Application for a new water supply connection

Page created by Stacy Mack
 
CONTINUE READING
Application
for a new
water supply
connection
Application form and guidance notes
Please detach and return the application form and keep our guidance notes
for reference.
This form should be used for applications for new water supply connections for
the following; upgrading an existing supply, conversion of a property into multiple
dwellings, separating a common supply, building water, new properties and other
new supplies which are connecting to an existing distribution main in the public
highway.
If you are unsure of what you need please contact our help desk. Please note, if
we consider it necessary to provide a new public water main we will contact you to
discuss your proposals.
Please complete all sections of this form and provide relevant diagrams and
information. Sending us all the information we need will avoid unnecessary delays
to your quotation.
Please send your completed application: Thames Water, Developer Services,
Clearwater Court, Vastern Road, Reading, Berkshire RG1 8DB.

 thameswater.co.uk/developerservices
Guidance notes
These guidance notes explain why we need the information we are requesting.
Please read them with the relevant section of the application form.

Section A - your details                                     • trial pits location plan
                                                             • trial pits depths (0.5m and 1.2m)
1 Applicant details
                                                             • soil chemical analysis
This section should be completed with the details
of the person or company responsible for paying for          The soil chemical analysis should include all of the
the new connection(s). We will contact this person in        following:
relation to the quotation as well as issue the quotation      • Any level which is equal to, or greater than that
to this address unless you inform us otherwise.                   shown, will deem the site to be contaminated for
                                                                  the use of PE pipe
2 Property owner’s details
If the applicant is not also the owner, we will require      TPH must be broken down into ‘carbon chain lengths’,
the owner’s details.                                         ‘aliphatics and aromatics’, BTEX and MTBE suites, and
                                                             chlorinated compounds must be indicated .
Section B - site details
                                                             TPH:
3 Site address                                               • aliphatic C5 - C12 (0.5 mg/kg)
We need full details of the address to be connected,         • aromatic C5 - C12 (0.5 mg/kg)
together with contact details if different from 1 above.     • aliphatic C12 - C21 (not chlorinated) (10 mg/kg)
Please supply the planning application number, if            • aromatic C12 - C21 (not BTEX) (10 mg/kg)
applicable. Please note that we need full postal details     • aliphatic C21 - C35 (500 mg/kg)
of each plot to be connected before we can arrange           • aromatic C21 - C35 (500 mg/kg)
the final connection.                                        • chlorinated short chain aliphatic hydrocarbons
                                                                (0.5 mg/kg)
4 Previous use of the site and                               • chlorinated short chain aromatic hydrocarbons (2
contamination                                                   mg/kg)
Thames Water must safeguard against contamination            • BTEX compounds (0.1 mg/kg)
of water supplied through pipes. The supply pipe             • MTBE compounds (0.1 mg/kg)
should not be laid in, on or pass through any areas
which might cause contamination. This includes the           PAH:
following: foul soil, refuse, and refuse chutes, ash pits,    • naphthalene (5 mg/kg)
sewers, drains, cesspools or inspection chambers.             • phenols:
Where the ground is classified as contaminated, (e.g.         • phenols (unless present with BTEX) (5 mg/kg)
reclaimed land sites) or the supply pipe is close to a        • phenols (in conjunction with BTEX) (2 mg/kg)
petrol or oil source, an alternative to the blue MDPE         • phenols (chlorinated) (2 mg/kg)
plastic pipe is used. For all development sites and if
the land you are developing is deemed contaminated           5 Traffic Management
for the use of plastic pipework, you must submit a           We are required to carry out traffic management to
comprehensive Soils Report when returning your               ensure that our work can be carried out in a safe way
application to us. This will enable us to correctly          for the contractors, and to ensure the flow of road
determine the type of pipe material that should be           and pedestrian traffic is disrupted as little as possible.
installed. You should not install any service pipe until     Traffic Management can include, but is not limited to:
the material has been verified as suitable by us.            road closures; lane closures; lane rental; parking bay
                                                             suspensions; and traffic management drawings.
The soil report must include all of the following:
• site history                                               Parking bays including residential bays and loading
• adjacent Sites                                             bays may be suspended for us to be able to work
safely outside your property; the number of bays on           8 What are the new supplies for?
either side of the road will be determined by Thames          We need to identify new applications as either
Water and our contractor, which is dependent upon             ‘domestic dwelling’ or ‘commercial premises’ in
the width of the road, the location of the water main,        accordance with the ‘Water Supply (Water Fittings)
and to ensure the flow of traffic can be maintained           Regulations 1999’. These are national requirements
around our works and vehicles.                                for the design, installation and maintenance of
                                                              plumbing systems, water fittings and water using
Thames Water incurs these additional charges from             appliances. Their purpose is to prevent inefficient use
the Local Authority and these charges must be paid            of water, waste, misuse, undue consumption and to
to them which are an additional cost of completing            prevent contamination of drinking water. We have a
your work. These additional charges are incorporated          legal duty to enforce the water regulations and owners
into your quotation where applicable, and you will see        and occupiers of premises and anyone who installs
them displayed on your quotation.                             plumbing systems or water fittings have a legal duty
                                                              to ensure that the systems comply with the Water
Section C - What supplies are there already                   Regulations.
on the site?
                                                          9 Development classification for VAT purposes
6 Meter and account numbers                               We use HM Revenue & Customs’ interpretation of
If there are any existing supplies on site please provide VAT legislation as our guide on how to correctly
us with the meter number(s) and your customer             charge VAT on the services we provide. Our work
account number(s). This will enable us to update our      attracts a different rate of VAT according to the type
records accurately.                                       of service we are supplying, the type of property
                                                          involved and where the work is being carried out. To
                                                          help us understand more about your development
Section D – Tell us about your new water
                                                          or project please tick which category best suits your
connection(s)                                             development/works.

7 Building water                                              In most cases VAT is applicable either at standard or
In many cases there will be an existing supply on the         zero rate. However if your property type is subject to a
site. If this is metered, please contact our customer         different rate of VAT than normal we will contact you
centre billing enquiries on 0800 980 8800 to set up an        to discuss further.
account for the use of water.
If the supply is not metered there are two methods of         10 Supply requirements
payment for the water you use for building purposes.          The standard material used in new connections
You may either:                                               is Medium Density Polyethylene (MDPE) and the
a) Pay on contract value (a fixed 0.17% of total              standard sizes for domestic properties are 25mm
contract value) or                                            and 32mm (external diameter). These equate to
b) Have a meter fitted                                        ¾” and 1”(internal diameter). We will size supplies
                                                              for domestic use (in both domestic dwellings and
If you choose to have a meter fitted, this must be
                                                              commercial premises) according to either the type
arranged with us before you begin work. If not, you
                                                              of property or on the information given in the fittings
will be obliged to pay under option a). Please note
                                                              table. Supplies for new build domestic projects,
that it is illegal to use a neighbour’s supply for building
                                                              commercial projects, and domestic conversions are
purposes.
                                                              automatically metered under the Water Industry Act
If you pay under option a) you need to advise us when         1989 and 1991 (section 47).
the building water supply is no longer required so that
we can install the meter.                                     If you require a fire supply, you will need to provide us
If you require a building water supply urgently, it may       with the following information:
be possible to allow you temporary use of a hydrant           a) The size of the fire supply (internal pipe diameter)
licence. For further details please contact us on             b) Whether the fire supply is to have security of supply
0800 009 3921 and request information on hydrant              (i.e. a dual feed)
use for building purposes.                                    c) The main to which the supply is to be taken
                                                              d) The peak flow rate of the supply.
In order to determine the above information, you             13 Water fittings table
may need to arrange a flow and pressure test on the          This information is needed to size the supply and
nominated Thames Water main(s). You may do this              calculate infrastructure charges where applicable.
through your designated Fire Protection Company in           14 Drainage details
accordance with advice from the local Fire Authority.
All valve operations will be carried out by our              Sewage drainage
Operations personnel.                                        This information is important as it determines whether
                                                             any waste water infrastructure charges are applicable.
11 Internal fit meters (developments that may                For more information on surface water drainage
require a shared supply pipe/developments                    please visit our website thameswater.co.uk.
requiring a communal bulk supply pipe)                       Surface water drainage
The preferred method of supply is separate metered           So that we set up the correct billing once we have laid
connections, with the meters externally fitted in the        the new connection please can you tell us how you
public highway. When a pumped system is installed to         are discharging your surface water. Surface water is
increase the flow and pressure within the property, we       rainwater that falls on to your property and runs via
will provide internal fit meters to be installed by your     guttering and drainpipes into the public sewer, or
designated plumber. We will provide a single supply          water that drains into the sewers from activities, such
(diameter to be determined accordingly) up to the            as car washing.
property boundary and deliver the meters. The meters         15 Checklist
must be installed on the risers (after the break tank
                                                             Please use the checklist to make sure you have
and pump) within a common area so that we will have
                                                             included all the information we need.
access to read and maintain the meters. Please note
that meters must not be installed above 1.5m from            Important customer information
floor level or in ceiling voids. You will be required to
                                                             Thames Water’s duties to provide water services
provide a mechanical services schematic drawing with
                                                             are contained in the Water Industry Act, which also
this application.
                                                             includes powers for us to access private land to
Where the proposed installation includes an energy           lay pipes and other equipment as well as carry out
centre/common hot water system/common heating                work on apparatus already present. Consequently,
system in the property, it may not be possible to            customers should not build over any Thames Water
individually meter each spur.                                apparatus and should consult us if they wish to build
Note - meters for hot water supplies are not used in         close to such apparatus. Anything constructed over or
the Thames Water area.                                       close to our apparatus could be damaged in the event
When you have paid for the meters, please contact            of a burst. In addition, we must have unrestricted
our help desk who will arrange for the meters to be          access to our apparatus at all times in order to comply
delivered to site.                                           with our statutory duties. Customers are therefore
                                                             advised that we may be obliged to take action to
12 Pulse meters (commercial buildings i.e. offices,          remove any construction that obstructs our rights of
schools, factories etc)                                      access. In the circumstances, please note that you
                                                             should always check whether we have any apparatus
We will read the meter. The pulse output facility
                                                             in the vicinity before carrying out any work.
is for customer internal energy management use
only. We will only provide the pulse output facility.        Design and technical services
The installation will be carried out by the customers
                                                             Our Design and Technical Services Team offer a
designated contractor. We will provide for a single
                                                             range of consultancy services from Network Analysis
supply (diameter to be determined accordingly) up
                                                             to Budget Estimates. You can contact Design and
to the property boundary and deliver the meters. The
                                                             Technical Services visiting our website
meters must be installed on the risers (after the break
                                                             thameswater.co.uk/developerservices
tank and pump) within a common area so that we will
have access to read and maintain the meters. Please          Helpdesk
note that meters must not be installed above 1.5m
                                                             Our help desk is available from Monday to Friday 8am
from floor level or in ceiling voids. You will be required
                                                             to 5pm to help and provide any advice or assistance
to provide a mechanical services schematic drawing
                                                             in completing this form. You can also visit our website
with this application. When you have paid for the
                                                             thameswater.co.uk/developerservices. For information
meters, please contact our help desk who will arrange
                                                             about us and how to get in contact.
for the meters to be delivered to site.
Application for a quotation for new water
supply connection(s) for domestic
dwellings and commercial premises
Please use the guidance notes to help complete all sections on the
application form. Please write clearly using BLOCK CAPITALS.

Section A - your details                             Address

Applicant details (see note 1)

Name

Company (where applicable)                                               Postcode:

                                                     Telephone number
Address

                                                     Mobile number

                                                     Email
                     Postcode:

Telephone number                                     Section B - site details (see note 3)
                                                     Site address
Mobile number
                                                     Address

Email

Property owners details (see note 2)
                                                                         Postcode:
Is the applicant the property owner?
                                                     Planning application number
Yes		          No
If no please provide details of the property owner
Name                                                 Site contact name

Company (where applicable)                           Site contact telephone number

                                                     Email
Previous use of the site and contamination               If ‘yes’ please provide your customer account number
(see note 4)
Please tick the current/previous usage of your site

      Existing property                                  If ‘no’ please move to section D

                                                         Is this supply metered?
      Greenfield site
                                                         Yes 		          No
      Brownfield site
                                                         If ‘yes’ please provide the meter number
      Petrol station

      Industrial use
                                                         If ‘no’ please move section D
      Garages
                                                         Do you wish to retain this supply?
      Workshop
                                                         Yes 		          No
Other – Please state
                                                         If ‘yes’ which plot would you like it to feed?

                                                          Please move to section D
If your site was previously brownfield or a petrol
station, please send us a detailed soil report so that we If ‘no’ do you require this supply to be disconnected?
can determine the material of your new supply. Please
refer to section 4 of the guidance notes.                 Yes		 No

Are you aware of any conservation or archaeological      Section D – Tell us about what new water
issues relating to this site?                            connection(s).
Yes		           No                                       Building water (see note 7)
                                                         Are you using an existing supply for building water?
If yes, please provide details
                                                         Yes		           No

                                                         If ‘yes’ is it metered?

Are there any parking bays of any kind in the vicinity   Yes 		          No
of the site? See Note 5
                                                         Do you require a supply for building water/site welfare/
Yes 		          No                                       construction?

If yes which side of the road?                           Yes		           No
(Please tick as applicable)
                                                         If ‘yes’ what size do you require?
      Same side of the road
                                                         What is the total contract value of the construction
      On the other side of the road                      works? (See note 6)

      Both sides of the road

Section C - What supplies are there already
on the site? (See Note 6)
Is there an existing supply at the site?

Yes 		          No
What are the new supplies used for?
Type of property/supply (see note 8)
Please complete the table below confirming the number of connections required for each type of property/
supply installation. Where Yes is indicated on the table for Water Regulations notification required, please also
complete water regulation domestic installation confirmation form which can be found later in this application.

Type                                                    Number of         Size              Water Regulation
                                                        connections                         notification
                                                        required                            required
House                                                                                       Yes
Flat                                                                                        Yes
Site compound                                                                               Yes
Landlord supply ( i.e cleaners cupboard)                                                    Yes
Bin store                                                                                   No
Bike store                                                                                  No
Barn conversion                                                                             Yes
Conversion of dwelling into flats                                                           No
Conversion of dwelling into more than one dwelling                                          No
Upgrade of supply for domestic purposes                                                     Yes
Upgrade of supply for non-domestic purposes                                                 No
Separation of supply for domestic purposes                                                  Yes
Separation of supply for non-domestic purposes                                              Yes
Industrial unit                                                                             Yes
Offices                                                                                     Yes
Mobile home/Portakabin                                                                      Yes
Retail unit                                                                                 Yes
Hotel                                                                                       Yes
School                                                                                      Yes
Agricultural                                                                                Yes
Animal trough                                                                               Yes
Standpipe                                                                                   Yes
Sprinkler                                                                                   Yes
Irrigation                                                                                  Yes
Fire sprinkler                                                                              Yes
Other (Please specify)                                                                      Yes
Please choose which category best fits your            What is the flow rate required for the fire supply?
development from the list below will help us determine
the correct rate of VAT applicable to your new                                               litres per second
connections. (See note 9)
                                                       Please provide a diagram showing the water main you
      New build house or flat                          require the fire supply to be connected.

      Relevant residential or charitable                Internal fit meters - developments that may
                                                        require a shared supply pipe/developments
      Commercial, existing or other                     requiring a communal supply pipe (see note 11)

      Listed                                            Are you intending to install a booster pump or
                                                        pumped system to increase the flow and pressure
      Conversion                                        within any of the properties?

      Mixed                                             Yes 		          No

Supply requirements (see note 10)                       Will there be a centralised energy centre or centralised
What is the total number of domestic dwelling water     hot water system?
supplies required?                                      Yes		           No

                                                        Will there be a centralised heating system?
What size of supply do you require (if known)?          Yes		           No

                                                        If ‘no’, please move to next section - water fittings
What is the total number of commercial premises         table
water supplies required?                                If ‘yes’, what is the proposed diameter of feed to each
                                                        unit?

What size of supply do you require for the commercial
premises (if known)?                                    What is the anticipated flow rate to each unit?

What is your planned date for the new connection(s)     Will you have facilities for storing water?
to be installed?
                                                        Yes		           No

                                                        If ‘yes’, what is the storage capacity in litres?
Fire supplies
Do you require any fire supplies?

Yes		          No                                       Pulse meters (see note 12)

Do you require a dual-feed supply?                      Are you planning to install pulse meters?

Yes		          No                                       Yes             No

How many and what size of supply do you require?

Have you carried out a flow and pressure test?

Yes 		         No
Water fittings table (see note 13)
Please complete the table below inserting the number of each relevant fitting.
If you have more than eight plots, please make extra copies of this table before you start to fill it in.

Property type requiring a water                          Example

supply (i.e. house, flat, bin store)

                                         Loading units
Your property reference                                  Plot 1

(plot/flat/house number)
Total number to be built                                 1

WC flushing cistern                     2.0              1

Wash hand basin – standard/mixer        1.5              1
tap
Wash hand basin – commercial            3.0              1

Bath – 20mm taps – standard/            10.0 1
mixer tap
Bath – taps larger than 20mm            22.0

Shower                                  3.0              1

Sink – standard/mixer tap               3.0              1

Commercial sink                         5.0

Spray taps                              0.5

Bidet                                   1.5

Domestic washing machine                3.0              1

Domestic dishwasher                     3.0              1

Communal/commercial washing             10.0
machine/ dishwasher
Internal/external tap                   3.0              1

Other domestic appliance/ waste         3.0
disposal
Water Regulations domestic
installation confirmation
Please complete this section as accurately as possible   Type of plumbing system (please tick as appropriate)
to ensure Thames Water has record of the proposed
installation.                                                 Direct supply hot and cold (i.e. all fittings
                                                              supplied from the mains supply)
All installations must comply with the Water Supply
(Water Fittings) Regulations 1999.                            Indirect supply hot and cold (i.e. mixed supply to
                                                              fittings mains/storage)
Plumber/contractor name (delete as applicable)
                                                              A pump or booster drawing more than 12 litres
                                                              per minute, connected directly or indirectly to a
                                                              supply pipe (please see note 1 overleaf)
Plumber/contractor telephone number
(delete as applicable)                                        Domestic fire sprinkler system
                                                              Bidet with an ascending spray or flexible hose
Plumber/contractor email (delete as applicable)               Common supply (more than one property being
                                                              supplied by the same pipe)
                                                              A garden irrigation system unless designed to be
Plumber/contractor postal address                             operated by hand
(delete as applicable)
                                                              Mains-fed washing machines/dishwasher
                                                              supplies (please see note 2 overleaf)
                                                              Any supply or distributing pipe fed with potable
                                                              water to be installed outside a building falling
                                                              outside the regulation requirements of 750mm
                                                              (min) depth to 1350mm (max) depth (Note
                      Postcode:
                                                              you must consider re-routing the supply pipe so
                                                              that you can reach the minimum or maximum
Please confirm whether they are an approved
                                                              depths as required.) (Please see note 3 overleaf)
plumber/contractor (delete as applicable)
                                                              The construction of a pond or swimming pool
Yes 		          No
                                                              with a capacity greater than 10,000 litres which
If ‘yes’ please can you confirm under what scheme             is designed to be replenished by automatic
they are approved (TAPS 5 external, TAPS 3 internal,          means and is to be filled with water supplied by
WIAPS, WATERMARK etc)                                         a water undertaker.

Approval scheme                                               Rainwater or any other recycling system
                                                              Borehole supply

Membership number

Have you applied for a temporary building supply?
Yes 		          No
If ‘yes’ will your site have a cement silo requiring a
water connection
Yes 		          No
Note 1 If you have ticked yes to item 3 we will require     Diagram of where you want your supply
full schematic drawings showing the new pipework            Please provide a drawing of where you require the
and fittings to be installed and we will also require the   new water supply to be laid at the boundary of your
full specification of the pump.                             property.
Note 2 For domestic washing machines and                    Section F
dishwashers where the supply or supplies (hot
and cold) will be left with no appliance connected,         Checklist (see note 15)
Thames Water sets a condition in accordance with            Please tick the information you have provided with
regulation 5, that the appropriate backflow protection      your application:
device must be installed. An appropriate backflow
protection device for domestic wash/dishwashers                  A site location plan showing the point of entry
used for domestic use is double check valve(s) or an             for the new supply/supplies
appropriate no less effective device.                            For all non-domestic and fire supplies/energy
Note 3 If you have ticked yes to item 9 you must                 centre/common hot water systems/common
submit a location plan to which the proposal relates             heating systems please provide a mechanical
and also justification as to why you are unable                  services schematic drawing (where applicable)
to comply with the requirements of the water                     Extra copies of the fittings table where
regulations.                                                     applicable
Section E                                                        Soil report for development sites (if relevant for
Drainage details (see note 14)                                   suspected or known contamination on site)
Sewage drainage
What method will be used for sewage disposal on the
site?
      Connection to public sewer
      Septic tank
      Other – please state

Surface water drainage
What method are you using to discharge your surface
water?
      Connection to public sewer
      No connection to public sewer
      Part of the site only connected to the public
      sewer.
      Information not known

If part of the sewer is connected to the public sewer
please provide details of which plots/properties will
not be connected.
Declaration
I confirm to the best of my knowledge that the
information in this application is complete and correct.
Your signature

Your full name in BLOCK CAPITALS

Your role in the company or job title (where applicable)

Date

Please note that Thames Water reserves the right not
to make the final connection to its water network.
Illegally connecting to the water network is a criminal
offence.
Please return the completed form making sure you
supply any additional information and return to us by:
• our enquiry form on our website; thameswater.
  co.uk/developerservices
• email to developer.services@thameswater.co.uk
• post Thames Water, Developer Services, Clearwater
  Court, Vastern Road, Reading, Berkshire RG1 8DB
Please ensure that you include copies of the required
plans with your application.
Getting in touch with us
For enquiries regarding this application or any other questions relating to your building or development work
please contact us on:

           thameswater.co.uk/developerservices

           developer.services@thameswater.co.uk

           0800 009 3921
           Monday - Friday 8.00am-5.00pm

           Thames Water, Developer Services, Clearwater Court,
           Vastern Road, Reading, Berkshire RG1 8DB

If you have any other questions for Thames Water
           thameswater.co.uk

           0800 980 8800
             • Queries relating to your bill
             • Change of address
             • Meter readings
           Minicom service if you are deaf or hard of hearing 0800 316 6899

           0800 316 9800
             • For emergencies
             • Other non-billing enquiries
             • Literature
           Minicom service if you are deaf or hard of hearing 0800 316 9898

           Thames Water, PO Box 286, Swindon, SN38 2RA

           This leaflet can be supplied in
           braille or audio-tape upon request.
                                                                                                       12744 01/15
You can also read