Service Improvement Plan 2018-2020
Irish Naturalisation and Immigration Service

                        1
Document version control

Version Update                               Author            Date
2.0      Final version for publication       INIS Change       October 2018
                                             Management Unit
                                             - Neil Ward and
                                             Richael Duffy

                                         2
Table of contents

Foreword.............................................................................................................................. 5

1. Introduction ...................................................................................................................... 6

   1.1. Background ............................................................................................................ 6

   1.1.1.      INIS Service Delivery Strategy ............................................................................ 7

   1.1.2.      Developments in Public Sector Service Design ................................................... 8

   1.1.3.      INIS Senior Management Forum ......................................................................... 9

   1.1.4.      OnePlan 2018 ..................................................................................................... 9

   1.1.5.      2018 INIS Business Plan ................................................................................... 10

   1.1.6.      INIS Service Improvement Drive ....................................................................... 14

   1.1.7.      Additional inputs of note .................................................................................... 16

   1.2      Pillars .................................................................................................................... 17

   1.3      Responsibilities ..................................................................................................... 17

   1.4      Structure of the report ........................................................................................... 18

2. Pillars, Objectives and Actions .................................................................................... 19

   Pillar 1 Our mission, purpose and legislative context ..................................................... 20

   Pillar 2 A safe and secure immigration system ............................................................... 26

   Pillar 3 Efficient and effective service delivery ................................................................ 31

                                                                    3
Pillar 4 Service design based on customer needs .......................................................... 40

   Pillar 5 Investing resources to deliver change ................................................................ 47

3. Implementation, Monitoring and Review ........................................................................ 53

   3.1      Risk Assessment .................................................................................................. 53

   3.2      Monitoring and Reporting ..................................................................................... 53

   3.3      Governance .......................................................................................................... 54

Appendix 1 – INIS Senior Management Forum – Key discussion points ........................... 60

Appendix 2 – Refreshed INIS Service Delivery Strategy ................................................... 61

Appendix 3 – Culture and Values Charter.......................................................................... 62

Appendix 4 – Commitments from the Programme for a Partnership Government ............. 65

Appendix 5 – Service Improvement Plan 2018-2020 High level Risk Register .................. 66

References ........................................................................................................................ 69

List of Acronyms ................................................................................................................ 70

                                                                  4
Foreword

The Irish Naturalisation and Immigration Service (INIS) has grown considerably in scale and
scope since it was established in 2005. INIS now comprises approximately one third of all
staff in the Department of Justice and Equality, and we process over 250,000 applications
a year – for visas, registration of non-EEA nationals, residence permissions, international
protection and citizenship. In addition, up to 16 million passengers are expected to be
immigrated by INIS through Dublin Airport.

It is clear to all of us working in immigration services that the demands we will face are likely
to continue to grow over the coming years. Meeting those demands requires that we seek
to deliver our services in different ways, and not just ask our staff to work harder. In a rapidly
changing international context, we must also become a more nimble organisation, and one
which focusses on delivering high quality services to all of our customers.

This Service Improvement Plan sets out our plans to achieve all of this between now and
the end of 2020. Every business area within INIS has been involved in its development, and
I appreciate the efforts involved by all of our teams. The plan has also benefitted from inputs
from members of the Management Board, and from staff in other business areas across the
Department of Justice and Equality. The assistance of the National Adult Literacy Agency
(NALA) was also valuable in carrying out a plain language edit of this document, to make
sure that this document will be accessible to all staff and stakeholders.

This Service Improvement Plan is ambitious in scope. But it is also realistic – these actions
can be delivered within the timeframes set out here, and a strong Programme Board will be
established to make sure that is the case. Detailed Annual Implementation Plans will ensure
that we are all held to account for the commitments we are making in this plan. It’s an exciting
time to be working in INIS, and in the Department more broadly – I have no doubt that this
plan will evolve as we meet these and fresh challenges in the years ahead.

Michael Kirrane
Director General
Irish Naturalisation and Immigration Service

                                                5
1. Introduction

This plan sets out the strategic priorities, objectives and actions for the Irish Naturalisation
and Immigration Service (INIS) to improve our services over the period 2018-2020. It takes
account of the available funding, ongoing projects and what can be delivered by realistic
and achievable objectives to improve the efficiency and effectiveness of the services
provided. The plan promotes the principle of designing our services around our customers’
needs. It draws on the work completed as part of the Service Delivery Strategy for INIS and
the objectives and actions are consistent with the priorities of the 2018 INIS Business Plan
and OnePlan2018 as well as the broader Public Sector reform agenda.

   1.1.       Background

In 2017 INIS processed almost 214,000 applications across the various business areas,
completed 75,000 registrations in the Burgh Quay Registration Office and processed 15
million inbound passengers at Dublin Airport. Registrations increased by 15% and traffic
through Dublin Airport increased by 20%.

The current arrangements for service delivery rely on a number of information and
communication technology (ICT) systems that have limited interoperability, and our
processes are heavily dependent on paper-based processing.

In the absence of an organisation-wide review of processes and investment in technology
to introduce efficiencies, we would need to keep increasing our staff numbers as demand
for our services continues to grow. This is not sustainable. In addition, there is a growing
need to develop or replace current infrastructure.

As we look to the future, our current approaches to service delivery will become ever more
challenging. The quality of service we provide would reduce, while the capacity of our staff
would be outstripped by the demands placed upon them.

We already have a number of projects underway which are aimed at improving our services,
and this plan has been informed by significant preparatory work which has been carried out
within INIS over the last 18 months. These and other inputs are summarised below.

                                               6
1.1.1. INIS Service Delivery Strategy

In February 2017, the INIS senior management team agreed a medium-term service delivery
strategy for immigration services. This work has recently been refreshed, and the updated
version is available at Appendix 2.

The key observations of the current landscape within INIS outlined in that document are:

      The IT systems are complex and do not share information efficiently. There are three
       process models supported across five IT platforms with minimal interoperability. This
       makes it difficult to gather all the information needed to create a full profile of an
       individual. It is also an expensive model to maintain, driving inefficiencies and
       complicating governance.
      The role of INIS has extended to encompass Border Management and Registration
       services exacerbating existing challenges. The IT system that supports these
       services, GNIB-IS, is outdated. Support for the operating system has not been
       available since 2008.
      INIS’ ability to respond speedily to legislative, policy and security change agendas is
       hampered by the complexity and ownership of the current IT systems landscape and
       its capability to deliver requirements.
      As demand for INIS services continues to grow low levels of investment in digital and
       self-service technologies continues to contribute to an inefficient use of resources,
       poor customer service and lengthy processing times.
      Limited focus on data quality standards and controls has led to trust issues with the
       current data set, which is compounded by high volumes of paper handling and paper
       file management.
      Access to information to underpin decision making and to validate a person’s identity
       can be incomplete, inaccurate, or inaccessible. This leads to lengthy processing
       times and inconsistent decision making, exposing INIS to external threats.
      Gap between the demand for service support hours and the supply model. This is the
       case with the visa process globally and at ports of entry where the need is for a 24-
       hour support service, 365 days a year.

From these observations, and from efforts to position the organisation with regard to the

                                                 7
future landscape, the Service Delivery Strategy focussed on three main recommendations:

 1. Invest in up-to-date technologies

 This investment would introduce efficiencies, whilst at the same time eliminate barriers to
 confident, consistent and compliant decision-making practices, with an approach that
 aligns to the Public Service Reform and ICT Strategies.
 2. Review the current immigration processes

 Such a review should examine processes from start to finish. This includes examining all
 parts – that is, applications, border procedures and registrations. The review should be
 conducted with the service user in mind and make design decisions that balance user
 needs and the rules laid down by the legislative and security focused environment within
 which INIS operates
 3. Build change management policy and procedures

 These should be built into the organisation structure & governance model, and equip the
 team with methodologies, tools & skills to support strategic business change initiatives.
 Start initially with a centre of excellence and over time, infuse change management
 competencies across the organisation

While the Service Delivery Strategy outlines a high-level road-map for delivering these
recommendations, it stops short of meeting the level of detail required. It has, therefore,
been used as an input only to this Service Improvement Plan, and is superseded by the
actions outlined within this plan.

       1.1.2. Developments in Public Sector Service Design

Service design is an increasingly important approach to improving public services by
streamlining processes and ensuring better customer experiences. A vital element of
Service Design is engaging with Service Users during the Service Design Process. The
Department of Public Expenditure and Reform has provided access to a toolkit on Service
Design Methodologies on its website.

On 12 January 2018, senior managers from across the Justice and Equality sector gathered

                                             8
at Dublin Castle for a Senior Management Conference.

The event focussed on developments in technology, on innovation through people and
design, and on designing services to meet user needs. During this event, the progress made
by bodies such as Cork County Council to enhance service delivery was outlined. This
triggered much subsequent debate about how services in the immigration sector might be
improved.

In addressing the Conference, the Acting Secretary General noted that “designing our
services in a targeted way - preferably in partnership with the customer - can solve complex
problems, help us to respond to ever-increasing demands and meet the legitimate public
expectations for greater efficiencies in the delivery of services”, and this is an idea which
has been explored further within INIS over the last three months.

         1.1.3. INIS Senior Management Forum

On 19 January 2018, senior managers from across the immigration sector (INIS, but also
IPAT, RIA, IRPP) gathered for a Senior Management Forum.

This event was the first such event to have been planned within the immigration services
over recent years. It particularly focused on the two strategic goals within the Department
Statement of Strategy for which INIS has responsibility:

        A Fair and Balanced Immigration and Protection Regime, and
        Developing our people, culture, systems and processes

Within the framework of these goals, participants were asked to identify areas of
organisational focus for the coming year.

Some of the main points which emerged during these discussions are included at Appendix
1.

         1.1.4. OnePlan 2018

The 2018 OnePlan was published in March 2018, and sets out the following strategic actions
to be advanced by INIS during 2018:

                                             9
OnePlan ID      Strategic action
 3.1.4.4         We will develop the necessary technical and legal infrastructure to
                 implement the PNR Directive and give effect to other EU measures
                 concerning police cooperation (Phase 2).
 3.4.1.2         We will ensure full implementation of Ireland’s opt-in to the EU Reception
                 of Asylum Seekers (recast) Directive, including the right to seek work.
 3.4.3.2         We will enhance Border Security including working with UK on further
                 enhancing security of the CTA (Phase 2).
 3.4.3.3         In conjunction with D/FAT, we will carry out a review of worldwide visa
                 service   and      commence      implementation   of   the    subsequent
                 recommendations.
 3.4.4.3         We will transfer Registration Functions from AGS to INIS.
 3.4.4.4         We will implement Process Changes to the service to improve its
                 productivity, quality and customer service such as delivery of online
                 services and improvements to data infrastructure and quality including
                 ICT supports for priority business objectives.
 3.4.5.1         With regard to implementing EU regulations, we will ensure a stringent
                 and effective approach to speedily refusing bogus applications and
                 facilitating removal from the State. We will increase cooperation with UK
                 in cracking down on the increasing numbers of bogus asylum seekers
                 applying for unmerited asylum status following expiry of their UK Visa.
 3.4.5.2         We will implement the new enforcement and deportation provisions in the
                 recently enacted International Protection Act 2015 to get tougher on
                 abuses of our migration system.

      1.1.5. 2018 INIS Business Plan

The senior management team agreed the 2018 INIS Business Plan in March 2018. It
captures all of the strategic actions outlined in the OnePlan, as well as a number of other
priorities for INIS. These are captured within seven core objectives for INIS during 2018,
and are outlined below.

                                             10
Objectives:                Actions to achieve these
1. Efficient processing -      Implement and review operational procedures for the single
of   all     immigration       application procedure with priority being given to case
cases                          processing and to reduce legacy cases on hands.
                           -   Implementation of administrative Right to Work scheme in line
                               with judgment regarding the right to work for those in the
                               protection process.
                           -   Opt-in to the EU (recast) Reception Conditions Directive
                           -   Implement the Irish Refugee Protection Programme including
                               operational aspects in the International Protection Office.
                           -   Process a broad range of applications for immigration status
                           -   Process cases for persons who have no right to remain in the
                               State in accordance with national law. Manage voluntary
                               returns and enforced removals as a last resort.
                           -   Process a broad range of visa categories with volumes
                               expected to exceed 120,000 in 2018.

2.      Brexit      and -      Continue to develop BREXIT strategy in relation to the CTA.
protecting           the
                           -   Work with the UK through the Common Travel Area Forum
Common Travel Area
                               (CTAF) on the ongoing operation of the Common Travel
                               Area.
                           -   Liaise with GNIB on periodic operations to protect the CTA.
                           -   Further enhance the security of the Common Travel Area.
                           -   Evaluate and agree the further rollout of the British Irish Visa
                               Scheme (BIVS) with UK partners.

3. Responsive Policy -         Administer and monitor schemes for encouragement of
Formation, including           entrepreneurs, business investments and other opportunities
EU Matters                     to encourage new business opportunities and inward
                               investment in Ireland.
                           -   Administer the Immigrant Investor Programme, and chair the
                               Investor Programme Steering Committee.

                                               11
-   Maintain monitoring role of international student regime.
                   -   Analyse legislation for future immigration needs
                   -   Implement new schemes approved by Minister and
                       Government, including the FRHAP, as well as changes
                       needed to respond to court judgments.
                   -   Commence the implementation of online applications starting
                       with a pilot scheme in Q2, for new schemes as they come on-
                       stream, and on a phased basis for other schemes.

4. Border          -   Continued rigorous control of Ireland’s borders.
Management and     -   Advance the operation of Electronic gates at Dublin Airport.
Security           -   Establish the Irish Passenger Information Unit in line with EU
                       decision and forthcoming legislation
                   -   Establish passenger data processing and analysis facility and
                       contribute to the introduction of PNR project.
                   -   Work with the US authorities on immigration related aspects
                       of US Visa Waiver Programme.
                   -   Further utilise technology to enhance border security
                       including though watchlists, access to case management
                       systems and interfaces to EU based systems.
                   -   Civilian Immigration Officers at DAP: review staffing and
                       operational model to include conditions of service and powers
                       of civilian IOs.
                   -   Conduct survey of requirements for the deployment of civilian
                       immigration control model to other airports/ports

5. An Ambitious    -   Maintain and enhance cooperation with other State agencies
Reform Programme       to ensure a more cohesive approach to immigration/protection
                       related matters and to ensure needs and rights of immigrants
                       are met and respected and that the immigration system
                       reflects wider public policy priorities.
                   -   Finalise and implement an INIS Service Delivery Strategy
                       2018-2020

                                          12
-   Consider the possibility of combining the new IRP card with
                             the Public Service Card
                         -   Integration of re-entry visa and registration functions
                         -   Commence the process of transferring responsibility for
                             registration of non-nationals who reside outside Dublin from
                             GNIB to INIS.
                         -   Under 16 year olds to be brought into the registration system,
                             commencing with 14-16 year olds.
                         -   Implement a series of reforms to the visa regime.
                         -   In conjunction with DFAT, carry out review of worldwide visa
                             service delivery and commence implementation of the
                             review.

6. Robust response to -      Actively manage and monitor cases in the Judicial Review
legal action                 process to ensure that appropriate decisions are taken and,
                             where appropriate, procedures are revised to take account of
                             Court judgements.
                         -   Examine the process to identify efficiencies and continue to
                             work with other agencies of the State in reforming the JR
                             process and addressing the backlog of cases on the Courts
                             Asylum list.

7. Corporate             -   Work with Human Resources Division to ensure that
functions that support       sufficient resources are available to deliver key services.
our work
                         -   Continue to provide training programmes for continuous
                             professional development.
                         -   Ensure the PMDS process is implemented for all staff.
                         -   Implement new technologies to improve service delivery to
                             customers including new on-line self service capabilities.
                         -   Enhanced INIS communications through website and all
                             communication channels
                         -   Provide research and statistical information for national, EU
                             and local management as required.
                                             13
-   Operate effective business planning in INIS

        1.1.6. INIS Service Improvement Drive

Following on from the INIS Senior Management Forum (see 1.2 above), the Director General
initiated an exercise at the end of January 2018 to identify opportunities for streamlining of
processes and procedures.

That exercise resulted in the submission of 76 suggestions for potential process
improvements, with about half of these identified as possible ‘quick-wins’ to be achieved
within the next 18 months or so. These areas on which rapid progress might be made are
summarised in the following five potential areas of focus.

 Area 1: Restructuring of INIS business areas, to include:

    -   Re-organisation of Repatriation Case Processing to form a Case Processing
        Support Unit and five focused case processing teams
    -   Introduce a triaging system for visa applications
    -   Outsource photocopying within the IPO
    -   Creation of specialised teams within the LSSU
    -   Set up a centralised investigation and liaison unit for all INIS
    -   Set up a centralised Training Unit
    -   The EU Funds Unit to take over the management of the returns aspect of the
        AIMF
    -   Create a new Communications Unit from within existing resources, incorporating
        Oireachtas Mail, Website, PQ and Policy Coordination teams.
    -   Regular staff mobility within the INIS.

 Area 2: Policy/process changes to improve efficiency:

    -   Domestic schemes – rationalisation of certain schemes or phasing out of certain
        schemes
    -   Moderation of threshold for granting permission to remain (PTR) in illegal cases

                                              14
-   Carry out a review of the Immigrant Investment Programme.
   -   Clear and streamlined policy on accounting processes for Travel Docs
   -   Postal renewal for low-risk customers, such as students on a multi-year degree
       course
   -   Providing for the granting of 3-year permissions for cases under 3(6) leading to
       granting of permission to remain as well as the consideration of applications for
       renewal of permission to remain from persons previously granted status.
   -   EUTR In Country & Domestic Schemes – improve the approach to investigation
       of immigration abuses.
   -   Process clarity on the read-across between EUTR and Domestic Scheme
       permissions granted under s.4(1) of the 2004 Act
   -   Review the documentation requirements for the various categories of visas.
   -   More efficient structuring of the removal process.
   -   Checking of passports and other ID documents be introduced at initial registration
       and at other strategic stages throughout a person’s interaction with immigration.

Area 3 ICT developments, including:

   -   Clear guidelines for all of INIS to reflect on AISIP whether an applicant has a
       passport
   -   Procurement of new appointment and queue management system for the
       Registration Office and re-entry visas
   -   Enhanced automation of invoicing for legal panel members
   -   Move away from reliance on paper based manual staff processing to decision
       making supported by technological advancements
   -   Enhance IT technology in the IPO to support a more streamlined business
       process.

                                            15
Area 4: Consolidation of legal expertise:

       -    Repatriation to co-operate with the IPO on a proposed new open competition to
            recruit new Panel Members, and to consider the appropriate fee level for Panel
            Members
       -    Legal actions in Citizenship cases to be centralised in the existing LSSU
       -    EUTR In Country & Domestic Schemes         - streamline efforts in relation to legal
            challenges.

 Area 5: Review of all INIS forms with a view to:

       -    Increase accessibility of language
       -    Streamline processes
       -    Improve data quality
       -    Ensure GDPR compliance
       -    Prepare for move to online forms

           1.1.7. Additional inputs of note

While the series of inputs outlined above is considerable, and highlights the complexity of
the landscape, this is not an exhaustive set of inputs. In devising this Service Improvement
Plan, we have also taken the following into account:

          Relevant departmental and public sector policies like our Culture and Values Charter.
           (See Appendix 3.)
          The recommendations included in Our Public Service 2020, including any new
           supports for innovation that are made available.
          The Department HR Strategy.
          The commitments relating to immigration from the Programme for a Partnership
           Government (see Appendix 4).
          Reports from the Effectiveness and Renewal Group (ERG).

                                                 16
We intend to monitor the progress of change and impact of the Plan through:

         Annual implementation plans which also incorporate actions emerging from future
          sectoral developments. (see Section 3 of this document); and

1.2       Pillars

The following five pillars have been selected to help shape the specific actions to be carried
out by INIS by the end of 2020.

Pillar 1 - Our mission, purpose and legislative context

Pillar 2 - Maintaining a safe and secure immigration system

Pillar 3 – Efficient and effective service delivery

Pillar 4 – Services designed based on customer needs

Pillar 5 – Investing resources in delivering change

1.3       Responsibilities

INIS Director General

The Director General of the Irish Naturalisation and Immigration Service is the programme
sponsor for this Service Improvement Plan. He will chair the Programme Board, which will
meet quarterly and include all members of the INIS Senior Management Team as well as
representatives from HR and ICT Divisions of the Department of Justice and Equality.

Programme Board

The Programme Board will communicate strategic direction and ensure consistency of
programme with overall strategy. It will also manage critical risks and issues, review
programme milestones, and be consulted on all major decisions.

                                               17
Change Management Unit

The INIS Change Management Unit (CMU), alongside all Project Managers throughout the
organisation, will serve as the Programme Team. This team will meet fortnightly to plan and
manage the execution of all aspects of the Service Improvement Plan.

Individual business responsibilities

Individual business responsibilities for each of the actions contained within this plan are
outlined in Section 2. Greater detail on implementation and governance structures and roles
are provided at Sections 3.

1.4   Structure of the report

The remainder of this document is structured as follows:

Section 2: Objectives
Section 3: Implementation, Monitoring and Review
Appendix 1: INIS Senior Management Forum – Key Points
Appendix 2: Refreshed INIS Service Delivery Strategy
Appendix 3: Culture and Values Charter
Appendix 4: Commitments from the Programme for a Partnership Government
References

                                            18
2. Pillars, Objectives and Actions

The following five pillars have been selected to help shape the specific actions to be
progressed by INIS over the coming three years.

Pillar 1 - Our mission, purpose and legislative context

Pillar 2 - Maintaining a safe and secure immigration system

Pillar 3 – Efficient and effective service delivery

Pillar 4 – Services designed based on customer needs

Pillar 5 – Investing resources in delivering change

All timelines in the tables below, apart from those projects already underway, are indicative
at this stage and will be settled during the preparation of the annual implementation plan
each year. Detailed annual implementation plans will be devised by the Programme Team
for approval by the Programme Board. Where resources might constrain our ability to deliver
upon any action, this will be clearly called out.

                                               19
Pillar 1 Our mission, purpose and legislative context

The current mission statement was prepared when INIS was established in 2005. Over
recent years, the role of the organisation has expanded.

Firstly, INIS took responsibility (from the Department of Foreign Affairs and Trade) for visa
processing. More recently, the registration of non-EEA nationals and border control at
Dublin Airport were civilianised and came within the remit of INIS. The enactment of the
International Protection Act saw the International Protection Office become part of INIS,
while the Irish Passenger Information Unit has been established as part of INIS in 2018

Review of mission and culture needed

Given these significant changes to the landscape in which we operate, it would therefore be
useful to consider a review of our current mission. We intend to carry out a review and
refresh of the INIS mission statement to be completed by Q1 2019. This will involve a deep
consultation with our own staff, stakeholders and customers.

Organisational culture can impact strongly on organisational performance. Action 18 of Our
Public Service 2020 encourages public sector organisations to undertake an asses their
culture and to follow up on areas that need improvement. We intend to carry out an
assessment of INIS culture and to prepare an action plan to assist in embedding the values
set out in the Department of Justice and Equality Culture and Values charter within INIS.

Legislation and the wider context

The legislation which underpins the immigration sector in Ireland impacts considerably on
our work. While the legislation relating to international protection was comprehensively
reformed through the International Protection Act 2015, other aspects of immigration have
not been revisited over recent years.       The Programme for Government contains a
commitment to “introduce a comprehensive Immigration and Residency Reform Bill, aimed
at modernising Ireland’s visa and residency systems”. A review of the legislative landscape
has started during 2018, and will be continued during the lifetime of this Plan.

While domestic legislation has a significant impact upon our work, so does the international
context in which we operate. Brexit and the European migration crisis can both be expected
                                             20
to require significant attention during the coming years, and the actions detailed below
represent our determination to manage the fallout from such events.

                                           21
Pillar 1 - Our mission, purpose and legislative context
Objectives            Actions                                                        Business Lead     Start Date   End Date
To review of our -        Establish a working group to oversee the review.           Change            Oct 18       Oct 18
mission and purpose                                                                  management unit
                      -   Engage an external facilitator to facilitate up to three                     Nov 18       Jan 19
                          workshops with staff.

                      -   Prepare a consultation strategy to engage with and                           Nov 18       Dec 18
                          gather feedback from staff and external stakeholders.

                      -   Consult with staff and external stakeholders including
                          community and voluntary bodies, other Departments                            Nov 18       Feb 19
                          and Offices, staff and the customers.

                      -   Prepare and publish new mission statement.                                   Feb 19       Mar 19

                                                                    22
Pillar 1 - Our mission, purpose and legislative context
Objectives                Actions                                                    Business Lead       Start Date   End Date
To      assess      our -     Engage with the Reform and Development Office in Change                    Mar 19       Mar 19
culture                       DPER to identify good practice in the review of management unit
                              organisational culture.

                          -   Undertake an analysis to see if the organisational                         Apr 19       May 19
                              culture aligns with the Departments defined culture
                              and values.

                          -   Create an Action Plan to address issues arising from                       Jun 19       Jul 19
                              the assessment.

                          -   Ongoing monitoring and assessment of culture to                            Aug 19       Q4 2020
                              ensure values are embedded.
To      introduce   an -      Research and drafting of New Migration Policy.         Policy              Sept 18      Oct 18
Immigration         and                                                              Development     &
Residency      Reform -       Draft 1 for circulation to INIS SMT.                   Legislative         Oct 18       Nov 18

Bill,     aimed      at                                                              Review
                          -   Final draft for decision at INIS SMT.                                      Nov 18       Nov 18
modernising

                          -   Collection and collation of change proposals for the                       On-going     Dec 18

                                                                      23
Pillar 1 - Our mission, purpose and legislative context
Objectives                Actions                                                     Business Lead     Start Date   End Date
Ireland’s visa and            legislation review.
residency systems.

To plan for Brexit -          Continue to develop a Brexit strategy in relation to the Border           On-going     Mar 19
and    protect      the       CTA.                                                    Management Unit
Common           Travel
Area                      -   Plan for “no-deal” scenario.                                              On-going     Mar 19

                          -   Evaluate and agree a further roll out of the BIVS Visa                    Q4 2018      Q4 2019
                              scheme.                                                 Division

                          -   Prepare a plan for the Registration of UK nationals.    Registration      On-going     Apr 19
                                                                                      Office
To     ensure       full -    New interim Right to Work scheme operating within Policy Division         Q1 2018      Q1 2018
implementation       of       timeframe set out by the Supreme Court.
Ireland’s opt-in to
the    EU    (recast) -       Support of Government and Oireachtas for opt-in to                        Q2 2018      Q2 2018

Reception                     directive.

Conditions Directive

                                                                      24
Pillar 1 - Our mission, purpose and legislative context
Objectives              Actions                                                       Business Lead        Start Date   End Date

Achieving our objectives will have these positive outcomes.
A clear mission and purpose and a positive organisational culture support organisational performance.
INIS will be in a strong position to deliver services to users in a pro-active, efficient and effective manner.
High levels of staff motivation and engagement.
Monitoring of progress using the following indicators
Level of staff engagement with initiatives.
Level of progress in introducing an Immigration and Residency Reform Bill.
Level of progress in preparing plan for the registration of UK Nationals in place.
Compliance with timelines as set out in project plans.
Outputs considered fit for purpose.

                                                                      25
Pillar 2 A safe and secure immigration system

The Service Delivery Strategy was an important resource in developing this plan, and it
identified the need for a shared service within INIS dealing with identity verification. This is
an important objective of Pillar 2. Such a shared service would provide all INIS business
areas with the tools to verify the identity of applicants, to check against international
watchlists, and to protect the security of our immigration system.

New technology

We will introduce a number of technology solutions to enhance border security, including
checking passenger information, automated checking of international watchlists at electronic
gates at ports of entry, alongside further civilianisation of frontline immigration controls.

Compliance and Anti-Fraud strategy

INIS should also consider preparing a Compliance and Anti-Fraud Strategy. We are aware
that such a strategy has delivered increased control for the Department of Employment
Affairs and Social Protection, and we believe that a similar initiative in the immigration sector
could set out clearly the actions we can take to help combat fraud and non-compliance
across all INIS schemes.

Building partnerships

Building on work already underway, we are going to increase efforts to build co-operation
with other government departments and agencies. This work will be carried out within the
frameworks provided by the Data Protection Act 2018 and the forthcoming Data Sharing and
Governance Bill.

Exit checks

A vital element of a secure immigration system is exit checks. Ireland is relatively unusual
in not having a comprehensive system of exit checks at airports and other ports of entry.
During 2019, we will commence a study to examine the merits of implementing exit checks.
This study will help us identify further actions for our 2019 and 2020 implementation plans

                                               26
Pillar 2 - A safe and secure immigration system
Objectives                  Actions                                                            Business Lead      Start Date   End Date
Implement            the -      Establish the Irish Passenger Information Unit in line Irish          Passenger Q1 2018        Q2 2018
Passenger         Name          with EU decision and forthcoming legislation.                  Information Unit
Record (PNR) Directive
                            -   Establish passenger data processing and analysis
                                facility and contribute to the introduction of PNR                                Sep 2018     Mar 2019
                                project.

                            -   Assess and identify the ICT requirements (software,
                                                                                                                  Sep 2018     Mar 2019
                                hardware,          staffing,       data       management,
                                support/maintenance on 24/7 basis) necessary to
                                permit IPIU to fully meet operational responsibilities in
                                respect of current phase (extra EU flights) and next
                                phases (intra EU flights and possibly other forms of
                                transport)

To develop an INIS- -           Merge the IILU and EU Treaty Rights Investigations EU Treaty Rights               Q2 2018      Q4 2018
wide   shared    service        Units      to   form   one     Identity   Verification   and
dealing   with   identity       Management Unit.
verification

                                                                              27
Pillar 2 - A safe and secure immigration system
Objectives                 Actions                                                           Business Lead     Start Date   End Date
                           -   Start   researching      the   requirements    of   an   ID                     Q3 2018      Q4 2018
                               Verifications & Validation shared service.

                           -   Examine the merits of preparing and implementing a Change                       Q3 2019      Q1 2020
                               Compliance & Anti-Fraud Strategy.                             Management Unit

To   enhance     border -      Complete 4 phases:                                            Border            Q1 2018      Q2 2019
security,      including                                                                     Management Unit
                                  o Phase 1 (installation of 20 eGates),
working with UK on
further      enhancing            o Phase 2 (CCTV and watchlist integration),
security of the CTA
                                  o Phase 3 (additional eGates for transfer
                                       facility), and

                                  o Phase 4 (Registered Travel Programme) of
                                       eGates development.

                           -   To work with An Garda Síochána to ensure Ireland’s                              Q4 2018      Q4 2019
                               participation in Schengen Information System (SIS II).

                                                                             28
Pillar 2 - A safe and secure immigration system
Objectives                  Actions                                                    Business Lead      Start Date   End Date
To               enhance -      Continue to engage with AGS and DEASP through the EU Treaty Rights        Q1 2018      Q4 2020
cooperation with AGS,           steering group and working group established by INIS
Revenue,         DEASP          in 2018.
regarding
                            -   Continue to exchange information with other Public INIS Divisions         Q1 2018      Q4 2020
investigations
                                Sector bodies and third party agencies to improve
                                efficiencies.
To examine the merits -         Phase 1 – Feasibility study to assess introducing exit BMU                Q1 2020      Q3 2020
and mechanisms for              checks in an Irish context.
the introduction of exit
checks
Administer           the -      Chair the Investor Programme Steering Committee.       Director General   Q1 2018      Q4 2020
Immigrant        Investor
Programme                   -   Commission an external review of the Immigrant Citizenship                Q3 2018      Q4 2018
                                Investor Programme.                                    Division

                            -   Implement the recommendations of the external                             Q4 2018      Q3 2019
                                review.

                                                                       29
Pillar 2 - A safe and secure immigration system
Objectives                 Actions                                                      Business Lead   Start Date   End Date
To     refuse    bogus -        Continue cooperation with the Garda National EU Treaty Rights           Q1 2018      Q4 2020
applications        and         Immigration Bureau (GNIB) on investigations through
facilitate removals from        Operation Vantage, targeting individuals suspected of
the State.                      sham marriages and in particular those facilitating
                                such activities.

                           -    Implement and enforce the deportation provisions in Repatriation        Q2 2018      Q4 2020
                                the International Protection Act.                       Division

Achieving our objectives will have these positive outcomes
Reduction in fraud and error.
Greater inter-agency co-operation.
Improved processes and procedures.
Monitoring of progress using the following indicators
Level of progress in introducing an INIS-wide shared service dealing with identity verification.
Compliance with timelines as set out in project plans.
Outputs considered fit for purpose.
Number of bogus applications refused and deportations effected.

                                                                        30
Pillar 3 Efficient and effective service delivery

Maintaining the security of our immigration systems is critical for INIS. Equally, we must
ensure that the services we provide are delivered in efficient and effective ways.

Eliminate backlogs

Over the lifetime of this plan, we will bring a renewed focus to eliminating processing
backlogs in key business areas, and particularly applications for international protection and
EU Treaty Rights. For example, it is planned to reach the stage of new international
protection cases being given a first instance decision within a nine month timeframe by the
end of 2019, assuming increased staffing levels and no change to the trend in application
numbers. The resources necessary to achieve this will be delivered through Pillar 5 of this
Plan.

Create greater savings for border control

The civilianisation of border control at Dublin Airport has led to significant savings for the
exchequer. Before civilianisation, the cost of this function was €7m per annum. These costs
have now fallen to €3m per annum. We believe that further civilianisation of border control
and registration functions can deliver further such efficiencies over the coming years.

Invest in ICT

For INIS services to be effective, we need ICT systems which are owned and operated by
INIS, and which have a considerably greater level of interoperability than is currently the
case. The actions below set out how we intend to achieve this.

Additionally, technological advances present the opportunity for the introduction of some
aspects of auto-decisioning using data analytics to inform the risk level of such processes.
It is planned to begin exploring such options during 2019, with further actions to be
subsequently defined. Any changes in this area will be made in a manner which respects
the GDPR right to not be subject to a decision based solely on automated decision making

                                             31
Pillar 3 - Efficient and effective service delivery
Objectives                Actions                                                       Business Lead      Start Date   End Date
To       review    our -      Templates to issue to all INIS divisions to support Corporate                Jan 19       Feb 19
process       operating       process mapping.                                          Affairs Division
model taking an end-                                                                    and
                          -   Each Division to prepare a process map for their areas                       Feb 19       Apr 19
to-end      immigration                                                                 INIS Divisions
                              of responsibility.
lifecycle
perspective.              -   Collate the process maps to develop an overview of the                       Apr 19       Jun 19
                              current journey through INIS.

                          -   Examine how the process could be improved.                                   Jun 19       Dec 19

                          -   Seek to rationalise or phase out certain domestic                            Jun 19       Dec 19
                              residence schemes.

                          -   Manage and monitor cases in the Judicial Review                              Q1 2018      Q4 2020
                              process to ensure that appropriate decisions are taken,
                              and that Court judgements are used to inform revisions
                              to procedures.

                                                                     32
-   Consolidate activity and capacity relating to Judicial
                              Review management within the Legal Services Support                      Q1 2018   Q3 2018
                              Unit (LSSU).

                          -   Creation of specialised teams within the LSSU.
                                                                                                       Q3 2018   Q4 2018
To implement and -            Reduce maximum processing times to 9 months for first IPO                Q1 2018   Q1 2020
review   operational          instance decisions on new cases.
procedures for the
                          -   Prioritise International Protection Office (IPO) resources               Q1 2018   Q4 2020
single      application
                              for case processing while ensuring that all non-
procedure,         and
                              processing work is efficiently serviced in line with
focus on elimination
                              statutory obligations.
of          processing
backlogs.                                                                                              Q1 2018   Q1 2019
                          -   Legacy cases carried over to new single procedure to be
                              all scheduled for interview by end of 2018 and processed
                              to completion by early 2018.

                          -   Provide additional staffing to key processing areas                      Q2 2018   Q4 2018

                              (detailed at Pillar 5).

                          -   Make maximum use of the IPO case Processing Panel                        Ongoing   Q4 2020
                                                                                           Corporate
                                                                                           Affairs

                                                                        33
-   Explore options to reduce administrative burden on staff                 Q3 2018   Q4 2018
                                resulting from existing paper-based processes.

To implement new -              Introduction of new scheme to allow refugees (and some Policy Division   Q1 2018   Q4 2018
schemes approved                others) who have eligible family members from the
by      Minister       to       UNHCR listing of top 10 major source countries of
respond     to     policy       refugees to apply to have these family members join
and                 legal       them in Ireland.
developments                                                                                             Q3 2018   Q2 2019
                            -   Bring forward a scheme to address the need of
                                significant cohort of undocumented former students who
                                came here a number of years ago.

To       continuously -         Prepare manuals documenting procedures for all All                  INIS Q4 2018   Q2 2019
improve control and             processing sections in line with what already exists in Divisions
compliance       across         some INIS areas (linked to processing mapping action
all     schemes        to       identified above).
reduce    fraud      and
                            -   Examine    the     merits   of   implementing   a   quality              Q3 2019   Q1 2020
error
                                management system for INIS and consider options for

                                                                          34
overseeing implementation, for example through the
                            creation of a Quality Office. This will include a review of
                            any existing quality assurance systems.

To    continue       to -   Payroll review to be carried out twice a year in line with Finance        Unit, Q1 2018   Q4      2018
improve     corporate       Internal Audit recommendation.                                Reporting     &             (with
governance       and                                                                      Analysis    Unit            further
financial               -   A permanent accountant to be recruited to assist with and all             INIS            actions to
management       and        financial management in INIS.                         divisions                           be
reporting systems.                                                                                                    subsequen
                        -   Provide monthly statistical information to INIS senior
                                                                                                                      tly
                            management team, including data on applications,
                                                                                                                      identified)
                            decisions, and so on.

                        -   Develop business plans and risk registers for each
                            division within INIS to be monitored by INIS senior
                            management team and to feed into the overall business
                            planning cycle.

                        -   Implement internal audit recommendations for visas,
                            registration and citizenship fees.

                        -   Use online forms to improve automation of invoicing for
                                                                      35
legal panel members.

To     progress    the -     Investigate options to civilianise the 75 registration Registration        Q3 2018   Q2 2019
civilianisation     of       offices around the country.                                Office
registration      and                                                                   BMU
border management -          Review staffing and operational model to include                           Q3 2018   Q4 2018

functions                    conditions of service and powers of civilian immigration
                             control officers.

                         -   Conduct survey of requirements for the deployment of BMU                   Nov 18    April 19
                             civilian immigration control model to other ports of entry.

To review worldwide -        Review Visa Processes and Procedures.                      Visa Division   Q2 2018   Q4 2018
visa   services   and
                         -   Implement recommendations arising from review.                             Q4 2018   Ongoing
implement      process
improvements             -   Business Process Review: 2018 Visa Initiatives,                            Ongoing   Q1 2019
across            visa       including:
processing
                                o UK Home Office Platform Changes;

                                o TelePerformance (TP) Contract;

                                                                     36
o Examination of LIDPRO as a tool for document
                               management;
                            o AVATS Support & Maintenance Contract.

                     -   Examine the contribution that upgraded technology and                 Q4 2018    Q4 2019
                         external service delivery can make to a more efficient
                         VISA Process.

To ensuring all IT -     Prepare the requirements for a replacement GNIB-IS.      Change       April 18   Oct 18
systems are owned                                                                 Management
and    operated   by -   Procurement of new registration system.                  Unit         Jul 18     Sep 19

INIS
                     -   Manage the delivery of new registration system.                       Sep 19     Jul 20

                     -   To explore options for support services for systems                   Mar 19     Dec 19
                         operating on a 24/7 basis.

                                                                37
To            improve -       Creation of a Single Data Repository and Data Reporting                    and Q2 2018   Q2 2019
reporting,         data       Dictionaries for INIS.                                         Analysis Unit
analysis           and
statistical               -   Restructure the Reporting and Analysis Unit to train staff                     Q2 2018   Q2 2019

capabilities of INIS,         in SQL, R and data analysis.

and to introduce
                          -   Focussed effort to improve data quality across INIS.                           Q2 2018   Q2 2019
auto-decisioning
using data analytics
                          -   Provide guidelines on data governance across INIS.                             Q2 2018   Q2 2019

                          -   Carry out an initial examination of potential areas to pilot                   Q3 2019   Q4 2019
                              auto-decisioning using data analytics.

                          -   Automation of statutory and scheduled reports                                  Q2 2018   Q2 2019

Achieving our objectives will have these positive outcomes
Enhanced corporate governance.
Improved processes and procedures.
Enhanced data quality and governance
Monitoring of progress using the following indicators
Level of control activity against targets.
Level of progress in introducing replacement GNIB-IS system

                                                                         38
Compliance with timelines as set out in project plans
Outputs considered fit for purpose
Number of reports automated, and proportion of time devoted to data analysis

                                                                39
Pillar 4 Service design based on customer needs

As discussed in section 1, our current arrangements for service delivery are reliant on a
number of ICT systems that have limited interoperability, and our processes are heavily
dependent on paper based processing.          This means that our customers are typically
required to contact us by post, and it means that processing times are longer than they could
be.

While continuing to protect the safety and security of the immigration service, we believe it
is possible to dramatically improve the service we provide to our customers. Doing so will
require a shift in mind-set towards one which puts the needs of our customers at the heart
of how we design our services.

Pre-clearance schemes

During 2018, we will begin to introduce preclearance schemes so that those who wish to
come and live here for specific purposes can have their applications for residence processed
before they arrive in Ireland. The lessons we learn from the first such schemes will be used
to inform a wider rollout of this approach.

A project is currently underway to allow people to apply for some schemes online, which will
include the ability to make payments and submit documentation, and to receive case
updates through an online portal. This service will be extended to all major INIS schemes
by the end of 2019.

Plain language

We will shift towards the use of plain language in all our communications. This will require
the training of staff, and we will begin by editing our publications, our forms and our website
to ensure that the information we offer to the public is provided in plain language.

Customer feedback

More fundamentally, to truly incorporate service design thinking into our work, we need to
begin by measuring the views of our customers on the services we currently provide. We
                                         40
will develop mechanisms to continually gather and assess customer feedback, and to use
this feedback in iterative developments of our systems and processes.

                                           41
Pillar 4 Service design based on customer needs
Objectives              Actions                                                           Business Lead   Start Date   End Date
Pre-clearance           -   Introduce preclearance schemes for volunteers and Policy Division             Q1 2018      Q2 2018
schemes to allow            Ministers of religion.
customers          to
                        -   Introduce preclearance schemes for retirees and carers. Policy Division       Ongoing      TBC
apply             for
residence               -   Review the implementation of the preclearance schemes
permissions                 and examine the merits of extending to other schemes.                         Q4 2018      Q1 2019
before             to
travelling

To           produce -      Phase 1 - delivery of online forms, payments and Corporate                    Jul 18       Sep 18
secure         online       document collection for two initial schemes.                  Affairs
forms,
                        -   Phase 2 - delivery of workflow management tools for                           Sept 18      Nov 18
incorporating
                            initial forms.
shared       services
for            online -     Phase 3 – full Integration with AISIP.                                        Oct 18       Dec 18
payments
                        -   Phase 4 – delivery of online forms for all INIS application                   Sep 18       Dec 19
                            types.

                                                                         42
Pillar 4 Service design based on customer needs
Objectives                Actions                                                       Business Lead   Start Date   End Date
                          -   Phase 5 – security audit of INIS online forms                             Jan 19       Mar 19

To   use          plain -     Create one INIS Communications Unit made up of staff      Communication   Q2 2018      Q2 2018
English      in     all       currently working on communications and co-ordination     s Unit
communications                tasks.

                          -   Establish INIS communications network and work on a                       Q2 2018      Q4 2018
                              refresh of the website content.

                          -   Provide plain English training for communications                         Q2 2018      Q2 2018
                              network.

                          -   Provide plain English training for senior management                      Q3 2018      Q3 2018
                              team.

                          -   Re-design all INIS application forms in plain language.                   Q2 2018      Q3 2018

                          -   Introduce a monthly internal newsletter.                                  Q3 2018      Q4 2020

                                                                         43
Pillar 4 Service design based on customer needs
Objectives             Actions                                                         Business Lead   Start Date   End Date
To   introduce     a -     Prepare a business case and secure approval.                Registration    Jan 19       Jan 19
new appointment                                                                        Office
system           and -     Prepare tender documentation.                                               Jan 19       Mar 19

queue
                       -   Run procurement process.                                                    Mar 19       Nov 19
management
system     for   the
                       -   Manage the delivery of the system.                                          Jan 20       Jun 20
Registration and
Re-entry         visa -    Consider the possibility of combining the new IRP card                      Ongoing      Nov 18
office                     with the Public Service Card/shared service delivery with
                           the Department of Employment Affairs and Social
                           Protection.

                       -   Under 16 year olds to be brought into the registration                      Ongoing      Dec 2019
                           system, commencing with 14-16 year olds.

                       -   Postal renewal for low-risk customers, such as students                     Ongoing      Q3 2019
                           on a multi-year degree course.

                                                                      44
Pillar 4 Service design based on customer needs
Objectives               Actions                                                         Business Lead   Start Date   End Date
To     incorporate -         Review the Service Design Toolkit in DPER and identify Change               Oct 18       Dec 18
service      design          relevant training.                                          Management
methodologies                                                                            Unit
into       process -         Engage with other Government Departments who have                           Oct 18       Mar 19

design                       experience in this area to learn from their practices.

                         -   Select pilot project for development using service design                   Jan 19       Jun 19
                             methodologies.

                         -   Identify customer requirements and profiles, and                            Jan 19       Dec 19
                             establish customer satisfaction levels through regular
                             surveys and through        the   provision   of feedback
                             mechanisms.

To             have -        Translate essential material from the website into other Corporate          Q4 2019      Q2 2020
accessible                   languages.                                                  Affairs
services     for   all
customers                -   Translate signage in public offices into key foreign                        Q3 2019      Q1 2020
                             languages.

                                                                          45
Pillar 4 Service design based on customer needs
Objectives          Actions                                                           Business Lead   Start Date   End Date
                    -   To consider technological solutions to allow staff in the                     Q1 2020
                        Public Office deal effectively with customers with
                        disabilities or with poor English language skills. E.g.
                        tablets with accessibility options or access to translation
                        software.

                                 Achieving our objectives will have these positive outcomes
Quality customer centred services.
Strong awareness and understanding of customers’ needs.
Increased self-service through digital provision.
Good internal communications.
                                     Monitoring of progress using the following indicators
The level of, and trends in, customer service satisfaction measures.
Number of forms conforming to GDPR and plain English guidelines.
Level of staff engagement.
Level of progress in introducing new appointment booking system and queue management system in the public office.

                                                                     46
Pillar 5 Investing resources to deliver change

A change programme on the scale set out within this Service Improvement Plan needs
resources to make it happen. INIS will establish a Change Management Unit to lead this
work. This new unit will work to develop the skills, capacity and behaviours of everyone in
the organisation. It will focus on embedding change management and project
management capabilities.

Increase staff numbers

The need to target some additional staff resources for a short period of time is also widely
accepted. Sanction has been granted for staff numbers to rise by 76 in 2018 to help
eliminate backlogs while service improvements are underway. The intention is that staff
numbers can return when the Plan is fully implemented.

Invest in systems and infrastructure

INIS also needs to invest to develop our systems and infrastructure. In 2017, INIS spent
€4.9m on technology supports, but this figure is expected to rise to €7.1m in 2018 and
further still over the years covered of this Plan so we can transform existing systems.

This need was recognised in the National Development Plan 2018-2027, which noted that
“ongoing investment is required by the Irish Naturalisation and Immigration Service over the
next 5-to-10-year period, to underpin an ICT strategy designed to transform and modernise
service delivery through greater use of automated processes and to protect the security of
the State”.

Strategic direction of opportunities

We recognise and value the skills, expertise and commitment of our staff. Another action
under this pillar is to ensure that learning and development opportunities are directed in a
strategic way. This can be achieved through setting up a skills matrix which will benefit both
the organisation and the individual and will be prepared in consultation with staff. The
benefits are set out in the table below.

                                             47
Benefits of a skills Advantages
matrix

Individual          Insight into their own competency and skills and areas of
                    improvement.

Team                Overview of the skill they have and areas where they need to
                    develop new skills

Organisational      Overview of available competencies and areas that need
                    investment. Can also aid in succession planning

                                    48