Are the fuels of the future zero-carbon? - JUNE 2019 - Container Management

Page created by Javier Henderson
 
CONTINUE READING
Are the fuels of the future zero-carbon? - JUNE 2019 - Container Management
J U N E 2 0 19

            Are the fuels of the
           future zero-carbon?
Are the fuels of the future zero-carbon? - JUNE 2019 - Container Management
Contents
                                                                                               Special Report
                                                                                               38 High Bay Storage
                                                                                                   BOXBAY’S high bay storage system
                                                                                                   represents a leap in port technology
                                     June 2019
                                                                                               40 Women in Maritime
                                               Editor                                              Smart shipping and digitisation offer oppor-
               Emmanuel Mair                                                                       tunities for women in the maritime sector
          Tel: +44 (0) 20 8687 4181
         Mobile: +44 (0) 7807 115 234                                                          47 Global Sulphur Cap
  Email: emmanuel.mair@container-mag.com                                                           As the IMO’s sulphur regulations kick in,

                   Lacey Jones
            Tel: +44 (0) 20 8687 4147
                                              Reporter
                                                                                          43       LNG’s viability is being debated

                                                                                               64 Brexit
        Mobile: +44 (0) 7792 134 562                                                               A no deal Brexit could shift the balance
     Email: lacey.jones@container-mag.com                                                          between ro-ro and short sea container trades
                                              Reporter
                     Joe Lo                                                                    Regional Reviews
        Mobile: +44 (0) 7496 654 020
       Email: joe.lo@container-mag.com
                                                                                               50 Far East
                                                                                                   Could the alliance between Hong
                                              Reporter                                             Kong’s container terminals prevent
              Federica Ragonese                                                                    decline?
           Mobile: +39 334 7367 209
 Email: federica.ragonese@container-mag.com                                                    54 The Mediterranean
                                              Reporter                                             Competition for transhipment volumes is
                    Alistair Ross                                                                  high with a new facility on the way
        Mobile: +44 (0) 7584 036 899
     Email: alistair.ross@container-mag.com                                                    56 France
                                                                                                   Stability has returned to the French ports

                                                                                          50
             Consulting Editor                                                                     market
                    Sid Cass
           Tel: +44 (0) 1249 820 080
         Mobile: +44 (0) 7974 950 912                                                          Features
         Email: sidcass@btinternet.com
                                                                                               59 Terminal Power
           Commercial Director                                                                     Crane electrification is appealing to
               Marie-Anne Hoffer                                                                   ports who want to be greener and more
           Tel: +44 (0) 20 8648 7113                                                               productive
         Mobile: +44 (0) 7789 683 620
  Email: marieanne.hoffer@container-mag.com                                                    62 Drives and Brakes
            Latin America Agent                                                                    Trial runs bring success or a return to the
              Michell De La Ossa                                                                   drawing board for manufacturers
              Tel: +507 6672 1097
       Email: mdelaossa@cwpanama.net
                                                                                               News
                                                                                               06 Ports & Terminals
             Subscription Rates
                                                                                               14 Equipment
            £300/€370/USD480
      Contact: subs@container-mag.com                                                          22 IT
      Marshall House, 124 Middleton Road,                                                      25 Shipping
            Morden, Surrey, SM4 6RW
            Tel: +44 (0) 20 8648 7113
            Fax: +44 (0) 20 8687 4130
                                                                                          38   26 Business
                                                                                               30 Reefer
             www.container-mag.com
                  issn 0269-7726                                                               31 People
All contents copyright Container Management Ltd
                                                                                               32 Environment

                                              No part of this publication may be
                                                                                               33 Intermodal
                                              reproduced or stored in any form by any
                                              mechanical, electronic, photocopying,
                                                                                               37 Talking the Talk
              Front cover: shutterstock.com   recording or other means without the
                                              prior written consent of the publisher.
                                              Whilst the information and articles in           Regulars
                                              Container Management are published
                                              in good faith and every effort is made to        05 Editor’s Comment:
                                              check accuracy, readers should verify
                                              facts and statements direct with official            Ports are taking steps towards modernisation
                                              sources before acting on them as the
                                              publisher can accept no responsibility in        43 Business Profile:
                                              this respect.                                       Patrick Terminals celebrates a century in
                                              Any opinions expressed in this
                                              magazine should not be construed as                 the maritime business
                                              those of the publisher.

      Follow us on twitter                                                                     66 One to One Interview:
      @ContainerMag
                                                                                          59      Milutin Gojkovic, head of Asia group
                                                                                                  operations at CMA CGM, on life at sea
                                                                                                       Container Management — June 2019 — 03
Are the fuels of the future zero-carbon? - JUNE 2019 - Container Management
Regulars — Editor's Comment

Experience the progress.

                                        Changing
                                            Perceptions
                                                                                   used in the handling of aluminium and steel        Port) as an example of “debt-trap diplomacy”
                                                                                   coils, may be able to increase productivity by     where a creditor country takes advantage
                                                                                   up to three times compared with standard           of a debtor country once it fails to meet its
                                                                                   rubber-tyred gantry (RTG) crane systems,           loan obligations. Whether or not that was
                                                                                   according to its makers.                           China’s intention, there was a local backlash
                                                                                      The most advanced systems currently             as anti-Chinese sentiment spilled into violent
                                                                                   on the market are not too shabby either, as        protests.
                                                                                   automatic stacking cranes (ASCs) and re-              Funnily enough, one of the most successful
                                                                                   mote-controlled operations bring a high level      container terminals in Sri Lanka – Colombo
                                                                                   of automation into play. In fact, crane drivers    International Container Terminals (CICT) – is
                                                                                   who have been transferred to offices, rather       also run by CM Port. The deepwater facility
                                                                                   than losing their jobs, now enjoy a safer and      has quickly become the busiest in the Port of
                                                                                   less stressful working environment.                Colombo and is an example to the nay-sayers
                                                                                      The green movement has reached the              of the benefits of cooperation with China.
                                Emmanuel Mair – Editor                             ports sector too, with shore power systems            Nevertheless, the controversy over
                                                                                   being implemented to reduce emissions at           Hambantota seemed to play its part in
                                                                                   berth, while electrification projects on cranes    derailing the concession process for the new
                                    Ports have taken great strides                 become more commonplace. Meanwhile,                deepwater East Container Terminal (ECT)
                                    towards modernisation,                         the “giant iron thumb in the eye of the digital    in Colombo. The Sri Lanka Ports Authority
                                    even if they don’t always                      world” may not be a fair reflection of the sheer   (SLPA) first invited expressions of interest
                                    get credit for it                              extent of IT systems that are required to keep     to develop ECT on a build-operate-transfer
                                                                                   a modern port running.                             (BOT) basis in mid-2016 – yet the process
                                                                                      By no means have all ports transitioned         was later seemingly shelved.

                                I
                                   t’s quite a rare occurrence when a famous       well to the digital world but a large number          Now, it turns out, ECT will be jointly
                                   face pays attention to the port industry, and   of them, especially the bigger ones, are now       developed by Japan and India, two countries
                                   that’s why I still remember coming across       making the leap.                                   that have not always had the best relations
                                a tweet by the British actor Hugh Laurie                                                              with China and that are trying to protect their
                                (Blackadder and House) a few years ago.            Is Sri Lanka playing a dangerous                   interests in the region. The SLPA will retain
                                He tweeted: “A port is a beautiful thing, isn't    game?                                              full ownership of ECT as well as 51% of the
                                it? A giant iron thumb in the eye of the digital   Whenever a critic of China’s intentions behind     terminal operations company.
                                world. Heavy, slow, real.”                         the Belt and Road Initiative (BRI) wants to           Yet one has to wonder with all the
                                    The ironic thing about what Laurie,            offer an example in support of their point,        speculation that takes place over Sri Lankan
                                who I assume is a layman when it comes             it’s pretty likely that the case of Sri Lanka      port concessions – is the government
                                to the ports sector, perceived is that it          will soon roll off their tongue. Sino-scep-        attempting to play both sides of the
                                flies completely in the face of everything         tics see the 99-year lease of Hambantota           geopolitical spectrum? And is this a wise
                                the industry’s modernisers are trying to           Port to China Merchants Port Holdings (CM          strategy?
                                accomplish.
                                    Perceptions do take time to change but,
                                as much of the container handling and
                                equipment market gears up for TOC Europe
                                in Rotterdam, “heavy” and “slow” operations             The green movement has reached the ports sector
                                are already becoming a thing of the past.
                                    With the launch of BOXBAY’s high bay                too, with shore power systems being implemented
                                storage (HBS) warehouse concept, advanced
                                systems that have previously eluded
                                                                                         to reduce emissions at berth, while electrification
                                container ports look to be on the way in.                 projects on cranes become more commonplace.
                                The technology, which has been successfully
maritime.cranes@liebherr.com
facebook.com/LiebherrMaritime                                                                                                                 Container Management — June 2019 — 05
www.liebherr.com
Are the fuels of the future zero-carbon? - JUNE 2019 - Container Management
Ports & Terminals News
                                                                                                                                                                              Exclusive - Brazil

                                                                                                                                                                             New Port of Santos CEO
                                                                                                                                                                             vows to shake things up
  Sri Lanka                                                                                           Ireland
                                                                                                                                                                             Newly appointed president of the Port of
                                                                                                                                                                             Santos (Codesp), Casemiro Tércio Carvalho,
Government planning to develop Colombo’s East                                                        Port of Cork gears up for new                                           has promised to root out corruption from the

Container Terminal with Japan and India                                                              container terminal opening in                                           port while developing a model that works better
                                                                                                                                                                             for the users of the port and its hinterland area.
                                                                                                     2020                                                                       The port authority’s former president Alex
Sri Lanka, Japan and India have signed              timely in their capacity expansion, execution,                                                                           Oliva was arrested in November 2018 over a
a Memorandum of Cooperation (MoC) to                and service levels. The envisaged MoC is a       The new container terminal at the Port of Cork is on track to           corruption scandal with allegations of fraud
jointly develop the new deep-water facility         significant step in ensuring Colombo Port        open in 2020 with one year of construction already completed            worth in excess of R$37m (US$10m), mainly                 Casemiro Tércio Carvalho, president of the Port of Santos

East Container Terminal (ECT) at the Port           delivers on these goals in an agile manner.”     at the multipurpose port, which also features cruise, bulk,             concerning IT systems.
of Colombo.                                             Sri Lanka’s ports minister Sagala            liquid bulk and ferry facilities.                                          Codesp has also attracted a reputation for           solutions.                                                    km road that connects both sides of the port.
   The plan is for the Sri Lanka Ports              Ratnayaka said two months ago that the              Last year, the port handled 230,000 teu representing a 6%            inefficiency with dredging problems making                 In terms of port operations, Carvalho                      The idea would be to have all port road in-
Authority (SLPA) to retain 100% ownership           SLPA was procuring cranes from Japan,            increase in container volumes and the new terminal will have            vessel dimension restrictions a fairly regular          identified “two huge bottlenecks” – the channel               frastructure provided by a concessionaire.
of ECT while owning a 51% stake in the              noting it wanted to attract shipping lines       a capacity of 330,000 teu in its first phase to accommodate             occurrence at South America’s biggest port.             and road and rail connections between the                        Over the long term, his vision is for the port
new Terminal Operations Company (TOC)               “which operate the largest ships in the          future growth.                                                             Carvalho told CM: “I want to provide                 port and the hinterland.                                      to have an initial public offering (IPO) on the
while the Japanese and Indian governments           industry”.                                          Increasing ship size was one of the main drivers behind              compliance and a transparent environment                   He intends to offer a long-term tender in                  stock market, offering 49% of the shares.
hold the remaining 49%.                                 ECT’s first phase was completed in 2015      the development and the facility will be able to accomodate             in the market. We need time to rebuild the              the market for the concession of the whole                       In the meantime however, Carvalho intends
   According to the SLPA, retaining                 with a US$80m loan from Bank of Ceylon           vessels of 13 m in draught and 4,000 teu in capacity– the               reputation. My table is the same table as the           channel, covering the dredging, environmental                 to issue a new concession by the first half
majority ownership in the TOC represents            (BOC). A part of the terminal is equipped        largest in any Irish port.                                              chief financial officer, the chief operating officer,   monitoring, emergency services equipment                      of 2020 for the terminal previously run by
a “significant step in prioritising national        with a 440 m quay berth and an 18 ha yard           The existing container terminal in Cork is nearer the city,          the engineering director etc. We sit together           and the vessel traffic management information                 Libra Terminais, a schedule he admits, will
interests” while financing from the joint           in addition to other equipment.                  thereby limiting the dimensions of vessel calls in both length          and make decisions with transparency.”                  system (VTMS).                                                be very tight.
venture partners will help “Colombo Port                In geopolitical terms, some observers        overall (LOA) and draught due to the narrowness of the river.              After reorganising all the costs at the Port            Carvalho would like to include both
to develop at a faster pace than would              have noted the agreement with Japan and             Paul O'Regan, chief operations officer and harbour master            of Santos within the next few months, he                maintenance and deepening dredging in
otherwise be feasible using the SLPA’s              India may be seen as a significant counter       at the Port of Cork, told CM: “This is the first greenfield             wants to issue monthly or bi-monthly reports            the same contract if feasible as margins for
own funds”.                                         to China’s Belt and Road Initiative.             container site to be built in Ireland in decades, from conception       to the market covering costs and revenues to            the increasing depth tend to be lower than                     Poland
   A statement from the SLPA noted that an              China already operates the only present      through to delivery.”                                                   indicate to customers that the port authority           the former.
envisaged Japanese loan “carries one of the         deep-water terminal in Colombo, Colombo             “The container terminal will be very advanced from an ICT            is a “serious administration”.                             He hopes to set up a dynamic draught in
best loan terms Sri Lanka has obtained”.            International Container Terminal (CICT),         perspective with a smart terminal operating system (TOS)                   In his first month in the post, R$10m                the channel, through investments in sensors,                  PSA acquires DCT
Bloomberg has reported that Japan will
provide a 40-year Yen loan with a 10-year
                                                    which is run by China Merchants Port
                                                    Holdings, while it also holds a 99 year
                                                                                                     system, an automatic gate system and a fully implemented
                                                                                                     vehicle booking system for pick up and deliveries at the
                                                                                                                                                                             (US$2.5m) of costs were cut, comprising
                                                                                                                                                                             contracts and redundancies. Codesp has more
                                                                                                                                                                                                                                     equipment and algorithmic models, in an effort
                                                                                                                                                                                                                                     to eliminate the average four hours per day
                                                                                                                                                                                                                                                                                                   Gdansk with Polish
grace period although the SLPA has not              concession for Hambantota Port.                  terminal. These are all game changers in Ireland.”                      than 1,300 employees today and Carvalho                 lost in operations.                                           Development Fund and
confirmed that these are the terms.                     The Port of Colombo currently has three         The port has ordered two new ship-to-shore (STS) cranes              hopes to reduce this number “to have a                     “More than deepening, I want to focus on                   IFM Investors
   The statement from the SLPA added:               main terminals — Jaya Container Terminal,        from Liebherr which will be the largest and most advanced               smaller healthy company with more revenues”.            how many days we have the same depth,”
“Within the next three decades, over 45%            run by the SLPA, South Asia Gateway              quay cranes in Ireland.                                                    Carvalho was previously president of the             noted Carvalho. “The security of operators                    PSA International, the Polish Development
of global GDP and trade is predicted to             Terminal (SAGT), operated by John Keells            The terminal will be the first in Ireland to have a vehicle          Port of São Sebastião, former director of the           – so they know that if they sign a contract                   Fund (PFR) and the IFM Global Infrastructure
originate or be located within the Asian            Holdings and APM Terminals, and CICT.            booking system, enabling the haulage community to pre-plan              Waterways Department of the State of São                in Santos, the port authority will provide the                Fund (GIF) have completed the transaction
region.                                             The SLPA has ownership stakes of 15%             their arrivals “with a service level that can be guaranteed to          Paulo and most recently head of infrastruc-             same depth during the whole contract and                      to jointly acquire DCT Gdansk, the largest
   “In this ultra-connected world, deep re-         each in SAGT and CICT.                           them,” noted O’Regan.                                                   ture at investment fund Garín Investimentos.            they will not lose any centimetre because I                   terminal in Poland.
lationships with multiple trading partners              Japan has provided cooperation for the          The Port of Cork primarily serves the south, south east and             He is keen to develop a “concentration               forgot to dredge. The idea is to support his                     The partners have received formal approval
is not only prudent business, it is critical        development of Jaya Container Terminal           south west regions of Ireland, with the agricultural and phar-          mindset” at the port, viewing it as a cluster           dynamic draught for 366 m vessels.”                           from relevant competition authorities to buy
to ensuing Colombo Port remains relevant            since the 1980s while around 70% of              maceutical sectors representing big customers of the port.              of operations and services 50 km from the                  Regarding hinterland connectivity,                         the only terminal in the Baltic that can serve
to global trade.”                                   Colombo Port’s transhipment business                Before operations begin, the port authority is hoping to             Sao Paulo metropolitan area. “I want to show            Carvalho is keen to improve long distance                     ultra large container vessels (ULCVs) with a
   It continued: “Global cargo trade is an          is India-related.                                attract direct services from shipping lines which traditional-          the market that we develop this infrastructure          rail connections for container services and has               capacity of up to 23,000 teu.
extremely competitive, fast paced, rapidly              Work will begin by March 2020 according      ly pass by Ireland due to vessel size restrictions.                     together, including the private port and the            received interest from Brazilian rail company                    Container volumes handled by the terminal
evolving industry, that requires ports be           to Nikkei.                                          O’Regan pointed out: “When the new terminal comes                    public port,” he added. “Can we concentrate             VLI.                                                          have grown steadily over the years to reach
                                                                                                     online, we will approach shipping companies to offer con-               more cargo in Santos? Can we provide this                  He would like to invest in two rail lines                  1.9m teu last year.
                                                                                                     nectivity to Spain, Le Havre in France and Bremerhaven in               kind of infrastructure with quality, speed and          in the area of the port near Santos Brasil                       The terminal has a quay length of 1,306 m
                                                                                                     order to widen the connectivity map from Cork.”                         low cost? If you can increase the amount of             and Libra Terminais, as well as a ring rail                   and a maximum depth of 17 m. DCT Gdansk
                                                                                                        He does not expect the port’s container trade to be affected         cargo in the port, we split all the costs in the        connection and a new rail connection near                     is already undergoing expansion, which will be
                                                                                                     much by Brexit as the majority of lift-on lift-off (lo-lo) cargo goes   port – dredging, energy, per tonne you can              Brasil Terminal Portuário (BTP). Currently, rail              completed in the course of 2019 and 2020.
                                                                                                     via the mainland European hubs Rotterdam and Antwerp.                   smash these costs.”                                     lines in the Port of Santos tend to focus on                     A statement from the partners noted that the
                                                                                                        Nevertheless, the port is preparing trade facilitation areas in         Part of this plan includes the formation of a        dry bulk cargo such as soya.                                  consortium intends to “further strengthen the
                                                                                                     the new terminal as well as a land area for inspections, while          start-up accelerator hub in the port bringing               Carvalho is further studying if it is econom-             terminal’s position and to look into additional
  The Port of Colombo handled more than 7m teu in 2018                                               making greater use of IT to ease the burden on customs.                 technology companies to the port to create              ically viable to have a concession for a 35-40                expansion needs as and when relevant”.

06 — June 2019 — Container Management                                                                                                                                                                                                                                                                     Container Management — June 2019 — 07
Are the fuels of the future zero-carbon? - JUNE 2019 - Container Management
Canada                                                                     Argentina

Prince Rupert unveils plan to boost                                          Port of Buenos Aires bidders required to                                             THE FUTURE OF PORTS IS NOW
capacity by 6-7m teu                                                         invest US$760m over next ten years
                                                                                                                                                                   Make further steps for the
Prince Rupert Port Authority (PRPA) has completed a container terminal       Argentina’s transportation ministry has approved the bidding documents for            next generation of ports & terminals
master plan outlining the addition of 6-7m teu in capacity through the       the public tender for the Port of Buenos Aires, with the winning company
development of multiple terminals.                                           required to continue the ongoing expansion works representing an investment
   The master planning concluded the potential for further expansion of      of US$760m in the first ten years.
Fairview Terminal and the development of a second container terminal             The modernisation plan indicates that public and private investment will               LaseLCPS Load Collision Prevention       LaseAYC Automated Yard Crane               LaseSPC Straddle Carrier Positioning                  LaseTLP Truck Lifting Prevention
at the Port of Prince Rupert’s South Kaien Island site.                      reach US$1.91bn in total in the next 50 years.
   This second terminal features a capacity of 2.5m teu and was identified       The country’s General Administration of Ports launched the call in late
as the next phase of terminal expansion for the container business at the    May for national and international public bidding to operate the port. On
port following the expansion of Fairview Container Terminal announced        October 2, the envelopes will be opened and the winning operator's
with DP World in 2018, increasing its current capacity from 1.35m teu        concession will be awarded in December 2019.
to 1.8m teu by 2022.                                                             If the process proceeds according to schedule, the Port of Buenos
                                                                                                                                                                      LaseLCPS-STS Load Collision Prevention    LaseTPC Truck Positioning System             LaseGCP Gantry Collision Prevention                LaseBCP Boom Collision Prevention
   Both the current Fairview Terminal and South Kaien sites are in close     Aires will next year have just one concessionaire instead of the current
proximity to expanding export logistics operations on Ridley Island, and     situation where three groups control separate container terminals – DP
will integrate with these operations following PRPA’s construction of        World (Terminales Río de la Plata -TRP, which operates Terminals 1, 2 and
the Fairview-Ridley Connector Corridor scheduled for the end of 2020.        3), APM Terminals (Terminal 4) and Hutchinson Ports (Terminal 5).
   Shaun Stevenson, president and CEO of PRPA, said: “Conducting                 The plan envisages a single provider of port services, for a term of 50
this work ensures we have a clear understanding of the future potential      years, with a single zone of customs verification and a single access to the
for terminal development and contributes to a vision for the future of       port, through the Paseo del Bajo. Gonzalo Mortola, controller at the Port
our container business to respond to the growing market demand for           of Buenos Aires, stated: “This project was unthinkable three years ago,                                                                                                   Visit us at Stand D54
capacity at the Port of Prince Rupert.                                       but despite the 'impossible' and 'cannot' we started the path to position
                                                                                                                                                                                                                                                   18 - 20 June 2019
   “The terminal development potential identified in the study ensures       Puerto Buenos Aires as a leader in the region, and we are achieving this,
that we can accommodate the short, medium and long term supply               today, with this resolution, we reinforce the direction of change, betting                                                                                            Ahoy Rotterdam, Netherlands
                                                                                                                                                                 www.lase.de                                                                       Conference, Exhibition & Networking Event
chain needs of Canadian exporters while continuing to provide the un-        on a port connected with the provinces, modern, with more capacity and
paralleled reach, reliability and speed shippers have come to expect at      fundamentally without mafias that increase the logistics costs and make
the Port of Prince Rupert.”                                                  it impossible to grow our country.”
   The plan’s research, which was completed with the assistance                  The port’s modernisation project has received heavy criticism in the last
of AECOM, considered capital costs, optimisation of construction             few years with long delays causing operators to put investments on hold                  Sweden                                                                             The container terminal has a natural depth of 16.5 m and the length
sequencing to minimise disruptions to ongoing operations, and mitigation     while some sceptics have hit out at the lack of a comprehensive national                                                                                                 of the quay and terminal area are large enough to handle the biggest
of impacts on air quality, noise and lighting to determine the feasibility   transport plan.                                                                                                                                                          vessels operating in the Baltic Sea.
and sequencing of container terminal potential at the port.                      In November 2018, Olaf Merk, ports and shipping expert at the Inter-                Stockholm Norvik Port completes                                                     Stockholm Norvik Port aims to be an efficient and sustainable
   Maksim Mihic, general manager of DP World (Canada) Inc. stated
the operator supports the port authority’s plans which “improve the
                                                                             national Transport Forum (ITF), part of the OECD, told CM: “If the size of
                                                                             container ships continues to grow, it is difficult to see how Buenos Aires
                                                                                                                                                                     container quay construction                                                      transport hub, especially as it benefits from a good location.
                                                                                                                                                                                                                                                         Its proximity to one of Europe’s most rapidly growing capital regions
balance between imports and exports through the northern corridor”.          can still be an effective container port in 35-50 years’ time.                                                                                                           along with its short approaches from the fairways, good links to major
   The port, which handled 1m teu and 27m tonnes of cargo in 2018,               “There could be long-term options that would be more attractive to                  Stockholm Norvik Port, a new freight facility in Sweden, has completed           roads and rail connections are expected to appeal to shipping lines and
expects to become Canada’s second busiest port within five years.            terminal operators, either more downstream or more upstream.”                           construction of its 450 m container quay with less than a year until             other customers.
   Stevenson added: “Our planned container terminal capacity expansion           Following the launch of the port modernisation plan in December, a period           the port is scheduled to open.
ensures Canadian shippers will be able to meet their supply chain            of consultations was enabled so that the port community and interested                     Work to complete the port is moving forward at a rapid pace and
needs well into the future and Canada will be well-served in meeting         parties could get to know the project and make suggestions.                             upon opening the facility will feature both a container terminal and a
its objectives of growing trade in the Asia Pacific region.”                     The renewal of the port infrastructure will double the current cargo capacity       roll-on roll-off (ro-ro) terminal.
                                                                             and will have a flexible design, adaptable to the needs of the market in a                 Johan Wallén, marketing and sales director at Ports of Stockholm,
                                                                             more competitive and sustainable way according to the port administration.              said: “There is a lot of work going on simultaneously in the construc-
                                                                                 Up to now Puerto Buenos Aires has carried out expansion works for                   tion of Stockholm Norvik Port.
                                                                             US$75m, adding 9 ha for logistic operations in the Dársena F area and 15
                                                                             ha north of the sixth jetty that will function as an external cargo terminal.
                                                                                 It is hoped that the expansion will allow the entry of larger vessels with
                                                                             greater cargo capacity. Being a single operator, the maximum rates will be                  Stockholm Norvik Port aims to be an
                                                                             established by contract to ensure greater transparency and competitiveness.
                                                                                                                                                                       efficient and sustainable transport hub,
                                                                                 Port administrators believe the modernisation will enhance intermodality,
                                                                             reduce logistics times and costs. Currently, and for the benefit of the most            especially as it benefits from a good location.
                                                                             remote provinces, railway accesses are being improved, trucks will have a
                                                                             single access and a larger and better equipped waiting area.
                                                                                 The barges, on the other hand, will have a dock with exclusive priority               “The rail track is being laid and surface water management facilities
                                                                             and, thanks to the customs corridor in which they are already working, the              are being constructed, but for those of us working with shipping the
  Prince Rupert handled 1m teu in 2018                                       operations will be more efficient and coordinated.                                      completion of the container quay is an incredibly important milestone.”             The container terminal has a natural depth of 16.5 m

08 — June 2019 — Container Management
Are the fuels of the future zero-carbon? - JUNE 2019 - Container Management
UAE                                                                                                     Philippines

COSCO’s Abu Dhabi Terminal receives two mega-                                                            ICTSI proposes
vessels in less than a month                                                                             US$166.4m investment
COSCO Shipping Ports Limited’s (CSP) Abu            an increasingly competitive global economy;          into Iloilo Port
Dhabi Terminal at Khalifa Port has received         applying the latest port technologies to improve
two of the world’s largest mega-vessels within      efficiencies, reduce calling times, and ultimately   International Container Terminal Services, Inc.
less than a month.                                  deliver a competitive edge to our customers.”        (ICTSI) intends to invest P8.7bn (US$166.4m)
   When it arrived on May 5, 2019, the M.V             The deep-water semi-automated CSP                 to upgrade the Iloilo Port once the Philippine
COSCO Shipping Pisces was the largest ship          Abu Dhabi Terminal connects Khalifa Port to          Ports Authority (PPA) acts on its unsolicited
ever to call at Khalifa Port, however three         CSP’s global terminal portfolio which covers         proposal.
weeks later the M.V COSCO Shipping Solar            285 berths at 37 ports worldwide and is                  The proposal is up for review by the PPA
dethroned it with a capacity of 21,000 teu.         the company’s first international greenfield         board but has gathered support from Ilonggo
   Captain Mohamed Juma Al Shamisi, CEO             subsidiary.                                          Senator Franklin M. Drilon who has urged
of Abu Dhabi Ports, said: “The container               CSP has invested AED1.1bn (US$299.5m)             the port authority to act upon the proposal.
industry is constantly looking for ways to          in capital expenditure on construction and               Drilon said: “The expansion of Iloilo port
improve efficiency, and the use of mega-ves-        machinery at the terminal, which boasts              sits well with our plans for the province. This
sels to cut costs and time is a trend shaping       1,200 m of quay, a water depth of 18 m and           early we are seeing a heightened shipping
the future of the sector.                           a design capacity of 2.5m teu.                       activity in the province due to the economic
   “We have ensured that through CSP Abu               It also includes the largest Container Freight    developments that have taken place in the
Dhabi Terminal, Khalifa Port is able to handle      Station (CFS) in the Middle East, covering           province for the past years.
the largest vessels of today and adapt to           275,000 sq m, which offers facilities for full and       “We have to develop our port and equip
those of tomorrow.”                                 partial bonded container shipments, the full         it with modern facilities so it can continue
   The arrival of the two mega-vessels – both       range of container packing services and more.        to accommodate the growing demand for
of which started their journeys from Qingdao           CSP Abu Dhabi Terminal forms part of a            port services.”
in China – highlights Abu Dhabu’s position          five-year strategy by Abu Dhabi Ports aimed              Christian Gonzalez, ICTSI’s global corporate
as a major trade hub aloing China’s Belt and        at strengthening the maritime sector in the          head, said that the company’s objective is
Road Initiative (BRI).                              Emirate and driving economic diversification.        to bring the port to “world class levels” by
   Since it started trial operations on April 20,      The strategy, in line with Abu Dhabi Economic     maximising ship capability, installing ship-to-     Peru                                                                                                           Brazil
2019, CSP Abu Dhabi Terminal has received           Vision 2030, aims to increase regional trade         shore (STS) gantry cranes and continuous-
four mainline vessels including the 14,000 teu      and attract foreign direct investment.               ly upgrading yard capacity.
capacity MV. CSCL Mercury and the 19,000               Abu Dhabi Ports has set aside AED10bn                 Through these development plans, Gonzalez      COSCO finalises agreement to develop US$3bn multi-                                                            DP World Santos
teu capacity MV. CSCL Globe.
   Captain Ju Weiping, CEO of CSP Abu Dhabi
                                                    (US$2.7bn) in investment to increase capacity
                                                    at Khalifa Port from the current 5m teu to 9.1m
                                                                                                         expects Iloilo to become a major regional
                                                                                                         transhipment hub for the Visayas as well as
                                                                                                                                                            purpose port                                                                                                  inaugurates logistics
Terminal, said: “The terminal has been built        teu, which also includes boosting capacity at        becoming more competitive for agri-aqua                                                                                                                          warehouse
to accommodate the evolution of trade in            Terminal 1 to over 5m teu.                           products.                                          COSCO Shipping Ports Ltd (CSP) has signed               Half of the four berths will be container terminals
                                                                                                             Iloilo’s agri-aqua products can be shipped     the subscription and investment agreement with       with an annual capacity of 1m teu while the other        DP World Santos has inaugurated a new
                                                                                                         to domestic and foreign markets in refriger-       Volcan to acquire stake in the Port of Chancay,      half will be multi-purpose terminals.                    logistics warehouse that will be used
                                                                                                         ated containers, thus driving costs down           where it has planned to develop a US$3bn mul-           Captain Xu Lirong, chairman of China CSP,             for general loads storage in addition
                                                                                                         potentially becoming a great benefit upon          tipurpose terminal.                                  explained that CSP chose to invest in the Port           to storing and spawning containers.
                                                                                                         the completion of the Jalaur River multi-pur-         Port of Chancay is located 58 km to the north     of Chancay because of the “great potential” in              Sultan Ahmed bin Sulayem, group
                                                                                                         pose project in 2022.                              of the Peruvian capital of Lima where, combined      Peru’s economic development and trade between            chairman of DP World Group, said: “We
                                                                                                             The project will irrigate 31,000 ha of rice    with the surrounding areas, 60% of the country’s     the two countries.                                       are in operation in Brazil for more than
                                                                                                         land, doubling the rice production of Iloilo and   economic activities are concentrated.                   In cooperation with Peru, CSP aims to develop         six years and we remain excited and
                                                                                                         Drilon believes that Iloilo is poised to become       Zhang Wei, chairman and managing director         the port into an important hub in Latin America          positive about the prospects for growth
                                                                                                         a major exporter of agricultural products once     of CSP, said: “With the rapid development of         and near the Pacific coast to promote regional           in our businesses and the creation of
                                                                                                         it is completed.                                   Peru’s economy and trade, insufficient port in-      economic development.                                    new opportunities.”
                                                                                                             When the traffic limit in the Iloilo port is   frastructure capacity has become increasingly           Lirong added: “It will become the new link               It was the first time bin Sulayem had
                                                                                                         about to be reached, the port in Dumangas          significant.                                         and bridge for trade and economic exchanges              visited the terminal, located on the left
                                                                                                         will be developed as originally proposed by           “Serious congestion and high logistics costs      between China and Peru.”                                 bank of the Port of Santos, since it
                                                                                                         Governor Arthur Defensor.                          have brought challenges to ship owners and              In order to develop the facility as a hub, CSP        began operations.
                                                                                                             Mayor-elect Jerry Trenas said that he will     shippers, which constrains the sustained and rapid   will introduce shipping companies and a logistics           The new logistics warehouse, which
                                                                                                         ensure full cooperation of the city to ensure      development of the Peruvian economy. Therefore,      supply chain, equipped with modern facilities and        is not yet in operation, was completed
                                                                                                         that the road network to and from the port         we, together with Volcan, have joined forces to      an intellectual system.                                  in May 2019 after eight months of work.
                                                                                                         is upgraded to accommodate the expected            invest, build and operate the Chancay project.”         Li Yun, charge d’affairs of the Chinese Embassy          With an investment of R$20m
                                                                                                         traffic.                                              The port is a natural deep-water harbour with     in Peru, said: “China and Peru jointly develop the       (US$5m), it covers 6,000 sq m and is
                                                                                                             Additionally, local incentives will also be    a maximum of 16 m water-depth, capable of            Port of Chancay, which is an important cooperation       built on an area of more than 19,000 sq
                                                                                                         reviewed to make it attractive for exporters       servicing larger vessels, and phase one of the       in the infrastructure field and symbolises the           m, enabling room for future expansion
   The 21,000 teu M.V COSCO Shipping Solar                                                               and importers to use the port.                     construction of Chancay will include four berths.    friendship between the two countries.”                   of the complex.

10 — June 2019 — Container Management                                                                                                                                                                                                                                     Container Management — June 2019 — 11
Are the fuels of the future zero-carbon? - JUNE 2019 - Container Management
Egypt                                             Mexico

Damietta Port ready to                             New Hutchison Ports ICAVE terminal receives first vessel
handle 14,000 teu vessels
                                                   Hamburg Süd’s Mexico Polar container ship                  subsidiary of Grupo Alfa, one of the largest
Deepening works at Damietta Port Authority         has become the first vessel to dock at the                 corporate groups in Mexico, said: “We are
(DPA) have been completed, enabling the            new Hutchison Ports ICAVE terminal in the                  proud to baptise this ship, while the city
Egyptian port to handle container vessels of up    Port of Veracruz.                                          and the port of Veracruz celebrate its 500 th
to 14,000 teu in capacity and 15 m in draught.       The vessel, which has a length of 230                    anniversary.”
   The works deepened the navigational channel     m, a width of 37.30 m and a capacity of                       The Mexican economy, he continued,
to 16 m and the turning circle and container       3,800 teu, was named in a ceremony at                      is strong in the fruit sector, as well as
berths to 15.5 m.                                  the terminal which is scheduled to soon                    in other industries with high import and
   Captain Tarek Shahin, chairman of the           begin operations.                                          export volumes, such as automotive
DPA, claimed that Damietta Port is now at                                                                     manufacturing, chemical products and
the forefront of ports in the Eastern Mediter-                                                                brewing.
ranean, especially as it can implement Just-                                                                     He added: “As a global operator, we are
in-time (JIT) operations on ships at the ports,      “As a global operator, we                                serving the Mexican market with a set of
thus eliminating waiting times for vessels.                                                                   very competitive connections to almost all
                                                     are serving the Mexican
   The port, which is 200 km north of Cairo,                                                                  other continents.”
was the first Egyptian port to introduce the         market with a set of very                                   The Mexico Polar is integrated into
OPS technique for providing electric power         competitive connections to                                 the German carrier’s Northern Europe –
to berthing vessels.                                                                                          Mexico / Caribbean (EMCS) Service, which
                                                   almost all other continents”
                                                                                                              connects Altamira, Veracruz and Progreso,
                                                                                                              as well as other Caribbean ports with
  Global                                                                                                      Ireland, Great Britain, Antwerp and
                                                      Due to its size, design and number of                   Bremerhaven.
                                                   reefer connections (1,000 plugs), the vessel                  The ship belongs to a group of four struc-
PSA acquires terminals                             is specially designed to transport refriger-               turally identical vessels in the Polar class

in Canada and the US                               ated cargo.
                                                      Carlos Ayala, director of logistics and
                                                                                                              that have been built for Hamburg Süd by
                                                                                                              the Chinese shipyard Jiangsu New Yangzi
                                                   distribution of Alpek Poliester, which is a                Shipbuilding.
PSA International has agreed to acquire
Halterm Container Terminal in the Port of
Halifax, Canada, and Penn Terminals in Penn-
sylvania, USA from Macquarie Infrastructure
Partners, a fund managed by Macquarie In-
frastructure and Real Assets.
   The Singapore-based operator overcame
a joint bid by Canada National Railway and
CMA CGM, Logistec and others for Halterm,
the biggest container terminal in eastern
Canada, according to JOC.com.
   The acquisitions give PSA its second and
third facilties in North America, adding to
Ashcroft Terminal, the inland depot it runs
300 km east of the Port of Vancouver.
   This transaction is in the process
of securing regulatory approvals from
the respective USA and Canadian
authorities.
   The Port of Halifax, which handled
550,000 teu last year, is currently executing
a temporary extension of the South End
Container Terminal enabling it to berth two
vessels of more than 10,000 teu simulta-
neously by 2020.
   It is hoped that the temporary pier extension
will enable the port to go ahead with planning
for a longer-term solution.                          The new ICAVE terminal will soon begin full operations

12 — June 2019 — Container Management
                                                                                                                                                              Visit Navis at TOC Europe, 18-20 June 2019, at stand E42!
Are the fuels of the future zero-carbon? - JUNE 2019 - Container Management
When Purchasing
Equipment                                                                                                                                                                                          a Shipping Container
                                                                                                                                                                                                     Never Forget The

                                                                                                                                                                             7 Questions
  Italy                                             that we will always have a partner in them,”                  technology could also potentially be used in
                                                    Faccini added.                                                container-handling contexts in the future.
                                                                                                                     “The financial investment required by
Fantuzzi enters North-                                                                                            these kind of machine is more significant

American market                                         "Delco had a positive
                                                                                                                  than that required by conventional ones
                                                                                                                  and spending less is often still considered             New containers may all look alike on the outside. But what’s going on under the surface?
                                                                                                                  more important than being environmental-
                                                     experience when operating                                                                                          As you will see in the comparison below, there can be a big difference in quality, durability and
Italian equipment manufacturer Fantuzzi                                                                           ly friendly,” he elaborated. “We decided that
Team Material Handling (FTMH) has entered            Fantuzzi Group’s machines                                    we will not make any investments into hybrid                         capability between a low specification and high specification box.
the North-American market for the first time            and they are now very                                     machines because we believe it is a further
with multiple orders for its empty container                                                                      complication of something already complex
                                                      satisfied with the FTMH’s                                                                                                                                                     High Specification Box.       Low Specification Box.
handlers.                                                                                                         on its own, but as far as reachstackers are                                                                     As always used by Flex-Box.       As used by many
    The company has delivered four units with         empty container handlers                                    concerned we will focus on alternatives                                                                          We never use low spec.               traders.
a maximum stacking height of 8+1 containers            we delivered last year"                                    including hydrostatic transmissions.”
to Delta Container (Delco), which operates
an off-dock depot for shipping lines calling
                                                                                                                     For the future, Faccini told CM that the man-
                                                                                                                  ufacturer will continue to produce high-qual-
                                                                                                                                                                        1 What is the Tare weight?
                                                                                                                                                                           (The weight of the empty box)
                                                                                                                                                                                                                                           2,185 kg       3               2,040 kg
                                                                                                                                                                                                                                                                        That’s 145 kg
                                                                                                                                                                                                                                                                        less material
                                                                                                                                                                                                                                                                                             7
Deltaport’s container terminal in Vancouver,                                                                      ity machines without rushing to increase its
Canada. Two more units of the same kind                FTMH has also recently developed a new                     production. He explained: “In addition to re-
will be delivered to Euro Asia’s container
yard, also located in Vancouver, in the third
                                                    fully-electric 25 tonne forklift truck. The new
                                                    machine is currently in the final stages of
                                                                                                                  furbishment projects, we currently produce
                                                                                                                  between 50 and 60 machines per year and
                                                                                                                                                                        2 How thick is the roof panel?                                     t 2.0 mm       3             t 1.6 mm
                                                                                                                                                                                                                                                                  Weak and prone to rust
                                                                                                                                                                                                                                                                       penetration
                                                                                                                                                                                                                                                                                             7
quarter of 2019.                                    testing and, at the time of writing, it was                   I believe now it is not the time to focus on
    According to FTMH’s sales director Corrado      expected to be delivered within weeks to                      revenue sacrificing margins.
Faccini, the company was able to enter the
Canadian market because customers like
                                                    an Italy-based steel plant. Faccini told CM
                                                    that while the new equipment unit was built
                                                                                                                     “As opposed to the big equipment manufac-
                                                                                                                  turers, which have to keep a large production
                                                                                                                                                                        3 How thick are the side panels?
                                                                                                                                                                           (For each of the five panels)
                                                                                                                                                                                                                                        t 2.0 mm outer
                                                                                                                                                                                                                                        t 1.6 mm inner    3             t 1.6 mm
                                                                                                                                                                                                                                                                  Weak and prone to rust
                                                                                                                                                                                                                                                                       penetration
                                                                                                                                                                                                                                                                                             7
Delco had in the past been very satisfied           to be able to operate on uneven grounds                       in order to maintain in operation their facilities,

                                                                                                                                                                                                                                                          3                                  7
with machines manufactured by the now               in challenging environments typical of steel                  our company size allows us to tailor production
closed-down Fantuzzi Group. Indeed, while           plants, depending on demand and costs, the                    to demand.”                                           4 How thick is the door panel?                                     t 2.0 mm
                                                                                                                                                                                                                                                                        t 1.6 mm
                                                                                                                                                                                                                                                                  Weak and cheap feeling
FTMH was founded in 2014, many members
of its staff, including several technicians, used

                                                                                                                                                                                                                                                          3                                  7
to work for the group.                                                                                                                                                                                                                                                    5,460 kg
    “Delco had a positive experience when                                                                                                                               5 How strong is the floor payload test?                            7,260 kg                  Likely floor failure
operating Fantuzzi Group’s machines and                                                                                                                                                                                                                              under heavy load
they are now very satisfied with the FTMH’s
empty container handlers we delivered last
year,” he told CM. “The fact that a customer
in a market geographically so far from us has
                                                                                                                                                                        6 How many years is the paint guaranteed for?                       5 years       3              2-3 years
                                                                                                                                                                                                                                                                       Very weak rust
                                                                                                                                                                                                                                                                         protection
                                                                                                                                                                                                                                                                                             7
realised that although our company is recent
                                                                                                                                                                                                                                                                    Zinc primer 10 um
the experience we have dates back several
decades is a great source of satisfaction.”
    According to Faccini, Delco is already
                                                                                                                                                                        7 What is the composition of the external paint?
                                                                                                                                                                           (Specifically the thickness of the Zinc rich primer)
                                                                                                                                                                                                                                      Zinc primer 30 um
                                                                                                                                                                                                                                      Middle coat 40 um
                                                                                                                                                                                                                                       Top coat 40 um
                                                                                                                                                                                                                                                          3         Middle coat 40 um
                                                                                                                                                                                                                                                                      Top coat 30 um
                                                                                                                                                                                                                                                                                             7
planning to add more machines to its fleet
                                                                                                                                                                                                                                                                 Very weak rust protection
as the Fantuzzi Group’s units currently being
operated there are reaching the end of their
                                                                                                                                                                                  When you have the answer to these seven questions, you can compare that
lifespan and need replacing. He added: “All                                                                                                                                  box’s specifications to those of a Flex-Box container. Then you can make an informed
thanks also to the precious work done by                                                                                                                                                           decision on which of them you want to buy.
local agent Scantlings Enterprises, which
has supported since the beginning FTMH

                                                                                                                                                                                                              NEW CONTAINERS
in sales and assistance.”
    As concerns the European market, FTMH
has recently received an order for six empty
container handlers from a north-European                                                                                                                                                         ANY TYPE • ANY VOLUME • ANY LOCATION
company which rents equipment units to
several terminals. “The company is always
very satisfied with our machines and told us          Delta Container's Vancouver facility with FTMH's machines
                                                                                                                                                                        www.flex-box.com                                                   new@flex-box.com
14 — June 2019 — Container Management                                                                                                                                                                                                                    Container Management — June 2019 — 15
Are the fuels of the future zero-carbon? - JUNE 2019 - Container Management
USA                                                   Spain                                                                                                               Spain                                                                                  Panama

Gulftainer orders 16                                   Port of Valencia converts existing Konecranes RTGs to                                                               BEST receives six new Konecranes ASCs                                                  Global Port Equipment
fuel-efficient terminal                                fully-electric operation                                                                                            Hutchison Ports’ Barcelona Europe South Terminal (BEST) has increased its
                                                                                                                                                                                                                                                                  reachstackers used in tunnel
tractors for Port                                      The Port of Valencia has implemented Spain’s                  physical contact while it eliminates the need         capacity with a delivery of six new automated stacking cranes (ASCs) supplied          reinforcement project
Wilmington                                             first busbar retrofit of its Konecranes rub-                  for refuelling in order to enable the RTGs to         by Konecranes.
                                                       ber-tyred gantry (RTG) cranes with the aim to                 spend more time shifting containers.                     The facility now has a storage capacity of 27 automated blocks, up from its         A Panamanian/Spanish company has embarked on an
GT USA, the US arm of Gulftainer, has placed           improve its sustainability, safety and efficiency.               Valentin added: “The challenge for us is           previous 24 automated blocks, which are being assembled and tested and are             inventive project to reinforce the tunnel of the large hydro-
an initial order of 16 fuel-efficient, low-emis-          In addition to purchasing new busbar-ready                 implementing new methods and procedures               expected to be fully operational in June 2019.                                         electric power plant in Changuinola, Panama, using reach-
sion terminal tractors from Terberg Tractors           Konecranes RTGs, MSC Terminal VLC (MSCTV)                     – to improve sustainability for example – and            Guillermo Belcastro, Hutchison Ports BEST CEO, said: “This investment will          stackers from Global Port Equipment (GPE), which is part of
Americas for the Port of Wilmington.                   converted its existing RTGs to fully electric                 instilling them in the minds and mentality of         result in a significant increase in operational and storage capacity at the terminal   the Forkliftcenter Group.
   The equipment will be introduced in a phased        operation through the busbar retrofit.                        each MSCTV employee and dock worker.                  and will contribute to our continuous improvement of service levels both in               The centrepiece of the project is a steel reinforcing mechanism,
manner with delivery of the first three units             MSCTV terminal manager Sven Valentin                          “The simplicity of Konecranes’ solution has        maritime and land operations.”                                                         which weighs approximately 10 tonnes.
scheduled for mid-June with subsequent                 said: “MSCTV has a strong company focus                       been a great help in this area.”                         BEST currently has 11 super post-panamax quay cranes capable of operating              The company has specially designed a distinct attachment
deliveries scheduled for August and October.           on sustainability and we believe that using                      Konecranes implemented a ‘single push              the largest vessels in the world, 48 ASCs, 2 rail-mounted gantries (RMGs) and          for this project, producing it in Spain.
   Eric Casey, CEO of GT USA Wilmington, said:         ‘clean’ equipment to reduce our environmen-                   button’ system, thought of by the MSCTV team,         30 shuttle carriers.                                                                      The specific attachment, which is hydraulically controlled
“We are eager to take delivery of these tractors       tal impact is imperative to continuing to work                with the aim to simplify the RTG operator’s              Hutchison Ports has been committed to building an efficient and environmen-         by electro valves and weighs two tonnes, is equipped with
in the coming months to enhance and support            harmoniously with our local communities.                      requirements and make the retrofit easier to          tally sustainable terminal in the Port of Barcelona and this is reflected in the new   hydraulic cylinders to position the steel reinforcing mechanism
our transformation at the Port of Wilmington.             “Konecranes not only supplies the technology               introduce and accept.                                 cranes which are electric and move on rails.                                           at the tunnel construction.
   “We are delighted to continue the 30-year           to make this happen, but they share the same                     The manufacturer also added trailer lift                                                                                                      The reachstackers supplied by GPE run two shifts a day,
relationship that our parent company has had           environmentally conscious mind set, which                     prevention and auto-steering to the RTGs in                                                                                                   six days a week. To secure the availability of the machines,
with Terberg for terminal tractors. They have          makes them a valued supplier to work with.”                   order to enhance safety and performance.                                                                                                      GPE installed a fully equipped mobile workshop which is
consistently proven to be reliable, cost effective        The retrofitted RTGs offer an approximate                     Additionally, MSCTV has a service agreement               “This investment will result in a significant                                    permanently staffed by a technician with parts nearby in stock.
and inevitably will exceed life cycle expectations.”   20% reduction in CO2 emissions and aim to                     in place with Konecranes to ensure all cranes                                                                                                    Besides the steel reinforcing mechanism, the reachstack-
                                                                                                                                                                                 increase in operational and storage capacity
                                                       provide less noise, operate at higher levels of               are maintained and serviced regularly.                                                                                                        ers are also bringing other heavy necessary building materials
                                                       productivity and reliability as well as requiring                Konecranes has also provided dedicated                     at the terminal and will contribute to our                                      and components into the tunnel which is longer than 1 km.
                                                       less maintenance.                                             service technicians to work closely with the                 continuous improvement of service levels                                           GPE offers sales, rental, spare parts and maintenance and
     "Terberg is delighted                                With a busbar system, the power is supplied                terminal’s maintenance department on a
                                                                                                                                                                                    both in maritime and land operations”                                         has branches in Europe and Latin America.
                                                       by a low electrified fence that provides the                  daily basis.
      to extend our strong
 relationship with Gulftainer
  as GT USA embarks on this                                                                                                                                                   BEST was officially inaugurated in September 2012 and has since achieved a
                                                                                                                                                                           ship productivity rate of over 200 movements per hour and a sustained average
     exciting new chapter"
                                                                                                                                                                           performance of more than 40 movements per hour and by crane.
                                                                                                                                                                              The facility is the first semi-automated terminal developed by Hutchison Ports
                                                                                                                                                                           Group and it boasts one of the most modern gate systems in Europe, and one
                                                                                                                                                                           of the largest railway terminals within a container terminal in the Mediterranean.
   The tractors are fitted with the most recent                                                                                                                               The railway terminal has eight mixed gauge tracks (Iberian and UIC) which
Tier 4F fuel-efficient low-emissions Cummins                                                                                                                               connect BEST daily with different points of Spain and the South of France.
engine, which is compliant with prevailing EPA
legislation, and energy efficient lighting.
   Additionally, the machines also include a new
                                                          The RTGs have been converted to fully-electric operation
design transmission which will further contribute
to fuel reduction by up to 17%.
   The tractors have a Gross Combined Weight
Rating (GCWR) of 155,000 lbs and incorporate            USA
a hydraulically operated fifth wheel fof 75,000
lbs lifting capacity.
   Safety and protection features include a            Phoenix launches versatile crane and terminal light
speed limiter, automatic engine protection and
a 90 db automatic reversing alarm.                     Phoenix Lighting has launched the Wayfinder,                     Should there be an interruption in power, the
   Terberg Tractors Americas Inc. spokesper-           the latest edition to its durable light-emitting              light fixture includes a built-in emergency battery
son Ron van Arkel said: “Terberg is delighted          diode (LED) product line, which has been spe-                 backup (EMB) option to keep it illuminated for a
to extend our strong relationship with Gulftainer      cifically designed for ports with safety in mind.             minimum of 120 minutes during power outages.
as GT USA embarks on this exciting new                    The Wayfinder projects a wide beam angle to                   The US-based lighting manufacturer said
chapter at the Port of Wilmington.                     allow fewer fixtures to cover more surface area               that, like all of its products, the compact yet
   “These new tier-4 final tractors, delivered         for effective and efficient lighting as it delivers           powerful Wayfinder fixture aims to increase
through Terberg Tractors Americas, will support        1,100 lumens to access ways, walkways,                        efficiency, eliminate untimely maintenance and                                                                                                The project features a steel reinforcing mechanism and a
GT USA’s productivity targets.”                        stairways, platforms and other small areas.                   support green initiatives.                              The ASCs are expected to be fully operational in June 2019                            specific attachment

16 — June 2019 — Container Management                                                                                                                                                                                                                                                     Container Management — June 2019 — 17
Are the fuels of the future zero-carbon? - JUNE 2019 - Container Management
Germany                                              the terminal has to pay fees.                             good to give them an opportunity to test their
                                                          “Therefore, it is better to run everything on a        ideas in the virtual world.”
                                                       computer in a virtual environment so you can                 In Schuett’s experience, the majority of
Akquinet looks to                                      test new strategies. You can rerun yesterday’s            terminals do not change the parameters from

smarten up the way ports                               shift and change the parameters and allocations
                                                       of the equipment. This allows planners to
                                                                                                                 their original terminal operating system (TOS)
                                                                                                                 set-up, partly due to a lack of opportunity to
use their equipment                                    improve without anyone telling them what to               test new strategies.
                                                       do and without burning fuel or disturbing the                Another company within the Akquinet Group
Container terminals should not only invest in          real operation.”                                          offers sensors for predictive maintenance.
new equipment but also in increasing the effec-           There are also tools for terminals to run              This data can be used to ensure that enough
tiveness of their existing equipment according         simulations so they can plan the next shift.              equipment is available at peak times.
to Holger Schuett, manager of Akquinet Port            Planners can enter parameters such as the                    “Normally equipment is taken out of operation
Consulting (APC).                                      number of quay cranes per vessel and the                  at standard periods without looking at the peak
    The Germany-based Akquinet Group features          number of straddle carriers per quay crane.               moments on the terminal at all,” added Schuett.
24 small and medium-sized businesses including            The simulation indicates how the plan will             “On the other hand, if you do not do maintenance
APC (formerly known as ISL Applications) which         turn out and enables operators to optimise their          in a good way, you will have a lot of breakdowns.”
offers virtual simulation and emulation tools to       strategy for forthcoming vessel calls.
ports.                                                    Schuett added: “Our idea is to make planning
    Its Virtual Terminal solution allows operators     more proactive. If you look at a container terminal
to test new strategies, optimise processes and         now, you will find 20 people in the control room
train the control staff of the terminal.               waiting to react to bottlenecks.”
    Schuett stated: “Typically nowadays, a planner        “Planners today have to do lifelong learning,”
at a terminal learns by watching other people.         noted Schuett. “Vessels are getting bigger, the
Only in the real world where vessels have to           number of containers with one trip has increased
be served is he/she able to test new ideas. If         a lot. Maybe before you had 3,000 moves at a                Holger Schuett, managing director of Akquinet
it doesn’t work, the vessel will be delayed and        vessel arrival but now you have double that. It’s           Port Consulting

  China                                                                              Finland

Bromma to deliver 30 yard spreaders to                                              Konecranes launches 11-tonne empty
Shenzhen                                                                            container handler

Shenzhen Haixing Harbour Development has ordered a total of 30 yard                 Konecranes has launched its first empty container handler with a double
spreaders from Swedish manufacturer Bromma.                                         stack capacity of up to 11 tonnes, specifically designed for heavy-duty
   The order consists of 27 single lift YSX45E and 3 twin-lift YTS45E               double handling application.
spreaders which will be delivered as part of automatic rail-mounted                    The SMV ECC 6/7 110 DS has been dubbed the “no limitations
gantry (aRMG) cranes from Chinese heavy equipment manufacturer Sany.                empty container handler” by the manufacturer as it makes full use of an
   Vikram Raman, vice president for Asia Pacific (APAC) at Bromma,                  11-tonne telescopic side lift spreader for handling two empty containers
said: “We have since a few years back strengthened our organisa-                    simultaneously.
tion in China. Today we have a very strong team of sales and service                   Patrik Lundbäck, director of sales and distribution at Konecranes Lift
engineers to support our local customers.                                           Trucks, said: “We’ve seen an increase in demand for empty container
   “This order is a result of our high quality products and the local support       handlers with double handling and 11-tonne capacity, especially from
we provide in China.”                                                               countries that export a lot of fruit in reefer containers.
                                                                                       “This truck’s ability to lift offset loads means increased productivity for
                                                                                    operators, as it can handle any type of container.”
                                                                                       Less sensitive to eccentric loading, the truck has the ability to lift double
                                                                                    reefer containers with aligned refrigerators and comes with sideways artic-
                                                                                    ulation that makes it easier to attach containers from the side as standard.
                                                                                       Konecanes Lift Trucks product manager Håkan Andersson added: “This
                                                                                    is also the first lift truck to use Smart Lift, an automatic height positioning
                                                                                    system for empty container handlers.
                                                                                       “Driver stress will reduce and that will greatly improve efficiency.”
                                                                                       The design is stronger, lighter and more robust for an extended uptime
                                                                                    and reduced maintenance while also offering an optimised hydraulic
                                                                                    system and a D8 engine.
                                                                                       Similarly to the manufacturer’s other lift trucks, the new empty container
                                                                                    handler has a range of customisable options such as remote monitoring
  The Bromma YSX40E-45E spreader                                                    service Truconnect and Power Drive, an ecolifting solution.

18 — June 2019 — Container Management
You can also read