ALPINE RESORTS CO-ORDINATING COUNCIL

CORPORATE PLAN
2019/20 - 2021/2022
CORPORATE PLAN 2019/20 2021/2022 - ALPINE RESORTS CO-ORDINATING COUNCIL - Alpine Resorts ...
Approved for publication on 18 November 2019 by the
Minister for Energy, Environment and Climate Change.
Published by the Alpine Resorts Co-ordinating Council
8 Nicholson St
East Melbourne
Victoria 3002

ISSN 2203-983X (Online)

© The State of Victoria, Alpine Resorts Co-ordinating
Council 2019

This work is licensed under a Creative Commons
Attribution 3.0 Australia licence. You are free to re-use
the work under that licence, on the condition that you
credit the State of Victoria as author. The licence does
not apply to any images, photographs or branding,
including the Victorian Government logo and the Alpine
Resorts Co-ordinating Council logo. To view a copy of
this licence, visit http://creativecommons.org/licenses/
by/3.0/au/deed.en
A PDF copy of this document is available on
www.arcc.vic.gov.au. For further information on this
publication contact the Alpine Resorts Co-ordinating
Council on (03) 9637 9642.

Disclaimer
This publication may be of assistance to you but the
State of Victoria and the Alpine Resorts Co-ordinating
Council and their employees do not guarantee that
the publication is without flaw of any kind or is wholly
appropriate for your particular purposes and therefore
disclaims all liability for any error, loss or other
consequence which may arise from you relying on any
information in this publication.

Acknowledgements
Photo Credit: Tony Harrington, Mount Buller
CORPORATE PLAN 2019/20 2021/2022 - ALPINE RESORTS CO-ORDINATING COUNCIL - Alpine Resorts ...
Alpine Resorts Co-ordinating Council

Corporate Plan 2019/20 – 2021/22
Executive Summary

The Alpine Resorts Co-ordinating Council (Council) addresses key issues relating to the alpine resorts,
including strategic positioning and advocacy, co-operation and research on behalf of the Minister for
Energy, Environment and Climate Change (the Minister).

The Council’s Corporate Plan 2019/20 – 2021/22 details how the Council will undertake its statutory
functions in a manner that continues to support achieving the vision of the legacy Alpine Resorts
Strategic Plan 2012 (2012 Plan), namely:

            Victoria’s Alpine Resorts will be vibrant,
            growing and sustainable places, delivering
            alpine recreational and tourism experiences
            that are available to all.
Council’s previous corporate plans were guided by this vision and the key actions contained in the 2012
Plan. Until a new industry strategic plan is adopted, it is felt appropriate to retain this agreed vision as
an overall guide to developing Council’s Corporate Plan 2019/20 – 2021/22.

The Council will continue to oversee and implement the on-going actions previously contained within
the 2012 Plan whilst it finalises and then implements the new industry strategic plan. Over the course of
2019/20 and in addition to undertaking its statutory obligations, the Council will also finalise projects
and oversee the implementation of the Ministerial Directions issued in 2018 and any further Ministerial
Directions and actions associated the new Strategic Plan, to be known as the “Alpine Resorts Strategic
plan 2019 – responding to a changing climate” once finalised. Specifically, it will:
   Revise the ARMB Master Plan Framework to reflect priorities of the new strategic plan;
   Monitor and report on the implementation of the new strategic plan;
   Broadening the collaborative approach for key projects using existing Tourism Destination Action
    Plans and Regional Partnership resources;
   Establish a cross government taskforce as part of the implementation of the new strategic plan to
    investigate viability of the green season to support resorts in the longer-term;
   Lead the development of climate adaptation planning for the alpine sector;
   Monitor the sector’s adaptation to the impacts of climate change;
   Implement revised VARDP policy referencing the Climate Change Act 2017;
   Support ARMBs to develop corporate plans that align with and support the delivery of the Alpine
    Resorts Strategic Plan and work with DELWP to review draft corporate plans to identify where
    amendments may be necessary;
   Monitor and report on the implementation of the recommendations of the ‘Business Systems and
    Services Review of Victoria’s Northern Resorts’;
   Monitor implementation and report on the ‘Stakeholder Engagement Plan’s’ ‘Improvement/Action
    Plan’;
   Develop a framework with Traditional Owners to facilitate on-going engagement, the development
    of partnership plans and understanding of connection to country in alpine areas;
   Co-ordinate the staging of an Industry Conference to reflect contemporary industry needs and
    outcomes of the 2019 Plan;
   Consider the likely impact of Vail Resorts entering the Victorian market;
   Undertake a review of the 2002 Alpine Resorts Leasing Policy on behalf of DELWP; and,
   Investigate the benefits of undertaking an alpine resort ‘carrying capacity’ study in conjunction with
    the NSW Office of Environment and Heritage;
                                                      1                                    Draft v17 July 2019
CORPORATE PLAN 2019/20 2021/2022 - ALPINE RESORTS CO-ORDINATING COUNCIL - Alpine Resorts ...
Council’s operating costs continue to be predominately met by contributions from the ARMBs. The
accompanying budget outlines the key areas of revenue and expenditure required to meet the
obligations of Council’s statutory requirements and the implementation of the Ministerial Directions.

                                                     2                                  Draft v17 July 2019
CORPORATE PLAN 2019/20 2021/2022 - ALPINE RESORTS CO-ORDINATING COUNCIL - Alpine Resorts ...
Contents

 Executive Summary…………………………………………………………………………………………………………...1
 Operating Environment ................................................................................................................ 5
 Policy Context .................................................................................................................................. 5
 Alpine Industry Context................................................................................................................ 5
 Legislative Context ........................................................................................................................ 6
 Context of Key Council Relationships .................................................................................... 6
 Statement of Corporate Intent ..................................................................................................8
 (a)        Objectives ..............................................................................................................................8
 (b)        Main Undertakings ..............................................................................................................8
 (c)        Nature & Scope of Activities ..........................................................................................8
    Strategic Positioning ...................................................................................................................................9
    Co-ordination and Co-operation..............................................................................................................9
    Knowledge and Understanding ................................................................................................................9
    Corporate Governance................................................................................................................................9
 (d)        Accounting Policies........................................................................................................... 9
 (e)        Performance Targets ........................................................................................................ 9
 (f)        Accountability and Reporting ...................................................................................... 10
 Business Plan 2019/20 ................................................................................................................. 11
 Activities & Performance Targets ........................................................................................... 12
 Financial Plan .................................................................................................................................. 17
 Overview .......................................................................................................................................... 17
 Budget Assumptions ................................................................................................................... 17
 Financial Key Performance Indicators………………………………………………………………………….17
 Table 3: Three Year Forward Look of Projected Income and Expenditure ............ 19
 Appendicies..................................................................................................................................... 21
 Appendix 1: Alpine Resorts (Management) Act 1997: S. 1A Object ........................... 21
 Appendix 2: Council Statutory Functions and Obligations ......................................... 22
 Appendix 3: Council Members and Terms of Office as at 1 July 2018 ..................... 23
 Appendix 4: Membership of Council Committees as at 1 July 2018 ......................... 24
 Appendix 5: Council Secretariat Staff .................................................................................. 25
 Appendix 6: Victorian Government’s Alpine Sector KPIs ............................................ 26

                                                                             3                                                     Draft v17 July 2019
4   Draft v17 July 2019
Operating Environment

Policy Context
The 2012 Plan has been the over-arching policy document for Council since its approval in late 2012.
During 2018/19 Council undertook the development of a new industry strategic plan to guide the future
of the sector. Until that plan has received approval, the legacy plan (i.e. the 2012 Plan) remains current.

The Ministerial Directions issued on 23 March 2018, along with the Climate Change Act 2017, the
Victorian Climate Change Framework and associated Victorian Climate Change Adaptation Plan 2017-
2020 provide the current policy context within which Council operates.

The table below summarises the key actions for which Council was the lead agency that continue to
remain in effect from the 2012 Plan.

Table 1: Continuing Actions from The Alpine Resorts Strategic Plan 2012 for which Council was the lead
agency

    21
         Develop and implement industry and resort-specific climate adaptation plans.

    44   Implement the integrated Victorian Alpine Resorts Development Program of infrastructure priorities for the
         industry, as a rolling five-year program.
    50   Provide financial reports to DELWP, including quarterly financial reports in accordance with legislative and
         Ministerial requirements.

Alpine Industry Context
The following is an overview of the key factors that are currently influencing the alpine industry;

   The 10-year average data shows winter visitor days spent in alpine resorts is growing at 2.0%
    growth per annum for the decade ending 2018. Despite seasonal variation between resorts, the
    long-term trends remain relatively stable.
   Green season visitor numbers have grown at 3.2% per annum since consistent vehicle and visitor
    surveys commenced in 2008/09. Green season activities are predominantly centred around
    mountain bike riding and road cycling, although there is an emerging trend around running and
    music/food events.
   Trends in visitor length of stay continue to move from long-stay to short-stay, as reflected in the
    increasing numbers of day-visitors of varied nationalities. This continues to be most pronounced at
    resorts closer to Melbourne, affecting decisions in respect of the visitor offer and operational
    requirements.
   Alpine resorts continue to make significant economic and employment contributions to Victoria and
    to the regions in which they are located. In the winter of 2018 alpine resorts generated $1,076
    million in Gross State Product (GSP) and over 10,400 jobs. In the summer of 2018-19 alpine resorts
    generated $146 million in Gross State Product (GSP) and over 1,400 jobs.
   Winter visitation numbers and the associated seasonal economic benefits are closely linked to
    prevailing weather conditions and the quantity and quality of reported snow.
   Cost pressures continue to be a major concern for many on-mountain businesses and site holders.
   The finances of the ARMBs continue to be constrained, with pressure on controlling costs and
    maintaining stable revenue streams, whilst trying to meet stakeholder expectations for better
    services at lower costs.
   Following introduction in 2018 of a new governance model for the northern resorts to improve co-
    ordination and provide better strategic planning and oversight, a series of Ministerial Directions was
    issued to both the Council and the ARMBs. Council and ARMBs have had to invest significant time
    and resources into projects arising out of the Ministerial Directions. There is some uncertainty for the
    Council and ARMBs as to any resultant implications until Ministerial guidance is provided.
   Climate change continues to impact ARMB operations and decision making, including a greater
    reliance on snow making during the winter season and the consequent pressures on managing
    production costs and water availability.
                                                               5                                            Draft v17 July 2019
    Changing demographics and visitation patterns continue to challenge product development and
     associated marketing across both winter and green seasons, including diversifying ARMB revenue
     streams and building capacity to benefit from changing markets.
    The impact on Victorian visitation arising from the entry of Vail Resorts, which controls a large
     stable of resorts in North America, as well as Perisher Blue in NSW, into the Victorian market as a
     result of its purchase of the Falls Creek and Mt Hotham ski lift companies, particularly due to the
     availability of a single lift pass giving access to all of Vail’s Australian and overseas resorts.

Legislative Context
Consistent with the object1 of the Alpine Resorts (Management) Act 1997 (the ‘Act’), the Council was
established to plan for and facilitate the establishment, development, promotion, management and use
of alpine resorts2.

The Act also establishes the ARMBs of Falls Creek, Lake Mountain and Mount Baw Baw (Southern),
Mount Buller and Mount Stirling, and Mount Hotham. The ARMBs are responsible to plan for and
facilitate the development, promotion, management and use of each such alpine resort and for the
provision of a range of services within each such alpine resort.

The Council is a statutory authority that reports to the Minister and is subject to the general direction
and control of the Minister. The Council is a body corporate and is a public body for the purposes of the
Financial Management Act 1994.

Context of Key Council Relationships
The Council consists of nine members comprising the chairperson of each of the ARMBs and five
persons (including the chairperson)3 appointed on a skills basis by the Governor-in-Council, on the
recommendation of the Minister.

The Council is serviced by a secretariat led by an Executive Officer who is the Council’s Accountable
Officer and is responsible for day to day matters4. An illustration of the key relationships of the Council
is provided in Figure 1 below.

From time to time, the Council may establish working groups or steering committees for specific
purposes. Three committees have been established under the authority of section 24 of the Act5. The
committees are:

    Audit and Risk Management Committee
     Provides assistance to the Council and its Executive Officer to oversee governance responsibilities
     of financial performance and reporting, audit, risk management, information systems, accounting
     policies, and monitoring of regulatory compliance.
    Co-operation Committee
     Encourages a culture of co-operation and knowledge sharing between the alpine resorts by
     assisting in planning, sharing programs, consistent policy application, resources and expertise, and
     for fostering assistance between the alpine resorts.
    Strategic Planning Committee
     The Committee provides oversight and investigation and research of issues relevant to the alpine
     resorts, to enable the Council to fulfil its role in strategic planning6 including the review of the
     Council’s and ARMB Corporate Plans. In addition, the committee oversees the implementation of
     the relevant strategic planning projects and acts as the assessment panel for VARDP.
The Chart below depicts the current working relationships between the Council, its Committees, the
Minister, the ARMBs, DELWP, ARIAG and the Secretariat.

1
  For details of the overall object of the Act refer to Appendix 1.
2
  Refer to Appendix 2 for an explanation of the statutory functions and obligations of the Council.
3
  Refer to Appendix 3 for the list of Council members, as at 1 July 2018.
4
  Refer to Appendix 5 for a list of secretariat staff.
5
  Refer to Appendix 4 for a list of Committee membership, as at 1 July 2018.
6
  This is a function of the Council under section 18(aa) of the Act.

                                                                  6                                   Draft v17 July 2019
Figure 1: Chart Showing Key Alpine Resorts Co-ordinating Council Relationships

                                                   7                             Draft v17 July 2019
Statement of Corporate Intent

The Statement of Corporate Intent includes the following information, in accordance with section 31 of
the Act.

(a) Objectives
The objective of the Council is to, on behalf of the Minister,
address key issues relating to the alpine resorts, including strategic positioning and
advocacy, co-operation and research.
The role of the Council is at a tactical or systems design level. It plays a key role in taking an industry
level perspective to support policy delivery through the ARMBs.

(b) Main Undertakings
The Council has four main undertakings:
       Strategic Positioning of the Victorian Alpine Resorts.
        High level strategic activities include positioning of the Victorian Alpine Resorts, leading the
        implementation of climate adaptation planning, developing sector strategic direction,
        infrastructure investment and sector advocacy that promotes the interests of the industry.
       Co-ordination and Collaboration across stakeholders in the Victorian Alpine Resorts.
        This program area focuses on matters that are of industry-wide importance and provide
        mechanisms for enhanced stakeholder engagement across a range of private and public
        organisations and agencies within Victoria and interstate and to foster collaboration between
        ARMBs.
       Knowledge and Understanding of the Victorian Alpine Resorts.
        This program area provides for several annual research projects, as well as one-off and less
        frequent projects, and publication of research reports. Priority is given to tasks of industry-wide
        benefit and understanding critical factors that may impact on the alpine resorts.
       Governance of the Council.
        This program area focuses on business planning, finance, risk management and reporting, whilst
        ensuring that the Council complies with the range of governance requirements to which it is
        subject.

(c) Nature & Scope of Activities
The nature of activities to be undertaken by the Council are derived from its mission:

To drive responsible use of Victoria’s Alpine Resorts by:
     strategic positioning of, and advocacy for, alpine resorts and the broader
      alpine industry
     developing strong and collaborative stakeholder partnerships, through
      programs and projects
     building knowledge of the unique values, assets and opportunities
     promoting alpine tourism to grow visitation
     fostering proactive environmental and cultural stewardship
     working closely with ARMBs, DELWP, Parks Victoria and other land managers,
      Visit Victoria and Regional Development Victoria.
The table below describes the broad scope of activities undertaken by the Council on an ongoing basis
in relation to its main undertakings. Specific annual activities are highlighted within the 2019/20
Business Plan.

                                                       8                                    Draft v17 July 2019
Table 2: Scope of Alpine Resort Co-ordinating Council Activities

MAIN UNDERTAKINGS                     ACTIVITIES

Strategic Positioning                     Take a lead role in advocacy and policy analysis for the alpine industry.
                                          Monitor and report on the implementation of the “Alpine Resorts Strategic plan
                                           2019 – responding to a changing climate”.
                                          Consider climate change in decision making, including taking into
                                           consideration the policy objectives of (s22) and guiding principles of (s23-28)
                                           of the Climate Change Act 2017.
                                          Lead development of climate adaptation planning for the alpine sector and
                                           monitor the sector’s adaptation.
                                          Undertake strategic projects as required.

Co-ordination and Co-                     Actively foster co-ordination across the alpine industry.
operation                                 Support better and improved collaboration and stakeholder engagement,
                                           including timely and role-appropriate engagement by the ARMB with
                                           Traditional Owners.
                                          Maintain strong links with the alpine industry.
                                          Manage select programs that extend across ARMBs.

Knowledge and                             Keep abreast of, and undertake, research to grow the understanding of the
Understanding                              alpine industry7 to provide an evidence base for policy, promotion, investment
                                           and operational decisions.
                                          Communicate current industry knowledge to stakeholders.

Corporate Governance                      Ensure Council’s functions and proceedings are undertaken in accordance with
                                           the requirements of the Act and the Financial Management Act 1994.
                                          Undertake yearly corporate and business planning activities.
                                          Meet annual reporting requirements.

The Council does not undertake day-to-day operational functions for or at the alpine resorts.

(d)       Accounting Policies
The Council has financial policies and procedures and a chart of accounts that are in accordance with the
Financial Management Act 1994. A financial code of practice and Financial Governance Framework has
also been prepared which sets the standards of conduct expected from Council staff.
The Council’s financial statements are prepared in accordance with the Directions of the Minister for
Finance under the Financial Management Act 1994 and applicable Australian Accounting Standards.

(e)       Performance Targets
The short-term success of the Council will be measured against the performance targets stated in the
Business Plan.
Longer term success of the Council’s role and functions will be measured by the implementation of the
new industry strategic plan.

7
    This may include research into economics, marketing, visitors, and environmental systems.

                                                                   9                                  Draft v17 July 2019
(f)       Accountability and Reporting
The Council will provide the Minister with an annual report8 that includes:
          key achievements
          corporate governance arrangements
          reporting of legislative compliance9
          an annual financial report10
          an assessment of performance against the Business Plan.
The Council will provide the Minister with regular reports on the implementation of the Ministerial
Directions and will report on current Alpine Sector KPIs developed from the 2012 Plan. Other reports
will be prepared as required.
The Council will immediately notify the Minister if it believes matters have arisen that may prevent or
significantly affect the achievement of its financial targets or objectives within the corporate plan11.

8
   The annual report is based on a year-end date of 30 June.
9
   This will include compliance with the Alpine Resorts (Management) Act 1997, Freedom of Information Act 1982, the Financial
Management Act 1994, the Protected Disclosures Act 2012, Public Administration Act 2004 and the Privacy and Data Protection Act
2014.
10
   This will be audited by the Victorian Auditor-General’s Office (VAGO) and prepared in accordance with the Directions of the
Minister for Finance under the Financial Management Act 1994.
11
   This is in accordance with section 32 of the Alpine Resorts (Management) Act 1997.

                                                               10                                         Draft v17 July 2019
Business Plan 2019/20

The Business Plan details the activities that will be delivered by the Council in 2019/20 across the four
main undertakings:
       Strategic Positioning of the Victorian Alpine Resorts
       Co-ordination and Collaboration across stakeholders in the Victorian Alpine Resorts
       Knowledge and Understanding of the Victorian Alpine Resorts and critical factors that may
        impact them
       Governance of the Council
The focus of activities will be on the overseeing and implementing activities to meet Council’s statutory
obligations, implementation of the new Alpine Resorts Strategic Plan and implementing activities
consistent with Ministerial Directions issued on 23 March 2018.

The Strategic Priorities Overview is shown below (Figure 2). Several of the projects or programs are of
an on-going nature and as such, the performance targets, shown in the following tables, have been
adjusted to reflect the current status.

Figure 2: Strategic Priorities for 2019/20: Overview

                                                       11                                 Draft v17 July 2019
Activities and Performance Targets 2019/20
Strategic Positioning Activities
The 2019/20 year will focus on working with ARMBs and agencies on implementation of the new Alpine
Resorts Strategic Plan and leading climate adaptation planning.

 ACTIVITY                                      SOURCE OF PERFORMANCE
                                                ACTION   TARGETS
                                                ARMA Section Nos,
                                               other Act, Ministerial
                                                 Direction or 2019
                                                       Plan.
 Alpine Resorts Strategic Plan 2019            Sec. 18(ad) &33F
 Revise Alpine Resort Management Board                                  Framework reviewed and
 (ARMB) Master Plan Framework to reflect                                implemented by 31 December 2019
 priorities of the new Alpine Resorts
 Strategic Plan 2019 (2019 Plan)

 Monitor and report on the implementation                               Progress reports produced bi-
 of the 2019 Plan                                                       annually

 Develop a collaborative approach between                               Alpine-related projects are co-
 Visit Victoria, RDV and DELWP on key                                   ordinated and referenced in regional
 alpine-related projects using existing                                 planning funding priorities
 Tourism Destination Action Plans and
 Regional Partnership resources

 Strategic Plan Cross Government
 Taskforce
 Establish a cross government taskforce as                              Taskforce is established and initial
 part of the implementation of the 2019                                 reports and findings available by
 Plan to investigate the viability of the                               March 2020
 green season to support economic and
 commercial outcomes for the resorts in the
 longer-term

 Climate Adaptation Planning
 Lead the development of climate               Ministerial              Clear subject based communications
 adaptation planning for the alpine sector     Directions               pieces are produced and made
 by identifying gaps in knowledge and                                   available to the sector as required
 better communicating the impacts of
 climate change in the alpine and regional
 context

 Monitor the sector’s adaption to the          Ministerial              Ensure the 2019 Plan is referenced in
 impacts of climate change                     Directions               revised ARMB master plans and
                                                                        corporate plans by 30 June 2020
 Victorian Alpine Resorts Development          Sec. 18(d)
 Program (VARDP)
 Implement revised VARDP policy                Ministerial              VARDP projects incorporate
 referencing the Climate Change Act 2017       Directions               reference and response to
                                                                        addressing climate change impacts
 Alpine Resort Management Boards
 Support ARMBs to develop corporate plans      Ministerial              Draft corporate plans reviewed in
 that align with and support delivery of the   Directions               conjunction with DELWP, by
 2019 Plan and desired biodiversity and        Biodiversity             31 December 2019.
 natural resource planning outcomes            Strategy 2037

                                                    12                                     Draft v17 July 2019
Co-ordination and Collaboration Activities

In 2019/20 the Council will continue to facilitate co-ordination and collaboration between ARMBs,
government and industry.

 ACTIVITY                                        SOURCE OF PERFORMANCE
                                                  ACTION   TARGETS
                                                  ARMA Section Nos,
                                                 other Act, Ministerial
                                                   Direction or 2019
                                                          Plan
 Co-ordination and Collaboration in
 Reporting
 Provide the Minister with uniform reports for   Ministerial              Uniform reports are provided in
 ARMBs                                           Directions               accordance with the Minister’s
                                                                          timelines
 Manage the All Resort Season Pass Program                                All Resort Season Passes are
                                                                          produced
 Monitor and report on the implementation of     Ministerial              Reports to the Minister are provided
 the recommendations of the ‘Business            Directions               in accordance with Ministerial
 Systems and Services Review of Victoria’s                                Directions
 Northern Resorts’
 Finalise and implement the six-yearly review    ARC/VSA                  Report to Minister provided to
 of 2019-2025 site rental arrangements under     Agreement                enable Ministerial determination
 the ARC/VSA Agreement to inform the                                      prior to 31 October 2019.
 Minister’s determination of an industry-wide
 ceiling.
 Co-ordination and Collaboration with
 Industry, Government and Key
 Stakeholders
 Provide secretariat support to the Alpine                                Secretariat support is provided to
 Resorts Industry Advisory Group (ARIAG)                                  ARIAG
 Monitor the commitment to and report on         Ministerial              Six-monthly reports are provided to
 the ‘Stakeholder Engagement Plan’s              Directions               the Minister
 ‘Improvement/Action Plan by ARMBs and
                                                                          A framework for stakeholder
 the Council
                                                                          engagement is developed by 31
                                                                          December 2019
 Develop a framework with Traditional            2019 Plan                A framework is developed in
 Owners to facilitate on-going engagement,                                partnership with Traditional Owners
 the development of partnership plans and                                 by June 2020
 understanding of connection to country in
 alpine areas
 Co-ordinate the staging of an Industry                                   Conference conducted by May 2020
 Conference to reflect contemporary industry
 needs and outcomes of the 2019 Plan
 Investigate the likely impact of Vail Resorts                            Report produced by February 2020
 entering the Victorian market
 Prepare industry overview and background        Sec. 18(a)&(c)           Reports are prepared as required
 papers for the Minister and DELWP
 Undertake a review of the 2002 Alpine           2019 Plan                Review is undertaken and a report
 Resorts Leasing Policy on behalf of Land                                 prepared for LMP by March 2020
 Management Policy Division (LMP)

                                                    13                                     Draft v17 July 2019
Knowledge and Understanding Activities

Knowledge and understanding activities will continue to centre on data collection and reporting of
visitation numbers and visitor satisfaction at the Victorian Alpine Resorts for both the winter and green
season to assist industry decision making.

 ACTIVITY                                       SOURCE OF PERFORMANCE
                                                 ACTION   TARGETS
                                                 ARMA Section Nos,
                                                other Act, Ministerial
                                                  Direction or 2019
                                                         Plan
 Winter Research Program                        Sec. 18(ab)
 Manage the conduct of winter visitor                                    Vehicle season pass surveys and
 satisfaction and vehicle season pass                                    visitor satisfaction surveys are
 surveys.                                                                conducted during the winter season
                                                                         and reports prepared
 Manage the collection, collation and                                    Winter visitation numbers are
 dissemination of weekly winter visitation                               disseminated on a weekly basis and
 numbers.                                                                reported annually
 Manage the collection, collation and                                    Snowfall and snow depth data is
 dissemination of snowfall and snow depth                                collated and reported annually
 data.
 Produce the Winter End of Season Report                                 The Winter End of Season Report
 and Fact Sheet                                                          and Fact Sheet are made available
 Summer Research Program                        Sec. 18(ab)
 Manage the conduct of the annual summer                                 Summer visitation surveys are
 visitation survey, following a review of                                completed
 methodology
 Produce the summer end of season report                                 Summer Report is made available
 Economic Significance Study Analysis           Sec 18(ab)
 Update annual key GSP and employment                                    Annual updated data made widely
 numbers from 2016/17 Economic                                           available
 Significance study
 Carrying Capacity Study                        Sec 18(ab)
 Investigate the benefits of undertaking an                              Preliminary report produced by
 alpine resorts ‘carrying capacity’ study                                February 2020
 focusing on emergency management, the
 environment, potable water and waste
 water management, etc in conjunction with
 the NSW Office of Environment and
 Heritage (as a key input to the review of
 the Alpine Resorts Planning Scheme.)

                                                     14                                    Draft v17 July 2019
Corporate Governance Activities
The corporate governance activities ensure that Council’s functions and proceedings are undertaken in
accordance with good management practice, the requirements of the Alpine Resorts (Management) Act
1997, Public Administration Act 2004 and Standing Directions for the Minister for Finance 2016.

 ACTIVITY                                     SOURCE OF PERFORMANCE
                                               ACTION   TARGETS
                                               ARMA Section Nos,
                                              other Act, Ministerial
                                                Direction or 2019
                                                       Plan
 Planning
 Develop a Corporate Plan, including yearly   Sec. 30(1)               The Corporate Plan is delivered to
 business plan                                                         the Minister by 31 July in each year
 Prepare an annual and forward look           Sec. 30(3)(c)            An annual budget and forward look
 budget                                                                are included in Corporate Plan

 Reporting
 Engage external auditors (VAGO)              FMA                      VAGO is engaged
 Prepare an annual report                     FMA                      The Annual Report is completed
                                                                       within Parliamentary timeframes

 Supporting Delivery
 Manage and provide Secretariat support to                             Support is provided to Council and
 Council and its committees.                                           its committees
 Oversee the budget and management of         Sec. 33                  Financial reports are prepared for all
 accounts                                                              Audit & Risk Management
                                                                       Committee and Council meetings

 Governance Policy                            PAA 2004
 Implement and review policies for                                     Governance policies updated as
 compliance with government requirements                               required and reviewed annually
 Conduct annual ARCC Member                                            Reviews are conducted
 Performance Reviews

 Risk Management                              2016 Standing
                                              Directions
 Maintain and review a risk management                                 Risk Management Strategy and
 policy, strategy and register                                         associated documents are regularly
                                                                       reviewed by the Audit & Risk
                                                                       Management Committee

 Financial Management Compliance              2016 Standing
                                              Directions
 Implement and monitor financial                                       Compliance with Standing Directions
 management practices for statutory and                                for the Minister for Finance 2016
 governance compliance                                                 achieved

                                                    15                                    Draft v17 July 2019
16   Draft v17 July 2019
Financial Plan

Overview
The Council is funded by periodical payments from the ARMBs12. Annual contributions are defined in the
Council’s Corporate Plan as approved by the Minister.
For 2019/20, Council proposes that consistent with arrangements approved in previous years, the
majority of funds contributed by ARMBs will be apportioned between Falls Creek, Mount Buller & Mount
Stirling and Mt Hotham ARMBs, based on averaging resort ‘visitor days’ over the previous three years.
Nominal amounts will be contributed by the Southern ARMB to cover associated Council member
expenses and other direct expenses. Formal Directions for the payment of ARMB contributions will be
sought from the Minister.
Council expenditure allows for payments to members of the Council, member superannuation and
expenses, costs associated with on-going research projects, support to ARIAG, meeting expenses and a
range of administrative functions, secretariat costs.
Secretariat staff, facilities and corporate support are provided by the Land Management Policy division
of the Department of Environment, Land, Water and Planning on an at-cost fee for service basis13.
Contingencies have also been made to meet Ministerial expectations for further projects that may arise
from Council’s work previously undertaken in accordance with 2018 Ministerial Directions.

Budget Assumptions
The budget is based on the following assumptions:
    Council member fees remain fixed at the current rate by the Minister, in accordance with the
     Appointment and Remuneration Guidelines issued by the Department of Premier and Cabinet.
    Superannuation payments for Council members and staff will be 9.5 per cent.
    Executive and administration support accommodation and corporate support supplied by DELWP at
     cost.
    The allocation of a 0.6 FTE Project Support Officer and a Chief Finance Officer are provided by
     DELWP at no cost to the Council under the current MoU.
    Additional contributions from the ARMBs are approved.
    Future contributions will be adjusted by the Treasurer’s ‘Annual Rate’.

Financial Key Performance Indicator
Council’s adopted financial Key Performance Indicator of ‘working capital maintained equivalent to 5 per
cent of annual budgeted income’, will continue to be met in respect of the ‘Operating’ income.

12 Section 38 (1)(af) of the Alpine Resorts (Management) Act 1997, states that one of the ARMBs’ functions is ‘to contribute to and

support the operation of the Council’.
13 With the exception of the salary and on-costs of the 0.6 FTE Project Support Officer position

                                                                  17                                           Draft v17 July 2019
THIS PAGE IS INTENTIONALLY BLANK

                18                 Draft v17 July 2019
ALPINE RESORTS CO-ORDINATING COUNCIL
                                                                                                                                                        PROJECTED INCOME AND EXPENDITURE
                                                                                                                                                                  ROLLING BUDGET

                                                                                                                                        2019-20          2020-2021          2021-2022
                                                                                                                                    Proposed Budget   Forward Estimate   Forward Estimate                                                                          Explanatory Notes-June 2019
                                                                                                                                           $                 $                  $
                                                                                                      OUTGOINGS

                                                                                         REGULAR EXTERNAL PROJECT COSTS
                                                  Alpine Resorts Industry Advisory Group                                                    3,000              3,000              3,000     Member travel, meeting & facilitation costs for advisory group
                                                                                                                                                                                            Hosting, reconfiguring and maintenance of WEB site [$2,000]; adaptation planning comms pieces x 3 [$12,000]; design and print 2019 Alpine Resorts Strategic
                                                  ARCC Communications                                                                      20,000              5,500              6,000
                                                                                                                                                                                            Plan [$6,000+].
                                                  Ongoing Research & Data Collation Projects                                               27,500             28,000             28,500     Woolcott visitor satisfaction surveys, all resorts season pass, visitor survey cards and summer & winter research reports costs
                                                  Tourism & Transport Forum Subscription                                                   30,000            30,000             30,000      TTF Subscription cost paid on behalf of all ARMBs
                                                  Victorian Alpine Resorts Development Program                                             10,000             10,000             10,000     Provision for external financial and other analysis to support VARDP funding submissions
                                                  Alpine Resorts Conference (off-set by external revenue)                                  45,000                   0                 0     Proposed industry conference for May 2020
                                                    Sub-total                                                                              135,500            76,500             77,500
                                                                     POTENTIAL ADDITIONAL PROJECTS- FUNDED FROM PROVISIONAL FUNDS

                                                                                                                                                                                            Projects associated with implementing 2019 Strategic Plan:
                                                                                                                                                                                            - Year 1 (2019/20), Review of 2002 Leasing Policy- Consultant fees [$20,000]; Collective Cultural Awareness Training for ARMBs and Development of TO
                                                  Alpine Resorts Strategic Plan and Climate Change Adaptation Planning                     80,000            90,000             150,000     Framework [$40,000]; Support for Strategic Plan Taksforce [$20,000];
                                                                                                                                                                                            - Year 2 (2020/21), Tourism Demand Study- Research Fees [$60,000]; Investigation of Carrying Capacity Study [$30,000];
                                                                                                                                                                                            - Year 3 (2021/22), Update Climate Science Modeling [$100,000]; Mid term review of 2019 Alpine Resorts Strategic Plan [$50,000]

                                                  ARMB Business Systems and Services Analysis                                              20,000                   0                 0     Allowance for monitoring compliance with Report's recommendations in line with Minister expectations

                                                  Collaboration and Stakeholder Engagement                                                 20,000                   0                 0     Allowance for assisting implementation of Stakeholder Improvement Plan in line with Minister expectations
                                                                                                                                                                                            Project estimate to review current summer vehicle and occupancy counting methodology by external traffic consultants (based on previous costs to review
                                                  Review of Summer Vehicle Counting & Occupancy Methodology                                 15,000
                                                                                                                                                                                            winter vehicle counting methodology)

                      ARCC Projects & Operating
                                                  Provision for Future Projects                                                            65,000            110,000            50,000      Provisional sum to be allocated for unforseen projects
                                                    Sub-total                                                                             200,000           200,000            200,000
                                                                                   ADMINISTRATION & INTERNAL SUPPORT COSTS
                                                                                                                                                                                            Includes full year FTE staffing as per award increments and on costs (in 2018-2019 one staff member was budgeted at 50% due to secondment), replacement
                                                  ARCC staff costs                                                                        632,063            654,185            677,081
                                                                                                                                                                                            staff member budgeted at 50% in 2019-2020

19
                                                                                                                                                                                            Associated office expenses including an additional allowance for DELWP Office 365 and shared services charges that are NEW charges levied by DELWP in the
                                                  ARCC operating costs                                                                      31,235            32,328             33,460
                                                                                                                                                                                            2nd half of 2019-2020 financial year (DELWP agreed to cap the charge in 2018-2019 but not in future years).

                                                  Accounting and Financial Services (CFO costs - funded by DELWP)                          40,000            40,000             40,000      Cost for provision of CFO services for monthly reports, compliance and annual financial statements- funded through DELWP MoU
                                                  Council meeting, travel and members' personal expenses                                   35,000            37,000             39,000      Allowance for increased on mountain Council members' meeting costs, travel, meals, overnight stays and vehicle Kms costs
                                                  Council members fees and superannuation                                                  79,500            80,000             80,000      Council member fees and superannuation payments as per Premier & Cabinet guidelines and remuneration levels
                                                  Insurance / audit / annual report                                                        20,500             21,000             21,500     Council members' OHS & P&L insurance, VAGO fees and annual report publication
                                                  Motor Vehicle Finance Lease Payments (Vic Fleet)                                          5,600              5,800              6,000     ARCC red plate motor vehicle costs set by Vic Fleet
                                                  Motor Vehicle Running Costs, Interest & Parking                                           7,500              7,700              7,900     ARCC red plate motor vehicle costs set by Vic Fleet
                                                  Telephone, IT & Workstation charges (DELWP supplied services)                            13,000             14,000             15,000     Telephone, new digital and SOE charges passed on by DELWP
                                                    Sub-total                                                                             864,398            892,013            919,941
                                                                                             TOTAL OPERATING EXPENSES                   1,199,898          1,168,513          1,197,441     Total of all external project cost and administration and internal support costs

                                                                                                                                        2019-20           2020-21            2020-21
                                                                                                                                    Proposed Budget   Forward Estimate   Forward Estimate                                                                         Explanatory Notes- June 2019
                                                                                                                                                                                                                                                                                                                                                                 Table 3: Three Year Forward Look of Projected Income and Expenditure

                                                                                                                                           $                 $                  $
                                                                                                        REVENUE
                                                                                                                                                                                            ARMB base contribution derived from total operating expenses less other revenue sources (for 2019-20 there are no surplus Trust Funds available to subsidise
                                                  Total ARMB base contributions                                                            921,898            914,513           943,441
                                                                                                                                                                                            additional project costs)

                                                                                                                                                                                            Provisional funds required to cover the cost of any additonal projects that Council undertakes in response to its Business Plan, the Alpine Resorts Strategic Plan
                                                  Total additional ARMB provisional sum for aditional project activity                    200,000           200,000            200,000
                                                                                                                                                                                            and/or Ministerial requirements [as endorsed by SPC for Council approval].

                                                   Sub-total                                                                              1,121,898          1,114,513         1,143,441

                      ARCC Income
                                                  Alpine Resorts Conference external revenue                                               25,000                   0                 0     Conference registration revenue
                                                  Accounting services funded from DELWP                                                    40,000            40,000             40,000      DELWP MOU outlines full subsidy for accounting and financial services
                                                  Visitor Satisfaction Survey                                                               7,500              8,000              8,000     Contributions from ARMB and Lift Companies (Falls Creek & Mt Hotham) to fund survey
                                                  Interest                                                                                  5,500              6,000              6,000     Estimated bank interest amount received from Westpac investment account (dependant on balance of funds held over the year)
                                                                                             TOTAL OPERATING INCOME                     1,199,898          1,168,513          1,197,441     Total Income reflects all ARMB contributions, plus all other funding amounts required to balance budget

                                                  Comprehensive Result (Budgeted Transfer from / to reserves)                                    0                 -0                -0

                                                  5% Minimum Reserve (KPI) of operating receipts held in bank account float                56,095             55,726              57,172

Draft v17 July 2019
THIS PAGE IS INTENTIONALLY BLANK

                20                 Draft v17 July 2019
Appendices

Appendix 1: Alpine Resorts (Management) Act 1997: S. 1A Object

The object of the Act is to make provision in respect of alpine resorts ---

        a) for the development, promotion, management and use of the resorts on a sustainable basis
           and in a manner that is compatible with the alpine environment, having regard to:

                 i) environmental and ecological considerations, in particular, climate change: and
                 ii) economic considerations; and
                 iii) cultural heritage considerations, in particular, indigenous cultural heritage
                      considerations; and

        b) for the use of the resorts:
                i) primarily for alpine recreation and tourism; and
                ii) in all seasons of the year; and
                iii) by persons from varied cultural and economic groups.’’

                                                 21                              Draft v17 July 2019
Appendix 2: Council Statutory Functions and Obligations

Statutory Functions
The statutory functions of the Council are set out in detail in Section 18 of the Act.

Prescriptive functions are:
 to review and co-ordinate the implementation of the Alpine Resorts Strategic Plan
 to monitor the development and implementation of Strategic Management Plans for each alpine
    resort
 to co-ordinate, in conjunction with Tourism Victoria, established under the Tourism Victoria Act 1992,
    the overall promotion of alpine resorts

Broad functions are:
 to plan for and facilitate the establishment, development, promotion, management and use of alpine
    resorts in accordance with the object of this Act
 to undertake research into alpine resort issues
 to liaise with and encourage the co-operation of all State and local government authorities,
    industries, communities and other persons involved in the development, promotion, management
    and use of alpine resorts
 to make recommendations to the Minister on matters related to the provision and improvement of
    services and facilities in alpine resorts
 to make recommendations to the Minister on any matter relating to alpine resorts in respect of
    which the Minister has asked for recommendations
 to attract investment for the improvement of alpine resorts
 to carry out any other function conferred on the Council by or under this or any other Act

The Council has no on-ground operational responsibilities within alpine resorts and works collaboratively
with the ARMBs for whole-of-industry benefit. Each ARMB is directly responsible to the Minister.

Obligations
The Council has obligations created by the Act as well as responsibilities to act in accordance with other
legislation.
The Council:
 is a body corporate with perpetual succession;
 has a common seal;
 may sue and be sued in its common name;
 may acquire, hold and dispose of real and personal property;
 may do and suffer all acts and things that a body corporate may, by law, do and suffer; and
 in carrying out its functions and powers, acts on behalf of the Crown.
Council is also required to establish a ‘general account’ and ensure that all monies received are paid into
this account.
In carrying out its functions and powers the Council is subject to the general direction and control of the
Minister.

                                                       22                                 Draft v17 July 2019
Appendix 3: Council Members and Terms of Office as at 1 July 2019

 MEMBER                                                  START         FINISH
 Ms Arianne Rose
                                                          01/01/2016     29/03/2021
 Council Chairperson, GIC appointee

 Mr Allan Bawden
                                                          01/01/2016      31/12/2019
 Chairperson Southern ARMB

 Dr Jenny Brereton
                                                          30/03/2018     29/03/2021
 GIC appointee

 Mr Christopher Eddy
                                                          30/03/2018     29/03/2021
 GIC appointee

 Ms Julia Hunter
                                                          30/03/2018     29/03/2021
 GIC appointee

 Dr Jacqueline Jennings
                                                          30/04/2017     29/03/2021
 Chairperson Mount Buller and Mount Stirling ARMB

 Mr Ian Maxfield
                                                          30/03/2018     29/03/2021
 GIC appointee

 Ms Maxine Morand
                                                          30/03/2018     29/03/2021
 Chairperson Mount Hotham ARMB

 Ms Joanne Shannon
                                                          30/03/2018     29/03/2021
 Chairperson Falls Creek ARMB

Alpine Resorts Co-ordinating Council (Council)
Alpine Resort Management Board (ARMB)
Governor in Council (GIC)

                                                    23                 Draft v17 July 2019
Appendix 4: Membership of Council Committees as at 1 July 2019

 AUDIT AND RISK MANAGEMENT COMMITTEE
 Mr Allan Bawden (Committee Chairperson)          Chairperson Southern ARMB
 Ms Arianne Rose                                  Council Chairperson, GIC appointee
 Ms Joanne Shannon                                Chairperson Falls Creek ARMB
 STRATEGIC PLANNING COMMITTEE
 Mr Christopher Eddy (Committee Chairperson)      GIC appointee
 Dr Jenny Brereton                                GIC appointee
 Ms Julia Hunter                                  GIC appointee
 Mr Ian Maxfield                                  GIC appointee
 Ms Arianne Rose                                  Council Chairperson, GIC appointee
 A Member representing the ARMB Chairpersons      ARMB Chairperson (rotating attendance)
 CO-OPERATION COMMITTEE
 Dr Jacqueline Jennings (Committee Chairperson)   Chairperson Mount Buller and Mount Stirling ARMB
 Mr Allan Bawden                                  Chairperson Southern ARMB
 Ms Maxine Morand                                 Chairperson Mount Hotham ARMB
 Ms Joanne Shannon                                Chairperson Falls Creek ARMB
 and by standing invitation
 Mr Mark Bennetts                                 CEO Mount Buller and Mount Stirling ARMB
 Ms Gail Conman                                   CEO Southern ARMB
 Mr Jon Hutchins                                  CEO Mount Hotham ARMB
 Mr Stuart Smythe                                 CEO Falls Creek ARMB

The Council Chairperson is an ex officio member of all Council Committees, whether or not expressly
appointed as a member.

                                                  24                                   Draft v17 July 2019
Appendix 5: Council Secretariat Staff

 STAFF             TITLE                                                   FULL TIME           FUNDING
 MEMBER                                                                    EQUIVALENT
 Ian Swan          Executive Officer                                              1.0          Council

 Alex Shilton      Principal Policy Officer                                       1.0          Council

 Natalie Baran     Senior Project Officer                                        0.8           Council

 Glen Forster      Senior Policy Officer                                         0.8           Council

 Shanaugh Lyon     Project Officer                                               0.5           Council

 Cassie Elder      Project Support Officer                                       0.6           DELWP

From time to time temporary agency staff or short-term secondments from DELWP may be required for
specific projects. The Council currently utilises the services of external consultants to provide Chief
Finance and Accounting Officer services and any other specialist services expertise, as required.

                                                   25                                   Draft v17 July 2019
Appendix 6: Victorian Government’s Alpine Sector KPIs

GOALS/STRATEGIC OBJECTIVES        TARGET/KPI
Economic (Financial) Goal        1.    Trend increase in real Gross State Product attributable to resorts
                                       to be at least 2% p.a. For 2012–17.
                                 2.    Trend increase in regional jobs attributable to resorts to be at
                                       least 2% p.a. For 2012–17.
                                 3.    Five-year alpine public investment program funded
                                 4.    All ARMBs meet government approved corporate plan financial
                                       targets.
Increase visitation (SO1)        5.    Trend growth in visitor numbers to be at least 2% per annum for
                                       2012–17.
                                 6.    Average annual winter occupancy rates for 2016–20 to be at
                                       least 20% higher than 2010–15.
Improve efficiency and           7.    Trend ARMB real unit costs decline at 1% p.a.
accountability (SO2)
                                 8.    ARMB CSOs identified, agreed with government and funded.
Environmental Goal               9.    Renewable energy to comprise at least 30% of resorts’ total
Respect the alpine environment         energy use by 2020.
(SO4)
                                 10.   Trend decrease in average annual solid waste disposed per
                                       visitor day to be at least 4% p.a.
                                 11.   Habitat protection programs in government approved corporate
                                       plans implemented.
Social Goal                      12.   Visitor household income profile approaches state profile.
Facilitate access, equity and
                                 13.   Visitor ethnicity profile approaches state profile.
diversity (SO5)
                                 14.   Increased number of beds available through central booking
                                       services.
                                 15.   Range of on-mountain services increases.
Cultural Goal                    16.   Indigenous employment opportunities created.
                                 17.   Events celebrating resort heritage increase.
Cross Cutting Strategic          18.   ARMBs implement formal stakeholder consultation programs.
Objectives
                                 19.   Planning timelines meet council norms.
Build partnerships (SO3)
Improve regulatory framework     20.   Lease inequities removed.
(SO6)
                                            Source: Alpine Resorts Strategic Plan 2012, Council, December 2012