City of Philadelphia Art Commission - Add B. Anderson Schoolyard Improvements April 14, 2021
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Participatory Design Engagement Over a three month period, The Trust for Public Land held Participatory Design and community workshops to un- derstand the current use, de- termine an overall vision and develop a conceptual design for the schoolyard.
LEGAL PROPERTY OWNER SCHOOL DISTRICT OF PHILADELPHIA WILLIAM FOX, JR., DIR. Demolition Plan RM 3152 - REAL PROP. MGMT PHILA EDUCATION CENTER 440 N. BROAD STREET PHILADELPHIA, PA 19130 OWNER TRUST FOR PUBLIC LAND ELIZABETH CLASS-MALDONADO 1608 WALNUT ST., SUITE 302 PHILADELPHIA, PA 19103 (215) 240-7739 CIVIL ENGINEER / LANDSCAPE DESIG AKRF, INC. ONE WASHINGTON SQUARE 530 WALNUT STREET, SUITE 998 PHILADELPHIA, PA 19106 (267) 585-4839 LAND SURVEYOR E&LP 140 WEST MAIN STREET HIGH BRIDGE, NEW JERSEY 08829 (908) 238-0544 FOR PERMITTING NOT FOR CONSTRUCTION KEVIN M. FLYNN, P.E. REVISIONS NO. DATE DESCRIPTION PROJECT ADD B. ANDERSON SCHOOLYARD IMPROVEMENT PROJEC 1034 S. 60TH STREET PHILADELPHIA, PA DRAWN BY CHECKED BY DEMOLITION NOTES: EH, SB KF 1. LOCATION OF TEMPORARY FENCING MAY NEED TO BE ADJUSTED WHEN MILLING SCALE DATE NEXT TO EAST WING OF THE BUILDING IN FRONT OF EXISTING DOORS AND CONCRETE PADS TO REMAIN. CONTRACTOR TO COORDINATE CONSTRUCTION 1" = 20' 02/25/2021 ACTIVITIES WITH THE SCHOOL TO MAINTAIN SAFE PEDESTRIAN ACCESS. SHEET TITLE 2. WHERE EXISTING FENCE SERVES AS CONSTRUCTION FENCING, SECURE ANY OPENING CHAINLINK FABRIC IF PRESENT. 3. CONTRACTOR TO CHECK CONSTRUCTION FENCING AT CLOSE OF WORK TO ENSURE THAT IT CANNOT BE BREACHED. 4. CONTRACTOR TO IMPLEMENT DUST CONTROL MEASURES AS FEASIBLE DURING DEMOLITION PLAN SAW CUTTING, MILLING AND EXCAVATION OPERATIONS. 5. REFER TO KEYED ITEMS ON DEMOLITION LEGEND AND CONSTRUCTION DETAILS 0 10 20 40 FOR DEMOLITION OF PAVEMENT ASSOCIATED WITH SITE FURNISHINGS AND PLAY EQUIPMENT INSTALLATION. SCALE: 1" = 20' SHEET NO. 6. ALL EXISTING PAVED SURFACE TO REMAIN MUST BE PROTECTED AND PRESERVE THROUGHOUT CONSTRUCTION ACTIVITIES. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO EXISTING PAVING TO REMAIN. PWD TRACKING NUMBER SD-1 FY21-AADB-6380-01 3 OF 21
Site Plan 1 Play Structures 1 2 Picnic Area 3 Multi Purpose Field 2 3 4 4 Run/Walk Track 5 Tree Trench 8 6 Basketball Court 5 6 7 Outdoor Classroom 9 7 8 Rain Garden 9 9 Student Access to Schoolyard
Site Furniture: Trash receptacle, tables and bench 1 Picnic Table 2 ADA Picnic Table 1 3 2 4 3 Bench 4 Trash Receptacle 4
Play Equipment: oodle swing, global motion, play booster 1 2 3 1 Playbooster 2 Global Motion 3 Oodle Single Swing
Picnic Area Planting 1 1 Thornless Honey Locust
20 SO Symphyotrichum novae-angliae 'October Skies' October Skies Aromatic Aster #1 container 24" on center Picnic Area Planting SYSTEM 1 PLANTING 0 5 10 20 SCALE: 1" = 10' P3 - PLANT SCHEDULE PLANTING NOTES Quantity Symbol Scientific Name Common Name Root Spacing TREES 1. LANDSCAPE ARCHITECT TO APPROV Thornless Honey Locust 3" caliper, B&B As shown PRIOR TO INSTALLATION. 5 GT Gleditsia triacanthos var. inermis DEPAVED PLANTING
Tree Trench Planting: tree, shrub, perennials 1 American Horbeam 2 Red Twig Dogwood 2 2 6 1 3 4 5 3 Fireworks 4 October Skies 5 Threadleaf Blue Star Rough Aromatic Aster Goldenrod 6 Ruby Ribbons Panic Grass
Tree Trench Planting: tree, shrub, perennials 0 5 10 20 SCALE: 1" = 10' P1 - PLANT SCHEDULE Quantity Symbol Scientific Name Common Name Root Spacing TREE 100 3 CC Carpinus caroliniana American Hornbeam 3" caliper, B&B As shown = 50' SHRUBS 22 CS Cornus sericea 'Farrow' ARCTIC FIRE Farrow ARCTIC FIRE Red Twig Dogwood #2 container 48" on center PERENNIALS 32 AH Amsonia hubrichtii Threadleaf Bluestar #1 container 24" on center 41 PR Panicum virgatum 'Ruby Ribbons' Ruby Ribbons Switch Grass #1 container 30" on center 19 SR Solidago rugosa 'Firework' Fireworks Rough Goldenrod #1 container 24" on center 20 SO Symphyotrichum novae-angliae 'October Skies' October Skies Aromatic Aster #1 container 24" on center
Rain Garden Planting: trees, shrubs 2 1 Black Gum 2 Robin Hill Apple 3 Serviceberry 4 1 3 Dwarf Fothergilla 4 Blue Blaze
Rain Garden Planting: perennials, grasses 1 Blue Flag Iris 2 Shenandoah Panic Grass 3 1 4 1 2 4 3 3 Fireworks Rough 4 Mountain Mint Goldenrod
Rain Garden Planting: perennials, grasses 3 1 Hameln Dwarf 2 October Skies 1 Fountain Grass Aromatic Aster 2 1 2 3 3 Threadleaf Blue Star
0 25 50 0 100 25 50 100 3 CC 3 Carpinus caroliniana CC Carpinus carolin SCALE: 1" = 50' SCALE: 1" = 50' N Rain Garden Planting: trees, shurbs, erennials, grasses 22 CS 22 Cornus sericea CS 'Farrow' ARCTIC Cornus FIRE'F sericea p:\PROJECTS\200296 - anderson elementary schoolyard\6_CAD\Sheets\75% DD SET\200296-LP101.dwg, 3/16/2021 12:43:35 PM 32 AH 32 Amsonia 0 hubrichtii AH 5 10 Amsonia 20 hubrich 41 PR 41 Panicum virgatum SCALE: 1" ='Ruby PR Ribbons' 10'Panicum virgatu 19 SR 19 Solidago rugosa SR 'Firework' Solidago rugosa P2 - PLANT SCHEDULE Symphyotrichum novae-angliae 'Octo Symphyotrichum 20 SO 20 SO Quantity Symbol Scientific Name Common Name Root Spacing TREES 1 AG Amelanchier x grandiflora 'Robin Hill' Robin Hill Apple Serviceberry 3" caliper, B&B As shown 3 NS Nyssa sylvatica Black Gum 3" caliper, B&B As shown SYSTEM 1 PLANTING SHRUBS SYSTEM 1 PLANTING 3 FG Fothergilla gardenii Dwarf Fothergilla #3 container 36" on center 7 VN Viburnum dentatum 'Blubzam' BLUE BLAZE BLUE BLAZE Blubzam Arrowwood Viburnum #3 container 48" on center GRASSES AND PERENNIALS 59 AH Amsonia hubrichtii Threadleaf Bluestar #1 container 24" on center 61 IV Iris versicolor Blue Flag Iris #1 container 30" on center 17 PA Pennisetum alopercoides 'Halemn' Halemn Dwarf Fountian Grass #1 container 24" on center 70 PS Panicum virgatum 'Shenandoah' Shanandoah Panic Grass #1 container 30" on center 29 PM Pycnanthemum muticum Mountain Mint #1 container 30" on center 33 SR Solidago rugosa 'Fireworks' Fireworks Rough Goldenrod #1 container 24" on center 40 SO Symphyotrichum oblongifolium 'October Skies' October Skies Aromatic Aster #1 container 24" on center SYSTEM 2 PLANTING 0 5 10 0 520 10 20 SCALE: 1" = 10' SCALE: 1" = 10' P3 - PLANT SCHED Quantity Symbol Quantity Symbol Name Scientific Scientific Name C TREES
Planting Details NOTES: 1. DO NOT HEAVILY PRUNE THE TREE AT PLANTING. PRUNE ONLY CO-DOMINANT LEADERS, BROKEN, DEAD OR DAMAGED BRANCHES. PRUNE WITH A CLEAN CUT PER CURRENT ANSI WARNING FLAG, 8" LONG, MIN. A300 & ISA STANDARDS. DO NOT CUT TREE'S CENTRAL LEADER. UV-STABILIZED POLYPROPYLENE 2. SET PLANTS PLUMB AND FACE TO GIVE THE BEST MONOFILAMENT WEBBING TIED TO TREE AND APPEARANCE OR RELATIONSHIP TO ADJACENT AREAS. STAKE. LEAVE WEBBING SLIGHTLY SLACK TO 3. REMOVE EXCESS SOIL FROM TOP OF ROOT BALL TO EXPOSE ALLOW TREE TO SWAY IN THE WIND. ROOT FLARE PRIOR TO PLANTING TO ENSURE THAT THE BASE OF THE FLARE IS FLUSH WITH ADJACENT GRADE AND PLUMB SET ROOT FLARE ABOVE FINISH GRADE, SEE IN ALL DIRECTIONS. NOTE 3 4. DO NOT USE TREE WRAP. REMOVE TREE WRAP OR NOTES: CARDBOARD TUBING FROM ALL TREE TRUNKS. DO NOT LEAVE 3" MIN. SHREDDED HARDWOOD BARK MULCH AROUND 1. DO NOT HEAVILY MATERIALS IN THEPRUNE TREE THE PIT. TREE AT PLANTING. PRUNE ALL SIDES TO THE EDGE OF THE PAVEMENT OPENING. 5. ONLY STAKECO-DOMINANT TREES OVER 2" LEADERS, CAL, SETBROKEN, DEAD OR STAKES PLUMB DAMAGED AND AT SAME 3" MULCH, DO NOT MULCH DO NOT MULCH AGAINST TRUNK. BRANCHES. HEIGHT. PRUNE PLACE WITHON STAKES A CLEAN CUTAND SIDEWALK PER ROADWAY CURRENT ANSI SIDES AGAINST STEMS WARNING FLAG, 8" LONG, MIN. A300 & OF TREE.ISA STANDARDS. DO NOT CUT TREE'S CENTRAL REMOVE ROOT BALL WRAPPING MATERIALS FROM FINISH GRADE LEADER. 6. WHERE PLANTING SOIL MEETS UNDISTURBED SOIL, SCARIFY TOP 12" OR 1/3 OF UV-STABILIZED BALL, WHICHEVER IS GREATER. POLYPROPYLENE 2. SET SIDESPLANTS PLUMB AND AND BOTTOM FACEPIT OF TREE TOUP GIVE TO THE THE BEST BOTTOM OF MONOFILAMENT 2" X 2" HARDWOOD WEBBING STAKESTIED TO TREE FIRMLY AND DRIVEN 18" APPEARANCE OR RELATIONSHIP TO ADJACENT AREAS. STORMWATER SOIL ROOTBALL. STAKE. MIN. INTOLEAVE WEBBING SLIGHTLY THE SUBGRADE OUTSIDESLACK OF TO 3. REMOVE EXCESS SOIL FROM TOP OF ROOT 7. PLANTING SOIL SHALL BE A MINIMUM DEPTH OF 3'-0" BALL TO UNLESS EXPOSE ALLOW ROOTBALL TREE TO SWAY IN THE WIND. ROOT FLARESPECIFIED. OTHERWISE PRIOR TO PLANTING TO ENSURE THAT THE BASE UNDISTURBED OR COMPACTED OF THE 8. DO NOT FLARE USE THEIS FLUSH TRUNK WITH OF THEADJACENT TREE ASGRADE A LEVERAND IN PLUMB SET ROOT FLARE ABOVE FINISH GRADE, SEE SUBGRADE TO SUPPORT ROOTBALL IN ALL DIRECTIONS. POSITIONING OR MOVING THE TREE. LEAVE PLANTING SOIL, SEE NOTE 9 SEE NOTE 7 NOTE 3 4. DO NOT USE TREE WRAP.SEAL REMOVE TREE WRAP OR 3'-0" MIN. NURSERY/CONTRACTOR IN PLACE. CARDBOARD 9. PRIOR TUBING FROM TO MULCHING, LIGHTLYALLTAMP TREESOIL TRUNKS. DO NOT AROUND LEAVE ROOT UNDISTURBED SOILHARDWOOD BARK MULCH AROUND 3" MIN. SHREDDED MATERIALS IN THE BALL IN 6" LIFTS TOTREE BRACE PIT. TREE. DO NOT OVER COMPACT. ALL SIDES TO THE EDGE OF THE PAVEMENT OPENING. 2X ROOT BALL PLACE ROOTBALL ON FIRMLY PACKED SOIL TO 5. STAKE TREES OVER WHEN PLANTING 2" CAL, HOLE HAS SET BEEN STAKES PLUMBPOUR BACKFILLED, AND AT SAME WATER 3" MULCH, DO NOT MULCH DO NOT MULCH AGAINST TRUNK. HEIGHT. PREVENT SETTLING AND PROVIDE TREE AROUNDPLACE STAKES ROOT BALL TO ON SIDEWALK SETTLE AND ROADWAY SIDES THE SOIL. AGAINST STEMS REMOVE STABILITYROOT BALL WRAPPING MATERIALS FROM OF TREE.TREE PROTECTION, WHERE REQUIRED, AS SHOWN 10. INSTALL FINISH GRADE TOP 12" OR 1/3 OF BALL, WHICHEVER IS GREATER. 6. ON WHERE TREEPLANTING SOILDETAILS. PROTECTION MEETS UNDISTURBED SOIL, SCARIFY NOTES: SIDES AND BOTTOM OF TREE PIT UP TO THE BOTTOM OF 1. REMOVE ROOT BALL CONTAINER. SET TOP OF BALL 3" ABOVE FINISH GRADE. 2" X 2" HARDWOOD STAKES FIRMLY DRIVEN 18" STORMWATER SOIL ROOTBALL. 2. SCARIFY EDGES OF PLANTING PIT. MIN. INTO THE SUBGRADE OUTSIDE OF 7. PLANTING SOIL SHALL BE A MINIMUM DEPTH OF 3'-0" UNLESS ROOTBALL OTHERWISE SPECIFIED. UNDISTURBED OR COMPACTED 8. DO NOT USE THE TRUNK OF THE TREE AS A LEVER IN SUBGRADE TO SUPPORT ROOTBALL TREE PLANTING PLANTING SOIL, SEE NOTE 9 POSITIONING OR MOVING THE TREE. LEAVE CONTAINER SHRUB PLANTING SEE NOTE 7 1 2 3'-0" MIN. SCALE: 1/2" = 1'-0" NURSERY/CONTRACTOR SEAL IN PLACE. SCALE: 1/2" = 1'-0" UNDISTURBED SOIL 9. PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND ROOT BALL IN 6" LIFTS TO BRACE TREE. DO NOT OVER COMPACT. 2X ROOT BALL PLACE ROOTBALL ON FIRMLY PACKED SOIL TO WHEN PLANTING HOLE HAS BEEN BACKFILLED, POUR WATER PREVENT SETTLING AND PROVIDE TREE AROUND ROOT BALL TO SETTLE THE SOIL. STABILITY 10. INSTALL TREE PROTECTION, WHERE REQUIRED, AS SHOWN ON TREE PROTECTION DETAILS. NOTES: 1. REMOVE ROOT BALL CONTAINER. SET TOP OF BALL 3" ABOVE FINISH GRADE. 2. SCARIFY EDGES OF PLANTING PIT. TREE PLANTING CONTAINER SHRUB PLANTING 1 SCALE: 1/2" = 1'-0" 2 SCALE: 1/2" = 1'-0" EDGE OF PLANTING BED BACKFILL HOLE WITH PLANTING SOIL AND SHREDDED HARDWOOD BARK MULCH TAMP THE SURROUNDING SOIL UNTIL FIRM VARIES 3" MULCH, TAPER AT BASE. DO NOT MULCH AGAINST STEMS. PLANT SHOULD BE FLUSH WITH EQ. EQ. FINISH GRADE VARIES PLANT EQ. STORMWATER SOIL EDGE OF PLANTING BED PRIOR TO PLANTING, TAMP SOIL AT BOTTOM OF HOLE UNTIL FIRM SUBGRADE BACKFILL HOLE WITH PLANTING SOIL AND SHREDDED HARDWOOD BARK MULCH TAMP THE SURROUNDING SOIL UNTIL FIRM PLAN VARIES 3" MULCH, TAPER AT BASE. DO NOT MULCH NOTES: AGAINST STEMS. NOTES: 1. PLANT SPACING AS PER PLANTING PLAN AND PLANT SCHEDULE. 1. REFER TO PLANT SCHEDULE FOR SPACING. 2. REMOVE CONTAINER BEFORE PLANTING. PLANT SHOULD BE FLUSH WITH EQ. EQ. FINISH GRADE VARIES 3. SCARIFY SIDES OF PERENNIAL ROOT BALL. PLANT EQ. STORMWATER SOIL PERENNIAL PLANTING PRIOR TO PLANTING, TAMP SOIL AT BOTTOM PLANT SPACING FOR SAME CONTAINER SIZE 3 SCALE: 1/2" = 1'-0" OF HOLE UNTIL FIRM 4 SCALE: 3/4" = 1'-0" SUBGRADE PLAN NOTES: NOTES:
Perspective
You can also read