THE ONLY PLAY IN NIOBIUM - MAY 2020 'diversified junior exploration/development company' - Niobay Metals
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Forward Looking Statements This presentation contains certain “forward-looking statements”, including, but not limited to, the statements regarding the Company’s strategic plans, its anticipated benefits and the use of proceeds resulting thereof, in particular, future financial results, production targets and timetables, the evolution of mineral reserves and resources, mine operating costs, capital expenditures, work programs, development plans, exploration programs, objectives and budgets, the possible determination of additional reserves, and the Company's eventual success to execute its strategy to focus on building its portfolio of properties. Forward looking statements express, at this date, the Company’s plans, estimates, forecasts, projections, expectations or beliefs as to future events and results. Forward-looking statements involve a number of risks and uncertainties, and there can be no assurance that such statements will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements. Risks and uncertainties that could cause results or future events to differ materially from current expectations expressed or implied by the forward-looking statements include, but are not limited to, factors associated with fluctuations in the market price of metals, mining industry risks, exploration risks, risks associated with foreign operations, environmental risks and hazards, uncertainty as to calculation of mineral reserves, requirement of additional financing or additional permits, authorizations or licenses, risks of delays in construction and production and other risks referred to in the Company’s Annual Information Form. Claude Dufresne, P. Eng, acted as the qualified person as defined in National Instrument 43-101. He reviewed and approved the technical and scientific content of this presentation. 2
Niobium an Undeniable Ally for Steel As an additive in steelmaking process Niobium improves steel properties Production of High Strength Low Alloy Steel Stronger Lighter Toughness Flexible $10 of Niobium in a mid-size vehicule 5% litres / km savings Weldability Contributes to GHG Reduction 3
Niobium - Tech https://www.youtube.com/watch?v=sw0e2qv6 90U https://www.youtube.com/watch?v=1j8cjnz4Q Ks § Additional information at https://www.niobium.tech/en 5
Niobium – Global Markets (HSLA) 130,000 World Consumption (t FeNb) 120,000 110,000 100,000 90,000 80,000 70,000 60,000 50,000 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 $44 $42 Price Ferro-Niobium $40 USD/kg Nb $38 $36 $34 $32 $30 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 Source: Global Trade Atlas, Camet Metallurgy Inc 6
Niobium – Global Markets 2009 2019 Others Others China 25% 26% 30% China 55,000 t 38% 124,000 t FeNb FeNb N.A. N.A. 17% 15% Europe Europe 28% 21% 7
Niobium - Supply Producer Ownership Value/Opex Niobec, Canada Capacity ~7,000 Nb tpa CEF Holdings Sold US$ 500M Market share 8% (+45%), HK Resource 70M to 100M Temasek (+45%), 2015 (below 850m) Singapore (5-6X EBITDA) Grade 0.56% Nb2O5 A. Regent, ~20 US$/kg Nb U/G Canada Catalao, Brazil Capacity ~9,000 Nb tpa China Moly. Sold US$ 1.7B Market share 11% (inc phosphate) Resource Esti 35 Mt 2016 (10-11X EBITDA) Grade 1.0% Nb2O5 N/A O/P CBMM, Brazil Capacity 100,000 Nb tpa Moreras Salles Net Earning US$ Market share +80% Family (70%) 2B (2018) Resource +500Mt Strategic Asian + US$ 15B O/P steelmakers (30%) Grade 2.3% Nb2O5
Project Location James Bay Moosonee Rail 40 km Renison station James Bay Niobium Project Wetum road 10
James Bay Niobium’s History Discovered in 1966 § 14,000 meters of drilling at an average depth of 170 meters in 85 holes. § Historical estimate of 56M t @ 0.52% Nb2O5. § Open at depth (below 275m). § Exploration shaft (~40m ) & a 75m cross-cut. § 225 t extracted for metallurgical testing (pilot plant). Lakefield Research carried out metallurgical tests § Overall recovery of 78%, very low impurities, and high grade concentrate. Feasibility study completed by Bechtel Canada in 1969 Access to all historical technical data and drill cores. Note: NioBay Metals has not yet undertaken the work necessary to verify or classify the historical estimates. Economic studies completed in the 1960s does not mean the James Bay Niobium deposit would be found to be economic today. NioBay Metals is not treating the historical results as a current mineral resource nor as having been verified by a qualified person. 11
James Bay Niobium Resource § A Mineral Resource Estimate 2018 (43-101) was published by RPA. Classification Tonnes Grade Contained Nb2O5 (cut-off 0.3%Nb2O5) (Mt) (%Nb2O5) (Mkg) Indicated 26 0.53 137 Inferred 25 0.51 128 Total Ind. & Inf. 51 0.52 265 § Mineralization is open at depth (> 275m). § A crown pillar is excluded from the resource (abt 6 Mt). § 30m of overburden. § High potential to increase resources. 12
Scoping Study 2019 (G Mining) 13
3D View James Bay Deposit 14
Sections 0 to 600N 0 200N 400m 400m 400N 600N 400m 400m 15
Plan View James Bay Deposit 16
Section 200N 17
Section 400N 18
Section 600N 19
Drill Program Pictures 20
Pyrochlore crystals 21
Benchmark Niobec1 vs James Bay2 0.9 800 700 0.8 600 0.7 500 0.6 400 300 0.5 200 0.4 100 0.3 0 Grade (% Nb2O5) Recovery (%) Prod ('0000 kg) Resources (M t) EBITDA (M US$) Value1 (M US$) Niobec James Bay Niobec James Bay Niobec valued between US$ 750M and US$ +1B Based on 5 to 8 X EBIDTA 1. Niobec data from historical & estimates 2. Niobay data are not 43-101 compliance 22
Niobec Operation • In operation for 44 years. • +70M t resource @ 0.56% Nb2O5 (2020). • Recovery improved to 65%. • Vast majority of resource is below shaft (850m). Blocs 7+ • Ramps to shaft then surface. • Hosting capacity ~ 7,000 tpd (ore & waste). • Believe owners have not yet decided to extend shaft depth or status quo. • Production: abt 7,000 tpa Nb (+/- 5%). • Opex US$19kg / Nb (+/- $2/kg). 23
Niobium – Anticipated Market Share Sale FeNb (t Nb) 250,000 NioBay’s James Bay Project will produce no more than 5% WS 200,000 150,000 CBMM sales won’t dip 100,000 50,000 - 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 CBMM World James Bay 24
Niobium - World Market Share Based on production of 6,500 tpy Nb 90% 6.0% 5.5% 85% Set limit by Niobay 5.0% 4.5% 80% 4.0% 75% 3.5% 3.0% 70% 2.5% 65% 2.0% 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 CBMM MS James Bay Market Share 25
Moose Cree First Nation § MCFN signed IBA w/ Detour Gold, Victor Mine, OPG. § Former Chief wasn’t supporting Resource Development. § Got expelled by councillors before end of her term. § New Chief & Council elected July 2019 (4 years term) § Favorable to engage with resource developers. § Seeking opportunities for local community. § Signed a “Protection Agreement’’ for early exploration programs (December 2019). § February/March Information Sessions in Moose Factory. § Considering having MCFN as equity partner in the project. 26
Next steps in 2020 § Drills Results § Remaining 4 holes. § End-April 2020. § Mineral Resource Update NI43-101 § RPA – July 2020. § Baseline Study § Initiate summer.. § Geophysics (summer/fall) § James Bay Niobium. § Valentine. § Preliminary Economic Assessment § G Mining Services Ltd. § Completed Q4 2020. 27
Company Profile STOCK INFORMATION ($CAD) DIRECTORS & MANAGEMENT Symbol NBY Serge Savard, ex NHL Chairman Businessman, Real Estate Exchange TSX-V Claude Dufresne, P.Eng Market Cap $15 M +15 years niobium, President & CEO Shares Outstanding 52 M Iamgold/Cambior Warrants 3M Anthony Glavac, CA CFO Falco Res, Osisko Metals Share Price $0.45 Jean-Sébastien David, P.Eng Director Cash (Dec 2019) $3.5 M Ariane Phosphate Inc, Osisko MAJOR HOLDERS Raymond Legault Director Retired Financial Investor Osisko Gold Royalties 20% Jacques Bonneau, Geo Toronto based High Net Worth 8% Director Ex-CEO Mazarin/Niobec Caisse de Dépôt & Placement Inc 4% Dawn Madahbee Leach Management 8% Waubetek Business Director Development Co/ First Nations 28
Thank You ! Claude Dufresne, P.Eng. President & CEO NioBay Metals Inc 300-1100 Ave Canadiens-de-Montreal Montreal, QC H3B 2S2 cdufresne@niobaymetals.com 29