Business Plan for The Lower Deschutes Wild & Scenic River 2021 - Bureau of Land ...

Page created by Stanley Stevens
 
CONTINUE READING
Business Plan for The Lower Deschutes Wild & Scenic River 2021 - Bureau of Land ...
BLM
           Business Plan for
The Lower Deschutes Wild & Scenic River
                 2021
Business Plan for The Lower Deschutes Wild & Scenic River 2021 - Bureau of Land ...
REVIEWS, RECOMMENDATIONS, APPROVALS
Developed by: Dru Johnson- Outdoor Recreation Planner, Heidi Mottl- Outdoor Recreation Planner,
Anna Smith- Hydrologist, Cecilia Marella – Outdoor Recreation Planner, and Michael Millay – Outdoor
Recreation Planner

Recommended by:

Kyle Hensley, Assistant Field Manager                                Date

Reviewed By:

Jeff Kitchens, Deschutes Field Manager                               Date

Approved By:

Dennis Teitzel, Prineville District Manager                          Date

This business plan was prepared pursuant to the Federal Lands Recreation Enhancement Act (Public Law
108-447) and BLM recreation fee program policy. It establishes future management goals and priorities
for the Lower Deschutes River recreation fee program in the Prineville District Office.

                                                                                          2|Page
Business Plan for The Lower Deschutes Wild & Scenic River 2021 - Bureau of Land ...
United States Department of the Interior
                               BUREAU OF LAND MANAGEMENT
                                      Deschutes Field Office
                                        3050 NE 3rd Street
                                      Prineville, OR 977545
                        https://www.blm.gov/office/prineville-district-office

In Reply Refer to:
2932 ()

Dear Reader,

I would like to present for your review and comment the 2021 Amended Business Plan for the Lower
Deschutes Wild & Scenic River. The Bureau of Land Management, Deschutes Field Office (BLM)
manages river use permitting on the Lower Deschutes Wild & Scenic River (LDR). The LDR annually
provides hundreds of thousands of visitors with outstanding recreational opportunities on their public
lands. Of these visitors, a significant percentage are passengers on commercial river trips.

The Business Plan for the Lower Deschutes Wild & Scenic River was originally presented for public
comment and review from 2015-2017 at number of public meetings. The plan was also presented to the
John Day/Snake Resource Advisory Council (RAC) for review and the panel approved the BLM moving
forward with a formal public process to get input on the propose fee changes. After incorporating public
comments, a final Business Plan will be presented to the RAC.

Since beginning this process in 2015 the BLM determined that Recreation.gov was the best and most
feasible option for Lower Deschutes online permitting system. This transition did not change permit
availability and allocation (common pool) or refund policies. To allow for that transition and
implementation, the BLM put on hold any further proposed changes to the Lower Deschutes Fee
Structure. After allowing the new system to be implemented and several issues resolved, the BLM now
feels it is the right time to continue moving forward with its proposed changes to the fee program.

The primary goals of the Draft Business Plan for the Lower Deschutes Wild & Scenic River are to
provide:
    • An overview of the current fee program including how funds are spent; and
    • Proposed changes in fee structures charged in the LDR corridor.
The public comment period is established to give you the opportunity to submit comments on the
proposed changes. Comments may be mailed to BLM, Deschutes Field Office, 3050 NE 3rd Street
Prineville, OR 977545 or to BLM_OR_PR_LDR@blm.gov (please put “Draft Lower Deschutes
Business Plan” in subject line). Comments are due by August 13th, 2021. Thank you for your interest in
your public lands.

                                                        Sincerely,

                                                        Jeff Kitchens
                                                        Deschutes Field Manager

                                                                                              3|Page
Business Plan for The Lower Deschutes Wild & Scenic River 2021 - Bureau of Land ...
Contents
A. Executive Summary ................................................................................................................................. 7
B. Authorities ................................................................................................................................................ 8
   B.1         The Federal Land Policy and Management Act of 1976 ............................................................... 8
   B.2         The Federal Lands Recreation Enhancement Act of 2004 ............................................................ 8
   B.3         Code of Federal Regulations, Title 43, Part 2930 (43 CFR 2930), ................................................. 9
   B.4         BLM Recreation Permit Administration Handbook (H-2930-1) .................................................... 9
   B.5         1988 Omnibus Oregon Wild and Scenic Rivers Act of 1988 ......................................................... 9
   B.5         1993 Lower Deschutes Wild & Scenic River Management Plan .................................................. 9
C. Background ........................................................................................................................................... 10
   C.1         Area Description ......................................................................................................................... 10
       C.1.1          Segment 1 ........................................................................................................................... 11
       C.1.2          Segment 2 ........................................................................................................................... 11
       C.1.3          Segment 3A and 3B ............................................................................................................. 11
       C.1.4          Segment 4 ........................................................................................................................... 12
   C.2         Visitor Demographics .................................................................................................................. 13
   C.3         Recreation Site Descriptions ....................................................................................................... 13
       C.3.1          Segment 1 Sites ................................................................................................................... 13
       C.3.2          Segment 2 Sites ................................................................................................................... 13
       C.3.3          Segment 3 Sites ................................................................................................................... 13
       C.3.4          Segment 4 Sites ................................................................................................................... 13
       C.3.5          Sites Adjacent to the wild and scenic river corridor ........................................................... 14
   C.4         Operating Costs........................................................................................................................... 14
       Contracts and Services ........................................................................................................................ 14
       Supplies, Equipment, and Vehicles (Including Heavy Equipment) ..................................................... 14
       Miscellaneous Operations .................................................................................................................. 14
       Overhead and Indirect Expenses ........................................................................................................ 15
       Oregon Parks and Recreation Department (OPRD) boater pass & BLM ISRP fees ............................. 15
   C.5         Recreation Use ............................................................................................................................ 15
       Segment 1: .......................................................................................................................................... 16
       Segment 2: .......................................................................................................................................... 16

                                                                                                                                                4|Page
Business Plan for The Lower Deschutes Wild & Scenic River 2021 - Bureau of Land ...
Segment 3: .......................................................................................................................................... 16
      Segment 4: .......................................................................................................................................... 17
D. Current Fee Program & Revenues ......................................................................................................... 18
   D.1       Existing Fees ................................................................................................................................ 18
      BLM Special Recreation Permit (SRP) Fees ......................................................................................... 19
      BLM Standard amenity fees (campgrounds)....................................................................................... 19
   D.2       Fee Revenues .............................................................................................................................. 19
   D.3       Use and Spending of Fees Collected ........................................................................................... 20
   D.4       Compliance, Enforcement, and Fee Collections ......................................................................... 20
E. Fee Amendments & Proposals ............................................................................................................... 20
   E.1       Summary of Fees Being Amended .............................................................................................. 20
   E.2       Summary of Fees Being Proposed .............................................................................................. 21
   E.2       Comparable Fees......................................................................................................................... 21
      Comparability with other agencies and similar Special Areas ............................................................ 22
      Fairness and Equality among Users .................................................................................................... 22
   E.3       Financial Analysis – Revenues, Costs, and Use of Fees ............................................................... 22
      Proposed Changes to the Individual Special Recreation Permit Fees ................................................ 22
      Proposed Campground Fee for Segments 1 and 4 ............................................................................. 23
   E.4       Impact of Fee Changes ................................................................................................................ 23
      Costs related to the Deschutes River Management Area ................................................................... 23
      Effects of the Proposed Fee Change on Users .................................................................................... 24
      Effects of the Proposed Fee Change on Low-Income Populations ..................................................... 24
      Effects of the Proposed Fee Change on Local Communities .............................................................. 24
F. Outreach 25
   F.1       Public and Stakeholder Participation .......................................................................................... 25
   F.2      Public Comments – This section will be completed once the public comment period closes and
   all responses can be summarized. .......................................................................................................... 25
   F.3        Visitor Feedback Mechanisms.................................................................................................... 25
Appendix 1: Summary of Lower Deschutes Recreation Sites .................................................................... 27
   Segment 1 – Above Warm Springs to Harpham Flat ................................. Error! Bookmark not defined.
   Segment 2 – Harpham Flat to Sandy Beach ............................................... Error! Bookmark not defined.

                                                                                                                                             5|Page
Business Plan for The Lower Deschutes Wild & Scenic River 2021 - Bureau of Land ...
Segment 3A – Buckhollow to Pine Tree ..................................................... Error! Bookmark not defined.
  Segment 3 B – Pine Tree to Macks Canyon ............................................... Error! Bookmark not defined.
  Segment 4 – Macks Canyon to Heritage Landing (blue indicates state).... Error! Bookmark not defined.
Appendix 2: Communications Plan ............................................................... Error! Bookmark not defined.

                                                                                                               6|Page
Business Plan for The Lower Deschutes Wild & Scenic River 2021 - Bureau of Land ...
A. Executive Summary
This Business Plan has been prepared by the Bureau of Land Management, Deschutes Field Office
(BLM) to inform the managing agencies of the Lower Deschutes Wild & Scenic River (LDR) as well as
all other interested stakeholders, of the following:

    •   An overview of the current fee program including how funds are spent;
    •   Proposed changes in fee structures charged in the LDR corridor; and
    •   A comparison of fees on the LDR (current and proposed) with other similar rivers/recreational
        features in the geographic area.

Currently, the BLM collects special recreation permit fees (SRPs) campground fees (group and individual
site use), and individual special recreation permit (ISRP) fees, often referred to as boater passes, for use of
the LDR special use area. Per the BLM’s 2930 Handbook: ISRPs may be required for individual (i.e.,
private, noncommercial) recreation use in Special Areas. Special Areas are defined as areas officially
designated by statute, Presidential decree, or Secretarial order and include components of the National
Trails System; the National Wild and Scenic Rivers System; the National Wilderness Preservation
System; national conservation areas, national monuments, or national recreation areas; an area covered
by joint agreement between the BLM and a state government, as provided for in Title II of the Sikes Act
(16 U.S.C. 670a et seq.); or any area where the AO determines that resources need to be protected by
special management and control measures and that a permit system for individual use would achieve
management objectives.

The BLM conducted numerous analysis of historical data including river use levels, fee collection
amounts, and costs associated with managing the LDR to complete this plan. Coordination with the John
Day – Snake Resource Advisory Council (RAC) as well as the LDR Managers Group in addition to the
public, with targeted communications toward river users, was completed. Proposed amendments and
changes to existing fee structures for which the BLM sought concurrence from the RAC included the
following:

    1. Amend the current ISRP fee which is
             a. Memorial Day to Labor Day: $8.00 ($6.00 BLM & $2.00 Oregon Parks and Recreation
                  Department OPRD) per person per day on Saturdays and $2.00 ($0.00 BLM & $2.00
                  OPRD) per person per day Monday through Friday
             b. Labor Day to Memorial Day: $2.00 ($0.00 BLM & $2.00 OPRD) per person per day
                  seven days a week
        to a flat fee of $5.00 ($3.00 BLM & $2.00 OPRD) per person per day for floating any portion of
        the river, 365 days a year; and

    2. Implement a new $5.00 per person per night camping fee in Segments 1 and 4 of the LDR on
        BLM managed public lands, where no vehicle access is present. The $5.00 per person per night
        camping fee would not be required for the following:
           a. Visitors who have already purchased a boater pass; and
           b. Visitors staying in developed camping sites that already require a fee.
                                                                                                   7|Page
For purposes of this analysis the BLM focuses on boating use, hike-in camping use, bike-in camping use,
and similar activities associated with fee collection. No other changes are proposed for fees on the LDR at
this time.

B. Authorities
This Business Plan has been prepared to meet the criteria defined in the Federal Lands Recreation
Enhancement Act, 2004 (FLREA) as well as the BLM’s H-2930-1 Recreation Permit and Fee
Administration Handbook. Through the authority of FLREA the BLM can collect expanded and/or
standard amenity recreation fees for use of certain areas, as well as SRP fees. Through these authorities,
fees collected are retained at the local level to directly support the areas from which they are collected.
Both FLREA and BLM guidance require that each fee program have a business plan which thoroughly
discusses proposals for new or adjusted fees and explains how fees are consistent with the criteria set
forth in the Act. Business plans are meant to assist management in determining the appropriateness and
level of fees, cost of administering fee programs, outline how fees will be used, and provide a structured
communication and marketing plan. The primary purpose of the plan is to serve as public notification of
the objectives for use of recreation fee revenues and to provide the public an opportunity to comment on
these objectives.

Certain Treaties, Federal laws, and Executive Orders give special and unique standing to Native
American Tribes. Tribes in this fee area include the Confederated Tribes of the Warm Springs
Reservation of Oregon (CTWS) who are identified in the enabling 1988 Legislation as one of the three
managing entities of the LDR. The CTWS is an active partner in management planning and monitoring of
the LDR. The Confederated Tribes of the Umatilla Indian Reservation, The Klamath Tribes, and the
Burns Paiute Tribe as well as all Pacific Northwest Tribes with ties to the Columbia River Watershed,
have an interest in this area. All have recognized traditional uses established on and/or near the LDR. For
these reasons, government-to-government consultation will continue with all tribes to create effective
collaboration and informed federal decision making.

B.1     The Federal Land Policy and Management Act of 1976 (Public Law 94-579), contains
BLM’s general land use management authority over the public lands, and establishes outdoor recreation
as one of the principal uses of those lands. Section 302 (b) of FLPMA authorizes the BLM to manage the
use of the public lands through permits.

B.2     The Federal Lands Recreation Enhancement Act of 2004 (Public Law 108-447),
repealed applicable portions of the Land and Water Conservation Fund Act and replaced BLM’s authority
to collect recreational fees. This law authorizes BLM to collect recreation fees at sites that meet certain
requirements, allows BLM to keep the fee revenues at the local offices where they are collected, and
directs how BLM will manage and utilize these revenues. Section 803 contains BLM’s authority to issue
permits and charge a permit fee for use of the LDR. Section 803 (h) authorizes the BLM to require SRPs
and fees associated with specialized recreation uses of federal lands and waters, such as group activities,
recreation events, and motorized recreational vehicle use. FLREA was enacted in October 2004 with a
ten-year sunset provision. Starting with the Consolidated Appropriations Act of 2014, Congress has
                                                                                                 8|Page
provided extensions, most recently the “Consolidated Appropriations Act, 2021” which extends FLREA
through October 1, 2022

B.3     Code of Federal Regulations, Title 43, Part 2930 (43 CFR 2930), contains the
regulations governing BLM’s recreation permitting programs. 43 CFR, Subpart 2932.11(b) contains
BLM’s authority to issue permits for use of the LDR. It states that, “If BLM determines that it is
necessary, based on planning decisions, resource concerns, potential user conflicts, or public health and
safety, we may require you to obtain a Special Recreation Permit for – (1) Recreational use of special
areas.” A “special area” is where the BLM determines that the resources require special management and
control measures for their protection. Permits for the LDR protect primitive recreation experiences,
riparian ecosystems, and cultural and historic resources.

B.4    BLM Recreation Permit Administration Handbook (H-2930-1),
Explains how the BLM implements its recreation permit and fee program. Chapter 1, page 1-26,
sections (e) and (f) specifically address ISRPs for Special Areas and application fees for SRPs.

B.5     1988 Omnibus Oregon Wild and Scenic Rivers Act of 1988
"( ) DESCHUTES, OREGON.—Those portions as follows: "(E) the 100-mile segment from the
Pelton Reregulating Dam to its confluence with the Columbia River as a recreational river; to be
administered by the Secretary of the Interior through a cooperative management agreement between the
Confederated Tribes of the Warm Springs Reservation, and the State of Oregon as provided in section
10(e) of this Act and section 105 of the Omnibus Oregon Wild and Scenic Rivers Act of 1988.

B.5     1993 Lower Deschutes Wild & Scenic River Management Plan
(p.76) states, “User fees will be collected for use of the Deschutes River where the collection of the fee is
cost effective and administratively feasible. This will include site specific access points, overnight
camping, and parking in developed or designated sites or areas, as well as boating use.

B.6     1997 Supplement to the Lower Deschutes Wild & Scenic River Management Plan
“A Federal use authorization fee for use of BLM lands and related waters within the Lower Deschutes
Wild and Scenic River has been established under the Federal Pilot Fee Program. This fee has initially
been incorporated into the non-permit measures to target weekend boating use during the peak use season.
The fee may be modified to apply during any period and for any type of use. All fees collected under this
program will be used to offset costs associated with visitor contact, maintenance, and law enforcement on
the Lower Deschutes River.”

                                                                                                   9|Page
C. Background

C.1     Area Description
This Business Plan focuses on the lower 100 miles of the Deschutes River in north central Oregon, from
the Pelton Reregulating Dam to the confluence with the Columbia River. This section of river and the
adjacent 41,467 acres constitute the federally designated Wild & Scenic River corridor and lies entirely
within the boundary of the Prineville District BLM.

The LDR was designated by the Oregon
Legislature as a State Scenic Waterway in
1970. In 1988, Congress declared the lower
100 miles of the Deschutes River as a
component of the National Wild and Scenic
River (WSR) System. WSRs are assigned one
or more classifications: wild, scenic, or
recreational. These classifications are based on
the developmental character of the river on the
date of designation. The LDR was classified as
a recreational river. Current management
direction for fee collection is summarized in the
LDR Management Plan (January 1993), the
Supplement to the LDR Management Plan
(June 1997), and the December 2004
Settlement Agreement.

The LDR is managed cooperatively by the
Bureau of Land Management, the State of
Oregon and the Confederated Tribes of the
Warm Springs Reservation. Several state
agencies including Oregon Parks and
Recreation Department (OPRD), Oregon
Department of Fish and Wildlife (ODF&W),
Oregon State Marine Board, and Oregon State
Police participate in management on behalf of
the State of Oregon. Other agencies including
the Bureau of Indian Affairs and local
                                                 Figure 1: Segment Map of the LDWSR
governments (with a shared representative for
Wasco, Sherman, and Jefferson counties and
the cities of Maupin, The Dalles, and Madras) play a role as partners or are responsible for specific
programs and offer recommendations to the managing agencies. The managing agencies are provided
recommendations by the Interagency Implementation Team (IIT) composed of field representatives of
state, tribal, local and federal agencies.

                                                                                             10 | P a g e
The river has been divided into four segments based on geographical features, public road access and
recreational use patterns. Each segment is managed for unique recreational opportunities and resource
protection. Figure 1 is a map of the various segments on the LDR.

C.1.1 Segment 1
Segment 1 extends from Pelton Reregulating Dam to the boat
ramp at Harpham Flat, for a total of 44 miles. The 12-mile
section from Pelton Reregulating Dam to Trout Creek offers
both vehicular and hiking trail access. Except for the
community of Warm Springs, the river canyon appears
natural in character. This portion of the river offers
outstanding fishing. Boating opportunities are restricted to
non-motorized craft. A person visiting the area can generally
expect to encounter low to moderate numbers of people.
Recreational use is highest in May and June when hundreds
of anglers arrive to fish during the salmon fly hatch. The 32- Figure 2: Boaters on Segment 1
mile section from Trout Creek to Harpham Flat is accessible
to the public primarily by boat. While this portion of the river is paralleled by the railroad, it is still
relatively remote and natural in character. It is managed primarily to maintain or enhance the high-
quality trout fishery and non-motorized boating opportunities (LDRMP, p.26). Occasional encounters
with other users occur. Day use and overnight camping occur.

C.1.2 Segment 2
Segment 2 is the 12-mile section from Harpham Flat
to Sherars Falls. The river is accessible by a paved or
graveled road along the east side of the river for the
entire length of the segment. The railroad also
parallels the river. The community of Maupin is
located in the middle of the segment. While the area
still possesses high scenic quality, it is the most
developed and highly used section of the LDR. This
river segment is used primarily for day use by            Figure 3: Rafters on Segment 2
whitewater boaters during the summer and by anglers
at other times of the year. Several challenging rapids and easy access make this area extremely popular
with whitewater enthusiasts. Visitor use is highest on summer weekends and weekday and off-season use
(mid-October to mid-May) is generally more moderate. is managed for relatively high levels of non-
motorized whitewater boating day use as well as trout and steelhead fishing. Management is focused on
achieving a higher level of environmental and social ethics. Management actions will emphasize resource
protection, public health and safety, and reduction of user conflicts (LDRMP, p.27).

C.1.3 Segment 3A and 3B
The 20-mile river Segment 3 from Sherars Falls to Macks Canyon is divided into Segments 3A and 3B. It
is paralleled by a gravel road on one side and a railroad on the other throughout its length. Except for the

                                                                                                  11 | P a g e
road, railroad and a few developed and semi-developed campgrounds, the area is essentially natural
appearing. Motorized boats are allowed in both Segment 3A and Segment 3B from October 1 through
June 15. It is managed primarily to provide moderate levels of dispersed use by boaters, anglers and
overnight campers with vehicles (LDRMP, p.27). Segment 3 was divided into Segment 3A and 3B to
allow access to the river for both extended trip boaters and traditional boaters (Segment 3 Limited Entry
Adjustment Environmental Assessment (EA), p. 12). The EA was signed in 2016 and implemented in
2019.

C.1.3a Segment 3A – Buckhollow to Pine Tree
Segment 3A is a four-mile stretch from Buckhollow
to Pine Tree which offers a short scenic float
without rapids, for those with less experience or
short on time. Segment 2 boaters desiring to add a
few extra miles onto their trip can hire a shuttle
around Sherars Falls and continue into Segment 3A
ending their trip at Pine Tree.

C.1.3b Segment 3B – Pine Tree to Macks Canyon
Steelhead fishing is popular in this segment, as are
                                                        Figure 4. Boaters Preparing to Launch
multi-day boating trips that continue into Segment
4. The 15-mile stretch from Pine Tree to Macks
Canyon offers a scenic float without rapids, for those with less experience.

C.1.4 Segment 4
Segment 4 extends 24 miles from Macks Canyon
downstream to the confluence of the LDR with the
Columbia River. The railroad parallels the river throughout
its length. Public access is available by boat, foot, and
bicycle. The character of the canyon is natural appearing
and relatively remote. This segment is popular for fall
steelhead fishing with lesser amounts of whitewater
boating and other angling opportunities. Motorized boats
may use this segment of river year-round, except for every
other Thursday-Sunday from mid-June through September.
Use levels are generally low to moderate except during the Figure 5, Jet Boat on the Lower Deschutes
late summer/fall steelhead fishing season when high
numbers of anglers result in days with no additional ISRP’s available. It is managed primarily for fishing
and will provide access for motorized and non-motorized boats, with opportunities for hiking, mountain
bike and horseback riding. Management direction is toward dispersed recreational opportunities.
Management actions will reduce social conflicts among users (LDRMP, p.27).

                                                                                                12 | P a g e
C.2    Visitor Demographics
Boating use on the LDR varies by river segment and by season. The primary attractions for boaters are
whitewater boating, fishing, and boat-in camping. With over 100 miles of river and numerous access
points, there are opportunities for both day and multi-day trips. Additionally, a growing number of
visitors are accessing Segments 1 and 4 by foot and bicycle for camping and fishing.

The BLM compiled demographic data from a representative sample of 2014 trip leaders. The data
showed that 40% of trip leaders came from Multnomah, Clackamas and Washington counties in Oregon;
24% of trip leaders came from central Oregon counties (including Wasco, Jefferson, Deschutes and
Crook); 21% from other Oregon counties; and 15% from Washington State. The average group size in
2014 was 8.7 in Segment 2 and 6.1 on the river.

In conversations with boaters, BLM and State Parks staff report most users indicate an understanding of
the need to fund the care of the river and a willingness to contribute some amount of money to these
efforts in the form of a boating fee (ISRP). Boaters expect BLM to reinvest fee income in the special
areas where the fees are collected. This business plan directs BLM to spend income from fees in the LDR
Corridor where they were generated and/or collected.

C.3    Recreation Site Descriptions
The following is a summary of the various recreation sites found along the LDR and managed by
the BLM. For a more detailed description see Appendix 1,

C.3.1 Segment 1 Sites
In Segment 1, one boat ramp and four developed campgrounds are managed by BLM. Warm Springs
boat ramp and day use area is owned by ODF&W, leased by OPRD, and co-managed by OPRD and
BLM.

C.3.2 Segment 2 Sites
Two boat ramps, 6 developed campgrounds and five-day use areas are managed by BLM. Boat ramps,
campgrounds, and facilities at Harpham Flat, White River, and Sandy Beach are on property owned by
the Confederated Tribes of Warm Springs and managed cooperatively with the BLM. The boat ramp and
campground at Maupin City Park is owned and managed by the City of Maupin.

C.3.3 Segment 3 Sites
Multiple developed recreation sites including three boat ramps, five developed campgrounds and three-
day use areas managed by the BLM. The boat ramp at Macks Canyon marks the boundary between
Segments 3 and 4.

C.3.4 Segment 4 Sites
Deschutes State Park and Heritage Landing, owned and managed by OPRD, includes a boat ramp,
developed campground, and day use area at the downstream end of the segment at the confluence of the
Columbia River.

                                                                                           13 | P a g e
C.3.5 Sites Adjacent to the wild and scenic river corridor
The Criterion Allotment and Management Area to the east of the LDR is regularly used for hiking and is
also a popular hunting area.

C.4     Operating Costs
Operating costs on the LDR are funded by a combination of congressionally allocated funds, BLM ISRP
fees, State boater pass fees, commercial SRP fees, and campground fees. In 2011 allocated funds
decreased while operating costs continued to rise due to inflation. In response, river management was
consolidated, several full-time positions were eliminated, and labor/operations were thinned down
significantly. Current staffing levels are down approximately 50% compared to previous years. Services
remain consistent in high use areas, but overall services are not as widely dispersed on the river. An
average of 16 seasonal and permanent recreation staff, 3-4 management, and numerous (over 15) resource
specialists support operations on the river either full or part time. Recreation staff include the River
Manager, a permanent River Ranger, one Maintenance Lead, and five seasonal and student staff that are
temporary/seasonal. The average cost of labor support ranges from $500,000 to $600,000 annually.

Contracts and Services
Each year contracts are awarded for a variety of services including toilet pumping, trash pick-up,
and other miscellaneous facility and site maintenance needs. The average total cost for these
contracts ranges from $70,000 to $80,000.

Supplies, Equipment, and Vehicles (Including Heavy Equipment)
Boats, trucks, trailers, mowers, graders and dump trucks, are required for annual operations on
the river. Supplies include disinfectants, bleach, air fresheners, pressure washers, hand tools, and
personal protective equipment (PPE). The total annual cost of supplies and equipment (including
vehicles) ranges from $50,000 to $70,000.

Miscellaneous Operations
All other operational costs associated with the river including labor support, miscellaneous
expenses, road management, etc. ranges from $40,000 to $50,000 each year.

        Table 1 – Average Annual Costs Associated with Managing the LDR

  Operations                                                                           Expense
                                                                                   $500,000 to
  Personnel and Labor                                                                 $600,000
  Contracts and Services                                                       70,000 to 80,000
  Supplies, Equipment, and Vehicles                                           $50,000 to 70,000
  Site and Facility Replacement                                                 $50,000-60,000
  Miscellaneous Operations                                                   $40,000 to $50,000
                                                                                   $730,000 to
  Total Annual Average Operating Costs                                                $760,000

                                                                                            14 | P a g e
Figure 6. Summary of Costs to Manage the LDR Annually from Table 1.

                                                                              Labor
                                                                              Contracts
                                                                              Equipment & Vehicles
                                                                              Misc. Operations

Overhead and Indirect Expenses
Income from fees and congressionally allocated funds are assessed overhead charges and contribute to
support the Prineville District, which in turn supports the river program. Congressionally allocated funds
contribute up to 20% in indirect costs. Overhead costs include a portion of the costs of office equipment,
space rental, telephone services, postage, personnel transfer costs, administrative and clerical support,
front desk staffing, training, safety, public information, cartography, basic series mapping, aviation
management, telecommunications, equipment maintenance, and systems design and implementation.
Administrative and supervisory staff provides safety training, computer support and human resources
assistance. Overhead costs do not include costs directly attributed to providing a specific service or
executing a specific project such as a campground rehabilitation projects (those are considered under
‘Personnel and Labor’).

Oregon Parks and Recreation Department (OPRD) boater pass & BLM ISRP fees
OPRD currently receives a boater pass fee of $2 per person per day year-round. This fee applies to all
users whether commercial or non-commercial. The BLM currently collects $6 per person per day for an
ISRP within the river corridor on Saturdays and Sundays between Memorial Day and Labor Day. This
fee applies to all users whether commercial or non-commercial.

C.5     Recreation Use
BLM examined visitor use levels in the 1993 LDR Management Plan and Environmental Impact
Statement along with the Supplement to the LDR Management Plan (Supplement). The Plan and later
supplements set seasonal (May 15 through September 15 in Segment 1, 2 and 3 and May 15 through
October 15 in Segment 4) and daily targets for all four segments based on 1990 seasonal levels.

Figure 7 below shows the number of boater days recorded per year in each Segment over the last 24
                                                                                                 15 | P a g e
years. A slight increase of 13-14% was found in Segments 1 and 2. Segments 3 and 4 both had a much
higher increase with 68% in Segment 3 and 55% in Segment 4.

Figure 7 – Lower Deschutes Wild & Scenic River Boater Days, Segments 1, 2, 3 and 4, 1993-2017

                                           1993 – 2017 Segment 1 through 4
                                                 Boater Days by Year
                    80000

                    70000
Number of Boaters

                    60000
                                                                                                              Segment 1
                    50000                                                                                     Segment 2

                    40000                                                                                     Segment 3
                                                                                                              Segment 4
                    30000

                    20000

                    10000

                        0
                            1993   1998      2003       2008      2013       2014       2015    2016   2017

River use varies depending on the Segments and time of year:

Segment 1:
Trout fishing opportunities are most popular from mid-May through June. Challenging rapids and the
relatively remote character of much of this river segment provide excellent whitewater boating
opportunities. Boating use increased significantly during the 1980's and 90's and was administratively
limited in 2005. Most boating occurs between mid-June and September.

Segment 2:
There are several challenging rapids for whitewater boaters and with easy access this segment makes it
popular to the whitewater boating community. The primary use has historically been whitewater boating
and most use occurs between mid-June and mid-September. Trout and Steelhead fishermen use Segment
2 year-round however most of the angling occurs outside of summer boating season. Between 2008 and
2017 there was a 2% increase in boater passes sold for Segment 2.

Segment 3:
Except for fishing during the fall months, boating use was relatively low in this river segment in the past.
In the last 10 years, commercial rafting companies began extending their whitewater trips from Segment 2
into the upstream 4 miles of this segment, thus increasing the use in what is now Segment 3A. In 2016 a
cooperative environmental assessment was developed by the managing agencies which split Segments 3A
and 3B each with its own use limits. Whitewater boating occurs from June through mid-September, while
fishing use occurs from August through November. Boating use levels in this segment have been
                                                                                               16 | P a g e
administratively limited since 2009.

       Segment 4:
       In the early 1990’s the predominate use in Segment 4 was fall steelhead fishing. There were lesser
       amounts of whitewater rafting and trout fishing. Steelhead fishing season occurred primarily between late
       summer and late October. Most of the use in this segment was motorized in the 1990’s.

       In more recent years non-motorized whitewater boating has become increasingly popular. With limited
       entry implementation, future use in Segment 4 could lower slightly over the next few years.

       Hike-in and bike-in use along the old railroad grade within Segment 4 has increased over the past three
       years. Table 1, Annual Segment 4 Trail Camera Data, indicates total non-boater visitors, both day and
       overnight use, averaged approximately 1,731 annually from 2015 to 2017, with a maximum of 2,110
       visitors (1,803 day use and 307 overnight) in 2017.

       Table 2 Hike/Bike-in visitation data is derived from trail camera inventories placed along the railroad
       grade approximately one mile upriver of Deschutes River State Park River Mile 0, and at Macks Canyon,
       River Mile 24. Activities observed include hiking, fishing, backpacking, hunting, biking, trail running,
       and horseback riding.

       Table 2. Annual Segment 4 Use Data Determined by a Trail Camera
                        Mack’s Canyon                                              Deschutes River State Park                       Total Non-
Year       Walk-in      Bike-in    Walk-in              Bike-in          Walk-in     Bike-in     Walk-in      Bike-in                Boater
           Day Use       Day      Overnight            Overnight         Day Use    Day Use     Overnight    Overnight               Visitors
                         Use        Use                  Use                                       Use         Use
2015          94           0         5                     0               834        252           82          92                     1,359
2016         351          15         29                    6               692        457           91          84                     1,725
2017         375           9         58                    0               925        494          161          88                     2,110
2018         391          21         47                    4              *237        *54          *13          *6                     *773
       *2018 Deschutes State Park data reflects use for January through February only due to trail camera memory card full.

       Visitors were counted when traveling upstream from Deschutes State Park or downstream from Macks
       Canyon. Visitors who made a loop by walking along the river one direction and using the old railroad
       grade trail the other direction were only counted when their trip originated on the old railroad grade trail.

       Visitors were categorized as walk-in or bike-in day use, or walk-in or bike-in overnight use. Visitors
       walking or biking on the trail with less equipment than would appear necessary to camp overnight were
       classified as day users; while users with larger backpacks, bike trailers, panniers, or what appeared to be
       enough equipment to camp were classified as overnight users.

                                                                                                                              17 | P a g e
D. Current Fee Program & Revenues

D.1       Existing Fees
As indicated above, the LDR fee program collects SRPs, campground fees (group and individual site use),
and ISRP fees (boater passes). Individual special recreation permit fees to float the river were first
collected in 1982. The original cost was $1.75 per person per day, collected by OPRD under the authority
of the State Scenic Waterways Act. Permits were available from vendors or from the Prineville BLM
office.

The goals related to the collection of fees on the LDR are:

      •   Continue to ensure the BLM, OPRD, and other managing agencies can successful manage the
          LDR on a segment-by-segment basis to protect and enhance the W&SR values.
      •   Provide a positive visitor experience throughout the 100 mile stretch of the LDR while ensuring
          limits of use are managed.
      •   Support operations of maintenance to ensure facilities are made safe and secure for public use.

BLM Individual Special Recreation Permit (ISRP) Fees
Current ISRPs are either $2.00 or $8.00 per person per day, depending on time of year and day of the
week, and are available through the recreation.gov website. A separate administrative fee of $6.00 per
transaction is charged by the contractor who operates the online reservation system.

Table 3. Summary of ISRP fees collected on the LDR throughout the year.
 Agency                              Current Lower Deschutes W&SR River ISRP Fee
                     Saturdays and Sundays     Weekdays                 Seven days a week
                     from Memorial Day to      from Memorial Day to     from Labor Day to
                     Labor Day                 Labor Day                Memorial Day
 OPRD                            $2                      $2                        $2
 BLM                             $6                       0                         0
 Total                           $8                      $2                        $2

Boat-in camping on the river is included in the cost of an ISRP. Individual special recreation permit fees
help pay for river operations like trash removal and maintenance of toilet facilities at remote campsites.
Drive-in developed campgrounds are dispersed throughout the LDR corridor. Between May 15th through
September 15th, campground fees are $8.00 per night mid-week and $12.00 per night on weekends
(Friday nights and Saturday nights) and group sites are $25.00 weekdays and $35.00 on weekends.

There are three developed, road-accessed BLM campgrounds in Segment 1, eight in Segment 2 and five
in Segment 3. Campsites are non-reservable, first-come, first-served. All campsites are self-registration
only. For undeveloped areas where no vehicle access is present in Segments 1 and 4, members of the
public who walk, horseback, and bike-in, can camp for up to 14 days. Currently, no ISRP or other fee
(e.g campground fee) is required for camping in areas of Segments 1 and 4 not accessible by a vehicle.

                                                                                              18 | P a g e
BLM Special Recreation Permit (SRP) Fees
In addition to ISRPs, the BLM collects fees from approximately 90 different commercial operations
through SRPs on the LDR. Rates and increases for the commercial SRPs are set at a national level and
are not subject to review by a Resource Advisory Committee.

BLM Standard amenity fees (campgrounds)
For the use of developed campgrounds with vehicle access, the BLM collects an expanded amenity fee of
$8 per site on weekdays, and $12 per site on weekends (Fridays & Saturdays, May 15-Sept 15). For a
group campsite, the BLM collects $25 on weekdays and $35 on weekends (Fridays & Saturdays, May 15-
Sept 15).

D.2          Fee Revenues
The following table summarizes fee revenues for the LDR for both the BLM and OPRD.

Table 4 – Revenues associated with fees collected on the LDR.
                                                 2014-2018 – Passes Sold, # of Boaters & Use
                                                                                                                                 5-Year
                                                                      2014        2015       2016       20171      20182
                                                                                                                                Average
    Number of Daily ISRPs (Boater Passes)
                                                                    15,315       15,808     15,712     12,628    13,119           14,516
    Sold
    Number of Boaters in all segments (1-4)                         91,244       96,131     95,112     83,814    82,951           89,850
    Use Days in all segments (1-4) (Number of
    Days x Number of People on each Daily                          133,947      140,689    137,316    131,702    132,097         135,150
    Pass)
    Number of Frequent User Passes Issued
                                                                         70         31         24         15         25         36
    (BLM & State)
                                                         2014-2018 - Fee Revenue by Fee Type
    State Boater Pass Fees                                       $267,894      $281,378   $274,530   $263,370   $264,194        $270,273
    BLM ISRP Fees (Boater Passes)                                $247,368      $264,732   $259,338   $244,840   $235,824        $250,420
    State Frequent User Pass Fees                                   $1,050        $465       $360       $225       $375              $495
    BLM Frequent User Pass Fees                                     $2,450       $1,085      $840       $525       $875           $1,155
    BLM Commercial SRP Fees                                      $165,454      $176,424   $159,699   $182,266   $158,683        $168,505
    BLM Campground Fees (expanded
                                                                   $84,890      $79,446    $59,369    $65,519    $84,396         $74,724
    amenity fee)
    Total Annual Fees Collected to BLM                           $500,162      $521,687   $479,246   $493,150   $479,778    $494,804.60
    Total Annual Fees Collected for OPRD                         $268,944      $281,843   $274,890   $263,595   $264,569    $270,768.20
    Total Annual Fees Collected                                  $769,106      $803,530   $754,136   $756,745   $744,347    $765,572.80
1
    2017 daily boater use decline due to wildfire smoke and poor visibility
2
    2018 daily boater use decline due to wildfires and river access closures

                                                                                                                 19 | P a g e
D.3       Use and Spending of Fees Collected
Fees are important in supporting operations, maintaining facilities, and providing a positive experience on
the LDR. Each year fees collected on the LDR go to both operational costs and labor of staff working
directly on and for the LDR. On average the BLM spends approximately $750,000 in fees on operations
and labor annually for the LDR. This spending equates to obligating 100% of a previous year’s fees and
50% of the current year. Since 2015 this has broken down to annual expenditures for ~$350,000 spent on
labor (mostly for seasonal and field staff working directly on the river) and ~$400,000 on operations,
which include facility maintenance, service contracts, supplies, road work, etc.

D.4       Compliance, Enforcement, and Fee Collections
Year-round law enforcement currently exists with a contract between Oregon Parks & Recreation
Department, and the Wasco County and Jefferson County Sheriff’s offices. In addition, BLM Law
Enforcement is paid to patrol in the Maupin Area (Segment 2) during the months of July and August.
Oregon State Police is paid by ODF&W and the State Marine Board to seasonally patrol by water and by
land the various segments of the lower 100 river miles. Fee collections are done by park rangers who are
certified Collection Officers. Two Officers are required when handling, depositing, and counting the
money. Single person collections are only allowed with 2 lock systems built into the device and when
money is not handled, but only transported in locked and secured storage devices.

E. Fee Amendments & Proposals
Under the Federal Land Recreation Enhancement Act (FLREA), Congress authorized the BLM to collect
ISRP and SRP fees for specialized used of federal lands and waters. The BLM is proposing an amended
ISRP fee within the LDR corridor, specifically Segments 1, 2, 3 and 4. The proposed flat fee structure
would replace the current fee structure that charges different fees depending upon time of year and day of
the week.

E.1       Summary of Fees Being Amended
BLM is planning to amend its ISRP fee to make it a flat rate of $5.00. The current fee which is $8.00
($6.00 BLM & $2.00 Oregon Parks and Recreation Department OPRD) per person per day on Saturdays
and Sundays between Memorial Day and Labor and $2.00 ($0.00 BLM & $2.00 OPRD) per person per
day Monday through Friday with become a flat fee of $5.00 ($3.00 BLM & $2.00 OPRD) per person per
day for floating any portion of the river, 365 days a year. The BLM is planning to begin the $5.00 flat fee
in January of 2022.

Table 5. Expected ISRP fees collected on the LDR throughout the year with the amended changes
 Agency                             Proposed Lower Deschutes W&SR River ISRP Fee
                     Saturdays and Sundays     Weekdays                Seven days a week
                     from Memorial Day to      from Memorial Day to    from Labor Day to
                     Labor Day                 Labor Day               Memorial Day
 OPRD                            $2                      $2                       $2
 BLM                             $3                      $3                       $3
 Total                           $5                      $5                       $5
                                                                                                20 | P a g e
E.2       Summary of Fees Being Proposed
The BLM is proposing a flat $5.00 camping fee per person per day for every person camping in Segments
1 and 4 of the LDR on BLM managed public lands, where no vehicle access is present. This fee was
developed by a subcommittee of the RAC and provided to the BLM with the intention of helping offset
increasing costs associated with managing facilities available to the public in Segments 1 & 4 being used
by both boaters and non-boaters. The $5.00/person/night camping fee would not be required for visitors
who already purchased an ISRP and/or visitors staying in developed camping sites that already require a
fee. No other fee changes are being proposed.

E.2       Comparable Fees
The Fair Market Assessment approach compares the ISRPs charged for boating similar rivers in the
western United States that are being administered by federal land management agencies. Many of these
comparison rivers had a different ISRP fee structure than the LDR, such as charging per person per trip or
per group per trip. To compare costs, the ISRPs from these commensurate rivers were translated into cost
per person per day. Where a per person per trip ISRP was charged, the trip fee was divided by the
average trip length in days. Where a per group per trip ISRP was charged, the fee was divided by 6, the
average size of a boating group on the LDR and was divided again by the average trip length in days.
Where a reservation or lottery fee is charged, in addition to a daily ISRP, the application or lottery fee is
assumed to be paid once by the group and is split by 6 people. All the comparative rivers have a limited-
entry permit system, provide on-site ranger services, and offer a backcountry river recreation experience
(except that the high concentration of toilets available on the LDR is commensurate with a rural or front
country river recreation experience). The services and facilities provided at the rivers listed are like those
of the LDR, except that most do not offer a high concentration of vault and pit toilets accessible to
boaters. Table 6 compares the ISRPs for various western rivers with a per person per day fee, or a per
group per day fee.

Table 6 - Comparison of river permit fees for similar recreation areas throughout the Western United States
      River Name -                              Permit            Permit and Application              Trip      Cost per Person per
                                Agency
        Segment                               Distribution                 Fees                      Length            day*
                                                                                                      17 mi.
   Colorado – Westwater           BLM           Reservation         $10 per person, per trip.                           $10.00
                                                                                                     (2 days)
      Green or Yampa–                                             One-Day Permit Fee $20.00           44 mi.
                                   NPS            Lottery                                                               $20,00
          Dinosaur                                                Overlength Trip Fee $35.00         (4 days)

          John Day                BLM           Reservation           $10 per one-daytrip             Varies           < $10.00

                                                                                                      50 mi.
            Rogue                 BLM             Lottery           $10 per person, per trip.                           $10.00
                                                                                                     (4 days)
  Salmon – 4 Rivers (non-                                                                             79 mi.
                                  USFS            Lottery            $4 per person per day                              $4.00
       motorized)                                                                                    (6 days)
     Tuolumne River               USFS          Reservation          $2 per person per day            Varies            $2.00
                                  USFS/
         Rio Chama                                Lottery            $5 per person per day            Varies            $5.00
                                  BLM
                                                                   $2.00 everday low season,                      $2.00 everyday low
      Lower Deschutes            BLM &
                                                Reservation       $8.00 on Sat. & Sun. during         Varies    season, $8.00 on Sat. &
         (current)               OPRD
                                                                          high season                           Sun. during high season

                                                                                                                      21 | P a g e
AVERAGE COST (per person per day)                                                           $7.88 - $8.63

        Lower Deschutes             BLM &
                                                   Reservation           $5 per person per day            Varies                   $5.00
          (Amended)                 OPRD
 1
     All of these rivers have reservation systems through recreation.gov and require an additional $6.00/transaction reservation fee.

When comparing ISRPs using this method, the current LDR daily cost of $2 on weekdays and during the
low season is 64% less than the $5.57 average daily cost of comparable federal river fee programs, and on
Saturdays and Sundays during the summer months, the daily cost of $8 is 43% more than the $5.57
average. The proposed flat ISRP fee of $5 per person per day is commensurate with the $5.57 average
daily cost of comparable federal river fee programs.

Comparability with other agencies and similar Special Areas
The fair market value analysis demonstrated that the amended ISRP of $5.00 is similar to fees charged
elsewhere and by other public agencies. The ISRP is equitable and assures that the United States is
provided a fair return for recreational use of the public lands.

Fairness and Equality among Users
BLM considered the effect of amending the ISRP fee on recreation users and recreation service providers
and found these fees to be optimal. Paying a $5 fee year-round seems to strike an acceptable balance in
comparison to the existing fees of $8 and $2, respectively.

E.3          Financial Analysis – Revenues, Costs, and Use of Fees

Amendment to existing Individual Special Recreation Permit Fees
Individual special recreation permit fees on the LDR have been at their current rates since 2003. Since that
time, the costs of operating the river recreation program have climbed substantially. Increases in costs have
come in every category, including labor, fuel, vehicles, supplies, and maintenance. This section outlines
both the Cost Recovery fee calculation method, as well as the Fair Market Value fee calculation method,
which compares the fees charged by other offices and/or agencies for river use with similar facilities and
services.

Fees collected on the LDR, including all proposed fees, will be spent in line with the same goals provided
in section D.1. Annual spend plans for fee use will be developed that will ensure fees are spent much like
they are now, which is focused on labor and operations directly improving and supporting the LDR.
Spending and use of fees will be the same as described in D.3. Additionally, section E.8 below. Table 7
below summarizes the calculated fees that would be collected with the amendment to the ISRP.

Table 7- Anticipated future revenues from proposed ISRP fee change.
                         Anticipated Future BLM Fee Revenue by Fee Type
                                              2022 With Existing Fees 2022 With Proposed Fees
 BLM ISRP (Boater Pass) Fees                         $250,710                $405,451
 BLM Frequent User Pass (Annual Pass)                 $1,218                   $1,218

                                                                                                                                22 | P a g e
BLM Commercial SRP Fees                                   $168,505                       168,505
 BLM Campground Fees (expanded amenity                                                    $74,724
 fee)                                                       $74,724
 Total Annual Fees Collected to BLM                         495,157                      $649,898

Proposed “All User” Camping Fee for Segments 1 and 4
As shared above in E.1, the BLM is proposing a flat $5.00 per person per day to every person camping in
Segments 1 and 4 of the LDR, where no vehicle access is present. The $5.00/person/night camping fee
would not be required for visitors who already purchased an ISRP; and visitors staying in developed
camping sites that already require a fee. In section C.5 a summary of walk and bike in traffic in both
Segments 1 and 4 were provided. Most of the total number of recreationists identified (~1,700/year on
average) were day users. However, around 200-300 were overnight users and we expect these numbers to
increase over time. Therefore, the expected revenue from implementing the flat $5.00 campground fee is
expected to be $1,000 to $1,500/year. This amount would provide some support the fee’s implementation
and monitoring of the area.

E.4     Impact of Fee Changes
User patterns have changed over the years. Implementation of use limits and fee structures have helped to
distribute use more equally amongst all days of the week. Services are provided year-round, including
bathroom facilities, trash clean up, river rescues, law enforcement, and road maintenance.
Changes in fee structure are being proposed to make fees more equitable for users throughout the year.
Other benefits include accounting efficiency, ease of financial analysis, a simplified fee structure for
public understanding, and predictable budgetary planning. Other factors considered for re-adjusting fees
include rising operating costs, year-round maintenance, and fairness and equity among all users. The
adjusted fees consider current fees and provide a reasonable solution to all users of the river.

Costs related to the Lower Deschutes Wild & Scenic River Management Area
The budgeted expenditures (Section 5 Cost Recovery) of the fee receipts are for services and
infrastructure that align with management plan objectives. These investments would maintain a high-
quality recreation opportunity for all users of the LDR. The operating budget that is possible under the
proposed fee rate provides funding for BLM to manage recreation programs and facilities in a manner that
protects the resources, the public and their investment, and fosters pride of public ownership.

BLM is not proposing to use fees to maximize revenue. BLM calculated the operating budget using the
current fee structure. Without adjusting fees, reduced services would result in more trash, human waste,
and unacceptable behavior along the river. Law enforcement personnel would be less available to assist
with emergencies or to enforce regulations such as boater safety, shooting, hunting regulations, and
unauthorized guiding. Reduced staffing would compromise the safety of the public and protection of the
resources. Not adjusting fees would limit BLM’s ability to fully protect and enhance the LDR
Outstanding Recreational Values.

                                                                                             23 | P a g e
Potential Effects of the Amended Fee Change on Users
A change in the ISRP fee will mean an individual will pay either $3 more per day, or $3 less per day
depending on the day of the week and the season of their trip. The change in $3/per person/per day to
float the LDR is not expected to have a measurable economic impact on boaters and/or affect visitation
trends. Additionally, it is likely that commercial outfitters with valid SRPs would transmit the additional
$3.00 in ISRP fee costs to their clients, which, given the cost of commercial trips for the general public,
would not be a significant increase Finally, the proposed $5 flat fee seven days a week will remove the
incentive to boat on weekdays, and ISRP fees will no longer influence what day of the week an individual
plans their trip.

Potential Effects of the Amended Fee Change on Low-Income Populations
Maintaining the current structure of disproportionate ISRPs, in which fees cost less on weekdays and
during the slow season and cost more on Saturdays and Sundays during summer months, makes weekday
or slow season trips slightly more affordable for low-income visitors. However, excluding the cost of
ISRPs, river boating is still an inherently expensive recreational activity for both non-guided and guided
visitors. It is unlikely that the amendment to ISRP fees will affect the ability visitors to participate in a
trip. An ISRP is a small part of the total cost of a river trip. Therefore, impacts to low-income
populations are expected to be minimal.

Potential Effects of the Amended Fee Change on Local Communities
On their way to the river and once they arrive, non-local boaters, both guided and non-guided, spend
money on goods and services. These visitors purchase food, gas, lodging, and vehicle shuttle services in
the communities of Maupin, Madras, and The Dalles, and these expenditures contribute greatly to the
local economy. Changing the ISRP to a flat fee of $5 is expected to have very little effect on the ability
of guided or non-guided boaters to afford a LDR trip. Depending on the day of the week and the season
of use, the ISRP fee will either decrease or increase slightly.

The BLM invests income from fees collected in resource management and recreation opportunities that
draw non-local users to spend money in the local economy. It is important to the local economy for the
LDR program to have the financial ability to maintain and improve, as necessary, the current services and
facilities associated with guided and non-guided recreational boating, as well as protect the quality of the
recreation experience. The LDR program provides a high-quality eco-tourism experience that draws
approximately 270,000 recreational users to the City of Maupin and the Wasco/ Sherman/Jefferson tri-
county area annually. According to BLM’s Central Billing System, in 2018-2020, guided passengers
spent over $5 million annually for guiding services on the LDR.

Potential Effects of the Proposed Camping Fee
The charging of a $5.00/person/night camping fee in areas not accessible to cars in Segments 1 and 4 is
not expected to have measurable impacts on users, low-income populations, local communities, and/or
overall visitation. Areas throughout Central Oregon as well as the Pacific Northwest that require similar
fees for overnight camping in backcountry areas continue to see high use. Furthermore, given the
majority of use for public lands accessible by foot, bike, and/or horse in segments 1 and 4 is day-use,
overall impacts to overnight use are expected too negligible if even measurable.

                                                                                                 24 | P a g e