BLOCKS BUILDING THE DNA OF LAB CONSTRUCTION
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
TABLE OF CONTENTS THE DNA OF BOSTON’S LAB CONSTRUCTION . . . . . . . 1-2 LIFE SCIENCE DEVELOPMENT LANDSCAPE . . . . . . . . 3-4 2020 – 2021 DEVELOPMENTS . . . . . . . . . . . . . . . . . . . . 5-9 2022 - 2023 DEVELOPMENTS . . . . . . . . . . . . . . . . . . . 10-14 2024 - BEYOND DEVELOPMENTS . . . . . . . . . . . . . . . . 15-18 5 FACTS OF LIFE SCIENCE DEVELOPMENT . . . . . . 19-20
THE DNA OF BOSTON’S NEW LABORATORY DELIVERIES IN GREATER BOSTON LAB CONSTRUCTION 6.0 5.0 4.0 SF MILLIONS 3.0 The narrative surrounding Boston’s lab market has been characterized with outsized demand, limited supply and swelling 2.0 rental rates. Conditions have been ripe for construction activity and developers are responding with new projects to take 1.0 advantage of such tight market fundamentals. With an ever-expanding planning pipeline, this market could see several 0.0 million square feet of lab space come on line over the next 5+ years. While Cambridge remains the epicenter of life science 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024+ activity, dwindling developable sites and non-existent vacancies have tenants, landlords and everyone in-between gravitating toward alternative markets to meet their needs. As a result, new and emerging life science clusters are sprouting up in areas CAMBRIDGE BOSTON & SUBURBS like the Seaport District, Fenway, Allston-Brighton, Somerville, South Boston, and Watertown. NOTE: FUTURE SUPPLY INCLUDES ALL RENTABLE BUILDING AREA WITHIN MIXED-USE PROJECTS WHERE LABORATORY SPACE CAN BE DELIVERED Source: NKF Research NEW DEVELOPMENTS 15.8 million square feet — representing 74% of current Avenue in Mid Cambridge totaling 542,000 square feet, The overall cost to build in this market, particularly in rentable building area. It is unlikely all of the proposed Vertex’s one million-square-foot build-to-suit in the Seaport urban areas like Boston and Cambridge, is especially high. RESPOND TO DEMAND projects will move forward or include only life science and Alexandria Real Estate’s 521,489-square-foot 50-60 Moreover, construction costs on lab product tend to The depth of future lab demand remains uncertain as uses, but the pipeline should be monitored closely. Binney Street in Kendall Square. Several major projects are outstrip traditional office space due to necessary base a wave of new supply looms. As we continue to move also actively under construction. Related Beal has moved building infrastructure and specialty installations. Looking through the late-stage growth phase of this current Developers were rather active this past cycle, with nearly forward on the 250,000-square-foot second phase of iSQ at average tenant improvement allowances (TI) over the expansion cycle, tenants may take a “wait-and-see” 6.2 million square feet of new lab supply delivering from on Northern Avenue in the Seaport, while MIT, Bulfinch and last ten years, it’s clear that fit outs for life science users approach when considering their real estate needs and 2010-2019 throughout the Boston metro area. The DivcoWest are adding nearly two million square feet in East have become especially costly. As of 2019, average TIs weigh on the market’s recent rapid growth patterns. If Cambridge markets accounted for more than 60% of this and West Cambridge. Looking ahead, developers appear reached a peak of more than $139/SF on lab deals across every project with the potential for lab space were to new space. Some of the largest developments to date to have set their sights on Boston and the Suburbs, which the metro area with select transactions in Cambridge deliver, Greater Boston’s inventory would increase by another include a build-to-suit by Novartis at 181 Massachusetts account for 60% of forecasted lab deliveries. reaching $275/SF. LEXINGTON LIFE SCIENCE AVERAGE TENANT CLUSTERS IMPROVEMENT ALLOWANCES EMERGING BURGEONING 2019 SOMERVILLE ESTABLISHED WALTHAM WEST CAMBRIDGE 2014 2018 2012 WATERTOWN MID EAST 2013 2015 2017 CAMBRIDGE CAMBRIDGE 2010 ALLSTON 2011 2016 2020 – 2021 Source: NKF Research BRIGHTON SEAPORT FENWAY SOUTH END LMA © NEWMARK KNIGHT FRANK | RESEARCH | 2020 2
LEXINGTON MALDEN V U 2 ARLINGTON MEDFORD ¨ ¤ £ ¨ WALTHAM BELMONT ¦ §93 1 ¦ § 90 LIFE SCIENCE SOMERVILLE DEVELOPMENT LANDSCAPE CAMBRIDGE WATERTOWN LOGAN BOSTON ¨ ¦ § 95 ¨ ¦ §90 INTERNATIONAL AIRPORT ALLSTON YEAR OF DELIVERY 2020 — 2021 Boston Harbor 2022 — 2023 BROOKLINE SOUTH BOSTON 2024 — Beyond V U 9 JAMAICA PLAIN ROXBURY ¨ ¦ § 93 Dorchester Bay © NEWMARK KNIGHT FRANK | RESEARCH | 2020 4
4 2 Cambridge Discovery Park Bldg 400/500, West Cambridge 8 2 DEVELOPER: The Bulfinch Companies RENTABLE BUILDING AREA: 270,000 SF 11 19 10 ESTIMATED DELIVERY: 1Q 2020 PRE-LEASED: 88% 12 TENANTS: Fog Pharmaceuticals, Kintai Therapeutics, Simcere Innovation and Arbor Biotechnologies DETAILS: Speculative building within Bulfinch’s three-building laboratory and office 6 7 5 development at Cambridge Discovery Park in Alewife. 13 3 The BEAT, Boston - Dorchester 3 DEVELOPER: Nordblom Company and Alcion Ventures RENTABLE BUILDING AREA: 693,900 SF (lab & office) ESTIMATED DELIVERY: 2Q 2020 PRE-LEASED: 0% TENANTS: N/A DETAILS: Fully renovated former headquarters of The Boston Globe. Fully-amenitized, three-story building for creative laboratory and office use located minutes from the MBTA Red Line. 75 Hayden Ave, Lexington 2020 - 2021 4 DEVELOPER: King Street Properties RENTABLE BUILDING AREA: 213,900 SF DEVELOPMENTS ESTIMATED DELIVERY: 3Q 2020 PRE-LEASED: 57% TENANTS: Dicerna Pharmaceuticals and Frequency Therapeutics DETAILS: Fourth building within the Hayden Research Campus that will total more than 600,000 SF upon the building’s completion. Neighboring tenants include Takeda Pharmaceuticals, Concert Pharmaceuticals, and Kaleido Biosciences. Premier suburban location with convenient access to Route 2 and I-95. 222 Jacobs St - Cambridge Crossing, East Cambridge 1 DEVELOPER: DivcoWest RENTABLE BUILDING AREA: 430,000 SF (lab & office) ESTIMATED DELIVERY: 1Q 2020 PRE-LEASED: 100% TENANTS: Philips and Cerevel Therapeutics DETAILS: First building to deliver within the +2.2 MSF laboratory and office development. Philips has leased 80% of the building and will relocate its operations from Andover in early 2020. © NEWMARK KNIGHT FRANK | RESEARCH | 2020 6
iSQ Phase II, Boston - Seaport District 250 Water St - Cambridge Crossing, East Cambridge 5 DEVELOPER: Related Beal and Kavanagh Advisory Group 9 DEVELOPER: DivcoWest RENTABLE BUILDING AREA: 250,000 SF RENTABLE BUILDING AREA: 504,000 SF (lab & office) ESTIMATED DELIVERY: 2Q 2021 ESTIMATED DELIVERY: 4Q 2021 PRE-LEASED: 100% PRE-LEASED: 0% TENANTS: Vertex Pharmaceuticals TENANTS: N/A DETAILS: Second phase of a 375,000 SF laboratory development located in the Raymond L. Flynn Marine Park and recently leased to Vertex, which occupies DETAILS: Construction of a nine-story building on Parcel EF at Cambridge Crossing. an additional 1.1 MSF in the Seaport. Phase I tenants include SmartLabs and The building will feature 56,000 SF floor plates and include approximately 2,600 SF PureTech Health. of retail space, 379 underground parking spaces, and 100 bicycle storage spaces. 238 Main St, East Cambridge 350 & 450 Water St - Cambridge Crossing, East Cambridge 6 DEVELOPER: MIT Investment Management Co. 10 DEVELOPER: DivcoWest RENTABLE BUILDING AREA: 308,800 SF RENTABLE BUILDING AREA: 915,000 SF ESTIMATED DELIVERY: 3Q 2021 ESTIMATED DELIVERY: 4Q 2021 PRE-LEASED: 100% PRE-LEASED: 100% TENANTS: Beam Therapeutics, LabCentral and Bayer TENANTS: Sanofi DETAILS: Part of the MIT Kendall Square Initiative. New construction of a 12-story DETAILS: Build-to-suit for Sanofi. 350 Water Street (Parcel G) is a 12-story building tower that will connect to an existing, renovated building on the first six floors. comprised of 500,000 SF of laboratory space, while 450 Water Street (Parcel H) is a Adjacent to 314 Main Street, a 355,000 SF office building also underway. nine-story building comprised of 415,000 SF of office space. Both buildings will have ground floor retail and a total of 850 parking spaces. The 105 by Breakthrough, Boston - Seaport District 101 South St - Boynton Yards Phase I, Somerville 7 DEVELOPER: Breakthrough Properties (Bellco Capital and Tishman Speyer JV) 11 DEVELOPER: DLJ Real Estate Capital Partners and Leggat McCall Properties RENTABLE BUILDING AREA: 248,000 SF RENTABLE BUILDING AREA: 275,100 SF (lab & office) ESTIMATED DELIVERY: 4Q 2021 ESTIMATED DELIVERY: 4Q 2021 PRE-LEASED: 0% PRE-LEASED: 0% TENANTS: N/A TENANTS: N/A DETAILS: Speculative redevelopment of the former RCN building where South DETAILS: Part of a two-phase mixed-use development that will span more than Boston meets the Seaport District. First life science development for Breakthrough 1.0 MSF. A nine-story speculative laboratory and office building is currently Properties in Boston. underway, with delivery coinciding with the planned completion of the MBTA Green Line extension to Union Square. 300 Third Ave, Waltham 8 DEVELOPER: Lincoln Property Company RENTABLE BUILDING AREA: 139,600 SF ESTIMATED DELIVERY: 4Q 2021 PRE-LEASED: 0% TENANTS: N/A DETAILS: The redevelopment of a two-story office building into a new four-story laboratory and office building overlooking Route 128 in Waltham. The project will feature 35,000 SF floor plates and 443 parking spaces. © NEWMARK KNIGHT FRANK | RESEARCH | 2020 8
481 Arsenal St, Watertown 9 12 DEVELOPER: Boylston Properties 15 10 12 RENTABLE BUILDING AREA: 155,000 SF 7 6 ESTIMATED DELIVERY: 4Q 2021 PRE-LEASED: 0% 14 TENANTS: N/A 11 8 DETAILS: Building G within the redevelopment and expansion of Arsenal Yards. Initially slated for residential use, the developer is now targeting life science tenants after not 34 receiving desired height approvals and the successful lease up of 480 Arsenal Street. 1 2 13 5 1 Harbor St, Boston – Seaport District 13 DEVELOPER: Millennium Partners and Cargo Ventures RENTABLE BUILDING AREA: 130,000 SF ESTIMATED DELIVERY: 4Q 2021 PRE-LEASED: 0% TENANTS: N/A DETAILS: Former warehouse that will be redeveloped into a two-story laboratory and R&D building. Situated at the intersection of Harbor Street and Northern Avenue, the project is adjacent to the joint developers’ scaled back innovation campus at 329 Northern Avenue, which is still slated to include 381,000 SF. 2022 - 2023 DEVELOPMENTS 201 Brookline Ave, Boston - Fenway 1 DEVELOPER: Samuels & Associates RENTABLE BUILDING AREA: 500,000 SF ESTIMATED DELIVERY: 2022 PRE-LEASED: 18% TENANTS: Tango Therapeutics and Third Rock Ventures DETAILS: Construction of a 14-story laboratory and office building located at the southwest corner of Brookline Avenue and Fullerton Street. Part of the approved expansion of the existing 401 Park Dr in the Fenway neighborhood. © NEWMARK KNIGHT FRANK | RESEARCH | 2020 10
10 Stack St - Hood Park, Charlestown 6 DEVELOPER: Catamount Management RENTABLE BUILDING AREA: 350,000 SF 99 A St, Boston - Seaport District 2 DEVELOPER: Alexandria Real Estate Equities and Anchor Line Partners ESTIMATED DELIVERY: 2022 PRE-LEASED: 0% RENTABLE BUILDING AREA: 210,000 SF TENANTS: N/A ESTIMATED DELIVERY: 2022 DETAILS: First planned building within the approved redevelopment at Hood Park PRE-LEASED: 0% which encompasses 20 acres and 1.8 MSF of mixed-use space. 10 Stack Street will TENANTS: N/A include 149 below-ground parking spaces and outdoor terraces at the second and DETAILS: Located across the street from Breakthrough Properties’ laboratory building top floors. at 105 W First Street, this six-story building is in the final permitting stage with construction set to begin in early 2021. The property is roughly a five-minute walk from the MBTA Red Line Broadway Station in South Boston. 30 Prospect St - USQ Phase I, Somerville 7 DEVELOPER: US2 15 Necco St (GE site) & 10 Necco St (Garage), Boston - Seaport District 3 DEVELOPER: Alexandria Real Estate Equities and National Development RENTABLE BUILDING AREA: 178,000 SF ESTIMATED DELIVERY: 2022 RENTABLE BUILDING AREA: 316,000 SF & 160,000 SF PRE-LEASED: 0% ESTIMATED DELIVERY: 2022 TENANTS: N/A PRE-LEASED: 0% DETAILS: Part of the first phase of the planned 2.4 MSF mixed-use development in TENANTS: N/A Somerville that will span 15.7 acres and feature lab, office, residential, and retail DETAILS: After abandoning plans to develop a new headquarters building at 15 Necco space. Approximately 60% of the development will be commercial use, with 40% for Street, General Electric sold the site to Alexandria and National Development in residential use and 3.5 acres of open space. mid-2019. Plans for a 316,000 SF building are currently under review. 10 Necco Street is a six-story parking structure that was acquired by the same group last year and is expected to undergo renovation that will include four additional floors of lab-ready use. 325 Binney St, East Cambridge 350 Summer St, Boston - Seaport District 8 4 DEVELOPER: WS Development DEVELOPER: Alexandria Real Estate Equities RENTABLE BUILDING AREA: 228,000 SF RENTABLE BUILDING AREA: 384,000 SF ESTIMATED DELIVERY: 2022 ESTIMATED DELIVERY: 2022 PRE-LEASED: 0% PRE-LEASED: 0% TENANTS: N/A TENANTS: N/A DETAILS: A 3.6-acre site located adjacent to Alexandria’s One Kendall Square DETAILS: Also known as Seaport Square Block N, this parcel recently underwent a complex. The building may be expandable in the future. notice of project change from residential to laboratory and office use. Located next to the future home of Foundation Medicine, which commissioned a 581,000 SF build-to-suit office building on Block P in mid-2019. Exchange South End Phase I, Boston - South End 225 Wyman St, Waltham 5 DEVELOPER: The Abbey Group 9 DEVELOPER: Hobbs Brook Management RENTABLE BUILDING AREA: 690,000 SF (lab & office) RENTABLE BUILDING AREA: 507,600 SF ESTIMATED DELIVERY: 2022 ESTIMATED DELIVERY: 2022 PRE-LEASED: 0% PRE-LEASED: 0% TENANTS: N/A TENANTS: N/A DETAILS: The largest laboratory and office building currently underway along DETAILS: Initial phase of the Boston Flower Exchange redevelopment, which will span a Route 128. The building is situated among the suburbs’ largest cluster of life total of 1.6 MSF across 5.6 acres. The first phase will see the development of two buildings science properties in Waltham. spanning 240,000 SF and 450,000 SF of laboratory and office use. Once completed, the project will also include 42,500 SF of retail space and 1,145 parking spaces. © NEWMARK KNIGHT FRANK | RESEARCH | 2020 12 © NEWMARK KNIGHT FRANK | RESEARCH | 2020 12
101 CambridgePark Dr, West Cambridge 441 Morgan Ave - Cambridge Crossing, East Cambridge 10 DEVELOPER: Healthpeak Properties 14 DEVELOPER: DivcoWest RENTABLE BUILDING AREA: 165,000 SF RENTABLE BUILDING AREA: 360,000 SF ESTIMATED DELIVERY: 2022 ESTIMATED DELIVERY: 2023 PRE-LEASED: 0% PRE-LEASED: 0% TENANTS: N/A TENANTS: N/A DETAILS: Proposed building situated next to the recently completed laboratory building at 35 CambridgePark Drive in Alewife. The building is steps from the MBTA DETAILS: Also known as Parcel U, this is the final large-scale laboratory and office Alewife Redline station. building planned at Cambridge Crossing. Construction and leasing efforts are currently focused on the development’s other three laboratory and office buildings underway. Nexus Phase I, Boston - Allston 101 Smith Pl - The Quad, West Cambridge 11 DEVELOPER: King Street Properties 15 DEVELOPER: The Davis Companies RENTABLE BUILDING AREA: 340,000 SF RENTABLE BUILDING AREA: 100,000 SF ESTIMATED DELIVERY: 2022 ESTIMATED DELIVERY: 2023 PRE-LEASED: 0% PRE-LEASED: 0% TENANTS: N/A TENANTS: N/A DETAILS: First of two laboratory buildings to be constructed on several parcels along DETAILS: Part of “The Quad” life science redevelopment underway in Alewife, which Western Avenue. At 340,000 SF, this building is the larger of the two and will rise includes four new and redeveloped laboratory buildings. Two buildings have already seven stories. The building will include a small ground floor retail component along undergone renovation at 75 Moulton Street and 10 Wilson Road, with new construction with 146 below-grade parking spaces. set to commence next at 101 Smith Place. 40 Smith Place will follow with roughly 250,000 SF of new construction. XMBLY, Somerville 12 DEVELOPER: BioMed Realty RENTABLE BUILDING AREA: 976,000 SF (lab & office) ESTIMATED DELIVERY: 2023 PRE-LEASED: 0% TENANTS: N/A DETAILS: Laboratory and office component of an approved 1.5 MSF mixed-use development next to Assembly Row. Includes an existing 162,000 SF office building and three planned laboratory, office and R&D buildings between 10 and 19 stories in height. 329 Northern Ave, Boston - Seaport District 13 DEVELOPER: Millennium Partners and Cargo Ventures RENTABLE BUILDING AREA: 381,000 SF ESTIMATED DELIVERY: 2023 PRE-LEASED: 0% TENANTS: N/A DETAILS: Planned construction of a 10-story, 381,000 SF laboratory and office building at Raymond Flynn Marine Industrial Park. The development team had earlier last year proposed an innovation campus totaling 900,000 SF, but opted to scale back the project in favor of a shorter construction timeline. © NEWMARK KNIGHT FRANK | RESEARCH | 2020 14
Nexus Phase II, Boston - Allston 2 8 DEVELOPER: King Street Properties RENTABLE BUILDING AREA: 240,000 SF ESTIMATED DELIVERY: 2024 9 2 1 64 PRE-LEASED: 0% TENANTS: N/A DETAILS: Second of two laboratory buildings to be constructed on several parcels 5 3 along Western Avenue. At 240,000 SF, this building is the smaller of the two and will 7 rise six stories at 305 Western Avenue. A six-story residential building with 40 units is also planned for the development and will provide 557 parking spaces for both residents and tenants. 244-284 A St (P&G site), Boston - Seaport District 3 DEVELOPER: Related Beal RENTABLE BUILDING AREA: 400,000 SF ESTIMATED DELIVERY: 2024 PRE-LEASED: 0% TENANTS: N/A DETAILS: Laboratory component of a proposed 1.1 MSF mixed-use development along the Fort Point Channel. Formerly a surface parking lot owned by Procter & Gamble, the 6.5-acre site recently acquired by Related Beal will also include a 334,000 SF office building and a 366,000 SF residential building. 2024 - BEYOND 4 585 Third St, East Cambridge DEVELOPER: BioMed Realty DEVELOPMENTS RENTABLE BUILDING AREA: TBD ESTIMATED DELIVERY: 2024 PRE-LEASED: 0% TENANTS: N/A DETAILS: Proposed development of a .82-acre site located in the heart of Kendall Square. The project is proposed to include a mixed-use building including laboratory, office, residential, and performing arts space. Enterprise Research Campus, Boston - Allston 1 DEVELOPER: Breakthrough Properties RENTABLE BUILDING AREA: 400,000 SF (lab & office) ESTIMATED DELIVERY: 2024 PRE-LEASED: 0% TENANTS: N/A DETAILS: Laboratory and office component of a 900,000 SF mixed-use development across 14.1 acres in Allston Landing. The development includes 400,000 SF of laboratory office space, 250,000 SF of hotel/conference center space, 250,000 SF of residential space, two public spaces, and 800 to 900 parking spaces. © NEWMARK KNIGHT FRANK | RESEARCH | 2020 16
Fenway Center Phase II, Boston - Fenway CambridgeSide Galleria Redevelopment, East Cambridge 5 DEVELOPER: Meredith Management and TH Real Estate 9 DEVELOPER: New England Development RENTABLE BUILDING AREA: 720,000 SF RENTABLE BUILDING AREA: 1.0 MSF (est.) ESTIMATED DELIVERY: 2024 ESTIMATED DELIVERY: 2024+ PRE-LEASED: 0% PRE-LEASED: 0% TENANTS: N/A TENANTS: N/A DETAILS: The second phase of Fenway Center will be constructed above the Mass Pike DETAILS: Full-scale redevelopment of the CambridgeSide Galleria mall that will and Landsdowne Commuter Rail station and is expected to commence construction introduce office, laboratory, and residential uses. The project is approved for by the end of 2020 on a speculative basis. The project includes two laboratory and 575,000 SF of net new floor area, including 400,000 SF for commercial use. office buildings that will rise 10 and 20 stories each. Volpe Redevelopment, East Cambridge 6 DEVELOPER: MIT Investment Management Co. RENTABLE BUILDING AREA: 1.7 MSF ESTIMATED DELIVERY: 2024+ PRE-LEASED: 0% TENANTS: N/A DETAILS: Redevelopment of the Volpe Transportation Center that recently commenced construction. MIT is first constructing a 400,000 SF office building for the USDOT and upon completion in late 2022, will begin developing roughly 1.7 MSF of commercial space including laboratory, office, retail and 1,400 housing units. 200 Main St, East Cambridge 7 DEVELOPER: MIT Investment Management Co. RENTABLE BUILDING AREA: 400,000 SF ESTIMATED DELIVERY: 2024+ PRE-LEASED: 0% TENANTS: N/A DETAILS: Part of MIT’s Kendall Square Initiative and located adjacent to the new laboratory building underway at 238 Main Street that is due for completion in mid-2021. A 13-story office and laboratory building is planned for the site, which is now home to a MIT student dormitory. 1 Earle St - Boynton Yards Phase II, Somerville 8 DEVELOPER: DLJ Real Estate Capital Partners and Leggat McCall Properties RENTABLE BUILDING AREA: 600,000 SF (est.) ESTIMATED DELIVERY: 2024+ PRE-LEASED: 0% TENANTS: N/A DETAILS: Second phase of the Boynton Yards development that will span more than 1.0 MSF upon completion. The developer acquired an adjacent 3-acre parcel in 2019 to expand the laboratory and office component of the development’s second phase, which initially proposed a building spanning 181,000 SF. © NEWMARK KNIGHT FRANK | RESEARCH | 2020 14 © NEWMARK KNIGHT FRANK | RESEARCH | 2020 18
5 FACTS OF LIFE SCIENCE DEVELOPMENT FIVE LARGEST PLANNED VOLPE CENTER PROJECTS IN THE REDEVELOPMENT PIPELINE: 1,700,000 SF 1 CAMBRIDGESIDE 10.3 MSF OF LABORATORY SPACE 4 GALLERIA REDEVELOPMENT 1,000,000 SF XMBLY, SOMERVILLE WILL DELIVER IN THE 976,000 SF NEXT FIVE YEARS AN ADDITIONAL BOYNTON YARDS, SOMERVILLE 5.5 MSF COULD 875,000 SF ENTER THE FENWAY CENTER PHASE II PIPELINE BY 720,000 SF 2025 2 $275 /SF TOP AVERAGE LABORATORY EMERGING BUILD OUT COST LIFE SCIENCE 5 CLUSTER: 3 URBAN FIT-OUT VS. CONSTRUCTION SEAPORT *E XCLUDES LAND COSTS 17% $1,000 * CURRENT /SF INVENTORY: LABORATORY OF EAST 1.1 MSF GROUND UP CAMBRIDGE LAB CONSTRUCTION INVENTORY IS 2025 COST CURRENTLY UNDER INVENTORY: 3.6 MSF CONSTRUCTION © NEWMARK KNIGHT FRANK | RESEARCH | 2020 20
225 Franklin Street, 33rd Floor Boston, Massachusetts 02110 NGKF.COM LIZ BERTHELETTE, RESEARCH DIRECTOR elizabeth.berthelette@ngkf.com | 617.863.8377 JONATHAN SULLIVAN, RESEARCH MANAGER jonathan.sullivan@ngkf.com | 617.863.8421 MICHAEL MALINCONICO, SENIOR RESEARCH ANALYST michael.malinconico@ngkf.com | 617.863.8428 ERIK VAN ZIJL, RESEARCH ANALYST erik.vanzijl@ngkf.com | 617.863.8425 SUSANNAH CAMPBELL, SENIOR GRAPHIC DESIGNER susannah.campbell@ngkf.com | 617.863.8544 All information contained in this publication is derived from sources that are deemed to be reliable. However, Newmark Knight Frank has not verified any such information, and the same constitutes the statements and representations only of the source thereof, and not of Newmark Knight Frank. Any recipient of this publication should independently verify such information and all other information that may be material to any decision that recipient may make in response to this publication, and should consult with professionals of the recipient’s choice with regard to all aspects of that decision, including its legal, financial, and tax aspects and implications. Any recipient of this publication may not, without the prior written approval of Newmark Knight Frank, distribute, disseminate, publish, transmit, copy, broadcast, upload, download, or in any other way reproduce this publication or any of the information it contains.
You can also read