Outline • Progress since the last Collaboration Meeting (31/01/20) - APA design, towards FDR - Transport Frame & Box design, review preparation - APA Boards, Task Force progress - Production Plan & QA/QC • COVID-19 fallout on operations • ProtoDUNE-II and FD I delivery • Consortium groups and responsibilities • Uncovered items (or lack thereof) 2 3 April 2020 C. Touramanis | DUNE C.C.
Two months of intense activity In February – March we had weekly meetings: • Consortium • Preproduction engineering • Transport Frame and Box • Boards Task Force • QA/QC • Ad hoc in response to matters arising All teams have been working full-time, many individuals making exceptional contributions. A big thank you to all! Close collaboration with TC, I&I: Compliance Office, QC … We are in good shape and on track to meet our major milestones 3 3 April 2020 C. Touramanis | DUNE C.C.
APA design • Complete design available • In progress: - Validation of PD wires & connectors at PSL and Ash River • Impacted by COVID-19 situation and measures - Validation of APA integration in TPC at Ash River • Impacted by COVID-19 situation and measures - APA analysis plan and document for FDR, PSL • Work starting in coordination with TC and Compliance Office 4 3 April 2020 C. Touramanis | DUNE C.C.
APA Transport Frame & Box • On track for 60% design review in May/June • Design practically final (Peter Sutcliffe, George Stavrakis, Liverpool) • FEA almost complete (Ang Lee, Fermilab) • Shock absorption suspension specified, waiting for external company final report (Peter) • Handling at SURF understood, final scheme close to sign off (Justin Freitag, Fermilab) • Box design final, allows for APA inspection/testing at intermediate stages of the journey from factory to underground (George) • Documents for review will be ready in April • Many thanks to Olga Beltramello (CERN), Jean-Louis Grenard (CERN), Mariana Zimbru (Compl. Office), Giuseppe Gallo (Fermilab), Dan Wenman (PSL) and others for advice and guidance • Prototype construction, Jeff Nelson (W&M) and testing, Bill Miller (Ash River) to be scheduled depending on COVID-19 situation 5 3 April 2020 C. Touramanis | DUNE C.C.
Transport Frame & Box Design Alum Profile Side frames and covers APA Supports and Anti Vibration Wire Rope Mounts Transport Frame APAs APA Covers 6 3 April 2020 C. Touramanis | DUNE C.C.
Stability Analysis 11 3 April 2020 C. Touramanis | DUNE C.C.
Handling at SURF 12 3 April 2020 C. Touramanis | DUNE C.C.
APA Boards • Task Force active (weekly meetings). Chair: Terry Shaw • Subgroups for mechanical tolerance, voltage, IPC standards for HV trace spacing, hole tolerance and press pins (meetings as required) • Many contributions from PSL (in addition to Andy Laundrie) • HV IPC checks, some redesign (Andy, Anthony Ezeribe, Sebastien Prince): almost there • Mechanical tolerances: a lot more than board thickness; good progress being made • Custom MillMax press-fit pins: Terry in charge Very impressive amount and depth of work done, good progress being made. Huge thank you to the TF members! 13 3 April 2020 C. Touramanis | DUNE C.C.
Production & QA/QC • Consortium working closely with DUNE QA leadership • Weekly meetings • Thanks to Jim Mateyak (Fermilab), Sebastien Prince and Guenette (Harvard), Gwenn Mouster (Lancaster) • Revisiting the whole chain (Physics requirements) – (specifications and tolerances) - (QA/QC) • Gwenn gathering all available documents to compile full set of production and QA/QC procedures • Investigating “digital factory” platform to ensure identical APAs and strict QA adherence in all factories • Examples of new developments: acceptance QC tools & jigs for frame bars, mesh frames (Daresbury, Liverpool, PSL) • Automatic electronic wire tension system advancing well (Harvard) 14 3 April 2020 C. Touramanis | DUNE C.C.
COVID-19 situation • Everybody working form home: design, engineering, review preparations continuing • In touch with many suppliers who are still partially working • On-site hands-on work: - Daresbury, Liverpool workshop: closed - FNAL workshops closed by not affecting APA work - PSL: evolving situation, basically closed - Ash River: continuing with reduced staff; can build on protoDUNE-II volume We are not changing our schedules for now on the assumption that the lockdowns will create a (small) global shift to the whole project 15 3 April 2020 C. Touramanis | DUNE C.C.
Delivering for ProtoDUNE-II and FD 1 • Based on existing schedule: - ProtoDUNE-II requires 4 APAs in late 2021: we can deliver that even with a few months lost due to COVID-19 - With the full complement of UK and US factories we are on track to have 150 APAs for FD 1 by mid-2024 - With all “money in the bank” in the UK we will deliver 152 APAs by May 2027 (25 APAs / calendar year at full production) We don’t see any reasons at this point to change our schedule and milestones 16 3 April 2020 C. Touramanis | DUNE C.C.
Institutes and deliverables Institution Country Deliverables University of Cambridge UK Testing and assembly of wire boards; QA/QC Daresbury Laboratory - Science and Technology Facilities Council UK APA production site; winding machines Lancaster University UK Testing and assembly of wire boards; QA/QC; APA assembly University of Liverpool UK Transportation frame, box & organisation; steel procurement; APA assembly University of Manchester UK Procurement and testing of wire boards; APA assembly University of Sheffield UK Mesh panels; testing and assembly of wire boards; APA assembly University of Sussex UK Testing and assembly of wire boards Brookhaven National Laboratory USA Simulation studies on signal shapes and transparency of ionization electrons University of Chicago USA APA production site, Grounding mesh frames Colorado State University USA Studies of wire vibration in LAr and induced electronic noise Harvard University USA QA/QC management, wire tension measurements University of Houston USA G-plane wire boards University of Iowa USA APA frames University of Mississippi USA Studies on mesh frames Northern Illinois University USA Cold electronics adapter boards Syracuse University USA G-bias boards University of Texas at Arlington USA X-plane wire boards Tufts University USA Participation in APA assembly College of William & Mary USA U/V-plane wire boards, APA transport crates University of Wisconsin-Madison, Physical Sciences Laboratory USA APA production site, CR boards, APA frames, Yokes and structural tees Yale University USA APA production site 17 3 April 2020 C. Touramanis | DUNE C.C.
Opportunities for further contributions • We don’t have uncovered items in our production plan • There will be opportunities for contributions in QA, integration, installation, operations and analysis in ProtoDUNE-II • The same will be true at SURF for the Far Detector modules 18 3 April 2020 C. Touramanis | DUNE C.C.
Summary • A lot of very impressive progress and convergence in the last two months • A lot still to be done but I am confident that we will be having the planned reviews this summer and the first APAs before the end of the calendar year • We see no show stoppers in our plans A very special thank you from myself and the whole consortium to Alberto Marchionni for his outstanding dedication and attention to every detail! 19 3 April 2020 C. Touramanis | DUNE C.C.