Social Impact Assessment February 2021 Indonesia: Metropolitan Sanitation Management Investment Project Wastewater Collection System of Makassar B2 Package Prepared by Directorate General of Human Settlements, Ministry of Public Works and Housing for the Asian Development Bank.
CURRENCY EQUIVALENTS (as of 2 February 2021) Currency unit – rupiah (Rp) Rp1.00 = $0.0000713267 $1.00 = Rp14,020 NOTE{S} (i) In this report, "$" refers to United States dollars. This social impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
WASTEWATER COLLECTION SYSTEM OF MAKASSAR B2 PACKAGE: SOCIAL IMPACT ASSESSMENT AND MANAGEMENT Construction of Sewerage and Wastewater Collection system North West Catchment MAKASSAR SEWERAGE B2 Draft For the period up to November 2020 Prepared on 12 January 2021 (Updated 2 February 2021)
PROJECT DESCRIPTION Name of Project : Construction of Sewerage and Wastewater Collection System North West Catchment (Makassar Sewerage B2) Location : Makassar, Sulawesi Selatan Owner : Work Unit of Settlement Infrastructure Implementation of Region II - Sulawesi province, Directorate General of Human Settlement, Ministry of Public Work and Housing Contractor : PT Waskita Karya (Persero), Tbk. Address : Jl. Jemursari Selatan II No. 2A-2B Surabaya 60237 Telp. (031) 843 9091 No. /Contract date : HK.02.03/SP/F/PPPW.II.SS/PPLP/49/2019,14 November 2019 No. /COW date : HK.01.24/SPMK/F/PPPW.II.SS/PPLP/49/2019,14 Nov 2019 Contract value : Rp. 180.727.870.000,00 (Excl.PPN) Source of funds : Loan Asian Development Bank (ADB) 3123-INO Fiscal year : 2019 – 2022 Implementation schedule : 900 Hk (14 November 2019 - 2 May 2022) Maintenance schedule : 365 Hk (3 May 2022 – 3 May 2023) Contract type : Unit Price Supervision Consultant : Project Implementation Support Consultant (PISC) - SMEC International
INTRODUCTION The Metropolitan Sanitation Management Investment Project (MSMIP) aims to reduce social and environmental impacts in cities by increasing public access to wastewater management service systems. The Makassar sewerage B2 project of approximately 81.716 km will use the road in the service area consisting of 41 wards in 6 subdistricts (Mariso, Mamajang, Tamalate, Ujung Pandang, Makassar, Bontoala Subdistrict). This centralized wastewater management system in Makassar City will serve 9,900 household connections and 4,100 commercial connections. The purposes and objectives of the preparation of the Temporary Social Impact During Construction are for: a) Understanding the social risks and impacts during construction activities on business activities along the roads under construction so that mitigation can be carried out, b) Managing social and environmental impacts during construction so that the impacts can be minimized.
MAP OF SEWERAGE AND WWTP LOSARI MAKASSAR
Status and Progress of Sewerage Makassar B2 Package on Dec 2020 Complete and Roads Recondition On Progress Not yet done Name of Roads Link Remarks Jl. Hati Mulia Complete Jl. Mawas Jl. Veteran Selatan Jl. Mapanyuki Complete and and road Jl. Singa Jl. Sam Ratulangi recondition in partially remaining Jl. Mappaodang Jl. Tupai Complete Jl. Amirullah Jl. Landak Jl. Serigala Complete (Asphalting) Jl. Hati Murni Jl. Onta Baru Complete (Asphalting & concrete Jl. Macan pavement) Jl. bangau Jl. Beruang Complete Jl. Anuang Jl. Badak Complete and and road Jl. Kakatua recondition in partially remaining Jl. Bhayangkara Jl. Kancil Utara Complete (concrete pavement) Jl. Amirullah Complete and and road recondition in partially remaining Source: Contractor Makassar B2 package on 31 Dec 2020
Monitoring of Completed Works in Makassar B2 1. Jl. Hati Mulia ✓ No : MH 6700A – MH 10334 ✓ Status : Recondition done ✓ Methods & type of pipe : Open Trench, PVC pipe dia. 200 mm ✓ Length & COI (m) : Length of pipe installation: 405 m, COI: 1.25 m ✓ Duration of disruption : The duration of disturbance for “open trench’ work is 1 day for 30 m (includes excavation, pipe installation and closure) Affected Persons/ Households: Business - Store 6 AH’s as follows: 1. Name : Pak Sukadi Address : Jl. Hati Mulia Business : Selling chicken noodle (Mobile vendor) Selling time : 13.00 – 18.00 Turnover/month : Rp 5,000,000 Impact : Dust, the contractor regular watered at construction areas to minimize dust pollution, yet buyers increased as workers bought the chicken noodles. During construction, Pak Sukadi was still selling and moved to the opposite side of the road (in front of the school) therefore the income did not decrease.
moving to the opposite site 2. Name : Pak Joni Address : Jl. Rajawali No. 44 Business : Selling eggs (Mobile vendor using tent) Selling time : 15.00 – 22.00 Turnover/month : Rp 15,000,000 Impact : Dust. the contractor regular watered at construction areas to minimize dust pollution. During construction, Pak Joni was still selling (selling location is at the junction of Jl. Hati Mulia, located on Jl. KS. Tubun) and earning the same as before construction. 3. Name : Pak Udin Address : Jl. Nuri Pekanbaru Business : Selling ornamental fish (Mobile vendor) Selling time : 15.00 – 22.00 Turnover/month : Rp 25,000,000 Impact : Limited access for customers but there is still access for buyers (selling locations at the junction in Jl. Hati Mulia, located in Jl. KS. Tubun). During construction, Pak Udin was still selling in the afternoon as usual and earning the same as before construction.
4. Name : Anika Address : Jl. Hati Mulia Business : Selling pot Selling time : 07.00-19.00 (30 days in a month) Turnover/month : - Impact : Dust. the contractor regular watered at construction areas to minimize dust pollution. During construction, Anika was still able to sell flower pots and her income was relatively the same as before construction. 5. Name : Ibu Harliana Address : Jl. Hati Mulia Business : Selling coconut (Fixed with tent) Selling time : 08.00-18.00 (30 days in a month) Turnover/month : - Impact : During construction, Bu Harliana was still able to sell coconut ice. No data on the turnover before and after construction but based on the interview result, her income was increased due to the increase in buyers from project workers.
6. Name : Bapak Mallari Address : Jl. Hati Mulia Business : Workshop (Fixed/stall) Selling time : 08.00-21.00 (30 days in a month) Turnover/month : Rp 3,000,000 Impact : Dust. the contractor regular watered at construction areas to minimize dust pollution Bapak Malari was selling during construction and earning same before construction. 7. Name : Ibu Risna Address : Jl. Hati Mulia Business : Car seat repair and drinks (fixed/stall) Selling time : 08.00-24.00 (30 days in a month) Turnover/month : - Impact : The area in front of the shop was dusty during excavation and the contractors has been regular watered so that can be minimize dust pollution in the construction areas. Based on the interview result, income increased is about IDR 200,000 per day during construction due to
increased buyers from project workers. During construction, Bu Risna's shop was open. Mitigations that have been done in Jl. Hati Mulia: • Material cleaning and watering Jl. Hati Mulia aftter road recondition / asphalting
• Contractor provided temporary access to the shops/business place during the works and implement traffic management and install road sign at construction site so it will not disturb existing traffic. • Contractor conducted socialization with the community before construction start and informed about project purpose and benefits, impacts and mitigation.
2. Jalan Beruang ✓ MH 6301 – MH 6593 ✓ Status: recondition done ✓ Methods & type of pipe: Open Trench, PVC pipe dia. 200 mm Length & COI (m): Length of pipe installation: 493 m, COI: 1.25 m Duration of disruption: 22 days ✓ Methods & type of pipe: Boring, PVC pipe dia. 250 mm Length & COI (m): Length of pipe installation: 219 m, COI: 21 m2 Duration of disruption: 40 days 1. Name : Ibu Susan Address : Jl. Beruang Business : Restaurant (Fixed building) Selling time : 09.00 – 18.00 (26 days in a month) Turnover/month : N/A Impact : No water pollution and shop cleanliness is not affected by construction waste. Dust in front of the shop is increased only during the excavation work and the contractors has been regular watered so that can be minimize dust pollution in the construction areas and front of shop 2. Name : Ibu Ria Nursyamsi Address : Jl. Beruang Business : Selling daily necessities (Fixed building) Selling time : 08.00 – 22.00 (30 days in a month) Turnover/month : N/A Impact : During construction, Bu Ria Nursyamsi's shop was open. No data given by the AP on the turnover of the shop. However, based on
the interview result, turnover increased Rp 300,000 per day from the project workers. 3. Name : Bapak Sudomo Address : Jl. Beruang Business : Cafe (Fixed building) Selling time : 06.00 – 22.00 (30 days in a month) Turnover/month : 120,000,000-150,000,000 Impact : There was temporary restriction to cafe, but only for 1 day during open trench activities. During construction, Mr.Sudomo's Café remained open. his income was relatively the same as before construction. 4. Name : Bapak Abadi Address : Jl. Beruang Business : Restaurant (Fixed) Selling time : 06.00 – 17.30 (30 days in a month) Turnover/month : N/A
Impact : The area in front of the restaurant is dusty during excavation and the contractors has been regular watered so that can be minimize dust pollution in the front of the restro. However, the restaurant remains open and earning the same as before construction. . Mitigations that have been done in Jl. Beruang: • Watering during construction • Installation of traffic signs
• Cleaning of sewers from sludge and garbage collection 3. Jalan Onta Baru ✓ MH 6157 – MH 6244 ✓ Status: recondition done ✓ Methods & type of pipe: Open Trench, PVC pipe dia. 160 mm ✓ Length & COI (m): Length of pipe installation: 91 m, COI: 1.25 m ✓ Duration of disruption: The duration of disturbance for “open trench’ work is 1 day for 30 m (includes excavation, pipe installation and closure. The total duration for installation pipe along 91 m is 20 days. Affected Persons/Households: 1. Name : Dion Ilham Address : Jl. Onta Baru Business : Restaurant (Fixed building) Selling time : 10.00 – 21.00 Turnover/month : Rp 30,000,000 Impact : During construction, Mr. Dion's restaurant was open as usual and earning the same as before construction. Dust increased in the excavated area in front of his shop and contractor regular watered at construction areas so that minimiaze dust pollution front of restro.
2. Name : Sitti Address : Jl. Onta Baru Business : Selling grave flowers Selling time : 06.00 – 18.00 (30 days in a month) Turnover/month : Rp 1,500,000 Impact : Dusty and access to the place was reduced. During construction, Siti’s shop remains open the contractors has been regular watered and provide access to the shop, and earning the same as before construction. 3. Name : Helmon Address : Jl. Onta Baru Business : Package delivery (Fixed building) Selling time : 08.45-21.15 (26 days in a month) Turnover/month : Rp 18,200,000 Impact : Dust and reduced parking access. During construction, Helmon's business was open and customers can park in front of next building and the contractors has been regular watered so that can be minimize dust pollution front of office and earning the same as before construction. .
4. Name : Hamzah Address : Jl. Onta Baru Business : Selling groceries (Fixed building) Selling time : 06.00 – 20.00 (30 days in a month) Turnover/month : Rp 3,000,000 Impact : Dust pollution. During construction, Hamzah's business activities were open. the contractor has been regular watered so that can be minimize the dust pollution front of the shop, and earning the same as before construction. Mitigation that have been done in Jl. Onta Baru: • Watering the road. • Asphalt pavement 4. Jalan Serigala ✓ MH 6154 – MH 6648 MH 6157 – MH 6244 ✓ Status: recondition done ✓ Methods & type of pipe: Open Trench, PVC pipe dia. 200 mm Length & COI (m): Length of pipe installation: 661 m, COI: 1.25 m
Duration of disruption: 30 days ✓ Methods & type of pipe: Boring, PVC pipe dia. 250 mm Length & COI (m): Length of pipe installation: 353 m, COI: 30 m2 Duration of disruption: 35 days Affected Persons/Households: 1. Name : Puddin Address : Jl. Cendrawasih Business : Food Selling time : 15.00-24.00 (30 days in a month) Turnover/month :- Impact : Less parking space during excavation work and the contractor coordination with local government have provided parking areas to next building (near his restro). Positive impact mentioned is increased number of customers from project workers. During construction, Mr. Pudin's food shop remained open. 2. Name : Muhamad Nani Address : Jl. Serigala Business : Groceries (Fixed building) Selling time : 08.00-22.00 (30 days in a month) Turnover/month : Rp 9,000,000 Impact : Limited access to the shop. the contractor has been provided temporary access to the shop and the duration of the disturbance is only 1 day, there is increased buyers from project workers. During construction, the shop was still open.
3. Name : Bu Sinta Address : Jl. Serigala Lorong Business : Groceries (Fixed building) Selling time : 06.00 – 22.00 Turnover/month : Rp 10,000,000 Impact : Increased buyers from project workers and she is happy with the project due to it will reduce drinking water pollution in densely populated residential location. During the construction, Mrs. Sinta's store remained open. 4. Name : Marta Address : Jl. Serigala Business : Satay (Fixed building) Selling time : 07.00 – 22.00 Turnover/month : Rp 15,000,000 Impact : Less parking space during excavation work. the contractor have provided temporary access to the shop During construction,
Marta’s shop remained open. Many workers shopped in her place but no info on the income before and after construction. 5. Name : Sefanya Address : Jl. Serigala Business : Selling fried rice (Cart) Selling time : 09.00-20.00 (30 days in a month) Turnover/month : Rp 9,000,000 Impact : Dust. The contractor regular watered the construction areas. He keeps selling during the construction and income remained the same as before construction. Mitigations that have been done in Jl. Serigala: • Road have been reconditioned.
• Cleaning of remaining material • Installed road signs and provided access roads • Conducted socialization with the community before construction start and informed about project purpose and benefits, impacts and mitigation.
5. Jl Kancil Utara ✓ MH 6260 – MH 6277 ✓ Status: recondition done until concrete ✓ Open Trench PVC pipe dia. 200 mm ✓ Length of pipe installation = 208 m, COI =1.25 m ✓ The duration of disturbance for open trench work is 1 day for 30 m (includes excavation, pipe installation and closure).The total duration for installation pipe along 208 m is 12 days. 1. Name : Naharia Address : Jl. Kancil Utara Business : Groceries (Fixed building) Selling time : 07.00-20.00 (30 days in a month) Turnover/month : Rp 9,000.000 Impact : Dust but no major impact during the construction, the contractor regular watered so that can be minimize dust pollution at construction areas, Positive impact mentioned by the AP during the interview is that many project workers bought in her shop. During construction, Naharia’s shop remained open. 2. Name : Rosmawati Address : Jl. Kancil Utara Business : Groceries (Fixed building) Selling time : 07.00-22.00 (30 days in a month) Turnover/month : Rp 30,000,000 Impact : Less parking space during excavation work and dust. the contractor has been provided parking areas at next building and regular watered so that can be minimize dust pollution at construction areas and access to the shop remains open, Positive impact mentioned by the AP during the interview is that many project workers bought in her shop. During construction, Rosmawati’s shop remained open and project workers often bought in her shop. 3. Name : Muhamad Tan Address : Jl. Kancil Utara Business : Groceries (Fixed building) Selling time : 07.00-02.00 (30 days in a month) Turnover/month : Rp 60,000,000
Impact : Project workers bought in his shop. Temporary negative impacts mentioned are less parking space and dust. the contractor has been provided parking areas at next building and regular watered so that can be minimize dust pollution at front of shop and accessibility remains open. During construction, Tan’s shop remained open and earning the same as before construction. Mitigations that have been done in Jl. Kancil Utara: • Installation of signs and fences • Cleaning and watering dust 6. Jl. Tupai ✓ MH 6316 – MH 6149 ✓ Status: recondition done ✓ Open Trench PVC pipe dia. 200mm ✓ Length of pipe installation = 150 m, COI =1.25 m ✓ The duration of disturbance for open trench work is 1 day for 30 m (includes excavation, pipe installation and closure). The total duration for installation pipe along 150 m is 6 days.
✓ Affected Persons/Households: 1. Name : Dian Address : Jl. Tupai Business : Food and beverage (Fixed) Selling time : 07.00-22.00 (30 days in a month) Turnover/month : Rp 6,000,000 Impact : Less parking space during excavation work and dust. During construction, Dian’s shop remained open and customers can park for a while in the next building. earning the same as before construction. 2. Name : Hendra Address : Jl. Tupai Business : Food and phone credit (Fixed building) Selling time : 12.00-01.00 (30 days in a month) Turnover/month : Rp 9,000,000 Impact : Less parking space during excavation work and dust. During construction, Hendra’s shop remained open and earning the same as before construction. and customers can park for a while in the next building and the contractor regular watered so that can be minimize dust pollution at front of shop.
3. Name : Muliyono Address : Jl. Tupai Business : Mixed ice/Es Teler (Fixed building) Selling time : 09.30-17.30 (30 days in a month) Turnover/month : Rp 24,000,000 Impact : During construction, Muliyono’s shop remained open and earning the same as before construction. even though dust increased in the excavated area in front of the shop but the contractor regular watered so that can be minimize dust pollution front of shop. 4. Name : Toni Address : Jl. Tupai Business : Drink (Fixed building) Selling time : 11.00-17.00 (30 days in a month) Turnover/month :- Impact : Dust is only in the excavated area in front of the shop and the contractor regular watered so that can be minimize dust pollution at front of shop During construction, Toni’s shop remained open. And earning the same as before construction. 5. Name : Linda Address : Jl. Tupai Business : Groceries (Fixed building) Selling time : 07.00-24.00 (30 days in a month) Turnover/month : Rp 30,000,000 Impact : Dust and less parking space during excavation work. During construction, Linda’s shop remained open and earning the same as
before construction. The customers can park in the opposite site of the shop and the contractor regular watered at construction areas. 6. Name : Erna Address : Jl. Tupai Business : Drink (Fixed building) Selling time : 08.00-16.30 (30 days in a month) Turnover/month : IDR 9,000,000 Impact : Dust and less parking space. During construction, Erna’s shop remained open and earning the same as before construction. The customers can park in the opposite site/beside the shop and the contractor regular watered at construction areas to minimize dust pollution. Mitigations that have been done in Jl. Tupai: • Installed traffic signs
• Watering at construction sites and recondition of the road • Provided access road • Road after asphalting 7. Jl. Badak ✓ MH 6260 – MH 6277 ✓ Open Trench PVC pipe dia. 200 mm ✓ Length of pipe installation = 132 m, COI = 1.25
✓ The duration of disturbance for open trench work is 1 day for 30 m (includes excavation, pipe installation and closure). The total duration for installation pipe along 132 m is 6 days. ✓ Affected Persons/Households: 1. Name : Wakilem Address : Jl. Badak Business : Chicken noodle (Fixed building) Selling time : 09.00-20.00 (26 days in a month) Turnover/month : IDR 39,000,000 Impact : Dust. However, during construction activities, Wakilem shop remained open and earning the same as before construction. and the contractor regular watered at construction areas to minimize dust pollution. 2. Name : Edi Address : Jl. Badak Business : Groceries (Fixed building) Selling time : 08.00-23.00 (30 days in a month) Turnover/month : IDR 12,000,000 Impact :Dust. However, during construction activities, Edi shop remained open and earning the same as before construction. and the contractor regular watered at construction areas to minimize dust pollution. . 3. Name : Samsiah Address : Jl. Badak Business : Groceries (Fixed building) Selling time : 07.00-03.00 (30 days in a month) Turnover/month : IDR 15,000,000 Impact :During construction, his shop remained open. Many workers shopped in his shop during construction despite dust and less parking space. and the contractor regular watered at construction areas to minimize dust pollution and coordination with local government to provided parking areas at next building. 4. Name : Sugeng Cahyono Address : Jl. Badak Business : Food and beverage (Fixed building)
Selling time : 08.00-21.00 (30 days in a month) Turnover/month : IDR 9,000,000 Impact : During construction, his shop remained open. Many workers shopped in his shop during construction despite dust and less parking space and the contractor regular watered at construction areas to minimize dust pollution and coordination with local government to provided parking areas at next building. 5. Name : Ranca Address : Jl. Badak Business : Laundry and drinking water (Fixed building) Selling time : 07.30-16.00 Turnover/month : IDR 6,000,000 Impact : Dust and access restriction to the shop during construction. During construction, Ranca’s business remained open and earning same before construction& the contractor regular watered at construction areas to minimize dust pollution and provided access to the shop. Mitigations that have been done in Jl. Badak: • Installation of traffic signs • Watering dust in Jl. Badak
• Provided temporary access road 8. Jl. Amirullah ✓ MH 6272 – MH 6222 ✓ Open Trench PVC pipe dia. 200 mm ✓ Length of pipe installation = 170 m, COI =1.25 m ✓ The duration of disturbance for open trench work is 1 day for 30 m (includes excavation, pipe installation and closure). The total duration for installation pipe along 170 m is 6 days. ✓ Affected Persons/Households: 1. Name : Fatma Address : Jl. Amirullah Business : Café (Fixed building) Selling time : 08.00-20.00 (30 days in a month) Turnover/month :- Impact : Dust in the excavated area in front of her cafe. Many workers shopped in her café during construction. the contractor regular watered at construction areas to minimize dust pollution 2. Name : Sudirman Address : Jl. Amirullah Business : Coffee shop (Fixed building) Selling time : 10.00 – 20.00 Turnover/month : IDR 15,000,000 Impact : Less access to the shop. During construction, the shop remained open and earning the same as before construction. The customers can park in the opposite site/beside the shop
3. Name : Yusril Address : Jl. Amirullah Business : Grocery shop (Fixed building) Selling time : 07.00-23.00 (30 days in a month) Turnover/month : IDR 27,000,000 Impact : Limited access to the shop. During construction, the shop remained open and earning the same as before construction. The customers can park in the opposite site/beside the shop . Mitigations that have been done in Jl. Amirullah: • Contractor provided access to the community’s houses/public facilities as per request by the AHs. • Conducted socialization with the community before construction start and the contractor informed about the project purpose and benefits, impacts and mitigation
• Contractor conducted regular watering in the dry season at construction activity 9. Jl. Mappanyukki ✓ MH 6191 – MH 10002 ✓ Status: recondition done ✓ Methods & type of pipe: Open Trench PVC pipe dia. 160mm ✓ Length & COI (m): length of pipe installation = 77 m ✓ Duration of disruption: The duration of disturbance for open trench work is 1 day for 30 m (includes excavation, pipe installation and closure. The total duration for installation pipe along 77 m is 3 days. ✓ Affected Persons/Households: 1. Name : Jumriani Address : Jl. Mappanyuki Business : Drink and snacks (Fixed building) Selling time : 06.00-18.00 (30 days in a month) Turnover/month : IDR 15.000.000 Impact : There was access limitation to the shop. During construction, the shop remained open and earning the same as before construction. The customers can park in the opposite site/beside the shop and the contractor regular watered at construction areas to minimize dust pollution. . 2. Name : Musdalifah Address : Jl. Mappanyuki Business : Food and beverage (Fixed building)
Selling time : 07.00-17.00 (30 days in a month) Turnover/month : IDR 9,000,000 Impact : Dust in front of her shop. During construction, the shop remained open and many workers bought in her shop. The contractor regular watered at construction areas to minimize dust pollution 3. Name : Sutarni Address : Jl. Mappanyuki Business : Chicken noodle (Mobile vendor) Selling time : 11.30-18.00 (30 days in a month) Turnover/month : IDR 18,000,000 Impact :Limitation of access and parking space and dust. During construction, the shop remained open and earning the same as before construction.The customers can park in the opposite site/beside the shop and the contractor regular watered at construction areas to minimize dust pollution. . Mitigations that have been done in Jl. Mappanyuki: • Contractor provided temporary access to the public facilities (Mosque & school) and the shops as per request during the works. • Install road signs at construction work
• Watering the road • Socialization • Contractor restored the road to original condition after construction
Conclusion 1. During construction, there has been disturbance of accessibility to business areas, public facilities and residential areas. 2. Other construction impacts on residents near by construction areas are dust, noise increased and damage to existing roads. 3. The business owner has been interviewed, consists of 19 females and 21 males, generally in the productive age (20-50 years), but there are 3 people aged over 60 years. Education is generally high school and there are several bachelor degrees. Some of them sell for a period of 10-19 years and some are under 4 years and they sell permanently at that location. The business owner month income around IDR. 3.000.000 – 120.000.000. They live in the selling location. Some of their houses are around the business location. For more detail, see in Appendix 1 4. Business activities along the roads under construction remain open, with the income of the business owner relatively the same as before the construction and some restaurant, coconut ice and Groceries business owners have experienced an increase in income due to additional buyers from project workers. 5. During construction, the contractor has carried out mitigation such as watering the dusty area, providing an access road, closing the open cut excavation in one day so that the road above the excavated area can be used again, installing traffic signs, repairing and reconditioning damaged roads, transporting waste materials construction/garbage to the landfill and immediately transporting the excavated soil and disposed of it to the disposal area. The contractor has conducted socialization to the community along the construction site before the construction started by explaining the objectives, project benefits then the types of impacts that will arise and the contractor's plans for mitigation, schedule for the transportation of materials and equipment as well as traffic management that will be carried out and the contractor also provides media for public complaints, etc. 6. During this reporting period, there is no complaints recorded according to info from PR Specialist.
Road Link/ Methods Length & COI Duration of Affected Identified Mitigation Measures Documentation Result & Follow Up Manhole No & Type (m) Disruption Persons/ Impacts of Pipe Households Jl. Veteran Open Length of pipe The duration of Business: Restriction access Contractor conduct the ▪ No significant impact. Selatan Trench installation=1,572 disturbance for Shop to the shop “work/ open trench” by ▪ Periodic monitoring by MH 6166 - MH PVC m, “open trench’ houses section/per 30 m to PISC to ensure the 6555 pipe dia. COI = 1.25 m. work is 1 day for (Showroom, minimize impact, the mitigation measures was 200mm 30 m (includes car works will be finished done properly. Status: Work excavation, pipe accessories, within one day, soon ▪ Record if any complaint has not started installation and jewelry store after finished contractor from the shop owners or yet closure) and coffee will ‘closure” the holes, community shop), Total so that the road above ▪ Result of monitoring to is 25 units the excavated area can be included in the QPR The total be used and open and semiannual report duration for access to business installation pipe activity along 1,572 m Disruption Provide temporary is 84 days with business access to the COI = 1,25. operations shops/business place during the works Traffic Implement traffic disturbance management and install road sign & flagmen at construction site Road damage Road restored to original condition or better after finish construction Community unrest Conduct socialization with the community before construction start and contractor will inform about project purpose and benefits, impacts and mitigation. Non- Restriction to Contractor conduct the ▪ No significant impact. business: access to public “work/ open trench” by ▪ Periodic monitoring by Office (3) facilities section/per 30m to PISC to ensure the Mosque (1), minimize impact, the mitigation measures works will be finished was done properly. within one day, soon ▪ Record if any complaint after finished contractor from the shop owners or will ‘closure” the holes community Provide temporary ▪ Result monitoring to access to the public include in the QPR and facilities (Mosque & semiannual report school) during the works Aesthetic Transport the residual disturbance /soil of construction spilled at the materials from the work construction site site immediately, Clean up spilled soil at the construction site Community unrest Conduct socialization with the community before construction start and contractor should inform about project purpose and benefits, impacts and mitigation. Dust pollution Conduct regular watering in the dry season at
resident and utilities near to construction activity Road damage Road restored to original condition or better after finish construction Boring Length of pipe The total Business: Restriction access Contractor conduct ▪ No significant impact. PVC dia. installation = 82 duration Shop to the shop preparation Boring ▪ Periodic monitoring by 250 mm m disturbance for houses hole/fit (7 x 4 m = 21 m2) PISC to ensure the COI = 4 m boring works (Showroom, during 20 days, there is mitigation measures along 7 m x 4 m car impact to business was done properly. = 21 m2 accessories, activity along 21 m2. To ▪ Record if any complaint (disturbance is jewelry store minimize of impact the from the shop owners only in pit and coffee contractor should provide or community locations) is 26 shop), Total the access to the shop at ▪ Result monitoring to days for COI = is 25 units fit location. include in the QPR and 4m2 (26 days = Disruption Provide access to semiannual report 20 days boring business business area at Boring preparation and operations hole/pit location work 6 days boring (±21 m2) works along 82 Traffic Implement traffic m with pipe disturbance management and install length 15 – 20 road sign & flagmen at m) construction site Community unrest Conduct socialization with the community before construction start and contractor should inform about project purpose and benefits, impacts & mitigation Road damage Road restored to original condition or better after finish construction Non- Restriction access Provide temporary ▪ No significant impact. Business: to the public access at boring ▪ Periodic monitoring by House (14) facilities hole/pit (7 x 4 m = 21 PISC to ensure the m2) to public facilities mitigation measures (Mosque & school) was done properly. during the works boring ▪ Record if any complaint hole/pit. ▪ from the shop owners or Traffic Implement traffic community disturbance management and install ▪ Result monitoring to road sign & flagmen at include in the QPR and construction site semiannual report Aesthetic Transport the residual disturbance at of construction construction site materials from the work site immediately Community unrest Conduct socialization with the community before construction start and contractor should inform about project purpose and benefits, impacts and mitigation. Dust pollution Conduct regular watering in the dry
season at resident and public facilities near at boring fit location Road damage Road restored to original condition or better after finish construction Jl.Sam Boring Length of pipe The total Business Restriction access Contractor conduct ▪ No significant impact. Ratulangi PVC dia, installation = 478 duration Shop house to the shop preparation Boring ▪ Periodic monitoring by MH 6207–MH 250 mm m disturbance for (14) hole/pit (9 x 4 m = 36 PISC to ensure the 6227 COI = 4 m boring works m2) during 24 days, mitigation measures MH 6561- along 7 m x 4 m there will be impact to was done properly. MH6520 = 21 m2 business activity. To ▪ Record if any complaint (disturbance is minimize the impact, from the shop owners Status: work only in pit contractor should or community has not started locations = 21 provide the access to ▪ Result monitoring to yet m2) is 51 days the shop at fit location. include in the QPR and (20 days boring Disruption Provide access to semiannual report preparation and business business area at Boring 31 days boring operations hole/pit location work is works along 478 around 36 m2 so it will m with pipe not disturb business length 15 – 20 activity m) Traffic Implement traffic disturbance management and install road sign & flagmen at construction site Community unrest Conduct socialization with the community before construction start and contractor should inform about project purpose and benefits, impacts and mitigation Road damage Road restored to original condition or better after finish construction Non- Restriction access Preparation Boring ▪ No significant impact. Business to the public hole/pit (9 x 4 m = 36) ▪ Periodic monitoring by School (1) facilities during 24 days, Provide PISC to ensure the office (11), temporary access to mitigation measures houses (12) resident, office & public was done properly. facilities (school) during ▪ Record if any complaint the works from the shop owners Aesthetic Transport the residual or community disturbance at of construction ▪ Result monitoring to construction site materials from the work include in the QPR and site immediately. semi annual report Community unrest Conduct socialization with the community before construction start and contractor should inform about project purpose and benefits, impacts and mitigation. Dust pollution Conduct regular watering in the dry season at Boring work.
Road damage Road restored to original condition or better after finish construction MH 6197–MH Open Length of pipe The duration of Business Restriction access Contractor conduct the ▪ No significant impact. 6204 Trench installation = 813 disturbance for Shop house to the shop “work/ open trench” by Periodic monitoring by PVC m COI = 1.25 “open trench’ (15) resto section/per 30 m to PISC to ensure the pipe dia. m work is 1 day (4) minimize impact, the mitigation measures 200mm for 30 m works will be finished was done properly. Length of pipe (includes within one day, soon ▪ Record if any complaint installation = 376 excavation, after finished contractor from the shop owners Open m pipe installation will ‘closure” the holes or community trench COI=1.25 m and closure so that the road above ▪ Result monitoring to PVC the excavated area can include in the QPR and pipe dia. Lenght of pipe The total be used and open semi annual report 200mm installation = 309 duration for access to business m installation pipe activity MH 6227 – MH COI = 1,25 m along 685 m is Disruption Provide temporary 6514 Open 62 days. business access to the trench operations shops/business place PVC during the works MH 6520 – MH pipe dia. Traffic Implement traffic 6407 200mm disturbance management and install road sign at construction site Road damage Road restored to original condition or better after finish construction Community unrest Conduct socialization with the community before construction start and contractor will inform about project purpose and benefits, impacts and mitigation. Non- Restriction to Contractor conduct the ▪ No significant impact. business access to public “work/ open trench” by Periodic monitoring by office (1), facilities section/per 30 m to PISC to ensure the houses (8) minimize impact, the mitigation measures works will be finished was done properly. within one day, soon ▪ Record if any complaint after finished contractor from the shop owners will ‘closure” the holes or community Provide temporary ▪ Result monitoring to access to the resident include in the QPR and &, office during the semiannual report works Traffic Implement traffic disturbance management and install road sign & flagmen at construction site Aesthetic Transport the residual disturbance at of construction construction site materials from the work site immediately. Community unrest Conduct socialization with the community before construction start and contractor will
inform about project purpose and benefits, impacts and mitigation. Dust pollution Conduct regular watering in the dry season at construction site Road damage Road restored to original condition or better after finish construction Jl. Landak Boring Lenght of pipe The total Business Restriction access Contractor conduct ▪ No significant impact. MH 6599 – MH PVC dia. installation = 283 duration Shop house to the shop preparation Boring Periodic monitoring by 6407 250 mm m disturbance for (13),store (1), hole/pit (7 x 4 m) during PISC to ensure the COI = 4 m boring works resto (1) 20 days, there will impact mitigation measures Status: Work along 7 m x 4 m to business activity along was done properly. has not started = 21 m2 21 m2, to minimize the ▪ Record if any complaint yet (disturbance is impact, contractor should from the shop owners only in pit provide temporary or community locations around access to business area. ▪ Result monitoring to 21 m2) is 42 Disruption Provide access to include in the QPR and days (20 days business business area at Boring semiannual report boring operations hole/pit location work preparation and 22 days boring Traffic Implement traffic works along 478 disturbance management and install m with pipe road sign & flagmen at length 15 – 20 construction site m) Road damage Road restored to original condition or better after finish construction Community unrest Conduct socialization with the community before construction start and contractor should inform about project purpose and benefits, impacts and mitigation Non- Restriction access Contractor conduct ▪ No significant impact. Business to shop preparation Boring Periodic monitoring by Office (2), hole/pit (7 x 4 m = 21 m2) PISC to ensure the hospital (1) during 20 days, there mitigation measures impact to resident, was done properly. hospital & office near ▪ Record if any complaint boring activity, to from the shop owners or minimize the impact, community contractor should provide ▪ Result monitoring to temporary access to the include in the QPR and shop & hospital. semiannual report Aesthetic Transport the residual disturbance of construction materials from the work site immediately, Traffic Implement traffic disturbance management and install road sign & flagmen at construction site so it will not disturb existing traffic
Community unrest Conduct socialization with the community before construction start and contractor should inform about project purpose and benefits, impacts and mitigation Dust pollution Conduct regular watering in the dry season at construction site Road damage Road restored to original condition or better after finish construction Jl. Landak Jacking length of pipe The total Business Restriction access Contractor conduct ▪ No significant impact. MH 6599 – MH PVC dia. installation = 128 duration store (1), to the shop preparation Jacking Periodic monitoring by 6407 450 mm m disturbance for resto (1) hole/pit (10 x 4 m = 40 PISC to ensure the COI = 4 m jacking works Office (2), m2) during 20 days, there mitigation measures Status: Work along 7 m x 4 m hospital (1) impact to business activity was done properly. has not started = 21 m2 along 40 m2, to minimize ▪ Record if any complaint yet (disturbance is the impact, contractor from the shop owners only in pit should provide temporary or community locations = 21 access to the shop. ▪ Result monitoring to m2) is 22 days Disruption Provide access to include in the QPR and (15 days Jacking business business area at semiannual report preparation and operations jacking hole/pit location 7 days boring work is only ± 40 m2 so works along 128 it will not disturb m with pipe business activity length 20 m) Traffic Implement traffic disturbance management and install road sign & flagmen at construction site so it will not disturb existing traffic Community unrest Conduct socialization with the community before construction start and contractor should inform about project purpose and benefits, impacts and mitigation Road damage Road restored to original condition or better after finish construction Non- Restriction access Preparation jacking ▪ No significant impact. Business to resident the hole/pit (10 x 4 m = 40 Periodic monitoring by House (13), public facilities m2) during 20 days, PISC to ensure the Provide temporary mitigation measures access to resident & was done properly. public facilities during ▪ Record if any complaint the works from the shop owners Traffic Implement traffic or community disturbance management and install ▪ Result monitoring to road sign & flagmen at include in the QPR and construction site semiannual report Aesthetic Transport the residual disturbance of construction materials from the work site immediately,
Road damage Road restored to original condition or better after finish construction Community unrest Conduct socialization with the community before construction start and contractor should inform about project purpose and benefits, impacts and mitigation. Jl. Mawas Open Length of pipe The duration of Business Restriction access Contractor conduct the ▪ No significant impact. MH 6593 – MH Trench installation = 216 disturbance for Parking area to the shop “work/ open trench” by Periodic monitoring by 6207 PVC m “open trench’ beside Mall section/per 30 m to PISC to ensure the pipe dia. COI = 1,25 m work is 1 day Ratu Indah minimize impact, the mitigation measures Status: Work 200mm for 30 m works will be finished was done properly. has not started (includes within one day, soon ▪ Record if any complaint yet excavation, after finished contractor from the shop owners pipe installation will ‘closure” the holes, or community and closure so that the road above ▪ Result monitoring to the excavated area can include in the QPR and The total be used and open semiannual report duration for access to business installation pipe activity along 216 m is Disruption Coordinate with the 12 days. business local government to operations temporarily move parking lots and street vendors (if any) to adjacent locations, Traffic Implement traffic disturbance management and install road sign at construction site so it will not disturb existing traffic Aesthetic Transport the residual disturbance at of construction construction site materials from the work site immediately. Community unrest Conduct socialization with the community before construction start and contractor will inform about project purpose and benefits, impacts and mitigation. Shorten working time & work in small segments Road damage Road restored to original condition or better after finish construction Jl. Mawas Open length of pipe The duration of Non- Restriction to Contractor conduct the ▪ No significant impact. MH 6593 – MH Trench installation = 216 disturbance for Business access to public “work/ open trench” by Periodic monitoring by 6207 PVC m “open trench’ Houses (9) facilities section/per 30 m to PISC to ensure the pipe dia. COI = 1,25 m work is 1 day minimize impact, the mitigation measures Status: Works 200mm for 30 m works will be finished was done properly. has not started (includes within one day, soon yet excavation, after finished contractor
pipe installation will ‘closure” the holes ▪ Record if any complaint and closure & provide temporary from the shop owners access to the houses or community The total during the works ▪ Result monitoring to duration for Traffic Implement traffic include in the QPR and installation pipe disturbance management and install semiannual report along 216 m is road sign & flagmen at 12 days. construction site Aesthetic Transport the residual disturbance of construction materials from the work site immediately, Community unrest Conduct socialization with the community before construction start and contractor will inform about project purpose and benefits, impacts and mitigation. Dust pollution Conducted regular watering in the dry season at construction activity Road damage Road restored to original condition or better after finish construction Jl.Singa Open length of pipe The duration of Business Restriction access Contractor conduct the ▪ No significant impact. MH 6657 – MH Trench installation = 187 disturbance for Shop house to the shop “work/ open trench” by Periodic monitoring by 6227 PVC m “open trench’ (4), section/per 30 m to PISC to ensure the pipe dia. work is 1 day minimize impact, the mitigation measures Status: Work 160mm for 30 m works will be finished was done properly. has not started (includes with in one day, soon ▪ Record if any complaint yet excavation, after finished contractor from the shop owners pipe installation will ‘closure” the holes or community and closure so that the road above ▪ Result monitoring to the excavated area can include in the QPR and The total be used and open semiannual report duration for access to business installation pipe activity along 187 m is 10 days. Open length of pipe The duration of Disruption Provide temporary Trench installation = 470 disturbance for business access to the PVC m “open trench’ operations shops/business place pipe dia. COI = 1,25 m work is 1 day during the works 200mm for 30 m Traffic Implement traffic (includes disturbance management and install excavation, road sign at pipe installation construction site so it and closure will not disturb existing traffic The total Road damage Road restored to duration for original condition or installation pipe better after finish along 470 m is construction 20 days. Community unrest Conduct socialization with the community
before construction start and contractor will inform about project purpose and benefits, impacts and mitigation. Non- Restriction to Contractor conduct the ▪ No significant impact. Business access to public “work/ open trench” by ▪ Periodic monitoring by Houses (24), facilities section/per 30 m to PISC to ensure the School (3), minimize impact, the mitigation measures office (1) works will be finished was done properly. within one day, soon ▪ Record if any complaint after finished contractor from the shop owners will ‘closure” the holes or community Provide temporary ▪ Result monitoring to access to houses & include in the QPR and public facilities during semi annual report the works Traffic Implement traffic disturbance management and install road sign & flagmen at construction site Aesthetic Transport the residual disturbance at the of construction construction site materials from the work site immediately Community unrest Conduct socialization with the community before construction start and contractor will inform about project purpose and benefits, impacts and mitigation. Dust pollution Conducted regular watering in the dry season at construction activity Road damage Road restored to original condition or better after finish construction Jl.Hati Murni Open Lenght of pipe The duration of Business Restriction access Soil excavation work ▪ Potentially traffic and MH 6726 – MH Trench installation = 98 disturbance for Store (9), to market and and transportation at accessibility disturbance, 6711 PVC m “open trench’ market (1), store night/after market ▪ Detail survey/ monitoring pipe dia. work is 1 day school (1), closed and direct cover to identify of impacts on Status: work 160mm for 30 m the open trenches, so business activity at has not started (includes that the road above the construction site is yet excavation, excavated area can be required pipe installation used and open access ▪ Record if any complaint and closure to business activity from the shop owners Disruption Provide temporary or community The total business access to the market, ▪ Result monitoring to duration for operations store /business place include in the QPR and installation pipe during the works semi annual report along 98 m is 4 Traffic Implement traffic days. disturbance management and install road sign & flagmen at construction site The duration of Road damage Road restored to disturbance for original condition or
“open trench’ better after finish Lenght of pipe work is 1 day construction Open installation = 309 for 30 m Community unrest Conduct socialization Trench m (includes with the community PVC COI = 1,25 m excavation, before construction pipe dia. pipe installation start and contractor 200mm and closure should inform about project purpose and The total benefits, impacts and duration for mitigation. installation pipe Non- Restriction to Contractor conduct the ▪ Potentially accessibility along 309 m is Business access to public “work/ open trench” by disturbance 15 days. Houses (30) facilities section/per 30 m to ▪ Periodic monitoring by minimize impact, the PISC to ensure the works will be finished mitigation measures within one day, soon was done properly. after finished contractor ▪ Record if any complaint will ‘closure” the holes from the shop owners Provide temporary or community access to houses ▪ Result monitoring to during the works include in the QPR and Traffic Implement traffic semi annual report disturbance management and install road sign & flagmen at construction site Aesthetic Transport the residual disturbance at the of construction construction site materials from the work site immediately. Community unrest Conduct socialization with the community before construction start and contractor will inform about project purpose and benefits, impacts and mitigation. Dust pollution Conduct regular watering in the dry season at construction activity Road damage Road restored to original condition or better after finish construction. Jl. Macan Boring Lenght of pipe The total Business Restriction access Contractor conduct ▪ No significant impact. MH 6651 – MH PVC dia. installation = 216 duration to the shop preparation Boring Periodic monitoring by 6674 250 mm m disturbance for hole/pit (7 x 4 m) during PISC to ensure the COI = 4 m boring works 20 days, there impact mitigation measures Status: work along 7 m x 4 m to business activity was done properly. has not started = 21 m2 along 21 m2. To ▪ Record if any complaint yet. (disturbance is minimize impact from the shop owners only in pit contractor should or community locations = 21 provide access to shop ▪ Result monitoring to m2) is 32 days houses include in the QPR and (20 days boring Disruption Provide access to shop semi annual report preparation and business houses at Boring 11 days boring operations hole/pit location work works along 216 m with pipe Traffic Implement traffic length 20 m) disturbance management and install
road sign & flagmen at construction site Community unrest Conduct socialization with the community before construction start and contractor should inform about project purpose and benefits, impacts and mitigation Road damage Road restored to original condition or better after finish construction Non- Restriction access Contractor conduct ▪ No significant impact. Business to the shop preparation Boring Periodic monitoring by Houses (41), hole/pit (7 x 4 m) during PISC to ensure the Vacant land 20 days, there impact mitigation measures (1). to business activity was done properly. along 21 m2. ▪ Record if any complaint Contractor provided from the shop owners access to houses area, or community Traffic Implement traffic ▪ Result monitoring to disturbance management and install include in the QPR and road sign & flagmen at semiannual report construction site so it will not disturb existing traffic Aesthetic Transport the residual disturbance at of construction construction site materials from the work site immediately. Dust pollution Conducted regular watering in the dry season at construction activity Road damage Road restored to original condition or better after finish construction Community unrest Conduct socialization with the community before construction start and contractor will inform about project purpose and benefits, impacts and mitigation Open Length of pipe The duration of Business Restriction access Contractor conduct the ▪ No significant impact. Trench installation = 301 disturbance for to the shop “work/ open trench” by Periodic monitoring by PVC m “open trench’ section/per 30 m to PISC to ensure the pipe dia. COI = 1,25mm work is 1 day minimize impact, the mitigation measures 200mm for 30 m works will finished within was done properly. (includes one day, soon after ▪ Record if any complaint excavation, finished contractor will from the shop owners ‘closure” the holes, so or community
pipe installation that the road above the ▪ Result monitoring to and closure excavated area can be include in the QPR and used and open access semi annual report The total to business activity duration for Disruption Provide access to installation pipe business business area at along 301 m is operations construction work 15 days. Traffic Implement traffic disturbance management and install road sign & flagmen at construction site. Community unrest Conduct socialization with the community before construction start and contractor will inform about project purpose and benefits, impacts and mitigation Road damage Road restored to original condition or better after finish construction Non- Restriction to Contractor conduct the ▪ No significant impact. Business access to public “work/ open trench” by Periodic monitoring by Houses facilities section/per 30 m to PISC to ensure the (41),Vacant minimize impact, the mitigation measures land (1) works will finished was done properly. within one day, soon ▪ Record if any complaint after finished contractor from the shop owners will ‘closure” the holes or community Provide temporary ▪ Result monitoring to access to the public include in the QPR and facilities (residents semi annual report area) during the works Traffic Implement traffic disturbance management and install road sign at construction site Aesthetic Transport the residual disturbance at the of construction construction site materials from the work site immediately, Community unrest Conduct socialization with the community before construction start and contractor will inform about project purpose and benefits, impacts and mitigation. Dust pollution Conducted regular watering in the dry season at construction activity Road damage Road restored to original condition or better after finish construction Jl.Mappaodang Open length of pipe The duration of Business Restriction access Contractor conduct the ▪ No significant impact. MH 6572 – MH Trench installation = 151 disturbance for Shop house to the shop “work/ open trench” by Periodic monitoring by 6557 PVC m “open trench’ cellular (1), section/per 30 m to PISC to ensure the