A new high-speed system. The Swedish Transport Administration is planning a new high-speed railway network for high-speed trains and fast regional trains between Stockholm–Malmö and Stockholm–Gothenburg, a New Generation Railway. Strategic consulting services for Hässleholm–Lund high-speed rail planning, design The Hässleholm–Lund project is one of the and delivery links in a new high-speed network railway. Knowledge from international high-speed Running through the heart of Sweden’s projects is necessary for effective planning, southern most province of Skåne, it’s the design and delivery of the Swedish high-speed key to connecting the south of Sweden to system. The contract starts: Autumn 2019. Stockholm. Hässleholm–Lund is a 70 km long double-track high speed railway with a Procurement information top speed of 320 km per hour. When the Tender documents will be published in June new main line is completed, you’ll be able 2019. to travel between Stockholm and Malmö in a significantly shorter amount of time than Contact today’s 4 hours and 25 minutes. With the Peter Uneklint, Programme Director new network comes an increase in +46 10-123 60 47 accessibility meaning both people and peter.uneklint@trafikverket.se businesses will be brought closer together. trafikverket.se/nygenerationjarnvag Start of construction: Planned for 2027–2029. Procurement information The East Link Project The Hässleholm–Lund Project is now The East Link is the first part of a future undergoing the procurement of a localiza- high-speed network railway. The East Link tion study, the first step in the planning project is the first step, a double-track process towards a railway plan. high-speed railway between Järna and Linköping. The East Link will be built for a trafikverket.se/hassleholm-lund top speed of 250 km/h (155 mph). Our forecasts are that the East Link will cost The Gothenburg–Borås project SEK 54 billion to build (the 2017 price The new railway will create a rail connec- level). The project includes construction tion to Göteborg Landvetter Airport and link work for 160 kilometres (or 100 miles) of the region's two largest cities closer together. double track. We will build about 30 Gothenburg–Borås is a 60 km long tunnels with lengths between 100 meters double-track high-speed railway with the and 8 kilometres (approximately 330 feet top speed of 250 km per hour. When the and 4.9 miles). Total length about 25 new main line is completed, you’ll be able kilometres (16 miles). We plan to build to travel between Stockholm and Gothen- approximately 200 bridges, with a total burg in a significantly shorter amount of length of about 10 kilometre (6 miles). time than today’s a just over three hours. We also plan to build tracks, contact lines, With the new network comes an increase in signal systems ERTMS and telecommunica- accesibility meaning both people and tions. business will be brought closer together. The contract starts: Planned for 2025–2027 The construction of the East Link is planned to start in 2022. The construction time is Procurement information expected to be over 10 years and by 2035 The Gothenburg–Borås Project is now we expect the railway to be ready for traffic undergoing the procurement of a localiza- start. tion study, the first step in the planning process towards a railway plan. Contact Christian Ljungdahl, Project Manager trafikverket.se/goteborg-boras +46 10-123 26 18 christian.c.ljungdahl@trafikverket.se Contact information for both projects: Sara Distner, Project Manager trafikverket.se/ostlanken +46 70-623 32 88 sara.distner@trafikverket.se 2
The Swedish Transport Administration will procure major construction and maintenance projects on road and rail for 2019–2022. Below is a presentation of projects that contractors can tender for. The geographical area is Southern Sweden. RAILWAY PROJECTS Helsingborg–Teckomatorp, track and points replacement West Coast Line, Ängelholm– To increase operational reliability and Helsingborg, Romares Väg reduce maintenance on Rååbanan, the In order to increase capacity and reduce Swedish Transport Administration will travel time, the Swedish Transport Adminis- replace track and points between Helsing- tration will convert the section of line borg and Teckomatorp. The work includes between Ängelholm and Helsingborg, replacing parts of the railway installations Romares Väg to double track. The section is such as rails, sleepers, ballast and points. 24 km long. Apart from the construction of The contract starts: Winter 2019/2020 double tracks, the work also includes the Procurement information rebuilding of stations and level crossings and Tender documents will be published in the construction of bridges, noise protection Summer 2019. and the installation of new points, overhead lines and new signalling systems along the Tenders in Winter 2019 route. The contract starts: Spring 2020 Cost: SEK 100–300 million Procurement information Contact Tender documents will be published in Jonas Lycksell, Project Manager Spring 2019. +46 10-123 37 26 jonas.lycksell@trafikverket.se Tenders in Winter 2019/2020 Cost: SEK > 1,000 million trafikverket.se/raabananhb-tp Contact Åsa Rosberg, Project Manager +46 10-123 01 22 ROAD PROJECTS asa.rosberg@trafikverket.se E22 Lösen–Jämjö trafikverket.se/angelholm-helsingborg The Swedish Transport Administration will rebuild E22 to motorway between Lösen Noise protection measures and Jämjö. The objective is to improve Continental line Malmö traffic safety and accessibility on the The Swedish Transport Administration will section. The residential environment in build noise barriers along parts of the Jämjö will also improve as traffic is moved Continental line to reduce noise from away from the community. The section to passenger trains in central Malmö. The be rebuilt is approximately 15 km. purpose is to meet Ground and Environ- The contract starts Spring 2021. ment Court’s requirements for passenger Procurement information traffic on the route. The measures include Tender documents will be published in approximately 4.4 kilometres of new/ Spring 2020. changed noise barriers. The contract starts: Autumn 2019 Tenders are submitted in Autumn 2020 Cost: SEK 500–700 million Procurement information Tender documents will be published in Contact Spring 2019. Johan Wolgast, Project Manager +46 10-123 73 35 Tenders in Autumn 2019 johan.wolgast@trafikverket.se Cost: SEK 100–300 million trafikverket.se/e22losen-jamjo Contact Lars Sätmark, Project Manager +46 10-124 26 51 lars.satmark@trafikverket.se trafikverket.se/kontinentalbanan 3
Contact Procurement information Daniel Andersson, Project Manager Tender documents will be published in +46 10-123 66 37 Autumn 2020. daniel.andersson@trafikverket.se Tenders in Autumn 2020. trafikverket.se/E22ronneby-nattraby Cost: SEK 100–300 million E22 Fjälkinge–Gualöv, Contact Magne Holm, Project Manager motorway development +46 10-123 68 71 To increase traffic safety and accessibility magne.holm@trafikverket.se on the E22, the Swedish Transport Administration will build a new motorway trafikverket.se/osterleden-vaxjo from Fjälkinge interchange to be connected to the existing motorway at Gualöv. On the route, a new interchange must be built at MAINTENANCE Bäckaskog, five bridges and parts of the pedestrian and cycle path and other local Basic maintenance contract road E22 Lund South interchange, traffic to be moved to new roads. A total of The basic maintenance contract includes daily about 10 km of new local roads to be built. maintenance of roads (winter road mainte- E22 Gastelyckan interchange, The contract starts: Spring 2022 nance, road surface, side area and median Lund North (Ideon) interchange strips, ancillary installations, road equipment, and road 108 Staffanstorp–Lund Procurement information permit preparation etc.) The contract period is The Swedish Transport Administration will Tender documents will be published in 4 years with the possibility of a 1 or 2 year rebuild the E22 interchange Lund South as Autumn 2021. option. well as the route between the Gastelyckan Tenders in Spring 2022. interchange and the Lund North interchange. Cost: SEK 300–500 million Basic maintenance on public The purpose is to increase accessibility and Contact roads in the Malmö area in Skåne road safety on the route. The project Johan Månsson, Project Manager county includes the construction of new additional +46 10-124 32 30 The contract starts: September 2020. lanes replacement of bridge structures and johan.mansson@trafikverket.se a new off-ramp and on-ramp to the Ideon/ Procurement information Pålsjö area. Road 108 between Staffanstorp trafikverket.se/E22-fjalkinge-gualov Tender documents will be published and Lund will be rebuilt to collision-free in Autumn 2019. with 2+2 lanes. E 65, Svedala–Börringe, motorway development Tenders in Autumn 2019 The contract starts: Autumn 2020. Cost: SEK 100–300 million The Swedish Transport Administration will Procurement information upgrade the E65 between Svedala and Contact Tender documents will be published in Börringe. Part of the route is to be rebuilt as Johan Högström, Project Manager Spring 2020. motorway and part to collision-free country +46 10-123 84 35 road with four lanes. The objective is to johan.hogstrom@trafikverket.se Tenders in Autumn 2020 improve traffic safety and accessibility on the Cost: SEK 500–700 million section. The contract starts: Autumn 2021 Basic maintenance on public Contact Procurement information roads in the Växjö area in Torbjörn Sundgren, Project Manager Tender documents will be published in Kronoberg county +46 10 123 72 52 Spring 2021 The contract starts: September 2021. torbjorn.sundgren@trafikverket.se Tenders in Autumn 2021. Procurement information trafikverket.se/e22-lund Cost: SEK 300-500 million Tender documents will be published in trafikverket.se/e22-ideon Autumn 2020. trafikverket.se/108-staffanstorp-lund Contact Johan Månsson, Project Manager Tenders in Spring 2021 E22 Ronneby Ö–Nättraby +46 10-124 32 30 Cost: SEK 100–300 million The Swedish Transport Administration will johan.mansson@trafikverket.se Contact build 13 km of new motorway connecting trafikverket.se/e65svedala-borringe Henrik Landhammar, Project Manager with the existing route of the E22. Two new +46 10-123 80 92 interchanges will be built and an existing Road 25, Österleden in Växjö henrik.landhammar@trafikverket.se interchange will be rebuilt. A Lay-by in Förkärla will be rebuilt and possibly have a – new interchange at Fagrabäck new location. The purpose of the motorway The Swedish Transport Administration will Basic maintenance road on public development is to improve accessibility and rebuild the Österleden in Växjö and build a roads in the Blekinge area in traffic safety on the section. The contract new interchange at Fagrabäck. The purpose Blekinge county starts: Autumn 2019. is to separate local traffic in Växjö from the The contract starts: September 2021. traffic that passes by on roads 25 and 27, Procurement information thus creating a safer and smoother journey Procurement information Tender documents will be published in on the Österleden. The project includes Tender documents will be published in Spring 2019. central separation of Österleden, three new Autumn 2020. roundabouts and new pedestrian and cycle Tenders in Autumn 2019 Tenders in Spring 2021 paths. The contract starts: Spring 2021 Cost: SEK 20–50 million Cost: SEK 100–300 million 4
Contact Maintenance and reinvestment Peter Johnsson, Project Manager work on road lighting on public +46 10-123 82 12 peter.johnsson@trafikverket.se roads in Västra Skåne county The contract starts: September 2020. Integrated bridge maintenance, Procurement information Jönköping Tender documents will be published in The contract starts: January 2020. Autumn 2019. Procurement information Tenders in Autumn 2019 Tender documents will be published in Cost: SEK 20–50 million August 2019. Contact Tenders in October 2019 Jörgen Lindberg, Project Manager Cost: SEK 20–50 million +46 10-123 84 14 jorgen.lindberg@trafikverket.se Contact Magnus Holm, Project Manager Integrated bridge +46 10-123 92 90 magnus.holm@trafikverket.se maintenance Skåne The contract starts: September 2021. Maintenance and reinvestment Procurement information works on pumping stations within Tender documents will be published in Jönköping, Kronoberg, Kalmar, Winter 2021. Blekinge and Skåne counties Tenders in Spring 2021 The contract starts: March 2020. Cost: SEK 50–100 million Procurement information Contact Tender documents will be published in Jörgen Boström, Project Manager Summer 2019. +46 10-124 18 36 Tenders in Autumn 2019 jorgen.bostrom@trafikverket.se Cost: SEK 20–50 million Integrated bridge maintenance Contact Kalmar/Blekinge Jörgen Lindberg, Project Manager The contract starts: Autumn 2021. +46 10-123 84 14 jorgen.lindberg@trafikverket.se Procurement information Tender documents will be published in Bridge package Winter 2022. Tenders in Spring 2022 Skåne 2020–Helsingborg Cost: SEK 20–50 million The contract starts: February 2020. Contact Procurement information Lars Nilosjö, Project Manager Tender documents will be published in +46 10-123 84 16 Autumn 2019. Tenders in Autumn 2019 lars.nilosjo@trafikverket.se Cost: SEK 20–50 million Basic maintenance contract rail Contact Basic maintenance rail is the product that Jörgen Boström, Project Manager meets the railway's need for basic mainte- +46 10-124 18 36 nance. Typical services in the basic contracts jorgen.bostrom@trafikverket.se are inspections, preventative and remedial maintenance and winter services. The Maintenace and reinvestment contracts include the technology areas Track, work on road lighting on public Electricity, Signals and Telecom. roads in Östra Skåne and Blekinge county Performance of basic The contract starts: September 2020. maintenance railway Malmö southeast Skåne Procurement information The contract start: Autumn 2022. Tender documents will be published in Autumn 2019. Procurement information Tender documents will be published in Tenders in Autumn 2019 Spring 2021. Cost: SEK 20–50 million Tenders in Autumn 2021 Contact Cost: SEK 500–700 million Jörgen Lindberg, Project Manager +46 10-123 84 14 Contact jorgen.lindberg@trafikverket.se Martin Thodenius, Project Manager +46 771-921 921 martin.thodenius@trafikverket.se 5
The Swedish Transport Administration will procure major construction and maintenance projects on road and rail for 2019–2022. Below is a presentation of projects that contractors can tender for. The geographical area is Western Sweden. RAILWAY PROJECTS procurement Ground, Track and Overhead line is during 2020. Staging track Lärje Estimated cost: SEK 3 million To deal with the forecast imbalance in the Announcement of tender documents for system and the new opportunities created contract procurement will be made during by the West Link traffic start in 2026, new 2022. Construction work is scheduled for staging tracks needs to be built. By 2027, September 2022–2024. a staging yard will be established in Lärje, Estimated cost: SEK 1.5 billion north of Gothenburg, along the Norway- Väner line. trafikverket.se/savenasgodsbangard Procurement information Contact Announcement of tender documents for Magnus Lundberg, Project Manager, procurement of railway plan will be +46 10-123 64 90 August/September 2019. Construction magnus.b.lundberg@trafikverket.se work is scheduled to start in 2023–2024. Cost: SEK 200–400 million Halmstad Central Station Halmstad C to be upgraded with, among Contact other things, new platforms, tracks and Meysam Cordi, Project Manager points, rebuilding of overhead contact line, +46 10-124 18 45 new passage under the rail depot, lifts and meysam.cordi@trafikverket.se escalators. Sävenäs Goods depot Procurement information Sävenäs goods depot is one of the largest The railway plan work starts in 2021. marshalling yards in Sweden and has a Project design is planned for 2022–2023. great need for modernisation. During the Construction work is scheduled to start in period 2019–2029, the Swedish Transport 2025. Administration will carry out a lot of Contact measures in the Sävenäs depot, where it is Fredrik Bärthel, Project Manager planned to change the signal switchgear +46 10-123 00 35 (95). Upgrading of Land, VA and Track. fredrik.barthel@trafikverket.se New overhead contact line will be built within the Sävenäs marshalling yard on the Älvsborgs Line Bridge replacement R-group. Sävenäs goods depot is located in the eastern part of Gothenburg. Vänersborg–Trollhättekanal New opening railway bridge over Trollhätte Sävenäs signal safety system kanal including ramps and guide sections, new pedestrian and cycle path and new Procurement information signals for shipping. New signalling system Announcement of tender documents for for train traffic. Connection to existing depot contract procurement will be during 2019. and line. Demolition of existing bridge. Construction work is scheduled for Procurement information September 2020. Investigation of placement, bridge type Estimated cost: SEK 70 million including calculations to be procured during April 2019. Procurement of the railway Sävenäs Ground, VA, Track and plan and preliminary design take place Overhead line at year end 2019–2020. These are planned to be completed in spring 2022. Procurement information Construction work is scheduled to start Announcement of tender documents for in september 2023. investigations for Ground and Track Design Cost: > SEK 1000 million will be during 2019. Announcement of tender documents regarding consultancy 6
Contact Viskadal Line Borås–Varberg: Procurment information Senad Cani, Project Manager Replacement of track, overhead Announcement of tender documents in +46 10-123 42 16 August/September 2019. Construction Senad.cani@trafikverket.se contact line and points work is scheduled to start in 2020. Upgrade of the Viskadalsbanan is carried Cost: SEK 50–70 million Älvsborgs Line Track and points out to ensure that the line functions as a robust and reliable rerouting track. The Contact: replacement Öxnered–Håkantorp contract includes replacement of track and Daniel Svensson, Project Manager Track and points replacement between ballast and replacement of 16 sets of points +46 10-123 32 68 Öxnered–Håkantorp is done to upgrade between Borås and Varberg (about 82 km). daniel.b.svensson@trafikverket.se track and points quality for the future heavy Overhead contact line replacement shall rerouting traffic that will operate on this trafikverket.se/boras-hillared also be carried out on the present route section when the West Link Project starts where the old contact and auxiliary power construction in the Gothenburg area. management system will demolished and Borås switchgear replacement replaced. The contract also includes Signal switchgear and externals are Procurment information replaced. With new modern signal Announcement of the contract is scheduled painting of steel bridges, drainage measures and adaptations of level switchgear, the depot is equipped with ATC. for June 2019. crossings. Construction work is scheduled to start in Contact 2021. Timo Järvinen, Project Manager Procurement information +46 10-123 41 31 Announcement of tender documents in Procurement information timo.jarvinen@trafikverket.se November 2019. Construction work is Tender documents will be published in 2020. scheduled in May 2020. Cost: SEK 50–100 million Västra Stambanan Line Overhead Cost: SEK 400–600 million Contact contact line replacement Contact Fredrik Kalén, Project Manager Alingsås–Olskroken Patric Bjälkander, Project Manager +46 76-027 43 23 The contract includes replacement of the +46 10-123 01 08 fredrik.kalen@trafikverket.se overhead contact line system, auxiliary patric.bjalkander@trafikverket.se power plant and conversion to AT system. trafikverket.se/boras-varberg Värmland Line Laxå–Arvika, This applies to both up and down tracks Karlstad Central and Viken on the route. The route concerned is about Älvsborg Line Remote blocking passagen 40 km long. Herrljunga–Borås and Track Rebuilding of Karlstad C including construc- Procurment information replacement, tion of new Vikenpassage (new tunnel under Execution time including design is between The project's goal is to remotely control the depot), introduction of new switchgear 95, 2019–2025. route Herrljunga–Borås, upgrade the replacement of all rails, sleepers, points, Estimated cost about SEK 420 million standard of the track, carry out 42 km of signals, overhead contact line and construc- track replacement, points replacement, tion of new central platform and rebuilding Contact of Karlstad C. Construction work is Anders Bjers, Project Manager ballast cleaning and embankment cleaning so that the track can also serve as a scheduled to start in 2022. +46 10-123 04 04 anders.bjers@trafikverket.se rerouting track for the western main line Procurement information and enable future capacity increases on Tender documents will be published in trafikverket.se/boras_signalstallverk Älvsborg Line. 2021. Construction work is scheduled to start in Cost: SEK 300–500 million Västra stambanan Line Overhead 2020. contact line replacement Contact Falköping–Alingsås Procurement information Martin Bergwall, Project Manager Tender documents will be published in +46 72-714 08 42 The contract includes replacement of the 2019. Cost: SEK 100–300 million martin.bergwall@trafikverket.se overhead contact line system, auxiliary power plant and conversion to AT system. Contact trafikverket.se/karlstad-c This applies to both up and down tracks on Håkan Gustafsson, Project Manager the route. The route concerned is about 69 +46 70-564 85 53 Värmland Line Laxå–Kil: km long. hakan.a.gustafsson@trafikverket.se Execution of track and points Procurment information Anders Magnusson. Project Manager replacement, Execution time including design is between +46 73-078 06 68 Track replacement on sections 383, 382 2023–2029. anders.magnusson@trafikverket.se and 551 in the following municipalities: Estimated cost: SEK 490 million trafikverket.se/herrljunga-boras Laxå, Degerfors, Kristinehamn, Karlstad and Kil. The track sections have a low Contact technical standard and risk causing Anders Bjers, Project Manager Kust till kust Line Track and points problems for train traffic and incurring high +46 10-123 04 04 replacement Borås–Hillared, maintenance costs. anders.bjers@trafikverket.se This is a design and construct contract. The contract includes track replacement and Procurment information ballast cleaning, points replacement, Project design: is called through renewed inspection of concrete bridges and competition on Framework Agreement geotechnical reinforcement measures. Planning and Project design. Announce- ment: November 2019. Contract starts: February 2020. 7
ROAD PROJECTS E20 past Mariestad New construction of 17 km of dual Construction of E20 carriageway in a new or existing stretch as Göteborg–Örebro a 2+2 road. Construction is scheduled to E20 will have improved road safety and start in June 2022. accessibility through Västra Götaland. Procurement information Several stretches still do not have a road with Tender documents for a turnkey contract oncoming traffic separated by a centre will be published in November 2021. barrier. Stages will build gradually towards a Cost: SEK 1000 million. meeting‑free situation, either a 1+1 road or a 2+2 road. Involves 6–8 different procure- E20 Tollered–Ingared ments. Rebuilding to 4 km of highway in an Contact existing stretch. Construction is scheduled Björn Elfström, Project Manager to start in February 2020. +46 10-123 27 85 Procurement information bjorn.elfstrom@trafikverket.se Tender documents for a turnkey contract will trafikverket.se/e20-goteborg-orebro be preliminarily published in September 2019. Cost: SEK 100–300 million. E20 Vårgårda–Vara, part Ribbingsberg–Eling and E20 past Vårgårda Eling–Vara New construction of a dual carriageway in New construction of 26 km of dual an existing stretch with at least 1.2 km as a carriageway in an existing section, 19 km 2+2 road. Construction is scheduled to with at least 8 km of 2+2 road. Construc- start in July 2020. tion is scheduled to start in January 2020. Procurement information Procurement information Tender documents for a performance Contract: Announcement of tender Tender documents for a performance contract will be published in January 2020. documents is in June 2020. contract will be published in September Cost: SEK 100–300 million Cost: SEK 5–10 million 2019. Cost: SEK 500–700 million. Construction work is scheduled Road 49, Axvall–Varnhem, to start in 2021. E20 past Skara, Vilan–Dalån dual carriageway Cost: SEK 500 million The expansion to a dual carriageway is New construction of a dual carriageway, 8 Contact km in an existing section with at least 40 scheduled to take place in May 2021. Jörgen Olofsson, Project Manager per cent as a 2+2 road. Construction is The aim is to improve accessibility, road +46 10-123 20 75 scheduled to start in October 2019. safety and road standards, but also to jorgen.olofsson@trafikverket.se improve environmental conditions along the Procurement information road. The project includes construction of a Tender documents for a performance new interchange at Varnhem as well as an National Agreement contract will be published in April 2019. animal crossing over road 49. for Rail Machining Cost: SEK 200–300 million. The Swedish Transport Administration Procurement information processes the entire rail network's rails and E20 past Skara, Dalån–Ledsjö Tender documents will be published in points, as the rail's surface is affected and New construction of a dual carriageway, November 2020. worn by vehicles operating on the tracks. 8 km in an existing section with at least Cost: SEK 100–300 million. Machining (material removal) can delay the 40 per cent as a 2+2 road. Construction is emergence of and remove surface damage Contact scheduled to start in November 2021. Johan Larsson, Project Manager and unevenness, which increases rail life and the safety of the tracks. Rail machining Procurement information +46 10-124 15 36 is primarily preventative, systematic Tender documents for a performance johan.c.larsson@trafikverket.se maintenance. contract will be published in February 2021. trafikverket.se/vag-49-axvall-varnhem Cost: SEK 200–300 million. Procurement information: Announcement of the contract is scheduled E6.20 Hisingsleden E20 Götene–Mariestad Reconstruction and new construction of the for May 2019. Establishment time is New construction of 20 km of dual southern part of Hisingsleden. The Swedish estimated at 1 year and the machining carriageway in a new or existing stretch as Transport Administration plans to rebuild orders will start from January 2021. a 2+2 road. Construction is scheduled to this into a collision-free road with four lanes. Contact start in August 2022. Two signal controlled and accident-prone Stefan Lundström-Sveder, Project Manager crossings are replaced with level-separated Procurement information +46 10-123 14 60 interchanges. A third interchange is built to Road plan, consultation document, draft stefan.lundstrom-sveder@trafikverket.se connect the new logistics centre in Sörred to plans, as well as preparation of tender Hisingsleden at John Bunyans Väg. documents for a turnkey contract, and building site management shall be The contract also includes a new pedestrian contracted out. Tender documents will be and cycle path from Assar Gabrielssons Väg published in February 2022. to Björlandavägen. Construction work is Cost: SEK 1000 million. scheduled to start in 2021. 8
Procurement information MAINTENANCE Integrated Bridge Maintenance Tender documents will be published in Integrated Bridge Maintenance involves 2020. Cost: SEK 100–300 million maintenance with a focus on bridges/ Basic maintenance contract road construction works. The contracts are divided Contact Includes daily maintenance of roads within a Karolina Petersen, Project Manager by county. The contract period extends over specified geographical area (winter road 5 years and is designed as turnkey contracts +46 70-679 49 78 maintenance, road surface, dewatering, side karolina.petersen@trafikverket.se split into two parts: Predetermined mainte- area and median strips, ancillary installations, nance and permit-based maintenance. road equipment, permit preparation). The E45 Collision-free country road, contract period is 4 years with the possibility Tösse–Åmål Integrated bridge of a 1 or 2 year option. The Tösse–Åmål is converted to collision- maintenance Skaraborg free with barriers and signposted speed is Basic road maintenance on public Procurement information increased to 100 km/h. This includes roads in Södra Halland area, Announcement of the contract is scheduled widening the road to 2 + 1 lanes, wildlife Halland county for June 2020. Cost: SEK 50–100 million fencing and overview of connecting roads. There will also be a pedestrian and cycle Procurement information Integrated bridge path including a pedestrian and cycle Announcement of the contract is scheduled bridge over the railway. maintenance Vänersborg for October 2019. Cost: SEK 100–300 million Procurement information Procurement information Announcement of tender documents is Announcement of the contract is scheduled Contact information for all planned in Autumn 2020. for June 2019. Cost: SEK 50–100 million maintenance projects Marlene Hansson, Purchaser Construction work is scheduled to start in Integrated bridge Spring 2021. +46 10-123 78 45 marlene.hansson@trafikverket.se maintenance Halland Contact Procurement information Ingrid Sjöstrand, Project Manager Basic road maintenance on public Announcement of the contract is scheduled +46 10-123 00 56 roads in Borås area, for January 2021. Cost: SEK 50–100 million ingrid.sjostrand@trafikverket.se Västra Götaland county Maintenance of bridge Tingstad tunnel: Execution of Procurement information over Sunnesundet in Sunne exstensive maintenance, Announcement of the contract is scheduled New superstructure of the former opening installation and safety enhancing for October 2019. span. Cost: SEK 100–300 million measures The Tingstad tunnel is a 455 m long sunken Procurement information Basic maintenance on public Announcement of the contract is scheduled tunnel, under the Göta Älv river, which connects Hisingen with the rest of roads in the south west Värmland for October 2019. Cost: SEK 20–50 million Gothenburg's mainland. The tunnel is area located on the E6 which is the main route through Gothenburg and is the busiest Procurement information Announcement of the contract is scheduled passage across the Göta Älv river. for October 2019. Cost: SEK 100–300 The tunnel will undergo comprehensive million measures during 2021–2023: renovation of existing structures and replacement of technology for increased longevity, Basic maintenance on public installation improving measures to reduce roads in the Arvika area vulnerability and environmental impact and Procurement information safety-enhancing measures to reduce the Announcement of the contract is scheduled consequences of accidents. for October 2020. Cost: SEK 100–300 Construction work is scheduled to start in million 2022–2023. Basic maintenance on public Procurement information Procurement of project design is planned to roads in the Kungälv–Tjörn area be announced in June 2019. Procurement information Procurement of contracts is planned to be Announcement of the contract is scheduled announced in the period December 2019 to for October 2020. Cost: SEK 100–300 million July 2020. Cost: SEK 450–500 million Basic road maintenance on public Contact roads in Uddevalla area, Västra Stefan Frisk, Project Manager +46 10-123 68 51 Götaland county stefan.a.frisk@trafikverket.se Procurement information www.trafikverket.se/tingstadstunneln Announcement of the contract is scheduled for October 2020. Cost: SEK 100–300 million 9
The Swedish Transport Administration will procure major construction and maintenance projects on road and rail for 2019–2022. Below is a presentation of projects that contractors can tender for. The geographical area is Stockholm and Eastern Sweden. RAILWAY PROJECTS Jessica Lindell, Head of procurement +46 72-141 96 68 Rebuilding and improvements jessica.lindell@trafikverket.se at Stockholm Central Station trafikverket.se/malarbanan The station environment at Stockholm Central Station does not meet accessibility Hallsberg–Degerön requirements, and there is a need for The Swedish Transport Administration is upgrades. Therefore, we are performing building double tracks on the Hallsberg– quality and safety measures at the central Degerön section. We wish to increase station and adapting platforms and tracks capacity and punctuality and improve to changing needs. safety. The section is 46 km long. The project consists of several parts that are at Procurement information different stages. Tender documents are published in March 2019. Cost: SEK 900 million Procurement information Contact Hallsberg–Stenkumla Veronica Bergfors Runing, Project Manager 2–4 construction and design and construct +46 10-123 52 63 contracts. veronica.bergfors-runing@trafikverket.se Cost: SEK 0.5–1.5 billion Includes: Bridges, ground, a large tunnel, trafikverket.se/atgarderstockholmc BEST. Request for quotation sent Summer/ Autumn 2020 Mälaren Line Project We are expanding the railway between Dunsjö–Jakobshyttan Tomteboda and Kallhäll near Stockholm, One design and construct contract from two to four tracks, a total of 20 Cost: SEK 200–400 million kilometres. The commuter train is being Includes: Ground, tunnel, BEST separated from other train services which Request for quotation sent Autumn 2019 provides tighter turnarounds, better Jakobshyttan–Degerön punctuality and shorter travel time. We are One design and construct contract building commuter stations as well as new Cost: SEK 500–700 million bridges and tunnels for both cars and Includes: Bridges, ground, BEST pedestrian traffic. Request for quotation sent Winter Parts of the route are already finished and 2019–2020 put into operation. The entire development Contact of Tomteboda–Kallhäll will be completed no Linda Lingdell, Programme Coordinator earlier than 2029. +46 10-123 70 35 Procurement information linda.lingdell@trafikverket.se The procurement of 5 major contracts for trafikverket.se/hallsberg-degeron the implementation of the project remains trafikverket.se/en/double-tracks-hallsberg- to be done. degeron Cost: The size of the procurements vary between SEK 100–700 million. Contact Per-Eric Metso, Project Manager + 46 70-758 81 69 per-eric.metso@trafikverket.se Ulf Öhman, Project Manager + 46 70-762 43 08 ulf.ohman@trafikverket.se 11
ROAD PROJECTS Contact Road 56 Katrineholm–Alberga Jan Halén, Project Manager Assignment on road 56 between Katrine- Road 77 Uppsala county border +46 72-143 28 87 holm comprises rebuilding to a collision- jan.halen@trafikverket.se – Rösa interchange free road with widening for overtaking The Swedish Transport Administration stretches along the existing road, a total of E 18, Arninge travel centre about 33 km of which 3 km is new. The intends to improve road safety and accessibility on road 77 between the A new travel centre will be built in Arninge. road geometry is poor in places and needs Uppsala county border and the Rösa Täby Centrum-Arninge in Täby municipality to be rebuilt entirely with improvements in interchange. The road is about 30 km long is one of the largest shopping areas in the plan and profile. and connects Rimbo, Norrtälje and the region. The overall objective of the project is to ensure the availability of sustainable Procurement information harbour in Kapellskär with the E4 and the public transport and fast, safe and easy Project design: Fixed-price with variable on inner parts of Uppland and Bergslagen. The changes for travellers. construction site follow up and E2 appendix project consists of both new construction in Contract: Construction contract. virgin land and rebuilding an existing Procurement information section. Construction starts in 2021. The construction parts to be built include Contact bridges and roads. We will be procuring Jan Nyman, Project Manager Road Procurement information this on 29 March 2019. +46 76-144 58 67 The project consists of three stages, of Cost: SEK 250–300 million jan.nyman@trafikverket.se which stage 1 is a build contract and stages 2 and 3 are design and construct contracts. Contact trafikverket.se/bie-alberga Tender documents for the procurement of Fredrik Emmot, Project Manager construction document consultant will be +46 10-123 67 69 Road 56 Kvicksund–Västjädra published in October 2019. fredrik.emmot@trafikverket.se The road 56 Kvicksund–Västjädra assign- ment, which is important for commuting Contact trafikverket.se/arninge between Västerås and Eskilstuna, compri- Pernilla Ngo Magnusson. Project Manager ses rebuilding to a collision-free road with +46 10-123 70 93 E4/E20 Södertälje bridge, widening from 9 meter to 13 meter. There pernilla.ngo@trafikverket.se capacity improvement are three accident prone crossings with trafikverket.se/vag77 The Swedish Transport Administration will poor visibility and low traffic safety develop a road plan to upgrade the E4 and standard on the section, which covers Road 263 replacement of opening E20 between Moraberg interchange and about 14 km. bridge, Erikssund Saltskog interchange from two to three lanes in each direction. Procurement information The opening bridge on road 263 over Project design: Fixed-price with variable on Erikssund shall be replaced with a new Procurement information construction site follow up and E2 appendix opening bridge. The two existing lanes are Procurement of consultants for the Contract: Construction contract. to be widened and the bridge will be given preparation of road plan, tender documents a pedestrian and cycle lane for unprotected and construction site follow-up during Contact road users. Summer 2019. Jan Nyman, Project Manager Road +46 76-144 58 67 Procurement information Contact jan.nyman@trafikverket.se Design and construct contract, procured Lars Sandberg, Project Manager together with road 841, replacement of +46 10-123 88 74 trafikverket.se/vag56kvicksund-vastjadra opening bridge Almarestäket. Tender lars.sandberg@trafikverket.se documentation for tender calculation will Programme E18 Jakobsberg be published in October 2019. E18 Köping–Västjädra interchange–Hjulsta interchange Cost: SEK 80–150 million. The assignment comprises upgrading of the including capacity increase as a Contact approximately 25 km long section between result of E4 Bypass Stockholm Jan Halén, Project Manager Köping and Västjädra on the E18 to The area around the districts of Hjulsta and +46 72-143 28 87 motorway. This is the last section to obtain Barkarby in north-western Stockholm will jan.halen@trafikverket.se motorway standard all the way between undergo a major change in the next 15 Örebro and Stockholm. A long-awaited years with several infrastructure measures Road 841, replacement of opening measure that provides a road with good and large-scale developments. The Hjulsta conditions for supporting regional develop- interchange will be a crossroads between bridge over Almarestäket ment, increasing road safety and improving the new E4 Bypass Stockholm and the E18, The opening bridge on road 841 over mobility. Almarestäket on the border between the which will make the interchange one of Sweden's busiest by 2030. municipalities of Järfälla and Upplands–Bro Procurement information will be replaced with a new opening bridge. Consultant procurement tender documents The aim of the programme is primarily to TE + construction site follow up: Fixed price increase the capacity of the Hjulsta Procurement information tender documents TE, variable construction interchange with connection to the E4 Design and construct contract, procured site follow up. Design and construct contract. Bypass Stockholm and to shorten travel together with road 263, replacement of times thanks to reduced traffic problems on opening bridge Erikssund. Tender documen- Contact the E18 and E4. tation for tender calculation will be Lars Königsson, Senior Project Manager published in October 2019. +46 70-324 43 48 The programme affects the E18 from Cost: SEK 80–150 million. lars.konigsson@trafikverket.se Jakobsberg interchange to Hjulsta inter- change, a distance of about 3 km. The trafikverket.se/E18koping-vastjadra 12
scope is not fully established, but currently Contact Procurement information: includes (from the west), a new interchan- Kajsa Svanberg, Sourcing Manager See the purchasing schedule. ge at Barkarby, a police checkpoint +46 10-123 41 04 kajsa.svanberg@trafikverket.se The size of the procurements vary between (included in the programme for geographi- SEK 30 and 120 million. Volume value 2019 cal reasons), capacity improvement Integrated bridge maintenance approximately SEK 610 million. measures in Hjulsta and the extension of lanes along the entire route. Integrated Bridge Maintenance involves Contact maintenance contracts divided by county Kajsa Svanberg, Sourcing Manager Procurement information with a focus on bridges/construction works. +46 10-123 41 04 Sending out tender documents for a joint The contract period extends over four or kajsa.svanberg@trafikverket.se procurement of road plan, production of five years and is designed as turnkey tender documents for the construction contract and construction site follow-up is contracts split into two parts: Predetermi- Infrasystems ned maintenance and permit-based Infrasystems include: planned to take place in Summer 2019. maintenance. • Electric Power/Lighting Estimated total cost: > SEK 500 million. Procurement starts: • VA/Ventilation Contact • Uppsala County Q1 2020 • Telecom, control and control technology Jonas Halzius, Project Manager • Örebro County Q1 2021 • Lead traffic +46 10-123 62 75 jonas.halzius@trafikverket.se • Västmanland County Q1 2022 • User charges • ATK trafikverket.se/E18_jakobsberg_hjulsta Procurement information • VViS See the purchasing schedule. • Coordination complex installations Södertörn Crosslink Project The size of the procurements vary between and maintenance system Maximo. The Swedish Transport Administration plans SEK 35–70 million. Volume value 2019 is to build Södertörn Crosslink Project, a new included in Construction work. Procurement information road between highway E4/E20 at Skär- Contact See the purchasing schedule. holmen/Kungens kurva to highway 73 at Kajsa Svanberg, Sourcing Manager Haninge centre, via Flemingsberg in The size of the procurements vary between +46 10-123 41 04 SEK 10 and 100 million. Volume value 2019 Stockholm region. kajsa.svanberg@trafikverket.se approximately SEK 390 million. This new traffic solution is needed to achieve the goals of improved safety and Basic maintenance contract rail Contact accessibility at Södertörn. The crosslink Basic maintenance contract rail includes Kajsa Svanberg, Sourcing Manager also contains a new pedestrian preventive and corrective maintenance of +46 10-123 41 04 and cycle route. railways within a particular geographical area. kajsa.svanberg@trafikverket.se The contract period is 5 years with the Procurement information possibility of a 2 year option. Procurement Construction work According to the current timetable, tender usually starts 2.5 years before the expected Construction work includes (excl integrated documents will be published in 2019/2020. contract start. bridge maintenance), other bridge Cost: SEK 10 billion. maintenance, tunnels, rock slopes and Procurement starts: bridges. Contact • 2019 – Stockholm South, Southern Main Ove Strömberg, Purchasing Officer Line 1 and Western Main Line Procurement starts: +46 10-124 31 81 • Varying bridge maintenance work ove.stromberg@trafikverket.se Procurement information Essingeleden 2019–2021 See the purchasing schedule. • Repairs Solna Tunnels 2020 trafikverket.se/tvarforbindelsesodertorn The size of the procurements vary between SEK 150 and 1000 million. Volume value Procurement information 2019 approximately SEK 1000 million. See the purchasing schedule. MAINTENANCE Contact The size of the procurements vary between Basic maintenance contract road Kajsa Svanberg, Sourcing Manager SEK 1 and 100 million. Volume value 2019 Basic maintenance contract road includes road +46 10-123 41 04 approximately SEK 390 million. repair and preventive maintenance within a kajsa.svanberg@trafikverket.se specified geographical area. Contact Surfacing Kajsa Svanberg, Sourcing Manager The contract period is 4 years with the +46 10-123 41 04 possibility of a 1 or 2 year option. Maintenance surfacing and reinforcement kajsa.svanberg@trafikverket.se measures in East/Stockholm: Surfacing Procurement starts: measures include adjustment, milling and a • Q4 2019–Värmdö, Norrköping new wear layer on the roadway and side • Q4 2020–Örebro surfaces, access roads and parking places. Procurement information The contract period is 1–3 years with the See the purchasing schedule. possibility of a 1 or 2 year option. The size of the procurements vary between SEK 50–300 million. Volume value 2019 approximately SEK 850 million. 13
14
The Swedish Transport Administration will procure major construction and maintenance projects on road and rail for 2019–2022. Below is a presentation of projects that contractors can tender for. The geographical area is Central Sweden. RAILWAY PROJECTS also have a positive effect on the Dala line. Railway plan including location investiga- East Coast Line Dingersjö– tion to find the best options for increasing the capacity of the freight line between Sundsvall Double Track Avesta Krylbo and Dalslund (about 5 km), Double track on the east coast line including Krylbo depot. between Dingersjö and Sundsvall, a distance of 14 km. The development Procurement information provides space for more trains and freight Planning sending out tender documents trains. It also provides better connections Autumn 2019. Cost SEK 10–20 million to industries along the track. Construction 2024–2028. Procurement information Construction documents. Sending out Procurement information tender documents Spring 2021. Railway plan, preliminary design, Cost: SEK 5–10 million construction documents. Sending out tender documents Summer 2019. Procurement information Production. Sending out tender documents Contact Spring 2022. Cost: SEK 100-300 million Thomas Gauffin, Project Manager +46 10-123 43 94 Contact thomas.gauffin@trafikverket.se Anders Danielsson +46 72-142 22 07 trafikverket.se/dingersjo-sundsvall anders.danielsson@trafikverket.se Sundsvall Travel Centre, trafikverket.se/godsstraket-avestakrylbo- dalslund access and platforms Rebuilding of tracks and platforms at Speed increasing measures Sundsvall Central Station's depot to increase accessibility, improve change along Dalabanan times, increase traffic safety and create Extension of existing passing tracks and more efficient handling of goods. Passenger construction of a new passing track on this trains and freight trains are separated by section. Improved passing tracks mean that having a new direct connection from the trains can pass without stopping, and more east coast line in the southeastern part. trains can operate on Dalabanan. Switchgear replacement. Construction Procurement 2022-2025. Ground contract. Sending out tender Procurement information documents January 2020. Preliminary design, Construction docu- Cost: SEK 100–300 million ments. Sending out tender documents Contact Autumn 2019. Riitta Pettersson, Project Manager Cost: SEK 10–20 million +46 10-124 41 75 Contact trafikverket.se/dalabanan Thomas Gauffin +46 10-123 43 94 East Coast Line, thomas.gauffin@trafikverket.se stage Gävle –Kringlan, trafikverket.se/sundsvall-resecentrum capacity increase Planning process in order to establish a Goods line Avesta Krylbo– railway plan for double track expansion Dalslund, double track between Gävle and Kringlan, approximately Measures to increase the capacity of the 38 km. The double track extends the goods line between Avesta Krylbo and capacity on the route. The process initially Dalslund, about 5 km. The measures will includes a formal choice of alternative route. 15
Procurement information Procurement information Road 83 Bollnäs-Vallsta Line study. Sending out tender documents Production. Sending out tender documents Reconstruction of road 83 between June 2019. October 2019. Bollnäs-Vallsta for increased road safety Cost: SEK 10–20 million Cost: SEK 100–300 million and better road standard. A distance of Procurement information Contact 17.4 km. Partly new route. Replacement of Railway Plan Gävle C-Gävle West. Sending Åsa Bergqvist, Project Manager railway portal in Växjö. out tender documents 2020. + 10-124 31 86 Procurement information Cost: SEK 20–50 million asa.bergqvist@trafikverket.se Construction documents including Procurement information trafikverket.se/e45-70-genom-mora construction site follow up. Sending out Railway plan Gävle Västra-Kringlan. tender documents Autumn 2019. Sending out tender documents 2020. E16/Road 70, Borlänge–Djurås, Cost: SEK 10–15 million. Production. Sending out tender documents Cost: SEK 20–50 million Traffic safety improvement Autumn 2021. Cost: SEK 100–300 million. Contact measures, Ragnhild Brändeskär, Project Manager Reconstruction of the road to Collision-free Contact +46 10-124 24 49 country road with central barrier to improve Christian Ödgren, Project Manager ragnhild.brandeskar@trafikverket.se traffic safety for road users and residents. +46 10-123 62 86 16 km. christian.odgren@trafikverket.se trafikverket.se/gavle-sundsvall-dubbelspar Procurement information trafikverket.se/bollnas-vallsta Gävle Harbour, rail connection Production. Sending out tender documents Measures to relieve the entrance to Gävle Spring 2020. depot, increase capacity and create a direct Cost: SEK 100–300 million MAINTENANCE connection to Gävle harbour. New Procurement information Basic maintenance contract road construction of about 2 km new track, Stage 2, Construction documents. Sending Includes daily maintenance of roads (winter electrification of about 8 km of existing out tender documents Autumn 2020. road maintenance, road surface, dewatering, track and new points. Railway bridge over Cost: SEK 10–20 million side area and median strips, ancillary Strömsbrovägen. Procurement information installations, road equipment, permit Procurement information Stage 2, Production. Sending out tender preparation). The contract period is 4 years Production. Sending out tender documents with the possibility of a 1 or 2 year option. documents Summer 2022. Summer 2019. Cost: SEK 100–300 million The following areas will be contracted out Cost: SEK 100–300 million Procurement information in 2021. Contact Stage 3, Construction documents. Sending Mark Jones, Project Manager Procurement information out tender documents Spring 2020. Tender documents will be published in +46 10-123 21 20 Cost: SEK 10–20 million October 2020. mark.jones@trafikverket.se Procurement information Kramfors, turnkey contract. trafikverket.se/gavlehamn Cost: SEK 100–300 million Stage 3, Production, design and construct contract. Sending out tender documents Sveg, turnkey contract. Gävle–Åänge, Track replacement Winter 2022. Cost: SEK 100–300 million Cost: SEK 100 –300 million Track replacement between Strömsbro and Svenstavik, turnkey contract. Vallvik, a distance of approximately 62 km, Contact Cost: SEK 100–300 million 6 points replacements. Investigation of Patrik Svärd, Project Manager Älvdalen, turnkey contract. possible speed increase is ongoing. +46 10-123 64 04 Cost: SEK 100–300 million patrik.svard@trafikverket.se Procurement information Contact Production. Sending out tender documents trafikverket.se/borlange-djuras Johanna Wik, Sourcing Manager Autumn 2019. +46 10-124 31 09 Cost: SEK 300–500 million E4 Kongberget-Gnarp, johanna.wik@trafikverket.se Contact Production New stretch of the E4 between Kongberget- Basic maintenance contract rail Adam Larsson, Project Manager Gnarp with collision-free road with central Basic maintenance contract rail includes +46 10-123 06 22 barrier (2 + 1), to increase road safety and preventive and corrective maintenance of adam.b.larsson@trafikverket.se accessibility along the route. A distance of railways within a particular geographical area. about 22 km. Start of construction 2022. The contract period is 5 years with the possibility of a 2 year option. ROAD PROJECTS Procurement information Production. Sending out tender documents Ostkustbanan E45/Road 70 through Mora, Autumn 2022. Ostkustbanan will be contracted out in capacity-increasing measures Cost: > SEK 1000 million 2021. New roundabouts, separate pedestrian and Contact cycle routes and passages, as well as more Procurement information Kerstin Holmgren, Project Manager lanes. Measures to prevent queues, shorten Tender documents will be published in +46 10-123 73 92 travel time and contribute to reduced august 2019. Cost: 700-1000 million kerstin.holmgren@trafikverket.se environmental impact through Mora. Start of construction 2020. Contact trafikverket.se/e4gnarp Anna-Pia Lingemyr, Project Manager +46 10-124 31 38 anna-pia.lingemyr@trafikverket.se 16
The Swedish Transport Administration will procure major construction and maintenance projects on road and rail for 2019–2022. Below is a presentation of projects that contractors can tender for. The geographical area is Northern Sweden. RAILWAY PROJECTS Track replacement incl overhead wire upgrade North Bothnia Line Västeraspby–Långsele A 270 km long new coastal railway The 46 km long stretch between Västerasp- between Umeå–Luleå, which will by and Långsele needs to be refurbished. strengthen rail freight traffic in Sweden and Ground work will be made in 2021, 2022 increase the ability to travel between the replacing track and 2022–2023 replacing cities along the Norrland coast. It will bring the contact line system. double tracks to the Main Line (Stamba- nan), increased capacity, substantial Procurement information reductions in transport costs and halved Tender documents: 2022 Railway contract. travelling times along the coast. Cost: SEK 300–400 million The project is estimated to cost SEK 29 Contact billion. Per Lindmark, Project manager +46 10-123 74 01 All railway studies have been completed. per.lindmark@trafikverket.se Trafikverket is currently working on developing railway plans for the section trafikverket.se/vasteraspby-langsele between Umeå-Skellefteå. In 2018, construction began between Umeå–Dåva. Gammelstad depot extension The project is currently working on a To increase the capacity of both passenger construction procurement plan for the and freight trains, the Gammelstad stretch from Dåva (north of the city of operating site needs to be extended so that Umeå) to the city of Skellefteå in the north 750 metre-long ore trains can pass there. of Sweden. The entire operating site will also be equipped with, among other things, Contact improved noise measures. Construction Lars Bergdahl, Project Director start no earlier than 2021. +46 10-123 74 41 lars.bergdahl@trafikverket.se Procurement information Tender documents: 2020. trafikverket.se/norrbotniabanan Cost: SEK 100–200 million Track replacement Contact incl overhead wire upgrade Peter Keisu, Project Manager Västeraspby–Långsele +46 10-123 81 62 The 46 km long stretch between Västerasp- peter.keisu@trafikverket.se by and Långsele needs to be refurbished. trafikverket.se/gammelstad_bangard Ground work will be made in 2021, 2022 replacing track and 2022–2023 replacing the contact line system. ROAD PROJECTS Procurement information MaKS = Ore shipments Railway project design. Tender documents: Kaunisvaara–Svappavaara 2021. Cost: SEK 10–15 million MaKS: Bypass Vittangi Contact and Anttis–Lovikka Per Lindmark, Project Manager Bypass Vittangi: new road about 6 km +46 10-123 74 01 including new bridge and snowmobile per.lindmark@trafikverket.se portal. Anttis-Lovikka: about 13.5 km trafikverket.se/vasteraspby-langsele widening and reinforcement of existing road and some curve correction 17