Background ESO Science Priorities Ø STC document discussed in April 2015 (STC-551) • AO instrument on UT4 as the next VLT instrument • ‘Select and design AO instrument’ Ø Discussion with a group of experts • 15/16 September 2015 Ø Paranal Science Priorities (STC-561; October 2015) • ’Discussion for the next AO instrument at the Nasmyth focus on UT4 to make full use of the AOF has started’ Ø Planning for the next VLT AO instrument (STC-568; April 2016) • Presented results of the expert discussion • Proposed potential future development directions VLT AO Community Days | 20/21 September 2016
Background STC requested community discussion Ø ‘The STC supports the initiative described in STC-568 to define a next generation AO instrument that can take advantage of the revolutionary AOF facility on UT4. We endorse the plan to hold an open meeting later this year to fully engage with the wider community in this effort.‘ Welcome VLT AO Community Days | 20/21 September 2016
VLT AO - Current status Current VLT AO instruments cover a wide range already Ø (Julien Milli’s talk for more details) Ø SPHERE - state of the art for XAO (IR and optical) Ø NACO/ERIS - SCAO with an old system – new one in the works Ø HAWK-I/GRAAL - AOF to provide IR GLAO over 7’x7’ Ø MUSE/GALACSI - AOF to bring optical AO (750nm; 7”x7”) Ø SINFONI/ERIS - AO support of IR integral spectroscopy Ø CRIRES+ is AO supported Ø AO for VLTI (NAOMI and CIAO)
SCAO MOAO UT3 UT4 10% LTAO MCAO ParanalISAAC Instrumentation 2013-2014 co Strehl ratio versus Field of View GLAO decom † mm upgrade issi Musical Chairs! on 0.1’ 1’ 10’ Total CRIRES VISIR ing corrected FoV (Ø) AO correction Strehl Ratio 100% at VIS (typ 0.7µm) VLT AO KMOS upgrade (2014- ) iss ion in UT1 g NACO UT2 mm 2014 co X-SHOOTER Strehlcost! ratio versus Field of View Strehl ratio move versus Field of 70% XAO AO correction sky coverage at NIR SPHERE AO correction Strehl Ratio (typ 2µm) Strehl Ratio move back/forth (typ com mis 100% SPHERE sio nin 100% g SCAO MOAO UT3 UT4 MUSE 10% LTAO MCAO co XAO GLAO ISAAC decom † mm cost! upgrade iss ion 0.1’ 1’ 10’ MAD Total VISIR ing 70% corrected FoV (Ø) 70% SPHERE! NACO sky coverage ZIMPOL XAO LTAO MCAO SCAO MOAO SCAO MOAO Strehl 10% ratio versus Field of View Strehl10% ratio versus Field LTAONF MUSE of View MCAO GLAO GL MUSE AO WF 0.1’ 1’ 10’ Total 0.1’ 1’ 10’ SINFONI! at NIR corrected FoV (Ø) AO correction at VIS correcte AO correction Strehl Ratio (CRIRES)! (typ 2µm) HAWKI/GRAAL Strehl Ratio (typ 0.7µm) VLTI 100% SPHERE 100% XAO MAD cost! 70% 70% SPHERE! NACO sky coverage ZIMPOL XAO LTAO MCAO SCAO MOAO SCAO MOAO 10% 10% LTAONF MUSE MCAO GLAO GL AO 0.1’ SINFONI! Thanks to 1’ Julien Girard Total (ESO) 10’ 0.1’ MUSE 1’ WF 10’ Total corrected FoV (Ø) corrected FoV (Ø) (CRIRES)! HAWKI/GRAAL VLTI
Assumptions for the discussion All current AO instruments to continue AOF commissioning in 2018 Ø GLAO for HAWK-I Ø MUSE narrow-field mode CRIRES to return in 2018 NACO available until mid-2019 ERIS will be working in ~2020
VLT Instrument Planning European Organisation for Astronomical Research in the Southern Hemisphere ESO/Cou-1656 Confidential until Council review, then PUBLIC DISTRIBUTION Page 26 Table 2 shows the planned development timetable. For the new projects, one year of Phase A is foreseen for all instruments plus a development time of 5 years. This duration is on the short Next instrument to start in 2017 side when compared to 2nd generation instruments such as MUSE, KMOS, SPHERE, but is not unrealistic. Yr Phase A Design & Constr. Delivered 2013 CRIRES+ MUSE MOONS 2014 NTT Call for Ideas 4MOST SPHERE PRIMA Astrometry (discontinued) 2015 NIRPS (New I) LFC for HARPS VLTI PR1 GRAVITY BCI 2016 SOXS (New I) GRAVITY CIAO VISIR Upgrade VLTI PR4 NACO ESPRESSO 2017 New II (for UT4) CUBES(?) MATISSE CRIRES+ 2018 New III New II (for UT4) AOF VLTI PR3 & PR5 From the Paranal SOXS&NIRPS(?) Instrumentation 2019 New IV New III MOONS 2020 New V New IV ERIS Programme Plan 2016- CUBES(?) 2021 4MOST 2021 New VI New V (Cou-1656; April 2016) Table 2 Development plan for the Paranal Instrumentation Programme. One year of Phase A is expected to be carried out for new instruments, and the overall duration is typically estimated in 6/7 years. According to the proposed scheme, New I-III are concerned by the first phase. Column VLT AO Community “Delivery” refersDays | 20/21 to shipping to September 2016 Paranal for instruments and to the end of the integration for infrastructure projects (AOF, VLTI). Dates with question marks are current estimates, to be confirmed.
VLT Instrument Planning Next instrument fully financed within the current plan Development and construction should be around 6 to 7 years Ø start operations around 2024 General agreement that this should be the AO instrument for UT4 VLT AO Community Days | 20/21 September 2016
VLT - considerations Optical/UV Ø we will lose HST in the next decade Ø Euclid (1.2m telescope)? VLT combines several instruments Ø flexibility Ø versatility AOF – DSM designed with a high density of actuators Ø MUSE NFM as driver Ø 4 lasers excellent for required field corrections Ø unique among current 8m telescopes