Business opportunities
in Sweden

         Major business
         opportunities
          in Sweden
          2018-2020
                           Together we
                           do intelligent
                          and sustainable
                             business
Business opportunities in Sweden - Major business opportunities in Sweden 2018-2020 - Road safety conference
7

                           1                                  10
                                                                   5   9

                                                                                          12
                                              11
                                                                             6
                                                   3                                  2
                                          1

                                                       4
                                                   7
                                                       8
                                               13

The Swedish Transport      1   Double tracks between Ängelholm                   3   Söderås Line, Åstorp–Teckomatorp
                               and Helsingborg, Romares väg                          In order for more freight and passenger
Administration will            In order to increase capacity and reduce              trains to be able to traffic the line, we will
                                                                                     refit the Söderås Line between Åstorp and
                               travel time, the Swedish Transport
procure major                  Administration will convert the section of            Teckomatorp in three stages. The section is
                               line between Ängelholm and Helsingborg,               30 km long. Start of construction: 2019.
construction and               Romares väg to double track. The section is
                                                                                     Procurement information
maintenance projects           24 km long. Start of construction: 2020
                                                                                     Tender documents will be published in June
                                                                                     2018. Cost SEK 300-500 million.
                               Procurement information
on road and rail for           Tender documents will be published in
                                                                                     Contact
                               2019. Cost SEK 1,4 billion.
2018–2020. Below is a          Contact
                                                                                     Johan Haagman, Project Manager
                                                                                     +46 10-124 19 60
presentation of projects       Åsa Rosberg, Project Manager                          johan.haagman@trafikverket.se
                               +46 10-123 01 22
that contractors can           asa.rosberg@trafikverket.se
                                                                                     www.trafikverket.se/soderasbanan

tender for. The                www.trafikverket.se/angelholm-helsingborg         4   Hässleholm–Lund
                                                                                     Around 70 km of high-speed railway will be
geographical area is       2   E22 Lösen Jämjö
                               In order to improve accessibility, the
                                                                                     built between Hässleholm and Lund. The
                                                                                     aim is to achieve faster travel between
southern Sweden.               housing environment and road safety, the              metropolitan regions, simplify work
                                                                                     commutes and ease the load on the
                               Swedish Transport Administration will
                               rebuild E22 to a trunk road between Lösen             Southern Main Line. Construction will begin
                               and Jämjö.                                            during the latter part of the National
                               The new road will be 14 kilometres long.              Transport Plan 2018–2029.
                               Start of construction: 2020.
                                                                                     Procurement information:
                               Procurement information                               Procurement of location investigation in
                               Tender documents will be published in                 2018. Call to supplier dialogue during 2018.
                               March 2020. Cost SEK 300-500 million.
                                                                                     Contact
                               Contact                                               Sara Distner, Project Manager
                               Daniel Andersson, Project Manager                     +46 70-623 32 88
                               +46 10-123 66 37                                      sara.distner@trafikverket.se
                               daniel.andersson@trafikverket.se
                               www.trafikverket.se/e22losen-Jamjo

2
Business opportunities in Sweden - Major business opportunities in Sweden 2018-2020 - Road safety conference
5   Jönköping Line, Sandhem-Nässjö                 8   E22 Conversion of interchange                  12 Basic maintenance of public roads in the
    To increase the capacity and shorten travel        Lund Södra                                        Kalmar area, Kalmar County
    time on the railway line Sandhem-Nässjö,           In order to improve road safety and               Contract start: September 2019.
    we will enable trains to drive into stations       accessibility for both public transport and       Procurement information
    from both directions simultaneously, as well       other traffic, we will rebuild interchange        Tender documents will be published in
    as make adaptations for speeds of 160              E22 Lund Södra. Start of construction:            November 2018.
    km/h. Start of construction: 2019.                 2019.                                             Cost SEK 100-300 million
    Procurement information                            Procurement information                           Contact
    Tender documents will be published in April        Tender documents will be published in June        Susanne Östangård, Project Manager
    2018. Cost SEK 100-300 million.                    2019. Cost SEK 100-300 million.                   +46 10-123 92 93
    Contact                                            Contact                                           susanne.ostangard@trafikverket.se
    Peter Bjers, Project Manager                       Olof Fredholm, Project Manager                 13 Basic maintenance of public roads in the
    +46 10-124 41 02                                   +46 10-124 43 58
    peter.bjers@trafikverket.se
                                                                                                         Malmö area, Malmö County
                                                       olof.fredholm@trafikverket.se                     Contract start: September 2020.
    www.trafikverket.se/sandhem-nassjo                 www.trafikverket.se/e22-lund
                                                                                                         Procurement information
6   Road 27 by-passing Backaryd to                                                                       Tender documents will be published in
                                                       Basic maintenance contract road                   November 2019.
    Hallabro, Blekinge County,                         The basic maintenance contract includes
                                                                                                         Cost SEK 100-300 million
    expansion in existing route                        daily maintenance of roads (winter road
    In order to improve accessibility and              maintenance, road surface, side area and          Contact
    increase safety, we will rebuild the section       median strips, ancillary installations, road      Johan Högström, Project Manager
    between Backaryd and Hallabro in Blekinge          equipment, permit preparation etc.)               +46 10-123 84 35
    to a road with oncoming traffic separated                                                            johan.hogstrom@trafikverket.se
                                                   9 Basic maintenance on public roads in
    by a centre barrier. The stretch is 7 km
                                                       the Eksjö area, Jönköping County
    long. Start of construction: 2019.
                                                       Contract start: September 2018.
    Procurement information
                                                       Procurement information
    Tender documents will be published in May
                                                       Tender documents will be published in
    2018.
                                                       November 2017. Cost SEK 100-300 million.
    Cost SEK 100-300 million
                                                       Contact
    Contact
                                                       Rikard Abrahamsson, Project Manager
    Andreas Rydström, Project Manager
                                                       +46 10-123 73 83
    +46 10-124 29 85
                                                       rikard.abrahamsson@trafikverket.se
    andreas.rydstrom@trafikverket.se
                                                   10 Basic maintenance on public roads in
    www.trafikverket.se/backaryd-hallabro
                                                       the Jönköping area, Jönköping County
7   E22 Interchange Gastelyckan                        Contract start: September 2018.
    – Interchange Lund N (Ideon)                       Procurement information
    In order to relieve interchange Lund N and         Tender documents will be published in
    increase accessibility and safety, we will         November 2017. Cost SEK 100-300 million
    rebuild E22 between the two existing
    interchanges and build a new connection at         Contact
    Ideon. Start of construction: 2019.                Lars Kildén, Project Manager
                                                       +46 10-123 84 02
    Procurement information                            lars.kilden@trafikverket.se
    Tender documents will be published in
                                                   11 Basic maintenance on public roads in
    October 2018. Cost SEK 100-300 million.
                                                       the Bjäre-Åsbo area, Skåne County
    Contact                                            Contract start: September 2018.
    Torbjörn Sundgren, Project Manager
    +46 10-123 72 52                                   Procurement information
    torbjorn.sundgren@trafikverket.se                  Tender documents will be published in
                                                       November 2017.
    www.trafikverket.se/e22-ideon                      Cost SEK 100-300 million
                                                       Contact
                                                       Jan Nordstrand, Project Manager
                                                       +46 10-123 11 01
                                                       jan.nordstrand@trafikverket.se

                                                                                                                                                 3
Business opportunities in Sweden - Major business opportunities in Sweden 2018-2020 - Road safety conference
20

                                                             40

                                                             17
                                                       16
                                                                        36

                                                                   34
                                                                        24
                                                                   23

                                                                  22
                                                            18
                           27                                                                                   31
                                                 21                    37
                                 38         26                    28
                                                      14
                                      25
                            19
                       20        39
                                      30              32
                            29
                                       33
                                 31

                                            15   35

The Swedish Transport           14   Remote control, Herrljunga–Borås               15   E6, Halmstad south entrance,
                                     We are planning a number of remote                  new interchange
Administration will                  control projects in Sweden, in which the
                                     Herrljunga-Borås route is included. The
                                                                                         As part of Halmstad Municipality urban
                                                                                         transformation, we are building a new
procure major                        work will increase safety and create an opp-        interchange on E6 as well as a grade-
                                     ortunity for increased punctuality and              separated passage over or under the West
construction and                     capacity/flexibility around the clock.              Coast Line. The aim is to achieve better

maintenance projects                 We will install a processor switchgear on
                                     rail section 654 to enable remote control
                                                                                         traffic flow in central Halmstad, increased
                                                                                         road safety, and to interconnect current
on road and rail for                 between Herrljunga and Borås. The project
                                     includes measures on 36 level crossings.
                                                                                         and planned areas of operation with the
                                                                                         harbour, E6 and road 15 (Laholmsvägen).
2018–2020. Below is a                Procurement information
                                                                                         Construction starts in 2018.
                                                                                         Procurement information
presentation of projects             Tender documents for a performance
                                     contract will be published in February 2019.        Tender documents will be published in April
that contractors can                 Cost SEK 100-300 million.                           2018. Cost SEK 100-300 million.
                                                                                         Contact
tender for. The                      Contact
                                      Anna Hildingsson, Project Manager                  Tonny Eliasson, Project Manager
                                                                                         +46 70-690 12 47
geographical area is                 +46 10-123 23 44
                                      anna.hildingsson@trafikverket.se                   tonny.eliasson@trafikverket.se

western Sweden.                      www.trafikverket.se/fjarrstyrning-                  www.trafikverket.se/e6halmstad
                                     herrljunga-boras

4
Business opportunities in Sweden - Major business opportunities in Sweden 2018-2020 - Road safety conference
16   Laxå-Arvika, Välsviken,                            19   E6.20 Hisingsleden, southern                          Contact
     passing station                                         section including Halvors link                        Björn Ållenberg
     To increase capacity and facilitate rail traffic        The southern section of Hisingsleden is               +46 10-123 74 47
     on the Värmland Line, a 2000 metre long                 planned for a four-lane meeting-free road.            bjorn.allenberg@trafikverket.se
     passing station will be built in Välsviken. In          In order to increase safety and capacity, the         www.trafikverket.se/hamnbanan
     addition, another platform is being built at            level crossings are being removed and three
     the Välsviken stop, as well as a level-                 grade-separated interchanges are to be                Construction of E20
     separated pedestrian and cycle passage.                 built. These measures are being implemen-             E20 will have improved road safety and
     Construction is scheduled to start in                   ted to get the heavy traffic from central             accessibility through Västra Götaland.
     autumn 2019.                                            routes to instead choose Hisingsleden, and            Several stretches still do not have a road
                                                             to increase road safety. Length: 4 km                 with oncoming traffic separated by a centre
     Procurement information                                 widening of existing road. Construction
     Tender documents will be published in                                                                         barrier. Stages will build gradually towards
                                                             starts in 2019                                        a meeting-free situation, either a 1+1 road
     february 2019. Cost SEK 100-300 million.
                                                             A new road, Halvors link, will be built to the        or a 2+2 road. Involves 6 different
     Contact                                                 south so that heavy traffic destined for the          procurements.
     Mark Jones, Project Manager                             harbour will have a direct link, as opposed
     +46 76-627 43 22                                                                                              Contact
                                                             to the current solution. An interchange will          Svante Jildenhed
     mark.jones@trafikverket.se                              be built in the middle of the link. The               +46 10-123 69 21
     www.trafikverket.se/valsviken                           expansion of a smaller stretch of Hisingsle-          svante.jildenhed@trafikverket.se
                                                             den is included. Length: 1.3 km of new road,
17   Laxå–Arvika, Karlstad Central                           1 km widening of existing road. Construc-             www.trafikverket.se/E20-Goteborg-
     Karlstad Central is the biggest access node             tion starts in 2018.                                  Orebro
     on the heavily trafficked Värmland Line and             Procurement information:
     it is also a bottleneck. In order to increase
                                                                                                              21   E20 Vårgårda–Vara, part
                                                             Tender documents will be published in
     capacity for both national and regional                                                                       Ribbingsberg–Eling and
                                                             March 2018 for Halvors link, cost SEK
     freight and passenger services, Karlstad C              300-500 million and in February 2019 for              Eling–Vara
     will be rebuilt.                                        Hisingsleden, cost SEK 500-700 million,               New construction of 26 km of dual
                                                             southern section                                      carriageway in an existing section, 19 km
     The aim is to increase capacity and have a                                                                    with at least 8 km of 2+2 road. Construc-
     connection to new travel centres being built
                                                             Contact                                               tion is scheduled to start in 2020.
     at Karlstad Central. Construction is
                                                             Project Manager: Johanna Arvidsson,
     scheduled to start in 2020.
                                                             +46 10-123 15 06                                      Procurement information
                                                             johanna.arvidsson@trafikverket.se                     Tender documents for a performance
     Procurement information:                                                                                      contract will be published in spring 2019.
     Tender documents will be published in                   www.trafikverket.se/hisingsleden                      Cost SEK 500-700 million.
     September 2019. Cost SEK 100-300 million.
     Contact                                            20   Harbour Line, sub-project                        22   E20 past Skara
     Mark Jones, Project Manager                             Eriksberg–Pölsebo                                     New construction of a dual carriageway,
     +46 76-627 43 22                                        In order to increase the proportion of rail           8 km in an existing section with at least
     mark.jones@trafikverket.se                              transport and the total freight traffic to the        40 per cent as a 2+2 road. Construction is
                                                             Port of Gothenburg, the Harbour Line is               scheduled to start in 2019.
     www.trafikverket.se/karlstad-c                          partly being converted to a double track.
                                                                                                                   Procurement information:
18   Road 49, Axvall–Varnhem,                                Sub-project Eriksberg - Pölsebo involves the          Tender documents for a performance
     dual carriageway                                        development of a new double track in a                contract will be published in January 2019.
     The expansion to a dual carriageway is                  new stretch north of the current track. The           Cost SEK 200-300 million.
     scheduled to take place in 2019-2022.                   expansion takes place on a section of
     The aim is to improve accessibility, road               approximately 1900 metres, through partly        23   E20 Götene–Mariestad
     safety and road standards, but also to                  dense urbanised area, of which about 1100             New construction of 20 km of dual
     improve environmental conditions along the              metres is located in double-track tunnel,             carriageway in a new or existing stretch as
     road. The project includes construction of a            varying rock and concrete tunnel. The                 a 2+2 road. Construction is scheduled to
     new interchange at Varnhem as well as an                existing railway is being demolished, and at          start in 2022.
     animal crossing over road 49.                           Pölsebo, the existing depot will also be
                                                                                                                   Procurement information:
                                                             removed in conjunction with the expansion;
     Procurement information                                                                                       Road plan, consultation document, draft
                                                             connection will be made to the sub-project
     Tender documents will be published in                                                                         plans, as well as preparation of tender
                                                             Pölsebo - Skandiahamnen.
     March 2019. Cost SEK 100-300 million.                                                                         documents for a turnkey contract, and
                                                             The tunnel also means that the districts              building site management shall be
     Contact                                                 north and south of the existing railway will          contracted out. Tender documents will be
     Johan Larsson, Project Manager building                 be interconnected and urban development               published in March 2018. Cost SEK 1000
     documents and build                                     in the area can continue. Start of construc-          million.
     +46 10-124 1536                                         tion: 2019
     johan.c.larsson@trafikverket.se
                                                             Procurement information
     Mikael Rintala, Project Manager Road plan               Tender documents for a turnkey contract
     +46 70-547 39 78                                        will be published before summer 2018.
     mikael.rintala@trafikverket.se                          Cost SEK 1000 million.

     www.trafikverket.se/vag-49-axvall-
     varnhem

                                                                                                                                                                 5
Business opportunities in Sweden - Major business opportunities in Sweden 2018-2020 - Road safety conference
24   E20 past Mariestad                              29   Lundbyleden, section Branting-                  Sävenäs
     New construction of 17 km of dual                    motet–Ringömotet                              30 1. Performance contract Sävenäs
     carriageway in a new or existing stretch as          Lundbyleden is being rebuilt on the section      switchgear replacement marshalling
     a 2+2 road. Construction is scheduled to             Brantingmotet - Ringömot, while the Bohus
     start in 2020.                                                                                        yard
                                                          Line is being expanded to a double track at
                                                                                                          Sävenäs railway yard is one of the larger
                                                          Brunnsbo. The city streets in Backaplan are
     Procurement information                                                                              railways yards in Sweden and it has a
                                                          also being rebuilt.
     Tender documents for a turnkey contract                                                              central function for the handling of
     will be published in autumn 2019.                    Procurement information:                        including Greeen Cargos wagon load
     Cost SEK 1000 million.                               Contract works in cooperation according to      system and freight transports from the port
                                                          ECI - Early Contract Involvement. The           of Gothenburg.
25   E20 Tollered-Ingared                                 procurement will be carried out as a            The contract works will be carried out as a
     Rebuilding to 4 km of highway in an                  selective procedure in two stages. Stage 1      construction contract.
     existing stretch. Construction is scheduled          refers to pre-qualification where the
     to start in 2019.                                    tenderer submits an application in order to      Procurement information
                                                          submit tender in the next stage. In stage 2     Tender documents will be published in
     Procurement information
                                                          an invitation is sent to selected tenderers     November 2018
     Tender documents for a turnkey contract
                                                          that they may submit tender. Stage 1
     will be preliminarily published in October
                                                          publication march 2018                        31 2. Performance contract Sävenäs
     2018. Cost SEK 100-300 million.
                                                                                                           catenary line replacement.
                                                          Procurement information
26   E20 past Vårgårda                                    Pre-qualification in March 2018, Cost            Procurement information:
     New construction of a dual carriageway in            SEK 1000 million.                               Tender documents will be published in
     an existing stretch with at least 1.2 km as a                                                        January 2019.
     2+2 road. Construction is scheduled to               Contact
     start in 2020.                                       Malin Remler, Project manager                   Contact
                                                          +46 10-123 82 03                                Sten Wuori
     Procurement information                              malin.remler@trafikverket.se                    +46 70 663 82 88
     Tender documents for a performance                                                                   sten.wuori@trafikverket.se
     contract will be published in spring 2019.           Lydia Lehtonen, Project Manager
     Cost SEK 100-300 million                             + 46 10-123 87 55
                                                          lydia.lehtonen@trafikverket.se
27   Road 161 Bäcken-Rotviksbro                           www.trafikverket.se/e621-lundbyleden
     Road 161, section Bäcken-Rotviksbro will
     be rebuilt in a new stretch.
     Procurement information
     Tender documents for a contract will be
     published in March 2018.
     Cost SEK 100-300 million                                                                                                                     29
     Contact
     Magnus Enhörning                                                 22
     +46 10 123 97 75
     magnus.enhörning@trafikverket.se
     www.trafikverket.se/Vag161

28   Västra stambanan, Bypass track
     Falköping
     Supplementing with a bypass track in either
     direction outside the main track in the
     municipality of Falköping, northeast of the
     city centre of Falköping.
     Procurement information
     Tender documents for a turnkey contract
     will be published in April 2018.
     Cost SEK 100-300 million.
     Contact
                                                                                                                         16
     Emma Stemme
     +46 70-377 09 27
     emma.stemme@trafikverket.se
     Marcus Kilmo
     +46 10-123 07 25
     marcus.kilmo@trafikverket.se

     6
Business opportunities in Sweden - Major business opportunities in Sweden 2018-2020 - Road safety conference
32   Replacement of switch gear                       35 Hot road surfacing, Halmstad district
     Borås                                                 Procurement information
     The replacement of existing switch gear to            Tender documents will be published in
     new generation of switch gear with                    January 2018. Cost SEK 50-100 million.
     surounding works. Will be performed as a
     performance contract.                            36 Hot road surfacing, Karlstad district

     Procurement information                               Procurement information
     Tender documents will be published in                 Tender documents will be published in
     March 2020.                                           December 2017. Cost SEK 20-50 million.
     Cost 100-300 MSEK
                                                           Contact
     Contact                                               Elin Skarin
     Fredrik Kalén. Telefon: 46 10–124 30 86               +46 10-123 25 50
     fredrik.kalen@trafikverket.se                         elin.skarin@trafikverket.se

     Basic maintenance contract Road                       Integrated bridge maintenance
     Basic maintenance contract road includes
                                                           Integrated Bridge Maintenance involves
     the daily maintenance of roads (winter road
                                                           maintenance contracts with a focus on
     maintenance, road surface, dewatering,
                                                           bridges/construction works. The contracts
     side area and median strips, ancillary instal-
                                                           are divided by county and extend over 5
     lations, road equipment, permit prepara-
                                                           years.
     tion) within a specified geographical area.
                                                           The contracts are divided into two parts;
     The contract period is 4 years with the
                                                           predetermined maintenance and permit-
     possibility of a 1 or 2 year option. The
                                                           based maintenance.
     contract period starts on 1 September of
     each year.                                            Predetermined maintenance involves
                                                           annual clearing of embankments and bridge
     Procurement information:                              tapers, cleaning of constituent bridge
     The following areas are being contracted              elements and impregnation of edge girders.
     out in 2017 for a value of SEK 100-300
     million each: Landvetter, Norra Värmland,             Permit-based maintenance involves
     Östra Värmland.                                       maintenance measures on various
                                                           designated bridges in the county. This
     The following areas are being contracted              could involve replacing railing and edge
     out in 2018 for a value of SEK 100-300                girders, sealant and surfacing replacement
     million each: Falkenberg and Trollhättan.             or concrete repairs.
     The following areas are being contracted
     out in 2019 for a value of SEK 100-300           37   Integrated bridge maintenance
     million each: Sydvästra Värmland, Södra               Skaraborg
     Halland and Borås.
                                                           Procurement information
     Contact                                               Tender documents will be published in May
     Marlene Hansson                                       2020. Cost SEK 20-50 million.
     +46 10-123 78 45
     marlene.hansson@trafikverket.se                  38   Integrated bridge maintenance
                                                           Bohuslän/Älvsborg
     Maintenance surfacing
     Includes adjustment, reinforcement, milling           Procurement information
     and a new wear layer on the roadway and               Tender documents will be published in May
     side surfaces, access roads and parking               2019. Cost SEK 50-100 million.
     places. The types of surfacing involved are
     hot road surfacing and heat treatment of         39   Integrated bridge maintenance
     wear surfaces within designated areas.                Göteborg C
33 Hot road surfacing,                                     Procurement information
     Gothenburg district                                   Tender documents will be published in
                                                           January 2019. Cost SEK 10-20 million.
     Procurement information
     Tender documents will be published in            40   Integrated bridge maintenance
     January 2018. Cost SEK 100-300 million.
                                                           Värmland
34 Hot road surfacing and heat treat-
                                                           Procurement information
     ment of wear surfaces,                                Tender documents will be published in May
     Mariestad and Vänersborg district                     2018. Cost SEK 20-50 million.
     Procurement information                               Contact
     Tender documents will be published in                 Marlene Hansson
     December 2017. Cost SEK 100-300 million.              +46 10-1237845
                                                           marlene.hansson@trafikverket.se

                                                                                                        7
Business opportunities in Sweden - Major business opportunities in Sweden 2018-2020 - Road safety conference
44
                                                                                                              49

                                                                                                         46
                                                                                                               43

                                                                         48                               42
                                                                                                    45
                                                                                            41

                                                                                       47

                                                                                                                              49

                                                     43

The Swedish Transport      41   East Link
                                New double-track high-speed railway Järna-
                                                                                  42   The Södertörn Crosslink
                                                                                       The Swedish Transport Administration plans
Administration will             Linköping. The East Link is the first part of a
                                future high-speed network between
                                                                                       to build Cross connection Södertörn, a new
                                                                                       road between E4/E20 at Skärholmen/
procure major                   Stockholm and Gothenburg, Stockholm and                Kungens kurva to highway 73 at Haninge
                                Malmö. We are planning for a gradual                   centre, via Flemingsberg.
construction and                construction start in 2017-2021. When we
                                                                                       A whole new traffic solution is needed to
                                are finished we will have built about 15o
maintenance projects            kilometres of new high-speed railway, 200
                                                                                       achieve the goals of improved safety and
                                                                                       accessibility at Södertörn. The cross
                                bridges and 20 kilometres of tunnels. The
on road and rail for            East Link is expected to be completed
                                                                                       connection also contains a new pedestrian
                                                                                       and cycle route along the entire section.
2018–2020. Below is a           between 2033 and 2035.
                                                                                       Procurement information:
                                Procurement information
presentation of projects        Procurement takes place on a regular basis
                                                                                       According to the current timetable, tender
                                                                                       documents will be published in 2018/2019.
                                as and from 2018 and includes several
that contractors can            major consultancy assignments and
                                                                                       Cost SEK 10 billion.

tender for. The                 contracts. Cost SEK 55 billion.                        Contact
                                                                                       Ove Strömberg, Purchasing Officer
                                Contact
geographical area is            Anna Forslund, Project Manager
                                                                                       +46 10-124 31 81
                                +46 10-123 86 57                                       ove.stromberg@trafikverket.se
Stockholm and eastern           anna.forslund@trafikverket.se
                                                                                       www.trafikverket.se/
Sweden.                         Pelle Hovland, Purchasing Officer
                                +46 10-123 07 74
                                                                                       tvarforbindelsesodertorn
                                pelle.hovland@trafikverket.se
                                www.trafikverket.se/ostlanken

8
Business opportunities in Sweden - Major business opportunities in Sweden 2018-2020 - Road safety conference
The Swedish ERTMS                               44   E4 Bypass Stockholm                             46   Rebuilding and improvements at
     A new signal system for the whole of                 The Swedish Transport Administration is              Stockholm Central Station
     Sweden’s railway. The system will replace a          building a new stretch of E4, Bypass                 The station environment at Stockholm
     worn installation and facilitates traffic            Stockholm, to create more accessibility to           Central Station does not meet accessibility
     between countries. The European Rail                 Stockholm. A more effective link creates             requirements, and there is a need for
     Traffic Management System (ERTMS) is a               new opportunities for bus routes and                 upgrades. Therefore, we are performing
     joint EU signal system. The Swedish                  enhances the attractiveness of public                quality and safety measures at the central
     Transport Administration is responsible for          transport. When the road is finished, traffic        station and adapting platforms and tracks
     its implementation in Sweden. We do this             on Essingeleden and in central Stockholm             to changing needs. Consultants have been
     in close cooperation with the industry.              will decrease, making everyday life easier           procured for design and further investiga-
     ERTMS is being gradually introduced on the           for many citizens.                                   tions starting in the autumn of 2017.
     Swedish rail network. It will be completed
                                                          The road is about 21 km long and over 18             Procurement information
     by 2035.
                                                          km is tunnel. The project is expected to be          Tender documents are scheduled to be
     Procurement information                              completed by 2026.                                   published in autumn 2018. Cost SEM 1
     The procurement of planning and design                                                                    billion.
                                                          Procurement information
     work has already begun. Tender documents
                                                          Tender documents for the procurement of              Contact
     for technical buildings will be published in
                                                          installation contracts will be published in          Veronica Bergfors Runing, Project Manager
     2018, and contracts for the Iron Ore Line in
                                                          November 2017. Cost SEK 300-1000                     +46 10-123 52 63
     2019. Overall, the project is seeking a
                                                          million.                                             veronica.bergfors-runing@trafikverket.se
     market dialogue prior to rollout, which
     begins on a large scale in the early 2020s.          Tender documents for the procurement of              www.trafikverket.se/atgarderstockholmc
     Cost SEK 20 billion.                                 interchange Vinsta will be published in
     Contact
                                                          October 2017. Cost SEK 400 million.             47   E22, Söderköping bypass
     Mattias Kjell, Purchasing Officer                    Tender documents for the procurement of              E22, Bypass Söderköping is being built as a
     +46 10-124 44 39                                     tunnel designs will be published in March            meeting-free road with three or four lanes.
     mattias.kjell@trafikverket.se                        2019. Cost SEK 100 million.                          With the bypass, we want to increase road
                                                                                                               safety and accessibility both for commuters
     Tapio Varjonen, Project Manager                      Contact                                              along road E22 by the coast and for local
     +46 72-142 86 75                                     Ove Strömberg, Purchasing Officer                    traffic in Söderköping. The bypass is about
     tapio.varjonen@trafikverket.se                       +46 10-124 31 81                                     10 km long with 4 positioned interchanges
                                                          ove.stromberg@trafikverket.se                        and an aqueduct that is unique to the
     www.trafikverket.se/ERTMS
                                                                                                               project. Construction starts in 2022.
                                                          www.trafikverket.se/forbifartstockholm
43   Road 222 – Skurubron                                                                                      Procurement information
     To improve accessibility and safety on road     45   Road 226/571 Pålamalm–                               Tender documents will be published in
     222, Värmdöleden, we will build a new                Södertörn University                                 2021. Cost SEK 900 million.
     bridge over Skurusundet. The new                     We are planning a new entrance to Riksten,
     Skurubron bridge will be built just south of         a new interchange at road 226 at the
                                                                                                         Contact
     the existing bridge. The project also                                                               Jonas Danielsson, Project Manager
                                                          University, as well as a connected
     includes rebuilding the Skuru and Björknäs                                                          +46 10-123 67 41
                                                          pedestrian and cycle route between
     interchanges, as well as renovating and                                                             jonas.danielsson@trafikverket.se
                                                          Flaggplan and Hälsovägen. In the road plan,
     rebuilding the existing bridge for a                 we propose a new road to lead from road        www.trafikverket.se/forbifartsoderkoping
     pedestrian and cycle route as well as local          226, Huddingevägen, via a bridge over the
     road. Construction start is planned in 2018          commuter tracks between Flemingsberg        48 Double tracks between Hallsberg
     and the new bridge is expected to be ready           and Tullinge, past Hantverksbyn, to finally
     and open to traffic in 2021. The entire                                                             and Degerön
                                                          be linked to road 571 Pålamalmsvägen. It is    The Swedish Transport Administration is
     project is expected to be completed by               the first section of Bypass Tullinge and it
     2023.                                                                                               gradually building double tracks and
                                                          called Interchange Riksten. The entrance       grade-separated crossings on the Halls-
     Procurement information                              will be about 2.5 kilometres long. It will     berg-Degerön section and through
     Tender documents for the procurement of a            have a lane in either direction, connect to    Hallsberg’s freight depot. We want to
     contractor (turnkey contract) for a new              road 226 with ramps and to road 571 with       increase the capacity for freight trains and
     bridge and rebuilding of the interchanges            a roundabout. Lighting all the way.            passenger services, as well as improve
     Skuru and Björknäs were published on 15              Procurement information                        safety and punctuality. The Hallsberg-
     November 2017.                                       Tender documents will be published in          Degerön section is 46 km long. The project
                                                          autumn 2018. Cost SEK 680 million              incorporates several sections that are in
     Tender documents for the procurement of a
                                                                                                         different stages.
     contractor (performance contract) for                Contact
     renovating and rebuilding the existing               Mikael Freiman, Project Manager                      Procurement information
     bridge for a pedestrian and cycle route as           +46 10-123 23 11                                     Dunsjö-Jakobshyttan and Jakobshyttan-
     well as local road will be published in 2021.        mikael.freiman@trafikverket.se                       Degerön, preparation of tender documents
     Cost SEK 1 billion.                                                                                       for two turnkey contract. Tender documents
                                                          www.trafikverket.se/ny-vag-226-                      will be published in spring 2018.
     Contact                                              flemingsberg
     Åse Wallin, Project Manager                                                                               Dunsjö-Jakobshyttan, turnkey contract.
     +46 10-123 73 09                                                                                          Cost SEK 200-400 million. Tender docu-
     ase.wallin@trafikverket.se                                                                                ments will be published in spring 2019.
     www.trafikverket.se/skurubron                                                                             Jakobshyttan-Degerön, turnkey contract.
                                                                                                               Cost SEK 500-700 million. Tender docu-
                                                                                                               ments will be published in autumn 2019.

                                                                                                                                                         9
Business opportunities in Sweden - Major business opportunities in Sweden 2018-2020 - Road safety conference
Contact                                       Procurement information                       Basic maintenance contract rail
     Jonas Victorin, Project Manager               Tender documents will be published during     Basic maintenance contract rail includes
     +46 73-417 20 22                              the period October-December each year.        preventive and corrective maintenance of
     jonas.victorin@trafikverket.se                The size of the procurements vary between     railways within a particular geographical
                                                   SEK 50-300 million.                           area.
     www.trafikverket.se/hallsberg-degeron
                                                   Contact                                       The contract period is 5 years with the
49   Mälaren Line                                  Kajsa Svanberg                                possibility of a 2 year option. Procurement
     We are expanding the railway between          +46 10-123 41 04                              usually starts 2.5 years before the expected
     Tomteboda and Kallhäll near Stockholm,        kajsa.svanberg@trafikverket.se                contract start.
     from two to four tracks, a total of 20
     kilometres. The commuter train is being       Integrated bridge maintenance                 Procurement information
     separated from other train services which     Integrated Bridge Maintenance involves        The Mälaren Line will be contracted out in
     provides tighter turnarounds, better          maintenance contracts divided by county       2018.
     punctuality and shorter travel time. We are   with a focus on bridges/construction works.   The size of the procurements vary between
     building commuter stations as well as new     The contract period extends over 4 or 5       SEK 150-1000 million.
     bridges and tunnels for both cars and         years and is designed as turnkey contracts
     pedestrian traffic.                           split into two parts:                         Contact
                                                                                                 Kajsa Svanberg
     Parts of the route are already finished and   Predetermined maintenance – annual clearing   +46 10-123 41 04
     put into operation. Preparatory work          of embankments and bridge tapers,             kajsa.svanberg@trafikverket.se
     between Huvudsta and Duvbo is scheduled       cleaning of constituent bridge elements and
     to start in 2018. The main contract for       impregnation of edge girders.
     tunnel and cutting in Sundbyberg/Solna
     will start at the earliest in 2020, with a    Permit-based maintenance – maintenance
     construction period of 8 years.               measures on various designated bridges in
                                                   the county. This could involve replacing
     The entire development of Tomteboda-          railing and edge girders, sealant and
     Kallhäll will be completed no earlier than    surfacing replacement or concrete repairs.
     2028.
                                                   The following areas will be contracted out
     Procurement information                       in 2018: The counties of Södermanland and
     The procurement of 7 major contracts for      Östergötland.
     the implementation of the project remains
     to be done. For more information see the      Procurement information
     purchasing schedule.                          See the purchasing schedule.
                                                   The size of the procurements vary between
     The size of the procurements vary between     SEK 35-70 million
     SEK 50-1000 million
                                                   Contact
     Contact                                       Kajsa Svanberg
     Niklas Bergman, Project Manager               +46 10-123 41 04
     + 46 72 141 24 73                             kajsa.svanberg@trafikverket.se
     niklas.bergman@trafikverket.se
     Liselotte Eriksson, Purchasing Officer        Surfacing
     +46 10-123 00 98                              Maintenance surfacing and reinforcement
     liselotte.eriksson@trafikverket.se            measures in East/Stockholm: Surfacing
                                                   measures include adjustment, milling and a
     www.trafikverket.se/malarbanan                new wear layer on the roadway and side
                                                   surfaces, access roads and parking places.
     Basic maintenance contract road               Surfacing types; Heat treatment of wear
     Basic maintenance contract road includes      surfaces, hot road surfacing, semi-heated
     road repair and preventive maintenance        road surfacing and cold paving.
     (winter road maintenance, road surface,
     dewatering, side area and median strips,      The contract period is 1-3 years with the
     ancillary installations, road equipment,      possibility of a 1 or 2 year option.
     permit preparation) within a specified        Procurement information
     geographical area. The contract period is 4   Procurement of the respective type of
     years with the possibility of a 1 or 2 year   surfacing is planned according to the
     option starting 1 September each year.        published purchasing schedule with tenders
     The following areas will be contracted out    being accepted between December 2017
     in 2018: Enköping, Hallsberg, Södertörn,      and March 2018.
     Järna, Tierp and Söderköping.                 The size of the procurements vary between
                                                   SEK 30-120 million.
     The following areas will be contracted out
     in 2019: Mälaröarna, Nora, Norra              Contact
     Roslagen, Norra Gotland, Uppsala, Mjölby,     Kajsa Svanberg
     Västra Södertörn                              +46 10-123 41 04
                                                   kajsa.svanberg@trafikverket.se

     10
50   51    52

                                                                53 54           55
                                                                                                                53

                                 56

                                          57      58

The Swedish Transport      Basic Maintenance Contract
                           Includes daily maintenance of roads (winter
                                                                                     Integrated bridge maintenance
                                                                                     Maintenance contract with focus on rail
Administration will        road maintenance, road surface, dewate-
                           ring, side area and median strips, ancillary
                                                                                     and road bridges. The contracts are divided
                                                                                     by county and extend over 4 or 5 years,
procure major              installations, road equipment, permit                     and are designed as turnkey contracts.
                           preparation).
construction and           The contract period is 4 years with the
                                                                                 The contracts are divided into two parts;
                                                                                 predetermined maintenance and permit-
maintenance projects       possibility of a 1 or 2 year option.                  based maintenance.

on road and rail for       The following areas will be contracted out
                           in 2018: Malung and Ånge with contract
                                                                                     Predetermined maintenance involves
                                                                                     annual clearing of embankments and bridge
2018–2020. Below is a      start in 2019. The following areas may be
                           contracted out; options available in existing
                                                                                     tapers, cleaning of constituent bridge
                                                                                     elements and impregnation of edge girders.
presentation of projects   contracts: Bollnäs, Kramfors and Älvdalen.
                                                                                     Condition based maintenance involves
                           Procurement information                                   maintenance measures on various
that contractors can       Tender documents will be published in                     designated bridges in the county, about 20
tender for. The            October 2018.                                             bridges. This could involve replacing edge
                                                                                     beams girders and bridge railings, sealant
                           Malung, turnkey contract (Cost SEK
geographical area is       100-300 million)
                                                                                     and surfacing replacement or concrete
                                                                                     repairs.
central Sweden.            Ånge, turnkey contract (Cost SEK 100-300
                           million)
                                                                                     Procurement information
                                                                                 Tender documents will be published in
                           Contact                                               May/June 2018. Cost SEK 100-300 million.
                           Emilia Edström, purchaser
                                                                                     Contact
                           +46-10-124 41 28,
                                                                                 Emilia Edström, purchaser
                           emilia.edstrom@trafikverket.se
                                                                                 + 46 10-124 41 28
                                                                                 emilia.edstrom@trafikverket.se

                                                                                                                              11
50   Maland and the Tunadal track,                   53   Road 562 Nolby–Sundsvall travel                      Contact
     Tunadal track                                        centre                                               Ulrika Sundgren, Project Manager
     The Tunadal track is an important connec-            Road 562 between Nolby and Sundsvall                 +46 10-123 88 98
     tion for rail transport to and from Sundsvall        travel centre will be rebuilt to be more             ulrika.sundgren@trafikverket.se
     harbour and Tunadalssågen. The track will            adapted to unprotected road users. The               www.trafikverket.se/
     be refitted to create better conditions for a        road is a section of the old E4 between              e14-timmervagen-stode
     combined terminal/logistics park with                Njurunda and Sundsvall, which will be
     better connections to the harbour.                   converted from a European route to a local      56   E45/Road 70 through Mora,
     Construction starts in 2019.                         road, about 18 km. Construction starts in            capacity-increasing measures
                                                          2018.                                                New roundabouts, separate pedestrian and
     Procurement information
     Contract Ground and Track. Tender                    Procurement information                              cycle routes and passages, as well as more
     documents will be published in October               Turnkey contract. Tender documents will be           lanes. Measures are being taken to increase
     2018. Cost SEK 100-300 million.                      published in October 2018. Cost SEK                  road safety and accessibility through Mora.
                                                          100-300 million.                                     Construction starts in 2018.
     Contact
     Håkan Åberg, Project Manager                         Contact                                              Procurement information
     +46 10-123 73 88                                     Bengt-Erik Eriksson, Project Manager                 Ground contract. Tender documents will be
     hakan.aberg@trafikverket.se                          +46 10-123 25 38                                     published in October 2018
     www.trafikverket.se/maland                           bengt-erik.eriksson@trafikverket.se                  Cost SEK 100-300 million
                                                          www.trafikverket.se/nolby-kubikenborg                Contact
51   Maland and the Tunadal track,                                                                             Åsa Bergqvist, Project Manager
                                                          www.trafikverket.se/skonsmon-sundsvalls-
     Birsta rail expansion                                resecentrum                                          +46 10-124 31 86
     Scheduled expansion of a partial double                                                                   asa.bergqvist@trafikverket.se
     track along the line “Ådalsbanan” on the        54   Sundsvall travel centre,
     section between E4 and Birsta passing                                                                     www.trafikverket.se/e45-70-genom-mora
     station as well as a third passing track for
                                                          accessibility and platforms
     the loop for north-going trains. The
                                                          Half of the depot will be rebuilt to adapt it   57   Road 50/66 through Ludvika
                                                          to future traffic, storage and other                 Measures together with Ludvika Municipa-
     expansion along with other measures
                                                          maintenance of the trains in the depot as            lity to improve the traffic environment,
     creates more efficient freight transport to
                                                          well as to increase capacity and replace             increase accessibility and create an
     and from Sundsvall harbour. Construction
                                                          switchgears.                                         attractive town. The measures include
     starts in 2018.
                                                                                                               building roundabouts, pedestrian and cycle
                                                          The amount of traffic will increase, which
     Procurement information                                                                                   routes, more lanes and other crossing
                                                          requires larger and safer platforms along
     Contract. Tender documents will be                                                                        elements.
                                                          with level walkways to the platforms. Start
     published in April 2018. Cost SEK 100-300
                                                          of construction in 2021.                             Procurement information
     million.
                                                                                                               Building documents including building site
                                                          Procurement information
     Contact                                                                                                   management. Tender documents will be
                                                          System document, construction document
     Håkan Åberg, Project Manager                                                                              published in May 2018. Cost SEK 10-20
                                                          or technical specification. Tender
     +46 10-123 73 88                                                                                          million
                                                          documents will be published in October
     hakan.aberg@trafikverket.se
                                                          2019. Cost SEK 10-20 million.                        Contact
     www.trafikverket.se/birsta                                                                                Fredrik Venngren
                                                          Contact
                                                                                                               +46 10-124 33 62
                                                          Robert Pettersson, Project Manager
52   Maland and the Tunadal track,                                                                             fredrik.venngren@trafikverket.se
                                                          +46 10-123 73 81
     Maland construction                                  robert.pettersson@trafikverket.se                    www.trafikverket.se/genomfart-ludvika
     Scheduled expansion of a partial double
     track along the line “Ådalsbanan” on the             www.trafikverket.se/sundsvall-resecentrum 58
                                                                                                               Freight line Avesta Krylbo–
     section between E4 and Birsta passing
     station as well as a third passing track for    55   E14, rebuilding of section                           Dalslund, double track
                                                                                                               Location investigation to find the best
     the loop for north-going trains. The                 Timmervägen–Stöde, section                           options for increasing the capacity of the
     expansion along with other measures                  Timmervägen–Blåberget
     creates more efficient freight transport to                                                               freight line between Avesta Krylbo and
                                                          E14 is being rebuilt with a centre separa-           Dalslund (about 5 km), including Krylbo
     and from Sundsvall harbour.                          tion to increase road safety and improve             depot.
     Procurement information                              accessibility for vehicles and unprotected
     Contract Bridge and Ground. Tender                   road users. The Timmervägen-Blåberget                Procurement information
     documents will be published in Maj 2019.             stretch is being converted to a 2 + 2 road,          Railway plan. Tender documents will be
     Cost SEK 100-300 million.                            including a new connection to Timmervä-              published in September 2018. Cost SEK
                                                          gen. Construction starts in 2018.                    10-20 million.
     Contact
     Håkan Åberg, Project Manager                         Procurement information                              Contact
     +46 10-123 73 88                                     Turnkey contract. Tender documents will be           Kristina Wilander Lindström, Project
     hakan.aberg@trafikverket.se                          published in April 2018. Cost SEK 100-300            Manager
                                                          million.                                             +46 10-123 12 98
     www.trafikverket.se/birsta                                                                                kristina.wilander-lindstrom@trafikverket.se
                                                                                                               www.trafikverket.se/godsstraket-
                                                                                                               avestakrylbo-dalslund

     12
59   National noise measures
     We have a large need of fixing noise
     vulnerable housing and schools along state
     roads and railways. The works consist of a
     measure inventory and thereafter window
     measures, local noise barriers and long
     track- and roadside barriers. Production
     2018.
     Procurement information
     Consulting mission 2018-2019. Cost 20-50
     million.
     Contact
     Per Högner, Head of the programme for
     noise measures
     +46 10-124 15 86
     per.hogner@trafikverket.se                        57

                                                  58

                                                            55

                                                                 13
64

                                                                                                62

               60

                                                 65

                                                                                      66

                                                                                           63

                                                                                      60

                                                                                 61

                                                                     65

The Swedish Transport      60   North Bothnia Line
                                A 270 km long new coastal railway
                                                                                  Design of conceptual documents for
                                                                                  section Dåva-Skellefteå, approx. 120 km.
Administration will             between Umeå and Luleå, which will
                                primarily strengthen freight traffic in the
                                                                                  Cost SEK 20-50 million.
                                                                                  2019
procure major                   country, but also enable passenger traffic
                                                                                  Construction contract Earth and rock
                                between the cities along the coast of North
construction and                Sweden . The project is estimated to cost
                                                                                  cutting, 2 bridges Umeå–Dåva section
                                                                                  0/000-3/500. Cost SEK 300-500 million
                                SEK 29 billion.
maintenance projects            There is currently work being done on
                                                                                  Construction contract Tunnel and tunnel
                                                                                  opening Umeå-Dåva section 3/500-5/300.
on road and rail for            railway plans for the first phase Umeå–Skel-
                                lefteå, around 130 km, and plans to start
                                                                                  Cost SEK 300-500 million.

2018–2020. Below is a           construction of the first 12 km between           Construction contract Earth/rock banks, 11
                                Umeå–Dåva . Construction specified below          bridges Umeå-Dåva section 5/300-12/000.
presentation of projects        starts in 2020.                                   Cost SEK 300-500 million.

that contractors can            Procurement information
                                Tender documents will be published:
                                                                                  Contact
                                                                                 Kenneth Strandh, Purchaser
tender for. The                 2018
                                                                                 +46 76-131 44 75
                                                                                 kenneth.strandh@trafikverket.se
geographical area is            Design of construction documents for
                                earthworks and rock cutting, tunnel, ”BEST”,      www.trafikverket.se/norrbotniabanan
northern Sweden.                which in swedish stands for rail, electronics,
                                signaling system and telecommunication
                                and approx. 13 bridges around 12 km. Cost
                                SEK 50-100 million

14
61   Umeå project, West Link                           Contact
     To improve the air environment and the            Gunilla Björklund, Project Manager
     traffic environment, a new ring road around       +46 10-123 84 09
     Umeå is being built. Now the last part, the       gunilla.bjorklund@trafikverket.se
     West Link, will be built. The new road is         www.trafikverket.se/e4vasterbotten
     about 11.5 km long and consists of 2+1            www.trafikverket.se/salmis-haparanda
     and 2+2 roads, as well as 18 structures, the
     longest of which is almost 500 metres.            Basic maintenance contract road
     Construction starts in 2018.                      The contract includes daily maintenance of
     Procurement information                           roads, such as winter road maintenance,
     Tender documents will be published in             road surface, side area and median strips,
     2018.                                             ancillary installations, road equipment,
                                                       permit preparation etc.
     Bridge across Ume river, turnkey contract.
     Cost SEK 300-500 million.                         In one stage to develop the contract,
                                                       Vilhelmina and Skellefteå Södra in
     Söderslätt-Klabböle, turnkey contract.            Västerbotten will be contracted out as
     Cost SEK 300-500 million.                         pilots for innovation and development
                                                       within Basic maintenance contract road.
     Baggböle–North Link, turnkey contract.
     Cost SEK 100-300 million.                         The contract period is 4 years with the
                                                       possibility of an additional 1 or 2 years.
     Contact
     Urban Larsson, Project Manager                    Procurement information
     +46 10- 124 21 67                                 Tender documents will be published in
     urban.larsson@trafikverket.se                     October 2017.
     www.trafikverket.se/umeaprojektet              65 Vilhelmina, turnkey contract. Cost SEK
                                                       100-300 million
62   Luleå depot                                    66 Skellefteå Södra, turnkey contract.
     We are rebuilding Luleå depot to improve
                                                       Cost SEK 100-300 million
     accessibility and safety, as well as to
     increase capacity. The project includes           Construction starts on 01/09/2018.
     construction of new tracks, platforms,
     platform connections and switches as well         Contact
     as new catenary lines. Construction starts        Mikael Lindholm, Unit Head
     in 2021.                                          +46 10-123 83 65
                                                       mikael.lindholm@trafikverket.se
     Procurement information
     Tender documents will be published in             Surfacing
     spring 2020.                                      Maintenance surfacing and reinforcement
     Stage 1 Cost SEK 100-300 million.                 measures, the counties of Norrbotten and
     Contact                                           Västerbotten.
     Malin Ekholm, Unit Head                           Surfacing measures include adjustment,
     +46 10-123 74 60                                  milling and a new wear layer on the
     malin.ekholm@trafikverket.se                      roadway and side surfaces, access roads
                                                       and parking places. Surfacing types;
     www.trafikverket.se/luleabangard                  hot road surfacing, cold/semi-heated road
                                                       surfacing and cold paving.
     E4 and E10 – Central separation
     We are rebuilding a number of road                The contract period refers to execution in
     sections on both E4 and E10 for improved          2018 and in any case 2019.
     accessibility and safety. The plan is for a
     2+1 road with central separation. In the          Procurement information                      We welcome tender
     summer of 2018, Djäkneboda - Bygdeå and           Specifications will be published in                            s
     Salmis - Haparanda (9 km and 7 km long            November and December 2018.                   from Swedish and
     respectively) on E4 will be contracted out.
     In 2019-2021, another section of E4 and           Hot road surfacing (Cost SEK 100-300             international
     two sections of E10 will be contracted out.
     Construction starts in 2019.
                                                       million)
                                                       Cold/semi-heated road surfacing
                                                                                                          suppliers!
                                                       (Cost SEK 100-300 million)
     Procurement information
                                                       Cold paving (Cost SEK 20-50 million)
     Tender documents will be published in
     summer 2018.
                                                       Contact
63 Djäkneboda – Bygdeå.                                Stephan Winneborn, purchaser
     Cost SEK 100–300 million.                         +46 10 123 48 63
64 Salmis – Haparanda.                                 stephan.winneborn@trafikverket.se
     Cost SEK 100–300 million.

                                                                                                                          15
TRAFIKVERKET. APRIL 2018. PRODUKTION: TRAFIKVERKET, FORM OCH EVENT. FOTO: MOSTPHOTOS (RACORN, MICHAEL ERHARDSSON, ALLAN WALLBERG, BRITT-MARIE SOHLSTRÖM), ELIN GÅRDESTIG, THOMAS ADOLFSÉN, KERSTIN ERICSSON, KASPER DUDZIK, P-O LARSSON-KRÅIN, MIKAEL ULLÉN, BORGSTRÖM BILD & VIDEO AB, SVEN
           Procurements at Trafikverket
           Keep your company updated and visit our website regularly for the latest about
           our procurements.
           Current procurements:
           http://www.trafikverket.se/en/startpage/suppliers/Procurement/Current-procurements/
           Planned procurements:
           http://www.trafikverket.se/en/startpage/suppliers/Procurement/Planned-procurements/

                       Scan and read more!