780 TACHÉ AVENUE Public Open House - June 27, 2019 - Landmark Planning

Page created by Johnny Gomez
 
CONTINUE READING
780 TACHÉ AVENUE Public Open House - June 27, 2019 - Landmark Planning
780 TACHÉ AVENUE
Public Open House
June 27, 2019
780 TACHÉ AVENUE Public Open House - June 27, 2019 - Landmark Planning
WELCOME / BIENVENUE

• Welcome to this meeting. Please feel free to browse the display boards.

• Members of the project team (wearing name tags) are available to answer any questions you
  may have. Your feedback is important to us, so please fill out a comment sheet before leaving.

• French translation is available if required. If you are interested in French translation, please ask
  one of our project team members for more information.

• Bienvenue à la journée portes ouvertes de ce soir. S'il vous plaît n'hésitez pas à parcourir les
  panneaux d'information.

• Les membres de notre équipe (portant une étiquette) sont disponibles pour répondre à toutes
  vos questions. Vos commentaires sont très importants pour nous, veuillez donc remplir une
  feuille de commentaires avant de partir.

• La traduction en français est disponible si nécessaire. Si vous êtes intéressé par la traduction
  en français, veuillez contacter un des membres de notre équipe pour plus d'informations.

                                                                                                         2
780 TACHÉ AVENUE Public Open House - June 27, 2019 - Landmark Planning
WHO ARE WE? WHAT WOULD WE LIKE TO DO?

                   • StreetSide Developments, a local developer with several
                     successful projects in St. Boniface, is currently preparing
                     an application to rezone land so that it can eventually be
                     developed as multi-family housing. StreetSide recognizes
                     that nearby residents are stakeholders and may be interested
                     in the redevelopment of this parcel.

                   • Landmark Planning & Design has been retained to lead this
                     engagement process and planning process. In January 2019,
                     we shared preliminary design concepts. Tonight, we would
                     like to share a preferred design concept.

                                                                                    3
780 TACHÉ AVENUE Public Open House - June 27, 2019 - Landmark Planning
SITE CONTEXT

• The 40,000 sq. ft. site
  is located at 780 Taché
                                                                                                                                                                                                                   N O R T H

  Avenue (at Grandin).
                                                                                                                 r
                                                                                                           ive
  –– Eastern boundary:                                                                           Re
                                                                                                      dR

                                      The
     Townhomes                      Exchange                                                      EM
                                                                                                       ESS
                                                                                                                 AG
                                                                                                                      ER                             Whittier Park
                                                                                            RU
                                     District
  –– Southern boundary:

                                                                                                 TAC
     Verve Taché

                                                                                                  Hé
                                                                                                      AV
                                                                                                         EN

                                                                                                                                        RU
  –– Western boundary:                                                                                                                DIN

                                                                                                           UE

                                                                                                                                            ES
                                                                                                                             R   AN
                                                                                                                          EG

                                                                                                                                               AIN
                                                                                                                     RU

     Taché Avenue                                                                                                                                                      North

                                                                                                                                                 TJ
                                                                                                                                             T
                                                                                                                                   U   BER

                                                                                                                                                    O
                                                                                                                           RU
                                                                                                                                EA
                                                                                                                                                                    St. Boniface

                                                                                                                                                  SEP
  –– Northern boundary:
                                    PIO

                                                                                                                                                     H
                                          NE
                                               ER
                                                    AV
                                                       E   NU

     Rue Grandin                                                E
                                                                    Shaw Park
                                                                                                                                                                                                           R   D
                                                                                                                                                                                                        VA
                                                                                                                                                                                              O   ULE
                                                                                                                                                                                           RB
                                                                                                                                                                                  C   HE
                                                                                                                                                                           V   EN
                                                                                                                                                                     PRO
• The proposed
  development site currently
                                                    MA

                                                                Canadian Museum
                                                     IN S

                                                                for Human Rights
                                                          TR

  includes a mix of single
                                                       EET

                               Downtown
  family homes, vacant land,
  and a vacant industrial
                                                                                                                                                                      St. Boniface
  operation.

                                                                                                                                                     TACHé AVENUE
                                                                                     The Forks

                                                                                                                                                                                                                   LEGEND
                                                                             Assiniboine River

                                                                                             St. Boniface Hospital                                                                                                             780 Taché Avenue

                                                                                                                                                                                                                                                  4
780 TACHÉ AVENUE Public Open House - June 27, 2019 - Landmark Planning
OurWINNIPEG – PLANNING CONTEXT

                                      urbAn StruCture
• OurWinnipeg is the overall
                                                                                                          RM OF                                                                                                                                                      lE
  development plan for                                                                                 WEST ST PAUL

  Winnipeg. Every piece of land                                       RM OF
                                                                                                                     RM OF
                                                                                                                  EAST ST PAUL
                                                                                                                                                                                                                                                                     dow
                                                                      ROSSER
  in the City is designated for

                                                                                                                                                                "Urban Structure" map of Winnipeg from Complete Communities: An OurWinnipeg Direction Strategy
  some form of land use.                                                                                                                                                                                                                                             ma

• OurWinnipeg designates                                                                                                                                                                                                                                             new

  this area of town as a                                                       780 TACHÉ AVENUE

  “Mature Community”.                                                                                                                                                                                                                                                reg

  The plan describes Mature
                                                    RM OF
  Communities as:                                 HEADINGLEY
                                                                                                                             RM OF
                                                                                                                                                                                                                                                                     reg

                                                                                                                             SPRINGFIELD

  –– "Winnipeg’s early suburbs,                                                                                                                                                                                                                                      ma
     mostly developed before
     the 1950s. Key features are a
                                                                                                                                                                                                                                                                     rec
     grid road network with back                                            RM OF
                                                                          MACDONALD
                                                                                                                                                   N
                                                                                                                                                       E
     lanes and sidewalks, low to                                                                                                           W
                                                                                                                                                   S
     moderate densities, and a fine                                                                             RM OF
                                                                                                               RITCHOT
                                                                                                                                                                                                                                                                     rur

     grained mix of land uses along
     commercial streets. Many of                                                                                                                                                                                                                                     airp

     these communities have a full
     range of municipal services."      figure 02a
                                        Winnipeg’s urban structure.
                                                                                                                         0      2     4        6       8   10

                                         LEGEND
                                        Amended    66/2013, 86/2013                                                      Kilometers
  –– These communities present
     some of the best opportunities              Downtown                                Regional Mixed Use Centre                    Recent Communities
     for infill development.                     Major Redevelopment Sites               Regional Mixed Use Corridor                  Rural and Agricultural

                                                 New Communities                         Mature Communities                           Airport Area

                                                                                                                                                                                                                                                                 5
780 TACHÉ AVENUE Public Open House - June 27, 2019 - Landmark Planning
OurWINNIPEG – POLICY CONTEXT

• These are selected policies that support or promote a
  project like this one:
  –– Provide a range of housing options to accommodate various
     incomes, household types, abilities, and stages of life
  –– Promote compact urban form and manage the extension of
     municipal services for new growth
  –– Enable the intensification of land-uses through the
     development application process
  –– Support new developments that are contiguous with existing
     developments to minimize the spatial use of land and the
     extension of services
  –– Accommodate intensification within existing communities in a
     sensitive manner that recognizes the existing form and the
     character of its location
  –– Support the creation of a range of sizes, forms and tenures of
     housing
  –– Support contextually-sensitive infill development that builds
     complete and inclusive communities

                                                                      6
780 TACHÉ AVENUE Public Open House - June 27, 2019 - Landmark Planning
NORTH ST. BONIFACE SECONDARY PLAN – POLICY CONTEXT

• The North St. Boniface Secondary Plan is a
  planning document that further guides and
  regulates growth and development within the
  North St. Boniface Community.                                                               North St. Boniface
• The Plan has several objectives and policies                                                 Secondary Plan
                                                                                (Schedule “A” to By-Law No. 30/2017)
  that support or promote a project like the one
  proposed for the subject site:
  ––   Provide a mix of densities
  ––   Develop a more “complete community”
  ––   Provide a range of housing options
  ––   Promote residential densities that support a safe
       and livable community
  ––   Design pedestrian-oriented buildings                                                                   Adopted: July 19, 2017

  ––   Accommodate a range of incomes, households,
       types, densities and tenures
  ––   Minimize the spatial use of land
  ––   Transition out industrial uses

                                                           V:\1URBAN & NEIGHBOURHOOD BRANCH\Secondary Plans\North St Boniface\Amendments\BL 30-2017\First Reading\170306 SP 1-2017 N St B Plan - First
                                                           Reading.doc

                                                                                                                                                                                                         7
780 TACHÉ AVENUE Public Open House - June 27, 2019 - Landmark Planning
NORTH ST. BONIFACE SECONDARY PLAN – POLICY CONTEXT

• The subject site is located within the High Density Policy Area of the Secondary Plan. This
  Policy Area can accommodate higher density multi-family development.

                                                                                   N O R T H

           780 TACHÉ AVENUE

                                                                                   LEGEND

                                                                                               Low Density

                                                                                               Medium Density

                                                                                               High Density

                                                                                               Mixed Use

                                                                                               Parks & Open
                                                                                               Space

                                                                                                                8
780 TACHÉ AVENUE Public Open House - June 27, 2019 - Landmark Planning
MULTI-FAMILY ZONING CONTEXT

• The neighbourhood surrounding the proposed development site includes existing zoning that
  allows two-family and multiple-family developments.

• The parcels in orange are zoned R2 (residential two-family), while the parcels in brown are
  zoned as multi-family residential.

                                                                                               N O R T H

  780 TACHÉ AVENUE

                                                                                               LEGEND

                                                                                                           Two-family
                                                                                                           Residential

                                                                                                           Multi-family
                                                                                                           Residential

                                                                                                                          9
                                                                        ©2019 City of Winnipeg ­ Conditions of Use
780 TACHÉ AVENUE Public Open House - June 27, 2019 - Landmark Planning
MULTI-FAMILY CONTEXT

• This board provides a sample of different multi-family buildings that are found in the community.

• A variety of styles and forms of buildings have been constructed over the past several years.

                                                                                                      10
PUBLIC CONSULTATION AND STAKEHOLDER ENGAGEMENT

• A thorough public engagement process is being undertaken as part of this project, including
  a series of stakeholder meetings and public open houses over a 8-month period.

 2018                            2019
    NOV                  DEC         JAN              FEB   MAR     APR      MAY   JUN                    JUL        AUG          SEP

                                       SECOND                                              THIRD
                                        ROUND                                             ROUND
             FIRST ROUND
                                    OF MEETINGS                                       OF MEETINGS
             OF MEETINGS                                     SELECTED PREFERRED
                                   WITH ADJACENT                                     WITH ADJACENT              MAKE A REZONING
            WITH ADJACENT                                    DESIGN OPTION AND
                                   RESIDENTS AND                                     RESIDENTS AND              AND SUBDIVISION
               RESIDENTS                                       PREPARED DRAFT
                                 PUBLIC OPEN HOUSE                                 PUBLIC OPEN HOUSE              APPLICATION
             (DECEMBER 3,                                      DESIGN CONCEPT
                                     FOR NORTH                                         FOR NORTH
                 2018)
                                    ST. BONIFACE                                      ST. BONIFACE
                                     RESIDENTS                                         RESIDENTS

          –– Introduced the      –– Introduced                                     –– Present a
             planning process,      preliminary design                                preferred design
             timeline, and          concepts                                          concept
             anticipated next
                                 –– Addressed any                                  –– Show how
             steps
                                    concerns or                                       feedback was
          –– Received input         questions raised at                               considered and
                                    the first meeting                                 addressed
                                                                                   –– Receive further
                                                                                      input
                                                                                   –– Outline municipal
                                                                                      approvals process

                                                                                    WE ARE HERE

                                                                                                                                        11
WHAT WE HEARD

• During the first two rounds of meetings, a few key concerns were raised by nearby residents
  and stakeholders. The project team has worked to address these concerns in the preferred
  concept. The team is open to other ideas as they may arise.

STAKEHOLDER CONCERNS       RESPONSE TO CONCERNS

Concerns about traffic     • A traffic analysis has been undertaken to assess potential
and site access              impacts.
                           • The City of Winnipeg Public Works department will consider
                             traffic in its evaluation of the rezoning application.

Concern regarding          • Research has shown that new developments generally don’t
property values              negatively impact property values of existing homes.

Concern regarding          • Some stakeholders preferred a shorter, longer building; some
building height              stakeholders preferred a taller, skinnier building.
                           • Both options were being considered by the project team.
                           • Although both options had merit, the project team has decided
                             to pursue the shortest of the design options (6 storeys).

                                                                                                12
WHAT WE HEARD

STAKEHOLDER CONCERNS       RESPONSE TO CONCERNS

Concerns regarding         • The preferred design includes over 1.1 parking stalls per unit,
sufficient parking being     which is in line with parking ratios found in recent infill projects.
provided                     The Zoning By-law requirement is 1.2 parking stalls per unit in
                             this area.
                           • The preferred design includes underground parking.
                           • A Parking Impact Study was undertaken to assess on-street
                             parking in the immediate vicinity (see Boards 22 and 23).

Concerns regarding         • The design of the building will be of high quality, incorporating
building aesthetics          a mix of materials, colours, and articulation.
                           • The design includes facades on all sides, to ensure that
                             neighbours do not face a ‘blank wall’.
                           • A ‘Design Review’ is required for new buildings in this area,
                             which will help ensure the final design fits the existing context.
                           • Should the rezoning be approved, a Plan Approval is still
                             required (where the Riel Community Committee will review
                             building materials, landscaping, etc.). A detailed design with a
                             full set of drawings will be prepared and submitted at that time.

                                                                                                     13
WHAT WE HEARD

STAKEHOLDER CONCERNS       RESPONSE TO CONCERNS

Concern regarding          • Shadow studies have been undertaken (see Board 24).
sightlines and shadows

Concern regarding          • Building articulation and finish materials may reduce noise
noise from the rail line     reflection.

                                                                                           14
DESIGN CONCEPT

• In January, the Project Team shared three preliminary design concepts, each with unique
  aspects and features. The three preliminary design concepts are illustrated on the following
  boards, and include:
  –– Design Concept 1: 6-Storey Wood-Frame Building
  –– Design Concept 2: 7-Storey Concrete/Masonry Building
  –– Design Concept 3: 13-Storey Concrete or Steel Building

• A variety of factors were considered in the evaluation of options, including:
  ––   Stakeholder input
  ––   Feedback from City of Winnipeg departments
  ––   Height, bulk, and setback considerations
  ––   Economic and market considerations
  ––   Parking and traffic, and
  ––   Neighbourhood context

• The preferred Design Concept is based on Design Concept 1.

                                                                                                 15
DESIGN CONCEPT 1: 6-STOREY WOOD-FRAME BUILDING

• Concept 1 was a 6-storey, wood-
  frame building that is roughly the
  same width and length as 770 Taché
  (although two storeys taller).
• It is setback from the southern
  property line in a similar fashion as
  770 Taché.
• Concept 1 featured a parkade
  entrance off of Taché Avenue,
• The 110-stall parkade would be
  built entirely below grade, unlike the
  parkade at 770 Taché, meaning that
  the first floor would be at ground
  level.
                                           3-D rendering, looking southeast
• Concept 1 featured approximately
  94 units.

                                           Elevation, looking east

Plan view, on air photo                    Elevation, looking south

                                                                              16
DESIGN CONCEPT 2: 7-STOREY CONCRETE/MASONRY BUILDING

• Concept 2 was a 7-storey, concrete/
  masonry building that was slightly
  narrower than Concept 1.
• This concept featured the largest
  setback from 770 Taché, as well as
  from the existing homes along Rue
  Grandin.
• This concept featured a parkade
  entrance off of Rue Grandin.
• Concept 2 featured approximately
  103 units and 115 underground
  parking stalls.

                                        3-D rendering, looking southeast

                                        Elevation, looking east

Plan view, on air photo                 Elevation, looking south

                                                                           17
DESIGN CONCEPT 3: 13-STOREY CONCRETE OR STEEL BUILDING

• Concept 3 was a 13-storey building
  which would be built using either
  concrete or steel construction.
• While the tallest proposal, the
  building footprint would have
  occupied only the western half of the
  site.
• Concept 3 would featured
  approximately 103 units.                 3-D rendering, looking southwest

• Parking was accessed from Rue
  Grandin. This concept features a
  117-stall parkade and an additional
  46 surface parking stalls, for a total
  of 163 parking stalls.

                                           Elevation, looking east

Plan view, on air photo                    Elevation, looking south

                                                                              18
PREFERRED DESIGN CONCEPT

    • This slide illustrates the preferred
      design concept in both plan view
                                                                                                                                                 GRANDIN STREET
      (from above) and elevation view                                                                                                                                                                                           10'-0"
                                                                                                                                                                                                                                         N

      (from the sides).                                                                                                                          SIDEWALK

    • The preferred design concept at

                                                                                          7'-8"

                                                                                                                                                                                                                DRIVE AISLE
                                                                                                                                                                                             EXIT
                                                                                                                             EXIT
                                                                                          12'-4"
      this stage is detailed enough to                                                                                                                                                                                 25'-9"

                                                                           TACHE AVENUE
      illustrate size, massing, context,
      setbacks, and dimensions. However,                                                                                            PROPOSED 6-STOREY BUILDING

                                                                                                   ENTRY
      precise details (in terms of colour,
      materials, and articulation) would
                                                                                                   7'-0"

      only be developed in full at the Plan
      Approval stage (if the rezoning were
                                                                                                                                                      TERRACES / PARKADE BELOW

                                                                                          27'-0"
                                                                                                           HYDRO                                                                                              LANDSCAPED
                                                                                                                                                                                                                 AREAS

      approved).

                                                                                          7'-0"
                                                                                                                   780 TACHE PROPOSED CONCEPT
                                                                                                                   6-STOREY + UNDERGROUND PARKADE
                                                                    Plan                                           93 UNITS + 114 PARKING STALLS

                                                                                                                                                                   VERVE TACHE NORTH
                                        GRANDIN STREET

          HOMES ON
          GRANDING STREET

    East Elevation
    (view from Taché Avenue)                                                                                                         60' - 11"
                                      102' - 0"

        EAST FROM TACHE AVENUE
1
        1/32" = 1'-0"
               TOWNHOMES ON GRANDIN STREET

                                                                                                                                                                                                                                                TACHE AVENUE
    South Elevation                                      31' - 5"
    (view from Grandin Street)                                                                                             No.             Description                    Date

                                                                                                                                                                                                                                                               /2019 4:24:04 PM
                                                                                                                                                                                 ELEVATION EAST FROM TACHE AVENUE
                                      780 TACHE AVE
                                                                                                                                                                                                                                                                                  19
                                                                                                                                                                                 Project       780 TACHE
    1
         SOUTH FROM GRANDIN STREET
         1/32" = 1'-0"                STREETSIDE PROJECT
                                                                                                                                                                                 Date
                                                                                                                                                                                 Drawn by
                                                                                                                                                                                               JUNE 25 2019
                                                                                                                                                                                               SB
                                                                                                                                                                                                                                         A102
PREFERRED DESIGN CONCEPT

• These two renderings illustrate the
  proposed development in 3D.
• The concept features 98 units and
  114 parking stalls.

                                        Massing Plan from Grandin Street (looking southwest)

                                        Massing Plan from Taché Avenue (looking southeast)

                                                                                               20
TRAFFIC ANALYSIS

• Engineering firm Dillon Consulting Limited               • The development-generated traffic was
  was retained to undertake a Trip Generation                distributed according to these proportions
  and Trip Distribution Study for the proposed               as shown in the following diagram:
  development.
• It was estimated that:
                                                                                                                          N O R T H

  –– 40% of traffic, leaving the site, will travel south
     along Taché Avenue and then west along
     Provencher Boulevard;
  –– 35% of traffic, leaving the site, will travel south
     along Rue St. Joseph and then east along
     Provencher Boulevard; and,
  –– 25% of traffic, leaving the site, will travel south
     along Taché Avenue towars St. Mary's Road.

• The Study concluded that during peak
  hours, the resulting increase in traffic
  from this development would be minimal.                                                                           35%

                                                                                               25%
• During the AM peak hour, the development
  would contribute one additional car every                                       40%

  4 minutes along Tache Avenue, and one
  additional car every 7.5 minutes on                      Distribution of Development Traffic (780 Taché Avenue)

  Rue St. Joseph.

                                                                                                                                      21
PARKING IMPACT STUDY

• Engineering firm Dillon Consulting Limited        86 ON-STREET PARKING SPACES
  was retained to undertake a Parking Analysis
  for the area; the Analysis utilized the City                                      N O R T H

  of Winnipeg’s standard methodology and                                        6
                                                                            5
  recent data.                                               15

• The study takes a variety of factors into              5
                                                                  21            5
  consideration, including on-street parking
  availability, location, access to transit, and
                                                              9
  parking demand.                                                      20

• The engineering team analyzes parking
  observation data, which are counts of how
  many cars are parked on adjacent streets
  at various points in time. They map this
  data visually, calculating the utilization of
  available on-street parking spaces during
  the various points in time (see next Board).

• The study concludes that even with the
  addition of 98 units to the area, on-street
  parking will still be readily available at most
  times.

                                                                                                22
PARKING IMPACT STUDY

• Shown below are the utilization rates of on-street parking in the vicinity of the proposed
  development at 6 different points in time.

                                                                                                                        N O R T H

Saturday September 30, 2017 – 9:00 AM   Saturday September 30, 2017 – 2:00 PM   Saturday September 30, 2017 – 9:00 PM
                                                                                                                        LEGEND

                                                                                                                                    Snow route

                                                                                                                                    0%–39% of stalls
                                                                                                                                    are being used

                                                                                                                                    40%–59% of stalls
                                                                                                                                    are being used

                                                                                                                                    60%–84% of stalls
                                                                                                                                    are being used

                                                                                                                                    85%–100% of stalls
                                                                                                                                    are being used
Thursday October 5, 2017 – 9:00 AM      Thursday October 5, 2017 – 2:00 PM      Thursday October 5, 2017 – 9:00 PM

                                                                                                                                                         23
SHADOW STUDY

               • In the earlier rounds of stakeholder meetings, nearby residents expressed concerns about the
                 impact of shadows. The project team committed to undertaking a shadow study.

               • All properties to the south of the subject property are unaffected by shadows.

               • The single-family homes to the north will experience increased shadows during the winter
                 months when the sun is at its lowest (just before sunset and just after sunrise).

               • The shadow effects are illustrated below (four seasons, three times of day).

               SUMMER SOLSTICE AND SPRING EQUINOX                                                                                                    FALL EQUINOX AND WINTER SOLSTICE

                                                                                                              Summer Solstice    3pm
mmer
mmer Solstice    1
      Solstice1 9am
                 Summer
                9am Summer Solstice 9am
                               Solstice
                                          Summer
                                          Summer Solstice
                                      22 9am         Solstice 12pm
                                                                2 21"Summer
                                                              12pm
                                                                2
                                                                   Summer
                                                                   Summer Solstice
                                                                            Solstice    12pm Solstice 12pm33 3Summer
                                                                                     12pm
                                                                                      Summer
                                                                               Solstice
                                                                                   2 12pm                      Summer   Solstice 3pm
                                                                                                                           Solstice   Summer
                                                                                                                                   33pm
                                                                                                                                      Summer
                                                                                                                                     Fall       Solstice
                                                                                                                                                Solstice
                                                                                                                                          Equinox        3pm
                                                                                                                                                   9am3 3pm
                                                                                                                                                   9am       1Fall
                                                                                                                                                          SummerFall Solstice
                                                                                                                                                                     Equinox
                                                                                                                                                                   Equinox    3pm
                                                                                                                                                                               9am
                                                                                                                                                                             9am                       2FallFall Equinox
                                                                                                                                                                                                              Equinox     12pm Fall Equinox 12pm 3 Fall Equinox 3pm
                                                                                                                                                                                                                       12pm                                       Fall Equinox 3pm          FallEquin
                                                                                                                                                                                                                                                                                                 Equin
=
= 160'-0"
  160'-0"         1" = 160'-0"             1"
                                           1" == 160'-0"
                                                 160'-0"           1" =
                                                                      = 160'-0"
                                                                        160'-0"        1" = 160'-0"           1"Fall
                                                                                                             11"
                                                                                                                     Equinox
                                                                                                                 == 160'-0"
                                                                                                                    160'-0"    9am1  Fall
                                                                                                                                  13 1"1"
                                                                                                                                      1"==
                                                                                                                                          Equinox
                                                                                                                                            160'-0"
                                                                                                                                          =160'-0"
                                                                                                                                            160'-0"        1 Fall
                                                                                                                                                          11" =1"
                                                                                                                                                                  Equinox
                                                                                                                                                                160'-0"
                                                                                                                                                                            9am
                                                                                                                                                                                   2                 2 Fall Equinox 12pm 22 Fall Equinox 12pm 3 Fall Equinox 3pm3
                                                                                                                                                                                     Fall Equinox 12pm
                                                                                                                                                                                                     2                                                          3 Fall Equinox 3pm         Fall
                                                                                                                                                                                                                                                                                         33 1" = 160'
                                                                                                                 1" = 160'-0"        1" =  160'-0"            1" ==160'-0"
                                                                                                                                                                    160'-0"          1" = 160'-0"       1" =
                                                                                                                                                                                                        1"   = 160'-0"
                                                                                                                                                                                                               160'-0"          1"==160'-0"
                                                                                                                                                                                                                               1"    160'-0"      1" = 160'-0"    1" =
                                                                                                                                                                                                                                                                  1" = 160'-0"
                                                                                                                                                                                                                                                                        160'-0"             1" = 160'-

 ng
 ng Equinox   4
    Equinox 9am  Spring
              Spring     Equinox
                      Equinox 9am59am
                                    Spring
                                    Spring Equinox
                                            Equinox 12pm 5Spring
                                                           Spring   Equinox
                                                                 Equinox    12pm Equinox 12pm 6 6Spring
                                                                         12pm
                                                                            Spring                Spring   Equinox
                                                                                                        Equinox
                                                                                                   Winter        3pm
                                                                                                           Solstice 43pm
                                                                                                                    9amWinter
                                                                                                                       Winter  Solstice
                                                                                                                        SpringSolstice
                                                                                                                        Spring          9am
                                                                                                                                Equinox9am
                                                                                                                                Equinox  3pm  4Winter
                                                                                                                                                 Winter
                                                                                                                                                Winter
                                                                                                                                            Spring       Solstice
                                                                                                                                                       Solstice
                                                                                                                                                      Solstice
                                                                                                                                                   Equinox  3pm9am                    5 5Winter
                                                                                                                                                                  9am Winter Solstice 12pm
                                                                                                                                                                9am                        Winter
                                                                                                                                                                                         Winter    Solstice
                                                                                                                                                                                                Solstice
                                                                                                                                                                                                Solstice    12pm
                                                                                                                                                                                                         12pm
                                                                                                                                                                                                         12pm  WinterSolstice
                                                                                                                                                                                                              Winter           12pm6Winter
                                                                                                                                                                                                                      Solstice12pm   Winter   Solstice
                                                                                                                                                                                                                                           Solstice 6 3pm
                                                                                                                                                                                                                                                    3pmWinter Solstice
                                                                                                                                                                                                                                                       Winter Solstice 3pm
                                                                                                                                                                                                                                                                       3pm Winter
                                                                                                                                                                                                                                                                             WinterSo
                                                                                                                                                                                                                                                                                    So
            9am
            4                     5 1" = 160'-0"
                                                    12pm
                                                       5  Spring Equinox
                                                       5 1" = 160'-0"
                                                                         12pm
                                                                         5                       Spring Equinox
                                                                                              6 41" = 160'-0"
                                                                                                                 3pm46
                                                                                                                     6 1"
                                                                                                                       1"1"=
                                                                                                                           = 160'-0"
                                                                                                                             160'-0"     6 44 1"
                                                                                                                                         3pm                        5                 5                     55 1" = 160'-0"      6                  6                     66 1" = 160'
=
= 160'-0"
  160'-0"      1" = 160'-0"          1" = 160'-0"         1" = 160'-0"      1" = 160'-0"         1" 1" = 160'-0"
                                                                                                    = 160'-0"           1" == 160'-0"
                                                                                                                              160'-0"       1" =1"==160'-0"
                                                                                                                                                     160'-0"
                                                                                                                                                 160'-0"              1" = 160'-0"       1" =
                                                                                                                                                                                         1" = 160'-0"
                                                                                                                                                                                              160'-0"          1" = 160'-0"         1" = 160'-0"       1" =
                                                                                                                                                                                                                                                       1" = 160'-0"
                                                                                                                                                                                                                                                            160'-0"          1" = 160'-

                                                                      No.        Description         Date                                                                                                                             No.   Description      No.   Date Description
                                                                                                                                                                                                                                                                                            24
                                                                                                                                                                                                                                                                                             Date
                                                                                                                                                                          AM

                                                                      No.        Description   No.   DateDescription
                                                                                                                  No.       Date
                                                                                                                           Description          Date                                                                  No.   Description
                                                                                                                                                                                                                                      No.   Description
                                                                                                                                                                                                                                             Date           No.    DateDescription          Date
                                                                                                                                                                                                AM

                                                                                               No.       Description
                                                                                                                SHADOW STUDYDate
                                                                                                                SHADOW STUDY SPRING
                                                                                                                             SPRING EQUINOX  AND SUMMER  SOLSTICE
                                                                                                                                                                                                                 AM

                                                                                                                                                                                                                      No.   Description     Date                              SHADOW AND
                                                                                                                                                                                                                                                                                      STUDY FALL EQUINO
                                                                                                                                                                                                                                                                                                  EQUINO
                                                                                                                                                                                                                                                                                                       S
                                                                                                                                                                    5:30 AM

                                                                                                                                                                                           5:30 AM

                                                                                                                                                                                                            5:30 AM

                                                                                                                                       SHADOW STUDY  SPRING EQUINOX AND SPRING
                                                                                                                                                                        SUMMEREQUINOX
                                                                                                                                                                               SOLSTICE                                                                   SHADOW STUDY
                                                                                                                                                                                                                                                                 STUDY FALL
                                                                                                                                                                                                                                                                        FALL EQUINOX
                                                                                                                                                                                                                                                                              EQUINOX
                                                                                                                                                                                                                                                                              SHADOW      WINTER
                                                                                                                                                                                                                                                                                      STUDY FALL      SH
                                                                                                                                                                                                                                                                                                  SOLST
              780 TACHE780
                        AVETACHE
                              780AVE
                                  TACHE AVE
                                                                                                                                     EQUINOX
                                                                                                                                       SHADOWAND SUMMER
                                                                                                                                              STUDY       SOLSTICE
                                                                                                                                                     SPRING
                                                                                                                                                          SHADOW
                                                                                                                                                            EQUINOX
                                                                                                                                                                  STUDY
                                                                                                                                                                    AND
                                                                                                                                                                         780 TACHE AVE
                                                                                                                                                                        SUMMER
                                                                                                                                                                    TACHE780
                                                                                                                                                                780AVE
                                                                                                                                                        780 TACHE         AVE      AVE
                                                                                                                                                                               SOLSTICE
                                                                                                                                                                             TACHE
                                                                                                                                                                                      AND SUMMER SOLSTICE                                                 SHADOW                      AND WINTER  SOLST
                                                                                                                                                                   :55:30

                                                                                                                                                                                          55:30

                                                                                                                                                                                                            5:30

                                                                                                             Project
                                                                                                             Project       780
                                                                                                                           780 TACHE
                                                                                                                               TACHEProject       780 TACHE
                                                                                                                                                        Project           780 TACHE                                                                       Project             Project
                                                                                                                                                                                                                                                                        780 TACHE
                                                                                                                                                                                                                                                                              Project      780 TACHE
                                                                                                                                                                                                                                                                                           780 TACHEPro
                                                                                                                                                                                                                                                                                                     P
CITY OF WINNIPEG FEEDBACK

• As part of the planning process, the Project Team initiated an informal circulation
  (pre-application) with the City of Winnipeg.

• Through this process, various City of Winnipeg Departments provided their feedback on the
  preliminary design concepts.

• Some of the key comments from the City Departments included:
  ––   That they would not be supportive of a proposal taller than 7 storeys
  ––   That they would like to see a pedestrian friendly ground floor
  ––   That they would like to see privacy concerns mitigated in some way
  ––   That the developer would need to build a sidewalk along Rue Grandin
  ––   That they would like to see landscaped setbacks to buffer the townhomes to the east

• The Project Team addressed much of the City's feedback in the preferred design.

                                                                                              25
NEXT STEPS

The next steps in the planning process include:
                                                            CONTACT INFORMATION /
1. Review comments and feedback                             INFORMATIONS DE CONTACT

2. Continue working with City Departments                   If you have any further questions,
                                                            please contact / Si vous avez
3. Finalize the Preferred Design Concept                    d'autres questions, veuillez
                                                            contacter :
4. Make an application to rezone the land (Summer 2019)
                                                            Brendan Salakoh, RPP, MCIP
5. Attend a formal Public Hearing at the Riel Community     Landmark Planning & Design Inc.
   Committee (anticipated Fall 2019)                        204-453-8008
                                                            info@landmarkplanning.ca

Thank you for attending this session. Your
feedback is important to us, so please fill out a comment
sheet before leaving.

Merci de votre présence à la journée portes ouvertes. Vos
commentaires sont importants pour nous, veuillez donc
remplir une feuille de commentaires avant de partir.

                                                                                                 26
You can also read