DAVIS PARK PRECINCT STRUCTURE PLAN - BEACONSFIELD DEPARTMENT OF COMMUNITIES - City of ...
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
PRECINCT © Urbis Pty Ltd ABN 50 105 256 228 All Rights Reserved. No material may be reproduced without prior permission. You must read the important disclaimer appearing within the body of this report. urbis.com.au
PRECINCT Table of Contents Part One – Implementation ............................................................................................................................. 2 1. Implementation of the Structure Plan ................................................................................................... 3 1.1. Structure Plan Area............................................................................................................................... 3 1.2. Structure Plan Objectives ..................................................................................................................... 3 1.3. Operation .............................................................................................................................................. 4 1.4. Staging .................................................................................................................................................. 4 1.5. Subdivision and Development Requirements ....................................................................................... 4 1.6. Local Development Plans ..................................................................................................................... 5 1.7. Additional Information ........................................................................................................................... 6 Part Two – Explanatory Section ..................................................................................................................... 8 1. Introduction and Purpose ...................................................................................................................... 9 1.1. Davis Park Precinct Vision .................................................................................................................... 9 1.2. The Heart of Beaconsfield Masterplan ............................................................................................... 10 2. Land Description ................................................................................................................................. 11 2.1. Locational And Regional Context ....................................................................................................... 11 2.2. Local Context ...................................................................................................................................... 12 2.3. Legal Description and Ownership ....................................................................................................... 13 2.4. History ................................................................................................................................................. 14 2.5. Land Use ............................................................................................................................................. 15 2.6. Population and Demographics ............................................................................................................ 16 2.7. Traffic and Access Context ................................................................................................................. 16 3. Planning Framework ........................................................................................................................... 17 3.1. Zoning and Reservations .................................................................................................................... 17 3.1.1. Metropolitan Region Scheme ............................................................................................................. 17 3.1.2. Local Planning Scheme ...................................................................................................................... 18 3.2. Regional and sub-regional structure Plans ......................................................................................... 19 3.3. State Planning ..................................................................................................................................... 19 3.4. Local Planning .................................................................................................................................... 21 3.5. Planning Specific to Davis Park .......................................................................................................... 23 3.5.1. Scheme Amendment .......................................................................................................................... 23 3.6. Pre-Lodgement Consultation .............................................................................................................. 23 4. Site Conditions and Constraints ......................................................................................................... 24 4.1. Biodiversity and Natural Area Assets ................................................................................................. 24 4.2. Landform and Soils ............................................................................................................................. 24 4.3. Groundwater and Surface Water ........................................................................................................ 24 4.4. Existing Movement Network ............................................................................................................... 25 4.5. Infrastructure and Servicing ................................................................................................................ 25 4.6. Opportunities and Constraints Summary ............................................................................................ 26 5. The Structure Plan .............................................................................................................................. 28 5.1. Vision and Design Principles .............................................................................................................. 28 5.2. Zones and Sub-Precincts ................................................................................................................... 30 5.2.1. South Street – 1.50ha ......................................................................................................................... 31 5.2.2. Residential – 5.95ha ........................................................................................................................... 31 5.2.3. Community / Education – 2.82ha........................................................................................................ 32 5.3. Retail Floor Space Assessment and Rationale .................................................................................. 33 URBIS DAVIS PARK STRUCTURE PLAN_MAY 2021_FINAL
PRECINCT 5.4. Public Open Space ............................................................................................................................. 34 5.4.1. Location and Distribution .................................................................................................................... 34 5.4.2. Form and Function .............................................................................................................................. 35 5.5. Landscape Design .............................................................................................................................. 36 5.5.1. Davis Park Public Open Space ........................................................................................................... 37 5.5.2. Streetscapes ....................................................................................................................................... 37 5.5.3. Green Link .......................................................................................................................................... 38 5.5.4. Landscape Planting, Management and Maintenance ........................................................................ 38 5.6. Movement and Traffic ......................................................................................................................... 39 5.6.1. Regional Road Network ...................................................................................................................... 40 5.6.2. Traffic Impact Assessment ................................................................................................................. 40 5.6.3. South Street Intersection .................................................................................................................... 40 5.6.4. Street Types and Connections ........................................................................................................... 41 5.6.5. Public Transport .................................................................................................................................. 43 5.6.6. Pedestrian Movements and Cycle Network ........................................................................................ 43 5.7. Water Management ............................................................................................................................ 44 5.7.1. Stormwater Management ................................................................................................................... 44 5.7.2. Water Quality ...................................................................................................................................... 44 5.7.3. Water Efficiency .................................................................................................................................. 45 5.8. Servicing and Infrastructure ................................................................................................................ 45 5.8.1. Earthworks .......................................................................................................................................... 45 5.8.2. Power .................................................................................................................................................. 45 5.8.3. Sewer .................................................................................................................................................. 45 5.8.4. Water................................................................................................................................................... 45 5.8.5. Gas...................................................................................................................................................... 45 5.8.6. Road Network ..................................................................................................................................... 45 5.8.7. Telecommunications ........................................................................................................................... 45 5.9. Sustainability ....................................................................................................................................... 46 6. Staging and Implementation ............................................................................................................... 47 APPENDICES ................................................................................................................................................. 48 Appendix A Land Ownership ................................................................................................................... 49 Appendix B Pre-Lodgement Consultation ............................................................................................... 53 Appendix C Environmental Assessment Report ..................................................................................... 54 Appendix D Arboricultural Report ............................................................................................................ 55 Appendix E Engineering Servicing Report .............................................................................................. 56 Appendix F Retail Sustainability Assessment ............................................................................................. 57 Appendix G Landscape Report ............................................................................................................... 58 Appendix H Transport Impact Assessment ............................................................................................. 59 Appendix I Local Water Management Plan ............................................................................................... 60 URBIS DAVIS PARK STRUCTURE PLAN_MAY 2021_FINAL
PRECINCT Figures: Figure 1 – ‘The Heart of Beaconsfield’ Concept ............................................................................................... 10 Figure 2 – Location and Context Plan .............................................................................................................. 11 Figure 3 – Aerial Plan ....................................................................................................................................... 12 Figure 4 – Land Ownership .............................................................................................................................. 13 Figure 5 – Historic Development ...................................................................................................................... 14 Figure 6 – Land Uses ....................................................................................................................................... 15 Figure 7 – MRS Zoning Extract ........................................................................................................................ 17 Figure 8 – LPS Zoning Extract ......................................................................................................................... 18 Figure 9 – Opportunities and Constraints ......................................................................................................... 27 Figure 10 – Davis Park Indicative Masterplan .................................................................................................. 30 Figure 11 – Public Open Space ........................................................................................................................ 34 Figure 12 – Indicative Landscape Masterplan .................................................................................................. 36 Figure 13 – Streetscape Typologies ................................................................................................................. 37 Figure 14 – Green Link Indicative Landscaping ............................................................................................... 38 Figure 15 – Movement Network Plan ............................................................................................................... 39 Figure 16 – Streetscape Cross Section – South Street (interim without road widening) .................................40 Figure 17 – Streetscape Cross Section – Avenues .......................................................................................... 41 Figure 18 – Streetscape Cross Section – East West Streets ........................................................................... 42 Figure 19 – Streetscape Cross Section – Conway Court ................................................................................. 42 Figure 20 – Pedestrian Movements .................................................................................................................. 43 Figure 21 – Indicative Staging Plan .................................................................................................................. 47 Tables: Table 1 – Local Development Plan requirements .............................................................................................. 5 Table 2 – Subdivision and development requirements ...................................................................................... 6 Table 3 – Regional and Sub-Regional Structure Plan Considerations ............................................................ 19 Table 4 – State Planning Considerations ......................................................................................................... 19 Table 5 – Local Planning Considerations ......................................................................................................... 21 Table 6 – Opportunities and Constraints .......................................................................................................... 26 Table 7 – Public Open Space Calculation ........................................................................................................ 35 URBIS DAVIS PARK STRUCTURE PLAN_MAY 2021_FINAL
PRECINCT DEVELOPER ………………………………………………………………………………………………………………………… Department of Communities PROJECT TEAM ………………………………………………………………………………………………………………………… Project Management – GMPM Planning & Urban Design – Urbis Civil Engineering – Pritchard Francis Landscape Design – Place Laboratory Traffic & Transport – GHD Environmental – GHD Arboricultural – The Arbour Lab Local Water Management – GHD Retail Assessment – Urbis AMENDMENT TABLE AMENDMENT NO. SUMMARY OF THE AMENDMENT TYPE DATE APPROVED BY AMENDMENT WAPC URBIS DAVIS PARK STRUCTURE PLAN_MAY 2021_FINAL
This structure plan is prepared under the provisions of the City of Fremantle Local Planning Scheme No. 4. IT IS CERTIFIED THAT THIS STRUCTURE PLAN WAS APPROVED BY RESOLUTION OF THE WESTERN AUSTRALIAN PLANNING COMMISSION ON: 14 MAY 2021 Signed for and on behalf of the Western Australian Planning Commission ______________________________________________________________ an officer of the Commission duly authorised by the Commission pursuant to Section 16 of the Planning and Development Act 2005 for that purpose, in the presence of: Witness 14 MAY 2021 Date 14 MAY 2031 Date of Expiry
PRECINCT EXECUTIVE SUMMARY The Davis Park Precinct Structure Plan applies to 10.18 hectares of land bounded by South Street, Lefroy Road, Caesar Street, and Fifth Avenue, Beaconsfield. The structure plan has the potential STRUCTURE PLAN SUMMARY TABLE to deliver a range of residential densities and building typologies ITEM DATA SECTION The structure plan provides for the realisation of the Total area covered 10.18Ha Section 2 vision for the Davis Park Precinct: by the structure The redevelopment of Davis Park plan: Precinct will support high quality Area of specific Ha Section 5.2 residential and commercial land uses: development in a vibrant and sustainable urban setting, Residential 6.28Ha consolidating the South Street Mixed Use 0.295Ha local centre as a transport- Local Centre 0.612Ha oriented development node on the South Street corridor whilst Education 0.28Ha maintaining a scale and character Estimated 85 dwellings per Ha Structure Plan complementary to its context. residential site Map Part I This will be achieved though an expansion of the density existing South Street local centre to support higher-density living alongside a mixture of Estimated number Nil N/A businesses to service the needs of the local of schools community. A range of dwelling types will be Estimated area and 9,642sqm or 10.90% Section 5.4 accommodated within the precinct to provide for a percentage of variety of housing options that reflect the diverse population of Beaconsfield and the wider City of public open space Fremantle. Estimated number 591-779 Section 5.2 The precinct will facilitate a strong north-south of dwellings (minimum 550) connection from South Street through an expanded Davis Park reserve and an extension of Estimated 1320 - 1870 a high quality Green Link through the site to Lefroy Population Road, Fremantle College and the wider ‘Heart of Beaconfield’ beyond. Integration of new and Estimated 3,500sq.m NLA (retail Section 5.3 established vegetation across the site symbolises Commercial floor space) an embedded sustainability and contributes to character and identity. Floorspace ii EXECUTIVE SUMMARY URBIS DAVIS PARK STRUCTURE PLAN_MAY 2021_FINAL
PART 1 DAVIS PARK PRECINCT STRUCTURE PLAN BEACONSFIELD
PRECINCT 1. IMPLEMENTATION OF THE STRUCTURE PLAN higher density development in the 1.1. STRUCTURE PLAN AREA remainder of the Structure Plan area. The subject of this structure plan is the land bound • Provide for two storey terrace housing by South Street, Lefroy Road, Caesar Street, and products fronting Fifth Avenue (rear Fifth Avenue, being the land contained within the loaded) with allowance for up to three inner edge of the structure plan boundary line storey built form to the rear/west of sub- shown on the Structure Plan Map. precinct, addressing Davis Park. • Promote the retention of mature 1.2. STRUCTURE PLAN vegetation, and the integration of this into OBJECTIVES site planning and built form outcomes. • Achieve a minimum dwelling target of 60 The purpose of this structure plan is to: dwellings. • Provide guidance on the subdivision and Innovative Housing Sub-Precinct development of the structure plan area. • Provide flexibility to accommodate a range • Facilitate orderly and proper planning of of non-conventional medium-density the structure plan area within the context of housing typologies, to a maximum height the site’s opportunities and constraints. of six storeys, including provision for Its overarching objective is to facilitate outcomes alternative and innovative built form consistent with the Davis Park Precinct vision. outcomes. These may include, but not Specific objectives of each Sub-Precinct are as limited to the following: follows: − small/micro housing; South Street Sub-Precinct − maisonette-style housing; • Provide for an extension of the existing − affordable housing; South Street Local Centre to the east of the sub-precinct. − aged and dependant persons housing; • Facilitate a mix of commercial and residential development along South − shared/communal (e.g. Street, with a minimum building height of Baugruppen) residential two storeys with an active frontage, and development. consideration of greater height in the • Promote the retention of mature eastern portion of the sub-precinct, vegetation, and the integration of this into providing for businesses and services site planning and built form outcomes. which service the local community. • Achieve a minimum dwelling target of 106 • Provide for higher-density multiple dwelling dwellings. development up to six storeys along South Street. Lefroy Sub-Precinct • Promote the retention of mature • Provide for residential development up to vegetation, and the integration of this into four storeys in height that addresses site planning and built form outcomes. Lefroy Road and the pedestrian access way through the sub-precinct. • Achieve a minimum dwelling target of 214 dwellings. • Promote the retention of mature vegetation, and the integration of this into Transition Sub-Precinct site planning and built form outcomes. • Provide for residential development that • Provide a landscaped pedestrian access maintains a streetscape along Fifth way from Davis Park to Lefroy Road, of at Avenue that complements the existing least 12 metres in width, designed in single residential dwellings to the east, accordance with Crime Prevention through minimises building bulk and traffic impacts Environmental Design (CPTED) principles. and provides an appropriate transition to URBIS DAVIS PARK STRUCTURE PLAN_MAY 2021_FINAL IMPLEMENTATION OF THE STRUCTURE PLAN 3
PRECINCT • Achieve a minimum dwelling target of 170 Subdivision and development is to be undertaken dwellings. in accordance with the R-Codes Volumes 1 and 2 unless varied by a local development plan. Retail floorspace in the South Street sub-precinct 1.3. OPERATION as defined by the structure plan is to be capped at In accordance with Clause 22 of Schedule 2 of the 3,500sq.m NLA. Planning and Development (Local Planning Minimum residential densities are to be in Scheme) Regulations 2015, this Structure Plan will accordance with the Part I Structure Plan Map. come into operation on the day in which the structure plan is approved by the Western A minimum yield of 550 dwellings is to be achieved Australian Planning Commission (WAPC). Once across the Structure Plan Area. approved, decision-makers shall have due regard to the contents of this Structure Plan when making Sustainability Schedule for Lower Density decisions on the subdivision and development of Development (R40 or less) land within the structure plan area. This structure plan has an effective period of 10 years Where development is proposed at a residential commencing from the day of endorsement unless density of R40 or less, all of the following criteria otherwise rescinded prior. shall be satisfied: 1.4. STAGING (a) Each dwelling shall demonstrate a Nationwide House Energy Rating Scheme The staging of the structure plan is primarily (NatHERS) star rating one star in excess influenced by the preferences and intentions of of the current energy efficiency land owners, the desire to introduce the South requirement of the Building Codes of Street Sub-Precinct amenity early in the project, Australia for class 1A buildings. The star market drivers, interfaces and practical rating shall be certified by a NatHERS considerations. accredited assessor; and Staging is anticipated to be undertaken as follows: (b) Provision of a minimum 2.0kw photovoltaic • Stage 1: South Street Sub-Precinct (north solar panel system per dwelling; and eastern corner) • Stage 2: Transition Sub-Precinct (c) Provision of a minimum 3000L capacity • Stage 3: Lefroy Sub-Precinct (Department rainwater tank per dwelling, or alternatively of Communities owned land only) an approved grey-water reuse system that • Stage 4: Innovative Housing Sub-Precinct collects grey water from the laundry and • Stage 5: South Street Sub-Precinct (north bathroom and re-directs it for irrigation western corner) and/or ground water recharge; and • Stage 6: Lefroy Sub-Precinct (Privately (d) A minimum of one existing mature tree per owned) dwelling shall be retained on site, or alternatively a minimum of one mature tree 1.5. SUBDIVISION AND per dwelling (minimum 100 Litre bag) shall be planted on site prior to occupancy of DEVELOPMENT development in a location nominated and approved on the development application. REQUIREMENTS The Structure Plan Map designates the land use zones applicable to the structure plan area. The decision-making authority is to have due regard to the zoning, subdivision and development requirements contained within this structure plan when making planning decisions. Land use and development within the structure plan is to be consistent with the prescribed zonings and reservations as detailed on the structure plan Map as defined under the City of Fremantle’s Local Planning Scheme No. 4. 4 IMPLEMENTATION OF THE STRUCTURE PLAN URBIS DAVIS PARK STRUCTURE PLAN_MAY 2021_FINAL
PRECINCT 1.6. LOCAL DEVELOPMENT PLANS Local Development Plans (LDPs) are required to be prepared for each sub-precinct, lodged with subdivision applications and approved prior to development. LDPs are to address the objectives of the Structure Plan and sub-precinct and the matters identified in Table 2 below: Table 1 – Local Development Plan requirements PRECINCT DESCRIPTION CONSIDERATIONS (INCLUDING BUT NOT LIMITED TO) 1 South Street Sub- − Interface with South Street and surrounding development SOUTH STREET Precinct fronting context (including adjoining local centre and adjacent SUB-PRECINCT South Street residential) − Transport Noise A – Local − Interface with adjacent residential Centre/Residential − Access and servicing considerations − Public transport integration and stop provision B- Mixed − Built form controls including building height, setbacks, Use/Residential indicative servicing/ storage areas and any other building design features considered relevant − Land use mix and allocation of retail floorspace 2 Residential Sub- − Interface with Fifth Avenue and surrounding development TRANSITION Precinct context (including adjacent residential) SUB-PRECINCT interfacing with − Access considerations Fifth Avenue and − Built form controls including building height, setbacks, adjacent indicative servicing/ storage areas and any other building residential design features considered relevant − Tree retention 3 Residential Sub- − Interface with Davis Park, Caesar Street and surrounding INNOVATIVE Precinct fronting development context (including adjacent residential) HOUSING SUB- Davis Park − Access considerations PRECINCT − Housing typologies, diversity and innovation and R-Code variations necessary to facilitate these − Built form controls including building height, setbacks, indicative servicing/ storage areas and any other building design features considered relevant − Tree retention 4 Residential Sub- − Interface with Education site (Fremantle Early Learning LEFROY SUB- Precinct fronting Centre) PRECINCT Lefroy Road − Interface with adjacent residential (Lefroy Road, Caesar Street and Fifth Avenue) − Green Link location and design − Green Link interface − Built form controls including building height, setbacks, indicative servicing/ storage areas and any other building design features considered relevant − Tree retention URBIS DAVIS PARK STRUCTURE PLAN_MAY 2021_FINAL IMPLEMENTATION OF THE STRUCTURE PLAN 5
PRECINCT 1.7. ADDITIONAL INFORMATION The following technical information is required to be undertaken at future planning stages: Table 2 – Subdivision and development requirements ADDITIONAL PURPOSE APPROVAL STAGE CONSULTATION INFORMATION REQUIRED Urban Water To detail drainage construction works, Condition of Department of Water. Management monitoring and maintenance subdivision approval. Plan arrangements in accordance with the WAPC’s Better Urban Water Management Guidelines. Landscape To detail landscape design and Condition of City of Fremantle Design and Open planting (including adherence to subdivision approval. Space water-wise principles) and the ongoing Management management and maintenance Plan arrangements of landscaping and public open space areas Arboricultural To detail the vegetation identified for Condition of City of Fremantle Report and Tree retention or transplanting. subdivision approval. Management To provide detail of specific Plan management, mitigation and tree retention methods to be implemented at both the construction and development stage. Traffic To provide technical specifications As required. City of Fremantle Management relating to road upgrades, construction Main Roads WA (if Plan management arrangements and required). broader traffic requirements. Geotechnical To detail the specific design and Condition of City of Fremantle Report construction recommendations and subdivision approval. requirements. Road To realign / close roads where Condition of Department of Realignment / required. subdivision approval. Planning Lands and Closure Approval Heritage. Local Preparation of Local Development Condition of City of Fremantle. Development Plans to guide detailed built form Subdivision of Plans outcomes across the project area in Development accordance with the provisions of Approval. Clause 1.6. 6 IMPLEMENTATION OF THE STRUCTURE PLAN URBIS DAVIS PARK STRUCTURE PLAN_MAY 2021_FINAL
LEGEND STRUCTURE PLAN AREA ZONES NANNINE AVENUE RESIDENTIAL MIXED USE LOCAL CENTRE RESERVES SOUTH STREET PUBLIC OPEN SPACE EDUCATION PRIMARY DISTRIBUTOR ROAD ROAD 1 LOCAL ROAD OTHER O'REILLY CLOSE GREEN LINK (PEDESTRIAN ACCESS WAY) REGIONAL ROAD AND STRATEGIC HIGH-FREQUENCY TRANSPORT EDGAR CT CORRIDOR CAESAR STREET R CODES FIFTH AVENUE SUB-PRECINCT BOUNDARY DENSITY MINIMUM CONWAY CT RANGE TARGET SOUTH STREET R60-R100 R60 SUB-PRECINCT TRANSITION SUB-PRECINCT R30-R60 R30 HOUSING INNOVATION R40-R80 R60 DOIG PLACE SUB-PRECINCT LEFROY SUB-PRECINCT R30-R80 R40 NOTES 1. LOTS SHOWN ON STRUCTURE PLAN MAP REFLECT EXISTING CADASTRAL BOUNDARIES OF LOTS WITHIN THE STRUCTURE PLAN AREA AT THE TIME OF THE STRUCTURE PLAN APPROVAL, PRIOR D LEFROY ROA TO AMALGAMATION AND RE-SUBDIVISION. DAVIS PARK PRECINCT STRUCTURE PLAN MAP DATA SOURCE MNG and Landgate DISCLAIMER Copyright by Urbis Pty Ltd. This drawing or parts thereof may not be reproduced for any purpose or used for another project without the consent of Urbis. The plan must not be used CLIENT PROJECT NO. PA1371 DATE 05.05.2021 Structure Plan Part II PROJECTION for ordering, supply or installation and no relevance should be placed on this plan for any financial dealing of the land. This plan is conceptual and is for discussion purposes only and subject to further detail study, Council approval, engineering input, and survey. Cadastral Department of 1:2,500 @ A3 DRAWING NO. REVISION Level 14, The Quadrant, 1 William Street | Perth WA 6000 Australia | +61 8 9346 0500 | URBIS Pty Ltd | ABN 50 105 256 228 MGA Zone 50 boundaries, areas and dimensions are approximate only. Written figured dimensions shall take preference to scaled dimensions. Communities 0 10 20 50m 18.1 A
PART 2 DAVIS PARK PRECINCT STRUCTURE PLAN BEACONSFIELD
PRECINCT 1. INTRODUCTION AND PURPOSE This part of the report provides an explanation of The delivery of the vision is to be through providing how the structure plan was developed considering a Structure Plan and design outcomes which the site, its characteristics and the planning addresses: framework. It provides detail on the structure plan’s form, function and key attributes. It also provides Character: a place for everyone which guidance on how the structure plan should be recognises the eclectic community interpreted and implemented, inclusive of future which has shaped Beaconsfield’s reporting. character. This should ensure the Davis Park Precinct allows for housing The purpose of the structure plan is to provide a stock that meets the needs of a wider framework that will guide future subdivision, demographic through providing a range development and land use within the structure plan of housing and lifestyle choices for area. This includes future reporting and approvals differing family structures and required to support more detailed planning for the community gatherings whilst retaining land. the character and sense of place. The structure plan will facilitate the development of Natural: a place set amongst the trees the Davis Park Precinct for a range of residential which maintains the visual and physical typologies and a supporting commercial node whilst relationship to existing vegetation and maintaining the existing Davis Park open space. greenery across the site. Development This document provides all necessary information which sits among the trees and is and addresses the reporting requirements of The oriented to provide access to natural City of Fremantle Local Planning Scheme No. 4 light and air will improve the liability of a (LPS 4) and the requirements of the Planning and higher density development on the site. Development (Local Planning Scheme) Regulations 2015, including the Western Australian Planning Live/Work/Play: providing the daily Commission’s Structure Plan Framework (August needs of residents through the 2015). expansion of the Beaconsfield Local Centre - providing opportunities for retail and commercial goods and 1.1. DAVIS PARK PRECINCT VISION services, eating and drinking places, community gathering places and Early in the process a visioning exercise was community services creating a sense of undertaken with the Department of Communities ownership and community within the and the project team to identify the vision and Davis Park Precinct. Providing a range process for setting the strategic direction for the of housing choice and high quality future of the Davis Park Precinct. passive and active recreation spaces The Davis Park Precinct is focused will ensure the Davis Park Precinct on diversity in both people and offers the complete package. housing choices. The eclectic neighbourhood includes cultural Connected: creating the ability to get and community facilities and a to and from the Davis Park Precinct and mixed use heart providing access the surrounding locality and further to a range of amenities. New and afield with ease. A focus on walkability established vegetation integrated and legibility of the site, and across the site symbolises an connections to the high frequency bus embedded sustainable approach to route ensures that additional amenities living and contributes to a strong and services are easily accessible in sense of community and identity the immediate surrounds and wider that is distinctly Beaconsfield. destinations such as Fremantle. URBIS DAVIS PARK STRUCTURE PLAN_MAY 2021_FINAL INTRODUCTION AND PURPOSE 9
PRECINCT 1.2. THE HEART OF BEACONSFIELD MASTERPLAN The Heart of Beaconsfield project is a City of An interim concept plan has been released to Fremantle project which responds to the changes provide a visual consolidation of outcomes from the occurring within Beaconsfield locality and ensuring initial community engagement. regeneration continues to occur in a co-ordinated manner. The objective is to work with the local The outcomes from the community consultation for community to develop an over-arching Master Plan the Masterplan have been incorporated into the to guide the future development. planning and design for the Davis Park Precinct Structure Plan, including the ‘Retail Heart.’ The project has undergone community engagement and the concepts and ideas are being tested regarding feasibility and achieving a consolidated approach prior to the Masterplan being released for feedback. Figure 1 – ‘The Heart of Beaconsfield’ Concept 10 INTRODUCTION AND PURPOSE URBIS DAVIS PARK STRUCTURE PLAN_MAY 2021_FINAL
PRECINCT 2. LAND DESCRIPTION 2.1. LOCATIONAL AND REGIONAL CONTEXT The structure plan area is located in the suburb of The structure plan area is located approximately Beaconsfield and is bound by South Street to the 15km south-west of the Perth CBD and 2km south- north, Lefroy Road to the south, Fifth Avenue to the east of the Fremantle City Centre and is located east and Caesar Street to the west. immediately south of the suburb of White Gum Valley. Figure 2 illustrates the location of the structure plan area in a regional context. Figure 2 – Location and Context Plan URBIS DAVIS PARK STRUCTURE PLAN_MAY 2021_FINAL LAND DESCRIPTION 11
PRECINCT 2.2. LOCAL CONTEXT high level of community and educational facilities At present, the overall structure plan area including Bruce Lee Reserve to the west and measures 10.18ha and is made up of 51 lots, Fremantle College to the south-west. To the east, comprising 266 dwellings. several commercial uses border South Street. The structure plan area is surrounded by low density residential development to the east and a Figure 3 – Aerial Plan 12 LAND DESCRIPTION URBIS DAVIS PARK STRUCTURE PLAN_MAY 2021_FINAL
PRECINCT 2.3. LEGAL DESCRIPTION AND OWNERSHIP The structure plan area is largely in the ownership A summary of the lot details is provided in of the Department of Communities (previously Appendix A, with a graphical representation known as the State Housing Commission). provided in Figure 4. Figure 4 – Land Ownership as at April 2019 URBIS DAVIS PARK STRUCTURE PLAN_MAY 2021_FINAL LAND DESCRIPTION 13
PRECINCT 2.4. HISTORY There are no sites of Aboriginal heritage The Davis Park Precinct was developed by the significance located within the structure plan area, Housing Authority (then the State Housing however it is acknowledged that Indigenous Commission) in the late 1940’s for the purposes of occupation rates of existing housing is high. post-war residential housing for migrants (refer historical imagery below), known as the Davis Park It is noted that several changes and a relatively Estate. Previous to this, the site comprised the large-scale redevelopment of the site have broader Mulberry Farm which was established in previously been seen on the site. In particular it is the 1860’s and comprised 3 acres of vineyard and noted a large-scale redevelopment in the late orchard uses. 1970s/early 1980s closed off connections to Fifth Avenue and Caesar Street, created the Davis Park Notwithstanding, no formal heritage listings are public open space and introduced higher density applicable to the structure plan area, 7 Housing built form across the site. Authority dwellings adjoining South Street have been identified as having some heritage A depiction of the historical development of Davis significance (registered on 2 February 2016). This Park is set out in Figure 5. includes properties located at 171-195 South Street (Place Number 25579). All properties have been identified as ‘RPH – Does not warrant assessment’. Figure 5 – Historic Development 14 LAND DESCRIPTION URBIS DAVIS PARK STRUCTURE PLAN_MAY 2021_FINAL
PRECINCT The structure plan area generally slopes towards 2.5. LAND USE the west and comprises a number of mature trees. The structure plan area comprises approximately Davis Park Public Open Space is located centrally 266 dwellings, with a mix of 1-, 2-, 3- and 4- within the site which was upgraded in 2015 to bedroom units. Approximately 45% of existing include new recreational facilities (scooter path, housing stock comprises 3 or more-bedroom playground, and nature play), upgraded lighting dwellings. and basketball facilities. A childcare (Fremantle Early Learning Centre) is located south of Davis The current site layout is predominantly a grouped Park and caters for ages 0 to 5-years. The centre dwelling/unit style arrangement with the housing is a community based, not-for-profit centre and is stock generally considered rundown and in need envisaged to remain as part of the future for refurbishment and/or redevelopment. redevelopment. Figure 6 – Land Uses A summary of land uses within the structure plan area are set out in Figure 6. URBIS DAVIS PARK STRUCTURE PLAN_MAY 2021_FINAL LAND DESCRIPTION 15
PRECINCT 2.6. POPULATION AND 2.7. TRAFFIC AND ACCESS DEMOGRAPHICS CONTEXT Beaconsfield comprises approximately 4,985 The structure plan area is bound by South Street to residents as of the 2016 census (ABS). the north, Lefroy Road to the south, Fifth Avenue to the east and Caesar Street to the west. South The community profile is characterised by: Street is a primary distribution road under Main Roads WA Functional Hierarchy and Primary • A median age of 41 Regional Road reserve under the Metropolitan • Children aged 0-14 years of age make up Region Scheme. 17.4% of the population • People aged 65 years and over make up South Street is currently a single carriageway road 18.2% of the population that connects key employment, health, rail and • Average household size of 2.4 persons education services and infrastructure in Fremantle • 1,345 families with an average of 1.7 and Murdoch. Existing traffic volumes on South children per family Street (21,000vpd) currently exceeds the threshold • Employment rate of 86% (inclusive of full (8-12,000vpd) for a single carriageway road with 1 time and part time work) which is reflective lane in each direction. The State Government has of the rates across Western Australia identified South Street as an important route for • Income levels – median weekly income of future rapid public transport, which may potentially $1,483.00 include widening to 6 lanes inclusive of 2 priority • A relatively equal proportion of owner bus lanes. A 10m wide road widening area is occupier and rented housing shown on the Metropolitan Region Scheme for future widening, impacting on the northernmost lots Surrounding suburbs of White Gum Valley, in the structure plan area. Hamilton Hill, South Fremantle and Hamilton Hill display characteristics generally similar to that of Lefroy Road to the south is a local distributor road Beaconsfield. under the Main Roads WA Functional Hierarchy, connecting Carrington Street to the east with Hampden Road to the west. Both Fifth Avenue and Caesar Street are both access roads. Internal roads comprise O’Reilly Drive, Doig Place, Edgar Court and Conway Court. Many of these internal roads are cul-de-sac configuration. 16 LAND DESCRIPTION URBIS DAVIS PARK STRUCTURE PLAN_MAY 2021_FINAL
PRECINCT 3. PLANNING FRAMEWORK 3.1. ZONING AND RESERVATIONS South Street is located directly north of the 3.1.1. Metropolitan Region Scheme amendment area which is reserved as a Primary The structure plan area is zoned Urban under the Regional Road under the MRS. A portion of the Metropolitan Region Scheme (MRS), as shown in northernmost lots are impacted by this reserve Figure 7 below. This allows for a variety of land which encroaches onto the lots for the purpose of uses including residential, commercial, and light future road widening (approximately 10m). industry. Figure 7 – MRS Zoning Extract URBIS DAVIS PARK STRUCTURE PLAN_MAY 2021_FINAL PLANNING FRAMEWORK 17
PRECINCT 3.1.2. Local Planning Scheme The structure plan area is zoned Development The specific zones proposed by this Structure Plan zone under the City of Fremantle Local Planning are outlined in section 5.2. Scheme No.4. This zoning was established in 2016 by way of a Scheme Amendment (No.72) in order to allow for a structure plan to be established over the subject area. Figure 8 – LPS Zoning Extract 18 PLANNING FRAMEWORK URBIS DAVIS PARK STRUCTURE PLAN_MAY 2021_FINAL
PRECINCT 3.2. REGIONAL AND SUB-REGIONAL STRUCTURE PLANS The Central Sub-Regional Planning framework aims to provide an integrated planning and infrastructure framework to guide infill growth. The below table provides a summary of provisions relevant to the structure plan area and discusses how the structure plan has addressed these. Table 3 – Regional and Sub-Regional Structure Plan Considerations Document Summary Discussion Central Sub- The framework focuses on achieving higher densities The structure plan is aligned with the Regional Planning of employment and residential development (including sub-regional framework in that it Framework infill development and consolidation). aims to redevelop existing housing stock as part of a broader urban March 2018 The framework identifies South Street as an ‘Urban renewal process and contribute Corridor’ which aims to transition key transport towards the City of Fremantle’s infill corridors into multi-functional corridors and high dwelling target of 7,100 dwellings. amenity. It also notes that existing or planned high- Specifically, the structure plan quality public transport is an important consideration facilitates higher density residential in determining whether a corridor is suitable for more development resulting in a minimum compact and diverse urban form. of 550 dwellings (R40 and above) and the provision of mixed use along a significant transit route and activity corridor (South Street). The density associated with the structure plan is considered to significantly contribute to the City’s infill targets, providing at a minimum an additional 324 dwellings. The State Government has identified South Street as an important route for future rapid public transport which can support higher residential densities and the agglomeration of employment uses. 3.3. STATE PLANNING A range of state planning policies are considered applicable to the development of the structure plan area, primarily those pertaining to built form and access. The below table provides a summary of provisions relevant to the structure plan area and discusses how the structure plan has addressed these. Table 4 – State Planning Considerations Document Summary Discussion State Planning State Planning Policy No. 3 – Urban Growth The structure plan is consistent with the Policy No. 3 – and Settlement (SPP 3) sets out the objectives of the Policy as it builds upon an Urban Growth and principles and considerations which apply to existing residential community that is Settlement planning for urban growth and settlement in strategically positioned in close proximity to Western Australia. established and future transport routes, public URBIS DAVIS PARK STRUCTURE PLAN_MAY 2021_FINAL PLANNING FRAMEWORK 19
PRECINCT Document Summary Discussion transport, activity centres and employment opportunities State Planning The purpose of the R-Codes is to provide a The structure plan provides for a range of R- Policy No. 3.1 – comprehensive basis for the control of Code densities reflective of the zoning, Residential Design residential development throughout Western location and amenity attributed to various Codes Australia. The R-Codes set out a variety of portions of the structure plan area. The residential density codes, from R2 through proposed densities range between R40 and to R-AC0, reflecting different densities of RAC-100 providing for a range of dwelling residential development and different typologies including single residential development contexts. dwellings. The design ensures future residential development can be developed in manner which is generally in accordance with the R-Codes. State Planning SPP4.2 sets out a network/hierarchy of The South Street Sub-Precinct, with a Policy 4.2 – Activity activity centres in Perth and Peel, having maximum retail floor space cap of 3,500sq.m Centres for Perth regard to the distribution, function, land use constitutes a Neighbourhood Centre under and Peel and urban design elements of centres. SPP4.2. The function of this is to provide for the weekly household shopping needs and community facilities. The structure plan builds upon the existing local centre on South Street to create the Neighbourhood Centre, incorporating land uses consistent with the intentions of SPP4.2. State Planning This policy aims to protect people from Appropriate mechanisms to protect future Policy No. 5.4 – unreasonable levels of transport noise by residents from transport noise on South Street Road and Rail establishing a standardised set of criteria to will be required through the LDP process and Transport Noise be used in the assessment of proposals. Development Applications relating to specific and Freight development. It is considered that Considerations in development within the structure plan area will Land Use Planning achieve appropriate noise levels. State Planning The purpose of the R-Codes Volume 2 is to The structure plan includes a range of R- Policy 7.3 provide guidance and controls for the Codes greater than R40 and has been Residential Design development of multiple dwellings designed to ensure the applicable sections of Codes Volume 2 – (apartments) within Western Australia. SPP 7.3 can be appropriately met in the Apartments These refer to all development coded R40 development of multiple dwellings on the site. or higher. The policy seeks to provide development which is appropriate for the intended purpose, responsive to the site characteristics and local context. Liveable Liveable Neighbourhoods is the WAPC’s The structure plan has been developed Neighbourhoods current operational policy guiding the design around the principles of Liveable and approval of structure plans. The Neighbourhoods, in particular the following: objective of Liveable Neighbourhoods is the 20 PLANNING FRAMEWORK URBIS DAVIS PARK STRUCTURE PLAN_MAY 2021_FINAL
PRECINCT Document Summary Discussion delivery of new developments that provide An improved urban structure based high quality living, working and recreational on interconnected, safe and environments, contributing to the successful walkabout street blocks aimed at implementation of the State Planning reducing car dependency. In this Strategy and State Sustainability Strategy. regard, a review of the existing cul- de-sacs will be undertaken to ensure a more connected urban environment. Creation of a sense of community, identity and place. Provision of a greater variety of lot sizes and dwelling types to cater for a more diverse community. Consideration of higher densities that can support local services and public transport. 3.4. LOCAL PLANNING A range of local planning policies are considered applicable to the development of the structure plan area, primarily those pertaining to built form and access. The below table provides a summary of provisions relevant to the structure plan area and discusses how the structure plan has addressed these. Table 5 – Local Planning Considerations Document Summary Discussion Local Planning The provisions of this policy apply to all residential Streetscape typologies within the Policy 2.9 - development and addresses items including structure plan have been influenced Residential setbacks, building orientation and building height by the Design WA built form drivers Streetscape Policy and scale. and the landscaping outcomes sought for the structure plan area. Setbacks, building orientation and height and scale for the built form will be in accordance with the LDPs prepared for the four identified sub- precincts. Local Planning The objective of this policy is to provide guidance on Opportunities for tree retention and Policy 2.10 - the requirement and assessment of landscape plans landscape enhancement have been Landscaping of and where Scheme and Policy requirements can be considered as part of the structure Development and varied in relation to planning applications which planning process. Importantly, the Existing Vegetation contain tree(s) and vegetation considered worthy of interface with the adjoining Bruce Lee on Development conservation. reserve and Davis Park have been Sites considered, as well as opportunities to enhance green spaces and increase the quality and distribution of green URBIS DAVIS PARK STRUCTURE PLAN_MAY 2021_FINAL PLANNING FRAMEWORK 21
You can also read