westernpower.co.uk Distribution Future Summary Energy Scenarios • Introduction to DFES • DFES methodology summary Methodology • Stakeholder engagement • Data sources and evidence gathering • Creating the DFES projections • How the WPD DFES is reconciled to FES 2020 2
westernpower.co.uk Distribution Future The Distribution Future Energy Scenarios outline the range of credible futures for connections to the Energy Scenarios distribution network. Using a scenario framework consistent with other Methodology distribution network operators and National Grid ESO – known as the Future Energy Scenarios or FES – these local stakeholder informed projections are created on an annual cycle and encompass changes in demand, storage and distributed generation, including electrified transport and heat. WPD works with Regen to create the Distribution Future Energy Scenarios for all of our licence areas on an annual cycle. 3
Why Future Energy Scenarios? The need for scenario based planning With customer requirements The DFES is used by WPD to changing in an evolving energy conduct a detailed review of its system, the DFES is used to network and how it will be inform strategic network planning impacted by each scenario. This and investment for an uncertain helps WPD to develop future. reinforcement solutions to solve anticipated network constraints in The DFES builds on historic different years and under different trends, as well as analyses of the scenarios. pipeline of near term projects, the local resource factors and The DFES is also used for RIIO- stakeholder input to create a ED2 business planning, and to range of credible scenarios. publicly signpost potential system flexibility needs. The DFES also assesses the potential growth of new technology connections, such as electric vehicles and chargers, battery storage sites and heat pumps. 4 westernpower.co.uk WPD DFES 2020 – Methodology
The four WPD DFES scenarios Incorporating the FES 2020 scenarios The National Grid ESO FES Additional local assumptions are 2020 scenarios are used in the made by Regen and the WPD WPD DFES 2020. The 2020 DFES team. For example, about scenarios are significantly the deployment of projects in the different from those used in pipeline, the lifetime of existing previous WPD DFES studies due projects, and the weighting of to the introduction of three new spatial factors such as affluence net zero compliant scenarios by and agricultural land grade. National Grid. Three of the scenarios are Key assumptions are published compliant with the UK by National Grid ESO for each of government net zero emissions the four scenarios. These are target for 2050. Each of these incorporated in the WPD DFES scenarios achieves emissions 2020. The four FES 2020 reductions in a different way. scenarios are defined by different ‘speeds of decarbonisation’ and ‘level of societal change’. 5 westernpower.co.uk WPD DFES 2020 – Methodology
A whole system approach Building on the Net Zero South Wales innovation study The Net Zero South Wales 2050 Learnings have been taken forward in innovation project was undertaken as a the WPD DFES 2020. In WPD DFES partnership between Regen, WPD and 2020 over 3,000 small areas were WWU with funding from the Network assessed, incorporating a key Innovation Allowance programme. recommendation from the innovation study for greater spatial granularity. This innovation project brought two networks together, developing insights The WPD DFES results can be directly and value from an integrated approach aggregated up to local authority areas, to gas and electricity scenario planning so that stakeholders or other networks and exploring an increasingly flexible can view results most relevant to them. and cross-vector system. The number of technologies assessed was expanded based on learnings from the innovation study. Multiple low carbon heating technologies were assessed, as well as a full picture of waste treatment processes, including the potential for biomethane development. 6 westernpower.co.uk WPD DFES 2020 – Methodology
WPD DFES Methodology Methodology in brief Update underlying scenario data Overview February - March Local factors are used, with assumptions from National Grid FES, to project the deployment of each technology type for four scenarios at a granular level. 1. Baseline: 3. Stakeholder engagement Data is collected on the current Local information is collected from Reconciliation between Stakeholder engagement FES and DFES April – May installed capacity, or number of consultation with developers and a February Annual Event report published installed units, for each individual survey of local authorities, this is process technology type. combined with analysis of existing trends and spatial data. 2. Pipeline Proposed sites that may connect in 4. Scenario projections DFES publication Scenario analysis and data validation the near term are individually (2020-2050) November - December June - October Suite of documents assessed and developers contacted Near term technology deployment is plus data published where possible. extrapolated to create the FES publication projections at the ESA level in the July New scenarios published medium and long term, incorporating local resource factors. 7 westernpower.co.uk WPD DFES 2020 – Methodology
Electricity Supply Areas Spatial granularity DFES analysis is produced from An ESA is: The geographical area the bottom up, using small supplied by a Primary Substation geographic cells called ‘Electricity (which contains WPD owned Supply Areas’ (ESAs). distribution substations) providing supplies at a voltage below 33 kV; Each ESA represents a block of or a customer directly supplied at demand and generation as visible 132, 66 or 33 kV or by a dedicated from the distribution network. This Primary Substation. way, projected new connections by scenario are linked to specific parts These network-informed spatial of the network, allowing for areas are also split by local detailed network analysis. authority borders. This means the WPD DFES 2020 results may be The attributes of the ESA informs directly aggregated up to local the deployment of each individual authority areas. technology type, for instance local windspeed or number of houses. Individual ESAs, split by local authority borders 8 westernpower.co.uk WPD DFES 2020 – Methodology
Stakeholder engagement Overview WPD and Regen ran four Developers of sites in the consultation events in May 2020, pipeline were contacted where engaging with 266 attendees in possible, including sites with webinars across the four licence planning applications. areas. Wider industry consultation is Regen also contacted every local also completed for each authority in the WPD licence technology where possible. areas to collate data on new Information is gathered developments predominantly through direct conversations as well as through As part of the discussion with existing industry networks and local authorities, local authorities events. were surveyed for plans or policies supporting low carbon infrastructure. A report summarising the consultation webinars and the feedback received are available on the WPD website: westernpower.co.uk/distribution-future-energy-scenarios-regional-information 9 westernpower.co.uk WPD DFES 2020 – Methodology
Stakeholder engagement Stakeholder consultation events The consultation events were After the events, a summary held online in May 2020, with report was published, detailing 266 participants across the four the content covered, as well as webinars. how the comments raised would be incorporated into the DFES The webinars participants had analysis. the opportunity to answer live polls regarding detailed For example, participants assumptions made in the DFES suggested that the large number analysis. of potential solar projects could begin to connect from 2022, and The participants were also able that battery storage would be to raise questions and critiques superseded by other energy during and after these sessions. storage technologies in the future. A report summarising the consultation webinars and the feedback received are available on the WPD website: westernpower.co.uk/distribution-future-energy-scenarios-regional-information 10 westernpower.co.uk WPD DFES 2020 – Methodology
Engagement with local authorities Using local authority plans in DFES New housing and non-domestic developments are sources of New developments process overview new demand on the electricity network. Local authority development plans are incorporated into DFES to include the Provide local localised impact on the distribution network. authority with Assumptions new Check new Assign Data collection applied to developments data against developments produce low, data from the most recent to ESAs (using Regen created an online database of all new development data previous local locational medium and collected during earlier DFES studies. This was then shared with high growth study, request documents data) scenarios the local authority planners. Updated data provided by the local verification or update authorities is verified against most recent local documents, and classified by: “ • Development type: • Domestic or non-domestic by individual use classes • Location Over 10,000 new development ” • Total number of homes or floorspace • Development stage records were processed as part of • Plan period WPD DFES 2020 • Land type 11 westernpower.co.uk WPD DFES 2020 – Methodology
Engagement with local authorities Assessing local authority local plans Creating deployment rates for the four scenarios Once processed and verified, the Historic trends in new developments individual developments are are also used to provide estimates projected to be built at a schedule for a low, medium, and high level of based on the source data. deployment. These are then A delay in this schedule is applied to assigned to the FES 2020 scenarios sites in the medium and long term – for the near and medium term as which varied by scenario to capture detailed below: the envelope of uncertainty. Steady Progression Stakeholder feedback also Low deployment suggested some delays in the near Consumer Transformation term due to COVID-19. Medium deployment The delay methodology means that System Transformation the precise spatial data and scale of Medium deployment development is maintained, but the period over which the sites are built Leading the Way varies. High deployment 12 westernpower.co.uk WPD DFES 2020 – Methodology
Engagement with local authorities Assessment of local authority local plans Not all local authority plans Each individual development Example of source data trajectory build rates extend out to 2030 or later, is also assigned to an ESA, and as a result there is a the part of the network to natural reduction in the data which it is most likely to available for the analysis of connect. planned developments. Though some of these sites To compensate for this are already visible to WPD reduction, additional dwellings through accepted demand and commercial floorspace connection offers, many are were modelled, with locations not. weighted towards areas of New build deployment also similar characteristics to those feeds into the other DFES that have seen recent models for heat pumps, deployment of new rooftop solar PV, and electric developments. vehicle charger uptake, among others. 13 westernpower.co.uk WPD DFES 2020 – Methodology
Engagement with local authorities Survey of local policies Local authorities in the WPD Local policies are expected to area were surveyed for local change significantly year on plans and policies which may year. Through an annual iteration affect the uptake of new low of the DFES this process will be carbon technologies included in expanded to make the surveys the DFES analysis. more comprehensive over time. This included waste treatment The local factors and policies will policies, electric vehicle charging therefore be updated and infrastructure or clean air zones, verified annually with relevant or specific policies supporting local authorities. renewable energy deployment. The surveys provided valuable insight into multiple factors which fed into the uptake modelling. Clean air zones are assumed to contribute to an increased use of electric vehicles in the local area 14 westernpower.co.uk WPD DFES 2020 – Methodology
Creating the DFES projections Overview and process Baseline Medium term (2025-2035) The baseline process Key growth factors and Near term Medium term Long term establishes the deployment of stakeholder perspectives are each technology to date and used to create four scenario identifies historic growth projections, with assumptions trends and local factors. linked to FES 2020. Near term (2020-2025) Long term (2035-2050) Sites which may connect in Key uncertainties in the near term are individually technology improvements and assessed for planning costs are incorporated in an applications, network envelope of scenario connection offers, and projections. Data is reported developer progress. in 5-year stages from 2035. 15 westernpower.co.uk WPD DFES 2020 – Methodology
Creating the DFES projections Data sources for deployment to date The primary source of data for The baseline registrations for the baseline of connected electric vehicles are based on generation and storage sites is Department for Transport data at WPD connection agreement local authority level. This data. For the WPD DFES 2020 information is then distributed to study, the cut-off data for this ESAs based upon demographic data is the beginning of April factors that reflect the 2020. characteristics of early adopters. Additional data records are The baseline of heat pump and sourced from public subsidy direct electric heating records and other sources such installations is based on analysis as the Feed in Tariff, the of Energy Performance Capacity Market, planning Certificate data and Renewable records and the Renewable Heat Heat Incentive reports. Incentive. 16 westernpower.co.uk WPD DFES 2020 – Methodology
Creating the DFES projections The pipeline analysis process “ Sites with an accepted network Factors which are specific to connection offer are individually different technologies were also Over 350 individual assessed to establish when and if included in the pipeline research. they will connect. Records of planning applications, network For example Capacity Market activity is a key factor in the pipeline sites were connection offers, and online information is used to assess pipeline treatment of thermal generation and storage pipeline assessed, across a progress. sites. range of generation Where possible, direct discussions The planning applications of the are had with the developers of the individual pipeline sites are also and storage ” pipeline sites to identify the stage assessed. The weighting given to of development and key factors affecting the connection year. a successful or undecided planning application varies by technologies. technology, as planning is a larger barrier for some generation technology types than others. 17 westernpower.co.uk WPD DFES 2020 – Methodology
Creating the DFES projections Projections driven Wind Solar Hydro AD Fossil Diesel Heat Electric Energy Marine Biomass by: power biogas gas pumps vehicles storage energy Technology-specific Analysis of pipeline projections are sites ● ● ● ● ● ● ○ ○ ● ● ● created at ESA level to ESA-level resource create the DFES availability ● ● ● ● ○ ○ ○ ○ ○ ● ● projections. The business-case for development ● ● ● ● ● ● ● ● ● ● ● ESA-level social factors ○ ● ○ ● ○ ○ ● ● ● ○ ○ Key: FES 2020 ● ● ● ● ● ● ● ● ● ● ● assumptions ● In line In line In line In line In line In line Led by Led by Led by In line In line Core factor Local authority factors ● ● ● ● ● ○ ● ● ● ● ● ● National policies and Secondary factor regulations ● ● ● ● ● ● ● ● ● ● ● ○ Local stakeholder Unused input ● ● ● ● ● ● ● ● ● ● ● 18 westernpower.co.uk WPD DFES 2020 – Methodology
Creating the DFES projections Proportion of homes not connected to the Demographic and social factors gas network Source: Projections for household- These demographic and UK Gov LSOA estimates of households not connected to the gas scale technologies such social factors are assumed network as heat pumps, rooftop to have a greater impact in solar PV and battery the near term, during electric cars, are most which low carbon DFES uses local factors to model the uptake of new affected by demographic technologies move from technologies. People in off-gas and social factors. being niche to more properties are currently more likely to install low carbon heat widespread adoption. In technologies such as heat For example heat pump the medium and long term pumps. deployment is impacted by therefore, uptake is much off-gas homes, building more widely distributed. types, and energy efficiency ratings. These factors interact with other factors such as affluence or national policies or financial incentives. 19 westernpower.co.uk WPD DFES 2020 – Methodology
Creating the DFES projections Geographic resource assessments Agricultural land grade Projections for generation Distance from housing, technologies such as proximity to the Resource factors are key to onshore wind and solar distribution network and the uptake and location of farms are weighted agricultural land grade are several renewable technologies. towards more also included in the geographical and spatial analysis. Solar farms are typically resource factors. found on lower grade These spatial resource agricultural land, however other spatial factors such as Renewable generation is assessments are verified hill slope, housing and particularly reliant on against existing projects, network availability are all critical too. areas of good resource, pipeline sites and in for instance high wind conversation with speed or solar irradiance. developers. Other key considerations are natural constraints including ground slope angle, National Parks and other protected areas. 20 westernpower.co.uk WPD DFES 2020 – Methodology
DFES reconciliation with FES Reporting consistency across DFES and FES The WPD DFES 2020 uses the same The set of underlying assumptions in FES scenario definitions as the National Grid 2020 are incorporated wherever possible ESO FES 2020. This means there is a in WPD DFES. Further technology-specific common and consistent framework and assumptions are made in DFES, for set of assumptions that allow for example around the deployment of comparison between the studies. The projects in the pipeline. scenarios are updated annually by the FES team. Like the range of FES documents, the suite of WPD DFES publications is The technology types used in DFES and designed to suit a variety of stakeholder FES data have been standardised for needs. A summary of results and the better consistency. In some areas, Regen underlying assumptions by each and WPD have included greater detail. For technology is published for each licence example, the standard ‘I&C’ demand area, alongside the data available through technology type is divided into 10 sub- the WPD DFES map hub. A summary of DFES results are available online at the WPD map hub technologies for WPD DFES, as these the stakeholder consultation event, these developments can have wide ranging methodology slides and a DFES ‘in 5 impacts on the network. minutes’ report are also published. 21 westernpower.co.uk WPD DFES 2020 – Methodology
DFES reconciliation with FES Data reconciliation across DFES and FES The WPD DFES results are produced at ESA Any technology specific assumptions and level and as part of the analysis is aggregated reasons for variance between the local DFES up to be compared with FES data published at and FES results are published in the WPD both national and GSP level. DFES summary reports for each licence area. The WPD DFES uses FES as a framework and Typical regional and local variations include: benchmark but in addition reflects the regional and local factors for each technology and • Resource availability scenario. Therefore some variance between • Historic factors the DFES and FES views is expected. • Political factors This variation is typically greatest in the near term as the DFES projections are based • Stakeholder input primarily on analysis of the pipeline sites. • Pipeline analysis In the medium and long term there is more convergence, although specific local resource • New technology adoption factors DFES results are available online at the WPD map hub availability or factors raised by stakeholders continue to affect the DFES results out to 2050. 22 westernpower.co.uk WPD DFES 2020 – Methodology
Next steps The WPD DFES 2020 suite of output If you have any questions in relation to documents is now available online: WPD’s Network Strategy work, please • Stakeholder feedback summary contact WPD on the details below: reports – available here Email: • Data available through the map hub wpdnetworkstrategy@westernpower.co.uk • Technology results and assumptions By post: reports Network Strategy Team • Methodology walkthrough slides Western Power Distribution Feeder Road • DFES Regional Review summary Bristol reports BS2 0TB The DFES is an annual process conducted by WPD and Regen, the WPD DFES 2021 process will begin in February 2021. WPD Distribution Managers are in contact with local authorities to discuss the results. The stakeholder engagement process runs from February to July 2021, if you have information to feed into the creation of the local factors for the DFES 2021 please get in contact using the above details. DFES results are available online at the WPD map hub 23 westernpower.co.uk WPD DFES 2020 – Methodology
If you have any questions in relation to WPD’s Network Strategy work, please contact WPD on the details below: Email: wpdnetworkstrategy@westernpower.co.uk westernpower.co.uk