Introduction 3 About us Aston Group is a leading Building Services and Facilities Management Company for Residential and Commercial Clients. We are an established, privately owned business and have been setting standards for efficiency, innovation and quality for over 55 years. We deliver a fully integrated Construction Design and Build service supported by our in-house Mechanical, Electrical and Renewable Technology teams for a wide range of residential and commercial projects. We believe in transforming communities by close collaboration with our clients, residents and other stakeholders to deliver the best solution for everyone. Our family-based ethos delivers quality, reliability and trust, demonstrated by our awards for design and conservation. Our teams work right across London and the South East. We work with a wide range of clients, such as Local Authorities, landlords, housing management organisations, education and health authorities, universities and private clients.
4 Community hall conversions Yardley Lane, London E4 Community hall conversion Previously, Yardley Lane was a dilapidated community centre. Working with our clients, we were able to redesign this single-storey building into a into a desirable two-storey, three-bedroom house. Works undertaken Our teams environmentally cleared and cleaned the building and surrounding area prior to commencement of the programme of work. The newly refurbished property provides accommodation for four to five people and the works included both fire and sound compartmentation. Adding value The benefits were both social and commercial with a final property value of circa £415,000. Duration Completed within a 16-week programme.
w Conversion of Existing Com 5920 Lounge/Dining 20.93m² 5140 Community hall conversions 5 air ch arm 2910 coffee table Cup'd 2 Storey block of maisonettes tv 6 Fridge / 5 freezer 4 3 2 1 Kitchen 3100 Hallway 7.30m² 9.14m² WASHING MACHINE LL Proposed front Elevation scale 1:50 Proposed Proposed Ground Floor Plan Completed www.akdesign.co.uk Conversion of Existing Community Center scale 1:50 side table 2115 2105 bed Bedroom 3 7.61m² 5920 Lounge/Dining single 20.93m² Cup'd wardrobe 5140 3040 air ch arm bed Cup'd 2520 2910 Bedroom 2 coffee table 11 12 13 7.67m² 10 Cup'd 2 Storey block of maisonettes table 2 Storey block of maisonettes side 9 tv 8 double 7 wardrobe 6 Fridge / 5 freezer 4 3 table side 2 1 3500 Kitchen Bedroom 1 3100 Hallway 2200 10.32m² 7.30m² 9.14m² Bathroom bed 3.89m² 1750 table side WASHING MACHINE LL Proposed front Elevation scale 1:50 Proposed First Floor Plan Proposed Ground Floor Plan scale 1:50 scale 1:50 P D K Yardley Lane Community Center A P D K A side table 2105 bed Bedroom 3 7.61m² single Cup'd wardrobe 3040 bed Cup'd 2520 Bedroom 2 11 12 13 7.67m² 10 2 Storey block of maisonettes table side 9 8 double 7 wardrobe table side 3500 Bedroom 1 2200 10.32m² Bathroom bed 3.89m² 1750 table side Proposed First Floor Plan scale 1:50 Aston P D Waltham Forest Proposed front Elevation K Yardley Lane Community Center Housi g A A K D P Group Working with Wa scale 1:50
6 Community hall conversions Wyatts Lane, London E17 Community hall conversion Wyatts Lane was a disused community centre in a poor state of repair. Our client required it to be converted to a residential dwelling. Works undertaken Our teams environmentally cleared and cleaned the building and surrounding area prior to commencement of the programme of work. The newly refurbished property provides accommodation for three to four people and the works included both fire and sound compartmentation. Adding value The benefits were both social and commercial, with a final property value of circa £350,000. Duration Completed within a 20-week programme.
www.akdesign.co. Conversion of Existing Community Cent Kitchen Community hall conversions 7 2050 8.45m² 2950 WASHING MACHINE LL Fridge / freezer air ch arm coffee table tv 6 Lounge/Dining 5320 5 16.34m² 4 3115 3 2 1 Proposed Completed Proposed Ground Floor Plan Proposed Front Elevation scale 1:50 scale 1:50 Storage www.akdesign.co.uk QM QM Conversion of Existing Community Center S S ISO 14001 ISO 9001 REGISTERED FIRM REGISTERED FIRM chest of drawers bed Kitchen 2050 table 2225 side 8.45m² Bedroom 3 6.60m² 2950 2950 WASHING MACHINE LL wardrobe single 14 Fridge / Desk bed freezer air ch arm 13 12 table 2250 side 11 10 Bedroom 2 coffee table 9 9.04m² tv 8 wardrobe drawers single 7 chest of 6 Lounge/Dining 6 5320 5 16.34m² 5 side side table table 4 4 3115 3 drawers chest of 3 2 2 bed 1 2800 wardrobe 2165 4380 double Bathroom2 3.76m² Bedroom 1 11.64m² Proposed Ground Floor Plan Proposed Front Elevation scale 1:50 scale 1:50 Proposed Ground Floor Plan scale 1:50 QM QM S S ISO 14001 ISO 9001 As P REGISTERED FIRM REGISTERED FIRM D K Wyatts Lane Community Center A chest of drawers K D P Gro bed A table 2225 side Bedroom 3 6.60m² 2950 wardrobe single 14 Desk bed 13 12 table 2250 side 11 10 Bedroom 2 9 9.04m² 8 wardrobe drawers single 7 chest of 6 5 side side table table 4 3 drawers chest of 2 bed 2800 wardrobe 2165 4380 double Bathroom2 3.76m² Bedroom 1 11.64m² Proposed Ground Floor Plan scale 1:50 Aston P K D Waltham Forest Wyatts Lane Community Center Housi g A A K D P Group Working with Waltham Forest Proposed Front Elevation scale 1:50
8 Community hall conversions Coney Burrows, London E4 Community hall conversion Coney Burrows was a disused community centre in a state of disrepair, which was converted to a residential dwelling. Works undertaken This large community centre was converted into a spacious five bedroom, ground-floor flat incorporating disabled access and facilities as well as sound and fire compartmentation. Coney Burrows has a floor plan of 130m2 with a small private garden, which is situated on the ground floor of the block. Adding value This has added an extra property to the local council stocklist, with an estimated value of £450,000. Duration Completed within a 16-week programme.
www.akdesign.co.uk QM QM Conversion of Existing Community Center S S ISO 14001 ISO 9001 REGISTERED FIRM REGISTERED FIRM Community hall conversions 9 Existing Pathway Existing Ramp Up Female Toilet Kitchen Male Toilet Total: 6.38m² 7.14m² Total: 4.82m² Hall Hallway Corridor 12.27m² 48.05m² 10.52m² Proposed Back Elevations scale 1: 100 Store Store 7.34m² 8.32m² Proposed Completed Existing Plan scale 1:50 Existing Pathway Entrance To Flat side boiler Washing table Machine wardrobe bed single 2365 1730 Bedroom Bedroom table side 6.92m² drawers chest of 6.22m² bed Wet Room 2970 Kitchen 3110 6.52m² 3315 2240 1595 10.72m² Bathroom drawers chest of 4.89m² wardrobe Fridge / single freezer Corridor Hallway 1465 11.11m² 18.05m² 4000 Lounge 15.52m² 3805 table side coffee table tv bed Bedroom Principal 10.21m² Bedroom 3515 16.54m² Bedroom 5135 MJ 10.54m² 2135 3305 2730 bed bed table side table side Gate Proposed Plan scale 1:50 Aston P K D Waltham Forest Coney Borrows Community Center Housi g A A K D P QM GroupQ M Working with Waltham Forest S S ISO 14001 ISO 9001 REGISTERED FIRM REGISTERED FIRM Proposed Back Elevations scale 1: 100
10 Sheltered accommodation Longfield House, London E17 Refurbished and modernised sheltered accommodation The works to both flats and communal areas were Individual flat works completed by our management teams using a Prior to commencement of works our teams followed structured pre-works activity schedule. Careful an agreed communication protocol. planning and co-ordination between stakeholders Our Resident Liaison and Site Team engaged with all was undertaken with special consideration given residents, assisting them to understand the nature of to minimise impact to residents. the works, co-ordinating safe accessible storage for This included restricting openings to one flat per some of their belongings and documenting on-site week with a maximum of three open at any one time. activity schedules. The works programme was designed to ensure Extent of works residents' welfare facilities were maintained throughout • Installation of new kitchens and shower rooms to and any planned interruptions were carefully managed 36 flats and mitigated, meaning the works were able to be • U pgrade of existing mechanical, electrical, warden call, undertaken while the residents were in occupation. TV aerial, fire alarm and lighting systems • Retrofit installation of sprinklers to 36 flats • Redecoration of individual flats and common areas • Installation of fire-rated ceilings and fire doors • Renewal of floor coverings and communal furniture • Landscaping Duration Approximately 11 months.
Sheltered accommodation 11 Concept Completed
14 Sheltered accommodation Dilwyn Court, London E17 Refurbished and modernised sheltered accommodation The works to both flats and communal areas were Individual flat works completed by our management teams using a Prior to commencement of works our teams followed structured pre-works activity schedule. Careful an agreed communication protocol. planning and coordination between stakeholders Our Resident Liaison and Site Team engaged with all was undertaken with special consideration given to residents, assisting them to understand the nature of minimise impact to residents. the works, co-ordinating safe accessible storage for This included restricting openings to one flat per some of their belongings and documenting on-site activity week with a maximum of three open at any one time. schedules. The works programme was designed to ensure Extent of works residents welfare facilities were maintained throughout • Installation of new kitchens and shower rooms to and any planned interruptions were carefully managed 31 flats and mitigated, meaning the works were able to be • Upgrade of existing mechanical, electrical, warden call, undertaken whilst the residents were in occupation. TV aerial, fire alarm and lighting systems • Retrofit installation of sprinklers to 31 flats • Redecoration of individual flats and common areas • Installation of fire-rated ceilings and fire doors • Renewal of floor coverings and communal furniture • Landscaping Duration Approximately 10 months.
Sheltered accommodation 15 Concept Completed
18 Sheltered accommodation Plaxton Court, London E11 Refurbished and modernised sheltered accommodation The works to both flats and communal areas were Individual flat works completed by our management teams using a Prior to commencement of works our teams followed structured pre-works activity schedule. Careful an agreed communication protocol. planning and co-ordination between stakeholders Our Resident Liaison and Site Team engaged with all was undertaken with special consideration given residents, assisting them to understand the nature of to minimise impact to residents. the works, co-ordinating safe accessible storage for This included restricting openings to one flat per some of their belongings and documenting on-site activity week with a maximum of three open at any one time. schedules. The works programme was designed to ensure Extent of works residents' welfare facilities were maintained throughout • Installation of new kitchens and shower rooms to and any planned interruptions were carefully managed 33 flats and mitigated, meaning the works were able to be • Upgrade of existing mechanical, electrical, warden call, undertaken while the residents were in occupation. TV aerial, fire alarm and lighting systems • Retrofit installation of sprinklers to 33 flats • Redecoration of individual flats and common areas • Installation of fire-rated ceilings and fire doors • Renewal of floor coverings and communal furniture • Landscaping Duration Approximately 12 months.
Sheltered accommodation 19 Concept Completed
20 Loft conversion Normanton Park, London E4 Residential loft conversion Our Construction Teams have been delivering "We felt it only right to highlight the outstanding Local Authority loft conversions since late workmanship of your builders. They were at all times clean, tidy and extremely accommodating with 2016 and have successfully completed 40 impeccable manners. I would like to say a huge thank conversions to date with a further 10 you to Slav, Dan and their teams who worked tirelessly in progress or being planned. to ensure that the works were not only done on time Our loft conversion programme works are and with no disruption to our family life, but also to a wonderfully high standard. completed with minimal impact. Careful planning and co-ordination with the "We are also fully aware that without your continuous residents is required as they remain in hard work and effort we would never have been given this wonderful opportunity, and we cannot express how occupation throughout the duration of the grateful we are as it has made such a huge difference works. to our family and home". Normanton Park resident Our site teams engage and involve residents throughout the process of improving their Works undertaken home, from discussions about the sequence This property was converted from two bedrooms to of works, allowing them to plan when they are three bedrooms, increasing living space by 22m2. separated from working areas and their living Adding value space, to involvement in design choices. The work increased the value of the property by circa £128,000 with costs of £62,000. Duration Completed within a 10-week programme.
Loft conversion 21 Proposed Completed
24 Extension Deerleap Grove, London E4 Residential extension The rear extension works were completed "Overall we are very pleased with the extension, it with minimal impact, careful planning and took a little longer than expected but a lovely result. Slav's team arrived at 8am and finished at 5pm, co-ordination, as the residents remained in great workers!" Deerleap Grove resident occupation throughout the duration of the works. Our site teams engage and involve the resident in design choices and the process of improving their home, which includes the sequence residents are separated from working areas and their living space. Proposed Works undertaken The project was designed to increase the available living space by adding a rear extension to create a fourth bedroom, new larger kitchen and dining area. Adding value The extension provided both social and commercial benefits, such as an expanded living area of 21.9m2 and increasing the property value by £115,000 with costs of £58,000. Duration Completed within a 10-week programme.
Extension 25 Proposed Completed
26 Why Aston Group? Why Aston Group? Fully integrated service Our management teams ensure suitably qualified Aston Group offer clients a fully integrated and experienced resources are available and that service from three regional office locations. Our all employees or specialist supply-chain members' directly employed Senior Management, Business qualifications and accreditations are adequate to Administration and Community Investment Teams undertake required activities. All works are quality provide support to our project and service delivery. control checked by our own staff and are also externally audited to ensure compliance and that Operational support is provided by contract works are of the required standard. managers, quantity surveyors, site manager supervisors, resident liaison officers, fully qualified Health and safety directly employed electrical, mechanical domestic/ Our directly employed Health and Safety Manager commercial engineers and building operatives. has over 20 years’ experience and leads our All these elements combine to give us the flexibility in-house team for Health, Safety and Quality (HS&Q). to resource and plan each programme of work The team supports our site teams in all matters of effectively. HS&Q, including pre-construction health and safety plans, site folders and risk assessments. Our team Each contract manager is responsible for overseeing ensure we implement a structured HS&Q approach. dedicated projects from design through to delivery and completion, including defect and warranty Operational delivery periods and CDM compliance. Our Senior Management Team ensures sufficient site management resources are allocated to deliver the Quality assurance requirements of contracted work programmes to Our company operates a fully integrated QMS ensure projects are delivered and handed over system which is both internally and externally in line with the project programme and budget. audited. Our management teams and staff are fully trained and accountable to ensure compliance and Our teams attend regular structured site progress understand adherence is crucial for the successful and performance review meetings to ensure implementation of our documented ISO 91001 milestones are on target and achieved. accredited Quality Policy and Procedures to ensure the highest standards of our contract delivery is maintained.
Why Aston Group? 27 Client engagement Our team will also communicate a clear agreed Our contract management teams follow a complaint escalation process with named personnel documented contract/project mobilisation and designation and contact details. communication plan. This ensures clear, concise, Good communication is key to our success. open and transparent communications are developed and maintained with clients from the outset. Before the commencement of any project, Aston Group arrange and attend regular pre- contract meetings. Site meetings together with monthly performance meetings also take place, where the project planner, KPIs and progress are discussed. Aston Group continue to build on good client relationships with openness, trust and transparency throughout the term of the contract. Resident/Stakeholder Relationships Aston Group ensure an allocation of dedicated, directly employed Resident Liaison Officers (RLOs) to agree with clients and stakeholders the desired approach for engagement, agreement of protocols, key contacts and resident details, along with agreements for uniformed and standard contract- specific forms, documentation and letters. Our RLO team will also provide all stakeholders and residents with the confidence that they have been fully consulted and are aware of what the works will entail, and any impacts they may have.
Aston Group Building Services and Facilities Management Head Office Moss Lane, Romford Essex, RM1 2PT 0208 0172234 mail@astongroup.co.uk