"Tunnels - the only practical way of the future for urban centres" - 27th June 2019 - Hilton Hotel - Sydney - Transport Australia Conference

Page created by Cindy Juarez
 
CONTINUE READING
"Tunnels - the only practical way of the future for urban centres" - 27th June 2019 - Hilton Hotel - Sydney - Transport Australia Conference
"Tunnels - the only practical way of the
      future for urban centres"

             Ted Nye - Presenter
              Sydney, Australia
      ted.nye@nyeconsulting-eng.com.au

         E J Nye & Associates Pty Ltd

   27th June 2019 – Hilton Hotel - Sydney

                                            1
"Tunnels - the only practical way of the future for urban centres" - 27th June 2019 - Hilton Hotel - Sydney - Transport Australia Conference
15000

10000

5000

    0
           Tokyo        Shanghai            New York           London              Sydney    Melbourne
                                        Land Area and Pop. Density
                                              Land Area            Pop. Density

         World               City                  Population                 Land Area      Pop. Density
        Ranking                                                                   (sq. Km)   (people/sq. km)

           1          Tokyo- Yokohama              38,505,000                     8,223          4,700
           7          Shanghai, SHG-JS-ZJ          22,125,000                     4,015          5,500
           8          New York, NY-NJ-CT           21,045,000                     11,875         1,700
          35               London                  10,840,000                     1,738          5,600

          94                Sydney                     4,515,000                  2,179          2,000

          97              Melbourne                    4,500,000                  2,705          1,600

                   City Ranking – Population, Land Area and Population Density*
                   *Source – Demographia - April 2019
"Tunnels - the only practical way of the future for urban centres" - 27th June 2019 - Hilton Hotel - Sydney - Transport Australia Conference
45 km

                                                     15 km

Current population of -- Sydney 5 million
ABS prediction by 2066, will be 10 million
"Tunnels - the only practical way of the future for urban centres" - 27th June 2019 - Hilton Hotel - Sydney - Transport Australia Conference
TOKYO
"Tunnels - the only practical way of the future for urban centres" - 27th June 2019 - Hilton Hotel - Sydney - Transport Australia Conference
LONDON
"Tunnels - the only practical way of the future for urban centres" - 27th June 2019 - Hilton Hotel - Sydney - Transport Australia Conference
Question?

Is Sydney being over developed or
is this perception a result of traffic
increasing congestion?

                 SYDNEY
"Tunnels - the only practical way of the future for urban centres" - 27th June 2019 - Hilton Hotel - Sydney - Transport Australia Conference
Gosford

                                                                       “Sydney, Gosford, Western Sydney Airport”

                                        Gosford and the
                                        Central Coast

                              Sydney
                               Sydney

Western Sydney Airport

                               ABS Prediction
                              Sydney’s                  - Sydney’s
                                       population is heading             Population
                                                             from 5 million                will
                                                                            towards 6 million    be 10million
                                                                                              in 2036.              in
                               2066.
                              By          The Sydney
                                  2046, Sydney’s           Harbour
                                                  population will total 7.3Bridge    will be
                                                                            million people      100anyears
                                                                                            – that’s    increaseold  in
                                                                                                                 of 2.6
                               2032(only
                              million          13withyears
                                      from 2016,            away).
                                                      jobs growing       Inmillion
                                                                     by 1.3  1932toSydney’s          population
                                                                                      totalling 3.7 million (sources, was
                              various).
                               1.3million. It is currently 5 million.
"Tunnels - the only practical way of the future for urban centres" - 27th June 2019 - Hilton Hotel - Sydney - Transport Australia Conference
Brookvale

                               Proposed Light Rail
                               (via Frenchs Forest Hospital)

                                                               New Underground Rail

                                                                                      8
E J Nye & Associates Pty Ltd
"Tunnels - the only practical way of the future for urban centres" - 27th June 2019 - Hilton Hotel - Sydney - Transport Australia Conference
“1969” DMR road proposal for the Manly-Warringah peninsula
"Tunnels - the only practical way of the future for urban centres" - 27th June 2019 - Hilton Hotel - Sydney - Transport Australia Conference
Why is this happening?

The Warringah Transport Corridor Inquiry (1983)
– Commissioner David Kirby (later to be the highly renowned Supreme Court Judge)

-   There was a significant proposal from the DMR for a freeway connected the Warringah Expressway.

-   It is likely that the Inquiry was impeded in its consideration of a railway by the absence of a specific proposal.

-   David Kirby noted, the Warringah peninsula is public transport poor, one of the few area in Sydney without rail.
    (this emphasis embarrassed the government of the day)

-   The political basis for the SRA’s despondency emerged in a later interview held by the SMH. The state cannot afford it.

-   The most important outcome of the Inquiry was its firm declaration in favour of a permanent mass transit system.

-   Kirby also states that the living environment is more attractive than the hot, exposed and polluted Cumberland Plain.

-   At the same time the Inquiry highlighted the prevalent small-mindedness and ignorance in this area.
Event         Who           Purpose                         Comment/Reaction                                                          Action
Email to      Mayor of        Sydney           ”Thanks Ted… your proposal would not get off on the            None. Since then the BNC has endorsed the NBL. Of
Michael       the             Heads            Northern Beaches as it proposes substantial population         course Warringah Road is being upgraded from 6 lanes to
Regan         Northern        Rail             increases on the beaches. People would be more                 10 lanes past the NB Hospital., Frenchs Forest. Mona Vale
              Beaches         Tunnel           accepting of rail here (there will always be people who        Road is being upgrade from 2 to 4 lanes between Terry Hills
                              (SHRT)           oppose) if it was to address the existing population           and Warriewood. When asked in a subsequent email how
                                               pressures. Thanks for the contribution though. There are       this will not result in increase population growth on the
                                               plenty of positives, but the underlying flaw is that it        Northern Beaches, got no response.
                                               involves significant population growth on the beaches”.
Meeting       Member for      SHRT             Good idea, not but interested as it does not go through        Light rail tunnel connecting Chatswood and Brookvale now
              Davidson,                        my electorate                                                  proposed through his electorate.
              Northshore
Meeting       NSW             SHRT             None, but Northern Beaches Road Tunnel Link and the            Action taken, none. NSW Labor did not win the following
              Shadow                           extension of Sydney Metro to Bankstown not Labor Party         state election.
              Minister. for                    policy.
              Transport
Community     Northern        Community        Quote “I have been in discussions on behalf of the council     Interjected at this point. “The height clearance for all
Meeting       Beaches         Meeting          with the RMS for the past 6 months”. “The NBL tunnel           future road tunnels in Sydney will be 5.3m, the same as the
(100 plus     Councillor      organised by     will not be big enough for the B-Line double decker buses      bridge code, hence high vehicles, including the B-line buses
attendees)                    an action        because the TBMs are not large enough”                         will be able to use the tunnel”. “There are TBM’s big
                              group against                                                                   enough, however, road tunnels in Sydney have been
                              the tunnel.                                                                     excavated by road headers(which place no restriction on
                                                                                                              the size of the tunnel excavation”.
Rotary Talk   Federal         Talk to Rotary   On tunnel ventilation – “the air filters in the M5 East Road   At question time corrected the “air filter” scenario. There
(Glenrose     Member for      (June 2019),     Tunnel are the cause of the air pollution in the tunnel”.      are no air filters in the M5 East Road tunnel nor any other
Shopping      Mackellar       particularly     “We have a NBL road tunnel because the alternative of          road tunnel in Australia. The M5 East road tunnel once had
Centre)                       requested to     rail cannot carry freight”.                                    a small pilot air filtration system, it no longer operates” In a
                              talk about                                                                      later email the MP. ”the NBL has nothing to do with large
                              the NBL                                                                         road freight trucks like Northconnex road tunnel has being
                                                                                                              on the National Highway”
There were 5 tower cranes at Dee Why, June 2018
Sydney Metro Stage 1 - operating 2019

                                                            Proposed Sydney
                                                            Heads Rail Tunnel

                 Sydney Metro Stage 2 - Harbour Crossing
                 800m long twin tunnel crossing
                 Single slurry TBM, in ground 2019.
                 Using retrieval shaft.

             Sydney Metro Stage 2 - operating 2024                       Bondi Junction
                                                                         Station

15/07/2019                                                                          14
Not all “Transport Tunnels” are the same
                            (comparing road and rail tunnels servicing the urban environment)
        Objectives                                       Comment                             Road Tunnel/Network   Metro Rail Tunnels
      Surface Impacts                    None (not including entrances and exits)
 (property/the environment)
      Surface Impacts                    Varies (for road very significant at portals)
   (property/environment)

         Efficiency             Tunnel road traffic impacts the local road network

       Productivity             Rail frees up the road network for surface freight.

         Reliability            Traffic congestion depends on the time of day and random
                                events(accidents).

           Safety               Decreases road accidents (increases local road traffic)

       Sustainability           Rail reduces air pollution and noise (increased traffic on
                                local roads)
   Enhancement of urban         Confine growth to designated areas, help development
 development consolidation      of satellite cities
Connectivity/decentralisation   Train speeds vary upwards from 120km/hr, >> road

 Transport Capacity/$ Spent     Road (6,000 people/hour), Rail (32,000+ people/hour)
TBM

                          Road Header

                                           Value for Dollar!

Sydney Road Tunnel - by                                        Sydney Metro - by TBM
     road header
                                Excavation Rate       Transport People/Hour
Slow shared passenger and freight rail line from Gosford

                                                                                                             Tunnel or bridge crossing
                                                                                                             at Pittwater

                                                                                        Option 1 - Stage 1
                                                                               Faster Train – Sydney CBD to Gosford

                                                  Tunnel crossing
                                                  Sydney Heads                            Via new railway tunnels

E J Nye & Associates Pty
Ltd                                                                                   Underground Light Rail between Chatswood and
                                                                                      Brookvale
Route of Light Rail (80% of length underground)
 Length of light rail is 14 km
                    Light Rail between Chatswood and Brookvale Railway Station

                                                         Northern Beaches Hospital, New Town
                                                         Centre & Industrial Park

                                                                                               Beacon Hill
                                           Forestville
   Suspend light rail under the                                                                                               Dee Why Rail Station
   existing Roseville Bridge
   structure

                                           Eastern Valley Light
                                                          Way rail connecting Chatswood
                                           Industrial Park and Brookvale Railway Stations                     Brookvale Rail Station New
                                                                                                              satellite CBD with major
                                                                                                              university
Eastern Valley Way
Industrial Park

                                                                                                             Manly Vale Rail Station
                                  Beaches Link road tunnel
                                  (2 x 3-lanes from North Sydney to
 Chatswood                        Seaforth)

E J Nye & Associates Pty Ltd
Sydney CBD and Harbour Bridge

                                 North Bondi

               Rail tunnel crossing
               of Sydney Heads

    Reduces surface traffic congestion at Bondi
    and Sydney’s dependence on the Harbour
    Bridge.

                                                      Manly

E J Nye & Associates Pty Ltd                                                      19
North
                                                  North Side Storage Tunnel

                                                                Middle Harbour Paleochannel                                              To Gosford and
                                                                  (depth below MSL 100m)                                                 Newcastle

                                                                                                  Brookvale                    Lakes

                       Rose Bay Paleochannel
                        (depth below MSL 65)

                                                                                                                                       MSL – Mean Sea Level

                                                                                           Manly Paleochannel
                                                                                         (depth below MSL 60m)
                                Sydney Heads Paleochannel                                                                                     new railway tunnels
                                  (depth below MSL 90m)                   North Head Outfall Tunnel
                                                                        4 km long(depth below MSL 120m)                                       existing railway tunnels
Bondi Outfall Tunnel

              Three significant deep underwater tunnel projects already completed in the vicinity of the proposed Sydney Heads rail tunnel crossing, Bondi
              and North Head Outfall Tunnels and the North Side Storage Tunnel

                                                                                                                                                             20
 E J Nye & Associates Pty Ltd
Sydney Heads Rail Tunnel - a potentially new rail harbour crossing 7.5km
east of the near “100 year” old Sydney Harbour Bridge

   7m diameter single track rail tunnel

                                                                                     12m wide with 3-lane road tunnel

 Sydney Metro Rail Tunnel – up to 32,000+ people/hour
               (takes vehicle traffic off surface roads)

Comparing a Metro Train capacity with a typical
  3-lane road tunnel (in one direction only)
 Are people in Sydney concerned about urban development,
                                                                Typical 3-lane road tunnel - max 6000 to 8000 people/hour
 or is it really all about road traffic congestion?        (adds around 5000 vehicles/hour to local surface roads from the exit portal at peak times)
E J Nye & Associates Pty Ltd                            PROJECT CONCEPT                                                             North

Doubling rail capacity to the north would
provide benefits to rail freight growth                                                                                 Gosford/Woy Woy
and city security, sustainability                                                                                       (new regional CBD)

                                                                Hornsby
Currently 40 long-distance passenger trains
up to 20 freight trains in each direction per
day
                                                                                                     Mona Vale
                                                                                                     Station at
Uses existing CBD stations Town                                                                      Warriewood
Hall and Martin Place then                                                                           Industrial Park
                                                       Strathfield
through to Central. Martin Place
Station is also an interchange                         Chatswood
station on the new Sydney Metro                                                        Dee Why
Stage 2 project.

                                                                                  Brookvale (develop to size of North
                                  Sydney CBD                                      Sydney CBD)
                                                                                                                                                2
                                                                                                                                                2
                                                                          Manly   The existing rail corridor (Northern Line) is approaching
A direct rail link between the north and        Bondi                     Vale    capacity, constraining future freight and passenger growth.
south shores across Sydney Heads,               Junction                          The proposed new line would enable planned, ordered
7.5km east of the Sydney Harbour Bridge.                                          population growth in the Northern Beaches Council and
Creates employment opportunities for                       North Bondi            Central Coast Regions
residents on both side of the harbour,
plus significant travel time related                                                                                         Schematic 1 of 3
benefits.
Brookvale

15/07/2019               23
To Gosford CBD

                                                    Sydney Metro Stage 1 - operating 2019

                                                                                                         Sydney Metro West
                                                                                New Frenchs Forest    Sydney Heads Rail Tunnel
                                                                                Hospital and Town        Proposed light rail
                                                                                Centre and existing
                                                                                  industrial zone.
                                                                                                                                 Brookvale CBD

                                                                                                                                   Manly
                                                                                                                                   Vale

                                         Westmead              Parramatta

   In future to                                                                                         Martin Place                Proposed Sydney
     Western                                              Homebush                                                                  Heads Rail
 Sydney Airport                                                                                                                     Tunnel

                                                                            Illawarra Line loops                                 North Bondi
                                 Sydney Metro Stage 2 - operating 2024      south
                                                                            via St James Station                        Bondi Junction
E. J. Nye & Associates Pty Ltd
July 2018

Mobile: 0422003275
    15/07/2019                                                                                                                        24
ted.nye@nyeconsulting-                                                                                      To Malabar
New connecting tunnels
 ted.nye@nyeconsulting-eng.com.au                                                                             (pass under the Sydney Metro tunnels)
 0422003275
                                                                                                              Sydney Metro West

                                                                                                              Sydney Metro Stage 2

                                                                                                               Existing disused tunnels
                           Existing tunnels linking Town Hall                                                  and St James Station
                           and Martin Place Station not used.                                                  central platforms

                                                                                                 Sydney Metro West connected to Bondi
                                                                                                 Junction using existing tunnels and then in new
                                                                                                 tunnels across Sydney Heads to Brookvale CBD
                                                                                                 and Gosford CBD and the central coast

                                                                                                                     Disused tunnel
                                                                                                                     north St James
                                                                                                                     Station
           Option 2 Alignment                                     New lower tunnels
                                                                                                                     Used as a pedestrian
           Direct rail connection between Parramatta              and platforms
                                                                                                                     link to Martin Place
           CBD and Westmead, the Sydney CBD and                   constructed below St
                                                                                                                     Station
           Brookvale CBD then up to the Gosford CBD               James Station
           and the central coast
                                                                Illawarra Line re-routed south
                                                                through St James Station
E. J. Nye & Associates Pty Ltd - Feb 2019
New lower St James Station – Concept Sectional Footprint
Station excavation - completed March 1923                                         Station platforms - completed end 1924

                 Station plan and section through booking hall                                      Booking hall steel frame erection 1925
Historical records of St James Station, the station was opened in 1927. The central platform at the station has never been used.
Where is the rail network east
                    of the Sydney CBD?

                  Thanks for Listening

                       E. J. Nye & Associates Pty Ltd
                       mobile: 0422003275
                       ted.nye@nyeconsulting-eng.com.au

                       27 June 2019

Link to YouTube EA presentation:
https://www.youtube.com/watch?v=t70kd6eUMfI
You can also read