Service Improvement Plan 2018-2020 Irish Naturalisation and Immigration Service 1
Document version control Version Update Author Date 2.0 Final version for publication INIS Change October 2018 Management Unit - Neil Ward and Richael Duffy 2
Table of contents Foreword.............................................................................................................................. 5 1. Introduction ...................................................................................................................... 6 1.1. Background ............................................................................................................ 6 1.1.1. INIS Service Delivery Strategy ............................................................................ 7 1.1.2. Developments in Public Sector Service Design ................................................... 8 1.1.3. INIS Senior Management Forum ......................................................................... 9 1.1.4. OnePlan 2018 ..................................................................................................... 9 1.1.5. 2018 INIS Business Plan ................................................................................... 10 1.1.6. INIS Service Improvement Drive ....................................................................... 14 1.1.7. Additional inputs of note .................................................................................... 16 1.2 Pillars .................................................................................................................... 17 1.3 Responsibilities ..................................................................................................... 17 1.4 Structure of the report ........................................................................................... 18 2. Pillars, Objectives and Actions .................................................................................... 19 Pillar 1 Our mission, purpose and legislative context ..................................................... 20 Pillar 2 A safe and secure immigration system ............................................................... 26 Pillar 3 Efficient and effective service delivery ................................................................ 31 3
Pillar 4 Service design based on customer needs .......................................................... 40 Pillar 5 Investing resources to deliver change ................................................................ 47 3. Implementation, Monitoring and Review ........................................................................ 53 3.1 Risk Assessment .................................................................................................. 53 3.2 Monitoring and Reporting ..................................................................................... 53 3.3 Governance .......................................................................................................... 54 Appendix 1 – INIS Senior Management Forum – Key discussion points ........................... 60 Appendix 2 – Refreshed INIS Service Delivery Strategy ................................................... 61 Appendix 3 – Culture and Values Charter.......................................................................... 62 Appendix 4 – Commitments from the Programme for a Partnership Government ............. 65 Appendix 5 – Service Improvement Plan 2018-2020 High level Risk Register .................. 66 References ........................................................................................................................ 69 List of Acronyms ................................................................................................................ 70 4
Foreword The Irish Naturalisation and Immigration Service (INIS) has grown considerably in scale and scope since it was established in 2005. INIS now comprises approximately one third of all staff in the Department of Justice and Equality, and we process over 250,000 applications a year – for visas, registration of non-EEA nationals, residence permissions, international protection and citizenship. In addition, up to 16 million passengers are expected to be immigrated by INIS through Dublin Airport. It is clear to all of us working in immigration services that the demands we will face are likely to continue to grow over the coming years. Meeting those demands requires that we seek to deliver our services in different ways, and not just ask our staff to work harder. In a rapidly changing international context, we must also become a more nimble organisation, and one which focusses on delivering high quality services to all of our customers. This Service Improvement Plan sets out our plans to achieve all of this between now and the end of 2020. Every business area within INIS has been involved in its development, and I appreciate the efforts involved by all of our teams. The plan has also benefitted from inputs from members of the Management Board, and from staff in other business areas across the Department of Justice and Equality. The assistance of the National Adult Literacy Agency (NALA) was also valuable in carrying out a plain language edit of this document, to make sure that this document will be accessible to all staff and stakeholders. This Service Improvement Plan is ambitious in scope. But it is also realistic – these actions can be delivered within the timeframes set out here, and a strong Programme Board will be established to make sure that is the case. Detailed Annual Implementation Plans will ensure that we are all held to account for the commitments we are making in this plan. It’s an exciting time to be working in INIS, and in the Department more broadly – I have no doubt that this plan will evolve as we meet these and fresh challenges in the years ahead. Michael Kirrane Director General Irish Naturalisation and Immigration Service 5
1. Introduction This plan sets out the strategic priorities, objectives and actions for the Irish Naturalisation and Immigration Service (INIS) to improve our services over the period 2018-2020. It takes account of the available funding, ongoing projects and what can be delivered by realistic and achievable objectives to improve the efficiency and effectiveness of the services provided. The plan promotes the principle of designing our services around our customers’ needs. It draws on the work completed as part of the Service Delivery Strategy for INIS and the objectives and actions are consistent with the priorities of the 2018 INIS Business Plan and OnePlan2018 as well as the broader Public Sector reform agenda. 1.1. Background In 2017 INIS processed almost 214,000 applications across the various business areas, completed 75,000 registrations in the Burgh Quay Registration Office and processed 15 million inbound passengers at Dublin Airport. Registrations increased by 15% and traffic through Dublin Airport increased by 20%. The current arrangements for service delivery rely on a number of information and communication technology (ICT) systems that have limited interoperability, and our processes are heavily dependent on paper-based processing. In the absence of an organisation-wide review of processes and investment in technology to introduce efficiencies, we would need to keep increasing our staff numbers as demand for our services continues to grow. This is not sustainable. In addition, there is a growing need to develop or replace current infrastructure. As we look to the future, our current approaches to service delivery will become ever more challenging. The quality of service we provide would reduce, while the capacity of our staff would be outstripped by the demands placed upon them. We already have a number of projects underway which are aimed at improving our services, and this plan has been informed by significant preparatory work which has been carried out within INIS over the last 18 months. These and other inputs are summarised below. 6
1.1.1. INIS Service Delivery Strategy In February 2017, the INIS senior management team agreed a medium-term service delivery strategy for immigration services. This work has recently been refreshed, and the updated version is available at Appendix 2. The key observations of the current landscape within INIS outlined in that document are: The IT systems are complex and do not share information efficiently. There are three process models supported across five IT platforms with minimal interoperability. This makes it difficult to gather all the information needed to create a full profile of an individual. It is also an expensive model to maintain, driving inefficiencies and complicating governance. The role of INIS has extended to encompass Border Management and Registration services exacerbating existing challenges. The IT system that supports these services, GNIB-IS, is outdated. Support for the operating system has not been available since 2008. INIS’ ability to respond speedily to legislative, policy and security change agendas is hampered by the complexity and ownership of the current IT systems landscape and its capability to deliver requirements. As demand for INIS services continues to grow low levels of investment in digital and self-service technologies continues to contribute to an inefficient use of resources, poor customer service and lengthy processing times. Limited focus on data quality standards and controls has led to trust issues with the current data set, which is compounded by high volumes of paper handling and paper file management. Access to information to underpin decision making and to validate a person’s identity can be incomplete, inaccurate, or inaccessible. This leads to lengthy processing times and inconsistent decision making, exposing INIS to external threats. Gap between the demand for service support hours and the supply model. This is the case with the visa process globally and at ports of entry where the need is for a 24- hour support service, 365 days a year. From these observations, and from efforts to position the organisation with regard to the 7
future landscape, the Service Delivery Strategy focussed on three main recommendations: 1. Invest in up-to-date technologies This investment would introduce efficiencies, whilst at the same time eliminate barriers to confident, consistent and compliant decision-making practices, with an approach that aligns to the Public Service Reform and ICT Strategies. 2. Review the current immigration processes Such a review should examine processes from start to finish. This includes examining all parts – that is, applications, border procedures and registrations. The review should be conducted with the service user in mind and make design decisions that balance user needs and the rules laid down by the legislative and security focused environment within which INIS operates 3. Build change management policy and procedures These should be built into the organisation structure & governance model, and equip the team with methodologies, tools & skills to support strategic business change initiatives. Start initially with a centre of excellence and over time, infuse change management competencies across the organisation While the Service Delivery Strategy outlines a high-level road-map for delivering these recommendations, it stops short of meeting the level of detail required. It has, therefore, been used as an input only to this Service Improvement Plan, and is superseded by the actions outlined within this plan. 1.1.2. Developments in Public Sector Service Design Service design is an increasingly important approach to improving public services by streamlining processes and ensuring better customer experiences. A vital element of Service Design is engaging with Service Users during the Service Design Process. The Department of Public Expenditure and Reform has provided access to a toolkit on Service Design Methodologies on its website. On 12 January 2018, senior managers from across the Justice and Equality sector gathered 8
at Dublin Castle for a Senior Management Conference. The event focussed on developments in technology, on innovation through people and design, and on designing services to meet user needs. During this event, the progress made by bodies such as Cork County Council to enhance service delivery was outlined. This triggered much subsequent debate about how services in the immigration sector might be improved. In addressing the Conference, the Acting Secretary General noted that “designing our services in a targeted way - preferably in partnership with the customer - can solve complex problems, help us to respond to ever-increasing demands and meet the legitimate public expectations for greater efficiencies in the delivery of services”, and this is an idea which has been explored further within INIS over the last three months. 1.1.3. INIS Senior Management Forum On 19 January 2018, senior managers from across the immigration sector (INIS, but also IPAT, RIA, IRPP) gathered for a Senior Management Forum. This event was the first such event to have been planned within the immigration services over recent years. It particularly focused on the two strategic goals within the Department Statement of Strategy for which INIS has responsibility: A Fair and Balanced Immigration and Protection Regime, and Developing our people, culture, systems and processes Within the framework of these goals, participants were asked to identify areas of organisational focus for the coming year. Some of the main points which emerged during these discussions are included at Appendix 1. 1.1.4. OnePlan 2018 The 2018 OnePlan was published in March 2018, and sets out the following strategic actions to be advanced by INIS during 2018: 9
OnePlan ID Strategic action 3.1.4.4 We will develop the necessary technical and legal infrastructure to implement the PNR Directive and give effect to other EU measures concerning police cooperation (Phase 2). 3.4.1.2 We will ensure full implementation of Ireland’s opt-in to the EU Reception of Asylum Seekers (recast) Directive, including the right to seek work. 3.4.3.2 We will enhance Border Security including working with UK on further enhancing security of the CTA (Phase 2). 3.4.3.3 In conjunction with D/FAT, we will carry out a review of worldwide visa service and commence implementation of the subsequent recommendations. 3.4.4.3 We will transfer Registration Functions from AGS to INIS. 3.4.4.4 We will implement Process Changes to the service to improve its productivity, quality and customer service such as delivery of online services and improvements to data infrastructure and quality including ICT supports for priority business objectives. 3.4.5.1 With regard to implementing EU regulations, we will ensure a stringent and effective approach to speedily refusing bogus applications and facilitating removal from the State. We will increase cooperation with UK in cracking down on the increasing numbers of bogus asylum seekers applying for unmerited asylum status following expiry of their UK Visa. 3.4.5.2 We will implement the new enforcement and deportation provisions in the recently enacted International Protection Act 2015 to get tougher on abuses of our migration system. 1.1.5. 2018 INIS Business Plan The senior management team agreed the 2018 INIS Business Plan in March 2018. It captures all of the strategic actions outlined in the OnePlan, as well as a number of other priorities for INIS. These are captured within seven core objectives for INIS during 2018, and are outlined below. 10
Objectives: Actions to achieve these 1. Efficient processing - Implement and review operational procedures for the single of all immigration application procedure with priority being given to case cases processing and to reduce legacy cases on hands. - Implementation of administrative Right to Work scheme in line with judgment regarding the right to work for those in the protection process. - Opt-in to the EU (recast) Reception Conditions Directive - Implement the Irish Refugee Protection Programme including operational aspects in the International Protection Office. - Process a broad range of applications for immigration status - Process cases for persons who have no right to remain in the State in accordance with national law. Manage voluntary returns and enforced removals as a last resort. - Process a broad range of visa categories with volumes expected to exceed 120,000 in 2018. 2. Brexit and - Continue to develop BREXIT strategy in relation to the CTA. protecting the - Work with the UK through the Common Travel Area Forum Common Travel Area (CTAF) on the ongoing operation of the Common Travel Area. - Liaise with GNIB on periodic operations to protect the CTA. - Further enhance the security of the Common Travel Area. - Evaluate and agree the further rollout of the British Irish Visa Scheme (BIVS) with UK partners. 3. Responsive Policy - Administer and monitor schemes for encouragement of Formation, including entrepreneurs, business investments and other opportunities EU Matters to encourage new business opportunities and inward investment in Ireland. - Administer the Immigrant Investor Programme, and chair the Investor Programme Steering Committee. 11
- Maintain monitoring role of international student regime. - Analyse legislation for future immigration needs - Implement new schemes approved by Minister and Government, including the FRHAP, as well as changes needed to respond to court judgments. - Commence the implementation of online applications starting with a pilot scheme in Q2, for new schemes as they come on- stream, and on a phased basis for other schemes. 4. Border - Continued rigorous control of Ireland’s borders. Management and - Advance the operation of Electronic gates at Dublin Airport. Security - Establish the Irish Passenger Information Unit in line with EU decision and forthcoming legislation - Establish passenger data processing and analysis facility and contribute to the introduction of PNR project. - Work with the US authorities on immigration related aspects of US Visa Waiver Programme. - Further utilise technology to enhance border security including though watchlists, access to case management systems and interfaces to EU based systems. - Civilian Immigration Officers at DAP: review staffing and operational model to include conditions of service and powers of civilian IOs. - Conduct survey of requirements for the deployment of civilian immigration control model to other airports/ports 5. An Ambitious - Maintain and enhance cooperation with other State agencies Reform Programme to ensure a more cohesive approach to immigration/protection related matters and to ensure needs and rights of immigrants are met and respected and that the immigration system reflects wider public policy priorities. - Finalise and implement an INIS Service Delivery Strategy 2018-2020 12
- Consider the possibility of combining the new IRP card with the Public Service Card - Integration of re-entry visa and registration functions - Commence the process of transferring responsibility for registration of non-nationals who reside outside Dublin from GNIB to INIS. - Under 16 year olds to be brought into the registration system, commencing with 14-16 year olds. - Implement a series of reforms to the visa regime. - In conjunction with DFAT, carry out review of worldwide visa service delivery and commence implementation of the review. 6. Robust response to - Actively manage and monitor cases in the Judicial Review legal action process to ensure that appropriate decisions are taken and, where appropriate, procedures are revised to take account of Court judgements. - Examine the process to identify efficiencies and continue to work with other agencies of the State in reforming the JR process and addressing the backlog of cases on the Courts Asylum list. 7. Corporate - Work with Human Resources Division to ensure that functions that support sufficient resources are available to deliver key services. our work - Continue to provide training programmes for continuous professional development. - Ensure the PMDS process is implemented for all staff. - Implement new technologies to improve service delivery to customers including new on-line self service capabilities. - Enhanced INIS communications through website and all communication channels - Provide research and statistical information for national, EU and local management as required. 13
- Operate effective business planning in INIS 1.1.6. INIS Service Improvement Drive Following on from the INIS Senior Management Forum (see 1.2 above), the Director General initiated an exercise at the end of January 2018 to identify opportunities for streamlining of processes and procedures. That exercise resulted in the submission of 76 suggestions for potential process improvements, with about half of these identified as possible ‘quick-wins’ to be achieved within the next 18 months or so. These areas on which rapid progress might be made are summarised in the following five potential areas of focus. Area 1: Restructuring of INIS business areas, to include: - Re-organisation of Repatriation Case Processing to form a Case Processing Support Unit and five focused case processing teams - Introduce a triaging system for visa applications - Outsource photocopying within the IPO - Creation of specialised teams within the LSSU - Set up a centralised investigation and liaison unit for all INIS - Set up a centralised Training Unit - The EU Funds Unit to take over the management of the returns aspect of the AIMF - Create a new Communications Unit from within existing resources, incorporating Oireachtas Mail, Website, PQ and Policy Coordination teams. - Regular staff mobility within the INIS. Area 2: Policy/process changes to improve efficiency: - Domestic schemes – rationalisation of certain schemes or phasing out of certain schemes - Moderation of threshold for granting permission to remain (PTR) in illegal cases 14
- Carry out a review of the Immigrant Investment Programme. - Clear and streamlined policy on accounting processes for Travel Docs - Postal renewal for low-risk customers, such as students on a multi-year degree course - Providing for the granting of 3-year permissions for cases under 3(6) leading to granting of permission to remain as well as the consideration of applications for renewal of permission to remain from persons previously granted status. - EUTR In Country & Domestic Schemes – improve the approach to investigation of immigration abuses. - Process clarity on the read-across between EUTR and Domestic Scheme permissions granted under s.4(1) of the 2004 Act - Review the documentation requirements for the various categories of visas. - More efficient structuring of the removal process. - Checking of passports and other ID documents be introduced at initial registration and at other strategic stages throughout a person’s interaction with immigration. Area 3 ICT developments, including: - Clear guidelines for all of INIS to reflect on AISIP whether an applicant has a passport - Procurement of new appointment and queue management system for the Registration Office and re-entry visas - Enhanced automation of invoicing for legal panel members - Move away from reliance on paper based manual staff processing to decision making supported by technological advancements - Enhance IT technology in the IPO to support a more streamlined business process. 15
Area 4: Consolidation of legal expertise: - Repatriation to co-operate with the IPO on a proposed new open competition to recruit new Panel Members, and to consider the appropriate fee level for Panel Members - Legal actions in Citizenship cases to be centralised in the existing LSSU - EUTR In Country & Domestic Schemes - streamline efforts in relation to legal challenges. Area 5: Review of all INIS forms with a view to: - Increase accessibility of language - Streamline processes - Improve data quality - Ensure GDPR compliance - Prepare for move to online forms 1.1.7. Additional inputs of note While the series of inputs outlined above is considerable, and highlights the complexity of the landscape, this is not an exhaustive set of inputs. In devising this Service Improvement Plan, we have also taken the following into account: Relevant departmental and public sector policies like our Culture and Values Charter. (See Appendix 3.) The recommendations included in Our Public Service 2020, including any new supports for innovation that are made available. The Department HR Strategy. The commitments relating to immigration from the Programme for a Partnership Government (see Appendix 4). Reports from the Effectiveness and Renewal Group (ERG). 16
We intend to monitor the progress of change and impact of the Plan through: Annual implementation plans which also incorporate actions emerging from future sectoral developments. (see Section 3 of this document); and 1.2 Pillars The following five pillars have been selected to help shape the specific actions to be carried out by INIS by the end of 2020. Pillar 1 - Our mission, purpose and legislative context Pillar 2 - Maintaining a safe and secure immigration system Pillar 3 – Efficient and effective service delivery Pillar 4 – Services designed based on customer needs Pillar 5 – Investing resources in delivering change 1.3 Responsibilities INIS Director General The Director General of the Irish Naturalisation and Immigration Service is the programme sponsor for this Service Improvement Plan. He will chair the Programme Board, which will meet quarterly and include all members of the INIS Senior Management Team as well as representatives from HR and ICT Divisions of the Department of Justice and Equality. Programme Board The Programme Board will communicate strategic direction and ensure consistency of programme with overall strategy. It will also manage critical risks and issues, review programme milestones, and be consulted on all major decisions. 17
Change Management Unit The INIS Change Management Unit (CMU), alongside all Project Managers throughout the organisation, will serve as the Programme Team. This team will meet fortnightly to plan and manage the execution of all aspects of the Service Improvement Plan. Individual business responsibilities Individual business responsibilities for each of the actions contained within this plan are outlined in Section 2. Greater detail on implementation and governance structures and roles are provided at Sections 3. 1.4 Structure of the report The remainder of this document is structured as follows: Section 2: Objectives Section 3: Implementation, Monitoring and Review Appendix 1: INIS Senior Management Forum – Key Points Appendix 2: Refreshed INIS Service Delivery Strategy Appendix 3: Culture and Values Charter Appendix 4: Commitments from the Programme for a Partnership Government References 18
2. Pillars, Objectives and Actions The following five pillars have been selected to help shape the specific actions to be progressed by INIS over the coming three years. Pillar 1 - Our mission, purpose and legislative context Pillar 2 - Maintaining a safe and secure immigration system Pillar 3 – Efficient and effective service delivery Pillar 4 – Services designed based on customer needs Pillar 5 – Investing resources in delivering change All timelines in the tables below, apart from those projects already underway, are indicative at this stage and will be settled during the preparation of the annual implementation plan each year. Detailed annual implementation plans will be devised by the Programme Team for approval by the Programme Board. Where resources might constrain our ability to deliver upon any action, this will be clearly called out. 19
Pillar 1 Our mission, purpose and legislative context The current mission statement was prepared when INIS was established in 2005. Over recent years, the role of the organisation has expanded. Firstly, INIS took responsibility (from the Department of Foreign Affairs and Trade) for visa processing. More recently, the registration of non-EEA nationals and border control at Dublin Airport were civilianised and came within the remit of INIS. The enactment of the International Protection Act saw the International Protection Office become part of INIS, while the Irish Passenger Information Unit has been established as part of INIS in 2018 Review of mission and culture needed Given these significant changes to the landscape in which we operate, it would therefore be useful to consider a review of our current mission. We intend to carry out a review and refresh of the INIS mission statement to be completed by Q1 2019. This will involve a deep consultation with our own staff, stakeholders and customers. Organisational culture can impact strongly on organisational performance. Action 18 of Our Public Service 2020 encourages public sector organisations to undertake an asses their culture and to follow up on areas that need improvement. We intend to carry out an assessment of INIS culture and to prepare an action plan to assist in embedding the values set out in the Department of Justice and Equality Culture and Values charter within INIS. Legislation and the wider context The legislation which underpins the immigration sector in Ireland impacts considerably on our work. While the legislation relating to international protection was comprehensively reformed through the International Protection Act 2015, other aspects of immigration have not been revisited over recent years. The Programme for Government contains a commitment to “introduce a comprehensive Immigration and Residency Reform Bill, aimed at modernising Ireland’s visa and residency systems”. A review of the legislative landscape has started during 2018, and will be continued during the lifetime of this Plan. While domestic legislation has a significant impact upon our work, so does the international context in which we operate. Brexit and the European migration crisis can both be expected 20
to require significant attention during the coming years, and the actions detailed below represent our determination to manage the fallout from such events. 21
Pillar 1 - Our mission, purpose and legislative context Objectives Actions Business Lead Start Date End Date To review of our - Establish a working group to oversee the review. Change Oct 18 Oct 18 mission and purpose management unit - Engage an external facilitator to facilitate up to three Nov 18 Jan 19 workshops with staff. - Prepare a consultation strategy to engage with and Nov 18 Dec 18 gather feedback from staff and external stakeholders. - Consult with staff and external stakeholders including community and voluntary bodies, other Departments Nov 18 Feb 19 and Offices, staff and the customers. - Prepare and publish new mission statement. Feb 19 Mar 19 22
Pillar 1 - Our mission, purpose and legislative context Objectives Actions Business Lead Start Date End Date To assess our - Engage with the Reform and Development Office in Change Mar 19 Mar 19 culture DPER to identify good practice in the review of management unit organisational culture. - Undertake an analysis to see if the organisational Apr 19 May 19 culture aligns with the Departments defined culture and values. - Create an Action Plan to address issues arising from Jun 19 Jul 19 the assessment. - Ongoing monitoring and assessment of culture to Aug 19 Q4 2020 ensure values are embedded. To introduce an - Research and drafting of New Migration Policy. Policy Sept 18 Oct 18 Immigration and Development & Residency Reform - Draft 1 for circulation to INIS SMT. Legislative Oct 18 Nov 18 Bill, aimed at Review - Final draft for decision at INIS SMT. Nov 18 Nov 18 modernising - Collection and collation of change proposals for the On-going Dec 18 23
Pillar 1 - Our mission, purpose and legislative context Objectives Actions Business Lead Start Date End Date Ireland’s visa and legislation review. residency systems. To plan for Brexit - Continue to develop a Brexit strategy in relation to the Border On-going Mar 19 and protect the CTA. Management Unit Common Travel Area - Plan for “no-deal” scenario. On-going Mar 19 - Evaluate and agree a further roll out of the BIVS Visa Q4 2018 Q4 2019 scheme. Division - Prepare a plan for the Registration of UK nationals. Registration On-going Apr 19 Office To ensure full - New interim Right to Work scheme operating within Policy Division Q1 2018 Q1 2018 implementation of timeframe set out by the Supreme Court. Ireland’s opt-in to the EU (recast) - Support of Government and Oireachtas for opt-in to Q2 2018 Q2 2018 Reception directive. Conditions Directive 24
Pillar 1 - Our mission, purpose and legislative context Objectives Actions Business Lead Start Date End Date Achieving our objectives will have these positive outcomes. A clear mission and purpose and a positive organisational culture support organisational performance. INIS will be in a strong position to deliver services to users in a pro-active, efficient and effective manner. High levels of staff motivation and engagement. Monitoring of progress using the following indicators Level of staff engagement with initiatives. Level of progress in introducing an Immigration and Residency Reform Bill. Level of progress in preparing plan for the registration of UK Nationals in place. Compliance with timelines as set out in project plans. Outputs considered fit for purpose. 25
Pillar 2 A safe and secure immigration system The Service Delivery Strategy was an important resource in developing this plan, and it identified the need for a shared service within INIS dealing with identity verification. This is an important objective of Pillar 2. Such a shared service would provide all INIS business areas with the tools to verify the identity of applicants, to check against international watchlists, and to protect the security of our immigration system. New technology We will introduce a number of technology solutions to enhance border security, including checking passenger information, automated checking of international watchlists at electronic gates at ports of entry, alongside further civilianisation of frontline immigration controls. Compliance and Anti-Fraud strategy INIS should also consider preparing a Compliance and Anti-Fraud Strategy. We are aware that such a strategy has delivered increased control for the Department of Employment Affairs and Social Protection, and we believe that a similar initiative in the immigration sector could set out clearly the actions we can take to help combat fraud and non-compliance across all INIS schemes. Building partnerships Building on work already underway, we are going to increase efforts to build co-operation with other government departments and agencies. This work will be carried out within the frameworks provided by the Data Protection Act 2018 and the forthcoming Data Sharing and Governance Bill. Exit checks A vital element of a secure immigration system is exit checks. Ireland is relatively unusual in not having a comprehensive system of exit checks at airports and other ports of entry. During 2019, we will commence a study to examine the merits of implementing exit checks. This study will help us identify further actions for our 2019 and 2020 implementation plans 26
Pillar 2 - A safe and secure immigration system Objectives Actions Business Lead Start Date End Date Implement the - Establish the Irish Passenger Information Unit in line Irish Passenger Q1 2018 Q2 2018 Passenger Name with EU decision and forthcoming legislation. Information Unit Record (PNR) Directive - Establish passenger data processing and analysis facility and contribute to the introduction of PNR Sep 2018 Mar 2019 project. - Assess and identify the ICT requirements (software, Sep 2018 Mar 2019 hardware, staffing, data management, support/maintenance on 24/7 basis) necessary to permit IPIU to fully meet operational responsibilities in respect of current phase (extra EU flights) and next phases (intra EU flights and possibly other forms of transport) To develop an INIS- - Merge the IILU and EU Treaty Rights Investigations EU Treaty Rights Q2 2018 Q4 2018 wide shared service Units to form one Identity Verification and dealing with identity Management Unit. verification 27
Pillar 2 - A safe and secure immigration system Objectives Actions Business Lead Start Date End Date - Start researching the requirements of an ID Q3 2018 Q4 2018 Verifications & Validation shared service. - Examine the merits of preparing and implementing a Change Q3 2019 Q1 2020 Compliance & Anti-Fraud Strategy. Management Unit To enhance border - Complete 4 phases: Border Q1 2018 Q2 2019 security, including Management Unit o Phase 1 (installation of 20 eGates), working with UK on further enhancing o Phase 2 (CCTV and watchlist integration), security of the CTA o Phase 3 (additional eGates for transfer facility), and o Phase 4 (Registered Travel Programme) of eGates development. - To work with An Garda Síochána to ensure Ireland’s Q4 2018 Q4 2019 participation in Schengen Information System (SIS II). 28
Pillar 2 - A safe and secure immigration system Objectives Actions Business Lead Start Date End Date To enhance - Continue to engage with AGS and DEASP through the EU Treaty Rights Q1 2018 Q4 2020 cooperation with AGS, steering group and working group established by INIS Revenue, DEASP in 2018. regarding - Continue to exchange information with other Public INIS Divisions Q1 2018 Q4 2020 investigations Sector bodies and third party agencies to improve efficiencies. To examine the merits - Phase 1 – Feasibility study to assess introducing exit BMU Q1 2020 Q3 2020 and mechanisms for checks in an Irish context. the introduction of exit checks Administer the - Chair the Investor Programme Steering Committee. Director General Q1 2018 Q4 2020 Immigrant Investor Programme - Commission an external review of the Immigrant Citizenship Q3 2018 Q4 2018 Investor Programme. Division - Implement the recommendations of the external Q4 2018 Q3 2019 review. 29
Pillar 2 - A safe and secure immigration system Objectives Actions Business Lead Start Date End Date To refuse bogus - Continue cooperation with the Garda National EU Treaty Rights Q1 2018 Q4 2020 applications and Immigration Bureau (GNIB) on investigations through facilitate removals from Operation Vantage, targeting individuals suspected of the State. sham marriages and in particular those facilitating such activities. - Implement and enforce the deportation provisions in Repatriation Q2 2018 Q4 2020 the International Protection Act. Division Achieving our objectives will have these positive outcomes Reduction in fraud and error. Greater inter-agency co-operation. Improved processes and procedures. Monitoring of progress using the following indicators Level of progress in introducing an INIS-wide shared service dealing with identity verification. Compliance with timelines as set out in project plans. Outputs considered fit for purpose. Number of bogus applications refused and deportations effected. 30
Pillar 3 Efficient and effective service delivery Maintaining the security of our immigration systems is critical for INIS. Equally, we must ensure that the services we provide are delivered in efficient and effective ways. Eliminate backlogs Over the lifetime of this plan, we will bring a renewed focus to eliminating processing backlogs in key business areas, and particularly applications for international protection and EU Treaty Rights. For example, it is planned to reach the stage of new international protection cases being given a first instance decision within a nine month timeframe by the end of 2019, assuming increased staffing levels and no change to the trend in application numbers. The resources necessary to achieve this will be delivered through Pillar 5 of this Plan. Create greater savings for border control The civilianisation of border control at Dublin Airport has led to significant savings for the exchequer. Before civilianisation, the cost of this function was €7m per annum. These costs have now fallen to €3m per annum. We believe that further civilianisation of border control and registration functions can deliver further such efficiencies over the coming years. Invest in ICT For INIS services to be effective, we need ICT systems which are owned and operated by INIS, and which have a considerably greater level of interoperability than is currently the case. The actions below set out how we intend to achieve this. Additionally, technological advances present the opportunity for the introduction of some aspects of auto-decisioning using data analytics to inform the risk level of such processes. It is planned to begin exploring such options during 2019, with further actions to be subsequently defined. Any changes in this area will be made in a manner which respects the GDPR right to not be subject to a decision based solely on automated decision making 31
Pillar 3 - Efficient and effective service delivery Objectives Actions Business Lead Start Date End Date To review our - Templates to issue to all INIS divisions to support Corporate Jan 19 Feb 19 process operating process mapping. Affairs Division model taking an end- and - Each Division to prepare a process map for their areas Feb 19 Apr 19 to-end immigration INIS Divisions of responsibility. lifecycle perspective. - Collate the process maps to develop an overview of the Apr 19 Jun 19 current journey through INIS. - Examine how the process could be improved. Jun 19 Dec 19 - Seek to rationalise or phase out certain domestic Jun 19 Dec 19 residence schemes. - Manage and monitor cases in the Judicial Review Q1 2018 Q4 2020 process to ensure that appropriate decisions are taken, and that Court judgements are used to inform revisions to procedures. 32
- Consolidate activity and capacity relating to Judicial Review management within the Legal Services Support Q1 2018 Q3 2018 Unit (LSSU). - Creation of specialised teams within the LSSU. Q3 2018 Q4 2018 To implement and - Reduce maximum processing times to 9 months for first IPO Q1 2018 Q1 2020 review operational instance decisions on new cases. procedures for the - Prioritise International Protection Office (IPO) resources Q1 2018 Q4 2020 single application for case processing while ensuring that all non- procedure, and processing work is efficiently serviced in line with focus on elimination statutory obligations. of processing backlogs. Q1 2018 Q1 2019 - Legacy cases carried over to new single procedure to be all scheduled for interview by end of 2018 and processed to completion by early 2018. - Provide additional staffing to key processing areas Q2 2018 Q4 2018 (detailed at Pillar 5). - Make maximum use of the IPO case Processing Panel Ongoing Q4 2020 Corporate Affairs 33
- Explore options to reduce administrative burden on staff Q3 2018 Q4 2018 resulting from existing paper-based processes. To implement new - Introduction of new scheme to allow refugees (and some Policy Division Q1 2018 Q4 2018 schemes approved others) who have eligible family members from the by Minister to UNHCR listing of top 10 major source countries of respond to policy refugees to apply to have these family members join and legal them in Ireland. developments Q3 2018 Q2 2019 - Bring forward a scheme to address the need of significant cohort of undocumented former students who came here a number of years ago. To continuously - Prepare manuals documenting procedures for all All INIS Q4 2018 Q2 2019 improve control and processing sections in line with what already exists in Divisions compliance across some INIS areas (linked to processing mapping action all schemes to identified above). reduce fraud and - Examine the merits of implementing a quality Q3 2019 Q1 2020 error management system for INIS and consider options for 34
overseeing implementation, for example through the creation of a Quality Office. This will include a review of any existing quality assurance systems. To continue to - Payroll review to be carried out twice a year in line with Finance Unit, Q1 2018 Q4 2018 improve corporate Internal Audit recommendation. Reporting & (with governance and Analysis Unit further financial - A permanent accountant to be recruited to assist with and all INIS actions to management and financial management in INIS. divisions be reporting systems. subsequen - Provide monthly statistical information to INIS senior tly management team, including data on applications, identified) decisions, and so on. - Develop business plans and risk registers for each division within INIS to be monitored by INIS senior management team and to feed into the overall business planning cycle. - Implement internal audit recommendations for visas, registration and citizenship fees. - Use online forms to improve automation of invoicing for 35
legal panel members. To progress the - Investigate options to civilianise the 75 registration Registration Q3 2018 Q2 2019 civilianisation of offices around the country. Office registration and BMU border management - Review staffing and operational model to include Q3 2018 Q4 2018 functions conditions of service and powers of civilian immigration control officers. - Conduct survey of requirements for the deployment of BMU Nov 18 April 19 civilian immigration control model to other ports of entry. To review worldwide - Review Visa Processes and Procedures. Visa Division Q2 2018 Q4 2018 visa services and - Implement recommendations arising from review. Q4 2018 Ongoing implement process improvements - Business Process Review: 2018 Visa Initiatives, Ongoing Q1 2019 across visa including: processing o UK Home Office Platform Changes; o TelePerformance (TP) Contract; 36
o Examination of LIDPRO as a tool for document management; o AVATS Support & Maintenance Contract. - Examine the contribution that upgraded technology and Q4 2018 Q4 2019 external service delivery can make to a more efficient VISA Process. To ensuring all IT - Prepare the requirements for a replacement GNIB-IS. Change April 18 Oct 18 systems are owned Management and operated by - Procurement of new registration system. Unit Jul 18 Sep 19 INIS - Manage the delivery of new registration system. Sep 19 Jul 20 - To explore options for support services for systems Mar 19 Dec 19 operating on a 24/7 basis. 37
To improve - Creation of a Single Data Repository and Data Reporting and Q2 2018 Q2 2019 reporting, data Dictionaries for INIS. Analysis Unit analysis and statistical - Restructure the Reporting and Analysis Unit to train staff Q2 2018 Q2 2019 capabilities of INIS, in SQL, R and data analysis. and to introduce - Focussed effort to improve data quality across INIS. Q2 2018 Q2 2019 auto-decisioning using data analytics - Provide guidelines on data governance across INIS. Q2 2018 Q2 2019 - Carry out an initial examination of potential areas to pilot Q3 2019 Q4 2019 auto-decisioning using data analytics. - Automation of statutory and scheduled reports Q2 2018 Q2 2019 Achieving our objectives will have these positive outcomes Enhanced corporate governance. Improved processes and procedures. Enhanced data quality and governance Monitoring of progress using the following indicators Level of control activity against targets. Level of progress in introducing replacement GNIB-IS system 38
Compliance with timelines as set out in project plans Outputs considered fit for purpose Number of reports automated, and proportion of time devoted to data analysis 39
Pillar 4 Service design based on customer needs As discussed in section 1, our current arrangements for service delivery are reliant on a number of ICT systems that have limited interoperability, and our processes are heavily dependent on paper based processing. This means that our customers are typically required to contact us by post, and it means that processing times are longer than they could be. While continuing to protect the safety and security of the immigration service, we believe it is possible to dramatically improve the service we provide to our customers. Doing so will require a shift in mind-set towards one which puts the needs of our customers at the heart of how we design our services. Pre-clearance schemes During 2018, we will begin to introduce preclearance schemes so that those who wish to come and live here for specific purposes can have their applications for residence processed before they arrive in Ireland. The lessons we learn from the first such schemes will be used to inform a wider rollout of this approach. A project is currently underway to allow people to apply for some schemes online, which will include the ability to make payments and submit documentation, and to receive case updates through an online portal. This service will be extended to all major INIS schemes by the end of 2019. Plain language We will shift towards the use of plain language in all our communications. This will require the training of staff, and we will begin by editing our publications, our forms and our website to ensure that the information we offer to the public is provided in plain language. Customer feedback More fundamentally, to truly incorporate service design thinking into our work, we need to begin by measuring the views of our customers on the services we currently provide. We 40
will develop mechanisms to continually gather and assess customer feedback, and to use this feedback in iterative developments of our systems and processes. 41
Pillar 4 Service design based on customer needs Objectives Actions Business Lead Start Date End Date Pre-clearance - Introduce preclearance schemes for volunteers and Policy Division Q1 2018 Q2 2018 schemes to allow Ministers of religion. customers to - Introduce preclearance schemes for retirees and carers. Policy Division Ongoing TBC apply for residence - Review the implementation of the preclearance schemes permissions and examine the merits of extending to other schemes. Q4 2018 Q1 2019 before to travelling To produce - Phase 1 - delivery of online forms, payments and Corporate Jul 18 Sep 18 secure online document collection for two initial schemes. Affairs forms, - Phase 2 - delivery of workflow management tools for Sept 18 Nov 18 incorporating initial forms. shared services for online - Phase 3 – full Integration with AISIP. Oct 18 Dec 18 payments - Phase 4 – delivery of online forms for all INIS application Sep 18 Dec 19 types. 42
Pillar 4 Service design based on customer needs Objectives Actions Business Lead Start Date End Date - Phase 5 – security audit of INIS online forms Jan 19 Mar 19 To use plain - Create one INIS Communications Unit made up of staff Communication Q2 2018 Q2 2018 English in all currently working on communications and co-ordination s Unit communications tasks. - Establish INIS communications network and work on a Q2 2018 Q4 2018 refresh of the website content. - Provide plain English training for communications Q2 2018 Q2 2018 network. - Provide plain English training for senior management Q3 2018 Q3 2018 team. - Re-design all INIS application forms in plain language. Q2 2018 Q3 2018 - Introduce a monthly internal newsletter. Q3 2018 Q4 2020 43
Pillar 4 Service design based on customer needs Objectives Actions Business Lead Start Date End Date To introduce a - Prepare a business case and secure approval. Registration Jan 19 Jan 19 new appointment Office system and - Prepare tender documentation. Jan 19 Mar 19 queue - Run procurement process. Mar 19 Nov 19 management system for the - Manage the delivery of the system. Jan 20 Jun 20 Registration and Re-entry visa - Consider the possibility of combining the new IRP card Ongoing Nov 18 office with the Public Service Card/shared service delivery with the Department of Employment Affairs and Social Protection. - Under 16 year olds to be brought into the registration Ongoing Dec 2019 system, commencing with 14-16 year olds. - Postal renewal for low-risk customers, such as students Ongoing Q3 2019 on a multi-year degree course. 44
Pillar 4 Service design based on customer needs Objectives Actions Business Lead Start Date End Date To incorporate - Review the Service Design Toolkit in DPER and identify Change Oct 18 Dec 18 service design relevant training. Management methodologies Unit into process - Engage with other Government Departments who have Oct 18 Mar 19 design experience in this area to learn from their practices. - Select pilot project for development using service design Jan 19 Jun 19 methodologies. - Identify customer requirements and profiles, and Jan 19 Dec 19 establish customer satisfaction levels through regular surveys and through the provision of feedback mechanisms. To have - Translate essential material from the website into other Corporate Q4 2019 Q2 2020 accessible languages. Affairs services for all customers - Translate signage in public offices into key foreign Q3 2019 Q1 2020 languages. 45
Pillar 4 Service design based on customer needs Objectives Actions Business Lead Start Date End Date - To consider technological solutions to allow staff in the Q1 2020 Public Office deal effectively with customers with disabilities or with poor English language skills. E.g. tablets with accessibility options or access to translation software. Achieving our objectives will have these positive outcomes Quality customer centred services. Strong awareness and understanding of customers’ needs. Increased self-service through digital provision. Good internal communications. Monitoring of progress using the following indicators The level of, and trends in, customer service satisfaction measures. Number of forms conforming to GDPR and plain English guidelines. Level of staff engagement. Level of progress in introducing new appointment booking system and queue management system in the public office. 46
Pillar 5 Investing resources to deliver change A change programme on the scale set out within this Service Improvement Plan needs resources to make it happen. INIS will establish a Change Management Unit to lead this work. This new unit will work to develop the skills, capacity and behaviours of everyone in the organisation. It will focus on embedding change management and project management capabilities. Increase staff numbers The need to target some additional staff resources for a short period of time is also widely accepted. Sanction has been granted for staff numbers to rise by 76 in 2018 to help eliminate backlogs while service improvements are underway. The intention is that staff numbers can return when the Plan is fully implemented. Invest in systems and infrastructure INIS also needs to invest to develop our systems and infrastructure. In 2017, INIS spent €4.9m on technology supports, but this figure is expected to rise to €7.1m in 2018 and further still over the years covered of this Plan so we can transform existing systems. This need was recognised in the National Development Plan 2018-2027, which noted that “ongoing investment is required by the Irish Naturalisation and Immigration Service over the next 5-to-10-year period, to underpin an ICT strategy designed to transform and modernise service delivery through greater use of automated processes and to protect the security of the State”. Strategic direction of opportunities We recognise and value the skills, expertise and commitment of our staff. Another action under this pillar is to ensure that learning and development opportunities are directed in a strategic way. This can be achieved through setting up a skills matrix which will benefit both the organisation and the individual and will be prepared in consultation with staff. The benefits are set out in the table below. 47
Benefits of a skills Advantages matrix Individual Insight into their own competency and skills and areas of improvement. Team Overview of the skill they have and areas where they need to develop new skills Organisational Overview of available competencies and areas that need investment. Can also aid in succession planning 48