WELCOME / BIENVENUE • Welcome to this meeting. Please feel free to browse the display boards. • Members of the project team (wearing name tags) are available to answer any questions you may have. Your feedback is important to us, so please fill out a comment sheet before leaving. • French translation is available if required. If you are interested in French translation, please ask one of our project team members for more information. • Bienvenue à la journée portes ouvertes de ce soir. S'il vous plaît n'hésitez pas à parcourir les panneaux d'information. • Les membres de notre équipe (portant une étiquette) sont disponibles pour répondre à toutes vos questions. Vos commentaires sont très importants pour nous, veuillez donc remplir une feuille de commentaires avant de partir. • La traduction en français est disponible si nécessaire. Si vous êtes intéressé par la traduction en français, veuillez contacter un des membres de notre équipe pour plus d'informations. 2
WHO ARE WE? WHAT WOULD WE LIKE TO DO? • StreetSide Developments, a local developer with several successful projects in St. Boniface, is currently preparing an application to rezone land so that it can eventually be developed as multi-family housing. StreetSide recognizes that nearby residents are stakeholders and may be interested in the redevelopment of this parcel. • Landmark Planning & Design has been retained to lead this engagement process and planning process. In January 2019, we shared preliminary design concepts. Tonight, we would like to share a preferred design concept. 3
SITE CONTEXT • The 40,000 sq. ft. site is located at 780 Taché N O R T H Avenue (at Grandin). r ive –– Eastern boundary: Re dR The Townhomes Exchange EM ESS AG ER Whittier Park RU District –– Southern boundary: TAC Verve Taché Hé AV EN RU –– Western boundary: DIN UE ES R AN EG AIN RU Taché Avenue North TJ T U BER O RU EA St. Boniface SEP –– Northern boundary: PIO H NE ER AV E NU Rue Grandin E Shaw Park R D VA O ULE RB C HE V EN PRO • The proposed development site currently MA Canadian Museum IN S for Human Rights TR includes a mix of single EET Downtown family homes, vacant land, and a vacant industrial St. Boniface operation. TACHé AVENUE The Forks LEGEND Assiniboine River St. Boniface Hospital 780 Taché Avenue 4
OurWINNIPEG – PLANNING CONTEXT urbAn StruCture • OurWinnipeg is the overall RM OF lE development plan for WEST ST PAUL Winnipeg. Every piece of land RM OF RM OF EAST ST PAUL dow ROSSER in the City is designated for "Urban Structure" map of Winnipeg from Complete Communities: An OurWinnipeg Direction Strategy some form of land use. ma • OurWinnipeg designates new this area of town as a 780 TACHÉ AVENUE “Mature Community”. reg The plan describes Mature RM OF Communities as: HEADINGLEY RM OF reg SPRINGFIELD –– "Winnipeg’s early suburbs, ma mostly developed before the 1950s. Key features are a rec grid road network with back RM OF MACDONALD N E lanes and sidewalks, low to W S moderate densities, and a fine RM OF RITCHOT rur grained mix of land uses along commercial streets. Many of airp these communities have a full range of municipal services." figure 02a Winnipeg’s urban structure. 0 2 4 6 8 10 LEGEND Amended 66/2013, 86/2013 Kilometers –– These communities present some of the best opportunities Downtown Regional Mixed Use Centre Recent Communities for infill development. Major Redevelopment Sites Regional Mixed Use Corridor Rural and Agricultural New Communities Mature Communities Airport Area 5
OurWINNIPEG – POLICY CONTEXT • These are selected policies that support or promote a project like this one: –– Provide a range of housing options to accommodate various incomes, household types, abilities, and stages of life –– Promote compact urban form and manage the extension of municipal services for new growth –– Enable the intensification of land-uses through the development application process –– Support new developments that are contiguous with existing developments to minimize the spatial use of land and the extension of services –– Accommodate intensification within existing communities in a sensitive manner that recognizes the existing form and the character of its location –– Support the creation of a range of sizes, forms and tenures of housing –– Support contextually-sensitive infill development that builds complete and inclusive communities 6
NORTH ST. BONIFACE SECONDARY PLAN – POLICY CONTEXT • The North St. Boniface Secondary Plan is a planning document that further guides and regulates growth and development within the North St. Boniface Community. North St. Boniface • The Plan has several objectives and policies Secondary Plan (Schedule “A” to By-Law No. 30/2017) that support or promote a project like the one proposed for the subject site: –– Provide a mix of densities –– Develop a more “complete community” –– Provide a range of housing options –– Promote residential densities that support a safe and livable community –– Design pedestrian-oriented buildings Adopted: July 19, 2017 –– Accommodate a range of incomes, households, types, densities and tenures –– Minimize the spatial use of land –– Transition out industrial uses V:\1URBAN & NEIGHBOURHOOD BRANCH\Secondary Plans\North St Boniface\Amendments\BL 30-2017\First Reading\170306 SP 1-2017 N St B Plan - First Reading.doc 7
NORTH ST. BONIFACE SECONDARY PLAN – POLICY CONTEXT • The subject site is located within the High Density Policy Area of the Secondary Plan. This Policy Area can accommodate higher density multi-family development. N O R T H 780 TACHÉ AVENUE LEGEND Low Density Medium Density High Density Mixed Use Parks & Open Space 8
MULTI-FAMILY ZONING CONTEXT • The neighbourhood surrounding the proposed development site includes existing zoning that allows two-family and multiple-family developments. • The parcels in orange are zoned R2 (residential two-family), while the parcels in brown are zoned as multi-family residential. N O R T H 780 TACHÉ AVENUE LEGEND Two-family Residential Multi-family Residential 9 ©2019 City of Winnipeg Conditions of Use
MULTI-FAMILY CONTEXT • This board provides a sample of different multi-family buildings that are found in the community. • A variety of styles and forms of buildings have been constructed over the past several years. 10
PUBLIC CONSULTATION AND STAKEHOLDER ENGAGEMENT • A thorough public engagement process is being undertaken as part of this project, including a series of stakeholder meetings and public open houses over a 8-month period. 2018 2019 NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP SECOND THIRD ROUND ROUND FIRST ROUND OF MEETINGS OF MEETINGS OF MEETINGS SELECTED PREFERRED WITH ADJACENT WITH ADJACENT MAKE A REZONING WITH ADJACENT DESIGN OPTION AND RESIDENTS AND RESIDENTS AND AND SUBDIVISION RESIDENTS PREPARED DRAFT PUBLIC OPEN HOUSE PUBLIC OPEN HOUSE APPLICATION (DECEMBER 3, DESIGN CONCEPT FOR NORTH FOR NORTH 2018) ST. BONIFACE ST. BONIFACE RESIDENTS RESIDENTS –– Introduced the –– Introduced –– Present a planning process, preliminary design preferred design timeline, and concepts concept anticipated next –– Addressed any –– Show how steps concerns or feedback was –– Received input questions raised at considered and the first meeting addressed –– Receive further input –– Outline municipal approvals process WE ARE HERE 11
WHAT WE HEARD • During the first two rounds of meetings, a few key concerns were raised by nearby residents and stakeholders. The project team has worked to address these concerns in the preferred concept. The team is open to other ideas as they may arise. STAKEHOLDER CONCERNS RESPONSE TO CONCERNS Concerns about traffic • A traffic analysis has been undertaken to assess potential and site access impacts. • The City of Winnipeg Public Works department will consider traffic in its evaluation of the rezoning application. Concern regarding • Research has shown that new developments generally don’t property values negatively impact property values of existing homes. Concern regarding • Some stakeholders preferred a shorter, longer building; some building height stakeholders preferred a taller, skinnier building. • Both options were being considered by the project team. • Although both options had merit, the project team has decided to pursue the shortest of the design options (6 storeys). 12
WHAT WE HEARD STAKEHOLDER CONCERNS RESPONSE TO CONCERNS Concerns regarding • The preferred design includes over 1.1 parking stalls per unit, sufficient parking being which is in line with parking ratios found in recent infill projects. provided The Zoning By-law requirement is 1.2 parking stalls per unit in this area. • The preferred design includes underground parking. • A Parking Impact Study was undertaken to assess on-street parking in the immediate vicinity (see Boards 22 and 23). Concerns regarding • The design of the building will be of high quality, incorporating building aesthetics a mix of materials, colours, and articulation. • The design includes facades on all sides, to ensure that neighbours do not face a ‘blank wall’. • A ‘Design Review’ is required for new buildings in this area, which will help ensure the final design fits the existing context. • Should the rezoning be approved, a Plan Approval is still required (where the Riel Community Committee will review building materials, landscaping, etc.). A detailed design with a full set of drawings will be prepared and submitted at that time. 13
WHAT WE HEARD STAKEHOLDER CONCERNS RESPONSE TO CONCERNS Concern regarding • Shadow studies have been undertaken (see Board 24). sightlines and shadows Concern regarding • Building articulation and finish materials may reduce noise noise from the rail line reflection. 14
DESIGN CONCEPT • In January, the Project Team shared three preliminary design concepts, each with unique aspects and features. The three preliminary design concepts are illustrated on the following boards, and include: –– Design Concept 1: 6-Storey Wood-Frame Building –– Design Concept 2: 7-Storey Concrete/Masonry Building –– Design Concept 3: 13-Storey Concrete or Steel Building • A variety of factors were considered in the evaluation of options, including: –– Stakeholder input –– Feedback from City of Winnipeg departments –– Height, bulk, and setback considerations –– Economic and market considerations –– Parking and traffic, and –– Neighbourhood context • The preferred Design Concept is based on Design Concept 1. 15
DESIGN CONCEPT 1: 6-STOREY WOOD-FRAME BUILDING • Concept 1 was a 6-storey, wood- frame building that is roughly the same width and length as 770 Taché (although two storeys taller). • It is setback from the southern property line in a similar fashion as 770 Taché. • Concept 1 featured a parkade entrance off of Taché Avenue, • The 110-stall parkade would be built entirely below grade, unlike the parkade at 770 Taché, meaning that the first floor would be at ground level. 3-D rendering, looking southeast • Concept 1 featured approximately 94 units. Elevation, looking east Plan view, on air photo Elevation, looking south 16
DESIGN CONCEPT 2: 7-STOREY CONCRETE/MASONRY BUILDING • Concept 2 was a 7-storey, concrete/ masonry building that was slightly narrower than Concept 1. • This concept featured the largest setback from 770 Taché, as well as from the existing homes along Rue Grandin. • This concept featured a parkade entrance off of Rue Grandin. • Concept 2 featured approximately 103 units and 115 underground parking stalls. 3-D rendering, looking southeast Elevation, looking east Plan view, on air photo Elevation, looking south 17
DESIGN CONCEPT 3: 13-STOREY CONCRETE OR STEEL BUILDING • Concept 3 was a 13-storey building which would be built using either concrete or steel construction. • While the tallest proposal, the building footprint would have occupied only the western half of the site. • Concept 3 would featured approximately 103 units. 3-D rendering, looking southwest • Parking was accessed from Rue Grandin. This concept features a 117-stall parkade and an additional 46 surface parking stalls, for a total of 163 parking stalls. Elevation, looking east Plan view, on air photo Elevation, looking south 18
PREFERRED DESIGN CONCEPT • This slide illustrates the preferred design concept in both plan view GRANDIN STREET (from above) and elevation view 10'-0" N (from the sides). SIDEWALK • The preferred design concept at 7'-8" DRIVE AISLE EXIT EXIT 12'-4" this stage is detailed enough to 25'-9" TACHE AVENUE illustrate size, massing, context, setbacks, and dimensions. However, PROPOSED 6-STOREY BUILDING ENTRY precise details (in terms of colour, materials, and articulation) would 7'-0" only be developed in full at the Plan Approval stage (if the rezoning were TERRACES / PARKADE BELOW 27'-0" HYDRO LANDSCAPED AREAS approved). 7'-0" 780 TACHE PROPOSED CONCEPT 6-STOREY + UNDERGROUND PARKADE Plan 93 UNITS + 114 PARKING STALLS VERVE TACHE NORTH GRANDIN STREET HOMES ON GRANDING STREET East Elevation (view from Taché Avenue) 60' - 11" 102' - 0" EAST FROM TACHE AVENUE 1 1/32" = 1'-0" TOWNHOMES ON GRANDIN STREET TACHE AVENUE South Elevation 31' - 5" (view from Grandin Street) No. Description Date /2019 4:24:04 PM ELEVATION EAST FROM TACHE AVENUE 780 TACHE AVE 19 Project 780 TACHE 1 SOUTH FROM GRANDIN STREET 1/32" = 1'-0" STREETSIDE PROJECT Date Drawn by JUNE 25 2019 SB A102
PREFERRED DESIGN CONCEPT • These two renderings illustrate the proposed development in 3D. • The concept features 98 units and 114 parking stalls. Massing Plan from Grandin Street (looking southwest) Massing Plan from Taché Avenue (looking southeast) 20
TRAFFIC ANALYSIS • Engineering firm Dillon Consulting Limited • The development-generated traffic was was retained to undertake a Trip Generation distributed according to these proportions and Trip Distribution Study for the proposed as shown in the following diagram: development. • It was estimated that: N O R T H –– 40% of traffic, leaving the site, will travel south along Taché Avenue and then west along Provencher Boulevard; –– 35% of traffic, leaving the site, will travel south along Rue St. Joseph and then east along Provencher Boulevard; and, –– 25% of traffic, leaving the site, will travel south along Taché Avenue towars St. Mary's Road. • The Study concluded that during peak hours, the resulting increase in traffic from this development would be minimal. 35% 25% • During the AM peak hour, the development would contribute one additional car every 40% 4 minutes along Tache Avenue, and one additional car every 7.5 minutes on Distribution of Development Traffic (780 Taché Avenue) Rue St. Joseph. 21
PARKING IMPACT STUDY • Engineering firm Dillon Consulting Limited 86 ON-STREET PARKING SPACES was retained to undertake a Parking Analysis for the area; the Analysis utilized the City N O R T H of Winnipeg’s standard methodology and 6 5 recent data. 15 • The study takes a variety of factors into 5 21 5 consideration, including on-street parking availability, location, access to transit, and 9 parking demand. 20 • The engineering team analyzes parking observation data, which are counts of how many cars are parked on adjacent streets at various points in time. They map this data visually, calculating the utilization of available on-street parking spaces during the various points in time (see next Board). • The study concludes that even with the addition of 98 units to the area, on-street parking will still be readily available at most times. 22
PARKING IMPACT STUDY • Shown below are the utilization rates of on-street parking in the vicinity of the proposed development at 6 different points in time. N O R T H Saturday September 30, 2017 – 9:00 AM Saturday September 30, 2017 – 2:00 PM Saturday September 30, 2017 – 9:00 PM LEGEND Snow route 0%–39% of stalls are being used 40%–59% of stalls are being used 60%–84% of stalls are being used 85%–100% of stalls are being used Thursday October 5, 2017 – 9:00 AM Thursday October 5, 2017 – 2:00 PM Thursday October 5, 2017 – 9:00 PM 23
SHADOW STUDY • In the earlier rounds of stakeholder meetings, nearby residents expressed concerns about the impact of shadows. The project team committed to undertaking a shadow study. • All properties to the south of the subject property are unaffected by shadows. • The single-family homes to the north will experience increased shadows during the winter months when the sun is at its lowest (just before sunset and just after sunrise). • The shadow effects are illustrated below (four seasons, three times of day). SUMMER SOLSTICE AND SPRING EQUINOX FALL EQUINOX AND WINTER SOLSTICE Summer Solstice 3pm mmer mmer Solstice 1 Solstice1 9am Summer 9am Summer Solstice 9am Solstice Summer Summer Solstice 22 9am Solstice 12pm 2 21"Summer 12pm 2 Summer Summer Solstice Solstice 12pm Solstice 12pm33 3Summer 12pm Summer Solstice 2 12pm Summer Solstice 3pm Solstice Summer 33pm Summer Fall Solstice Solstice Equinox 3pm 9am3 3pm 9am 1Fall SummerFall Solstice Equinox Equinox 3pm 9am 9am 2FallFall Equinox Equinox 12pm Fall Equinox 12pm 3 Fall Equinox 3pm 12pm Fall Equinox 3pm FallEquin Equin = = 160'-0" 160'-0" 1" = 160'-0" 1" 1" == 160'-0" 160'-0" 1" = = 160'-0" 160'-0" 1" = 160'-0" 1"Fall 11" Equinox == 160'-0" 160'-0" 9am1 Fall 13 1"1" 1"== Equinox 160'-0" =160'-0" 160'-0" 1 Fall 11" =1" Equinox 160'-0" 9am 2 2 Fall Equinox 12pm 22 Fall Equinox 12pm 3 Fall Equinox 3pm3 Fall Equinox 12pm 2 3 Fall Equinox 3pm Fall 33 1" = 160' 1" = 160'-0" 1" = 160'-0" 1" ==160'-0" 160'-0" 1" = 160'-0" 1" = 1" = 160'-0" 160'-0" 1"==160'-0" 1" 160'-0" 1" = 160'-0" 1" = 1" = 160'-0" 160'-0" 1" = 160'- ng ng Equinox 4 Equinox 9am Spring Spring Equinox Equinox 9am59am Spring Spring Equinox Equinox 12pm 5Spring Spring Equinox Equinox 12pm Equinox 12pm 6 6Spring 12pm Spring Spring Equinox Equinox Winter 3pm Solstice 43pm 9amWinter Winter Solstice SpringSolstice Spring 9am Equinox9am Equinox 3pm 4Winter Winter Winter Spring Solstice Solstice Solstice Equinox 3pm9am 5 5Winter 9am Winter Solstice 12pm 9am Winter Winter Solstice Solstice Solstice 12pm 12pm 12pm WinterSolstice Winter 12pm6Winter Solstice12pm Winter Solstice Solstice 6 3pm 3pmWinter Solstice Winter Solstice 3pm 3pm Winter WinterSo So 9am 4 5 1" = 160'-0" 12pm 5 Spring Equinox 5 1" = 160'-0" 12pm 5 Spring Equinox 6 41" = 160'-0" 3pm46 6 1" 1"1"= = 160'-0" 160'-0" 6 44 1" 3pm 5 5 55 1" = 160'-0" 6 6 66 1" = 160' = = 160'-0" 160'-0" 1" = 160'-0" 1" = 160'-0" 1" = 160'-0" 1" = 160'-0" 1" 1" = 160'-0" = 160'-0" 1" == 160'-0" 160'-0" 1" =1"==160'-0" 160'-0" 160'-0" 1" = 160'-0" 1" = 1" = 160'-0" 160'-0" 1" = 160'-0" 1" = 160'-0" 1" = 1" = 160'-0" 160'-0" 1" = 160'- No. Description Date No. Description No. Date Description 24 Date AM No. Description No. DateDescription No. Date Description Date No. Description No. Description Date No. DateDescription Date AM No. Description SHADOW STUDYDate SHADOW STUDY SPRING SPRING EQUINOX AND SUMMER SOLSTICE AM No. Description Date SHADOW AND STUDY FALL EQUINO EQUINO S 5:30 AM 5:30 AM 5:30 AM SHADOW STUDY SPRING EQUINOX AND SPRING SUMMEREQUINOX SOLSTICE SHADOW STUDY STUDY FALL FALL EQUINOX EQUINOX SHADOW WINTER STUDY FALL SH SOLST 780 TACHE780 AVETACHE 780AVE TACHE AVE EQUINOX SHADOWAND SUMMER STUDY SOLSTICE SPRING SHADOW EQUINOX STUDY AND 780 TACHE AVE SUMMER TACHE780 780AVE 780 TACHE AVE AVE SOLSTICE TACHE AND SUMMER SOLSTICE SHADOW AND WINTER SOLST :55:30 55:30 5:30 Project Project 780 780 TACHE TACHEProject 780 TACHE Project 780 TACHE Project Project 780 TACHE Project 780 TACHE 780 TACHEPro P
CITY OF WINNIPEG FEEDBACK • As part of the planning process, the Project Team initiated an informal circulation (pre-application) with the City of Winnipeg. • Through this process, various City of Winnipeg Departments provided their feedback on the preliminary design concepts. • Some of the key comments from the City Departments included: –– That they would not be supportive of a proposal taller than 7 storeys –– That they would like to see a pedestrian friendly ground floor –– That they would like to see privacy concerns mitigated in some way –– That the developer would need to build a sidewalk along Rue Grandin –– That they would like to see landscaped setbacks to buffer the townhomes to the east • The Project Team addressed much of the City's feedback in the preferred design. 25
NEXT STEPS The next steps in the planning process include: CONTACT INFORMATION / 1. Review comments and feedback INFORMATIONS DE CONTACT 2. Continue working with City Departments If you have any further questions, please contact / Si vous avez 3. Finalize the Preferred Design Concept d'autres questions, veuillez contacter : 4. Make an application to rezone the land (Summer 2019) Brendan Salakoh, RPP, MCIP 5. Attend a formal Public Hearing at the Riel Community Landmark Planning & Design Inc. Committee (anticipated Fall 2019) 204-453-8008 info@landmarkplanning.ca Thank you for attending this session. Your feedback is important to us, so please fill out a comment sheet before leaving. Merci de votre présence à la journée portes ouvertes. Vos commentaires sont importants pour nous, veuillez donc remplir une feuille de commentaires avant de partir. 26