The New HIS Campus Sept 2019
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
• The History and Future • The Location • The Brief Welcome • The Challenges and Opportunities • The Latest Schematic Designs •Q &A
A Little History… 2002 2017 Spring 2019 Fall 2019 Spring 2020 Fall 2020 The Start of The Agreement to Testing and Foundation Main Building Inspections and Something Re-locate Government Construction Construction Handover Completely Different Approvals Completion Overall Construction November 2020 11 Design Contractor Selection Temporary Power Supply The Need to Piling Expand Groundbreaking and Exterior Construction (PAC Center Foundation Basement Planned Transition Designed) Construction Begins Construction Construction Interior Construction Sem II Next SY January PAC 2021 2015 Summer 2019 Winter 2020 Summer 2020 Winter 2021 Fall 2018
The Location… The New Land: 70 MU (approx. 24 50,000m2) Current Land is 30 MU (approx. 20,000m2) 70 50,000 路 东 30 20,000 湘 滨 Mandated Challenges: 1/3 Green space, parking, setback and fire lanes, orientation, access, building SITE AREA:about 50000 s q m. density, plot ratio, and building heights. SETBACK AREA:about 45900 s q m. 1/3 Opportunities: Design for future needs, use of space, 湖 西 33 面积约50003平方米(约75亩) 路 flow of people, acoustics, colors, flooring, environments. Actual land
The Location… • About 12-20 minutes by car from current location • 12-20 • About 2 hour walk (3 hours over the mountain) • 2 3 • Auto transport likely to be more consistent at 15 minutes w/ new roads • / 15
New Housing Developments in Area
Most Essentials will not Change: • Vision and Mission • General Learning Targets • IB Commitment IB The • International School in China Context Opportunities… • Small Class Size Ratios • Highest Quality Teachers • Dragon Spirit • Commitment to Safety and Security of Students
HIS will Maintain its Unique Identity HIS • Community-Centered and Inclusive • IB World School IB • University Preparation • Strong Opportunities in Academics, Arts, and Athletics • Promoting International-Mindedness & Multilingualism • Celebrating Diversity while Promoting Unity • Celebrating Host Country Language and Culture • Targeting Individual Learning Needs • Caring Supportive Environment
Some Positive Changes to Look Forward to… • SPACE!!! • World Class Theater and Black Box • Swimming Pool • Two Full-sized 7-aside Soccer Pitches 2 7 • 3-4 Full-sized Basketball and Volleyball Courts 3-4 • Design and Innovation Centers • Purpose-built Facilities • Expansion to Medium-sized school (more academic, arts, and athletics programs) • Targeting Individual Learning Needs • Caring Supportive Environment • Canal Boating! • Purposeful Divisions and Orientation • View of Mountains and Canals, not Star Wars Building • SPACE!!!
ARRANGEMENT OF CLASSROOMS
Building Layout
• FLOW and BREAKOUT SPACE •
DESIGN CENTERS DESIGN CENTERS
• ATTRACTIVE MULTIPURPOSE ENTRANCE HALLS and FOYERS •
Attractive Gardens and Outdoor Inquiry Spaces… Butterfly Garden?
600-650 Seat Theater 600-650
Black Box Theater Connected to Exhibition Hall
Swimming Pool 6-Lanes 25m 6 25
Open Cafeteria
Purpose Built Libraries
Connecting Café
Purpose-Built Breakout Learning and Common Areas
Outdoor Playgrounds and Fitness Circuit
The Brief… Merge International w/ Design for 1300 Students (4-5 Traditional and Modern China Classes per Grade Level) 25 Meter Swimming Pool Attractive Outdoor Gardens General Features 1300 25 4-5 Gyms and Libraries for Upper School, Lower School and ECE 400 seat Blackbox Theater and Community Area and Café Separate ECE Facility with Strategic Views 600-650 Seat Theater Performing Arts Center 600-650 400 Strong Consideration for 100x60 Meter pitch (allows two Environmental Planning, Energy Large Main Campus and Separate 45x60 Meter 7-aside pitches Purposeful Designs of Learning Efficiencies and Sufficient Safe One Drop-Off Point for ECE Cafeterias inside) Spaces Based on Ages of Students Indoor Space on Rainy/Poor AQ Transportation 100*60 2 Days 45*60 7
Early Childhood Center (ECE) • Very Large 110m2 Classrooms to Support Inquiry Centers Inside Classrooms • 110 • Early Childhood Literacy Library • • Inquiry Garden, Indoor and Outdoor Playground Areas Designed for Children 2-5 Years Old • The Brief… • Large Rhythm and Movement/Gym/Assembly Space • • Separate Access from Main Campus • • Joined by Chinese Garden to Main Campus • • ECE Cafeteria • ECE
Lower School (Grades 1-5) • Large 85m2 Classrooms to Support Inquiry Centers Inside Classrooms • 85 • Large Library for Reading, Investigation, Collaboration, and Study • • Outdoor Playground Areas Designed for Children 5-12 The Brief… Years Old • 5-12 • Large Gym that can Accommodate at least One Volleyball/Basketball Competition Court • / • STEAM (Science, Technology, Engineering, Arts, and Mathematics) Center • STEAM • Grade Level Classrooms Together with Common Space for Breakout Learning •
Upper School (Grades 6-12) • Large Upper School Library for Archives, Research and Collaboration (ARC) and attached to Common Café • • Some Smaller 45m2 Classrooms for World Languages and other Specialists • 45 • Large Gym that can Accommodate at least Two Volleyball/Basketball Competition Courts • 2 • Design Center for Technology, Creativity and Innovation • • Common Spaces outside of Classrooms for Breakout Learning and Socializing during, between and after Classes The Brief… • • Fitness Center • Middle School (Grades 6-8) • Large 85m2 Classrooms Grouped by Grade Level for Math, English, Science and Social Studies • 85 • Outdoor Area Designed for Children 12-15 Years Old • 12-15 High School (Grades 9-12) • Classrooms Organized by Department • • Accessible Laboratories, Design Center, and Music Rooms •
January 2021-August 2022 Transition Phases 2021 1 -2022 8 • Criteria for move • Able to stay on current HIS campus until August 2023 2023 8 • Phase I: Move all Upper School in January 2021, Early Years through Grade 5 continues on current HIS Campus 2021 1 -5 HIS • Phase II: Move ECE and Lower School to new HIS Campus in August 2021 2021 8 • Options to Consider: Allow 1-3 classes of Lower School to transition to New Campus in August 2021 2021 8 1-3 • Community will be surveyed as to preferences. Space and staffing will allow us to be flexible for 18 months 18 • All grades will hosted at new HIS Campus by August 2022 2022 8
Answers before Questions… • Local design firm and international group oversight • Tuition will NOT be increased more than past (3-9%) and most fees remain consistent, exception for Upper School where reduced tuition increase to meet BYOM goal (3-9%) BYOM • The construction has commenced (planned timeline is 12-14 months with scheduled launch in January 2021) 12-14 2021 1 • We will be hosting several events on new site with students, faculty and parents • There will be significant attention on the emotions of transition • Yes, we will still host Welcome Back BBQs, WESTLAKE MUN, Halloween Parade, International Day and Fun Run events WELCOME BACK BBQ, • Yes, we will expand transportation services to the new campus, including After-School Activities (ASA) service • Yes, there are major housing developments going up in the area at various costs • Until we can safely move, we will continue improving current campus for learning and aesthetics
Want to See More? Have a Visit!!!
Thank you… Questions??? Interested in joining Design Advisory Group??? Email: jstubbs@his-china.org
You can also read