Major business opportunities
  in Sweden 2019–2022
Major business opportunities in Sweden 2019-2022 - WKO
A new high-speed system. The Swedish Transport
    Administration is planning a new high-speed
    railway network for high-speed trains and fast
    regional trains between Stockholm–Malmö and
    Stockholm–Gothenburg, a New Generation Railway.

    Strategic consulting services for               Hässleholm–Lund
    high-speed rail planning, design                The Hässleholm–Lund project is one of the
    and delivery                                    links in a new high-speed network railway.
    Knowledge from international high-speed         Running through the heart of Sweden’s
    projects is necessary for effective planning,   southern most province of Skåne, it’s the
    design and delivery of the Swedish high-speed   key to connecting the south of Sweden to
    system. The contract starts: Autumn 2019.       Stockholm. Hässleholm–Lund is a 70 km
                                                    long double-track high speed railway with a
    Procurement information                         top speed of 320 km per hour. When the
    Tender documents will be published in June      new main line is completed, you’ll be able
    2019.                                           to travel between Stockholm and Malmö in
                                                    a significantly shorter amount of time than
    Contact                                         today’s 4 hours and 25 minutes. With the
    Peter Uneklint, Programme Director
                                                    new network comes an increase in
    +46 10-123 60 47
                                                    accessibility meaning both people and
    peter.uneklint@trafikverket.se
                                                    businesses will be brought closer together.
    trafikverket.se/nygenerationjarnvag             Start of construction: Planned for 2027–2029.
                                                    Procurement information
    The East Link Project                           The Hässleholm–Lund Project is now
    The East Link is the first part of a future     undergoing the procurement of a localiza-
    high-speed network railway. The East Link       tion study, the first step in the planning
    project is the first step, a double-track       process towards a railway plan.
    high-speed railway between Järna and
    Linköping. The East Link will be built for a    trafikverket.se/hassleholm-lund
    top speed of 250 km/h (155 mph). Our
    forecasts are that the East Link will cost      The Gothenburg–Borås project
    SEK 54 billion to build (the 2017 price         The new railway will create a rail connec-
    level). The project includes construction       tion to Göteborg Landvetter Airport and link
    work for 160 kilometres (or 100 miles) of       the region's two largest cities closer together.
    double track. We will build about 30            Gothenburg–Borås is a 60 km long
    tunnels with lengths between 100 meters         double-track high-speed railway with the
    and 8 kilometres (approximately 330 feet        top speed of 250 km per hour. When the
    and 4.9 miles). Total length about 25           new main line is completed, you’ll be able
    kilometres (16 miles). We plan to build         to travel between Stockholm and Gothen-
    approximately 200 bridges, with a total         burg in a significantly shorter amount of
    length of about 10 kilometre (6 miles).         time than today’s a just over three hours.
    We also plan to build tracks, contact lines,    With the new network comes an increase in
    signal systems ERTMS and telecommunica-         accesibility meaning both people and
    tions.                                          business will be brought closer together.
                                                    The contract starts: Planned for 2025–2027
    The construction of the East Link is planned
    to start in 2022. The construction time is      Procurement information
    expected to be over 10 years and by 2035        The Gothenburg–Borås Project is now
    we expect the railway to be ready for traffic   undergoing the procurement of a localiza-
    start.                                          tion study, the first step in the planning
                                                    process towards a railway plan.
    Contact
    Christian Ljungdahl, Project Manager            trafikverket.se/goteborg-boras
    +46 10-123 26 18
    christian.c.ljungdahl@trafikverket.se           Contact information for both projects:
                                                    Sara Distner, Project Manager
    trafikverket.se/ostlanken                       +46 70-623 32 88
                                                    sara.distner@trafikverket.se

2
Major business opportunities in Sweden 2019-2022 - WKO
The Swedish Transport Administration will procure
major construction and maintenance projects on
road and rail for 2019–2022. Below is a presentation
of projects that contractors can tender for.
The geographical area is Southern Sweden.

RAILWAY PROJECTS                                 Helsingborg–Teckomatorp,
                                                 track and points replacement
West Coast Line, Ängelholm–                      To increase operational reliability and
Helsingborg, Romares Väg                         reduce maintenance on Rååbanan, the
In order to increase capacity and reduce         Swedish Transport Administration will
travel time, the Swedish Transport Adminis-      replace track and points between Helsing-
tration will convert the section of line         borg and Teckomatorp. The work includes
between Ängelholm and Helsingborg,               replacing parts of the railway installations
Romares Väg to double track. The section is      such as rails, sleepers, ballast and points.
24 km long. Apart from the construction of       The contract starts: Winter 2019/2020
double tracks, the work also includes the
                                                 Procurement information
rebuilding of stations and level crossings and
                                                 Tender documents will be published in
the construction of bridges, noise protection
                                                 Summer 2019.
and the installation of new points, overhead
lines and new signalling systems along the       Tenders in Winter 2019
route. The contract starts: Spring 2020          Cost: SEK 100–300 million
Procurement information                          Contact
Tender documents will be published in            Jonas Lycksell, Project Manager
Spring 2019.                                     +46 10-123 37 26
                                                 jonas.lycksell@trafikverket.se
Tenders in Winter 2019/2020
Cost: SEK > 1,000 million                        trafikverket.se/raabananhb-tp
Contact
Åsa Rosberg, Project Manager
+46 10-123 01 22
                                                 ROAD PROJECTS
asa.rosberg@trafikverket.se
                                                 E22 Lösen–Jämjö
trafikverket.se/angelholm-helsingborg            The Swedish Transport Administration will
                                                 rebuild E22 to motorway between Lösen
Noise protection measures                        and Jämjö. The objective is to improve
Continental line Malmö                           traffic safety and accessibility on the
The Swedish Transport Administration will        section. The residential environment in
build noise barriers along parts of the          Jämjö will also improve as traffic is moved
Continental line to reduce noise from            away from the community. The section to
passenger trains in central Malmö. The           be rebuilt is approximately 15 km.
purpose is to meet Ground and Environ-           The contract starts Spring 2021.
ment Court’s requirements for passenger          Procurement information
traffic on the route. The measures include       Tender documents will be published in
approximately 4.4 kilometres of new/             Spring 2020.
changed noise barriers.
The contract starts: Autumn 2019                 Tenders are submitted in Autumn 2020
                                                 Cost: SEK 500–700 million
Procurement information
Tender documents will be published in            Contact
Spring 2019.                                     Johan Wolgast, Project Manager
                                                 +46 10-123 73 35
Tenders in Autumn 2019                           johan.wolgast@trafikverket.se
Cost: SEK 100–300 million
                                                 trafikverket.se/e22losen-jamjo
Contact
Lars Sätmark, Project Manager
+46 10-124 26 51
lars.satmark@trafikverket.se
trafikverket.se/kontinentalbanan

                                                                                                3
Major business opportunities in Sweden 2019-2022 - WKO
Contact                                           Procurement information
                                               Daniel Andersson, Project Manager                 Tender documents will be published in
                                               +46 10-123 66 37                                  Autumn 2020.
                                               daniel.andersson@trafikverket.se
                                                                                                 Tenders in Autumn 2020.
                                               trafikverket.se/E22ronneby-nattraby               Cost: SEK 100–300 million

                                               E22 Fjälkinge–Gualöv,                             Contact
                                                                                                 Magne Holm, Project Manager
                                               motorway development                              +46 10-123 68 71
                                               To increase traffic safety and accessibility      magne.holm@trafikverket.se
                                               on the E22, the Swedish Transport
                                               Administration will build a new motorway          trafikverket.se/osterleden-vaxjo
                                               from Fjälkinge interchange to be connected
                                               to the existing motorway at Gualöv. On the
                                               route, a new interchange must be built at         MAINTENANCE
                                               Bäckaskog, five bridges and parts of the
                                               pedestrian and cycle path and other local         Basic maintenance contract road
E22 Lund South interchange,                    traffic to be moved to new roads. A total of      The basic maintenance contract includes daily
                                               about 10 km of new local roads to be built.       maintenance of roads (winter road mainte-
E22 Gastelyckan interchange,                   The contract starts: Spring 2022                  nance, road surface, side area and median
Lund North (Ideon) interchange                                                                   strips, ancillary installations, road equipment,
and road 108 Staffanstorp–Lund                 Procurement information                           permit preparation etc.) The contract period is
The Swedish Transport Administration will      Tender documents will be published in             4 years with the possibility of a 1 or 2 year
rebuild the E22 interchange Lund South as      Autumn 2021.                                      option.
well as the route between the Gastelyckan      Tenders in Spring 2022.
interchange and the Lund North interchange.    Cost: SEK 300–500 million                         Basic maintenance on public
The purpose is to increase accessibility and   Contact                                           roads in the Malmö area in Skåne
road safety on the route. The project          Johan Månsson, Project Manager                    county
includes the construction of new additional    +46 10-124 32 30                                  The contract starts: September 2020.
lanes replacement of bridge structures and     johan.mansson@trafikverket.se
a new off-ramp and on-ramp to the Ideon/                                                         Procurement information
Pålsjö area. Road 108 between Staffanstorp     trafikverket.se/E22-fjalkinge-gualov              Tender documents will be published
and Lund will be rebuilt to collision-free                                                       in Autumn 2019.
with 2+2 lanes.                                E 65, Svedala–Börringe,
                                               motorway development                              Tenders in Autumn 2019
The contract starts: Autumn 2020.                                                                Cost: SEK 100–300 million
                                               The Swedish Transport Administration will
Procurement information                        upgrade the E65 between Svedala and               Contact
Tender documents will be published in          Börringe. Part of the route is to be rebuilt as   Johan Högström, Project Manager
Spring 2020.                                   motorway and part to collision-free country       +46 10-123 84 35
                                               road with four lanes. The objective is to         johan.hogstrom@trafikverket.se
Tenders in Autumn 2020                         improve traffic safety and accessibility on the
Cost: SEK 500–700 million                      section. The contract starts: Autumn 2021         Basic maintenance on public
Contact                                        Procurement information                           roads in the Växjö area in
Torbjörn Sundgren, Project Manager             Tender documents will be published in             Kronoberg county
+46 10 123 72 52                               Spring 2021                                       The contract starts: September 2021.
torbjorn.sundgren@trafikverket.se
                                               Tenders in Autumn 2021.                           Procurement information
trafikverket.se/e22-lund                       Cost: SEK 300-500 million                         Tender documents will be published in
trafikverket.se/e22-ideon
                                                                                                 Autumn 2020.
trafikverket.se/108-staffanstorp-lund          Contact
                                               Johan Månsson, Project Manager                    Tenders in Spring 2021
E22 Ronneby Ö–Nättraby                         +46 10-124 32 30                                  Cost: SEK 100–300 million
The Swedish Transport Administration will      johan.mansson@trafikverket.se
                                                                                                 Contact
build 13 km of new motorway connecting         trafikverket.se/e65svedala-borringe               Henrik Landhammar, Project Manager
with the existing route of the E22. Two new
                                                                                                 +46 10-123 80 92
interchanges will be built and an existing     Road 25, Österleden in Växjö                      henrik.landhammar@trafikverket.se
interchange will be rebuilt. A Lay-by in
Förkärla will be rebuilt and possibly have a
                                               – new interchange at Fagrabäck
new location. The purpose of the motorway      The Swedish Transport Administration will         Basic maintenance road on public
development is to improve accessibility and    rebuild the Österleden in Växjö and build a       roads in the Blekinge area in
traffic safety on the section. The contract    new interchange at Fagrabäck. The purpose         Blekinge county
starts: Autumn 2019.                           is to separate local traffic in Växjö from the    The contract starts: September 2021.
                                               traffic that passes by on roads 25 and 27,
Procurement information                        thus creating a safer and smoother journey        Procurement information
Tender documents will be published in          on the Österleden. The project includes           Tender documents will be published in
Spring 2019.                                   central separation of Österleden, three new       Autumn 2020.
                                               roundabouts and new pedestrian and cycle
Tenders in Autumn 2019                                                                           Tenders in Spring 2021
                                               paths. The contract starts: Spring 2021
Cost: SEK 20–50 million                                                                          Cost: SEK 100–300 million

4
Major business opportunities in Sweden 2019-2022 - WKO
Contact                                 Maintenance and reinvestment
Peter Johnsson, Project Manager         work on road lighting on public
+46 10-123 82 12
peter.johnsson@trafikverket.se
                                        roads in Västra Skåne county
                                        The contract starts: September 2020.
Integrated bridge maintenance,          Procurement information
Jönköping                               Tender documents will be published in
The contract starts: January 2020.      Autumn 2019.

Procurement information                 Tenders in Autumn 2019
Tender documents will be published in   Cost: SEK 20–50 million
August 2019.
                                        Contact
Tenders in October 2019                 Jörgen Lindberg, Project Manager
Cost: SEK 20–50 million                 +46 10-123 84 14
                                        jorgen.lindberg@trafikverket.se
Contact
Magnus Holm, Project Manager            Integrated bridge
+46 10-123 92 90
magnus.holm@trafikverket.se
                                        maintenance Skåne
                                        The contract starts: September 2021.
Maintenance and reinvestment            Procurement information
works on pumping stations within        Tender documents will be published in
Jönköping, Kronoberg, Kalmar,           Winter 2021.
Blekinge and Skåne counties             Tenders in Spring 2021
The contract starts: March 2020.        Cost: SEK 50–100 million
Procurement information                 Contact
Tender documents will be published in   Jörgen Boström, Project Manager
Summer 2019.                            +46 10-124 18 36
Tenders in Autumn 2019                  jorgen.bostrom@trafikverket.se
Cost: SEK 20–50 million
                                        Integrated bridge maintenance
Contact                                 Kalmar/Blekinge
Jörgen Lindberg, Project Manager        The contract starts: Autumn 2021.
+46 10-123 84 14
jorgen.lindberg@trafikverket.se         Procurement information
                                        Tender documents will be published in
Bridge package                          Winter 2022. Tenders in Spring 2022
Skåne 2020–Helsingborg                  Cost: SEK 20–50 million
The contract starts: February 2020.     Contact
Procurement information                 Lars Nilosjö, Project Manager
Tender documents will be published in   +46 10-123 84 16
Autumn 2019. Tenders in Autumn 2019     lars.nilosjo@trafikverket.se
Cost: SEK 20–50 million
                                        Basic maintenance contract rail
Contact                                 Basic maintenance rail is the product that
Jörgen Boström, Project Manager         meets the railway's need for basic mainte-
+46 10-124 18 36                        nance. Typical services in the basic contracts
jorgen.bostrom@trafikverket.se          are inspections, preventative and remedial
                                        maintenance and winter services. The
Maintenace and reinvestment             contracts include the technology areas Track,
work on road lighting on public         Electricity, Signals and Telecom.
roads in Östra Skåne and
Blekinge county                         Performance of basic
The contract starts: September 2020.    maintenance railway
                                        Malmö southeast Skåne
Procurement information                 The contract start: Autumn 2022.
Tender documents will be published in
Autumn 2019.                            Procurement information
                                        Tender documents will be published in
Tenders in Autumn 2019                  Spring 2021.
Cost: SEK 20–50 million
                                        Tenders in Autumn 2021
Contact                                 Cost: SEK 500–700 million
Jörgen Lindberg, Project Manager
+46 10-123 84 14                        Contact
jorgen.lindberg@trafikverket.se         Martin Thodenius, Project Manager
                                        +46 771-921 921
                                        martin.thodenius@trafikverket.se

                                                                                         5
Major business opportunities in Sweden 2019-2022 - WKO
The Swedish Transport Administration will procure
    major construction and maintenance projects on
    road and rail for 2019–2022. Below is a presentation
    of projects that contractors can tender for. The
    geographical area is Western Sweden.

    RAILWAY PROJECTS                               procurement Ground, Track and Overhead
                                                   line is during 2020.
    Staging track Lärje                            Estimated cost: SEK 3 million
    To deal with the forecast imbalance in the     Announcement of tender documents for
    system and the new opportunities created       contract procurement will be made during
    by the West Link traffic start in 2026, new    2022. Construction work is scheduled for
    staging tracks needs to be built. By 2027,     September 2022–2024.
    a staging yard will be established in Lärje,   Estimated cost: SEK 1.5 billion
    north of Gothenburg, along the Norway-
    Väner line.                                    trafikverket.se/savenasgodsbangard

    Procurement information                        Contact
    Announcement of tender documents for           Magnus Lundberg, Project Manager,
    procurement of railway plan will be            +46 10-123 64 90
    August/September 2019. Construction            magnus.b.lundberg@trafikverket.se
    work is scheduled to start in 2023–2024.
    Cost: SEK 200–400 million                      Halmstad Central Station
                                                   Halmstad C to be upgraded with, among
    Contact                                        other things, new platforms, tracks and
    Meysam Cordi, Project Manager                  points, rebuilding of overhead contact line,
    +46 10-124 18 45                               new passage under the rail depot, lifts and
    meysam.cordi@trafikverket.se                   escalators.

    Sävenäs Goods depot                            Procurement information
    Sävenäs goods depot is one of the largest      The railway plan work starts in 2021.
    marshalling yards in Sweden and has a          Project design is planned for 2022–2023.
    great need for modernisation. During the       Construction work is scheduled to start in
    period 2019–2029, the Swedish Transport        2025.
    Administration will carry out a lot of         Contact
    measures in the Sävenäs depot, where it is     Fredrik Bärthel, Project Manager
    planned to change the signal switchgear        +46 10-123 00 35
    (95). Upgrading of Land, VA and Track.         fredrik.barthel@trafikverket.se
    New overhead contact line will be built
    within the Sävenäs marshalling yard on the     Älvsborgs Line Bridge replacement
    R-group. Sävenäs goods depot is located in
    the eastern part of Gothenburg.
                                                   Vänersborg–Trollhättekanal
                                                   New opening railway bridge over Trollhätte­
    Sävenäs signal safety system                   kanal including ramps and guide sections,
                                                   new pedestrian and cycle path and new
    Procurement information                        signals for shipping. New signalling system
    Announcement of tender documents for           for train traffic. Connection to existing depot
    contract procurement will be during 2019.      and line. Demolition of existing bridge.
    Construction work is scheduled for
                                                   Procurement information
    September 2020.
                                                   Investigation of placement, bridge type
    Estimated cost: SEK 70 million
                                                   including calculations to be procured during
                                                   April 2019. Procurement of the railway
    Sävenäs Ground, VA, Track and                  plan and preliminary design take place
    Overhead line                                  at year end 2019–2020. These are planned
                                                   to be completed in spring 2022.
    Procurement information
                                                   Construction work is scheduled to start
    Announcement of tender documents for
                                                   in september 2023.
    investigations for Ground and Track Design
                                                   Cost: > SEK 1000 million
    will be during 2019. Announcement of
    tender documents regarding consultancy

6
Major business opportunities in Sweden 2019-2022 - WKO
Contact                                         Viskadal Line Borås–Varberg:                    Procurment information
Senad Cani, Project Manager                     Replacement of track, overhead                  Announcement of tender documents in
+46 10-123 42 16                                                                                August/September 2019. Construction
Senad.cani@trafikverket.se
                                                contact line and points                         work is scheduled to start in 2020.
                                                Upgrade of the Viskadalsbanan is carried        Cost: SEK 50–70 million
Älvsborgs Line Track and points                 out to ensure that the line functions as a
                                                robust and reliable rerouting track. The        Contact:
replacement Öxnered–Håkantorp                   contract includes replacement of track and      Daniel Svensson, Project Manager
Track and points replacement between            ballast and replacement of 16 sets of points    +46 10-123 32 68
Öxnered–Håkantorp is done to upgrade            between Borås and Varberg (about 82 km).        daniel.b.svensson@trafikverket.se
track and points quality for the future heavy   Overhead contact line replacement shall
rerouting traffic that will operate on this                                                     trafikverket.se/boras-hillared
                                                also be carried out on the present route
section when the West Link Project starts       where the old contact and auxiliary power
construction in the Gothenburg area.            management system will demolished and
                                                                                                Borås switchgear replacement
                                                replaced. The contract also includes            Signal switchgear and externals are
Procurment information                                                                          replaced. With new modern signal
Announcement of the contract is scheduled       painting of steel bridges, drainage
                                                measures and adaptations of level               switchgear, the depot is equipped with ATC.
for June 2019.
                                                crossings.                                      Construction work is scheduled to start in
Contact                                                                                         2021.
Timo Järvinen, Project Manager                  Procurement information
+46 10-123 41 31                                Announcement of tender documents in             Procurement information
timo.jarvinen@trafikverket.se                   November 2019. Construction work is             Tender documents will be published in 2020.
                                                scheduled in May 2020.                          Cost: SEK 50–100 million
Västra Stambanan Line Overhead                  Cost: SEK 400–600 million
                                                                                                Contact
contact line replacement                        Contact                                         Fredrik Kalén, Project Manager
Alingsås–Olskroken                              Patric Bjälkander, Project Manager              +46 76-027 43 23
The contract includes replacement of the        +46 10-123 01 08                                fredrik.kalen@trafikverket.se
overhead contact line system, auxiliary         patric.bjalkander@trafikverket.se
power plant and conversion to AT system.        trafikverket.se/boras-varberg                   Värmland Line Laxå–Arvika,
This applies to both up and down tracks                                                         Karlstad Central and Viken­
on the route. The route concerned is about      Älvsborg Line Remote blocking                   passagen
40 km long.
                                                Herrljunga–Borås and Track                      Rebuilding of Karlstad C including construc-
Procurment information                          replacement,                                    tion of new Vikenpassage (new tunnel under
Execution time including design is between      The project's goal is to remotely control the   depot), introduction of new switchgear 95,
2019–2025.                                      route Herrljunga–Borås, upgrade the             replacement of all rails, sleepers, points,
Estimated cost about SEK 420 million            standard of the track, carry out 42 km of       signals, overhead contact line and construc-
                                                track replacement, points replacement,          tion of new central platform and rebuilding
Contact                                                                                         of Karlstad C. Construction work is
Anders Bjers, Project Manager                   ballast cleaning and embankment cleaning
                                                so that the track can also serve as a           scheduled to start in 2022.
+46 10-123 04 04
anders.bjers@trafikverket.se                    rerouting track for the western main line       Procurement information
                                                and enable future capacity increases on         Tender documents will be published in
trafikverket.se/boras_signalstallverk           Älvsborg Line.                                  2021.
                                                Construction work is scheduled to start in      Cost: SEK 300–500 million
Västra stambanan Line Overhead
                                                2020.
contact line replacement                                                                        Contact
Falköping–Alingsås                              Procurement information                         Martin Bergwall, Project Manager
                                                Tender documents will be published in           +46 72-714 08 42
The contract includes replacement of the
                                                2019. Cost: SEK 100–300 million                 martin.bergwall@trafikverket.se
overhead contact line system, auxiliary
power plant and conversion to AT system.        Contact                                         trafikverket.se/karlstad-c
This applies to both up and down tracks on      Håkan Gustafsson, Project Manager
the route. The route concerned is about 69      +46 70-564 85 53                                Värmland Line Laxå–Kil:
km long.                                        hakan.a.gustafsson@trafikverket.se              Execution of track and points
Procurment information                          Anders Magnusson. Project Manager               replacement,
Execution time including design is between      +46 73-078 06 68                                Track replacement on sections 383, 382
2023–2029.                                      anders.magnusson@trafikverket.se                and 551 in the following municipalities:
Estimated cost: SEK 490 million                 trafikverket.se/herrljunga-boras                Laxå, Degerfors, Kristinehamn, Karlstad
                                                                                                and Kil. The track sections have a low
Contact                                                                                         technical standard and risk causing
Anders Bjers, Project Manager                   Kust till kust Line Track and points
                                                                                                problems for train traffic and incurring high
+46 10-123 04 04                                replacement Borås–Hillared,                     maintenance costs.
anders.bjers@trafikverket.se                    This is a design and construct contract. The
                                                contract includes track replacement and         Procurment information
                                                ballast cleaning, points replacement,           Project design: is called through renewed
                                                inspection of concrete bridges and              competition on Framework Agreement
                                                geotechnical reinforcement measures.            Planning and Project design. Announce-
                                                                                                ment: November 2019.
                                                                                                Contract starts: February 2020.

                                                                                                                                             7
Major business opportunities in Sweden 2019-2022 - WKO
ROAD PROJECTS                                     E20 past Mariestad
                                                                                                  New construction of 17 km of dual
                                                Construction of E20                               carriageway in a new or existing stretch as
                                                Göteborg–Örebro                                   a 2+2 road. Construction is scheduled to
                                                E20 will have improved road safety and            start in June 2022.
                                                accessibility through Västra Götaland.            Procurement information
                                                Several stretches still do not have a road with   Tender documents for a turnkey contract
                                                oncoming traffic separated by a centre            will be published in November 2021.
                                                barrier. Stages will build gradually towards a    Cost: SEK 1000 million.
                                                meeting­‑free situation, either a 1+1 road or a
                                                2+2 road. Involves 6–8 different procure-         E20 Tollered–Ingared
                                                ments.
                                                                                                  Rebuilding to 4 km of highway in an
                                                Contact 				                                      existing stretch. Construction is scheduled
                                                Björn Elfström, Project Manager                   to start in February 2020.
                                                +46 10-123 27 85
                                                                                                  Procurement information
                                                bjorn.elfstrom@trafikverket.se
                                                                                                  Tender documents for a turnkey contract will
                                                trafikverket.se/e20-goteborg-orebro               be preliminarily published in September 2019.
                                                                                                  Cost: SEK 100–300 million.
                                                E20 Vårgårda–Vara, part
                                                Ribbingsberg–Eling and                            E20 past Vårgårda
                                                Eling–Vara                                        New construction of a dual carriageway in
                                                New construction of 26 km of dual                 an existing stretch with at least 1.2 km as a
                                                carriageway in an existing section, 19 km         2+2 road. Construction is scheduled to
                                                with at least 8 km of 2+2 road. Construc-         start in July 2020.
                                                tion is scheduled to start in January 2020.       Procurement information
                                                Procurement information                           Tender documents for a performance
Contract: Announcement of tender
                                                Tender documents for a performance                contract will be published in January 2020.
documents is in June 2020.
                                                contract will be published in September           Cost: SEK 100–300 million
Cost: SEK 5–10 million
                                                2019. Cost: SEK 500–700 million.
Construction work is scheduled                                                                    Road 49, Axvall–Varnhem,
to start in 2021.                               E20 past Skara, Vilan–Dalån                       dual carriageway
Cost: SEK 500 million                                                                             The expansion to a dual carriageway is
                                                New construction of a dual carriageway, 8
Contact                                         km in an existing section with at least 40        scheduled to take place in May 2021.
Jörgen Olofsson, Project Manager                per cent as a 2+2 road. Construction is           The aim is to improve accessibility, road
+46 10-123 20 75                                scheduled to start in October 2019.               safety and road standards, but also to
jorgen.olofsson@trafikverket.se                                                                   improve environmental conditions along the
                                                Procurement information                           road. The project includes construction of a
                                                Tender documents for a performance                new interchange at Varnhem as well as an
National Agreement
                                                contract will be published in April 2019.         animal crossing over road 49.
for Rail Machining                              Cost: SEK 200–300 million.
The Swedish Transport Administration                                                              Procurement information
processes the entire rail network's rails and   E20 past Skara, Dalån–Ledsjö                      Tender documents will be published in
points, as the rail's surface is affected and   New construction of a dual carriageway,           November 2020.
worn by vehicles operating on the tracks.       8 km in an existing section with at least         Cost: SEK 100–300 million.
Machining (material removal) can delay the      40 per cent as a 2+2 road. Construction is
emergence of and remove surface damage                                                            Contact
                                                scheduled to start in November 2021.              Johan Larsson, Project Manager
and unevenness, which increases rail life
and the safety of the tracks. Rail machining    Procurement information                           +46 10-124 15 36
is primarily preventative, systematic           Tender documents for a performance                johan.c.larsson@trafikverket.se
maintenance.                                    contract will be published in February 2021.      trafikverket.se/vag-49-axvall-varnhem
                                                Cost: SEK 200–300 million.
Procurement information:
Announcement of the contract is scheduled
                                                                                                  E6.20 Hisingsleden
                                                E20 Götene–Mariestad                              Reconstruction and new construction of the
for May 2019. Establishment time is
                                                New construction of 20 km of dual                 southern part of Hisingsleden. The Swedish
estimated at 1 year and the machining
                                                carriageway in a new or existing stretch as       Transport Administration plans to rebuild
orders will start from January 2021.
                                                a 2+2 road. Construction is scheduled to          this into a collision-free road with four lanes.
Contact                                         start in August 2022.                             Two signal controlled and accident-prone
Stefan Lundström-Sveder, Project Manager                                                          crossings are replaced with level-separated
                                                Procurement information
+46 10-123 14 60                                                                                  interchanges. A third interchange is built to
                                                Road plan, consultation document, draft
stefan.lundstrom-sveder@trafikverket.se                                                           connect the new logistics centre in Sörred to
                                                plans, as well as preparation of tender
                                                                                                  Hisingsleden at John Bunyans Väg.
                                                documents for a turnkey contract, and
                                                building site management shall be                 The contract also includes a new pedestrian
                                                contracted out. Tender documents will be          and cycle path from Assar Gabrielssons Väg
                                                published in February 2022.                       to Björlandavägen. Construction work is
                                                Cost: SEK 1000 million.                           scheduled to start in 2021.

8
Major business opportunities in Sweden 2019-2022 - WKO
Procurement information                       MAINTENANCE                                        Integrated Bridge Maintenance
Tender documents will be published in                                                            Integrated Bridge Maintenance involves
2020. Cost: SEK 100–300 million                                                                  maintenance with a focus on bridges/
                                              Basic maintenance contract road                    construction works. The contracts are divided
Contact                                       Includes daily maintenance of roads within a
Karolina Petersen, Project Manager                                                               by county. The contract period extends over
                                              specified geographical area (winter road           5 years and is designed as turnkey contracts
+46 70-679 49 78                              maintenance, road surface, dewatering, side
karolina.petersen@trafikverket.se                                                                split into two parts: Predetermined mainte-
                                              area and median strips, ancillary installations,   nance and permit-based maintenance.
                                              road equipment, permit preparation). The
E45 Collision-free country road,              contract period is 4 years with the possibility
Tösse–Åmål                                                                                       Integrated bridge
                                              of a 1 or 2 year option.
The Tösse–Åmål is converted to collision-
                                                                                                 maintenance Skaraborg
free with barriers and signposted speed is    Basic road maintenance on public                   Procurement information
increased to 100 km/h. This includes          roads in Södra Halland area,                       Announcement of the contract is scheduled
widening the road to 2 + 1 lanes, wildlife    Halland county                                     for June 2020. Cost: SEK 50–100 million
fencing and overview of connecting roads.
There will also be a pedestrian and cycle     Procurement information                            Integrated bridge
path including a pedestrian and cycle         Announcement of the contract is scheduled
bridge over the railway.
                                                                                                 maintenance Vänersborg
                                              for October 2019.
                                              Cost: SEK 100–300 million                          Procurement information
Procurement information
Announcement of tender documents is                                                              Announcement of the contract is scheduled
                                              Contact information for all
planned in Autumn 2020.                                                                          for June 2019. Cost: SEK 50–100 million
                                              maintenance projects
                                              Marlene Hansson, Purchaser
Construction work is scheduled to start in                                                       Integrated bridge
Spring 2021.                                  +46 10-123 78 45
                                              marlene.hansson@trafikverket.se                    maintenance Halland
Contact                                                                                          Procurement information
Ingrid Sjöstrand, Project Manager             Basic road maintenance on public                   Announcement of the contract is scheduled
+46 10-123 00 56                              roads in Borås area,                               for January 2021. Cost: SEK 50–100 million
ingrid.sjostrand@trafikverket.se              Västra Götaland county
                                                                                                 Maintenance of bridge
Tingstad tunnel: Execution of                 Procurement information
                                                                                                 over Sunnesundet in Sunne
exstensive maintenance,                       Announcement of the contract is scheduled
                                                                                                 New superstructure of the former opening
installation and safety enhancing             for October 2019.
                                                                                                 span.
                                              Cost: SEK 100–300 million
measures
The Tingstad tunnel is a 455 m long sunken                                                       Procurement information
                                              Basic maintenance on public                        Announcement of the contract is scheduled
tunnel, under the Göta Älv river, which
connects Hisingen with the rest of            roads in the south west Värmland                   for October 2019. Cost: SEK 20–50 million
Gothenburg's mainland. The tunnel is          area
located on the E6 which is the main route
through Gothenburg and is the busiest
                                              Procurement information
                                              Announcement of the contract is scheduled
passage across the Göta Älv river.
                                              for October 2019. Cost: SEK 100–300
The tunnel will undergo comprehensive
                                              million
measures during 2021–2023: renovation of
existing structures and replacement of
technology for increased longevity,
                                              Basic maintenance on public
installation improving measures to reduce     roads in the Arvika area
vulnerability and environmental impact and
                                              Procurement information
safety-enhancing measures to reduce the
                                              Announcement of the contract is scheduled
consequences of accidents.
                                              for October 2020. Cost: SEK 100–300
Construction work is scheduled to start in    million
2022–2023.
                                              Basic maintenance on public
Procurement information
Procurement of project design is planned to
                                              roads in the Kungälv–Tjörn area
be announced in June 2019.                    Procurement information
Procurement of contracts is planned to be     Announcement of the contract is scheduled
announced in the period December 2019 to      for October 2020. Cost: SEK 100–300 million
July 2020. Cost: SEK 450–500 million
                                              Basic road maintenance on public
Contact                                       roads in Uddevalla area, Västra
Stefan Frisk, Project Manager
+46 10-123 68 51
                                              Götaland county
stefan.a.frisk@trafikverket.se                Procurement information
www.trafikverket.se/tingstadstunneln          Announcement of the contract is scheduled
                                              for October 2020.
                                              Cost: SEK 100–300 million

                                                                                                                                                 9
Major business opportunities in Sweden 2019-2022 - WKO
10
The Swedish Transport Administration will procure
major construction and maintenance projects on
road and rail for 2019–2022. Below is a presentation
of projects that contractors can tender for. The
geographical area is Stockholm and Eastern Sweden.

RAILWAY PROJECTS                              Jessica Lindell, Head of procurement
                                              +46 72-141 96 68
Rebuilding and improvements                   jessica.lindell@trafikverket.se
at Stockholm Central Station                  trafikverket.se/malarbanan
The station environment at Stockholm
Central Station does not meet accessibility   Hallsberg–Degerön
requirements, and there is a need for         The Swedish Transport Administration is
upgrades. Therefore, we are performing        building double tracks on the Hallsberg–
quality and safety measures at the central    Degerön section. We wish to increase
station and adapting platforms and tracks     capacity and punctuality and improve
to changing needs.                            safety. The section is 46 km long. The
                                              project consists of several parts that are at
Procurement information
                                              different stages.
Tender documents are published in March
2019. Cost: SEK 900 million                   Procurement information
Contact                                       Hallsberg–Stenkumla
Veronica Bergfors Runing, Project Manager     2–4 construction and design and construct
+46 10-123 52 63                              contracts.
veronica.bergfors-runing@trafikverket.se      Cost: SEK 0.5–1.5 billion
                                              Includes: Bridges, ground, a large tunnel,
trafikverket.se/atgarderstockholmc
                                              BEST. Request for quotation sent Summer/
                                              Autumn 2020
Mälaren Line Project
We are expanding the railway between          Dunsjö–Jakobshyttan
Tomteboda and Kallhäll near Stockholm,        One design and construct contract
from two to four tracks, a total of 20        Cost: SEK 200–400 million
kilometres. The commuter train is being       Includes: Ground, tunnel, BEST
separated from other train services which     Request for quotation sent Autumn 2019
provides tighter turnarounds, better
                                              Jakobshyttan–Degerön
punctuality and shorter travel time. We are
                                              One design and construct contract
building commuter stations as well as new
                                              Cost: SEK 500–700 million
bridges and tunnels for both cars and
                                              Includes: Bridges, ground, BEST
pedestrian traffic.
                                              Request for quotation sent Winter
Parts of the route are already finished and   2019–2020
put into operation. The entire development
                                              Contact
of Tomteboda–Kallhäll will be completed no
                                              Linda Lingdell, Programme Coordinator
earlier than 2029.
                                              +46 10-123 70 35
Procurement information                       linda.lingdell@trafikverket.se
The procurement of 5 major contracts for
                                              trafikverket.se/hallsberg-degeron
the implementation of the project remains
                                              trafikverket.se/en/double-tracks-hallsberg-
to be done.
                                              degeron
Cost: The size of the procurements vary
between SEK 100–700 million.
Contact
Per-Eric Metso, Project Manager
+ 46 70-758 81 69
per-eric.metso@trafikverket.se
Ulf Öhman, Project Manager
+ 46 70-762 43 08
ulf.ohman@trafikverket.se

                                                                                          11
ROAD PROJECTS                                  Contact                                          Road 56 Katrineholm–Alberga
                                               Jan Halén, Project Manager
                                                                                                Assignment on road 56 between Katrine-
 Road 77 Uppsala county border                 +46 72-143 28 87
                                                                                                holm comprises rebuilding to a collision-
                                               jan.halen@trafikverket.se
– Rösa interchange                                                                              free road with widening for overtaking
The Swedish Transport Administration                                                            stretches along the existing road, a total of
                                               E 18, Arninge travel centre                      about 33 km of which 3 km is new. The
intends to improve road safety and
accessibility on road 77 between the           A new travel centre will be built in Arninge.    road geometry is poor in places and needs
Uppsala county border and the Rösa             Täby Centrum-Arninge in Täby municipality        to be rebuilt entirely with improvements in
interchange. The road is about 30 km long      is one of the largest shopping areas in the      plan and profile.
and connects Rimbo, Norrtälje and the          region. The overall objective of the project
                                               is to ensure the availability of sustainable     Procurement information
harbour in Kapellskär with the E4 and the
                                               public transport and fast, safe and easy         Project design: Fixed-price with variable on
inner parts of Uppland and Bergslagen. The
                                               changes for travellers.                          construction site follow up and E2 appendix
project consists of both new construction in
                                                                                                Contract: Construction contract.
virgin land and rebuilding an existing         Procurement information
section. Construction starts in 2021.          The construction parts to be built include       Contact
                                               bridges and roads. We will be procuring          Jan Nyman, Project Manager Road
Procurement information
                                               this on 29 March 2019.                           +46 76-144 58 67
The project consists of three stages, of
                                               Cost: SEK 250–300 million                        jan.nyman@trafikverket.se
which stage 1 is a build contract and stages
2 and 3 are design and construct contracts.    Contact                                          trafikverket.se/bie-alberga
Tender documents for the procurement of        Fredrik Emmot, Project Manager
construction document consultant will be       +46 10-123 67 69                                 Road 56 Kvicksund–Västjädra
published in October 2019.                     fredrik.emmot@trafikverket.se                    The road 56 Kvicksund–Västjädra assign-
                                                                                                ment, which is important for commuting
Contact                                        trafikverket.se/arninge
                                                                                                between Västerås and Eskilstuna, compri-
Pernilla Ngo Magnusson. Project Manager
                                                                                                ses rebuilding to a collision-free road with
+46 10-123 70 93                               E4/E20 Södertälje bridge,                        widening from 9 meter to 13 meter. There
pernilla.ngo@trafikverket.se                   capacity improvement                             are three accident prone crossings with
trafikverket.se/vag77                          The Swedish Transport Administration will        poor visibility and low traffic safety
                                               develop a road plan to upgrade the E4 and        standard on the section, which covers
Road 263 replacement of opening                E20 between Moraberg interchange and             about 14 km.
bridge, Erikssund                              Saltskog interchange from two to three
                                               lanes in each direction.                         Procurement information
The opening bridge on road 263 over                                                             Project design: Fixed-price with variable on
Erikssund shall be replaced with a new         Procurement information                          construction site follow up and E2 appendix
opening bridge. The two existing lanes are     Procurement of consultants for the               Contract: Construction contract.
to be widened and the bridge will be given     preparation of road plan, tender documents
a pedestrian and cycle lane for unprotected    and construction site follow-up during           Contact
road users.                                    Summer 2019.                                     Jan Nyman, Project Manager Road
                                                                                                +46 76-144 58 67
Procurement information                        Contact                                          jan.nyman@trafikverket.se
Design and construct contract, procured        Lars Sandberg, Project Manager
together with road 841, replacement of         +46 10-123 88 74                                 trafikverket.se/vag56kvicksund-vastjadra
opening bridge Almarestäket. Tender            lars.sandberg@trafikverket.se
documentation for tender calculation will                                                       Programme E18 Jakobsberg
be published in October 2019.                  E18 Köping–Västjädra                             interchange–Hjulsta interchange
Cost: SEK 80–150 million.                      The assignment comprises upgrading of the        including capacity increase as a
Contact                                        approximately 25 km long section between         result of E4 Bypass Stockholm
Jan Halén, Project Manager                     Köping and Västjädra on the E18 to               The area around the districts of Hjulsta and
+46 72-143 28 87                               motorway. This is the last section to obtain     Barkarby in north-western Stockholm will
jan.halen@trafikverket.se                      motorway standard all the way between            undergo a major change in the next 15
                                               Örebro and Stockholm. A long-awaited             years with several infrastructure measures
Road 841, replacement of opening               measure that provides a road with good           and large-scale developments. The Hjulsta
                                               conditions for supporting regional develop-      interchange will be a crossroads between
bridge over Almarestäket
                                               ment, increasing road safety and improving       the new E4 Bypass Stockholm and the E18,
The opening bridge on road 841 over            mobility.
Almarestäket on the border between the                                                          which will make the interchange one of
                                                                                                Sweden's busiest by 2030.
municipalities of Järfälla and Upplands–Bro    Procurement information
will be replaced with a new opening bridge.    Consultant procurement tender documents          The aim of the programme is primarily to
                                               TE + construction site follow up: Fixed price    increase the capacity of the Hjulsta
Procurement information                        tender documents TE, variable construction       interchange with connection to the E4
Design and construct contract, procured        site follow up. Design and construct contract.   Bypass Stockholm and to shorten travel
together with road 263, replacement of
                                                                                                times thanks to reduced traffic problems on
opening bridge Erikssund. Tender documen-      Contact
                                                                                                the E18 and E4.
tation for tender calculation will be          Lars Königsson, Senior Project Manager
published in October 2019.                     +46 70-324 43 48                                 The programme affects the E18 from
Cost: SEK 80–150 million.                      lars.konigsson@trafikverket.se                   Jakobsberg interchange to Hjulsta inter-
                                                                                                change, a distance of about 3 km. The
                                               trafikverket.se/E18koping-vastjadra

12
scope is not fully established, but currently   Contact                                           Procurement information:
includes (from the west), a new interchan-      Kajsa Svanberg, Sourcing Manager                  See the purchasing schedule.
ge at Barkarby, a police checkpoint             +46 10-123 41 04
                                                kajsa.svanberg@trafikverket.se                    The size of the procurements vary between
(included in the programme for geographi-
                                                                                                  SEK 30 and 120 million. Volume value 2019
cal reasons), capacity improvement
                                                Integrated bridge maintenance                     approximately SEK 610 million.
measures in Hjulsta and the extension of
lanes along the entire route.                   Integrated Bridge Maintenance involves            Contact
                                                maintenance contracts divided by county           Kajsa Svanberg, Sourcing Manager
Procurement information
                                                with a focus on bridges/construction works.       +46 10-123 41 04
Sending out tender documents for a joint
                                                The contract period extends over four or          kajsa.svanberg@trafikverket.se
procurement of road plan, production of
                                                five years and is designed as turnkey
tender documents for the construction
contract and construction site follow-up is
                                                contracts split into two parts: Predetermi-       Infrasystems
                                                ned maintenance and permit-based                  Infrasystems include:
planned to take place in Summer 2019.
                                                maintenance.                                      • Electric Power/Lighting
Estimated total cost: > SEK 500 million.
                                                Procurement starts:                               • VA/Ventilation
Contact                                         • Uppsala County Q1 2020                          • Telecom, control and control technology
Jonas Halzius, Project Manager
                                                • Örebro County Q1 2021                           • Lead traffic
+46 10-123 62 75
jonas.halzius@trafikverket.se                   • Västmanland County Q1 2022                      • User charges
                                                                                                  • ATK
trafikverket.se/E18_jakobsberg_hjulsta          Procurement information
                                                                                                  • VViS
                                                See the purchasing schedule.
                                                                                                  • Coordination complex installations
Södertörn Crosslink Project                     The size of the procurements vary between
                                                                                                      and maintenance system Maximo.
The Swedish Transport Administration plans      SEK 35–70 million. Volume value 2019 is
to build Södertörn Crosslink Project, a new     included in Construction work.                    Procurement information
road between highway E4/E20 at Skär-            Contact                                           See the purchasing schedule.
holmen/Kungens kurva to highway 73 at           Kajsa Svanberg, Sourcing Manager
Haninge centre, via Flemingsberg in                                                               The size of the procurements vary between
                                                +46 10-123 41 04                                  SEK 10 and 100 million. Volume value 2019
Stockholm region.                               kajsa.svanberg@trafikverket.se                    approximately SEK 390 million.
This new traffic solution is needed to
achieve the goals of improved safety and        Basic maintenance contract rail                   Contact
accessibility at Södertörn. The crosslink       Basic maintenance contract rail includes          Kajsa Svanberg, Sourcing Manager
also contains a new pedestrian                  preventive and corrective maintenance of          +46 10-123 41 04
and cycle route.                                railways within a particular geographical area.   kajsa.svanberg@trafikverket.se
                                                The contract period is 5 years with the
Procurement information                         possibility of a 2 year option. Procurement       Construction work
According to the current timetable, tender      usually starts 2.5 years before the expected      Construction work includes (excl integrated
documents will be published in 2019/2020.       contract start.                                   bridge maintenance), other bridge
Cost: SEK 10 billion.                                                                             maintenance, tunnels, rock slopes and
                                                Procurement starts:                               bridges.
Contact                                         • 2019 – Stockholm South, Southern Main
Ove Strömberg, Purchasing Officer                  Line 1 and Western Main Line                   Procurement starts:
+46 10-124 31 81                                                                                  • Varying bridge maintenance work
ove.stromberg@trafikverket.se                   Procurement information                              Essingeleden 2019–2021
                                                See the purchasing schedule.                      • Repairs Solna Tunnels 2020
trafikverket.se/tvarforbindelsesodertorn
                                                The size of the procurements vary between
                                                SEK 150 and 1000 million. Volume value            Procurement information
                                                2019 approximately SEK 1000 million.              See the purchasing schedule.
MAINTENANCE
                                                Contact                                           The size of the procurements vary between
Basic maintenance contract road                 Kajsa Svanberg, Sourcing Manager                  SEK 1 and 100 million. Volume value 2019
Basic maintenance contract road includes road   +46 10-123 41 04                                  approximately SEK 390 million.
repair and preventive maintenance within a      kajsa.svanberg@trafikverket.se
specified geographical area.
                                                                                                  Contact
                                                Surfacing                                         Kajsa Svanberg, Sourcing Manager
The contract period is 4 years with the
                                                                                                  +46 10-123 41 04
possibility of a 1 or 2 year option.            Maintenance surfacing and reinforcement
                                                                                                  kajsa.svanberg@trafikverket.se
                                                measures in East/Stockholm: Surfacing
Procurement starts:
                                                measures include adjustment, milling and a
• Q4 2019–Värmdö, Norrköping
                                                new wear layer on the roadway and side
• Q4 2020–Örebro                                surfaces, access roads and parking places.
Procurement information                         The contract period is 1–3 years with the
See the purchasing schedule.                    possibility of a 1 or 2 year option.
The size of the procurements vary between
SEK 50–300 million. Volume value 2019
approximately SEK 850 million.

                                                                                                                                           13
14
The Swedish Transport Administration will procure
major construction and maintenance projects on
road and rail for 2019–2022. Below is a presentation
of projects that contractors can tender for. The
geographical area is Central Sweden.

RAILWAY PROJECTS                              also have a positive effect on the Dala line.
                                              Railway plan including location investiga-
East Coast Line Dingersjö–                    tion to find the best options for increasing
                                              the capacity of the freight line between
Sundsvall Double Track                        Avesta Krylbo and Dalslund (about 5 km),
Double track on the east coast line           including Krylbo depot.
between Dingersjö and Sundsvall, a
distance of 14 km. The development            Procurement information
provides space for more trains and freight    Planning sending out tender documents
trains. It also provides better connections   Autumn 2019. Cost SEK 10–20 million
to industries along the track. Construction
2024–2028.                                    Procurement information
                                              Construction documents. Sending out
Procurement information                       tender documents Spring 2021.
Railway plan, preliminary design,             Cost: SEK 5–10 million
construction documents. Sending out
tender documents Summer 2019.                 Procurement information
                                              Production. Sending out tender documents
Contact                                       Spring 2022. Cost: SEK 100-300 million
Thomas Gauffin, Project Manager
+46 10-123 43 94                              Contact
thomas.gauffin@trafikverket.se                Anders Danielsson
                                              +46 72-142 22 07
trafikverket.se/dingersjo-sundsvall           anders.danielsson@trafikverket.se

Sundsvall Travel Centre,                      trafikverket.se/godsstraket-avestakrylbo-
                                              dalslund
access and platforms
Rebuilding of tracks and platforms at         Speed increasing measures
Sundsvall Central Station's depot to
increase accessibility, improve change
                                              along Dalabanan
times, increase traffic safety and create     Extension of existing passing tracks and
more efficient handling of goods. Passenger   construction of a new passing track on this
trains and freight trains are separated by    section. Improved passing tracks mean that
having a new direct connection from the       trains can pass without stopping, and more
east coast line in the southeastern part.     trains can operate on Dalabanan.
Switchgear replacement. Construction          Procurement
2022-2025.                                    Ground contract. Sending out tender
Procurement information                       documents January 2020.
Preliminary design, Construction docu-        Cost: SEK 100–300 million
ments. Sending out tender documents           Contact
Autumn 2019.                                  Riitta Pettersson, Project Manager
Cost: SEK 10–20 million                       +46 10-124 41 75
Contact                                       trafikverket.se/dalabanan
Thomas Gauffin
+46 10-123 43 94                              East Coast Line,
thomas.gauffin@trafikverket.se                stage Gävle –Kringlan,
trafikverket.se/sundsvall-resecentrum         capacity increase
                                              Planning process in order to establish a
Goods line Avesta Krylbo–                     railway plan for double track expansion
Dalslund, double track                        between Gävle and Kringlan, approximately
Measures to increase the capacity of the      38 km. The double track extends the
goods line between Avesta Krylbo and          capacity on the route. The process initially
Dalslund, about 5 km. The measures will       includes a formal choice of alternative
                                              route.

                                                                                          15
Procurement information                        Procurement information                        Road 83 Bollnäs-Vallsta
Line study. Sending out tender documents       Production. Sending out tender documents       Reconstruction of road 83 between
June 2019.                                     October 2019.                                  Bollnäs-Vallsta for increased road safety
Cost: SEK 10–20 million                        Cost: SEK 100–300 million                      and better road standard. A distance of
Procurement information                        Contact                                        17.4 km. Partly new route. Replacement of
Railway Plan Gävle C-Gävle West. Sending       Åsa Bergqvist, Project Manager                 railway portal in Växjö.
out tender documents 2020.                     + 10-124 31 86                                 Procurement information
Cost: SEK 20–50 million                        asa.bergqvist@trafikverket.se                  Construction documents including
Procurement information                        trafikverket.se/e45-70-genom-mora              construction site follow up. Sending out
Railway plan Gävle Västra-Kringlan.                                                           tender documents Autumn 2019.
Sending out tender documents 2020.             E16/Road 70, Borlänge–Djurås,                  Cost: SEK 10–15 million.
                                                                                              Production. Sending out tender documents
Cost: SEK 20–50 million                        Traffic safety improvement
                                                                                              Autumn 2021. Cost: SEK 100–300 million.
Contact                                        measures,
Ragnhild Brändeskär, Project Manager           Reconstruction of the road to Collision-free   Contact
+46 10-124 24 49                               country road with central barrier to improve   Christian Ödgren, Project Manager
ragnhild.brandeskar@trafikverket.se            traffic safety for road users and residents.   +46 10-123 62 86
                                               16 km.                                         christian.odgren@trafikverket.se
trafikverket.se/gavle-sundsvall-dubbelspar
                                               Procurement information                        trafikverket.se/bollnas-vallsta
Gävle Harbour, rail connection                 Production. Sending out tender documents
Measures to relieve the entrance to Gävle      Spring 2020.
depot, increase capacity and create a direct   Cost: SEK 100–300 million                      MAINTENANCE
connection to Gävle harbour. New
                                               Procurement information                        Basic maintenance contract road
construction of about 2 km new track,
                                               Stage 2, Construction documents. Sending       Includes daily maintenance of roads (winter
electrification of about 8 km of existing
                                               out tender documents Autumn 2020.              road maintenance, road surface, dewatering,
track and new points. Railway bridge over
                                               Cost: SEK 10–20 million                        side area and median strips, ancillary
Strömsbrovägen.
                                               Procurement information                        installations, road equipment, permit
Procurement information                        Stage 2, Production. Sending out tender        preparation). The contract period is 4 years
Production. Sending out tender documents                                                      with the possibility of a 1 or 2 year option.
                                               documents Summer 2022.
Summer 2019.
                                               Cost: SEK 100–300 million                      The following areas will be contracted out
Cost: SEK 100–300 million
                                               Procurement information                        in 2021.
Contact                                        Stage 3, Construction documents. Sending
Mark Jones, Project Manager                                                                   Procurement information
                                               out tender documents Spring 2020.              Tender documents will be published in
+46 10-123 21 20
                                               Cost: SEK 10–20 million                        October 2020.
mark.jones@trafikverket.se
                                               Procurement information                        Kramfors, turnkey contract.
trafikverket.se/gavlehamn                                                                     Cost: SEK 100–300 million
                                               Stage 3, Production, design and construct
                                               contract. Sending out tender documents         Sveg, turnkey contract.
Gävle–Åänge, Track replacement                 Winter 2022. Cost: SEK 100–300 million         Cost: SEK 100 –300 million
Track replacement between Strömsbro and                                                       Svenstavik, turnkey contract.
Vallvik, a distance of approximately 62 km,    Contact                                        Cost: SEK 100–300 million
6 points replacements. Investigation of        Patrik Svärd, Project Manager                  Älvdalen, turnkey contract.
possible speed increase is ongoing.            +46 10-123 64 04                               Cost: SEK 100–300 million
                                               patrik.svard@trafikverket.se
Procurement information                                                                       Contact
Production. Sending out tender documents       trafikverket.se/borlange-djuras                Johanna Wik, Sourcing Manager
Autumn 2019.                                                                                  +46 10-124 31 09
Cost: SEK 300–500 million                      E4 Kongberget-Gnarp,                           johanna.wik@trafikverket.se
Contact
                                               Production
                                               New stretch of the E4 between Kongberget-      Basic maintenance contract rail
Adam Larsson, Project Manager
                                               Gnarp with collision-free road with central    Basic maintenance contract rail includes
+46 10-123 06 22
                                               barrier (2 + 1), to increase road safety and   preventive and corrective maintenance of
adam.b.larsson@trafikverket.se
                                               accessibility along the route. A distance of   railways within a particular geographical area.
                                               about 22 km. Start of construction 2022.       The contract period is 5 years with the
                                                                                              possibility of a 2 year option.
ROAD PROJECTS                                  Procurement information
                                               Production. Sending out tender documents       Ostkustbanan
E45/Road 70 through Mora,                      Autumn 2022.
                                                                                              Ostkustbanan will be contracted out in
capacity-increasing measures                   Cost: > SEK 1000 million
                                                                                              2021.
New roundabouts, separate pedestrian and
                                               Contact
cycle routes and passages, as well as more                                                    Procurement information
                                               Kerstin Holmgren, Project Manager
lanes. Measures to prevent queues, shorten                                                    Tender documents will be published in
                                               +46 10-123 73 92
travel time and contribute to reduced                                                         august 2019. Cost: 700-1000 million
                                               kerstin.holmgren@trafikverket.se
environmental impact through Mora. Start
of construction 2020.
                                                                                              Contact
                                               trafikverket.se/e4gnarp
                                                                                              Anna-Pia Lingemyr, Project Manager
                                                                                              +46 10-124 31 38
                                                                                              anna-pia.lingemyr@trafikverket.se

16
The Swedish Transport Administration will procure
major construction and maintenance projects on
road and rail for 2019–2022. Below is a presentation
of projects that contractors can tender for. The
geographical area is Northern Sweden.

RAILWAY PROJECTS                                 Track replacement
                                                 incl overhead wire upgrade
North Bothnia Line                               Västeraspby–Långsele
A 270 km long new coastal railway                The 46 km long stretch between Västerasp-
between Umeå–Luleå, which will                   by and Långsele needs to be refurbished.
strengthen rail freight traffic in Sweden and    Ground work will be made in 2021, 2022
increase the ability to travel between the       replacing track and 2022–2023 replacing
cities along the Norrland coast. It will bring   the contact line system.
double tracks to the Main Line (Stamba-
nan), increased capacity, substantial            Procurement information
reductions in transport costs and halved         Tender documents: 2022 Railway contract.
travelling times along the coast.                Cost: SEK 300–400 million

The project is estimated to cost SEK 29          Contact
billion.                                         Per Lindmark, Project manager
                                                 +46 10-123 74 01
All railway studies have been completed.         per.lindmark@trafikverket.se
Trafikverket is currently working on
developing railway plans for the section         trafikverket.se/vasteraspby-langsele
between Umeå-Skellefteå. In 2018,
construction began between Umeå–Dåva.            Gammelstad depot extension
The project is currently working on a            To increase the capacity of both passenger
construction procurement plan for the            and freight trains, the Gammelstad
stretch from Dåva (north of the city of          operating site needs to be extended so that
Umeå) to the city of Skellefteå in the north     750 metre-long ore trains can pass there.
of Sweden.                                       The entire operating site will also be
                                                 equipped with, among other things,
Contact
                                                 improved noise measures. Construction
Lars Bergdahl, Project Director
                                                 start no earlier than 2021.
+46 10-123 74 41
lars.bergdahl@trafikverket.se                    Procurement information
                                                 Tender documents: 2020.
trafikverket.se/norrbotniabanan
                                                 Cost: SEK 100–200 million
Track replacement                                Contact
incl overhead wire upgrade                       Peter Keisu, Project Manager
Västeraspby–Långsele                             +46 10-123 81 62
The 46 km long stretch between Västerasp-        peter.keisu@trafikverket.se
by and Långsele needs to be refurbished.         trafikverket.se/gammelstad_bangard
Ground work will be made in 2021, 2022
replacing track and 2022–2023 replacing
the contact line system.                         ROAD PROJECTS
Procurement information                          MaKS = Ore shipments
Railway project design. Tender documents:        Kaunisvaara–Svappavaara
2021. Cost: SEK 10–15 million
                                                 MaKS: Bypass Vittangi
Contact                                          and Anttis–Lovikka
Per Lindmark, Project Manager                    Bypass Vittangi: new road about 6 km
+46 10-123 74 01                                 including new bridge and snowmobile
per.lindmark@trafikverket.se                     portal. Anttis-Lovikka: about 13.5 km
trafikverket.se/vasteraspby-langsele             widening and reinforcement of existing road
                                                 and some curve correction