報告 - China Water Affairs Group Limited
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
CONTENTS 目錄 REPORT OVERVIEW 50 INDEX OF THE CONTENTS OF THE GUIDELINES 48 ON ENVIRONMENTAL, SOCIAL AND GOVERNANCE REPORTING OF THE HONG KONG STOCK EXCHANGE 34 PRACTICE THE COOPERATIVE DEVELOPMENT OF SOCIETY PROMOTING ENVIRONMENTAL IMPROVEMENT 18 CONSTRUCTION OF MANAGEMENT PLATFORM 17 MATERIALITY ANALYSIS 14 STAKEHOLDER ENGAGEMENT 09 13 OVERVIEW OF CORPORATE DEVELOPMENT MANAGEMENT’S STATEMENT 07 STATEMENT OF THE BOARD 05 CORE VALUES 03
China Water Affairs Group Limited 2021 Environmental, Social and Governance Report 詞彙 GLOSSARY “Al2(SO4)3” Aluminium Sulfate 硫酸鋁 “BOD” Biochemical Oxygen Demand 生化需氧量 “ClO2” Chlorine Dioxide 二氧化氯 “CO2” Carbon Dioxide 二氧化碳 “COD” Chemical Oxygen Demand 化學需氧量 “GJ” Gigajoule 吉焦 “H2S” Hydrogen Sulfide 硫化氫 “km” Kilometer 千米 / 公里 “km ” 2 Square kilometer 平方千米 / 平方公里 “kW·h” Kilowatt-hour 千瓦時 01
Glossary “m3” Cubic meter 立方米 “MWh” Megawatt-hour 兆瓦時 “NaClO” Sodium Hypochlorite 次氯酸鈉 “NaOH” Sodium Hydroxide 氫氧化鈉 “NH3” Ammonia 氨氣 “NH3-N” Ammonia Nitrogen 氨氮 “PAC” Polyaluminium Chloride 聚合氯化鋁 “SS” Suspended Solids 懸浮物 02
核心價値觀 CORE VALUES 03
Water-oriented Kindness to Society 04
China Water Affairs Group Limited 2021 Environmental, Social and Governance Report 董事會聲明 STATEMENT OF THE BOARD China Water Affairs Group Limited (“China Water” or the “Company”), together with its subsidiaries and associates (the “Group”), upholds the business philosophy of “Water- oriented, Kindness to Society”, attaches great importance to environmental, social and governance (ESG), and organically integrates green operation and low-carbon development with the Group’s core strategy to create a win- win situation with satisfied customers, satisfied employees, satisfied governments and satisfied shareholders. The Group has established a four-tier ESG management structure, which consists of the Board, the management, the functional departments and the subsidiaries. The Board is the chief ESG decision-making body, and is responsible for the Group’s environmental, social and governance strategies and reporting. The management is responsible for ensuring the consistent implementation of ESG- related work and reporting the progress to the Board on a regular basis. The functional departments formulate work plans for each ESG issue, supervise the implementation of such plans and report to the management regularly. The subsidiaries are equipped with dedicated personnel who are responsible for performing specific ESG tasks and carrying out data and information collection and compilation. During the reporting period, the Group continued to improve its ESG management by holding focus group meetings to identify, evaluate and shor tlist material issues and allocate appropriate resources to ensure the smooth implementation of ESG work. The management is responsible for overseeing the preparation of the ESG report, which will ultimately be reviewed and approved by the Board. 05
Statement of the Board 06
China Water Affairs Group Limited 2021 Environmental, Social and Governance Report 管理層聲明 , MANAGEMENT S STATEMENT A t t h e 7 5 t h U n i te d N a t i o n s G e n e ra l strive for the building up of the “China Assembly held in 2020, President Xi Jinping Water, Nourishing Thousands of Families announced that “China will strengthen its with Love” brand, take concrete actions intended nationally determined contribution in responding to our nation’s call and by adopting more vigorous policies and fulfil corporate environmental and social measures, and aim to peak CO2 emissions responsibilities. by 2030 and achieve carbon neutrality In anticipation of a low-carbon development before 2060”. The green and low-carbon trend in the next 40 years, China Water development has marked the course of has performed designing at the top level technological revolution and corporate and made overall deployment for the transformation in the current era, which also establishment of a green management represented social progress and people’s system from a global perspective, grasped a aspiration for a better life. profound understanding of the fundamental As an advocate and a practitioner of low- requirements of green and low-carbon carbon development, China Water has operation, and realized the targets of been staying true to its roots and working “economical production”, “clean production” hard for progress to uphold its business and “ethical production”, all of which enabled philosophy of “Water-oriented, Kindness its cor porate development to be built to Society”, implement the core strategies upon efficient use of resources, stringent of water supply integration in urban and protection of the environment and effective rural areas and water supply and drainage control of greenhouse gas emissions. With integration through steadfast determination, the establishment of a well-structured green 07
Management’s Statement framework, the Group has successfully Looking forward, as par t of the wider issued a US$200 million green bond in May effort in turning over a new leaf toward the 2021. construction of an ecological civilization under the National 14 th Five-Year Plan, The past year has been an unusual year China Water will, by pooling together all as the novel coronavirus pandemic has resources and keeping abreast of the times, profoundly changed the world and forced continue to base its development on green us to look at ourselves and the dialectical value, set out key tasks in relation to green relationship between our development and and low-carbon development, compile an the environment and society. Under such action plan for future green operation, and complicated circumstances, China Water make greater contributions in tackling global has ridden out the storm and improved challenges such as climate change, water itself from inside-out by enforcing strict shortage and environmental pollution. management internally and strengthening cooperation externally, and as such, steadily overcame each and ever y challenge and achieved stable operating results. At the same time, our operations in direct drinking water, secondary water supply, and Fingertip Water App were vigorously promoted in pursuit of providing healthier products and more convenient services for the benefit of the society and community. Duan Chuan Liang Chairman of the Board and Executive Director 08
China Water Affairs Group Limited 2021 Environmental, Social and Governance Report 企業發展概況 OVERVIEW OF CORPORATE DEVELOPMENT ABOUT CHINA WATER China Water Affairs Group Limited is a company listed on the Main Board of The Stock Exchange of Hong Kong Limited (stock code: 00855.HK) and its shares are tradable under the Shenzhen-Hong Kong Stock Connect. Since 2003, the Group has been committed to investing, constructing and operating water projects in mainland China, including raw water, tap water, direct drinking water, wastewater treatment, drainage operation, comprehensive water environmental renovation and water-related construction. The Group has grown into a Shanxi professional and market-oriented international leader of integrated water operation across multiple regions, with its business covering 13 provinces, 3 municipalities and over 60 cities in the PRC. The Group is headquartered Shaanxi in Hong Kong, the PRC, with a national management headquarter in Beijing, our capital city. Henan SCALE OF THE GROUP Sichuan Chongqing As of 31 March 2021, the Group had 199 water plants, with a total designed daily water supply capacity of 14.94 million m 3; 19 sewage treatment plants, with a total designed daily sewage treatment capacity of Guizhou 1.05 million m3; total length of water pipelines under operation and maintenance of over 155,000 km; over Jiangxi 6.70 million users of the Group’s water supply service (number of registered water metres), representing an increase of approximately 1 million users as compared Guangxi to last year, comprising approximately 6.25 million domestic users and approximately 450,000 commercial and industrial users. The Group had a total of 9,965 employees, representing an increase of 609 employees as compared to last year. MAJOR OPERATING Hainan ACHIEVEMENTS During the reporting period: Tota l i n ve st m e n t a m o u n t Total investment amount in in new large-scale water construction and upgrade 3.68 5.57 acquisition of water projects 160 Total financing amount projects HK$ million HK$ billion HK$ billion 09
Overview Of Corporate Development Heilongjiang Hebei Beijing Tianjin Shandong Jiangsu Hubei Hunan Guangdong Water supply business Environmental protection business Drainage operation City water supply operation and construction Sewage treatment operation and construction – Connected users over 6.7 million (including water environmental renovation – Potential reaching population over 30 million people construction projects) – Water pipelines of approximately 155,000 km 10
China Water Affairs Group Limited 2021 Environmental, Social and Governance Report Management indicators Revenue Profit Unit: HK$’000 Unit: HK$’000 2,662,074 10,345,533 2,507,289 8,694,303 2,130,283 8,302,211 7,580,176 1,761,524 5,707,895 1,379,346 2017 2018 2019 2020 2021 2017 2018 2019 2020 2021 Power consumption per unit water supply Leakage ratio Unit: kW-h/’000 m3 Unit: % Industry average 300 Industry average 23.22% 251 15.55 15.25 237 15.05 226 227 14.43 225 14.32 2017 2018 2019 2020 2021 2017 2018 2019 2020 2021 Source: The industry average is extracted from Urban Water Supply Statistic Yearbook (2019) of China Urban Water Association 11
Overview Of Corporate Development HONOURS China Water was awarded “Best Infrastructure and Public Utilities Stock Company” at the 5th Golden Hong Kong Stocks Awards. Our subsidiary, Jingzhou Water Affairs Group Co., Ltd., was named as “National Civilized Unit” in 2021. Our subsidiary, Changsha (China Water) Group Co., Ltd., was rated as “Advanced Unit in Water Supply Industry of Hunan Province” in 2021. M u l t i p l e w a te r p l a n t s u n d e r o u r s u b s i d i a r i e s , n a m e ly Zhenxinzhuang Water Plant of Yuncheng Silver Dragon Water Affairs Co., Ltd., Liuji Water Plant of Wuhan Xinzhou District Changyuan Water Supply Co., Ltd., and the South-to-North Water Transfer Project – Ancillary Water Treatment Plant of Yexian Guoyuan Water Affairs Co., Ltd., were rated as “Best Water Plant Practice in Rural Water Supply” by the Ministry of Water Resources of the PRC in 2021. 12
China Water Affairs Group Limited 2021 Environmental, Social and Governance Report 利益相關方參與 STAKEHOLDER ENGAGEMENT Stakeholder engagement is an integral part of the corporate governance of China Water. The Group’s stakeholders mainly include our shareholders, investors, creditors, the government, our customers, consumers, employees, suppliers and the local communities. Adhering to our operating philosophy of “Water-oriented, Kindness to Society”, the Group has established open, transparent and efficient communication channels with its stakeholders to promptly respond to their demands and to understand their expectations and suggestions on the sustainable development of the Group. The Group defines its stakeholders based on the following four principles: Responsibility: Decision-making: Dependence: Impact: Stakeholders associated Stakeholders who have Stakeholders who rely Stakeholders in the vicinity with the Group in terms of decision-making authority to a significant extent on of the Group’s business policies, laws, regulations, over the Group; the Group’s operation who are affected by our contracts, financials and and governance; operation. operation; Stakeholders Means of engagement and communication Concerned Issues Frequency or schedule General meeting Regularly/as and when necessary Results announcement meeting Economic performance Annually/biannually Annual/interim report Supply chain management Annually/biannually Shareholders, Press release/announcement Organisational structure Regularly/as and when necessary investors, creditors Roadshow Governance measures Regularly/as and when necessary Investor conference As and when necessary Site visit As and when necessary Correspondence Operational safety As and when necessary Regulatory inspection Product quality and service Regularly/as and when necessary Site visit Compliant operation As and when necessary Themed conference Emissions As and when necessary The government Energy saving and Seminar Regularly consumption reduction Progress report Labour standards Regularly Customer satisfaction survey Annually Community services Regularly Plant open day Product quality and service Regularly Customers, consumers Hearing Consumer rights protection As and when necessary User seminar Regularly/as and when necessary WeChat official account As and when necessary Business meeting Regularly Employee seminar Remuneration and benefits Year-end/half-year Employee representative meeting Employment Annually/biannually Interview Development and training As and when necessary Employees Team building Work environment Regularly Training Health and safety Regularly/as and when necessary Employee group activity Labour standards Regularly China Water News (internal publication) Regularly Procurement tender As and when necessary Resources use Site visit As and when necessary Procurement behaviours Suppliers Meeting As and when necessary Anti-corruption Product briefing As and when necessary Plant open day Regularly Community service Community investment Regularly/as and when necessary Local community Survey on environmental and social impact Charity and relief As and when necessary Public welfare and charity event As and when necessary 13
Materiality Analysis 實質性分析 MATERIALITY ANALYSIS With reference to the requirements of“Environmental, Social and Governance Reporting Guidelines”of the Hong Kong Stock Exchange and the issues stated in the materiality list in“G4 Sustainability Reporting Guidelines”issued by Global Reporting Initiative (GRI) and taking into account the results of stakeholder engagement, China Water has identified, prioritised and verified issues of materiality and determined the level of disclosure and reporting boundaries. Process of materiality analysis: Management discussion Analyse operation indicators Feedback on assessment results Internal and external expert advice Experience of industry veteran Gather community feedback Feedback from suppliers Source of issues Align with the Group’s development strategies Attended to the concerns of our stakeholders Reduce environmental and social impacts Enhance the Group’s governance Selection criteria 14
China Water Affairs Group Limited 2021 Environmental, Social and Governance Report IDENTIFICATION By rationalising our policies, setting out clear strategies, reviewing our business and determining our sustainable development goals, as well as considering our stakeholder engagement, the Group has identified 20 materiality issues and determined the scope and boundaries of their impact. Scope of impact Materiality External No. Aspect Boundary issues Internal Investors Customers and Government and Suppliers Community Creditors Consumers 1 Establish a Governance measures rational, effective 2 Organisation structure and legitimate 3 management Economic performance 4 platform Compliant operation 5 Actively, Emissions comprehensively Energy saving 6 and sustainably and consumption reduction promoting 7 Environmental protection Materiality environmental 8 improvement Resources use aspects are applicable 9 Employment to China 10 Remuneration and benefits Water and its 11 Development and training subsidiaries and associated 12 Health and safety Practice companies(1) 13 cooperative Labour standards development 14 Supply chain management of society 15 with passion, Procurement behaviours 16 kindness and Anti-corruption aggressiveness 17 Product quality 18 Customer confidentiality 19 Community investment 20 Charity and relief represents materiality issues with larger impacts on represents materiality issues with less impacts on stakeholders stakeholders (1) Kangda International Environmental Company Limited (“Kangda International”) is not included in this report. For details of Kangda International’s Environmental, Social and Governance ("ESG") performance, please refer to Kangda International’s ESG Report 2020. 15
Materiality Analysis PRIORITISATION The identified materiality issues are prioritised in terms of importance according to the degree of impact on the economy, environment, society as well as the assessment and decision-making of our stakeholders. Priority of materiality Product quality 5 and decision-making of stakeholders Degree of impacts on assessment Employment Economic performance Remuneration and benefits Compliant operation Emissions Development and Health and safety Procurement Organisation training behaviours structure Customer confidentiality Resources use Energy saving and Environmental protection consumption reduction 2.5 Community investment Governance measures Anti-corruption Labour standards Charity and relief Supply chain management 0 2.5 5 Degree of impacts on economy, environment and society Sound operational Ongoing environmental Social co-development management optimisation High materiality Medium materiality Product quality Employment Economic performance Remuneration and benefits Compliant operation Development and training Emissions Customer confidentiality Health and safety Labour standards Organisation structure Supply chain management Procurement behaviours Environmental protection Low materiality Energy saving and consumption Community investment reduction Anti-corruption Resources use Charity and relief Governance measures VERIFICATION In respect of the identified and prioritised materiality issues, the Group has collected opinions from experts, users and stakeholders and carried out verification in many ways. Meanwhile, the Group formulated administrative measures regarding the indicators involved in the materiality issues to determine the methods and procedures of indicator collection so as to ensure the reasonableness, balance and completeness of the report. 16
China Water Affairs Group Limited 2021 Environmental, Social and Governance Report 構建管治平台 CONSTRUCTION OF MANAGEMENT PLATFORM Sound corporate governance is essential to boost The Group’s governance policy is in compliance with investor confidence as it helps to define decision- the relevant guidelines in the “Corporate Governance making procedures and management responsibilities Code” and “Corporate Governance Report” as set and increase operation transparency. China Water has out in Appendix 14 to the Rules Governing the always been committed to maintaining high standards Listing of Securities on The Stock Exchange of Hong of corporate governance and strictly complying with Kong Limited. We have built a legitimate, rational national laws, regulations and industry standards and efficient governance model by establishing a in the course of its operation and management as sound management structure with comprehensive well as its mergers and acquisitions. It has been rules and regulations, conducting regular audits, steadfastly implementing its sustainable development fully implementing risk prevention and control, and strategy to provide sufficient protection to the interests disclosing accurate corporate information in a timely of its shareholders and create values for the society. manner. THE BOARD RISK MANAGEMENT As the highest decision-making body, the Board The Board is fully responsible for maintaining is responsible for formulating and authorising the a sound and effective inter nal control system Group’s governance policies, providing leadership for the Group, which include establishing a risk and supervising our management, reviewing the management framework, defining authorities, Group’s business performance, and ensuring effective safeguarding corporate assets against unauthorised risk management and internal control. The Group’s misappropriation or handling, ensuring proper Board comprises 14 directors, including 5 executive maintenance of financial records for internal use or directors, 4 non-executive directors and 5 independent disclosure, and ensuring compliance with laws and non-executive directors. industry regulations. The Board has set up three board committees, T h e G ro u p h a s e s ta bl i s h e d a fo u r- l eve l r i s k namely the Audit Committee, Nomination Committee management framework comprising the decision- and Remuneration Committee. making level (the Board), the executive level (management), the operation level (departments of The Audit Committee is mainly responsible for reviewing different functions in the Group’s headquarter) and the the Company’s accounting policies and monitoring corporate level (person-in-charge of risk management the financial reporting procedures, monitoring the of the Group’s subsidiaries) to meet the requirement performance of the internal and external auditors, for continuous control of risks during our business reviewing and verifying the effectiveness of the Group’s development. Within the framework, the Board is risk management and internal control measures, responsible for implementing controls from the top, and ensuring compliance with applicable laws and while the business level, which includes our finance, regulations and regulatory requirements. engineering, operation, legal and human resources The Nomination Committee is responsible for teams, utilise their expertise to help our management identifying qualified candidates for the Board, to discharge their internal control responsibilities. nominating talented professionals and quality Meanwhile, the Audit Committee, assisted by our individuals to join the Group, safeguarding a strong external auditors, is responsible for monitoring the and diverse Board, and making recommendations to practices of our management and the effectiveness of the Board on matters relating to the appointment or the internal controls in place. reappointment of directors as necessary. During the reporting period, the Group’s management The Remuneration Committee is mainly responsible held risk management meetings with our operation for making recommendations on the remuneration level and identified three types of significant risks, policies and systems for senior management of the namely operational risk, compliance risk and financial Company, reviewing the Company’ s remuneration risk. The audit department assessed our potential risks structure and formulating remuneration incentive through surveys and interviews to further distinguish plans to ensure that the remuneration level is in line our risks and submitted the “Risk Management and with the Group’s long term interests and risk policies. Internal Control Report” to the Audit Committee. GOVERNANCE OF PROJECT COMPANIES The Group abides by the “Administration Measures for perform such duties and exercise such powers of the Concession Arrangements of Infrastructure and a decision-making organ, supervision organ and Public Utilities” in mergers and acquisitions of new management organ respectively in strict compliance projects. It actively cooperates with local governments with the Company Law of the People’s Republic of to acquire project concession through public tenders China. or competitive negotiation, and establishes project companies at the same time. A board of directors, For details of the corporate governance, please refer board of supervisors and operation and management to the relevant contents disclosed in the annual report team are formed within the project companies to of the Group. 17
Promoting Environmental Improvement 推進環境改善 PROMOTING ENVIRONMENTAL IMPROVEMENT From the Kyoto Protocol to the Paris Agreement, low- steady growth in its main business of water supply and carbon has always been a hot topic in promoting wastewater treatment, while continuing to vigorously environmental improvement. “Achieving the goals of promote water supply integration in urban and rural peaking carbon emissions by 2030 and achieving areas and the piped direct drinking water business, carbon neutrality by 2060” are the major strategic striving to improve the living environment in rural areas decisions made after careful consideration by the and provide healthy drinking water to more people. PRC gover nment, and represent an impor tant Following the publication of the “Green Operation foothold for systematic economic and social change Proposal for China Water Group”, the Group has mainly as the PRC officially enters the era of low-carbon focused on organizing and commencing works related development. to energy saving and consumption reduction, reduction of the leakage ratio and utilization of clean energy As a public utility company, China Water cannot and throughout the year, and has achieved remarkable has no reason to stay away from this low-carbon results. revolution. In the past year, the Group maintained 18
China Water Affairs Group Limited 2021 Environmental, Social and Governance Report Time Will Come When We Shall Mount the Wind and Break the Waves – The Issuance of Green Bond Leveraging on the highest priority given to environmental The framework for green finance has been developed protection over the years and the outstanding to elaborate how the Group plans to implement green achievements in promoting environmental improvement, finance transactions to support projects and works the Group has developed a well-structured framework for that generate environmental benefits, thereby better green finance and successfully issued US$200 million, achieving the Group’s business strategy and vision for fixed-rate, senior unsecured green notes on 18 May 2021. green sustainability. A green finance transaction may The five-year bond in Reg S only format will mature on be an issuance of bonds, loans or other debt-type 18 May 2026 with 4.850 per cent coupon. An equivalent financing products, the proceeds of which shall be amount of the net proceeds were 100% allocated to the used for green projects as defined in the framework. Group's existing sustainable water supply projects in accordance with the Company's green finance framework. Management procedure for a green finance transaction: Project Purpose of Management of evaluation and Reporting the fund selection the fund Types of green projects: Construction, modification or Construction of renewable Sustainable Renewable upgrade of water supply and water resources wastewater treatment related energy (including solar and and wastewater energy wind energy) production management facilities, infrastructure and system. units. 19
Promoting Environmental Improvement List of green projects associated with this issuance: Current Type of Name of project Location progress of the project project Daya Bay Petrochemical Zone Water Plant Phase II Water Huizhou City, In operation Project supply Guangdong Chenxi County Water Plant and Ancillary Pipeline Water Chenxi County, In operation Construction Project supply Hunan Water Ji’an Chengbei Water Plant Project Ji’an City, Jiangxi In operation supply Water Huizhou City, Daya Bay Central District Water Plant Phase II Project In operation supply Guangdong Water Wannian County, Jiangxi Wannian Shizhen Water Plant Construction In operation supply Jiangxi Ningxiang City Zhengnong Water Plant Relocation Water Ningxiang City, In operation Project supply Hunan Yifeng County Liangtou Water Plant 80,000 tons/day Water Yifeng County, In operation Water Intake Upward Adjustment Project supply Jiangxi Xiezhou Water Purification Plant and Urban Main Water Yuncheng City, In operation Pipeline Network Construction Project supply Shanxi Hubei Jingzhou City Urban Water Supply Pipeline Water Jingzhou City, In operation Network Construction and Renovation Project supply Hubei Guangdong Huizhou Daya Bay District Water Supply Water Huizhou City, In operation Pipeline Network Construction and Renovation Project supply Guangdong Jiangxi Pingxiang City Urban Water Supply Pipeline Water Pingxiang City, In operation Network Construction and Renovation Project supply Jiangxi Hunan Ningxiang City Water Supply Pipeline Network Water Ningxiang City, In operation Construction and Renovation Project supply Hunan Yongchuan Chongqing Yongchuan District Water Supply Pipeline Water District, In operation Network Construction and Renovation Project supply Chongqing Note: According to the framework for green finance, all project types listed in this table fall under “Sustainable water resources and wastewater management”. 20
China Water Affairs Group Limited 2021 Environmental, Social and Governance Report Into Our Rural Villages, Embraced by Clear River Flows – The Continuous Advancement of Water Supply Inte- gration in Urban and Rural Areas In January 2021, the “Opinions of the CPC Central in urban and rural areas, in order to achieve a rural Committee and the State Council on Comprehensively water supply pervasion rate of 88% by 2025. Advancing Rural Vitalization and Accelerating the Modernization of Agriculture and Rural Areas” Maintaining a steadfast determination in implementing has specifically proposed for the comprehensive water supply integration in urban and rural represents advancement of rural vitalization as a major task a strategic decision for the Group to uphold the in realizing the great rejuvenation of the Chinese business philosophy of “Water-oriented, Kindness to nation, the strengthening of rural public infrastructure Society” and to better serve the people’s livelihood construction, the implementation of rural water and economic and social development while ensuring supply safeguarding projects, the enhancement a quality and safe urban water supply. Since the of small and medium-sized reservoirs and other implementation of such projects, many of the stable water supply projects construction and water Group’s companies have fundamentally achieved source protection, the implementation of large- full coverage of urban and rural water supply and scale construction of water supply projects and have accumulated rich experience in operation and standardized modification of smaller projects, and the management, solving many rural drinking water conditional advancement of water supply integration problems that have long troubled local governments and benefiting millions of rural residents. Case: Water supply integration in urban and rural areas in Pengze County of Jiangxi is largely completed Jiujiang Pengze Silver Dragon Water Affairs Co., Ltd., a subsidiary of the Group, has been responsible for promoting water supply integration in urban and rural areas in Pengze County of Jiangxi, for which total investment was RMB478 million. The company expanded the Pengze County No. 2 Water Plant by increasing its water supply capacity by 40,000 m3 per day; a combination of centralized and decentralized water supply methods were adopted in urban districts, characterized by the newly built Tianhong Water Plant, Huangling Water Plant and Haoshan Water Plant, the modified and expanded Mianchuan Water Plant, Madang Water Plant, Yangzi Water Plant, Shangxiling Water Plant, Leguan Water Plant and Dongsheng Water Plant, and the renovation of 3 small rural water supply facilities; 797.23 km of water transmission and distribution pipeline networks and 920.68 km of pipelines to villages and households were laid, which solved the drinking water safety problem for 372,700 people from 176 administrative villages in 17 towns and villages in Pengze County. Case: Efficient takeover of rural water supply in Wugang During the reporting City of Henan Province period Wugang Silver Dragon Water Affairs Co., Ltd., a subsidiary of the Group, has completed a takeover of all rural water supply projects in Wugang City in only six months through efficient 490,000 coordination and a well-developed takeover proposal, including households 3 rural water plants and 84 rural water supply facilities, were new household covering an area of 612 km2 and serving a rural population of nearly 250,000. After the takeover, the management of rural users of the Group water supply has been significantly improved through various administrative measures such as optimizing the water meter reading method, strengthening the management of water 1.71 meter services, carrying out energy saving and consumption million people reduction, repairing and renovating pipeline networks, were new rural and expanding payment channels, which have laid a solid water users foundation for us to continue exploring the rural market. 21
Promoting Environmental Improvement How So Crystal Clear the Water We Pursue – The Vigorous Effort in Developing the Direct Drinking Water Business The development of the direct drinking water business with an aim to provide healthy and quality water for the general public represents a vital step to meet people’s pursuit of a better life in a new era, to lead a healthy lifestyle and to create a new point of growth for China Water, and is a strategic choice to align with the social development trend and the needs of the people as well as to demonstrate corporate value. Established a wholly- Established a joint Signed a cooperation Many of our owned head office venture, namely Jiangxi framework agreement subsidiaries have in Changsha City, Yinli Direct Drinking with Nanjing Aquacup formed their own Hunan Province for Equipment Co., Ltd., with Technology Co., distinctive models the direct drinking Japan’s ORIX and Toray Ltd., laying a solid for the development Group, and completed the water business, which construction of factory and foundation for further and operation of the fully enhanced our production lines, which development of the direct drinking water management level enabled automated and direct drinking water business, which are and market expansion large-scale production, market. widely recognized and capabilities. and the production of supported by local equipment products of governments and first-class quality. public. The Group has Direct drinking water The total accumulated Serving a population of established direct projects invested number of projects over drinking water during the reporting exceeded 40 232 800 1 companies in period cities projects projects millionpeople 22
China Water Affairs Group Limited 2021 Environmental, Social and Governance Report Eco-friendly Safe Water-saving Convenient Professional Economical Straight from Running Industrial-grade Over 90% Ready to drink, Operated by the tap, no disinfection equipment and of raw water no boiling a team of packaging cycle in closed centralised utilisation rate. needed. experts to erase needed. pipelines with management concerns. online quality to keep monitoring. maintenance costs low. Case: The Group has invested over RMB40 million in Gao'an City, Jiangxi Province, and has completed 117 direct drinking water projects for enterprises and institutions, including a 60% direct drinking water coverage rate for school campuses, benefiting more than 120,000 people. At the same time, 21 residential direct drinking water projects are being implemented, benefiting approximately 55,000 residents. Currently, Gao'an City ranks first in the province in terms of direct drinking water supply pervasion rate. Case: The Group has invested RMB29 million in the construction of direct drinking water projects in Xinyu City, Jiangxi Province, including 9 projects for school campuses, 7 projects for enterprises and institutions, and 5 projects for residential communities, benefiting more than 60,000 people. In addition, the Group has invested in the construction of 3 municipal public area drinking water facilities. Case: The Group has invested RMB35 million in Yongchuan District, Chongqing, and completed 18 piped direct drinking water projects for residential communities, benefiting 20,000 households; and 13 piped direct drinking water projects for enterprises and institutions, benefiting approximately 10,000 people. 23
Promoting Environmental Improvement Environmental Management System Throughout the Process I n o rd e r to re g u l a te t h e e nv i ro n m e n ta l a n d s o c i a l management of investment and construction projects, the Group has formulated the “Environmental and Social Management System” (the “ESMS”) in 2011. It was subjected to multiple revisions and the latest version was prepared in September 2020. ESMS provides that the investment and construction projects under the Group shall comply with the system for the purposes of comprehensive identification and analysis of any potential environmental and social risks and formulation of remedial measures. Disclosure of information, discussion about concerned areas and supervision from relevant stakeholders shall be duly conducted throughout the implementation of the projects. Meanwhile, the Group has established a standardised management system which combines five key elements: water production, water supply, safety, service and branding. The Group inspects and supervises the compliance of its subsidiaries with the relevant standards on an irregular basis. An evaluation is conducted every year, whereby reward or punishment is made based on the mar ks given. Environmental management covering the whole process from initiation to ultimate operation of a project is basically achieved. Relish in our Water, Rippling on the Glimmering Sunlight – Engaged in Urban Water Supply The Group has been deeply engaged in the urban water supply business for decades and has a professional operation team with rich experience. The Group provides safe and quality drinking water to thousands of households through excellent management, and a strong sense of responsibility and commitment, to protect people’s livelihood, boost the economy and serve the society. During the reporting period 1.463 Supply of purified water billion m3 Ensuring accessibilities to water for drinking and other 30 need for million people 24
China Water Affairs Group Limited 2021 Environmental, Social and Governance Report Let Water be the Protector of Our Field and Encircles our Green Earth – The Reduction of Environmental Impact of Wastewater Wastewater collection and treatment and resource ensure that the effluent quality is in compliance with utilization are the core components of urban the grade 1-A standard of the “Discharge Standard environmental infrastructure, and an impor tant of Pollutants for Municipal Wastewater Treatment foothold in fighting the hard battle against pollution. Plant” (GB18918-2002), and all wastewater treatment The Group continuously processes its wastewater projects are equipped with effluent monitoring effectively to minimize its environmental impact. systems to enable recording of effluent quality data in Meanwhile, the Group has upgraded its standards a timely and reliable manner. and modified its wastewater treatment plants to During the reporting period 192 Total processed sewage million m3 41,097 COD emissions reduced by tonnes 19,795 BOD emissions reduced by tonnes 35,737 Discharge of SS reduced by tonnes 4,660 NH3-N emissions reduced by tonnes 25
Promoting Environmental Improvement O u r D a p p l e d S h a d ow s H a n g i n g A s l a n t O ve r Clear Shallow Water – The Commencement of Comprehensive Remediation of Water Environment The comprehensive remediation of water environment water culture and water economy, with an aim plays an impor tant role in improving the living centred around enhancing people’s sense of access, environment of cities and towns, accelerating happiness and security, the Group is actively the construction of an ecological civilization and par ticipating in the comprehensive remediation promoting high-quality development. Starting from of urban water environment and extending the water resources, water ecology, water security, enterprise’s environmental value chain. Case: Comprehensive remediation of water environment project of Maozhou River in Shenzhen T h e r e m e d i a t i o n o f Ma o z h o u River has always been a major task for Shenzhen. Through a series o f e n g i n e e r i n g m e a s u re s t h a t eliminate the threat of flooding, cl e a n up r ive r d eb r i s, d re d g e riverbed sediment and improve wa t e r q u a l i t y, Ma o z h o u R ive r has once again become clear and beautiful for the world to see. The Group’s portion of the construction works includes two ecological water replenishment projects and four drainage pumping stations construction projects, mainly completing the laying of 31.4 km of water replenishment pipelines, the newly built of 38 exhaust chambers, 51 blow-off chambers, 50 valve chambers, 13 flow meter chambers, 13 flow regulating chambers, as well as the greening and lighting of roads within the project area. Case: Phase II of the comprehensive water and riverbank treatment campaign“Two Rivers and Fourteen Nullahs”in Hegang City Phase II of the comprehensive water and riverbank treatment campaign “Two Rivers and Fourteen Nullahs”in Hegang City mainly includes channel works, sediment dredging works, sewage interception and pipeline works, greening works, roads and bridges, wastewater treatment stations and landscape along the river. The Group is responsible for construction in the Xishan Nullah section, which is 6.6 km long and has the largest workload among the 13 tender projects. At present, the laying of 7,011 meters of wastewater pipelines, the preparation of 412,100 square meters of green area, the planting of 6,387 trees, the construction of 9 public toilets, 7 bridges and 1 wastewater treatment station, as well as the whole river dredging and the construction and maintenance of barges have been completed. 26
And Then We Encounter the Shade of a Willow, Bright China Water Affairs Group Limited 2021 Environmental, Social and Governance Report Flowers and a Lovely Village – The Commencement of Urban and Rural Drainage Operations Improving the living environment in urban and rural implement the concept of ecological civilization. The areas and building beautiful and liveable villages Group focuses on the issues relating to the urban are important initiatives to promote integration in and rural ecological environment, and vigorously urban and rural areas, to promote the harmonious commences drainage operations to protect our clear resonance bet ween towns and villages, and to waters and green mountains. Case: Urban and rural drainage integration PPP Project in Ninxiang City, Hunan Province The Group successfully won a tender for an urban and rural drainage integration PPP project in Ningxiang City in July 2020, which includes both urban and rural parts. The urban part consists the expansion and improvement of Ningxiang City Wastewater Treatment Plant, the new construction of Baimaqiao Wastewater Treatment Plant and the phase III construction of Dongcheng Wastewater Treatment Plant. The rural part consists the operation of 30 wastewater treatment plants and ancillary pipeline networks with an aggregate scale of 40,000 m3 per day and a pipeline network length of approximately 151 城市排水管網運維 km, and the upgrading and renovation of 26 wastewater treatment plants. Case: Domestic wastewater treatment facilities bundled PPP project in Luhe County, Guangdong Province T h e G r o u p's c o n s t r u c t i o n o f the bundled PPP project for domestic wastewater treatment facilities in Luhe County involves 8 towns and 253 natural villages, including 5 town-level wastewater treatment plants, 137 village-level wastewater treatment stations, w i t h a n a g g re ga t e t o w n - l e vel pipeline net work of 20.97 km and wastewater treatment scale of 14,900 m 3 per day, benefiting approximately 122,900 residents. 27
Operation and Maintenance of Urban Drainage Network Promoting Environmental Improvement Within the Group there are professional providers and management model for its urban rainwater and of operation and maintenance for urban drainage sewage pipeline network, which has continuously network. With our flexible mechanisms, efficient increased the operational efficiency of our drainage m a n a g e m e n t , c a p a bl e te a m s a n d ex te n s i ve pipeline network and significantly improved the urban experience, the Group has established a scientific landscape and water environment quality in the and systematic operation and maintenance system region. Together We Have the Autumn Water and the Skies on High – The Strengthening of Our Effort in Energy Saving and Emission Reduction The year 2021 has finally become a watershed for the and policies in the area of ecological civilization PRC to achieve “peak carbon emissions” and “carbon construction and carbon emissions, sparing no effort neutrality”, as President Xi Jinping has emphasized at to promote energy saving and emission reduction, the ninth meeting of the Central Financial and Economic and actively transforming to a green and sustainable Affairs Commission that “peak carbon emissions and growth model. Through the publication of the “Green carbon neutrality should be incorporated into the overall Operation Proposal for China Water Group”, we have layout of building an ecological civilization, and we comprehensively elaborated and analysed the grave should put forth a spirit of perseverance in achieving difficulties in energy use and carbon emission in the the goals of peaking carbon emissions by 2030 and domestic and global water industries, and introduced achieving carbon neutrality by 2060.” the green operation concepts of “economical production”, “clean production” and “ethical production”, under As a public utility company, the Group has always been which the Group fully supervises all companies within a pioneer in low-carbon footprint, upholding the business the Group to carry out energy saving and emission philosophy of “Water-oriented, Kindness to Society”, reduction practices. firmly supporting the PRC government’s strategies During the reporting period, there was no significant environmental pollution incidents occurred within the Group. Economical Clean Ethical production production production Continuous application Improve resource of the environmental Emphasise the contribution utilisation efficiency protection strategy of of the production process and reduce energy and integrated prevention to the people, environment material consumption. to o u r p ro d u c t i o n and society. processes and services to eliminate pollutants before their generation. 28
China Water Affairs Group Limited 2021 Environmental, Social and Governance Report Emissions The major pollutants emitted during production and operation of the Group are divided into two categories: The first category represents the sludge The second category represents the waste produced during the water production gases, sludge and treated discharge process at the filtered water plant, the key produced during sewage treatment at components of which are the dissolved sewage plant. Waste gases are CO2, H2S and substances in the natural body of water NH3 produced in the course of bioprocessing; and the water purifiers added during the sludge mainly includes silt, garbage and purification process. excess activated sludge; major pollutants in treated discharge are COD, SS and NH3-N. The Group has in place a comprehensive set of management processes and operational procedures for general emissions that have smaller impacts on the environment under its operation and management standards, covering identification, discharge, disposal and regulation of emissions to ensure compliant emission. Hazardous emissions produced by industrial sewage treatment plants are dealt with by qualified professional companies. Emission categories and emission data (A1.1) Total volume of Total volume emission during of emission in Category Emission Emission method Compliance with applicable laws and regulations the reporting the last year period (tonnes) (tonnes) Naturally dissolved Water supply Sludge substances and 180,296 165,442 Compliant emission water purifiers “Environmental Protection Law of the People’s Below Below Republic of China” H2S emission emission Compliant emission limit limit “Environmental Impact Assessment Law of the Air emission Below Below People’s Republic of China” NH3 emission emission Compliant emission “Water Pollution Prevention and Control Law of the limit limit People’s Republic of China” 3,928 4,533 COD Compliant emission “Atmospheric Pollution Prevention and Control Law of the People’s Republic of China” “Law of the People’s Republic of China on the Preven- 1,519 2,224 Treated SS Compliant emission tion and Control of Environmental Pollution by Solid discharge Sewage Waste” treatment 200 301 “Ambient Air Quality Standards” NH3-N Compliant emission “Environmental Quality Standards for Surface Water” Sludge from domestic sewage “Environmental Quality Standards for Underground treatment plants is used for Water Emission” reclamation and electricity Silt, garbage and generation after dehydration and “Standards for Odour Pollutants” Sludge excess activated 73,704 60,710 desiccation; and sludge from “Pollutants Emission Standards of Urban Sewage sludge industrial sewage treatment Water Treatment Plant” plants is dealt with by qualified professional companies after dehydration and desiccation 29
Promoting Environmental Improvement Greenhouse gas (“GHG”) emission (A1.2) GHG directly produced by the Group in the course of mainly attributed to power consumption in the course of production and operation is very limited. It is mainly production. The direct and indirect GHG emissions are produced from fuel used in production and office calculated in CO2 equivalent (unit: tonnes). premises; while the indirect generation of GHG is Scope 1 – Scope 2 – Scope 3 – Category Direct GHG Indirect GHG Other indirect Total amount emissions emissions GHG emissions Water supply 1,749 320,546 N/A 322,295 business Sewage treatment 31 52,764 N/A 52,795 business Total 1,780 373,310 375,090 * The definition of GHG Indicator Scope is cited from United Nation’s Kyoto Protocol and The Greenhouse Gas Protocol – A Corporate Accounting and Reporting Standard of WRI and WBCSD. Scope 1: Direct GHG emissions which are derived from sources that are owned or controlled by the corporation (including those produced in the course of production process and those produced in fuel consumption). Scope 2: Indirect GHG emissions which result from the electricity, heating, cooling and steam purchased from other entities for self-consumption (produced from purchased electricity). Scope 3: Other indirect GHG emissions which are produced as a result of the activities of the entity but the emissions are not derived from sources owned or controlled by the corporation. The Group has not established any statistical method for scope 3. Emission factor and global warming potential (“GWP”) are based on United Nation’s Inter-governmental Panel on Climate Change (“IPCC”) data. Hazardous wastes (A1.3/A1.6) Non-hazardous wastes (A1.4/A1.6) The hazardous wastes produced in the course of The non-hazardous wastes produced in the course of operation of the Group are mainly sludge produced operation of the Group are mainly sludge produced in in our industrial sewage treatment plants. During the filtered water plants and domestic sewage treatment reporting period, total sludge produced was amounted plants. During the reporting period, total sludge to 4,988 tonnes, all of which were properly dealt with produced was amounted to 254,001 tonnes. Treated by qualified professional companies. sludge, which met with the emission standards, was dealt with by the local environmental hygiene departments after dehydration and desiccation. Major processing methods include reclamation, compost or combustion for electricity generation. 30
China Water Affairs Group Limited 2021 Environmental, Social and Governance Report Energy saving and consumption reduction (A1.5) Given the characteristics of the industry, filtered external experts together with professional third water plants and wastewater treatment plants usually party institutions led by the headquarter, to conduct carry out advance construction activities beyond a in-depth research and analysis on the operation certain degree, while the rate of equipment upgrade of pumping stations, net work scheduling and is relatively low, which means that there may be pipeline leakages of the water plants of the Group’s a deviation from the actual demand during the companies, with an aim to fully explore opportunities operation of water plants. In addition, water leakage for energy saving, scientifically develop leakage and loss during the transmission process has always control measures, formulate, organize and implement been a problem for the water supply industry. The feasible and practicable proposals for energy saving Group has incorporated energy consumption and and consumption reduction according to the actual leakage control indicators into its performance situation, and effectively reduce production costs. assessment system, and has organized internal and During the reporting period Energy consumption of the water supply Increased as compared with last year business accounted for the cost of 16.36 15.64 by production with % % Energy consumption of the wastewater Decreased as compared with last year treatment business accounted for the 19.02 21.60 by cost of production with % % All of the energy used by the Group is indirect energy (A2.1) Unit power consumption Fuel consumption Category Power consumption (MWh) (kW-h/’000 m3) (tonnes) Water supply business 408,339 237 551 Sewage treatment 67,215 351 9 business Total 475,554 N/A 560 Total energy consumption (converted from power consumption and fuel consumption) is 1,712,324 GJ During the reporting period, the average leakage ratio of the Group’s water supply business was 15.05%, lower than the average leakage ratio of 23.22% of the industry; the average power consumption per unit water supply of the Group was 237 kW-h/’000 m3, lower than the average power consumption per unit water supply of 300 kW- h/’000 m3 of the industry (A2.3). 31
Promoting Environmental Improvement Develop clean energy Compared with traditional energy sources, solar distributed photovoltaic power generation to enhance energy is an inexhaustible renewable energy source the utilization rate of clean energy. During the with the advantages of complete cleanliness, absolute reporting period, the Group provided 52,669 MWh of safety, relative extensiveness, resource abundancy clean energy, accounting for approximately 11% of and economical potential, and plays an important total power consumption; as of 31 March 2021, the role in low-carbon strategy. The Group makes full total installed capacity of the Group’s photovoltaic use of the space and light conditions of its filtered projects has reached 67 MW, providing approximately water plants and wastewater treatment plants, and 15.4% of total power consumption under full load encourages the Group’s companies to implement operating conditions. Implementation of water conservation and water source protection The Group’s principal business is water supply and wastewater treatment, while it does not have any issue in sourcing water that is fit for purpose, but it has always been an advocate and practitioner of water conservation and efficiency (A2.4). During the reporting period, the Group’s total water intake was 1,769.25 million tonnes, total water supplied was 1,721.9 million tonnes, and total water consumption was 47.35 million tonnes, representing a water consumption ratio of 2.68% per unit (A2.2). 32
You can also read