SR-804 Boynton Beach Boulevard from NW 3rd Street to US-1/Federal Highway Financial Project ID: 444079-1-52-01 Public Meeting | July 26, 2022 THE PRESENTATION WILL BEGIN AT 5:30 PM
Agenda Rules of Engagement Project Overview Project Location Proposed Improvements – Scope of Work Project Schedule and Cost Project Design Plans Maintenance of Traffic Questions and Answers 2
Project Team Leslie Wetherell, P.E. Maj Alam, P.E., PMP Project Manager Consultant Project Manager Florida Department of Transportation Propel Engineering District 4 Ericka Moran Lisa Murphy Project Designer Public Information Officer Propel Engineering Quest Corporation of America 3
Meeting Format Online: • Tuesday, July 26, 2022 • 5:30 p.m. In-Person: • Wednesday, July 27, 2022 • 5:30 p.m. • Boynton Beach City Hall 100 East Ocean Avenue COVID-19- Pandemic Measures Boynton Beach, FL 33435 4
Rules of Engagement This Public Information Meeting is being recorded. If you experience technical difficulties, please contact +1 (813) 785- 0120 so that a member of our technical support team may assist you. All attendees will remain muted throughout the meeting except for the Open Discussion. At the end of the presentation attendees are also welcome to submit any questions/comments using the GoToWebinar Question Panel and a member of the team will respond during the question-and- answer portion. To request to speak, click the Raise Hand button on the Control Panel and unmute your microphone when your name is called. 5
For Dial-In by Phone Attendees If you requested or downloaded the presentation Dial-in attendees are “Now showing ‘listen only’ slide 4.” Paper copy of Presenter will indicate presentation slide number https://www.d4fdot.com/pbfdot/city_of_boynton_beach_various_locations.asp 7
To report a technical issue… ? Type in Send an email to Call Question box on David.Alberts@QCAusa.com (813) 785-0120 GoToWebinar Control Panel 8
Public Notice Florida Administrative Register Property owner/tenant letters Email to project contacts list Department/project webpage Newspapers Social media 9
Non-Discrimination Policy Public participation is solicited without regard Title VI to race, color, national origin, age, sex, religion, Compliance disability, or family status. Persons wishing to express concerns relative to FDOT compliance with Title VI may do so by contacting: Sharon Singh Hagyan Jacqueline Paramore District Four Title VI Coordinator State Title VI Coordinator 3400 West Commercial Boulevard Fort 605 Suwanee Street, MS 65 Lauderdale, FL 33309 Tallahassee, FL 32399 (954) 777-4190 (850) 414-4753 Sharon.SinghHagyan@dot.state.fl.us jacqueline.paramore@dot.state.fl.us All inquiries or concerns will be handled according to FDOT procedure and 10 in a prompt and courteous manner.
Project Overview 11
Project Location 12
Project Scope • Repaving and reconstructing existing pavement • Widening existing sidewalk on south side of Boynton Beach Boulevard to 15 ft. and to 9 ft. on the north side • Adding decorative hardscape with a wave pattern within the expanded sidewalk in coordination with City • Drainage modification to accommodate sidewalk expansion • Retrofitting pedestrian lighting at signalized intersections • Adding shared lane bicycle markings • Upgrading pavement markings and signs and pedestrian signals 13
Project Schedule and Cost • Construction Start: Spring 2024 • Construction Completion: Fall 2025 • Construction Cost Estimate: $6 Million 14
Project Design Plans 15
Roadway Concept 16
Roadway Concept 17
Roadway Concept 18
Lighting and Signalization Improvements Retrofitting pedestrian lighting at signalized Updating to accessible intersections. pedestrian signals (audible/tactile) 19
Shared Lane Markings (Sharrows) Sharrows on the outside travel lanes of Boynton Beach Blvd and in both directions of travel on NW 3rd Street and Ocean Ave. 20
Maintenance of Traffic 21
Maintenance of Traffic • One travel lane open to traffic in each direction at all times. • Access to schools, businesses, churches and residences will be maintained. • Pedestrian access to crosswalks at signalized intersections will be maintained at all times. • Railroad crossing work will occur concurrently with roadway work and will be done using flaggers. 22
Maintenance of Traffic 23
Questions and Answers 24
Submitting Comments and Questions Multiple ways to submit: 1. Online using GoToWebinar Website Type your comment/question in the https://www.d4fdot.com/pbfdot/city_of _boynton_beach_various_locations.asp Question box 2. Verbally by using the Raise Hand Project Manager feature on your control panel to Contact Information be unmuted Leslie Wetherell, P.E. FDOT District Four 3. Online at project website 3400 West Commercial Blvd Fort Lauderdale, FL 33309 4. By email to Project Manager Leslie.Wetherell@dot.state.fl.us 954-777-4438 5. By U.S. mail to Project Manager 25
About Your Comments and Questions All comments Please submit All registrants and questions your comments will receive a link are part of the and questions by to the meeting Public Record. August 6, 2022. recording. 26
Question and Answer Session 27
Thank you for participating. Please submit comments and questions by August 6, 2022 Leslie.Wetherell@dot.state.fl.us Attention: Leslie Wetherell 3400 West Commercial Blvd Fort Lauderdale, FL 33309 954-777-4438 Toll free (866) 336-8435, ext. 4438 https://www.d4fdot.com/pbfdot/city_of_boynton_beach_various_locations.asp 28