VLT AO Community Days - Bruno Leibundgut

Page created by Sarah Graham
 
CONTINUE READING
VLT AO Community Days - Bruno Leibundgut
VLT AO Community Days

      Bruno Leibundgut
VLT AO Community Days - Bruno Leibundgut
Background
    ESO Science Priorities
     Ø STC document discussed in April 2015 (STC-551)
           • AO instrument on UT4 as the next VLT instrument
           • ‘Select and design AO instrument’
     Ø Discussion with a group of experts
           • 15/16 September 2015
     Ø Paranal Science Priorities (STC-561; October 2015)
           • ’Discussion for the next AO instrument at the Nasmyth focus on
             UT4 to make full use of the AOF has started’
     Ø Planning for the next VLT AO instrument (STC-568; April
       2016)
           • Presented results of the expert discussion
           • Proposed potential future development directions

VLT AO Community Days | 20/21 September 2016
Background
    STC requested community discussion
     Ø ‘The STC supports the initiative described in STC-568 to
       define a next generation AO instrument that can take
       advantage of the revolutionary AOF facility on UT4. We
       endorse the plan to hold an open meeting later this year
       to fully engage with the wider community in this effort.‘

                              Welcome
VLT AO Community Days | 20/21 September 2016
VLT AO - Current status
Current VLT AO instruments cover a wide range
already
Ø (Julien Milli’s talk for more details)
Ø SPHERE - state of the art for XAO (IR and optical)
Ø NACO/ERIS - SCAO with an old system – new one in the
  works
Ø HAWK-I/GRAAL - AOF to provide IR GLAO over 7’x7’
Ø MUSE/GALACSI - AOF to bring optical AO (750nm;
  7”x7”)
Ø SINFONI/ERIS - AO support of IR integral spectroscopy
Ø CRIRES+ is AO supported
Ø AO for VLTI (NAOMI and CIAO)
SCAO                               MOAO                                                            UT3                                                                                     UT4
                       10%               LTAO      MCAO                                                         ParanalISAAC
                                                                                                                         Instrumentation 2013-2014                                                                       co
                 Strehl ratio versus Field of View
                                              GLAO
                                                                                                                                                         decom †                                                           mm
                                                                                                                                                                    upgrade                                                   issi
                                                                                                                                                                                 Musical               Chairs!
                                                                                                                                                                                                                                   on
                              0.1’                 1’                       10’
                                                                                              Total   CRIRES                                                                  VISIR
                                                                                                                                                                                                                                     ing

                                                                                  corrected FoV (Ø)
AO correction
 Strehl Ratio

 100%
                                                                at VIS
                                                          (typ 0.7µm)
                                                                                    VLT AO              KMOS
                                                                                                                       upgrade (2014- )

                                                                                                                         iss
                                                                                                                            ion
                                                                                                                                in
                                                                                                                                       UT1
                                                                                                                                       g
                                                                                                                                                             NACO

                                                                                                                                                                                    UT2
                                                                                                                       mm                                                                             2014
                                                                                                                  co
                                                                                                                                                                                                      X-SHOOTER
                                      Strehlcost!
                                             ratio versus Field of View                                                                                            Strehl ratio
                                                                                                                                                                            move
                                                                                                                                                                                 versus Field of
 70%

         XAO         AO correction               sky coverage                              at NIR SPHERE                                   AO correction
                      Strehl Ratio                                                     (typ 2µm)                                            Strehl Ratio                                                move
                                                                                                                                                                                                      back/forth                  (typ
                                                                                                               com
                                                                                                                  mis
                      100%
                             SPHERE                                                                                    sio
                                                                                                                             nin             100%
                                                                                                                                   g
         SCAO                              MOAO                                                                                        UT3                                          UT4               MUSE
 10%               LTAO       MCAO                                                                                                                                                  co
                               XAO         GLAO                                                       ISAAC
                                                                                                               decom †                                                                mm

                                                                            cost!
                                                                                                                               upgrade                                                    iss
                                                                                                                                                                                             ion
         0.1’                 1’                  10’   MAD         Total                                                                     VISIR
                                                                                                                                                                                                ing

                       70%                              corrected FoV (Ø)                                                                    70%         SPHERE!
                             NACO
                                                                            sky coverage                                                                 ZIMPOL
                                                                                                                                                         XAO
                                          LTAO      MCAO
                              SCAO
                                                                 MOAO
                                                                                                                                                         SCAO
                                                                                                                                                           MOAO
                 Strehl
                     10% ratio versus Field of View                                                                         Strehl10%
                                                                                                                                   ratio versus  Field
                                                                                                                                            LTAONF
                                                                                                                                            MUSE       of View
                                                                                                                                                    MCAO
                                                                   GLAO                                                                                                                GL
                                                                                                                                                                                    MUSE  AO
                                                                                                                                                                                         WF
                              0.1’                 1’                   10’
                                                                                        Total                                                             0.1’                       1’                            10’
                                     SINFONI!                     at NIR    corrected FoV (Ø) AO correction                                                                                      at VIS                   correcte
AO correction
 Strehl Ratio                        (CRIRES)!                (typ 2µm)
                                                               HAWKI/GRAAL                     Strehl Ratio                                                                                (typ 0.7µm)
                                     VLTI
 100%
        SPHERE                                                                                        100%

          XAO
                                   MAD             cost!
 70%                                                                                                   70%    SPHERE!
        NACO
                                                   sky coverage                                               ZIMPOL
                                                                                                               XAO
                    LTAO       MCAO
         SCAO
                                           MOAO
                                                                                                               SCAO                                         MOAO
 10%                                                                                                   10%                         LTAONF
                                                                                                                                   MUSE             MCAO
                                    GLAO                                                                                                               GL AO
         0.1’   SINFONI!
                             Thanks to
                              1’
                                       Julien Girard
                                                 Total (ESO)
                                                  10’                                                          0.1’
                                                                                                                                                    MUSE
                                                                                                                                                    1’
                                                                                                                                                         WF
                                                                                                                                                                              10’
                                                                                                                                                                                                 Total
                                                        corrected FoV (Ø)                                                                                                            corrected FoV (Ø)
                (CRIRES)!                HAWKI/GRAAL
                VLTI
Assumptions for the discussion
All current AO instruments to continue
AOF commissioning in 2018
Ø GLAO for HAWK-I
Ø MUSE narrow-field mode
CRIRES to return in 2018
NACO available until mid-2019
ERIS will be working in ~2020
VLT Instrument Planning
       European Organisation for Astronomical Research in the Southern Hemisphere    ESO/Cou-1656
       Confidential until Council review, then PUBLIC DISTRIBUTION                   Page 26

       Table 2 shows the planned development timetable. For the new projects, one year of Phase A
       is foreseen for all instruments plus a development time of 5 years. This duration is on the short

     Next instrument to start in 2017
       side when compared to 2nd generation instruments such as MUSE, KMOS, SPHERE, but is
       not unrealistic.

        Yr              Phase A                       Design & Constr.      Delivered
        2013                                          CRIRES+               MUSE
                                                      MOONS
        2014            NTT Call for Ideas            4MOST                 SPHERE
                                                                            PRIMA Astrometry
                                                                            (discontinued)
        2015                                          NIRPS (New I)         LFC for HARPS
                                                                            VLTI PR1
                                                                            GRAVITY BCI
        2016                                          SOXS (New I)          GRAVITY CIAO
                                                                            VISIR Upgrade
                                                                            VLTI PR4
                                                                            NACO
                                                                            ESPRESSO
        2017            New II (for UT4)              CUBES(?)              MATISSE
                                                                            CRIRES+
        2018            New III                       New II (for UT4)      AOF
                                                                            VLTI PR3 & PR5
                                                                                                     From the Paranal
                                                                            SOXS&NIRPS(?)            Instrumentation
        2019            New IV                        New III               MOONS
        2020            New V                         New IV                ERIS                     Programme Plan 2016-
                                                                            CUBES(?)                 2021
                                                                            4MOST
        2021            New VI                        New V                                          (Cou-1656; April 2016)
     Table 2 Development plan for the Paranal Instrumentation Programme. One year of Phase A is
     expected to be carried out for new instruments, and the overall duration is typically estimated in
     6/7 years. According to the proposed scheme, New I-III are concerned by the first phase. Column
VLT AO  Community
     “Delivery”  refersDays   | 20/21
                        to shipping to September    2016
                                       Paranal for instruments  and to the end of the integration for
     infrastructure projects (AOF, VLTI). Dates with question marks are current estimates, to be
     confirmed.
VLT Instrument Planning
    Next instrument fully financed within the current
    plan
    Development and construction should be around
    6 to 7 years
     Ø start operations around 2024
    General agreement that this should be the AO
    instrument for UT4

VLT AO Community Days | 20/21 September 2016
VLT - considerations
Optical/UV
Ø we will lose HST in the next decade
Ø Euclid (1.2m telescope)?
VLT combines several instruments
Ø flexibility
Ø versatility
AOF – DSM designed with a high density of
actuators
Ø MUSE NFM as driver
Ø 4 lasers excellent for required field corrections
Ø unique among current 8m telescopes
VLT AO Community Days

VLT AO Community Days | 20/21 September 2016
You can also read