                                        To further improve standards of Teaching and Learning
                                 through the rigorous self- assessment of their own teaching by
                                 teachers, leadership and of their own learning by learners ensuring
                                 high levels of challenge for all.
                                        To improve standards in Writing and Oracy, by increasing
                                 accuracy in grammar and organisation.
                                        To improve standards in procedural Mathematics
                                        To improve the attainment of pupils vulnerable to
                                 underachievement
                                        To develop questioning across the Curriculum
                                        To prepare teaching staff and pupils for new curriculum and
                                 digital competency

               Danescourt Primary School
Chair of Governors- Dr. Dirk Wilson

Headteacher- Judith M. Davies

Deputy Headteacher- Kate Haynes

LEA- Cardiff

Challenge Adviser- Alison Botarelli
Contents
Background Context
6      The School Context

7       The School Self Evaluation and Improvement Cycle
Action Plans

 9-13 Priority 1
      To further improve standards of Teaching and Learning through the rigorous self- assessment of
      their own teaching by teachers, leadership and of their own learning by learners ensuring high
      levels of challenge for all.
14-17 Priority 2
      To improve standards in Writing and Oracy, by increasing accuracy in Grammar and Organisation.

18-21 Priority 3
      To improve standards in procedural Mathematics

22-28 Priority 4
      To improve the attainment of pupils vulnerable to underachievement

29-32 Priority 5
       To develop questioning across the Curriculum
33-37 Priority 6
       To Prepare teaching staff and pupils for new curriculum and digital competency.
What Informs the SIP?
40     The School Vision
   41     National/ Local priorities
 42-44    Self- Evaluation Findings
 45-57    Summary of Key performance Data
   58      Estyn Recommendations
 59-63    Peer Enquiry- February 2016
 64-69    Mathematics Review – October 2015
 70-99    Review of progress on previous SIP 2015-16
101-104   Summary of School Improvement Targets and Termly
           milestones for tracking data.
 105-106 Summary of Priorities for 3 years
          ( high level priorities, actions and targets)
Appendices
108-113   Full School Targets and benchmarks
114-120   Staff Structure and roles/responsibilities
  121     Key External Challenge and Support
  122     Summary of Development of school finances including EIG and PDG
123-124   Summary of Staff Development Programme
  125     Summary of partnership proposals to engage wider community including work with other
          schools
126-132   Monitoring, evaluation and review- arrangements and timetable- including governing body
          monitoring and review
Danescourt Primary School and Nursery
Danescourt Primary School and Nursery caters for around children aged 3 to 11. The school is set in extensive land and in
the centre of the Danescourt housing estate in the Llandaff area of Cardiff.
The primary school was created in September 2008 when Danescourt Infant and Danescourt Junior Schools were
amalgamated.
Between July 2009 and September 2010 the school underwent an extensive building refurbishment programme to provide
‘state of the art’ two form accommodation for the children.
There are currently around 420 pupils on roll and pupils are arranged in a mixture of single age and mixed age classes
housed in well -resourced indoor and outdoor learning areas.
Danescourt Primary School Self – Evaluation and Improvement Cycle
    Area of                Learning            Year 2    Year 3    Year 4    Year 5    Year 6     Year 7
   Learning               Team /SLT           2016-17   2017-18   2018-19   2019-20   2020-21   2021-2022

    Literacy              Language                                                            
                           Literacy           Autumn    Spring    Autumn    Spring    Autumn     Spring
                        Communication
  Numeracy         Mathematical Development                                                  
                                               Spring   Autumn     Spring   Autumn     Spring   Autumn
    Digital         Science and Technology                                                   
Competency                                     Spring   Autumn    Summer     Spring   Autumn    Summer
RE inc. Global          Personal Social                                                
 Citizenship         Development/ESDGC        Summer                                  Autumn
    Welsh           Welsh 2nd Language/MFL                                                      
                                                        Summer              Summer              Summer
 Science inc.       Science and Technology                                            
     K&U                                      Autumn              Spring              Summer

    History               Humanities                                                              
                                                                                                 Autumn
Geography inc.           Humanities/                                         
Ed. Sustainable            ESDGC              Spring                        Summer
     Dev.
PE inc. Physical     Physical Development                                              
 development                                            Spring                        Summer
      DT                                                                                          
                                                                  Summer                         Spring
      Art                 Expressive                                         
                             Arts             Summer                        Spring
    Music                                                                              
                                                        Autumn                        Spring
Action Plans
Danescourt Primary School                                            Subject or Aspect Action Plan: Teaching and Learning

Action Plan 2016-17

Priority 1: Standards of Teaching and Learning                       Source: Lesson Observations, SER, Peer Enquiry

Target: To further improve standards of Teaching and Learning through the rigorous self- assessment of their own teaching by teachers,
leadership and of their own learning by learners ensuring high levels of challenge for all.

Success Criteria :
  Regular self- evaluation of teaching will have improved % of teaching at ‘good’ and ‘excellent’ to between 80-90%
      Audit of teaching Continua to be used and analysed in Oct, Feb and May to establish progress

  Planned observations of lessons complete across phases inform school self- review process of the standard of Teaching and Learning.
      Scheduled observations of Language/ Literacy, Maths/Numeracy, Digital Competency, Science, Geography, RE and Art by learning leaders and co-
         ordinators.
      Evaluative Summary of findings recorded on the Subject Self- Evaluation in preparation for feeding into main school Self Evaluation Report.
  Curriculum Teams will be reviewed and given hands on training in school self- evaluation activities;
      Teaching Staff will be confident listening to learners, and scrutinising work and STP planning to make accurate evaluation of standards.
      Language/ Literacy, Maths/Numeracy, Digital Competency, Science, Geography, RE and Art will all be reviewed and self-evaluation to include lesson
         observation, scrutiny of planning and books, listening to learners and environmental audit.

  Role of governing body in the evaluation of progress towards School Priorities will be consolidated.
      Governors will be assigned to a school priority from the Autumn Term and receive updates from Priority Lead on progress termly.
      Each priority will be subject to an evaluative learning walk at the beginning of June to verify progress and provide an evaluative commentary.

  Pupils contribution to learning process has become more evaluative
      Role of Learning Forum has further enhanced to feed into the school self- evaluation process.
      Pupils have self-assessed their own learning and identified areas for improvement.
      Pupils have trialled the Learner’s Continua and are confident in knowing their next steps in learning.

Strategically Planned                                        Actions                                     On      Lead            Time Scale             RAG
Tasks/ Skills:                                                                                           Track   Person(s)                              Analysis
                                                                                                                 Involved     Start    End
Introduction of           Performance Management Teams to be reformed on a Key                       HT    Sept   Sept
revised Teaching           Phase basis.                                                                     16     16
Continua Tracker
                          Performance Management Leaders to receive introductory                  HT/      Jun    Sept
                           training on facilitating new systems                                  Teaching   16     16
                                                                                                 Continua
                          Introductory training session to be held and Teaching Staff to self     HT       Oct    Oct
                           – assess their own teaching against the given criteria                           16     16
                          Each Teacher to meet with their Team Leader to assess the             PM Team    Oct    Oct
                           areas of their teaching they wish to target improvement in.            Leaders   16     16
                          One area will be selected and agreed as performance                   PM Team    Oct    Oct
                           management target for each teacher.                                   Leaders    16     16
                          Check- in meetings to happen half termly                              PM Team    Nov    Jul
                                                                                                 Leaders    16     17
                          Teaching Continua to be updated at regular intervals by Teacher,      Teachers   Oct    Jul
                          At least half termly                                                             16     17
                          Composite of all results to be tracked for overall levels of          HT         Jul    Jul
                           teaching termly and summatively in July.                                         17     17
                        Observation of each teacher by performance management team              PM Team    Jun    Jun
                           leader with a focus on the aspect jointly agreed at the beginning     Leaders    17     17
                           of the cycle.
  Review of            Autumn Term                                                               LL and     Nov    Nov
  standards of         Leader for Learning for Literacy to lead a review of standards of         team       16     16
  Teaching and         writing carrying out agreed self-evaluation activities (Talking to
  Learning in          Learners, scrutiny of books and planning, environmental audit and
  designated subject   sample lesson observations.
  areas
                          Literacy Learning Team to evaluate finding and record on              LLC        Nov    Nov
                           Subject evaluation.                                                   Learning   16     16
                                                                                                 Team
                          Leader for Learning for Science to lead a review of standards of      Sc         Nov    Nov
                           Science carrying out agreed self-evaluation activities ( Talking to   Leader     16     16
                           learners, scrutiny of books and planning, environmental audit         and team
                           and lesson observations
                          Science Learning Team to evaluate finding and record in Subject       Sc         Nov    Nov
                           evaluation.                                                           Learning   16     16
                                                                                                 Team
Spring Term                                                                Numeracy     Jan   Jan
 Leader for Learning for Mathematics and Numeracy to lead a               Lead and     17    17
   review of standards of procedural maths carrying out agreed self-       team
   evaluation activities (Talking to Learners, scrutiny of books and
   planning, environmental audit and sample lesson observations).

   Mathematics and Numeracy Learning Team to evaluate finding             MD/          Jan   Nov
    and record in Subject evaluation.                                      Numeracy     17    17
                                                                           Learning
                                                                           Team
   Leader for Learning for Digital Competency to lead a review of         Leader       Feb   Feb
    standards carrying out agreed self-evaluation activities ( Talking     for E        17    17
    to learners, scrutiny of books and planning, environmental audit       Learning
    and lesson observations).                                              and team
   Science and Digital Competency Team to evaluate finding and            Science      Feb   Feb
    record in subject evaluation.                                          and          17    17
                                                                           Technology
                                                                           Team
   Learning co-ordinator for the Humanities to lead a review of           Humanities   Mar   Mar
    standards in History/Knowledge and Understanding of the World          Learning     17    17
    carrying out agreed self-evaluation activities (Talking to learners,   Team
    scrutiny of books and planning, environmental audit and lesson
    observations).
   Humanities Learning Team to evaluate finding and record in             Humanities   Mar   Mar
    subject evaluation.                                                    Learning     17    17
                                                                           Team
Summer Term                                                                Humanities   Apr   Apr
 Leader for Learning for Humanities to lead a review of standards         Learning     17    17
  of teaching and learning in RE. carrying out agreed self-                Team
  evaluation activities (Talking to Learners, scrutiny of books and
  planning, environmental audit and sample lesson observations).

   Humanities Learning Team to evaluate finding and record in             Humanities   Apr   Apr
    Subject evaluation.                                                    Learning     17    17
                                                                           Team
                                                                           Expressive   May   May
   Leader for Learning for Expressive Arts to lead a review of            Arts         17    17
                                                                           Learning
standards of teaching and learning in Art, carrying out agreed       Team
                             self-evaluation activities (Talking to Learners, scrutiny of books
                             and planning, environmental audit and sample lesson
                             observations).

                            Expressive Arts Learning Team to evaluate finding and record in      Expressive   May      May
                             Subject evaluation.                                                  Arts         17       17
                                                                                                  Learning
                                                                                                  Team
Learning Forum to           Members of Learning Forum to be nominated by teachers of             Teachers     Sept     Septem
develop their role           Year 2 to 6.                                                                      16       ber 16
further in the
evaluating of learning
                            Learning Forum to devise their own questions re learning to be       LF           Oct      Oct
                             added to the annual questionnaire of pupils.                                      16       16
                            Learning Forum to collate and analyse the results of the half        HT and       Nov      Nov
                             termly rubric of learning (HOM)                                      LF           16       16
                            Learning Forum to formulate simple action plan of activities they    LF           Oct      Nov
                             wish to undertake to monitor and improve learning                                 16       16
Pupils’ Learning            Selected strands of the pupil continua to assess their own           HT and       Jan      Jul
Continua to be               learning and set next steps for improvement.                         DH           17       17
introduced to pupils
Deepening of GB             GB to be formed into six teams- one for each current school          HT           Oct      Oct
involvement in the           priority.                                                                         16       16
evaluation of
Teaching and
Learning                   Each team to be provided with termly update on progress against       SLT      Nov          May
                            the priority by priority lead.                                                 16           17
                          Each team to carry out a self-evaluative learning walk and             Gov Body June 17
                            provide an evaluative commentary to feed into the SER
Resources (time; finance; staff development; equipment)                     Budget Allocation           Budget Source
Cost of Staff Training
Teaching Continua- Training and Set up                                      £1300                       Delegated budget- Teaching Materials

Supply Costs for covering Leaders for Learning- 12 days                         £1800                   Delegated Budget-Agency costs
Supply cover for Performance Management- 10 days                       £1500                       Delegated Budget- Performance
                                                                                                   Management

Monitoring                                                           Evaluation

        How?                  Who?                    When?                 How?                   Who?                  When?
By Report, PM Paper
 work, Monitoring of  HT. Performance              Half Termly and
                                                                                             Governing Body and   Termly and
 Teaching Continua    Leaders, SLT and GB            Termly as       By SLT and HT reports
                                                                                              Challenge Advisor   summatively in June
  and subject Self    Learning Teams                approprpiate
 Evaluation Reports
Monitoring Commentary                                                Evaluation Commentary
                                                                    
Danescourt Primary School                                         Subject or Aspect Action Plan: Literacy

Action Plan 2015-16

Priority 2 : Writing    and Oracy                                Source: Core Data Analysis, End of In Year and End of Key Stage Teacher
                                                                 Assessment

Target:
To improve standards in Writing and Oracy, by increasing accuracy in Grammar and Organisation.

Success Criteria :
    Percentage of pupils achieving Outcome 6 in LLC increased to between 50-55 %
    Percentage of boys achieving Outcome 6 in LLC increased to between35-45%
    Percentage of pupils achieving Level 5 in Writing increased to between 50-60%
    Percentage of boys achieving Level 5 in Writing increased to between 45 -55%
    Percentage of pupils achieving Level 5 in Oracy increased to between 50-60%

Strategically Planned                                        Actions                                        Lead                            RAG
                                                                                                                           Time Scale       Analysis
Tasks/ Skills:                                                                                              Person(s)
                                                                                                            Involved    Start    End
To improve standards         School to become a member of NACE                                             HT          Sept 16
of writing for MAT
                                                                                                                         th
learners.                    NACE course: ‘The MAT Learner: challenge in the everyday classroom.’          Literacy    5 Oct 16
(See also Priority 4)                                                                                       Leader/HT
                             Training Day to Identify criteria for MAT Learners at our school and          Literacy    Nov 16
                              looking at provision for MAT learners at DPS- enrichment and                  Leader/HT
                              enhancement strategies
                             MAT to be identified in each class and a register of gifted children to be    All         Nov 16
                              established.                                                                  Teachers

                             Plan regular opportunities to use ICT in the publishing writing.( Link with   All         Sept 16    Jul 17
                              Priority 6)                                                                   Teachers
   Engage with positive male role models e.g. Dads, Grandads, to take part     LL/ ELSA   Sept 16    Jul 17
To work                 in writing workshops (see Priority 4)
collaboratively        Male writers celebrated throughout the year, e.g. Roald Dahl Day, World
with partner            storytelling Day, assemblies etc.
schools to bring
about               Continue to develop more meaningful opportunities for boys as writers           LL/NL      Oct 16    Nov 16
improvement in      through Contexts for Learning.
boys motivation      Recap on opportunities for consolidation through meaningful contexts
for and standards       (joint Twilight INSET with Numeracy Leader)
in writing           Medium term mapping to include opportunities exist to cover a range of
                        skills monitored by book scrutiny, PPA team meetings, INCERTs
                        analysis.

                       Book Fairs: Groups of boys to decide on commission to be spent              Pupils     Nov 16    Nov 16

                       Celebration of pupil learning as part of display and whole school           DH/HT           Termly
                        assemblies. ‘Write here Write now’. 50% of writing to be boys.

                       Boys’ handwriting groups to be set up: series of fun activities which       LL         Oct 16        Jul
                        develop fine motor skills.                                                                           17

                       Revisit pen passports: aim for all pupils to have graduated to pen by the   All         Sept         Jul
                        end of Year 5.                                                              Teachers     16          17

                       To meet with other member schools of SIG5 (Significant Improvement          LL/ SIG    Sept 16   June 17
                        Group) to schedule a series of workshop sessions to encourage boys          convenor
                        writing. Each school to offer a workshop session to enhance boys writing
                       E.g. encouraging boys as writers in the early years, using Thinking Maps
                        to inspire boys to write.
                       Course to be provided by outside provider (tbc) for representatives of      SIG          Feb
                        each SIG member school on how to build a culture where boys are             Convenor    17 tbc
                        inspired to write.

                       DPS to set challenging in-year targets for boys’ writing and progress to    SLT        Sept 16   Jul 16
                        be monitored at 3,6 and 9 months.
   Data across member schools to be collated.                                  SIG                    Jul 16
                                                                                                          Convenor
To improve levels of         Twilight INSET: revisit ‘prompt posters’ as devised last year; review how   Literacy
spoken and written            grammar is taught throughout genres of writing. Non-negotiables’ of         Leader
grammar across the            grammar on display in every classroom.
                                                                                                                       Nov
school.
                                                                                                                       16
                             OUP grammar resources used to support teaching.                             All          Sep       July 17
                                                                                                          Teachers     16

                             Revision of ‘starters’ in English lessons.                                  LL           Nov 16

                          Twilight INSET (with Numeracy Leader): Asking good questions to promote         Literacy     Nov 16
                          enquiry – use of Q-Matrix, Thinking Buddies system, TASC Wheel (See             and
                                                                                                          Numeracy/
                          Priority 5: Thinking)                                                           Thinking
                                                                                                          Leaders
                          Use of i-Pads for AFL, tracking oracy skills on INCERTS Snap                    Literacy     Sept 16   Jul 17
                                                                                                          Leader/who
                                                                                                          le staff
                          FP – Speech and Language Links interventions (see Priority 4)                   Literacy     Oct 16    Jul 17
                                                                                                          Leader/AL
                                                                                                          Nco
                         INSET: developing the use of drama and role play across the school. Role         Literacy     Feb 17
                         play areas set up across school.                                                 Leader
Resources (time; finance; staff development; equipment)                 Budget Allocation                     Budget Source

1.Membership of NACE                                                        £170                              Delegated Budget- memberships
2. Supply cover for SIG activities                                          £800                              SIG grant

3. NACE conference                                                          £340                              EIG

                               Monitoring                                                                 Evaluation

        How?                         Who?                   When?                   How?                      Who?                   When?
In-year target setting,                                                     Report to GB,
                              Literacy Leader      3,6,9 months                                       GB/ Challenge Adviser        June 2017
book looks, feedback                                                        Evaluative learning
marking.           walk, in-year and end
                        of KS2 writing TA.
Monitoring Commentary   Evaluation Commentary
  
                        
Danescourt Primary School                                        Subject or Aspect Action Plan: Mathematics- Procedural

Action Plan 2016-17

Priority 3: Mathematics                                          Source: In Year Target Setting, End of Key Stage Assessment and National
                                                                 Test Analysis.

Target:
To improve standards in procedural mathematics.
Success Criteria:

   Evidence of Increased opportunities in books and planning for children to use numeracy through context
   The number of boys achieving Outcome 6 has risen to between 50 and 55%
   The percentage of pupils achieving Outcome 6 has risen to between 55% and 60%
   The percentage of pupils achieving Level 5 has risen to between 53 and 55%
   The percentage of pupils achieving Level 4 and Outcome 5 has been at least maintained.
   National percentage of pupils in Years 2-6 achieving a standardized score of 115+ on procedural numeracy test has risen to between 16 and 20%

Strategically Planned                                    Actions                                  On      Lead          Time Scale       RAG
Tasks/ Skills:                                                                                    Track   Persons                        Analysis
                                                                                                                     Start   End
                                                                                                          Involved
Place value:                 Utilize cyclical planning format presented as part of Abacus and            CL         Sept 16   July 16
Improvement of pupil          embedded as part of weekly planning (all staff) to ensure
understanding                 coverage.

                             Monitor planning to ensure pupils’ understanding of how                     NL         Oct       June
                              numbers are composed and how they relate to each other is                              16        17
                              being systematically developed through progressive teaching of
                              PV
                             Purchase Manipulatives: classroom equipment such as Dienes                  NL         Sept 16
                              apparatus to reinforce the connection between mental and
                              recorded calculations.
                             Introduce exemplar question cards to all staff to develop talk              NL         Oct 16
                              within mathematics as an integral part of daily learning. Provide
                              opportunities for children to talk about why and how calculations
work (links to school priority 2)

                          Distribute mathematical language synonyms using posters in           NL         Oct 16
                           classroom and linked to thinking maps. All classroom to display
                           procedural mathematical board in classroom and relevant
                           number lines

                          Purchase of mathematical dictionaries                                NL         Sept 16

                          Action research project to develop baseline tool on types of         NL         Sept 16   July 17
                           questions asked as part of mathematical learning. Comparison
                           after further development of Q Matrix (see Thinking Action Plan)
                          Complete Long Term curriculum mapping of skills linked with CfL      LL/NL           Oct 16

Using Mathematics in      Recap on opportunities for consolidation through meaningful          LL/NL           Jan 17
context                    contexts (joint Twilight INSET with Literacy Leader)
                       
                          Medium term mapping to include opportunities to cover a range        NL
                           of skills (number, measure, data handling etc) monitored by book
                                                                                                                Oct 16
                           scrutiny, PPA team meetings, INCERTs analysis.

                          Pupils mentioned in Celebration assemblies regularly for             Teachers   Sept 16   July 17
                           applying their maths skills.
                          Maths displays to highlight achievement in mathematics and it’s      Teachers   Sept 16   July 17
                           application across the curriculum.
Stepped word              Twilight INSET: Analysis (whole staff) of procedural results (LNF)   NL         Sept 16   Sept 16
problems                   to feed into teacher planning
                          Staff training on ways to provide practice in stepped problems       CL         Nov 16
                           through modelling and guiding leading to independent practice
                          Opportunities planned for whole school and/team moderation           NL         Nov 16
                           (planned into PPA timetable) exercises with a procedural focus.
                       
                           Review of Procedural Maths to include;                               NL and     Jan 17
                           Book looks                                                           Maths
                          Monitoring of planning – to ensure opportunities exist for MA        Learning
   Lesson observations                                                 Team
                           Listening to learners
                           INCERTs analysis
To establish               Revisit homework platform as part of whole school assembly to       NL          Oct 16
homework platform           promote and embed the learning tool

                           Monitor the usage of homework platform on weekly basis              CTs         Oct 16    Jul 17

                           Provide weekly opportunity for children without computer access     SLT         Oct 16    Jul 17
                            to complete homework in school at lunchtime

                           Distribute questionnaire and evaluate comments on the               NL          Jan 17
                            effectiveness of using platform to support, consolidate and
                            extend children’s procedural skills
To embed Target            Planned task in PPA – team leaders to work with staff to assign                 Sept 16
setting                     bookmarks

                           Monitoring of book mark usage during Maths Review                               Jan 17

Resources (time; finance; staff development; equipment)                     Budget Allocation         Budget Source
Training Costs:                                                                                       Delegated budget
Resources costs:
Maths Resources ( Manipulatives and dictionaries)                           £500                      Delegated budget- teaching materials

Supply cover costs for Long Term Planning mapping                           £300                      Delegated budget- agency

Supply cover for Maths Review                                               £300                      Delegated budget- agency

Monitoring                                                       Evaluation

      How?                     Who?                     When?                     How?              Who?                    When?
 Feedback from staff     SLT and GB priority         3,6, 9 months       Report from SLT        Systems Leader              June 17
training, Task Force           team                                    Governor’s evaluative        GB Evaluative Team
  meetings, Learning                                                    commentary.
      Forum and
Observations, report to
          GB
Monitoring Commentary                                                   Evaluation Commentary

 Danescourt Primary School                                    Subject or Aspect Action Plan: Additional Learning Needs

 Action Plan 2016-17

 Priority 4 :Raising Achievement of Vulnerable Pupils         Source: National Tests, INCERTS, teacher assessment, baseline and end of key
                                                              stage data

 Target: To improve the attainment of pupils vulnerable to underachievement

 Success Criteria :
            65-75% targeted pupils make better than expected progress and return to within average range of scores in literacy, speech and
               language and numeracy interventions ( baseline and final test)
            90-100% of FSM pupils achieve estimated targets (end of year pupil progress review)
            75%-85% of MAT pupils achieve aspirational outcomes and levels ( end of year pupil progress review)
            90-100% of ME pupils to achieve estimated targets ( end of year pupil progress review)
            90-100%of pupils with EAL to achieve estimated targets ( end of year pupil progress review)
            Attendance of targeted pupils to improve by 5% ( SIMS attendance calculator)

 Strategically Planned                                  Actions                                 On      Lead          Time Scale     RAG
Tasks/ Skills:                                                                              Track   Person(s)   Start                 End        Analysis
                                                                                                    Involved
Literacy Interventions   Pupils to be targeted using baseline assessments, teacher                  ALNco,      September 2016
targeted pupils to       assessment and NNS + NLS analysis                                          DH
receive literacy         Wellcom- Nursery                                                           TA &        Oct
interventions            All pupils in Nursery to be assessed using the Wellcom                     ALNCo       16
                         intervention.
                         Pupils identified as needing extra help to be grouped according            TA &        Nov                   July
                         to need and receive targeted intervention from T and TAs.                  ALNCo       16                    17
                         Progress to be monitored at 3,6, and 9 month intervals                     TA &        Jan ’17
                                                                                                    ALNCo       May ’17
                                                                                                                July ‘17
                         Language Links- Reception                                                  CT, TA &    Sept ‘16              Oct ‘16
                         All pupils in Reception to be assessed using the Language Links            ALNCo
                         programme
                         Pupils identified as needing extra help to be grouped according            CT, SLTA    Oct ‘16               Jul 17
                         to need and receive targeted intervention from T and TAs.                  & ALNCo
                         Progress to be monitored at 3,6, and 9 month intervals                     CT, SLTA    Jan ’17 May ’17
                                                                                                    & ALNCo     July ‘17
                         Speech Links – Reception                                                   CT, SLTA
                         Targeted pupils to receive a minimum of 2 sessions per week                & ALNCo     Oct’16                July ‘17
                         with a TA upon the successful completion of the Language links                         May’17
                                                                                                                (if chn needed Lang
                         screening.                                                                              Links intervention
                                                                                                                first)

                         Progress to be monitored and assessed.                                     CTs      Jan ’17 April ’17
                                                                                                             July ‘17
                         Speech Link – Year 1                                                       CT, SLTA Oct ‘16   July ‘17
                         Target group of Year 1 pupils to receive a minimum of 2 sessions           & ALNCo
                         per week from TA
                         Progress to be monitored and assessed.                                     SLTA &      Jan ’17 April ’17
                                                                                                    CT          July ‘17
                                                                                                    ALNco
                         SAIL- Year 1                                                               SAIL TAs    Jan ‘17               July ‘17
                         Target group of Year 1 pupils to receive a minimum of 4 sessions           CT, DH &
                         per week from TA.                                                          ALNCo
                         Interim progress to be assessed after 3 and 6 months.                      SAIL        March ’17
                                                                                                    TAs, CT,    June ’17
                                                                                                    DH &
ALNCo

                             Baseline test to be repeated after 6 months                        SAIL TAs   June ‘17
                                                                                                CT, DH &
                                                                                                ALNCo
                             SAIL- Year 2                                                       SAIL       Sept‘16    Dec ‘16
                             Target group of Year 2 pupils to receive a minimum of 4 sessions   TAs, CT,
                             per week from TA.                                                  DH &
                                                                                                ALNCo
                             STARS –Group Y2                                                    HLTA,      Oct ‘16    July ‘17
                             Target group to receive group session with HLTA                    CT, DH &
                                                                                                ALNCo
                             Interim progress to be monitored at 3,6 and 9 month intervals      DH,        Jan ’17 April ’17
                                                                                                ALNco,     July ‘17
                                                                                                PK & CT
                             Rapid Readers – Y3 and 4                                           DH, RR     Oct ‘16    July ‘17
                             Target group to receive individual/group session twice a week      TA
                             with TA                                                            ALNCo,
                                                                                                CT & CP
                             Rainbow Readers – Y4, Y5 and 6                                     HLTA       Oct ‘16    July ‘17
                             Target group to receive individual/group session with HLTA
                             Motorway Handwriting                                               HLTA       Oct ‘16    July ‘17
                             Targeted individuals to receive individual session with HLTA
Numeracy                     Catch Up Maths - Year 1                                            NL, CT &   Oct ‘16    July ‘17
Interventions                Target group of Year 1 pupils to receive a minimum of 3 sessions   TA
Targeted pupils to           per week with a TA
receive numeracy             Catch Up Maths – Year 2                                            NL, CT,    Oct ‘16    July ‘17
interventions                Target group of Year 2 pupils to receive a minimum of 3 sessions   TA
                             per week from TA

To ensure Equal              Equalities support from Shaun Evans-Pask                           HT &       Oct 16     Nov 16
Opportunities in place      Writing annual Equality Report, Strategic Equality Plan            DHT
for pupils in school.
                            Update Access Plan and take to GB for approval                     HT &       Oct 16     Nov 16
                                                                                                DHT
Publish Strategic Equality Report, Annual Report and Equality      HT         Oct 16
                         Impact Assessments on Untethered Ltd website
                        Equality impact assess new policies                                HT/DHT     Oct 16     Jul 17

FSM Group            FSM Group                                                              HT         Sept ’16 Dec ’16
                     FSM group identified and progress monitored                            ALNCo      March ’17 June ‘17
                      at 3,6,and 9 months to ensure that they are making two sub levels a
                     year and at least expected progress
                     Aspirational targets set for pupils informed by teacher assessment     HT, CT’S   Sept ‘16
                     and FFT data.                                                          & ALNCo

MAT Learners         School to become a member of the National Association for Able         HT
                     Children in Education (NACE)
                     Attend NACE conference about strategies for more able pupils in the    HT/DHT     Oct 16
                     classroom
                     Staff Training Day to look at strategies to engage and challenge       HT/DHT     14th Nov 16
                     More Able pupils within the classroom.
                     More Able and Gifted pupils to be identified and in -year targets                 Nov 16     Dec 16
                     verified for challenge level.
                     Progress of identified pupils to be monitored at 3, 6, and 9 month     CT &       Jan ’17 April ’17
                     intervals by scrutiny of books and planning.                           MAT co-    July ‘17
                                                                                            ord
                         Workshop sessions to be held in Spring and Summer to allow for     MAT Co-    Jan        Jul
                         the sharing of good practice                                       ord        17         17
                         Whole Day Staff training on Growth Mindsets delivered by Will      Cog Lead   Mar
                         Ord                                                                           3rd
ME & EAL Pupils          Complete annual needs survey                                       ALNCo      Nov 16

                         Complete new entrant forms with parents of any new EAL pupils      ALNCo      Sept      Jul
                         To identify any additional needs                                              16        17
                         Progress to be monitored at 3,6, and 9 month intervals             CT &       Jan ’17 April ’17
                                                                                            ALNCo      July ‘17
Emotional Literacy       Standardised questionnaire PASS to be used to identify areas of    ELSA,      Sept ‘16 July ‘17
                         underdeveloped emotional literacy which may hamper progress        CT &
                         e.g. self esteem                                                   ALNCo
ELSA                                                               ALNCo +     Sept ‘16    July ‘17
                           Sessions for pupils with profiles revealing high anxiety of low    ELSA
                           confidence/self-esteem
                           Emotional literacy measure to be revisited at 3 and 6 month        ALNCo +     Jan ’17 March ‘17
                           intervals                                                          ELSA
To Establish Forest        Staff to attend training as Level 3 Forest Schools Practitioners   ELSA        Sept 2016
School within School                                                                          and FS
                                                                                              TA
                           To develop Forest School Site and buy equipment                    ELSA        Oct         Nov
                                                                                              and FS      16          16
                                                                                              TA
                           To work with small groups of the whole Reception cohort in team    FSTA        Nov         Jul
                           building and confidence building activities                                    16          17
                           To work with small groups of pupils who are disengaged from        ELSA        Nov         Jul
                           learning or emotionally vulnerable in team building and                        16          17
                           confidence building activities
Investors in Families      Parents – You Can Do It!                                           ALNco &     Oct ‘16     Nov ‘ 16
To engage the parents of   6 week block of sessions for identified families (FSM /            ELSA
learners who are           attendance / improving levels of engagement with school)
vulnerable to              Parents – You Can Do It!                                           ALNco &     Jan ‘17     Feb ‘17
underachievement           6 week block of sessions for identified families (FSM /            PLO
through targeted support
                           attendance / improving levels of engagement with school)
and intervention
programmes and to          Parents – You Can Do It!                                           IiF co-     April ‘17   May ‘17
develop a whole school     6 week block of sessions for identified families (FSM /            ordinator
approach to pupil          attendance / improving levels of engagement with school)           & PLO
wellbeing                  Investors in Families                                              IiF Co-     Oct 16
                           Provide all evidence to IiF to gain award                          ord
                           join the network of IiF and collaborate with other schools also    IiF co-     Oct 16
                           wishing to work more extensively with parents.                     ordinator
                                                                                              & PLO
                           Engagement with dads and grandads                                  IiF co-     Nov 16
                           Run writing workshop for dads and grandads to encourage            ordinator
                           engagement in writing                                              & LL
                           Dads and Grandads project to develop the Forest School Site        PLO         Oct 16
                                                                                              Parent
                                                                                              Liaison
                                                                                              Officer
Attendance                     Pupils with attendance of less than 90% which is not explained         HT &         Sept ‘16   July ‘17
Interventions                  by exceptional circumstances targeted.                                 Attendance
Targeted pupils to be                                                                                 Officer
monitored to achieve         Governors attendance cups for FP and KS2 are awarded during              HT           Sept ‘16   July ‘17
improvements in their        Celebration Assembly
attendance                   Half Termly to parents of pupils whose attendance is causing             HT           Sept ‘16   July ‘17
                             concern and visits from attendance support officer where
                             appropriate.
                             Attendance certificates awarded to pupils whose attendance is in         HT           Sept ‘16   July ‘17
                             excess of 95%
                             Prizes given to pupils with 100% attendance for the academic             HT           Sept ‘16   July ‘17
                             year
Longer term tasks and objectives (3 year plan)

   To further develop the Forest Schools Project
   To further develop use of data from PASS
Resources (time; finance; staff development; equipment)                        Budget Allocation           Budget Source

Cost of Teaching Assistant time to run interventions                           £56,400                     Delegated budget- NT Support
                                                                               £16,500                     PDG
Forest School Training Costs
                                                                               £3,000                      PDG
Forest School Equipment                                                        £300                        PDG

Investors in People- Annual Fee                                                £600                        Delegated budget- accreditations

PASS- Annual Fee                                                               £500                        PDG

Supply Costs for Parenting Course                                              £2,400                      PDG

Monitoring                                                          Evaluation

        How?                    Who?                       When?                      How?                Who?                      When?
                                ALNco                                                                      SLT
 Revisiting baselines
                            LLC and MD co-          3,6,9 month intervals   Comparison of scores   Challenge Adviser GB       3,6,9 month intervals
 Termly Report to GB
                              ordinators                                                             Evaluative Team
Danescourt Primary School                                        Subject or Aspect Action Plan: Thinking Skills

Action Plan 2016-17

Priority 5: Thinking Skills                                      Source: Data, Non- Statutory Skills Framework, Curriculum 2014

Target:
To develop questioning across the curriculum.
Success Criteria:

 75% of staff have achieved Level 1 accreditation in P4C
 School will achieve advanced accreditation as a Thinking School from the University of Exeter.
 Questionnaires show an improvement in the range and type of questioning used by teachers and learners.
Thinking in Mathematics:
 The number of boys achieving Outcome 6 has risen to between 50 and 55%
 The percentage of pupils achieving Outcome 6 has risen to between 55% and 60%
 The percentage of pupils achieving Level 5 has risen to between 53 and 55%
 The percentage of pupils achieving Level 4 and Outcome 5 has been at least maintained.
 National percentage of pupils in Years 2-6 achieving a standardized score of 115+ on test has risen to between 16 and 20%

Strategically Planned                                    Actions                                  On      Lead            Time Scale      RAG
Tasks/ Skills:                                                                                    Track   Person(s)   Start    End        Analysis
                                                                                                          Involved
Embedding of P4C             Regular opportunities planned for P4C enquiries through Medium              Think       Sept 16   July 17
                              Term Plans, monitored by Think Tank                                         Tank
                                                                                                          Members
                             INSET discussion: All classrooms to display a relevant P4C                  Cognitive   Sept 16   Sept 16
                              board using stimulus tool e.g. picture, QR code, question                   Ed Lead
                             INSET: professional discussion on development of P4C within                 Cognitive   Sept 16   Jul 17
                              classroom setting. Regular agenda as part of Twilight INSET                 Ed Lead
                             Staff to provide evidence for portfolio and upload onto server on           Staff       Sept 16   Jul 17
                              a regular basis
                             Training of new staff via drop-in workshops                                 Cognitive   Oct 16    Dec 17
                                                                                                          Ed Lead
                                                                                                          Think
                                                                                                          Tank
   All staff who underwent initial training to submit information to   Ts and      Sept 16   Feb 17
                             complete Level 1 accreditation                                      TAs
Develop the use of the      Action research programme to develop baseline tool on types of      Cognitive   Sept 16   Jul 17
Q Matrix grid                questions asked as part of mathematical learning. Comparison        Ed Lead
                             after further development of Q Matrix (see Maths Action plan)
                            Teachers to complete types of questions used as a baseline and      Teaching    Nov 16    July 17
                             compare after development.                                          staff
                            INSET: Revisit questioning types. How the Q Matrix can be used      C Lawton    Nov 16
                             to develop the use of deeper levels of questioning in the
                             classroom setting
                            Scrutiny of data – questionnaires                                   C Lawton    Sept 16   Jul 17
                                                                                                 Think
                                                                                                 Tank
Re-introduce the            Twilight INSET: Reintroduction of TASC wheel and overview of        Year 2      Oct 16
TASC wheel                   project                                                             and
                                                                                                 Cognitive
                                                                                                 Lead
                            Year 2 action research programme= centred on the development        Year 2      Sept 16   July 17
                             of the TASC wheel                                                   team
                                                                                                 Cognitive
                                                                                                 Lead
                            Work in partnership on a regular basis with identified thinking     Year 2      Sept 16   July 17
                             partner school to develop research programme                        team
                            Regular updates on progress via half termly Think tank meetings     Think       Oct 16    Jul 17
                                                                                                 Tank
                            Data collected and analysed as part of project. Feed into final     Year 2      Sept 16   Jul 17
                                                                                                 Cognitive
                             report and shared with Think Tank and wider school community        Lead
Introduce                   Attend training day to develop understanding of thinking strategy   Cognitive   Sept 16   Sept 16
Growth Mindset                                                                                   Lead

                            Staff Training Day- Growth Mindsets- Speaker Will Ord               All Staff   3rd March 17

The Learning Pit            Training day (As above).
                            Making of classroom resources to support strategies                 SLT         Nov 16
                            Scrutiny of lesson planning to include level of challenge for                   Feb 17
                             learners
    School website updated with relevant information                      Cognitive   Feb 17
                                                                                                      lead
                                                                                                      IT Lead
                               Parental workshop overview of Growth Mindset and The                  Cognitive   May 17
                                Learning Pit                                                          lead
                                                                                                      HT
Resources (time; finance; staff development; equipment)                        Budget Allocation          Budget Source
Training Costs:
Resources costs:

Growth Mindset Conference- Danescourt Primary School                           £3200                      £1100- Whitchurch Primary School.
                                                                                                          £2,100- contributions from invited
                                                                                                          delegates
                                                                                                          (Zero cost to DPS)

Supply Cover for Action Research Project                                       £300                       Delegated budget- Agency

Attendee at Midset Conference- Blaenavon                                       £170                       Teaching Materials
Supply cover                                                                   £150                       Supply Cover

Monitoring                                                           Evaluation

         How?                      Who?                    When?                      How?                Who?                  When?
  Feedback from staff
                                                                                                     Systems Leader
training, data analysis,       SLT, Think Tank          3,6, 9 months          Report from SLT                                   July 16
                                                                                                    GB Evaluative Team
     scrutiny cycle
Monitoring Commentary                                                       Evaluation Commentary
Action Plan 2016-17

Priority 6 : ICT                                          Source: ESTYN Inspection Framework, 360o Assessment criteria, DCF and
                                                          staff skills audit results.
Target:
 To prepare teaching staff and pupils for the new curriculum and digital competency.
Success Criteria :
Teachers confidentially use the DCF to plan and deliver high quality ICT lessons across the curriculum.
All staff are equipped to support learners to develop and use their ICT skills for learning.
Pupils are able to apply their digital skills across the curriculum.
   Lesson observations reveal that at least 80% standards of teaching in ICT across the curriculum are at least good.
   Staff skills audit responses re-analysed to establish an improvement in confidence levels:
    -   Uploading to Forest Nas Drive 70%– 80%
    -   Using iPad functions and apps
    -   Accessing and using J2e software through Hwb
Teachers are confident in delivering Computing Unlocked lessons.
   Staff skills audit responses re-analysed to establish confidence levels.
   Confidence levels:
    -   Data Handling 70% - 80%
    -   Multimedia 70% – 80%
    -   Our Digital World 70% – 80%
    -   Programming 70% – 80%
The profile of e safety is raised within the school.
   During half termly e-safety weeks, teachers deliver high quality e-safety lessons.
   The e-safety mark has been achieved by September 2018.
Strategically Planned      Actions                                                               Lead                                RAG
                                                                                                                        Time Scale   Analysis
Tasks/ Skills:                                                                                   Person(s)           Start    End
                                                                                                 Involved
Teachers confidentially use the DCF to plan and deliver high quality ICT lessons across the curriculum.
Pupils are able to apply their digital skills across the curriculum.

To embed the DCF           SLT to agree strategic vision for cross-curricular digital competence and    SLT          Sept    Sept
across the curriculum.     how this will translate into practice.                                                    2016    2016
Launch DCF to staff.                                                           E-Learning   Oct    Oct
                                                                                                        Leader       2016   2016
                         Staff trained to implement DCF.                                                E-Learning   Oct    Dec
                                                                                                        Leader       2016   2016
                         DCF portfolio created – staff to submit samples of work on agreed Twilight     E-Learning   Oct    July
                         INSET dates.                                                                   Leader       2016   2016
                                                                                                        Teaching
                                                                                                        staff
                         Planning scrutiny, lesson observations and listening to learners.              E-Learning   Feb    Feb
                                                                                                        Leader       2017   2017
                         Monitoring of learning (pupil output) via book looks/ IT folders, INCERTS      E-Learning   Feb    Feb
                         data capture, ensure pupils’ digital work is sitting alongside written work,   Leader       2017   2017
                         linked via QR codes, etc.
                         Set up a digital competence council to facilitate pupil voice and expertise.   E-Learning   Dec    July
                                                                                                        Leader       2016   2016
All staff are equipped to support learners to develop and use their ICT skills for learning.

Staff Training           Audit of staff ICT skills to establish confidence levels.                      RT           July   Sept
                                                                                                        E-Learning   2016   2016
                                                                                                        Leader
                         Develop a detailed staff training programme based on the results of the        E-Learning   Sept   Sept
                         staff skills audit.                                                            Leader       2016   2016
                         Staff training on uploading work to the Forest Nas Drive.                      E-Learning   Oct    Oct
                                                                                                        Leader       2016   2016

                         Staff training on iPad features.                                               E-Learning   Dec    Dec
                                                                                                        Leader       2016   2016

                         Staff Training on using targeted apps.                                         E-Learning   Dec    Dec
                                                                                                        Leader       2016   2016

                         Staff progress and confidence levels to be monitored.                          E-Learning   Oct    July
                                                                                                        Leader       2016   2017
Pupils are supported to publish writing using word processing              EL and LL
                        programmes. ( Priority 2)
Teachers are confident in delivering Computing Unlocked lessons.

To     increase    staff Develop a detailed staff training programme based on the results of the   E-Learning   Sept   Sept
confidence levels when staff skills audit.                                                         Leader       2016   2016
teaching     Computing
Unlocked.                Staff training on Multimedia strand.                                      E-Learning   Nov    Nov
                                                                                                   Leader       2016   2016

                             Staff training on Programming strand.                                 RC           Nov    Feb
                                                                                                   SD           2016   2017
                                                                                                   E-Learning
                                                                                                   Leader

                             Staff training on Data Handling strand.                               E-Learning   Jan    Jan
                                                                                                   Leader       2017   2017
                                                                                                   All Staff
                             Staff training on Our Digital World strand.                           E-Learning   Mar    Mar
                                                                                                   Leader       2017   2017
                                                                                                   All Staff
                             Staff progress and confidence levels to be monitored.                 E-Learning   Oct    July
                                                                                                   Leader       2016   2016
                                                                                                   All Staff
The profile of e safety is raised within the school.

To raise the profile of e-   Staff training on the new digital literacy curriculum.                E-Learning   Oct    Jul
safety within the school                                                                           Leader       2016   2017
                                                                                                   All Staff
                             Introduce half termly e-safety weeks.                                 E-Learning   Jan    Mar
                                                                                                   Leader       2017   2017
                                                                                                   All Staff
                             Planning scrutiny, lesson observations and listening to learners.     E-Learning   Jan    Jul
                                                                                                   Leader       2017   17
                                                                                                   All Staff
Tech Gang to complete Childnet Digital Leaders programme.                  E-Learning   Apr      Jul
                                                                                                    Leader       2017     2017
                                                                                                    Tech Gang
                         Tech Gang to deliver e-safety activities to the rest of the school.        E-Learning   June     On
                                                                                                    Leader       2017     going
                                                                                                    Tech Gang
Start process to achieve Completion of 360o self-review tool to review e-safety provision.          E-Learning   Sept     July
the e-safety mark.                                                                                  Leader       2016     2016
                         Update the school’s current e-safety policy, password policy, data         E-Learning   Oct      Oct
                         protection policy, AUP.                                                    Leader       2016     2016
                                                                                                    SLT
                         Set up an e-safety committee – The e-safety committee will seek to include E-Learning   Nov      Nov
                         representation from all stakeholders. This group will include:             Leader       2016     2016
                            • SLT member/s
                            • Child Protection/Safeguarding officer
                            • Teaching staff member
                            • Support staff member
                            • e-safety coordinator
                            • Governor
                            • Parent/Carer
                            • Pupil representation – for advice and feedback
                         Develop e-safety committee terms of reference to include calendar of       E-Learning   Nov      Nov
                         duties.                                                                    Leader       2016     2016
                                                                                                    SLT
                         Deliver INSET to governors about e-safety.                                 E-Learning           Jan
                                                                                                    Leader              2017
Increase parental        Provide e-safety information through the school newsletter.                E-Learning   Oct       July
involvement with e-                                                                                 Leader       2016      2016
safety                   Hold e-safety meetings throughout the year.                                E-Learning   Nov       July
                                                                                                    Leader       2016      2016
                         E-safety newsletter for parents.                                           E-Learning   Oct       July
                                                                                                    Leader       2016      2016
                         Develop the e-safety section of the school website.                        E-Learning   Oct       July
                                                                                                    Leader       2016      2016
Resources (time; finance; staff development;   Budget Allocation                            Budget Source
equipment)

Childnet Digital Leaders programme.            £500                                         Delegated Budget- Training

Supply Costs for Monitoring of ICT             £600                                         Delegated Budget- agency

                              Monitoring                                                      Evaluation

       Who?                     When?                  How?                  Who?                 When?                 How
  E Learning Leader                            Book Looks, Planning                                               GB Termly Reports
                                                                               GB           Termly
                            Apr, June 2017     scrutiny, Listening to                                              and Evaluative
                                                                        Challenge Adviser   summatively in June
                                                     Learners                                                          Report