BUILDING FOR TOMORROW - VINCI Construction
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
#AllCommitted The men and women of VINCI Construction VINCI Construction — 2021 VINCI Construction — 2021 VINCI Construction — 2021
CONTENTS 02 TALK WITH THE CHAIRMAN 06 INTERNATIONAL PRESENCE 07 ECONOMIC PERFORMANCE 08 OUR ORGANISATION 10 OUR COMMITMENTS 12 MANAGEMENT TEAM 14 EXPERTISE AND SKILLS 16 Buildings Structures 24 32 Infrastructure 44 FOR TOMORROW Environment 46 52 Innovation VINCI Construction — 2021
2 3 Our ambition in response Talk with Pierre Anjolras, Chairman of VINCI Construction to a changing world A new organisational structure The move also boosts our collective at VINCI, combining the activities innovation capacity, which will be critical of VINCI Construction and Eurovia in accelerating the transformation of our within a single business line, businesses, products, services and solutions was announced in January 2021; in response to the ecological transition, it is headed by Pierre Anjolras. in which we play a leading role. Why are Eurovia and VINCI How is VINCI Construction Construction joining forces? now organised? This move is all about preparing We are organised into three pillars, for the future. We live in a world with leading positions in each. The first, where transformations are accelerating. which most clearly sets us apart from The ecological transition, the digital our competitors, is our Speciality Network; revolution... These far-reaching changes it brings together our subsidiaries that are leading us to rethink the assets specialise in soil technologies, structures, that need to be built and how we build them. nuclear engineering and digital solutions This presents both a fantastic opportunity for the construction sector, with skills and and an immense challenge for all our brands that set the standard worldwide. construction businesses. Together The second is our Major Projects Division, they cover an unrivalled range of expertise which brings together the businesses that across building, civil engineering and work on the largest and most complex projects. infrastructure, and are equally outstanding Here again, ours is a global playing field, in terms of human community, economic as evidenced by the major projects we are potential and geographical coverage, with currently carrying out on all continents. 115,000 employees and over 1,000 companies The third pillar, which we call our Proximity in some 100 countries, and €23 billion Network and generates the largest part in revenue in 2020. Connecting all of these of our revenue, is made up of our local skills and creating new synergies among subsidiaries – our front line. In France, our teams places us in a better position where our markets are mature, Eurovia and to meet the challenges that lie ahead and VINCI Construction divisions and branches to fulfill our customers’ expectations. will continue to operate as usual and to bring VINCI Construction — 2021
4 5 Talk with Pierre Anjolras to bear their expertise throughout the country, and production sites. All VINCI Construction close to their customers. Outside France, executives, starting with myself, are both entities’ networks of local subsidiaries committed to supporting the development are now grouped by geographical area: of our business units. At the same time, The western Strasbourg bypass on the A355 motorway. the United Kingdom, our second-largest and working as always from the ground up, Dodin Campenon Bernard, VINCI Construction Terrassement, VINCI Construction France, Eurovia, Cegelec Mobility (VINCI Energies), VINCI Autoroutes market; continental Europe and Africa; we have structured our organisation the Americas and Oceania. In short, in a manner that fosters cross-business this organisation allows our companies cooperation and the pooling of expertise – to focus on their own catchment areas within VINCI Construction, with the other and markets, while making the most of the VINCI business lines or with our external “Our aspiration is that our clients, of small-scale projects, we secured a series as well as the talents complementarity between them, which partners. This will enable us to provide of major contracts. These include ultimately benefits our customers’ projects. the best local solutions within a framework the Grand Paris Express and The Link tower in that makes it possible to marshal collective resources and encourages new initiatives. who come to work with us, the Greater Paris area, the HS2 high-speed line in the United Kingdom, and road infrastructure How do you manage both the global and local within such This management model demonstrated will choose us for our projects in Africa, Canada and Australia. This confirms our ability to harness our a large entity? its effectiveness during the pandemic. ability to deliver global expertise and our teams to support our performance, for the benefit We reiterated that the absolute priority for customers on large, complex projects as well We remain faithful to the principle all our companies is to guarantee everyone’s as on specialised, local projects. of decentralisation that is in VINCI’s DNA: the heart of our organisation is the health and safety. Each one of them then developed and implemented solutions of all our stakeholders.” In the context of uncertainty surrounding the course of the pandemic, 1,000 operational entities that deliver tailored to their local situations, which varied our strong order book gives us peace of mind: our daily performance across our projects greatly from one country or region to another. How do you view business in 2020 it allows us to continue being selective and In this respect, I must point out that thanks and what is your outlook for 2021? to target those projects that generate the most to constructive social dialogue at grassroots value, thus enabling us to pursue our policy “Our organisation allows level, it was possible in some regions to keep operations going or to restart them swiftly The responsiveness I have just mentioned, combined with our highly diverse of profitable growth. our companies to focus on and safely on sites that were at a standstill markets and geographies, attest to the Over and above economic their own catchment due to lockdown measures. resilience of our model in the face of a crisis. This was reflected in our revenue suffering performance, what is your goal areas and markets […], only a slight decline, our cash flow remaining remarkably high, and our earnings holding up for VINCI Construction? which ultimately benefits well, with those of Eurovia in particular surpassing industry standards once again. This is not about size. We want to be leaders in each of our markets, of course, our customers’ projects.” VINCI Construction’s earnings prior to and we want to achieve this through our the change in scope were adversely affected by economic performance as measured in terms the restructuring costs of Entrepose, our oil of margin rate, but also through the quality and gas business that is now part of the Major of our expertise and our contribution to the Projects Division and is refocusing on its most environment, society and employment, buoyant markets, and by the sanitary measures by upholding the values and the public-interest that hampered VINCI Construction’s activity approach of the VINCI Group. Our aspiration in France, particularly in the building sector. is that our clients, as well as the talents who However, across all markets, VINCI Construction come to work with us, will choose us for also held up rather well. our ability to deliver global performance, for the benefit of all our stakeholders. Most importantly, 2020 was a year The current period drives us to work of record order intake, with a backlog of more even harder to achieve this goal because than €32 billion, which sends a very positive our construction specialities are more crucially signal for the year 2021 and beyond. Despite important than ever in helping the world the crisis, in addition to a very large number to meet the challenges of tomorrow! The Papyrus residential building designed by The Fehmarnbelt immersed road and rail Primméa for and with first-time homebuyers in tunnel between Denmark and Germany. Montpellier (France). VINCI Construction France VINCI Construction Grands Projets VINCI Construction — 2021
6 7 INTERNATIONAL ECONOMIC PRESENCE PERFORMANCE Revenue by geographical area. (in €M and as a percentage) One of the world's leading construction companies. NORTH AMERICA FRANCE EUROPE ASIA 1,000 €471 M €2,718 M €11,009 M €5,675 M €451 M 12% of revenue 47% of revenue 24% of revenue 2% of revenue consolidated operating income companies from ordinary activities* €23.2 Bn revenue FRENCH OVERSEAS €613 M 3% of revenue 70,000+ projects each year 115,000 employees CENTRAL AND SOUTH AMERICA AFRICA MIDDLE EAST OCEANIA €631 M €955 M €119 M €1,046 M Figures as at 31 December 2020. 3% of revenue 4% of revenue 0.5% of revenue 4.5% of revenue *IFRS 2020 data. VINCI Construction — 2021
8 9 OUR ORGANISATION A NETWORK OF PROXIMITY SUBSIDIARIES This worldwide network, which brings together multiple companies with strong local roots, is based on a simple principle: to provide a team that focuses on one core skill in a given geographical area, working as closely as possible with its customers. VINCI Construction is organised into three complementary pillars, which allow us to support our clients over the long term, €18.4 Bn 87,000 whatever the size, nature and location of projects. revenue* employees Proximity A DIVISION DEDICATED TO MAJOR PROJECTS networks Working alone or in synergy with other VINCI Construction entities, the companies in this division design and carry out projects that require general contractor capabilities because of their size, complexity or type. €1.6 Bn revenue* 7,000 employees A DIVISION DEDICATED TO SPECIALTY NETWORKS These subsidiaries, which bring together engineers with a high level of expertise in geotechnical and structural engineering, digital technology, nuclear energy, oil and gas and renewable thermal energy, deliver high-technology, high-value solutions. Specialty Major networks projects €3.2 Bn revenue* 21,000employees Figures as at 31 December 2020. *IFRS 2020 data. VINCI Construction — 2021
10 All over the world, we are driven OUR by our aim to set an example to all COMMITMENTS of our stakeholders. We expect everyone on our teams to comply with applicable regulations on business ethics or human rights, as well as the commitments set out in VINCI's Code of Ethics and Conduct, Anti-Corruption Code of Conduct and Manifesto. Our companies' success, growth and future, individually and collectively, ETHICS hinge on strict compliance with best AND VIGILANCE practices and our commitments, which apply to us all, without exception. We make health and safety the utmost priority on all our worksites and production Through our activity in the construction sites every single day; of infrastructure, civil works and buildings, that’s the idea behind our we are driving the environmental transition. Safety First commitment. Our environmental ambition focuses on: Our health and safety culture • acting for the climate; is built on three pillars: • optimising resources thanks to the circular • transparency; economy; HEALTH • exemplarity; • preserving natural environments. • dialogue. AND SAFETY We are all working towards our We are committed to reducing the direct impacts of our activities. shared goal of zero accidents. And we are committed to enabling our THE ENVIRONMENT customers to reduce their own environmental impacts, by driving innovation and developing AND THE new options that bring about new services, ECOLOGICAL solutions and business lines. TRANSITION VINCI Construction — 2021
12 13 Governance MANAGEMENT TEAM* Patrick Kadri Managing Director in charge of Major Projects Division Pierre Anjolras Thierry Mirville Chairman, Chief Financial VINCI Construction Officer Ludovic Demierre Director, Human Resources Robert Bello Managing Director in charge of Eurovia France Division Sébastien Morant Managing Director in charge of Europe and Africa Division Hugues Fourmentraux Managing Director in charge of VCF Division Manuel Peltier Managing Director in charge of Speciality Networks Division Gilles Godard Managing Director Patrick Sulliot in charge of Managing Director United Kingdom in charge of Americas Division and Oceania Division *As at 1 February 2021. VINCI Construction — 2021
BUILDING FOR TOMORROW EXPERTISE AND SKILLS Our teams work on projects of all sizes all over the world. Each one of these is important. Whether it is about transforming cities and regions, improving daily life, preserving the environment or helping people and goods flow more freely, every project is a reflection of the expertise, passion and trust that drive us. P. 16 Buildings P. 24 Structures P. 32 Infrastructure Upgrade work in Arcachon (France), on boulevard Leclerc, its pedestrian esplanades and Eurovia’s multimodal transport hub. VINCI Construction — 2021
E X P E R T I S E 16 17 BUILDINGS From offices, residential, healthcare and educational commercial and cultural facilities, VINCI Construction operates across all sectors of the building industry and helps public and private players respond to the challenges of urban development, the ecological transition and new ways of working and living together. Its ability to leverage its skills, production resources Three new skyscrapers grace and general contracting expertise is brought the Warsaw skyline, providing space Varso, Skyliner and Mennica Legacy towers Warsaw, Poland Warbud to bear in a wide variety of undertakings, ranging for offices, shops and services: from flagship projects to local operations. the Skyliner, Mennica Legacy and Varso towers. The buildings have all received the international BREEAM green certification. The Mennica Legacy and Skyliner towers were awarded VINCI Construction France the Excellent rating, while the Varso tower was bestowed the Outstanding rating. KupkA-A building Puteaux, France The KupkA-A building located in the heart of the Paris-La Défense VINCI Construction Grands Projets business district, has been completely refurbished. on behalf of VINCI Airports This 19-story high-rise aspires to gain Renovation and expansion of BREEAM® and HQETM Excellent green Belgrade Airport. The design-build certifications, as well as the WELL contract included renovation of Belgrade Airport Belgrade, Serbia Gold and WiredScore Gold ratings. the existing terminal and construction of an extension, eleven new jetways, an additional runway, as well as new taxiways and aircraft aprons. VINCI Construction France Saint-Gobain tower La Défense, France Measuring 165 metres high, the Saint-Gobain Tower (centre) is truly a technical feat. In 2020, the high-rise building received an award for outstanding technical know-how. VINCI Construction — 2021
18 19 A complete system of REHASKEEN® retrofitted In the autumn of 2021, nearly 4,000 VINCI employees VINCI Construction France Cachan, France La Plaine III insulation panels was implemented for the first will relocate to l’archipel, their new headquarters, time in 2020 on a building site in the Paris region. which showcases the expertise of VINCI Group companies. The system contributes to rationalising, accelerating and industrialising the energy-efficiency upgrades required to address the climate emergency. VINCI Construction France Nanterre, France L’archipel VINCI Construction France Marseille, France La Poste Colbert Kenitra high-speed railway station This Art Nouveau building located in Marseille has undergone thorough The Link, Total's future headquarters, will renovation and refurbishment Kenitra, Maroc and is now home Sogea-Satom boast the highest-possible environmental certification (HQE™ Exceptional), which to the new Village La Poste. guarantees best-in-class energy, thermal and acoustic performance. The housing complex, VINCI Construction France located in the École Polytechnique Rosalind Franklin residence VINCI Construction France Palaiseau, France neighbourhood, will feature 192 student flats, including several La Défense, France shared units. The site will also comprise a public car park and a shopping area. The construction of the Kenitra station The Link will considerably reduce travel times between Tangiers and Casablanca while boosting the appeal of those areas that are already served by the rail line. VINCI Construction — 2021
20 Offshore wind turbine manufacturing plant VINCI Construction France, Eurovia Le Havre, France VINCI Construction France Opéra Grand Avignon Avignon, France In the final and most complex phase of the modernisation of Avignon's opera house, renovation work began on the main building, which dates back to 1848, and its Italianate theatre, which are both listed historical monuments. The Siemens Gamesa wind turbine manufacturing plant in Le Havre is scheduled to go into production in early 2022. Spread out over 20 hectares, it will be the first in the world to manufacture the key components This remarkable project in the heart of Paris of an offshore wind turbine under one roof. (70,000 sq. metres of floor space, as many as The renovation and expansion 1,300 people involved) included the renovation of the National Museum in Prague of various Art Nouveau and Art Deco buildings. will extend the life of the building while Located at the centre of the complex, the restoring it to its original appearance. department store's 20,000 sq. metres of retail The project received the Building space will soon be opening up to visitors. of the Year 2019 award from the Czech Foundation for the Development of Architecture and Construction. VINCI Construction France Paris, France La Samaritaine In response to increasing demand, eight multi-storey student accommodation blocks were built on the University of Manchester campus, offering a total of 1,122 student rooms and a combined floor area of 32,020 sq. metres. Prague, Czech Republic Prague National Museum Průmstav In French Guiana, a comprehensive contract to build 96 social housing units will help to accommodate many new families to the neighbourhood. The off-plan operation Fallowfield student accommodation was carried out on Amazones housing development Manchester, United Kingdom behalf of Sodim Guyane. VINCI Construction Dom-Tom VINCI Construction UK French Guiana VINCI Construction — 2021
23 Socially cohesive housing VINCI Construction France Colombes, France VINCI Construction France Courbevoie, France Aurore tower Manchester, Deeside, Preston, Huddersfield, United Kingdom Construction of temporary hospitals VINCI Construction UK VINCI Construction France Maison des Avocats Paris, France To meet the demand for social housing, several residences were built for Adoma (CDC Habitat group) in Marseille, Colombes (see photo), Argenteuil, Saint-Maur-des-Fossés, Champigny-sur-Marne, Saint-Ouen-sur-Seine and other locations. Major restructuring of the Aurore tower, built in the 1970s in the La Défense business district: the project involves The Maison des Avocats was completed transforming and redeveloping the original As part of a drive to help the NHS respond in January 2020. This transparent 27-storey building complex, as well as to the health crisis, 750 beds at North West eight-storey building covering a total surface raising it by adding six new floors. Nightingale Hospital, 430 at Deeside area of 7,150 sq. metres completes Field Hospital and 223 at Bangor Field Hospital the project for the Parisian judicial precinct were installed in record time. A 34-bed critical in the heart of the Clichy-Batignolles care unit at Preston Hospital and development zone in northern Paris. a 33-bed acute assessment unit at Christie Hospital in Manchester were also delivered in just five weeks. VINCI Construction Grands Projets, Bitumix Arturo Merino Benítez International Airport on behalf of Nuevo Pudahuel consortium Optimisation of the operating (VINCI Airports, ADP and Astaldi) potential of the Zénith performance venue in Greater As part of the expansion VINCI Construction France Nancy by improving spectator of Santiago Airport for VINCI Airports Greater Nancy’s Zénith comfort, increasing indoor capacity performance venue and ADP, five terminals spanning and developing the open-air 250,000 sq. metres were designed Santiago, Chile Nancy, France amphitheatre. Upon completion, the and built by VINCI Construction cultural facility will be able to in order to double the capacity of accommodate 30,000 additional the existing airport and bring it up spectators each year. from 15 to 30 million passengers. VINCI Construction — 2021
E X P E R T I S E 24 Renovation of the Pňovany–Bezdruzice railway bridge Pňovany, Czech Republic SMP CZ STRUCTURES This railway bridge, built in 1901, has a special place in the history of architecture thanks to its three inverted arches which hold up the structure under the track. New arches were put into place Bridges, tunnels, dams, large-scale industrial facilities... by rotating the old and new assemblies deck-to-deck VINCI Construction builds civil engineering structures by 180° using hydraulic jacks. all over the world. It sets the standard for its ability to design and build complex turnkey projects in cooperation with the Group's local companies or other partners. VINCI Construction combines custom solutions Dodin Campenon Bernard, Freyssinet and cutting-edge expertise in soil and structural technologies, VINCI Construction Grands Projets, as well as in digital solutions applied to construction. New Coastal Motorway Reunion Island, France Traffic was diverted to the new E.E. Williamson Bridge over I-4 , in Seminole County to allow the demolition of the old structure. 2021 marks the final stage in the construction of the bridge, which includes a new bicycle path leading to Florida's Seminole Wekiva Trail. The New Coastal Motorway will facilitate travel between Saint-Denis, the main city, and the island's commercial harbour some 20 km to the west. Positioned out at sea, the viaduct is designed to last 100 years and withstand extreme events. Hubbard Construction Company Seminole, United States E.E. Williamson bridge VINCI Construction — 2021
26 27 The 5th major Reinforcement of Marina Smir harbour Marina Smir, Morocco Sogea-Satom Spartanburg and Cherokee Counties, United States Reconstruction of Interstate 85 Blythe Construction project carried out by Eurovia in fifteen years on the I-85 corridor Eurovia, VINCI Construction Terrassement in South Carolina and North Carolina Viaduct over the Palissy roundabout involves upgrading and widening Reinforcement of Marina Smir harbour in order to ensure structural durability and La Roche-sur-Yon, France a 32 km stretch on one of the busiest allow for safe operation. The marina is a popular motorways in the summertime tourist destination. east of the country. Construction of a new four-kilometre In Vendée, a roundabout used daily bridge over the Maribyrnong River by 35,000 vehicles will be given in the heart of Melbourne as part of the West a complete makeover as the main road Gate Tunnel project. Teams are overseeing is converted into a two-lane dual the installation of 90 spans using a custom-built carriageway supported by a flyover, launching gantry, as well as 216 precast which will significantly improve traffic flow piers incorporating more than 1,000 tonnes to the north of La Roche-sur-Yon. of prestressing bars. The new infrastructure will eventually alleviate traffic congestion between the port and the city centre. VINCI Construction Maritime et Fluvial Port-au-Prince, Haiti Varreux Bolloré Terminal VINCI Construction Dom-Tom, By increasing Haiti's port capacity, the new Varreux Bolloré Terminal (TVB) in Port-au-Prince will improve the reliability and performance of harbour infrastructure Melbourne, Australia and will help to provide greater access to Westgate Freeway and from one of the world's poorest countries. Operations will include dredging, Freyssinet building storage facilities and constructing a quay capable of accommodating container ships measuring over 200 m. VINCI Construction — 2021
29 The largest hydroelectric development currently being carried out by EDF in France: the six power stations and five dams on the Romanche river were replaced with a single, more We Paalo hydroelectric power station powerful underground power station which will contribute to France's target of VINCI Construction Dom-Tom 23% electricity from renewable sources. We Paalo, France Dodin Campenon Bernard, VINCI Construction France Romanche-Gavet hydroelectric power plant On New Caledonia's East coast, the future We Paalo hydroelectric power plant is the first significant hydroelectricity project to be built on the island in thirty years. The plant will bring renewable energy to remote communities. Isère, France VINCI Construction Grands Projets Upgrade of the spillway and associated Ho Chi Minh City, Vietnam infrastructure of the Kariba dam, Water treatment plant the world's largest man-made reservoir: Kariba, Zambia standing 128 metres high and 617 metres Kariba dam Freyssinet long, the double-curvature concrete arch dam can hold 181 billion cu. metres of water. A design-build wastewater treatment plant in Ho Chi Minh City. With a peak flow of 34,000 cu. metres/hour, Dounreay nuclear research facility the plant will provide clean water to over 1 million people and thus play Dounreay, United Kingdom a key role in the Vietnamese Decommissioning of the Dounreay nuclear Soletanche Freyssinet capital's second environmental plan. research centre in northern Scotland: work consists in preparing the site for decontamination prior to future demolition. The Advanced Transition Works (ATW) are a key step in the decommissioning plan for the site. VINCI Construction — 2021
30 In New Zealand, the Napier Port construction project was designed in consultation with a variety of stakeholders (Maori regional representatives, divers, fishermen, scientists) to ensure that the impacts of dredging and construction work Avalanche protection wall on the marine environment of Hawke's Bay are properly identified and managed. Terre Armée Napier, New Zealand HEB Construction Napier Port Chile Soletanche Bachy Le Havre, France Port 2000 In this open-cast mine located 3,500 m above sea level, Terre Armée has built a 110 m Techspan® tunnel as well as two Geotrel™ MSE walls. The third wall is under way and will measure 270 m in length and 25 m Nearly fifteen years after an initial project, in height. In this region where winters are especially Soletanche Bachy's teams are taking part harsh, these walls will serve to protect the mining in the design and building of two 350 m berths facilities from avalanches. and a closing quay at Port 2000. Environmental measures implemented in connection with this project include using Exegy low-carbon concrete, optimising resources (sludge, water) and preserving protected areas. The work will optimise capacity at France's busiest container port. 6,000 piles were driven to a depth of 30 m at the construction site of the new Dos Bocas refinery for Samsung Engineering; ground improvement operations were also carried out under the future tanks. Located in the state of Tabasco, the refinery will be the largest ever built in Mexico. VINCI Construction Dom-Tom, Soletanche Freyssinet It is part of a comprehensive government plan to reduce petrol imports and consolidate the country's energy sovereignty. Piton Rouge hill reservoir Le Tampon, France Soletanche Bachy, Menard The Piton Rouge hill reservoir will be used to store rainwater collected when the Bras de Pontho Dos Bocas, Mexico river floods; the water will then be filtered before being supplied to local farmers. The reservoir will supply Refinery irrigation for 600 hectares, thus increasing agricultural resources while preserving drinking water and helping to prevent forest fires. VINCI Construction — 2021
E X P E R T I S E 32 33 The Southeast Extension VINCI Construction Grands Projets, ETF Cairo, Egypt Cairo metro on the NC 540 Motorway in North Carolina includes the design-build of a 12.8 km six-lane expressway and the construction of 29 bridges. Raleigh, United States Triangle Expressway Blythe Construction Cairo’s population is expected to surge to 20 million by 2022, a fifth of Egypt’s total population, highlighting the importance of developing an efficient transport network for the city. Construction of Line 3 is a major step forward for the city’s metro network. The project, which is to be delivered in four phases, will connect the east and west banks of the Nile, alleviating congestion on one of the city’s busiest thoroughfares. INFRASTRUCTURE Difficult terrain meant From roads and motorways, railways and light rail lines it took four years to complete Ferrand valley, France Sewer network Eurovia to urban road networks, cycling lanes, greenways, work to connect three small and much more, VINCI Construction builds hamlets to the Bourg d’Oisans Between Lena and Tibati, Cameroon Lena–Tibati road Sogea-Satom all types of mobility infrastructure, applying a circular sewer network, some economy approach to our work that combines components having to be construction with the production of materials. delivered by helicopter. Our expertise also extends to urban development, energy, water treatment and distribution infrastructure, and ecological engineering work. In central Cameroon, upgrading a 135 km section of the RN15 between Lena and Tibati, and 6.7 km of roads in the town of Tibati. The project will improve the country’s north-south route and help to boost trade with Chad and Nigeria. VINCI Construction — 2021
34 35 It took two months’ work Restoring traffic on the LGV Est line Ingenheim, France ETF to restore traffic on the LGV Est line. This major high-speed rail route between north-east France, Germany, Switzerland and Luxembourg was cut following a slope failure. Bakheng drinking water treatment plant VINCI Construction Grands Projets Bakheng, Cambodia Work on the forecourt at the new head-office building for Le Monde press Forecourt for the new Le Monde head office Paris, France Eurovia group, built on a slab over railway lines, In Cambodia, construction of the Bakheng was made possible by using BIM In Uganda, the Katosi drinking Drinking water treatment plant water treatment plant will produce treatment plant will deliver drinking water technology to model all the existing to almost 1 million people. It will enter into underground infrastructure. 160 million cu. metres of water a day. Added to the 240 million litres of drinking operation in 2022. water produced daily by the Ggaba plant, also built by Sogea-Satom, a total of Katosi, Uganda Sogea-Satom 400 million cu. metres of drinking water will be delivered to the people of Kampala every day. Upgrades to the A48/A480 motorway will help traffic to move more freely on this currently saturated route, improving safety for drivers and reducing VINCI Construction Terrassement, VINCI Construction France, traffic nuisance in the residential VINCI Construction Maritime et Fluvial, Eurovia, Signature areas it passes through. As part of a contract for resurfacing roads Resurfacing the Lones bridge Lones, France Eurovia in south-east France, VINCI Construction Grands Projets, The High Speed 2 (HS2) rail line project the surface course VINCI Construction Terrassement is currently the largest infrastructure on the Lones bridge, project in Europe. It will connect which crosses over Upgrades to the A48/A480 HS2 high-speed rail line the Midlands and northern England, which VINCI Construction UK, the Rhône river are currently served by a number of lines and connects the Grenoble, France United Kingdom dating back to the nineteenth century. Drôme and Ardèche administrative departments, was replaced at night to minimise disruption to users. VINCI Construction — 2021
36 37 Total renovation of runway Dodin Campenon Bernard, VINCI Construction France, VINCI Construction Grands Projets Île-de-France, France Line 14, works package GC02 Renovation work at Rennes airport Rennes, France Eurovia VINCI Construction Grands Projets, VINCI Construction Terrassement 10-28 at Rennes Bretagne airport and all associated infrastructure will bring the VINCI Airports-managed facility up to standard. Abdelmoumen pumped-storage hydroelectric plant Work was completed on 11 May 2020, allowing government and air medical services to resume during the peak of the Covid-19 crisis. Melbourne, Australia Abdelmoumen, Morocco Melbourne Metro Sixense The city of Melbourne has just begun its largest-ever rail project, the Metro Tunnel, which will add new capacity to the existing metro system, the City Loop. Real-time monitoring of the City Loop is essential so as to avoid any structural impact from construction of the Metro Tunnel. Sixense has fitted four City Loop tunnels with its patented Cyclops system to ensure the underground transport system can continue to operate safely during construction. The Abdelmoumen pumped-storage hydroelectric plant project includes earthworks for two large reservoirs and the construction of a power station embedded in the hillside. This reversible plant will generate electricity in turbine In Australia, the project to extend a water mode, and pump water from the lower to pipeline northwards requires extensive the upper reservoir in pumping mode, thus specialist skills. The route crosses two waterways, providing renewable energy on demand. the M1 motorway, land set aside for future road-building, private lots and fragile natural areas. Due to these special features, non-invasive technologies are required. Development of the Gama Goat site Undertaken as part of the Grand Paris Express Mardi to Warnervale pipeline project, the extension of metro Line 14 Charlotte, United States Central Coast, Australia from Villejuif to the future Maison Blanche Blythe Construction station in Paris will make daily travel easier In North Carolina, a former military Seymour Whyte for the region’s residents. munitions factory is being repurposed into creative workspaces, restaurants and housing as part of a large-scale redevelopment project undertaken by the City of Charlotte. VINCI Construction — 2021
38 Resurfacing work on the A88 motorway and the interchange connecting the A28 and A88, Road markings for a pop-up cycling lane Lyon, France Signature two major routes in the Normandy region, was performed at night to limit inconvenience to users. VINCI Construction Grands Projets, Bachy Soletanche Ltd London, United Kingdom Tideway East Argentan, France A88 Eurovia The Thames Tideway programme involves designing and building an extensive underground sewerage system to transfer and store wastewater and stormwater. People’s reluctance to use public transport It runs mostly under the Thames during the Covid-19 crisis highlighted all the way to the Beckton the importance of reserving road space for wastewater treatment plant greener forms of mobility. In Lyon and in east London. This truly other cities, local authorities redesigned exceptional engineering structure urban streets to accommodate more bicycles will help clean up the river by and fewer fossil-fuel vehicles. preventing sewage and pollution spills during bad weather. VINCI Construction Grands Projets In Qatar, the four lines of the Lusail Light Rail Transit system will cover a distance of 30 km, with seven On the Côte Vermeille, in South-West underground stations and 25 at-grade France, the only two roads linking Sorède stations. A turnkey design-build in the hills to Argelès-sur-Mer on the coast are very unsuited to bicycles. There is Lusail Light Rail project, the network will provide now a dedicated cycling route linking Lusail, Qatar environmentally friendly transport for a new city that will eventually the two municipalities, making green accommodate 200,000 residents and mobility safer than ever. as many daily workers and visitors. Construction of a cycling route Sorède, France Eurovia In Australia, New South Wales, Australia M4 Smart Motorway Seymour Whyte work is underway on the first Smart Motorway in New South Wales; this Brive, France A20 motorway Eurovia will include realigning, extending and Maintenance on two raised widening on- and sections of the A20 motorway off-ramps, and provided an opportunity to lay installing ramp a special asphalt mix on meters and this critical link on the route control signs. between Paris and Toulouse. Viapont® is a paving material that weighs up to 40% less than conventional materials while providing comparable mechanical performance. VINCI Construction — 2021
40 41 Hubbard Construction Company In Chile, this road upgrade In Maine, the rehabilitation Seminole County, United States Between Tres Pinos and Coronel, Chile Upgrading Ruta 160 Bitumix Rehabilitation of Route 1, Presque Ile Maine, United States Eurovia project is the first to use of Route 1 between on-site recycling using cement Caribou and Presque Isle Widening the SR-417 as a binder. won a NAPA Quality VINCI Construction Grands Projets, Dodin Campenon Bernard in Construction Award. I-64 road link, Hampton Road Bridge Tunnel Virginia, United States In Virginia, over 100,000 vehicles use the I-64 between Norfolk and Hampton every day. Upgrade and extension operations on this link will help ease congestion in the existing network. This major project calls for designing and building 5.3 km of viaducts over the sea and large-diameter tunnels Construction of a bypass Surface maintenance on the A62 motorway between two artificial islands, as well as is particularly important as this route widening 14.5 km of existing roads. Szczecinek, Poland is used by 72,000 vehicles daily. This worksite, Eurovia Polska where respectively 40% and 50% of the binder and surface courses were recycled, also provided an opportunity to test a self-driving pre-marking vehicle. Between Toulouse and Montauban, France Resurfacing the A62 Eurovia In Florida, just over five kilometres of the SR-417, a very busy limited-access toll road that forms the beltway around In north-east Poland, the new Szczecinek the city of Orlando, have been widened from bypass now diverts through traffic away four lanes to six. The new lanes will feature from this town of over 40,000 residents. automated toll booths. The completion of the bypass has brought the total length of Poland’s expressways to 4,000 km. VINCI Construction — 2021
42 43 After delivering the M5 and M6 VINCI Construction France, Eurovia, VINCI Energies on behalf of ARCOS, a VINCI subsidiary VINCI Construction Grands Projets London, United Kingdom M4, M5 and M6 Smart Motorways Smart Motorway upgrades, VINCI Construction is now working on the M4 outside London. The goal is to adapt the existing motorway to increase capacity over a 51 km section, without widening it. This is achieved by making the hard Dodin Campenon Bernard, VINCI Construction Terrassement, shoulder available for use and introducing variable speed limits. In Auckland, VINCI Construction is delivering a turnkey design-build railway line extension involving 3.2 km of tunnels beneath New Zealand’s capital. The project will double capacity on the line, allowing up Western Strasbourg bypass to 54,000 passengers an hour to reach the city centre in less than 30 minutes. Strasbourg, France As part of a design-build contract for Metroselskabet, VINCI Construction is carrying out all-trades work on Line 4 of the Copenhagen metro. The project includes two 4.5 km tunnels, two switching shafts Offering the chance to bypass Strasbourg and five stations. from the West, the A355 will save drivers a lot of time. By channelling through traffic, it will improve quality of life for people living near the current traffic City Rail Link works packages 3, 5 and 7 artery, which is used daily by 150,000 light vehicles VINCI Construction Grands Projets and 15,000 lorries. Auckland, New Zealand For the extension to its O-Train Eurovia, VINCI Construction Grands Projets, O-Train light rail transit system Dodin Campenon Bernard Ottawa, Canada light rail system, Ottawa tasked VINCI Construction and its partners with designing, building and financing over 27 km of track, including VINCI Construction Grands Projets four kilometres of cut-and-cover tunnels, 20 engineering structures, 16 stations, a maintenance centre Copenhagen, Denmark and all the associated systems. Copenhagen metro Work also includes widening 12 km of motorway without traffic downtime. VINCI Construction — 2021
44 45 FOR TOMORROW VINCI Construction’s entrepreneurial mindset, with its integrated business lines and a structure that allows for entrepreneurial initiative, fosters a constant quest for the new solutions of tomorrow. The technical innovations we develop, our project-management processes and the dedication of our 115,000 employees all focus on tackling the challenges facing humanity. Everything we do is guided by the three priorities of VINCI’s environmental ambition: acting for the climate, optimising resources thanks to the circular economy, and preserving natural environments. P. 46 Environment P. 52 Innovation Restoring the Yvette River’s ecosystem at Saint-Rémy-lès-Chevreuse, France. Equo Vivo. VINCI Construction — 2021
F O R T O M O R R O W 46 47 Working on behalf of VINCI Construction Terrassement France Equo Vivo local public-sector customers, Equo Vivo is VINCI Construction’s ecological engineering ENVIRONMENT brand. It focuses on protecting and restoring biodiversity, and designing and delivering projects that help maintain ecological continuity. VINCI Construction strives for environmental Next-generation asphalt plant excellence in all of its activities. With their clear focus on supporting the ecological transition, our activities Lentföhrden, Germany create economic value while ensuring environmental equilibrium. The personal commitment of every Eurovia has over 20 years’ experience employee is the cornerstone of our approach. in reclaiming waste from construction and industrial activities. In its role Eurovia as market leader, Eurovia has rolled out its Granulat+ programme in every part of France. Its circular-economy brand for construction materials aims to double production of recycled materials by 2030. Tourville-la-Rivière, France Soil recycling plant Eurovia A concrete illustration of Eurovia’s environmental aims, the Lentföhrden plant in Germany is designed to produce asphalt mixes that incorporate 20% more recycled materials and emit 20% less CO2. Saint-Bruno quarry, Canada Numerous initiatives were held to mark the first-ever VINCI Environment Day, Planting trees providing tangible illustrations of our commitments, such as planting over Eurovia 100 trees at the Saint-Bruno quarry in Quebec.
48 With its three categories The ActivSkeen brand was set up to assist Exegy low-carbon concretes VINCI Construction France France (low-carbon, very-low-carbon architects, developers, project managers and ultra-low-carbon), Exegy and project owners to realise their environmental introduces new standards for visions by working together in designing low-carbon concrete. These and building the envelopes for the buildings formulations reduce CO2 emissions of tomorrow. Using building-integrated by up to 70% compared with photovoltaics, ActivSkeen enables to optimise traditional concretes and offer energy use and occupant well-being. equivalent, if not superior, strength and durability properties. As part of the Franco-British Marineff programme, a number of prototype coastal structures designed to help protect fish stocks and marine biodiversity were placed underwater at the port in Cherbourg. The aim Inauguration of a Power Road® of these trials is to provide a home for marine life and to help improve the ecological status of coastal waters by at least 15%. Égletons, France VINCI Construction France Cherbourg, France Biomimetic dykes Eurovia Power Road® again proved its effectiveness in snowy conditions in January 2021, when extreme weather in South-West France affected its most recently commissioned section. A connection to the urban heating network keeps the road safe in winter. During the summer, the same connection in reverse feeds low-carbon renewable energy back into the network. Waste Marketplace is an application that identifies the most suitable solution Between Combaillaux and Saint-Jean-de-Cuculles, France for recovering each type of industrial or worksite waste. Astana, Kazakhstan Soletanche Freyssinet Nur Alem Sphere The e-beton platform helps worksite teams Waste Marketplace VINCI Construction France VINCI Construction France France e-beton to optimise their concrete selection and management process and take carbon footprints into account before operations begin. On-site, Eurovia, VINCI Construction The Recyvia®-E process was used it helps site supervisors to manage orders and schedules, and submit their forecasts and Recyvia®-E test strip for the first time in 2020. Roads can now be resurfaced by recycling order confirmations directly to suppliers. 100% of the damaged surface course. This new road-maintenance method took four years to develop. VINCI Construction — 2021
50 51 Orléans, France Île Charlemagne lake Eurovia VeloDunajec, Poland Cycling lanes Poland Between Tulle and Égletons, France A large number of cycling lanes are being delivered as part of design-build contracts in Poland to create Resurfacing the A89 a large-scale network of routes that sit seamlessly in their environment. They form part of the VeloDunajec network VINCI Construction and Functional restoration, landscaping (237 km in Poland) and the EuroVelo 11, a cycling route AgroParisTech have created Urbalia, and hydroecological engineering Eurovia that runs from Norway all the way to Greece. a startup dedicated to embedding at the Île Charlemagne lake near Orléans biodiversity and urban farming improved water quality. Operations included into urban development projects. dredging, creating a reedbed to encourage Resurfacing work was carried out on Its mission is to support local wildlife, earthworks for flood management the Tulle-Est–Égletons section of the A89 motorway authorities, planners and builders and work to combat creeping water primrose, (VINCI Autoroutes). As part of efforts to reduce with solutions that integrate an invasive non-native plant. the environmental impact of the work, biodiversity into their projects. a one-of-a-kind mobile asphalt plant made it possible to incorporate a very high percentage of recycled materials (70%) Besançon, France Diamant Vert project for MCGP VINCI Construction France into the new road surface. From light rail systems and railway lines to metros and cycling lanes, VINCI Construction companies work worldwide to develop low-carbon transport solutions. The extension of Line 3 of As part of a partnership in place since 2012, the Saint-Étienne light rail system, France’s Natural History Museum works with one of the lines delivered Eurovia to implement and monitor the national recently by Eurovia, only took biodiversity strategy. Eurovia provides the museum 16 months to complete. With with access to study sites to help it build a more the exception of cycling, tram complete understanding of biodiversity. and light rail are the most environmentally friendly form of urban transport: one train carries the same number of passengers as 170 cars. Extension of the light rail system Biodiversity inventory Saint-Étienne, France Cauna, France Eurovia Eurovia VINCI Construction — 2021
F O R T O M O R R O W 52 53 A self-driving shuttle runs between Self-driving shuttle in a rural area Eurre, France Signature the Crest railway station and the Écosite du Val de Drôme business park. This is a first for a road located in a rural area and open to conventional INNOVATION traffic. Thus, these journeys can be made safely is the result of research by our Signature brand into minimalist changes to road infrastructure. VINCI Construction launches dozens of R&D projects every year, most of them in collaboration with leading graduate schools and universities, institutional and industrial partners and startups. The way we are organised allows us to move swiftly from idea to experiment, then on to deployment or large-scale industrialisation. It also fosters the dissemination of innovations. Construction of the A7 motorway Eurovia for VINCI Motorways Germany An electric Hydrofraise® is used to create concrete VINCI Construction Grands Projets, London, United Kingdom Electric Hydrofraise® Bachy Soletanche Ltd shaft walls at several sites of the East works package of the Thames Tideway Tunnel project. This new Hydrofraise® is more environmentally friendly and very much quieter as the diesel engine has been replaced by an electric Eurovia has trialled AVUS, motor, minimising disruption a tool developed in-house to people living nearby. via the Leonard* intrapreneur programme, at the worksite for the A-Modell (public-private partnership) A7 motorway in Germany. AVUS is a suite of innovative services that maps all on-site underground utilities with VINCI Construction Grands Projets, Dodin Campenon Bernard, VINCI Construction France, Soletanche Freyssinet International Tunnel Factory centimetre-level accuracy. Tunnel Factory is a cross-disciplinary R&D initiative developed as part of the Leonard programme*. It aims to collate and exploit ideas put forward by employees Type : Construction Lieu : Lorem Ouvrages : Building from every VINCI Construction entity, turning them into new ways of drilling tunnels. * Leonard is VINCI's foresight platform for fast-tracking innovations.
54 55 Dodin Campenon Bernard Virtual reality France DISCO is a tool to guide miners digging tunnels using traditional techniques. Asphalt plants all over France The solution allows production teams to compare are now connected to E-Drive, Connected asphalt plants theoretical profiles against the actual geometry a tool for accurate real-time excavated, without the need for surveyors and management of asphalt while excavation is under way. production that also optimises energy consumption Using virtual reality when designing and the use of materials, Eurovia France specific tools and materials allows thus contributing to our design and production teams cutting CO2 emissions. to virtually explore and adapt functions they are working on, such as access to the work area, workstation ergonomics, traffic flows, collective protection, etc.). An artificial intelligence tool for consolidating time-analysis data, Chronsite is an automated worksite monitoring solution that relies on deep learning and computer vision. VINCI Construction France, Warbud, Dodin Campenon Bernard France and Poland Chronsite Discern, a worksite augmented- reality solution, overlays a digital plan over ongoing construction work at any given moment, making it easier to understand and check equipment, box-outs and inserts. VINCI Construction, Dodin Campenon Bernard France Discern 3D printing for specific tools and equipment Dodin Campenon Bernard France Dodin Campenon Bernard A small-scale model created using a 3D printer allows production teams to simulate the sequencing of assembly, utilisation and dismantling France DISCO of temporary structures before transferring the process in situ. VINCI Construction — 2021
56 Photo credits: Cover: © andresr / Getty Images. Portfolio: © Seymour Whyte, ETF photo library, Sogea-Satom photo library, © Jonathan Alexandre, © Alexis Toureau, all rights reserved / VINCI Construction and subsidiary photo library, © Spencer Griffiths. Contents: © Yann Bouvier. Page 2: © Stéphane Lavoue. Pages 4/5: © Femern A/S, all rights reserved / VINCI Construction and subsidiary photo library, © Jean-Francois Reforestation programme in Kourabahi Badia, © Jean-Luc Girod. Pages 10/11: VINCI Construction Terrassement photo library, © Yves Chanoit, © Tulipes. Pages 12/13: © Zephyr18 / iStock, © Stéphane Lavoue, © Richard Nourry, © Richard Nourry, © JulienLutt/CAPA Pictures, © JulienLutt/CAPA Pictures, © JulienLutt/CAPA Pictures, © Christian Dao, © Arnaud Février, © JulienLutt/CAPA Pictures, © Richard Nourry. Pages 14/15: © Philippe de Gaillande. Pages 16/17: © Augusto Da Silva / Graphix-images, © Sydney Zaggoury, all rights reserved / VINCI Construction and subsidiary photo library, Warbud photo library. Pages 18/19: © Guillaume Mussau, all rights reserved / VINCI Construction and subsidiary photo library, © Philippe Guignard - Air Kourabahi, Ivory Coast Images, © Jérome Cabanel, Sogea-Satom photo library, © ArtefactoryLab for PCA-STREAM. Pages 20/21: © enia architectes – 2020 – team project: Egis / Artelia / enia architectes, © Christian Smith, © Zuzana Oplatková, © Jérome Cabanel, VINCI Construction Dom-Tom photo library, © Boris-Yvan Dassié. Pages 22/23: all rights reserved / VINCI Construction and subsidiary photo library, © Benoît Cavaro, © Marc Philippe / Images de Marc, © Christian Smith, © Guillaume Mussau, © Sergio Grazia for Renzo Piano Building Workshop, all rights reserved Sixense / VINCI Construction and subsidiary photo library. Pages 24/25: all rights reserved / VINCI Construction and subsidiary photo library, SMP CZ photo library, Hubbard Construction Company photo library. Pages 26/27: Hubbard Construction Company photo library, Sogea-Satom photo library, Freyssinet photo library, © Céline Levain, VINCI Construction Dom-Tom photo library. Pages 28/29: Dodin Campenon Bernard Sixense provided its expertise to a programme in Ivory Coast photo library, © Dounreay Site Restoration Limited (DSRL), Soletanche Freyssinet photo library, all rights reserved / VINCI Construction and run by the FarmStrong Foundation which included subsidiary photo library, © Inventive. Pages 30/31: © Cédric Helsly, © Florent Colas, © Dan Chisnall, Terre Armée photo library, © Pro Drone a topographical survey beneath a primary forest canopy, 974. Pages 32/33: © Aerial Innovations, all rights reserved / VINCI Construction and subsidiary photo library, Sogea-Satom photo library, high-resolution orthophotography to identify certain tree Perino Bordone photo library. Pages 34/35: © Laura Innocente, © HS2 Ltd, © Frédéric Noy, ETF photo library, © Inventive, © Adrien Cailliau, species, and a vertical analysis of vegetation layers. The © Régis Bouchu / ACTOPHOTO. Pages 36/37: Seymour Whyte photo library, Sixense photo library, © Alexandre Soria, © Sabine de Villeroy/ data collected will, mainly by measuring vegetation growth, MRW Zeppeline Bretagne, VINCI photo library, Blythe Construction photo library. Pages 38/39: © François Monier/Septième Ciel Images, increase understanding of the current situation and allow all rights reserved / VINCI Construction and subsidiary photo library, © Thierry Fournier, © Garnements - Cédric D., © Seymour Whyte. for targeted interventions benefiting the forest. Local farmers Pages 40/41: Bitumix photo library,© Axel Heise, © Aerial Innovations, all rights reserved / VINCI Construction and subsidiary photo library, © will also see their working and living conditions improve Paul Cyr, © Andrzej Adamski. Pages 42/43: © John Zammit Absolute Photography Ltd, all rights reserved / VINCI Construction and subsidiary thanks to the introduction of integrated farming systems. photo library, © Jean-Francois Badia. Pages 44/45: © Pascal Le Doaré - Cap Vertical. Pages 46/47: © Matthieu Engelen, all rights reserved / VINCI Construction and subsidiary photo library, © Axel Heise, all rights reserved / Eurovia photo library. Pages 48/49: © Solène Petitdidier, © Aixcut Production, © Philippe Beuf, © Ertex Solar, all rights reserved / VINCI Construction and subsidiary photo library, Eurovia photo library. Pages 50/51: Eurovia photo library, © Céline Levain, © B-Wonder, Sethy photo library, Eurovia photo library, © Adrien Cailliau. Pages 52/53: © Céline Levain, © Alpcat Medias, © Cédric Helsy, © Torsten Brock, all rights reserved / VINCI Construction and subsidiary photo library. Pages 54/55: all rights reserved / VINCI Construction and subsidiary photo library. Page 56: Sixense photo library, © Axel Heise. Back cover: Karlsruhe, Germany Inductive charging road Eurovia © Céline Levain. Some photographs published herein were taken before the Covid-19 crisis and do not show mask-wearing or social distancing. Design and production: Tackling the challenge of in-road battery charging is critical to increasing the uptake of e-mobility. Germany will be carrying out a pilot project on a 100-metre strip of road at the EnBW training centre in 2021. The second phase will see the building of a 600-metre section of public road In line with VINCI Construction’s commitment to sustainable development, this document has been linking the training centre to the city of Karlsruhe. printed on FSC®-certified paper, composed of materials sourced from well-managed, FSC®-certified The city’s public transport company intends to use forests and other controlled sources. The paper is produced by an ISO 14001-certified company the system to charge its buses. meeting environmental performance standards.
You can also read