TOTAL PRIOR PROJ YEARS STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED ID COST COST COUNTY ROUTE/CITY NUMBER LOCATION / DESCRIPTION LENGTH (THOU) (THOU) FUNDS FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FUTURE YEARS HAZARD ELIMINATION PROJECTS ANSON VARIOUS W-5210 DIVISION 10 RUMBLE STRIPS, GUARDRAIL, 7015 7015 CABARRUS SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. MECKLENBURG STANLY UNION DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS INTERSTATE PROJECTS CABARRUS I-85 I-3802 NC 73 IN CABARRUS COUNTY (EXIT 55) TO 13.6 413548 82109 NHP C 53673 A C 53673 A C 53673 A ROWAN US 29/US 601 CONNECTOR (EXIT 68) IN CMAQ C 1900 AA ROWAN COUNTY. WIDEN TO EIGHT LANES. NHP RG 1025 B RG 1025 B RG 1025 B RG 1025 B RG 1025 B RG 1025 B RG 1025 B RG 1025 B RG 1025 B RG 1025 B RG 2050 B S(M) R 1200 B R 1200 B R 1200 B NHP U 2753 B NHP M 1471 B NHP CG 9533 B CG 9533 B CG 9533 B CG 9533 B CG 9533 B CG 9533 B CG 9533 B CG 9533 B CG 9533 B CG 9533 B CG 19066 B S(M) C 10000 B C 10000 B C 10000 B NHP C 1334 B C 1333 B C 1333 B TRN A NC 73 IN CABARRUS COUNTY (EXIT 55) TO LANE STREET (EXIT 63) IN CABARRUS COUNTY. - UNDER CONSTRUCTION TRN AA ITS FOR I-3802 A SW B LANE STREET (EXIT 63) IN CABARRUS COUNTY TO US 29/US 601 CONNECTOR (EXIT 68) IN ROWAN COUNTY - PLANNING / DESIGN IN PROGRESS - DESIGN-BUILD PROJECT PART B INCLUDES B-5365 AND I-3610 - PART B GARVEE BOND FUNDING $10 MILLION FOR RIGHT OF WAY AND $90 MILLION FOR CONSTRUCTION - PAYBACK FY 2016 - FY 2027 CABARRUS I-85 I-3803 US 29/NC 49 CONNECTOR, MECKLENBURG 12.8 299282 218410 NHP CG 11296 B CG 11296 B CG 11296 B CG 11296 B CG 11296 B CG 11296 B CG 11296 B MECKLENBURG COUNTY TO NC 73 IN CABARRUS COUNTY. NHP C 1800 BA ADD ADDITIONAL LANES. (COORDINATE WITH U-3415). A SOUTH OF US 29/NC 49 CONNECTOR TO SR 2894 (CONCORD MILLS - BRUTON SMITH BOULEVARD) - COMPLETE TRN B SOUTH OF SR 2894 (CONCORD MILLS - BRUTON SMITH BOULEVARD) TO NC 73 IN CABARRUS COUNTY - UNDER CONSTRUCTION AS DESIGN-BUILD PROJECT TRN BA ITS FOR I-3803 B SECTION B, GARVEE BOND FUNDING $103 MILLION; CONSTRUCTION - PAYBACK FY 2010 - FY 2021 RURAL PROJECTS CABARRUS NC 73 (DAVIDSON R-5706 US 29 TO POPLAR TENT ROAD. WIDEN TO 8.9 93500 T R 17300 HIGHWAY) MULTI-LANES. T U 2100 T C 24700 C 49400 REG CABARRUS GEORGE LILES R-2246 NC 49 TO SOUTH OF I-85. WIDEN TO FOUR 6.5 90568 73568 STP R 4400 A PARKWAY LANES DIVIDED, SOME NEW LOCATION. STP C 12600 A A NC 49 TO SR 1304 (ROBERTA ROAD) B SR 1304 (ROBERTA ROAD) TO SR 1431 (WEDDINGTON ROAD) - UNDER CONSTRUCTION C SR 1431 (WEDDINGTON ROAD) TO SOUTH OF I-85 - COMPLETE URBAN PROJECTS CABARRUS NC 3 U-3440 PROPOSED WEST SIDE BYPASS (U-2009) TO 2.5 32118 2498 T R 10700 SR 1691 (LOOP ROAD) IN KANNAPOLIS. T U 420 WIDEN TO A FOUR-LANE DIVIDED FACILITY. T C 18500 TRN PLANNING/DESIGN IN PROGRESS CABARRUS NC 3 (DALE EARNHARDT U-5761 INTERSECTION OF NC 3 (DALE EARNHARDT 930 T R 180 BOULEVARD) BOULEVARD) AND US 29/601 (CANNON T C 750 BOULEVARD). CONSTRUCT INTERSECTION REG IMPROVEMENTS. CABARRUS SR 1445 (DERITA U-4910 SR 2894 (CONCORD MILLS BOULEVARD) TO 2.6 24510 3210 HP C 7160 B ROAD) SR 1394 (POPLAR TENT ROAD) IN L C 1790 B CONCORD. WIDEN TO MULTI-LANES. T R 600 A T C 11750 A TRN A SR 2894 (CONCORD MILLS BOULEVARD) TO AVIATION BOULEVARD. WIDEN TO MULTI-LANES. TRN B AVIATION BOULEVARD TO SR 1394 (POPLAR TENT ROAD). WIDEN TO MULTI-LANES. - RIGHT OF WAY IN PROGRESS PLANNING/DESIGN IN PROGRESS BY CITY OF CONCORD DIV - Division Category EX - Exempt Category 10-8 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO HF - State Dollars (Non STI) REG - Regional Category SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES SW - Statewide Category TRN - Transition Project AVAILABLE
HIGHWAY PROGRAM DIVISION 10 TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS TOTAL PRIOR PROJ YEARS STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED ID COST COST COUNTY ROUTE/CITY NUMBER LOCATION / DESCRIPTION LENGTH (THOU) (THOU) FUNDS FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FUTURE YEARS URBAN PROJECTS CABARRUS SR 2894 (CONCORD U-5806 INTERSECTION OF SR 2894 (CONCORD 7500 T C 6000 MILLS BOULEVARD) MILLS BOULEVARD) AND ENTRANCE #1 - L C 1500 KINGS GRANT PAVILION. CONSTRUCT 2- DIV LANE GRADE SEPARATED DIRECTIONAL LEFT FLYOVER. $1,500,000 BY CITY OF CONCORD CABARRUS VARIOUS U-5614 STP-DA IN THE CABARRUS-ROWAN 24900 STPDA C 1020 C 2700 C 2700 C 2700 C 2700 C 2700 C 2700 C 2700 ROWAN METROPOLITAN PLANNING ORGANIZATION L C 255 C 675 C 675 C 675 C 675 C 675 C 675 C 675 (MPO) AREA. DIV CABARRUS CONCORD U-5522 CONCORD TRAFFIC MANAGEMENT SYSTEM 1100 DP C 880 L C 220 TRN FY 2012 TRANSPORTATION, COMMUNITY, AND SYSTEM PRESERVATION PROGRAM (TCSP) GRANT - $120 K USED FOR PE CABARRUS CONCORD LAKE RD U-5773 DALE EARNHARDT BOULEVARD TO US 601. 8 63300 T R 8300 BRANCHVIEW DRIVE WIDEN TO MULTI-LANES. T U 1000 T C 18000 C 36000 REG FEDERAL BRIDGE PROJECTS CABARRUS US 29/US 601 B-5136 REPLACE BRIDGE NO. 66 AND BRIDGE NO. 14150 1750 NHPB C 12400 69 OVER SOUTHERN RAILROAD. REG RIGHT OF WAY IN PROGRESS CABARRUS US 29 B-5123 REPLACE BRIDGE NO. 14 AND BRIDGE NO. 7455 100 HFB R 1000 19 OVER ROCKY RIVER AND ACCESS ROAD. HFB U 155 HFB C 6200 HF CABARRUS US 29 B-5808 REPLACE BRIDGE NO. 57 AND 59 OVER 5355 NHPB R 255 US 601 IRISH BUFFALO CREEK. NHPB C 2550 C 2550 REG CABARRUS NC 24 & B-5810 REPLACE BRIDGE NO. 22 OVER ROCKY 8470 HFB R 770 NC 27 EAST RIVER. HFB C 7700 HF CABARRUS NC 49 B-5548 REPLACE BRIDGE NO. 103 OVER DUTCH 1780 100 NHPB R 80 BUFFALO CREEK. NHPB C 1600 SW CABARRUS NC 73 B-5813 REPLACE BRIDGE NO. 132 OVER DUTCH 3080 HFB R 280 BUFFALO CREEK. HFB C 2800 HF CABARRUS SR 1002 B-3421 REPLACE BRIDGE NO. 266 OVER SOUTHERN 11009 11009 (CABARRUS AVENUE) RAILWAY. DIV UNDER CONSTRUCTION CABARRUS SR 1006 B-5790 REPLACE BRIDGE NO. 239 OVER 1650 HFB R 150 (MAIN STREET) MCALLISTER CREEK. HFB C 1500 HF CABARRUS SR 1006 B-4972 REPLACE BRIDGE NO. 227 OVER ROCKY 3310 510 STPON C 2800 (MAIN STREET) RIVER. DIV RIGHT OF WAY IN PROGRESS CABARRUS SR 1132 B-5375 REPLACE BRIDGE NO. 137 OVER DUTCH 2310 STPOFF R 210 (MIAMI CHURCH BUFFALO CREEK. STPOFF C 2100 ROAD) DIV DIV - Division Category EX - Exempt Category 10-9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO HF - State Dollars (Non STI) REG - Regional Category SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES SW - Statewide Category TRN - Transition Project AVAILABLE
HIGHWAY PROGRAM DIVISION 10 TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS TOTAL PRIOR PROJ YEARS STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED ID COST COST COUNTY ROUTE/CITY NUMBER LOCATION / DESCRIPTION LENGTH (THOU) (THOU) FUNDS FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FUTURE YEARS FEDERAL BRIDGE PROJECTS CABARRUS SR 1157 B-4973 REPLACE BRIDGE NO. 271 OVER IRISH 1847 1847 (WILSHIRE AVENUE) BUFFALO CREEK. DIV UNDER CONSTRUCTION CABARRUS SR 1706 B-5372 REPLACE BRIDGE NO. 109 OVER US 29. 4235 HFB R 385 (OAK AVENUE) HFB C 3850 HF CABARRUS SR 2000 B-5804 REPLACE BRIDGE NO. 56 OVER LAKE 2200 HFB R 200 (BRANTLEY ROAD) FISHER. HFB C 2000 HF CABARRUS SR 2114 B-5369 REPLACE BRIDGE NO. 53 OVER COLD 2130 150 HFB R 180 (CENTERGROVE WATER CREEK. HFB C 1800 ROAD) HF CABARRUS SR 2443 B-5793 REPLACE BRIDGE NO. 201 OVER LITTLE 370 STPOFF R 20 (CROWELL ROAD) BUFFALO CREEK. STPOFF C 350 DIV CABARRUS SR 2610 B-4720 REPLACE BRIDGE NO. 113 OVER DUTCH 1086 1086 (GREEN HILL DRIVE) BUFFALO CREEK. DIV UNDER CONSTRUCTION CABARRUS SR 2635 B-5794 REPLACE BRIDGE NO. 129 OVER COLD 1320 HFB R 120 (CENTER CHURCH) WATER CREEK. HFB C 1200 HF ANSON VARIOUS BD-5110 DIVISION 10 PURCHASE ORDER CONTRACT 18292 16292 STPOFF R 200 CABARRUS BRIDGE REPLACEMENT PROJECTS AT STPOFF C 1800 SELECTED LOCATIONS. MECKLENBURG STANLY UNION DIV PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC) MUNICIPAL BRIDGE PROJECTS CABARRUS CONCORD B-5000 REPLACE BRIDGE NO. 151 OVER THREE 2696 2696 (BURRAGE ROAD) MILE BRANCH. DIV UNDER CONSTRUCTION MITIGATION PROJECTS ANSON VARIOUS EE-4910 ECOSYSTEM ENHANCEMENT PROGRAM FOR 29356 29356 CABARRUS DIVISION 10 PROJECT MITIGATION. MECKLENBURG STANLY UNION IN PROGRESS HAZARD ELIMINATION PROJECTS ANSON VARIOUS W-5210 DIVISION 10 RUMBLE STRIPS, GUARDRAIL, 7015 7015 CABARRUS SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. MECKLENBURG STANLY UNION DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS DIV - Division Category EX - Exempt Category 10-10 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO HF - State Dollars (Non STI) REG - Regional Category SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES SW - Statewide Category TRN - Transition Project AVAILABLE
HIGHWAY PROGRAM DIVISION 10 TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS TOTAL PRIOR PROJ YEARS STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED ID COST COST COUNTY ROUTE/CITY NUMBER LOCATION / DESCRIPTION LENGTH (THOU) (THOU) FUNDS FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FUTURE YEARS CONGESTION MITIGATION PROJECTS CABARRUS US 601 C-5503 US 601 AND NC 24/NC 27 IN MIDLAND. 140 CMAQ PE 11 NC 24/NC 27 CONSTRUCT SIDEWALKS. L PE 3 CMAQ C 101 L C 25 EX CABARRUS VARIOUS C-5603 PROJECTS TO IMPROVE CONGESTION AND 3268 CMAQ C 1634 C 1634 ROWAN AIR QUALITY IN THE CABARRUS-ROWAN MPO. EX CABARRUS VARIOUS C-4918 INTERSECTION IMPROVEMENTS AND 2063 1236 CMAQ C 662 A ADDITIONAL TURN LANES AT SELECTED L C 165 A EX LOCATIONS IN CONCORD. EX A SR 1394 (POPLAR TENT ROAD) - INTERSECTION IMPROVEMENTS - RIGHT OF WAY IN PROGRESS EX B NC 3 - ADDITIONAL TURN LANES - UNDER CONSTRUCTION CABARRUS VARIOUS C-4916 CONSTRUCT SIDEWALKS AT SELECTED 1091 407 CMAQ R 98 C LOCATIONS IN KANNAPOLIS. L R 25 C CMAQ C 449 C L C 112 C EX EX A HUDSON STREET TO SOUTH CANNON BOULEVARD - UNDER CONSTRUCTION EX B FUNDS TRANSFERRED TO C-4918B EX C WINDSOR DRIVE TO ROGERS LAKE ROAD PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF KANNAPOLIS CABARRUS CHARLOTTE C-5536 MECKLENBURG COUNTY AIR QUALITY - 500 500 GASTON GRADE (GRANTS TO REPLACE AGING DIESEL ENGINS). REPLACE, REPOWER OR IREDELL RETROFIT AGING DIESEL VEHICLES AND LINCOLN EQUIPMENT. MECKLENBURG ROWAN UNION EX IN PROGRESS CABARRUS CONCORD C-5155 RIDER TRANSIT - OPERATIONAL ASSISTANCE FOR SUNDAY SERVICE IN EX CONCORD. FUNDS FLEXED TO PUBLIC TRANSPORTATION PROGRAM TO-5138 CABARRUS CONCORD C-5557 CITY OF CONCORD'S NE SUBSET 525 CMAQ C 420 SIDEWALKS. INSTALL SIDEWALKS AT L C 105 EX VARIOUS LOCATIONS. CABARRUS CONCORD C-4919 CONSTRUCT MCEACHERN GREENWAY 313 313 CONNECTOR TO DOWNTOWN CORBAN EX PARK IN CONCORD. UNDER CONSTRUCTION CABARRUS HARRISBURG C-5157 CONSTRUCT SIDEWALKS ON TOM QUERY 564 CMAQ PE 73 ROAD, ROBINSON CHURCH ROAD AND L PE 18 STALLINGS ROAD IN HARRISBURG. CMAQ C 378 L C 95 EX CABARRUS HARRISBURG C-4921 CONSTRUCT SIDEWALKS TO CONNECT 300 300 NEIGHBORHOODS AND TOWN CENTER IN EX HARRISBURG. UNDER CONSTRUCTION CABARRUS KANNAPOLIS C-5159 ROXIE STREET, NC 3 AND DALE EARNHARDT 675 CMAQ PE 108 BOULEVARD IN KANNAPOLIS. STREET L PE 27 IMPROVEMENTS. CMAQ C 432 L C 108 EX DIV - Division Category EX - Exempt Category 10-11 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO HF - State Dollars (Non STI) REG - Regional Category SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES SW - Statewide Category TRN - Transition Project AVAILABLE
HIGHWAY PROGRAM DIVISION 10 TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS TOTAL PRIOR PROJ YEARS STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED ID COST COST COUNTY ROUTE/CITY NUMBER LOCATION / DESCRIPTION LENGTH (THOU) (THOU) FUNDS FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FUTURE YEARS CONGESTION MITIGATION PROJECTS CABARRUS KANNAPOLIS C-5161 IRISH BUFFALO CREEK GREENWAY IN 2090 CMAQ PE 117 KANNAPOLIS. CONSTRUCT GREENWAY. L PE 29 CMAQ C 1555 L C 389 EX CABARRUS LITTLE TEXAS ROAD C-5502 LITTLE TEXAS ROAD IN KANNAPOLIS, 204 CMAQ PE 11 FOREST PARK DRIVE TO EXISTING L PE 4 SIDEWALK SOUTH OF MISSION TRIPP CMAQ R 10 STREET. CONSTRUCT 800 FEET OF L R 3 SIDEWALK. CMAQ C 132 L C 44 EX INTERSTATE PROJECTS MECKLENBURG I-77 I-5714 SR 2136 (GILEAD ROAD) INTERCHANGE. 10600 NHP R 100 UPGRADE EXISTING INTERCHANGE. NHP C 10500 SW MECKLENBURG I-77 / US 21 I-5825 SR 1577 (TYVOLA ROAD) TO I-277 IN 4.7 5800 NHPIM C 5800 CHARLOTTE. PAVEMENT REHABILITATION. SW MECKLENBURG I-77 I-5769 I-277 TO 0.7 MILE NORTH OF NC 27. 1 2250 NHPIM C 2250 PAVEMENT REHABILITATION. SW MECKLENBURG I-77 I-5768 SOUTH CAROLINA LINE TO SR 1577 (WEST 4.8 8900 NHPIM C 8900 TYVOLA ROAD). PAVEMENT SW REHABILITATION. MECKLENBURG I-77 I-5715 NC 73 INTERCHANGE. UPGRADE EXISTING 11150 NHP R 1550 INTERCHANGE TO SPLIT DIAMOND NHP C 9600 SW CONFIGURATION. IREDELL I-77 I-5405 I-277 (BROOKSHIRE FREEWAY) TO WEST 17 644656 6456 NHP R 2000 MECKLENBURG CATAWBA AVENUE (EXIT 28). CONSTRUCT CMAQ C 13000 HIGH OCCUPANCY TOLL (HOT) LANES AND NHP C 73200 CONVERT EXISTING HIGH OCCUPANCY O C 550000 VEHICLE (HOV) LANES TO HIGH TRN OCCUPANCY TOLL (HOT) LANES. INCLUDES FUNDING FOR I-3311 C AND I-4750 AA - "O" FUNDING IS PUBLIC PRIVATE PARTNERSHIP (PPP) FUNDING CONSISTING OF $216 M TIFIA BONDS, $100 M PRIVATE ACTIVITY BONDS, AND $234 M PRIVATE EQUITY IREDELL I-77 I-4750 SR 5544 (WEST CATAWBA AVENUE - EXIT 28) 23 503839 5248 NHP R 10500 AB MECKLENBURG TO I-40. WIDEN AND RECONSTRUCT NHP U 675 AB ROADWAY. NHP C 133000 AB NHP R 11700 B NHP M 16 B NHP C 105200 B NHP R 17500 C NHP C 220000 C AA SR 5544 (WEST CATAWBA AVENUE - EXIT 28) TO NC 150 (EXIT 36). CONSTRUCT HIGH OCCUPANCY/TOLL (HOT) LANES. AB SR 5544 (WEST CATAWBA AVENUE - EXIT 28) TO NC 150 (EXIT 36). CONSTRUCT ONE ADDITIONAL LANE IN EACH DIRECTION. B NC 150 (EXIT 36) TO NC 115/US 21 (EXIT 42) C NC 115/US 21 (EXIT 42) TO I-40 PLANNING/DESIGN IN PROGRESS - FUNDING FOR I-4750 AA INCLUDED IN I-5405 MECKLENBURG I-77 I-4733 I-77/SR 5544 (WEST CATAWBA AVENUE) IN 11143 11143 CORNELIUS. MODIFY INTERCHANGE. UNDER CONSTRUCTION MECKLENBURG I-77 I-4720 I-277 (EXIT 9) TO THE SOUTH CAROLINA 9.3 3699 2595 NHP CG 276 CG 276 CG 276 CG 276 STATE LINE. RESURFACE WITH NOVACHIP. TRN PROJECT COMPLETE - GARVEE BOND FUNDING $2.52 MILLION; PAYBACK FY 2007 - FY 2018 DIV - Division Category EX - Exempt Category 10-12 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO HF - State Dollars (Non STI) REG - Regional Category SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES SW - Statewide Category TRN - Transition Project AVAILABLE
HIGHWAY PROGRAM DIVISION 10 TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS TOTAL PRIOR PROJ YEARS STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED ID COST COST COUNTY ROUTE/CITY NUMBER LOCATION / DESCRIPTION LENGTH (THOU) (THOU) FUNDS FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FUTURE YEARS INTERSTATE PROJECTS MECKLENBURG I-77 I-3311 I-277 (BROOKSHIRE FREEWAY) IN 17.4 149772 102672 NHP R 100 B CHARLOTTE TO SR 5544 (WEST CATAWBA NHP C 47000 B AVENUE - EXIT 28). ADDITIONAL LANES. A I-85 TO NORTH OF I-485 (CHARLOTTE OUTER LOOP) - COMPLETE AA NC 73 (SAM FURR ROAD), WEST OF I-77 TO EAST OF I-77; SR 2136 (GILEAD ROAD), WEST OF I-77 TO EAST OF I-77 - COMPLETE B I-485 (CHARLOTTE OUTER LOOP) TO SR 5544 (WEST CATAWBA AVENUE) EXIT 28. C I-277 TO NORTH OF I-85. CONSTRUCT HIGH OCCUPANCY TOLL (HOT) LANES AND CONVERT EXISTING HIGH OCCUPANCY VEHICLE (HOV) LANES TO HOT LANES. I-277 (BROOKSHIRE FREEWAY), I-77 TO NORTH BREVARD STREET. CONSTRUCT HOT LANES. D I-485 (CHARLOTTE OUTER LOOP) TO SR 2136 (GILEAD ROAD) - COMPLETE E NORTH OF I-277/NC 16 (BROOKSHIRE FREEWAY) TO NORTH OF I-85. WORK TO BE ACCOMPLISHED IN I-3311 C. PLANNING/DESIGN IN PROGRESS - FUNDING FOR I-3311 C INCLUDED IN I-5405 MECKLENBURG I-77 I-5718 I-485 (EXIT 1) TO I-277/NC 16 (BROOKSHIRE 9.6 1219300 NHP R 48600 A R 48600 A R 48600 A FREEWAY) (EXIT 11). WIDEN EXISTING NHP U 500 A FREEWAY TO TEN LANES BY BOND R C 61800 A CONSTRUCTING MANAGED LANES. NHP C 210200 A NHP R 37900 B R 37900 B NHP U 500 B BOND R C 56800 B NHP C 86200 B NHP R 30000 C R 30000 C NHP U 500 C BOND R C 14400 C NHP C 275600 C NHP R 22200 D NHP U 100 D NHP C 107300 D NHP R 17400 E NHP U 100 E NHP C 84100 E SW A I-485 (EXIT 1) TO WOODLAWN ROAD (EXIT 6). WIDEN EXISTING FREEWAY TO TEN LANES BY CONSTRUCTING MANAGED LANES. SW B WOODLAWN ROAD (EXIT 6) TO I-277/US 74 (BELK FREEWAY (EXIT 9). WIDEN EXISTING FREEWAY TO TEN LANES BY CONSTRUCTING MANAGED LANES. SW C I-277/US 74 (BELK FREEWAY) (EXIT 9) TO I-277/NC 16 (BROOKSHIRE FREEWAY) (EXIT 11). WIDEN EXISTING FREEWAY TO TEN LANES BY CONSTRUCTING MANAGED LANES. SW D I-277/US 74/NC 27 INTERCHANGE. CONSTRUCT INTERCHANGE IMPROVEMENTS. SW E I-277/NC 16 (BROOKSHIRE FREEWAY), US 21 INTERCHANGE. CONSTRUCT INTERCHANGE IMPROVEMENTS. MECKLENBURG I-85 I-5006 GASTON COUNTY LINE TO CONCRETE 0.7 1602 1146 NHP CG 114 CG 114 CG 114 CG 114 PAVEMENT IN MECKLENBURG COUNTY TRN NEAR SR 1601. PAVEMENT REHABILITATION. PROJECT COMPLETE - GARVEE BOND FUNDING $1.04 MILLION; PAYBACK FY 2007 - FY 2018 CABARRUS I-85 I-3803 US 29/NC 49 CONNECTOR, MECKLENBURG 12.8 299282 218410 NHP CG 11296 B CG 11296 B CG 11296 B CG 11296 B CG 11296 B CG 11296 B CG 11296 B MECKLENBURG COUNTY TO NC 73 IN CABARRUS COUNTY. NHP C 1800 BA ADD ADDITIONAL LANES. (COORDINATE WITH U-3415). A SOUTH OF US 29/NC 49 CONNECTOR TO SR 2894 (CONCORD MILLS - BRUTON SMITH BOULEVARD) - COMPLETE TRN B SOUTH OF SR 2894 (CONCORD MILLS - BRUTON SMITH BOULEVARD) TO NC 73 IN CABARRUS COUNTY - UNDER CONSTRUCTION AS DESIGN-BUILD PROJECT TRN BA ITS FOR I-3803 B SECTION B, GARVEE BOND FUNDING $103 MILLION; CONSTRUCTION - PAYBACK FY 2010 - FY 2021 MECKLENBURG I-85 I-5770 0.7 MILE NORTH OF GASTON COUNTY LINE 5 6400 NHPIM C 6400 TO 0.1 MILE NORTH OF SR 5901 (BILLY SW GRAHAM PARKWAY). PAVEMENT REHABILITATION. MECKLENBURG I-85 I-5796 0.1 MILE NORTH OF SR 5901 (BILLY GRAHAM 3.2 5100 NHPIM C 5100 PKWY) TO 0.3 MILE NORTH OF NC 16. SW PAVEMENT REHABILITATION. MECKLENBURG I-85 I-5797 0.1 MILE NORTH OF SR 2540 (N. GRAHAM 2.8 350 NHPIM C 350 ST.) TO 0.3 MILE NORTH OF SR 5383 (CITY SW BLVD.). PAVEMENT REHABILITATION. MECKLENBURG I-85 I-5860 SR 2472 (W. MALLARD CREEK CHURCH RD) 2.5 5500 NHPIM C 5500 TO 0.8 MILE NORTH OF SR 2467 (MALLARD SW CREEK RD). PAVEMENT REHABILITATION. MECKLENBURG I-85 I-5826 0.3 MILE NORTH OF SR 5383 (UNIVERSITY 2.9 5000 NHPIM C 5000 CITY BOULEVARD) TO SR 2472 (MALLARD SW CREEK CHURCH ROAD) IN CHARLOTTE. PAVEMENT REHABILITATION. DIV - Division Category EX - Exempt Category 10-13 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO HF - State Dollars (Non STI) REG - Regional Category SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES SW - Statewide Category TRN - Transition Project AVAILABLE
HIGHWAY PROGRAM DIVISION 10 TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS TOTAL PRIOR PROJ YEARS STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED ID COST COST COUNTY ROUTE/CITY NUMBER LOCATION / DESCRIPTION LENGTH (THOU) (THOU) FUNDS FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FUTURE YEARS INTERSTATE PROJECTS MECKLENBURG I-85 I-5837 GASTON COUNTY LINE TO 0.7 MILES NORTH 0.7 120 NHPIM C 120 OF GASTON COUNTY LINE. PAVEMENT SW REHABILITATION. GASTON I-85 I-5869 MAIN STREET IN LOWELL (EXIT 22) TO SAM 7.1 1700 NHP C 1700 MECKLENBURG WILSON ROAD (EXIT 29). DEPLOY INTELLIGENT TRANSPORTATION SYSTEM SW (ITS) IMPROVEMENTS ALONG CORRIDOR. MECKLENBURG I-277 / US 74 I-5746 I-77 TO BREVARD ROAD. PAVEMENT 3.5 13700 NHPIM C 13700 REHABILITATION. SW MECKLENBURG I-277 I-5838 0.6 MILES NORTH OF NC 27 TO I-77. BRIDGE 1.5 1000 NHPIM C 1000 REHABILITATION. SW MECKLENBURG I-485 I-5318 MILE MARKER 51 TO MILE MARKER 59. 8 8000 NHPIM C 8000 PAVEMENT REHABILITATION. SW MECKLENBURG I-485 I-5507 I-485, I-77 SOUTH OF CHARLOTTE TO US 74 16.6 202900 T R 1600 (INDEPENDENCE BOULEVARD). ADD ONE BOND R C 17200 EXPRESS LANE IN EACH DIRECTION. T C 46025 C 46025 C 46025 C 46025 SW DESIGN-BUILD PROJECT MECKLENBURG I-485 I-5861 0.3 MILE EAST OF SR 2042 (OAKDALE RD) TO 5.4 7000 NHPIM C 7000 END OF MAINTENANCE. PAVEMENT SW REHABILITATION. MECKLENBURG I-485 I-5798 I-85 TO CAMP STEWARD ROAD. PAVEMENT 10.8 13000 NHPIM C 13000 REHABILITATION. SW MECKLENBURG I-485 I-5800 1.9 MILES WEST OF SR 3649 (ELM LANE) TO 5 500 NHPIM C 500 SR 1126 (NATIONS FORD ROAD). BRIDGE SW REHABILITATION. MECKLENBURG I-485 I-5827 IDLEWILD ROAD TO US 74. PAVEMENT 2.2 3000 NHPIM C 3000 REHABILITATION. SW MECKLENBURG I-485 I-5828 I-77 TO 1.1 MILES NORTH OF I-77 / US 21. 1.1 3000 NHPIM C 3000 PAVEMENT REHABILITATION. SW MECKLENBURG I-485 I-5748 IDELWILD ROAD TO US 74. PAVEMENT 2.2 500 NHPIM C 500 REHABILITATION. SW MECKLENBURG I-485 I-5747 I-85 TO SR 2808 (CAMP STEWART ROAD). 9.3 900 NHPIM C 900 PAVEMENT REHABILITATION. SW MECKLENBURG I-485 I-5871 IDLEWILD RD TO NC 51. PAVEMENT 5.6 600 NHPIM C 600 REHABILITATION SW RURAL PROJECTS MECKLENBURG I-485 (CHARLOTTE R-2123* US 74 EAST (INDEPENDENCE BOULEVARD) 18.8 341604 302616 CMAQ C 600 CG EASTERN OUTER TO I-85 NORTH. CONSTRUCT FREEWAY ON NHP CG 5484 CE CG 5484 CE CG 5484 CE CG 5484 CE CG 5484 CE CG 5484 CE CG 5484 CE NEW LOCATION. LOOP) TRN CE AT I-85 INTERCHANGE. RE-CONSTRUCT INTERCHANGE. - UNDER CONSTRUCTION TRN CG SEPARATE ITS CONTRACT FOR R-2123 CE PART COMPLETE - GARVEE BOND FUNDING $50 MILLION; CONSTRUCTION - PAYBACK FY 2010 - FY 2021 DIV - Division Category EX - Exempt Category 10-14 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO HF - State Dollars (Non STI) REG - Regional Category SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES SW - Statewide Category TRN - Transition Project AVAILABLE
HIGHWAY PROGRAM DIVISION 10 TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS TOTAL PRIOR PROJ YEARS STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED ID COST COST COUNTY ROUTE/CITY NUMBER LOCATION / DESCRIPTION LENGTH (THOU) (THOU) FUNDS FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FUTURE YEARS RURAL PROJECTS MECKLENBURG I-485(CHARLOTTE R-2248* WEST OF I-77 TO I-85 NORTH. FREEWAY ON 28 777968 735180 NHP CG 5484 E CG 5484 E CG 5484 E CG 5484 E CG 5484 E CG 5484 E CG 5484 E WESTERN OUTER NEW LOCATION. CMAQ C 1500 EA LOOP) T R 200 G T C 2700 G A WEST OF I-77 SOUTH TO US 29-74 - COMPLETE BA NORTH OF US 29/US 74 (WILKINSON BOULEVARD) TO NORTH OF I-85 - COMPLETE BB NORTH OF I-85 TO NORTH OF NC 27 - COMPLETE C NORTH OF NC 27 (MOUNT HOLLY ROAD) TO EAST OF SR 2042 (OAKDALE ROAD) - COMPLETE D EAST OF SR 2042 (OAKDALE ROAD) TO EAST OF NC 115 (OLD STATESVILLE ROAD) - COMPLETE TRN E EAST OF NC 115 (OLD STATESVILLE ROAD) TO I-85 NORTH - UNDER CONSTRUCTION AS DESIGN-BUILD PROJECT TRN EA ITS FOR R-2248 E EB EDINMEADOW DRIVE NEPA STUDY F I-485, WEST OF I-77 TO ARROWOOD ROAD-BROWN GRIER ROAD - COMPLETE TRN G I-485 INTERCHANGE WITH SR 2042 (OAKDALE ROAD) H I-485 INTERCHANGE WITH SR 1148 (GARRISON ROAD) - COMPLETE GARVEE BOND FUNDING $50 MILLION; CONSTRUCTION - PAYBACK FY 2010 - FY 2021 MECKLENBURG I-485 R-4902* I-77 SOUTH OF CHARLOTTE TO SR 3624 (REA 9.2 100614 99864 CMAQ C 750 A ROAD). WIDEN TO SIX-LANES. TRN A SEPARATE ITS CONTRACT FOR R-4902 UNDER CONSTRUCTION - DESIGN/BUILD PROJECT MECKLENBURG US 74 BYPASS R-3329* I-485 (CHARLOTTE OUTER LOOP) TO 10.5 970293 714817 BOND R C 204149 UNION PROJECT R-2559 (US 74 MONROE BYPASS). NHP RG 16012 RG 16012 RG 16012 MULTI-LANE FREEWAY ON NEW LOCATION. NHP CG 1097 CG 1097 CG 1097 TRN NC TURNPIKE AUTHORITY PROJECT - $135.5 M IN GARVEE BOND FUNDING FOR RIGHT OF WAY AND $10 M IN GARVEE BOND FUNDING FOR CONSTRUCTION - BOND FUNDING IN FY 18 REPRESENTS REVENUE BONDS THAT WILL RETIRE GARVEE BONDS MECKLENBURG NC 73 R-2632 US 21 TO SR 2693 (DAVIDSON-CONCORD 4.3 19670 STP R 1100 AB ROAD). WIDEN TO MULTI-LANES. STP U 130 AB STP C 18200 AB T R 50 AC T C 190 AC AA US 21 TO NC 115. - COMPLETE REG AB NC 115 TO SR 2693 (DAVIDSON-CONCORD ROAD). TRN AC NC 73 AT NC 115. CONVERT RIGHT TURN LANE ON NC 115 SOUTHBOUND TO A THROUGH LANE AND WIDEN FOR MERGING TAPER. LINCOLN NC 73 R-5721 NC 16 BUSINESS IN LINCOLN COUNTY TO SR 9.1 64430 T R 5500 A MECKLENBURG 5544 (WEST CATAWBA AVENUE) IN T U 2600 A MECKLENBURG COUNTY. WIDEN TO MULTI- T C 9050 A C 9050 A C 18100 A LANES. T R 3600 B T U 430 B T C 16100 B REG A NC 16 BUSINESS TO VANCE ROAD EXTENSION/BEATTIES FORD ROAD. REG B VANCE ROAD EXTENSION/BEATTIES FORD ROAD TO SR 5544 (WEST CATAWBA AVENUE). MECKLENBURG SR 5544 R-2555 NC 73 (SAM FURR ROAD) TO EAST OF SR 3.4 47196 18096 T R 7500 B R 7500 B WEST CATAWBA 2195 (TORRENCE CHAPEL ROAD). WIDEN TO T U 3500 B FOUR-LANES DIVIDED. T C 9400 B AVENUE L C 1200 B A SR 2151 (JETTON ROAD) TO SR 2195 (TORRENCE CHAPEL ROAD) - COMPLETE DIV B NC 73 (SAM FURR ROAD) TO SR 2151 (JETTON ROAD) URBAN PROJECTS MECKLENBURG US 21 (STATESVILLE U-5767 NORTHCROSS CENTER COURT TO SR 2147 1.2 23200 T R 800 ROAD) (WESTMORELAND ROAD). WIDEN TO MULTI- T U 1400 LANES. T C 10500 C 10500 REG MECKLENBURG US 21 U-5771 SR 2136 (GILEAD ROAD) TO HOLLY POINT 2.2 19500 T R 2700 DRIVE. WIDEN TO MULTI-LANES. T U 300 T C 16500 REG DIV - Division Category EX - Exempt Category 10-15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO HF - State Dollars (Non STI) REG - Regional Category SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES SW - Statewide Category TRN - Transition Project AVAILABLE
HIGHWAY PROGRAM DIVISION 10 TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS TOTAL PRIOR PROJ YEARS STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED ID COST COST COUNTY ROUTE/CITY NUMBER LOCATION / DESCRIPTION LENGTH (THOU) (THOU) FUNDS FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FUTURE YEARS URBAN PROJECTS MECKLENBURG US 74 U-2509 CHARLOTTE OUTER LOOP TO CONFERENCE 6.3 405726 720 NHP R 20000 A R 20000 A (INDEPENDENCE DRIVE IN CHARLOTTE. UPGRADE NHP U 2500 A U 2500 A CORRIDOR TO PROVIDE ADDITIONAL NHP M 106 A BOULEVARD) CAPACITY AND SAFETY. BOND R C 28500 A NHP C 25625 A C 25625 A C 25625 A C 25625 A NHP R 22500 B R 22500 B NHP U 2500 B U 2500 B BOND R C 21900 B NHP C 39250 B C 39250 B C 39250 B C 39250 B SW A CONFERENCE DRIVE TO SARDIS ROAD NORTH SW B SARDIS ROAD NORTH TO CHARLOTTE OUTER LOOP MECKLENBURG US 74 U-0209* BROOKSHIRE FREEWAY TO IDLEWILD ROAD 1.4 341292 271454 NHP RG 5484 B RG 5484 B RG 5484 B RG 5484 B RG 5484 B RG 5484 B RG 5484 B (INDEPENDENCE IN CHARLOTTE. ADD ADDITIONAL LANES NHP CG 205 B CG 205 B CG 205 B CG 205 B CG 205 B CG 205 B CG 205 B CG 205 B CG 205 B CG 205 B AND CONSTRUCT INTERCHANGES WITH T C 14000 B C 14000 B BOULEVARD) SHARON AMITY ROAD AND IDLEWILD ROAD CMAQ C 1400 BA AND SAFETY IMPROVEMENTS. TRN B NC 24/NC 27 (ALBEMARLE ROAD) TO IDLEWILD ROAD - UNDER CONSTRUCTION TRN BA SEPARATE ITS CONTRACT FOR U-209 B PART COMPLETE - GARVEE BOND FUNDING $50 MILLION FOR RIGHT OF WAY - PAYBACK FY 2010 - FY 2021; GARVEE BOND FUNDING $2 MILLION FOR CONSTRUCTION - PAYBACK FY 2013 - FY 2024 MECKLENBURG US 74 U-5526 I-277 TO I-485. CONVERT EXISTING AND 15650 1950 NHP R 100 A INDEPENDENCE BLVD PROPOSED BUSWAY TO MANAGED LANES BOND R C 6700 A FROM I-277 TO WALLACE LANE AND NHP C 6900 A CONSTRUCT NEW MANAGED LANES FROM WALLACE LANE TO I-485. SW A I-277 TO NC 27 (ALBEMARLE ROAD). CONVERT BUS LANES TO REVERSIBLE MANAGED LANES. PLANNING/DESIGN IN PROGRESS MECKLENBURG NC 16 FS-1510A EAST OF IDAHO DRIVE TO I-85. UPGRADE 0.8 (BROOKSHIRE TO FREEWAY. BOULEVARD) SCHEDULED FOR FEASIBILITY STUDY MECKLENBURG NC 49 U-5768 JOHN KIRK DRIVE TO I-485. WIDEN EXISTING 3.1 25400 T R 100 ROADWAY. T U 1300 T C 12000 C 12000 REG MECKLENBURG NC 51 (MATTHEWS U-5763 SR 3356 (SARDIS ROAD) TO SR 1010 (EAST 0.7 3900 T R 1600 TOWNSHIP PARKWAY) JOHN STREET/ MONROE ROAD). WIDEN T U 200 EXISTING ROADWAY. T C 2100 REG MECKLENBURG NC 51 U-5007 MATTHEWS TOWNSHIP PARKWAY TO SR 3.9 35100 T R 100 3128 (LAWYERS ROAD). WIDEN TO MULTI- T U 4500 LANES. T C 15250 C 15250 REG MECKLENBURG NC 73 (SAM FURR ROAD) U-5765 SR 5544 (WEST CATAWBA AVENUE) TO SR 1.1 28100 T R 100 2316 (NORTHCROSS AVENUE). WIDEN T U 1200 EXISTING ROADWAY. T C 26800 REG MECKLENBURG NC 115 (OLD STATESVILLE U-5772 NC 24 (HARRIS BOULEVARD) TO I-485. 2.2 24900 T R 5900 ROAD) WIDEN TO MULTI-LANES. T U 700 T C 18300 REG MECKLENBURG NC 160 (WEST U-5712 SR 5901 (BILLY GRAHAM PARKWAY) 8350 T R 1600 BOULEVARD) INTERSECTION. UPGRADE INTERSECTION T C 6750 TO INTERCHANGE. SW MECKLENBURG NC 160 (STEELE U-5762 INTERSECTION OF NC 160 (STEELE CREEK 1615 T R 315 CREEK ROAD) ROAD) AND SR 1106 (HAMILTON ROAD). T C 1300 INTERSECTION IMPROVEMENTS. REG DIV - Division Category EX - Exempt Category 10-16 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO HF - State Dollars (Non STI) REG - Regional Category SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES SW - Statewide Category TRN - Transition Project AVAILABLE
HIGHWAY PROGRAM DIVISION 10 TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS TOTAL PRIOR PROJ YEARS STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED ID COST COST COUNTY ROUTE/CITY NUMBER LOCATION / DESCRIPTION LENGTH (THOU) (THOU) FUNDS FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FUTURE YEARS URBAN PROJECTS MECKLENBURG NC 160 U-5766 NC 49 (SOUTH TRYON ROAD) TO SR 1116 4.2 39000 T R 3100 (SHOPTON ROAD). WIDEN TO MULTI-LANES. T U 4600 T C 15650 C 15650 REG MECKLENBURG SR 1009 (MONROE U-5805 INTERSECTION OF SR 1009 (MONROE ROAD) 1395 T R 270 ROAD) AND RAMA ROAD/IDLEWILD ROAD. T C 1125 CONSTRUCT INTERSECTION DIV IMPROVEMENTS. MECKLENBURG SR 1009 (JOHN U-4714 SR 3448-SR 3474 (TRADE STREET) TO SR 6.5 88030 1000 STP R 4850 A R 4850 A UNION STREET-OLD 1377 (WESLEY CHAPEL-STOUTS ROAD). STP C 7700 A WIDEN TO MULTI-LANES. STPDA R 8520 B R 8520 B MONROE ROAD) S(M) R 2130 B R 2130 B STPDA M 24 B S(M) M 6 B STPDA C 6760 B C 6760 B S(M) C 1690 B C 1690 B STP R 17500 C STP C 13900 C DIV A SR 3448-SR 3474 (TRADE STREET) TO I-485 DIV B I-485 TO SR 1008 (INDIAN TRAIL ROAD) C SR 1008 (INDIAN TRAIL ROAD) TO SR 1377 (WESLEY CHAPEL-STOUTS ROAD) MECKLENBURG SR 2136 U-5807 US 21 (STATESVILLE ROAD) TO NC 115. 0.7 6150 T R 700 (GILEAD ROAD) WIDEN TO MULTI-LANES. T U 750 T C 4700 DIV MECKLENBURG SR 2467 (MALLARD U-2507 SR 2480 (SUGAR CREEK ROAD) TO SR 2472 4.1 52999 52999 CREEK ROAD) (MALLARD CREEK CHURCH ROAD) IN CHARLOTTE. WIDEN TO MULTI-LANES, PART ON NEW LOCATION. TRN A SR 2480 (SUGAR CREEK ROAD) TO SR 2665 (HARRIS BOULEVARD) - UNDER CONSTRUCTION TRN AA SR 2467 (MALLARD CREEK ROAD) TO IBM DRIVE. CONSTRUCT NEW CONNECTOR ROAD AND MULTI-USE PATH. - IMPROVEMENTS CONSTRUCTED UNDER U-2507A B SR 2665 (W.T. HARRIS BOULEVARD) TO SR 2472 (MALLARD CREEK CHURCH ROAD) - COMPLETE PLANNING/DESIGN IN PROGRESS MECKLENBURG SR 2940 U-5803 INTERSECTION OF SR 2940 (EASTWAY 2800 T R 550 (EASTWAY DRIVE) DRIVE) AND SHAMROCK DRIVE. REALIGN T C 2250 SR 2940 AND RECONFIGURE 5-LEG SKEWED DIV INTERSECTION TO THREE 2-LEG INTERSECTIONS. MECKLENBURG SR 2975 (SUGAR U-5008 CONSTRUCT GRADE SEPARATION OVER 45696 2696 FED C 24000 CREEK ROAD) NORTH CAROLINA RAILROAD/NORFOLK L C 5000 SOUTHERN RAILWAY CROSSING 715 352H O C 13000 AND THE CLOSURE OF CRAIGHEAD ROAD T C 1000 CROSSING 715 355D. TRN RIGHT OF WAY IN PROGRESS - "OTHER" FUNDS ARE $10 M FROM NCRR AND $3 M FROM NORFOLK SOUTHER RAILROAD MECKLENBURG SR 3448 (SOUTH U-5804 FULLWOOD LANE TO WEDDINGTON ROAD. 0.6 1300 T R 100 B TRADE STREET) WIDEN TO MULTI-LANES. T C 1200 B A FULLWOOD LANE TO FOUR MILE CREEK - UNDER CONSTRUCTION BY TOWN OF MATTHEWS USING TOWN FUNDS. DIV B FOUR MILE CREEK TO WEDDINGTON ROAD. MECKLENBURG SR 5901 (BILLY U-5714 MORRIS FIELD DRIVE INTERSECTION. 11300 T R 2200 GRAHAM PARKWAY) CONSTRUCT GRADE SEPARATION. T C 9100 SW MECKLENBURG NEW ROUTE U-4713 SR 3457 (CAMPUS RIDGE ROAD) TO SR 3448 1.1 9616 816 STPDA C 1600 B (PLEASANT PLAINS ROAD) IN MATTHEWS. L C 400 B TWO LANES ON MULTI-LANE RIGHT OF WAY STP R 3900 A ON NEW LOCATION. STP C 2900 A A SR 3448 (PLEASANT PLAINS ROAD) TO SR 1009 (JOHN STREET) TRN B SR 1009 (JOHN STREET) TO SR 3457 (CAMPUS RIDGE ROAD) - RIGHT OF WAY IN PROGRESS PLANNING AND DESIGN OF SEGMENT "B" BY TOWN OF MATTHEWS DIV - Division Category EX - Exempt Category 10-17 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO HF - State Dollars (Non STI) REG - Regional Category SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES SW - Statewide Category TRN - Transition Project AVAILABLE
HIGHWAY PROGRAM DIVISION 10 TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS TOTAL PRIOR PROJ YEARS STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED ID COST COST COUNTY ROUTE/CITY NUMBER LOCATION / DESCRIPTION LENGTH (THOU) (THOU) FUNDS FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FUTURE YEARS URBAN PROJECTS MECKLENBURG VARIOUS U-4950 MECKLENBURG-UNION METROPOLITAN 11000 STPDA PE 800 PE 800 PE 800 PE 800 PE 800 PE 800 PE 800 PE 800 PE 800 PE 800 PE 800 UNION PLANNING ORGANIZATION (MUMPO) L PE 200 PE 200 PE 200 PE 200 PE 200 PE 200 PE 200 PE 200 PE 200 PE 200 PE 200 PLANNING (PL) SUPPLEMENT. DIV FORMERLY U-9999C - IN PROGRESS IREDELL VARIOUS U-4744 STP-DA IN MECKLENBURG-UNION 182675 STPDA C 11300 C 13605 C 9235 C 14000 C 14000 C 28000 C 14000 C 14000 C 14000 C 14000 MECKLENBURG METROPOLITAN PLANNING ORGANIZATION L C 2825 C 3401 C 2309 C 3500 C 3500 C 7000 C 3500 C 3500 C 3500 C 3500 (MUMPO). UNION DIV MECKLENBURG CHARLOTTE U-5133 UPGRADE-EXPAND TRAFFIC SIGNAL AND 3914 3914 MANAGEMENT SYSTEM IN CHARLOTTE. A VARIOUS - UNDER CONSTRUCTION B NC 51 - UNDER CONSTRUCTION C TRADE STREET - UNDER CONSTRUCTION D UNIVERSITY AREA (NORTH TRYON STREET, W.T. HARRIS AND NC 49) - UNDER CONSTRUCTION MECKLENBURG CHARLOTTE U-5507 CONSTRUCT NORTHWEST ARC OF THE I- 10150 3050 STPDA C 1100 A 485/PROSPERITY CHURCH ROAD L C 1420 A INTERCHANGE IN CHARLOTTE. STPDA C 2000 B L C 2580 B TRN A I-485 TO RIDGE ROAD. - RIGHT OF WAY IN PROGRESS TRN B RIDGE ROAD TO PROSPERITY CHURCH ROAD. - RIGHT OF WAY IN PROGRESS PROJECT TO BE ADMINISTERED BY THE CITY OF CHARLOTTE MECKLENBURG CHARLOTTE U-5107 CONSTRUCT TRANSPORTATION 780 HP C 624 IMPROVEMENTS AT THE MARION DIEHL O C 156 TRN CENTER (QUEENS UNIVERSITY) IN CHARLOTTE. CONSTRUCTION BY OTHERS MECKLENBURG CHARLOTTE U-4911 BELMONT NEIGHBORHOOD 1230 1230 INFRASTRUCTURE AND STREETSCAPE IMPROVEMENTS IN CHARLOTTE. UNDER CONSTRUCTION - BY CITY OF CHARLOTTE MECKLENBURG HUNTERSVILLE U-5114 INTERSECTION OF US 21 AND GILEAD ROAD 4600 L R 100 IN HUNTERSVILLE. CONSTRUCT STPDA C 3600 INTERSECTION IMPROVEMENTS, INCLUDING L C 900 TRN BICYCLE AND PEDESTRIAN ACCOMMODATIONS. PROJECT TO BE ADMINISTERED BY THE TOWN OF HUNTERSVILLE MECKLENBURG MATTHEWS U-5511 INTERSECTION OF NC 51 AND MATTHEWS- 758 100 DP C 526 MINT HILL ROAD. CONSTRUCT A L C 132 TRN SUPERSTREET. FY 2011 TRANSPORTATION AND COMMUNITY AND SYSTEM PRESERVATION (TCSP) PROJECT MECKLENBURG MATTHEWS U-5115 INTERSECTION OF NC 51 AND IDLEWILD 1625 STPDA R 100 MINT HILL ROAD. CONSTRUCT INTERSECTION L R 25 IMPROVEMENTS. STPDA C 1200 L C 300 TRN PROJECT TO BE ADMINISTERED BY THE TOWNS OF MATTHEWS AND MINT HILL MECKLENBURG NORTH COMMUNITY U-5519 NORTH COMMUNITY HOUSE ROAD 1.2 8600 O R 100 HOUSE ROAD EXTENSION AND BRIDGE ACROSS I-485. O C 8500 EX MECKLENBURG NORTHCROSS DRIVE U-5108 END OF NORTHCROSS DRIVE TO 8232 STPDA R 955 EXTENSION WESTMORELAND ROAD IN CORNELIUS. L R 421 CONSTRUCT ROAD ON NEW LOCATION. STPDA C 4765 L C 2091 TRN PROJECT TO BE ADMINISTERED BY THE TOWN OF CORNELIUS DIV - Division Category EX - Exempt Category 10-18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO HF - State Dollars (Non STI) REG - Regional Category SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES SW - Statewide Category TRN - Transition Project AVAILABLE
HIGHWAY PROGRAM DIVISION 10 TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS TOTAL PRIOR PROJ YEARS STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED ID COST COST COUNTY ROUTE/CITY NUMBER LOCATION / DESCRIPTION LENGTH (THOU) (THOU) FUNDS FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FUTURE YEARS FEASIBILITY STUDIES MECKLENBURG I-77 FS-0810A I-77, SOUTH CAROLINA LINE TO 5TH STREET 11 IN CHARLOTTE. ADD ADDITIONAL LANES. FEASIBILITY STUDY IN PROGRESS MECKLENBURG I-77 FS-1210A CONSTRUCT IMPROVEMENTS TO THE I-77/I- I-85 85 INTERCHANGE. SCHEDULED FOR FEASIBILITY STUDY FEDERAL BRIDGE PROJECTS MECKLENBURG US 29 (SOUTH AND B-4779 REPLACE BRIDGE NO. 147 (SBL) AND 6688 6688 NORTHBOUND LANES) BRIDGE NO. 140 (NBL) OVER MALLARD CREEK. REG UNDER CONSTRUCTION MECKLENBURG NC 16 B-5792 REPLACE BRIDGE NO. 342 OVER ANDRILL 6860 150 HFB R 610 SOUTHBOUND TERRACE STREET AND IRWIN CREEK. HFB C 6100 HF MECKLENBURG SR 1138 WEST B-5803 REPLACE BRIDGE NO. 01 OVER SUGAR 2970 HFB R 270 (ARROWOOD ROAD) CREEK. HFB C 2700 HF MECKLENBURG SR 1155 B-5789 REPLACE BRIDGE NO. 165 OVER COFFEY 1320 HFB R 120 (DIXIE RIVER ROAD) CREEK. HFB C 1200 HF MECKLENBURG SR 2442 B-5814 REPLACE BRIDGE NO. 90 OVER SOUTH 1155 STPOFF R 55 (ASBURY CHURCH PRONG OF CLARKS CREEK. STPOFF C 1100 ROAD) DIV MECKLENBURG SR 2826 BK-5114 REPLACE BRIDGE NO. 59 OVER REEDY 670 670 CREEK. DIV UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC) MECKLENBURG SR 3168 B-4201 REPLACE BRIDGE NO. 38 OVER GREASY 1949 1949 (NEWELL ROAD) CREEK. DIV UNDER CONSTRUCTION MECKLENBURG SR 4982 B-5105 REPLACE BRIDGE NO. 49 OVER LITTLE 3427 727 NHPB C 2700 (SOUTH POLK SUGAR CREEK. STREET) DIV RIGHT OF WAY IN PROGRESS ANSON VARIOUS BD-5110 DIVISION 10 PURCHASE ORDER CONTRACT 18292 16292 STPOFF R 200 CABARRUS BRIDGE REPLACEMENT PROJECTS AT STPOFF C 1800 SELECTED LOCATIONS. MECKLENBURG STANLY UNION DIV PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC) MUNICIPAL BRIDGE PROJECTS MECKLENBURG BARRINGER DRIVE B-5242 REPLACE BRIDGE NO. 376 OVER IRWIN 2175 160 STPOFF R 12 CREEK IN CHARLOTTE. L R 3 STPOFF C 1600 L C 400 DIV PROJECT ADMINISTERED BY CITY OF CHARLOTTE - MUNICIPAL BRIDGE DIV - Division Category EX - Exempt Category 10-19 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO HF - State Dollars (Non STI) REG - Regional Category SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES SW - Statewide Category TRN - Transition Project AVAILABLE
HIGHWAY PROGRAM DIVISION 10 TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS TOTAL PRIOR PROJ YEARS STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED ID COST COST COUNTY ROUTE/CITY NUMBER LOCATION / DESCRIPTION LENGTH (THOU) (THOU) FUNDS FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FUTURE YEARS MUNICIPAL BRIDGE PROJECTS MECKLENBURG MICHAEL BAKER B-5378 REPLACE BRIDGE NO. 210 OVER BRIAR 2160 160 STPOFF R 80 ROAD CREEK IN CHARLOTTE. L R 20 STPOFF U 160 L U 40 STPOFF C 1360 L C 340 DIV PROJECT ADMINISTERED BY CITY OF CHARLOTTE - MUNICIPAL BRIDGE MECKLENBURG MORRIS FIELD DRIVE B-5931 REPLACE BRIDGE NO. 443 OVER SOUTHERN 1090 STPOFF R 32 RAILROAD. L R 8 STPOFF C 840 L C 210 DIV PLANNING/DESIGN BY CITY OF CHARLOTTE MECKLENBURG SARDIS LANE B-5930 REPLACE BRIDGE NO. 433 OVER MCALPINE 680 STPOFF R 32 CREEK. L R 8 STPOFF C 512 L C 128 DIV PLANNING/DESIGN BY CITY OF CHARLOTTE MITIGATION PROJECTS ANSON VARIOUS EE-4910 ECOSYSTEM ENHANCEMENT PROGRAM FOR 29356 29356 CABARRUS DIVISION 10 PROJECT MITIGATION. MECKLENBURG STANLY UNION IN PROGRESS HAZARD ELIMINATION PROJECTS ANSON VARIOUS W-5210 DIVISION 10 RUMBLE STRIPS, GUARDRAIL, 7015 7015 CABARRUS SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. MECKLENBURG STANLY UNION DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS CONGESTION MITIGATION PROJECTS MECKLENBURG VARIOUS C-5613 PROJECTS TO IMPROVE CONGESTION AND 14256 CMAQ C 7128 C 7128 UNION AIR QUALITY IN THE MECKLENBURG-UNION MPO. EX MECKLENBURG CHARLOTTE C-5108 US 521-BALLANTYNE COMMONS PARKWAY 582 582 IN CHARLOTTE. INTERSECTION EX IMPROVEMENTS. UNDER CONSTRUCTION MECKLENBURG CHARLOTTE C-5533 SR 5469 (SHOPTON ROAD) AND SR 1156 1589 129 CMAQ R 65 (BEAM ROAD) IN CHARLOTTE. CONSTRUCT L R 125 ROUNDABOUT. CMAQ C 995 L C 275 EX MECKLENBURG CHARLOTTE C-4951 INTEGRATE CAT'S AUTOMATIC VEHICLE LOCATION (AVL) SYSTEM AND CITY OF EX CHARLOTT'S DOT SIGNAL SYSTEM. FUNDS FLEXED TO FTA MECKLENBURG CHARLOTTE C-4963 INSTALL PARTICULATE FILTERS ON 90 BUSES. EX FUNDS FLEXED TO FTA DIV - Division Category EX - Exempt Category 10-20 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO HF - State Dollars (Non STI) REG - Regional Category SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES SW - Statewide Category TRN - Transition Project AVAILABLE
HIGHWAY PROGRAM DIVISION 10 TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS TOTAL PRIOR PROJ YEARS STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED ID COST COST COUNTY ROUTE/CITY NUMBER LOCATION / DESCRIPTION LENGTH (THOU) (THOU) FUNDS FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FUTURE YEARS CONGESTION MITIGATION PROJECTS MECKLENBURG CHARLOTTE C-5111 INSTALL TWO STATE MAINTAINED E-85 250 250 ORANGE HILLSBOROUGH FUELING SITES IN CHARLOTTE AND HILLSBOROUGH. EX IN PROGRESS MECKLENBURG CHARLOTTE C-5225 TOBY CREEK GREENWAY (PHASE II). 1.3 2467 174 CMAQ C 1274 CONNECT UNCC TO NEARBY RETAIL AND L C 319 RESIDENTIAL DEVELOPMENT. STPEB C 700 EX MECKLENBURG CHARLOTTE C-5227 UNIVERSITY CITY BOULEVARD IN 400 400 CHARLOTTE. CONSTRUCT A 10 FOOT WIDE EX MULTI-USE PATH ON THE NORTH SIDE OF UNIVERSITY CITY BOULEVARD BETWEEN MALLARD CREEK CHURCH ROAD AND BROADRICK BOULEVARD. UNDER CONSTRUCTION MECKLENBURG CHARLOTTE C-5228 DAVID COX ROAD-NC 115 IN CHARLOTTE. 1940 176 CMAQ R 120 INTERSECTION IMPROVEMENTS. ADD LEFT L R 30 TURN LANES ON ALL FOUR APPROACHES. CMAQ C 1291 L C 323 EX MECKLENBURG CHARLOTTE C-5534 SR 4979 (BALLANTYNE COMMONS 1494 CMAQ C 371 C 371 C 371 PARKWAY-MCKEE ROAD) AND NC 16 L C 127 C 127 C 127 EX (PROVIDENCE ROAD) IN CHARLOTTE. CONSTRUCT AN ADDITIONAL LEFT TURN LANE ON SR 4979 AND A SECOND LEFT TURN LANE ON SOUTHBOUND NC 16. CABARRUS CHARLOTTE C-5536 MECKLENBURG COUNTY AIR QUALITY - 500 500 GASTON GRADE (GRANTS TO REPLACE AGING DIESEL ENGINS). REPLACE, REPOWER OR IREDELL RETROFIT AGING DIESEL VEHICLES AND LINCOLN EQUIPMENT. MECKLENBURG ROWAN UNION EX IN PROGRESS MECKLENBURG CHARLOTTE C-5537 BARTON CREEK GREENWAY IN 1064 154 CMAQ C 728 CHARLOTTE. CONSTRUCT A CONNECTOR L C 182 EX BETWEEN CLARK'S CREEK AND MALLARD CREEK GREENWAYS. MECKLENBURG CHARLOTTE C-5538 INTERSECTION OF TUCKASEEGEE- 2800 L PE 240 BERRYHILL-THRIFT ROADS IN CHARLOTTE. L R 150 CONSTRUCT A TRAFFIC CIRCLE. CMAQ C 1847 L C 563 EX MECKLENBURG CHARLOTTE C-5540 NAVIN ROAD, ALPINE DRIVE TO GIBBON 1108 356 CMAQ C 564 ROAD. CONSTRUCT SIDEWALK ON NORTH L C 188 EX SIDE. GIBBON ROAD, NEVIN ROAD TO SUGAR CREEK ROAD. CONSTRUCT SIDEWALK ON SOUTH SIDE.WEST SUGAR ROAD, BISANER STREET AND MALLARD CREEK ROAD. FILL GAPS IN SIDEWALK NETWORK ON EAST SIDE. RIGHT OF WAY IN PROGRESS DIV - Division Category EX - Exempt Category 10-21 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO HF - State Dollars (Non STI) REG - Regional Category SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES SW - Statewide Category TRN - Transition Project AVAILABLE
HIGHWAY PROGRAM DIVISION 10 TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS TOTAL PRIOR PROJ YEARS STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED ID COST COST COUNTY ROUTE/CITY NUMBER LOCATION / DESCRIPTION LENGTH (THOU) (THOU) FUNDS FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FUTURE YEARS CONGESTION MITIGATION PROJECTS MECKLENBURG CORNELIUS C-5621 US 21 AND CATAWBA AVENUE. RELOCATE 2508 CMAQ PE 200 INTERSECTION OF US 21 AND CATAWBA L PE 50 AVENUE TO THE EAST AND CONSTRUCT CMAQ R 1000 ROUNDABOUT. L R 250 CMAQ C 806 L C 202 EX MECKLENBURG CORNELIUS C-4956 INTERSECTION IMPROVEMENTS AT 564 564 SELECTED LOCATIONS IN CORNELIUS. EX EX A WEST CATAWBA AND WESTMORELAND AVENUES - UNDER CONSTRUCTION EX B NC 115 AND WASHAM POTTS ROAD - COMPLETE MECKLENBURG COUNTY C-5550 MECKLENBURG COUNTY AIR QUALITY - 596 596 GRADE (GRANTS TO REPLACE AGING EX DIESEL ENGINS). REPLACE, REPOWER OR RETROFIT AGING DIESEL VEHICLES AND EQUIPMENT. IN PROGRESS MECKLENBURG COUNTYWIDE C-5110 MECKLENBURG EPA, CLEAN AIR WORKS. 200 200 EX IN PROGRESS MECKLENBURG COUNTYWIDE C-5226 MECKLENBURG COUNTY AIR QUALITY. 300 300 GRANTS TO REDUCE AGING DIESEL EX ENGINES (GRADE). UNDER CONSTRUCTION MECKLENBURG COUNTYWIDE C-4964 GAS CAP REPLACEMENT PROGRAM TO 90 90 PRODUCE QUANTIFIABLE REDUCTIONS IN EX VOLATILE ORGANIC COMPOUNDS. MCAQ WILL RECRUIT INSPECTION STATIONS TO INCLUDE A GAS CAP TEST AS PART OF THE REGULAR STATE EMISSIONS TEST. IN PROGRESS BY MECKLENBURG EPA MECKLENBURG GRAHAM STREET C-5501 GRAHAM STREET IN CHARLOTTE. 188 188 CONSTRUCT SIDEWALK ON THE EX INTERCHANGE AND BRIDGE OVER I-85. UNDER CONSTRUCTION MECKLENBURG PROVIDENCE ROAD C-5541 PROVIDENCE ROAD IN CHARLOTTE. 938 CMAQ R 400 CONSTRUCT A SIDEWALK ON SOUTHWEST L R 100 SIDE. CMAQ C 350 L C 88 EX MECKLENBURG SOUTH TRYON C-5542 SOUTH TRYON STREET, QUEEN ANNE DRIVE 1743 5 CMAQ R 124 STREET TO NATIONS FORD ROAD IN CHARLOTTE. L R 124 CONSTRUCT SIDEWALK ON SOUTHEAST CMAQ C 745 SIDE. L C 745 EX MECKLENBURG SUNSET ROAD C-5543 SUNSET ROAD, I-77 TO STATESVILLE ROAD 1848 CMAQ PE 234 IN CHARLOTTE. CONSTRUCT SIDEWALKS L PE 78 ON SOUTH SIDE AND INSTALL SIDEWALK ON CMAQ R 79 THE I-77 OVERPASS. L R 26 CMAQ C 1073 L C 358 EX ENHANCEMENT (CALL PROJECTS) MECKLENBURG CORNELIUS E-4953 CONSTRUCT MULTI-USE FACILITY 172 172 ADJACENT TO MCDOWELL CREEK, LINKING BIRKDALE NEIGHBORHOOD IN HUNTERSVILLE TO WESTMORELAND ROAD IN CORNELIUS. UNDER CONSTRUCTION DIV - Division Category EX - Exempt Category 10-22 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO HF - State Dollars (Non STI) REG - Regional Category SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES SW - Statewide Category TRN - Transition Project AVAILABLE
HIGHWAY PROGRAM DIVISION 10 TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS TOTAL PRIOR PROJ YEARS STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED ID COST COST COUNTY ROUTE/CITY NUMBER LOCATION / DESCRIPTION LENGTH (THOU) (THOU) FUNDS FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FUTURE YEARS ENHANCEMENT (CALL PROJECTS) MECKLENBURG HUNTERSVILLE E-4954 CONSTRUCT A MULTI-USE FACILITY, 400 400 TORRANCE CREEK GREENWAY IN THE CEDARFIELD NEIGHBORHOOD TO ROSEDALE PARK IN HUNTERSVILLE. UNDER CONSTRUCTION RURAL PROJECTS STANLY NC 24/NC 27 R-2530* SR 1963 (ST. MARTIN ROAD) IN ALBEMARLE 8.9 71677 26577 T R 14000 B TO NC 73. WIDEN TO MULTI- LANES. T U 1900 B (COORDINATE WITH B-4974). T C 14600 B C 14600 B A SR 1963 (ST. MARTIN ROAD) TO BIRD ROAD IN ALBEMARLE - COMPLETE REG B BIRD ROAD IN ALBEMARLE TO WEST OF THE PEE DEE RIVER PLANNING/DESIGN IN PROGRESS FEDERAL BRIDGE PROJECTS STANLY NC 24/NC 27/NC 73 B-4974 REPLACE BRIDGE NO. 51 OVER PEE DEE 30025 HFB R 2025 RIVER, (COORDINATE WITH R-2530). HFB C 28000 HF STANLY NC 49 B-4643 REPLACE BRIDGE NO. 24 OVER CURL TAIL 3615 3615 CREEK. SW UNDER CONSTRUCTION STANLY SR 1109 B-4818 REPLACE BRIDGE NO. 138 OVER ISLAND 935 935 (PHILADELPHIA CHURCH CREEK. ROAD) DIV UNDER CONSTRUCTION STANLY SR 1134 B-5537 REPLACE BRIDGE NO. 35 OVER LONG 2035 HFB R 185 (RUNNING CREEK CREEK. HFB C 1850 CHURCH ROAD) HF STANLY SR 1253 B-5800 REPLACE BRIDGE NO. 160 OVER RAMSEY 210 STPOFF R 10 (SAM ROAD) BRANCH. STPOFF C 200 DIV STANLY SR 1434 B-5811 REPLACE BRIDGE NO. 42 OVER BIG BEAR 395 HFB R 35 (ROGERS ROAD) CREEK. HFB C 360 HF STANLY SR 1435 B-5373 REPLACE BRIDGE NO. 44 OVER LONG 760 100 HFB R 60 (KENDALLS CHURCH) CREEK. HFB C 600 HF STANLY SR 1507 B-5820 REPLACE BRIDGE NO. 221 OVER CURL TAIL 275 HFB R 25 (GOLD BRANCH CREEK. HFB C 250 ROAD) HF STANLY SR 1542 B-5137 REPLACE BRIDGE NO. 215 OVER LITTLE 1066 1066 (RIDGE ROAD) MOUNTAIN CREEK. DIV UNDER CONSTRUCTION STANLY SR 1968 B-5807 REPLACE BRIDGE NO. 115 OVER STONY RUN 1210 HFB R 110 (SAINT MARTIN ROAD) CREEK. HFB C 1100 HF STANLY SR 1970 B-5812 REPLACE BRIDGE NO. 105 OVER STONY RUN 1210 HFB R 110 (HILL-FORD ROAD) CREEK. HFB C 1100 HF DIV - Division Category EX - Exempt Category 10-23 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO HF - State Dollars (Non STI) REG - Regional Category SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES SW - Statewide Category TRN - Transition Project AVAILABLE
HIGHWAY PROGRAM DIVISION 10 TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS TOTAL PRIOR PROJ YEARS STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED ID COST COST COUNTY ROUTE/CITY NUMBER LOCATION / DESCRIPTION LENGTH (THOU) (THOU) FUNDS FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FUTURE YEARS FEDERAL BRIDGE PROJECTS ANSON VARIOUS BD-5110 DIVISION 10 PURCHASE ORDER CONTRACT 18292 16292 STPOFF R 200 CABARRUS BRIDGE REPLACEMENT PROJECTS AT STPOFF C 1800 SELECTED LOCATIONS. MECKLENBURG STANLY UNION DIV PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC) MITIGATION PROJECTS ANSON VARIOUS EE-4910 ECOSYSTEM ENHANCEMENT PROGRAM FOR 29356 29356 CABARRUS DIVISION 10 PROJECT MITIGATION. MECKLENBURG STANLY UNION IN PROGRESS HAZARD ELIMINATION PROJECTS ANSON VARIOUS W-5210 DIVISION 10 RUMBLE STRIPS, GUARDRAIL, 7015 7015 CABARRUS SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. MECKLENBURG STANLY UNION DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS RURAL PROJECTS MECKLENBURG US 74 BYPASS R-3329* I-485 (CHARLOTTE OUTER LOOP) TO 10.5 970293 714817 BOND R C 204149 UNION PROJECT R-2559 (US 74 MONROE BYPASS). NHP RG 16012 RG 16012 RG 16012 MULTI-LANE FREEWAY ON NEW LOCATION. NHP CG 1097 CG 1097 CG 1097 TRN NC TURNPIKE AUTHORITY PROJECT - $135.5 M IN GARVEE BOND FUNDING FOR RIGHT OF WAY AND $10 M IN GARVEE BOND FUNDING FOR CONSTRUCTION - BOND FUNDING IN FY 18 REPRESENTS REVENUE BONDS THAT WILL RETIRE GARVEE BONDS UNION US 74 R-2559* FOUR LANES DIVIDED ON NEW LOCATION. 9.2 29663 29663 MONROE BYPASS NORTH CAROLINA TURNPIKE AUTHORITY PROJECT - SEE R-3329 FOR ADDITIONAL FUNDING URBAN PROJECTS UNION US 74 U-5764 HANOVER DRIVE TO SR 1007 (ROCKY RIVER 2.8 21600 T R 100 ROAD). WIDEN EXISTING ROADWAY. T C 21500 REG UNION US 74 (ROOSEVELT U-5703 SR 1514 (ROCKY RIVER ROAD) 2150 NHP R 400 BLVD) INTERSECTION. RECONFIGURE TO NHP C 1750 SUPERSTREET. SW PLANNING/DESIGN BY DIVISION UNION NC 16 (PROVIDENCE U-5769 SR 1316 (REA ROAD EXTENSION) TO SR 1321 4.1 38400 T R 8200 ROAD SOUTH) (CUTHBERTSON ROAD). WIDEN TO MULTI- T U 1000 LANES. T C 14600 C 14600 REG DIV - Division Category EX - Exempt Category 10-24 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO HF - State Dollars (Non STI) REG - Regional Category SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES SW - Statewide Category TRN - Transition Project AVAILABLE
HIGHWAY PROGRAM DIVISION 10 TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS TOTAL PRIOR PROJ YEARS STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM UNFUNDED ID COST COST COUNTY ROUTE/CITY NUMBER LOCATION / DESCRIPTION LENGTH (THOU) (THOU) FUNDS FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FUTURE YEARS URBAN PROJECTS MECKLENBURG SR 1009 (JOHN U-4714 SR 3448-SR 3474 (TRADE STREET) TO SR 6.5 88030 1000 STP R 4850 A R 4850 A UNION STREET-OLD 1377 (WESLEY CHAPEL-STOUTS ROAD). STP C 7700 A WIDEN TO MULTI-LANES. STPDA R 8520 B R 8520 B MONROE ROAD) S(M) R 2130 B R 2130 B STPDA M 24 B S(M) M 6 B STPDA C 6760 B C 6760 B S(M) C 1690 B C 1690 B STP R 17500 C STP C 13900 C DIV A SR 3448-SR 3474 (TRADE STREET) TO I-485 DIV B I-485 TO SR 1008 (INDIAN TRAIL ROAD) C SR 1008 (INDIAN TRAIL ROAD) TO SR 1377 (WESLEY CHAPEL-STOUTS ROAD) UNION SR 1316 (REA ROAD) U-3467 NC 16 TO SR 1008 (WAXHAW-INDIAN TRAIL 3.8 35692 300 STP R 2400 A EXTENSION ROAD) IN WESLEY CHAPEL. CONSTRUCT STP U 2200 A FOUR LANE ROADWAY, PART ON NEW STP M 350 A LOCATION. STP C 15600 A STP R 3000 B STP M 42 B STP C 11800 B REG A NC 16 TO TWELVE MILE CREEK ROAD/NC 84 (WEDDINGTON ROAD). CONSTRUCT FOUR LANE ROADWAY. REG B TWELVE MILE CREEK ROAD/NC 84 (WEDDINGTON ROAD) TO SR 1008 (WAXHAW-INDIAN TRAIL ROAD). CONSTRUCT FOUR LANE ROADWAY. UNION SR 1362 (CHESTNUT U-5808 SR 1367 (MATTHEWS INDIAN TRAIL ROAD) 0.4 3740 T R 300 LANE CONNECTOR) TO SR 1368 (GRIBBLE ROAD). CONSTRUCT T U 40 ROAD ON NEW LOCATION. T C 3400 DIV MECKLENBURG VARIOUS U-4950 MECKLENBURG-UNION METROPOLITAN 11000 STPDA PE 800 PE 800 PE 800 PE 800 PE 800 PE 800 PE 800 PE 800 PE 800 PE 800 PE 800 UNION PLANNING ORGANIZATION (MUMPO) L PE 200 PE 200 PE 200 PE 200 PE 200 PE 200 PE 200 PE 200 PE 200 PE 200 PE 200 PLANNING (PL) SUPPLEMENT. DIV FORMERLY U-9999C - IN PROGRESS IREDELL VARIOUS U-4744 STP-DA IN MECKLENBURG-UNION 182675 STPDA C 11300 C 13605 C 9235 C 14000 C 14000 C 28000 C 14000 C 14000 C 14000 C 14000 MECKLENBURG METROPOLITAN PLANNING ORGANIZATION L C 2825 C 3401 C 2309 C 3500 C 3500 C 7000 C 3500 C 3500 C 3500 C 3500 (MUMPO). UNION DIV UNION EXISTING US 74 U-5723 US 601 INTERCHANGE. CONSTRUCT 2200 T R 300 IMPROVEMENTS. T C 1900 SW UNION MONROE NORTHERN U-2549 US 74 TO SR 1751 (WALKUP AVENUE) AT SR 4.7 19200 STP R 1700 LOOP 1763 (BIVENS ROAD). TWO LANES ON FOUR STP U 200 LANE RIGHT OF WAY. STP C 17300 DIV UNION STALLINGS U-5112 SR 1364 (PLEASANT PLAINS ROAD) AT SR 2825 HSIP R 325 1357 (POTTERS ROAD) IN STALLINGS. STPDA C 1600 CONSTRUCT INTERSECTION L C 400 IMPROVEMENTS INCLUDING LEFT TURN HSIP C 500 LANES AND MODIFICATION OF TRAFFIC TRN SIGNAL. PROJECT TO BE ADMINISTERED BY THE TOWN OF STALLINGS FEDERAL BRIDGE PROJECTS UNION US 601 B-5371 REPLACE BRIDGE NO. 71 OVER CLEAR 2630 100 HFB R 230 CREEK. HFB C 2300 HF UNION NC 200 B-5134 REPLACE BRIDGE NO. 72 OVER CHINKAPIN 1542 1542 CREEK. REG UNDER CONSTRUCTION DIV - Division Category EX - Exempt Category 10-25 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO HF - State Dollars (Non STI) REG - Regional Category SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES SW - Statewide Category TRN - Transition Project AVAILABLE
You can also read