Reduce the Pain of ERP Upgrades With Better Planning

Page created by Patrick Andrews
 
CONTINUE READING
June 2007

Reduce the Pain of ERP Upgrades
With Better Planning
by Jim Shepherd

                  As corporations become more dependent on their ERP systems, they struggle to
                  strike the right balance between regularly updating the software and minimizing
                  cost and disruption to the business. This Report offers advice on how to develop
                  and communicate a practical upgrade strategy and then build an effective process
                  for maintaining your ERP asset.

Enterprise Strategies Report
Acronyms and Initialisms
COE        Center of excellence

ERP        Enterprise resource planning

ROI        Return on investment

© Copyright 2007 by AMR Research, Inc.

                 ®
AMR Research is a registered trademark of AMR Research, Inc.

No portion of this report may be reproduced in whole or in part without the prior written permission of AMR Research. Any written
materials are protected by United States copyright laws and international treaty provisions.
AMR Research offers no specific guarantee regarding the accuracy or completeness of the information presented, but the professional staff
of AMR Research makes every reasonable effort to present the most reliable information available to it and to meet or exceed any
applicable industry standards.
AMR Research is not a registered investment advisor, and it is not the intent of this document to recommend specific companies for
investment, acquisition, or other financial considerations.

This is printed on 100% post-consumer recycled fiber. It is manufactured entirely with wind-generated electricity and in accordance with a
Forest Stewardship Council (FSC) pilot program that certifies products made with high percentages of post-consumer reclaimed materials.
Reduce the Pain of ERP Upgrades
With Better Planning
by Jim Shepherd

                                                                                                   The
  The key to minimizing the pain of ERP upgrades is to have both a long-term ERP
  lifecycle strategy and a comprehensive tactical plan for the actual upgrade project.
                                                                                                   Bottom
                                                                                                   Line

                   In many organizations, the ERP system has become the application
Executive          support for the majority of business processes and the repository for
Summary            the corporation’s most sensitive data. As these systems become more
                   important and pervasive, there are often conflicting opinions about
how they should be maintained and updated. This is no longer a technical decision that
can be made by the IT department or dictated by the software vendor’s release schedule.
ERP upgrades are now important enough that senior management needs to fully under-
stand both the timing and project plan.

This Report offers guidance on developing an overall corporate strategy for maintain-
ing an ERP system by providing practical advice for planning and managing an ERP
upgrade project. Here are some of the areas that will be addressed:
• Why companies should periodically upgrade their ERP systems
• Defining the strategy and timing for ERP upgrades
• Consensus building and communicating the ERP strategy
• How to justify the cost and resources required for an ERP upgrade
• Creating a project plan for a successful upgrade
• Organization and governance options
• Resources, services, and tools available for upgrades

It is vital that the company develops a strategy for how often the software and underlying
technology will be updated so that the entire organization can plan and budget for the
inevitable costs and disruptions. Because upgrades are periodic events, it is also important
to create a repeatable process as well as a set of tools and skills to ensure the projects can
be executed efficiently while minimizing any risk to the organization.

Enterprise Strategies Report | June 2007                                                         © 2007 AMR Research, Inc.   
Why companies need to upgrade their ERP systems
                           Most organizations are realizing the ERP system is not just a key part of their IT
                           strategies, but one of their most important and sensitive corporate assets. ERP systems
                           should have at least a 15- to 20-year useful life, but over that time they will need to be
                           maintained and enhanced to protect their value and serve the changing needs of the
                           business.

                           Other capital assets that corporations own, such as buildings, vehicles, or equipment,
                           need regular maintenance, but they don’t typically require large-scale upgrades. Software-
                           based assets like ERP systems have some unusual characteristics:
                           • They can deliver long lifecycles, but they’re subject to rapid technical obsolescence
                             because of the volatility of the underlying software and hardware technology.
                           • This technological instability and the complexity inherent in millions of lines of
                             computer code tend to result in surprisingly poor quality by the standards of other
                             highly engineered products.
                           • Most companies pay 17% to 22% of the original software license price per year
                             in order to gain access to bug fixes, legal changes, and technical and functional
                             enhancement releases.

                           These factors alone would suggest that companies need to plan for periodic updates just
                           to ensure the reliability of mission-critical applications. Perhaps even more important is
                           the role that upgrades play in adding new functionality, improving business processes,
                           and extending the deployment of ERP suites.

                           In the last few years, we have seen a best practice evolve in which companies use the
                           upgrade project as a focal point for a whole series of related improvements. At a
                           minimum, this is an excellent time to consider implementing new capabilities and
                           refreshing the technology environment, but it is often combined with other business
                           and IT initiatives. Corporations moving from decentralized environments to shared-
                           services functions or global integrated structures typically upgrade their ERP systems
                           as a part of the consolidation effort. Upgrades are also an excellent time for companies
                           to evaluate their IT portfolios and look for opportunities to eliminate custom software,
                           unneeded modifications, and even third-party or legacy systems in order to simplify
                           their environments and lower costs of ownership.

   © 2007 AMR Research, Inc.                                                            Enterprise Strategies Report | June 2007
Defining an ERP upgrade strategy
It is very important that a company’s management team and board of directors
understand the nature of ERP systems so that they can appreciate the importance of
having a long-term upgrade strategy. It is quite possible for organizations to squander
their investments and shorten the asset life by failing to invest in periodic upgrades of
their business systems. At the same time, AMR Research frequently sees companies
that seem to be in constant upgrade mode because they are simply reacting to a variety
of internal and vendor-driven imperatives and deadlines.

A proper upgrade strategy should span a minimum of five to seven years and consider a
number of different factors. The first issue, of course, is your company’s commitment to
the software package. If there are plans to replace the current system in the next two or
three years, it rarely makes sense to invest in an upgrade project, regardless of the vendor’s
support policy. Even if the vendor plans to end support of the product or version, it would
still be less expensive to pay for extended maintenance or a third-party support contract.

Assuming that your company intends to keep the software, it should spend some time
developing a strategic plan for the timing and frequency of upgrade projects (see Figure
1). The rate of change in the business and the software vendor’s approach to new-release
timing generally determines the frequency of upgrades. Very aggressive companies may
plan upgrades every two-to-three years if their business environments are quite volatile
and they have an ERP vendor like Oracle with relatively rapid release cycles. In other
cases, we may see large, global companies choosing a much more conservative five- to
six-year upgrade pattern because they consider the cost and risk to be high relative to
the benefits. This decision about upgrade frequency must ensure that the company
stays within the bounds of the vendor’s support and maintenance policy. Running the
organization’s most critical business processes on unsupported software is too risky to
be acceptable to most boards of directors.

Enterprise Strategies Report | June 2007                                                         © 2007 AMR Research, Inc.   
Figure 1: ERP upgrade strategy example

                                ERP Upgrade Schedule
                                                                           Duration

                                                   2006     2007    2008       2009   2010       2011         2012

                                Significant business
                                          initiatives

                                     Vendor release
                                         schedules

                                           Planned
                                      infrastructure

                                                                                                                       Scheduled Activity
                                            updates

                                    Vendor support
                                           policies

                                       Demand for
                                  new functionality

                                        Technology
                                      requirements

                                     Resource and
                                 budget constraints
                                                            Release 6.0                         Release 8.0

                                                                                         Source: AMR Research, 2007

                           Once the upgrade frequency is determined, the specific upgrade projects can be scheduled
                           by looking for windows of opportunity or particular business requirements. As shown in
                           Figure 1, the upgrade timing needs to be shifted in order to accommodate other
                           constraints or incentives:
                           • Related business initiatives
                           • Software release schedules
                           • Upgrade infrastructure like servers, databases, and middleware
                           • Requirements for new software functionality
                           • Availability of critical internal IT or user resources
                           • Attractive go-live windows, like three-day weekends
                           • Unacceptable go-live periods during busy seasons or fiscal quarter ends

   © 2007 AMR Research, Inc.                                                          Enterprise Strategies Report | June 2007
Consensus building and communicating the ERP
strategy
One of the most critical reasons to create an ERP upgrade strategy is to facilitate the
buy-in and involvement of the rest of the organization. Like successful implementations,
ERP upgrades require the active participation and support of many parts of the company.
One of the main causes of resistance to upgrades is they often come as a surprise, with
management and business leaders feeling like they are being blackmailed by the software
vendor or their own IT departments. Developing a strategy document that explains the
reasons why periodic upgrades are necessary and lays out the time frames of the next
several projects will encourage an internal dialog and allow for financial and resource
planning.

An ERP upgrade strategy must be actively sold to the organization. Unlike ERP prac-
titioners, most people don’t understand why something that costs so much to buy and
deploy needs to be changed and upgraded every few years. It may appear the company
is paying a lot of money to fix things that weren’t done right the first time. A key part
of the upgrade strategy process is getting a critical mass of employees to understand
ERP upgrades are a normal part of the product lifecycle.

ERP systems are typically implemented in phases over several months or several years.
The phases may represent groups of modules, business units, geographic locations, or
some combination of all three. The ERP upgrade strategy needs to be positioned as a
continuation of that approach, with new phases every three to five years that respond to
inevitable changes in the business requirements and incorporate improvements in tech-
nology. The important thing is to help everyone understand that the purpose is to allow
the company to have a modern, up-to-date information system without having to buy
a new one every few years. ERP upgrades may seem expensive, but they are much less
expensive than replacement projects.

Justifying the cost and resources required for an ERP
upgrade
A formal ERP upgrade strategy helps to prepare the organization, but in most cases each
upgrade project will require its own justification. Preparing a formal business case for an
ERP upgrade is challenging and can sometimes take longer than the actual project. Part
of the problem is that companies are accustomed to creating justifications for tangible
capital equipment. They tend to approach the upgrade justification by trying to find
enough cost savings to fund the project and provide the appropriate ROI. While there are
often potential cost savings from improved processes or IT portfolio rationalization, much
of the justification for an upgrade must be based on opportunities and risk avoidance.
While these soft benefits may not fit neatly into an ROI calculation, it is very important
to quantify them and include them in the justification.

Enterprise Strategies Report | June 2007                                                      © 2007 AMR Research, Inc.   
The process of creating the justification should start by listing each element that might
                           be included in the project: the sponsor or beneficiary and what the potential value is to
                           the corporation (see Table 1). This list then becomes a working document that is used to
                           socialize and scope the project. Tasks and features get added or subtracted from the list,
                           and sponsors must get involved in supplying the detailed requirements and benefits. At
                           the same time, the IT department needs to develop a cost estimate for the upgrade project
                           that includes any anticipated software and hardware investment, external IT services, and
                           internal personnel costs.

                            Table 1: Proposed scope for upgrade project
                                Project Element                            Internal Sponsor             Potential Value
                                Consolidation of nine divisional          CEO, CFO, VP of            $6,600,000
                                instances into one centralized global     Sales
                                instance
                                Upgrade to Release 7.5                    CIO, Director of COE       $730,000

                                Replace existing custom configuration     VP of Sales, VP of         $1,250,000
                                system with Advanced Configurator         Engineering, CIO
                                3.0
                                Deploy electronic batch record and        VP of                      $900,000
                                electronic signature capability to all    Manufacturing,
                                plants                                    VP of Quality
                                Implement treasury management             CFO                        $1,400,000

                                Replace database servers and              CIO                        $600,000
                                upgrade SAN
                                                                                               Source: AMR Research, 2007

                            The ERP vendors can provide a great deal of assistance in developing an upgrade justifica-
                            tion but we find that most customers are hesitant to get them involved. The vendors are
                            always very interested in getting their users to move to the next release, and they invest a
                            lot of money in creating tools and programs to facilitate the process. On their own or in
                            conjunction with their user groups, they gather comprehensive data on customer upgrade
                            experiences, which is very helpful in creating a cost estimate and timeline for the project.
                            The vendors also compile guides to the new technology and functionality features of the
                            release. These release notes or delta comparisons to your current release are a good starting
                            point for creating the benefits side of the justification.

   © 2007 AMR Research, Inc.                                                               Enterprise Strategies Report | June 2007
The most difficult part of the justification tends to be assigning a monetary value to the
opportunities and risks. The opportunities are generally associated with business capabili-
ties supported by the new release (or could be implemented during the upgrade project)
that are not available with the current system or are viewed as inadequate. The groups
within the organization that understand the need for these new features are the ones that
can develop estimates of potential value. These may be related to better efficiency, faster
response to change, competitive threats, new business models, or improved processes.
With a little creativity, however, they can all be assigned cost or revenue values.

Risk mitigation is nearly always a part of the rationale for ERP upgrades, but companies
struggle to find a way to include it in a financial justification. The easiest area to
quantify tends to be vendor support costs. Most companies recognize they can’t afford
to be running their business on unsupported ERP software, and nearly all the vendors
specify support windows for each release. A typical vendor policy might be to provide
standard maintenance for five years from the release date and then charge a premium
for the next two or three years. At that point, most vendors will continue taking your
maintenance fees, but they stop providing bug fixes, legal changes, and technology
compatibility. Avoiding the maintenance premiums alone can be a significant savings,
but staffing internally or paying consulting fees to support old releases is very expensive.

Another significant area of risk is technological obsolescence. Hardware, operating
systems, and databases tend to evolve faster than ERP systems, so companies that fail
to upgrade their applications can easily find themselves unable to capitalize on the
benefits of newer and more cost-effective technology. ERP releases that are only four
or five years old may not be compatible with the latest infrastructure, and the software
vendors have little incentive to update old releases. The monetary value of this risk
increases dramatically if the company faces capacity constraints related to transaction
throughput or data volumes. In some cases, upgrading may be the only way to ensure
critical functions like order processing are not degraded. The upgrade also may allow
IT to add needed capacity at a much lower cost.

The best practice in building an ERP upgrade justification is to make the benefits-and-
opportunities list as long as possible. There is a tendency to look for the silver bullet—an
item so compelling that it will justify the entire project—but in most cases it simply
doesn’t exist. The best upgrade projects provide value to lots of parts of the organization
and incorporate improved processes, new functionality, and updated technology. It is
more work up front to gather the necessary information and coordinate all the interested
parties, but it results in a better justification and broader support for the project.

Enterprise Strategies Report | June 2007                                                       © 2007 AMR Research, Inc.   
Creating a project plan for a successful upgrade
                           A project plan for an ERP upgrade should look like a condensed version of an ERP
                           implementation plan, since the essential steps are the same. In most cases, though, the
                           duration and resources required will be reduced. Regardless of how narrow the scope
                           is for an upgrade project, it always needs a formal project plan and a project team. The
                           project should have a governance structure in place and management oversight with
                           specific milestone dates, metrics, and change management. Companies that take a
                           casual approach to upgrades or simply dump the project in the lap of the IT depart-
                           ment will increase the risk of business disruption and jeopardize the expected benefits.

                                Figure 2: Typical ERP upgrade timeline

                                 Jan.   Feb.   Mar.     Apr.   May    Jun.   Jul.    Aug.    Sep.     Oct.      Nov.      Dec.

                                        Planning

                                               Design

                                                          Development

                                                               Prepare for cutover

                                                      Final go live and production support

                                                                                               Source: AMR Research, 2007

                           The key activities in an ERP upgrade include the following:

                           Planning
                           • Determine what organizational changes, business process improvements, and technol-
                             ogy updates are in scope for the project.
                           • Evaluate the existing application portfolio to determine if there are any existing
                             applications that can be eliminated or replaced by functionality in the ERP system.
                           • Create a formal project plan and establish an upgrade project team.
                           • Identify and secure any necessary resources.

   © 2007 AMR Research, Inc.                                                                 Enterprise Strategies Report | June 2007
Design
• Train the project team on new release functionality and technology.
• Modify existing business processes slated for improvement and design any new
  processes.
• Evaluate existing modifications to see if they are still needed.
• Configure new applications and develop any new reports.
• Redesign any integration software or procedures that may be affected by the upgrade.
• Evaluate system infrastructure, perform sizing analysis, and determine required
  upgrades.

Development
• Develop any necessary data migration scripts and clean up any affected data.
• Establish a test system that runs new software against a representative data set.
• Create or revise documentation and education materials.
• Evaluate regulatory or validation requirements.
• Revise and extend existing test scripts.

Prepare for cutover
• Develop cutover sequence, intermediate check points, and recovery options.
• Perform comprehensive integration and functional testing.
• Schedule super-user walk-through of all key business processes.
• Conduct stress tests to identify any performance issues.
• Train any users that will be affected by new or changed functionality or processes.
• Perform a technical upgrade rehearsal using the “sandbox system.”

Final go-live and production support
• Upgrade production system to new release.
• Conduct performance measurements and do any necessary tuning.
• Monitor user and help-desk activity to identify required follow-up employee training.
• Evaluate process changes and new functionality where adjustments are needed.
• Conduct a post go-live project assessment to look for ways to improve the next
  upgrade project.

Enterprise Strategies Report | June 2007                                                  © 2007 AMR Research, Inc.   
Organizational and governance options
                            There are organizational and governance requirements for a successful ERP upgrade
                            project, but in many companies, permanent structures can be readily adapted. A manage-
                            ment steering committee should be responsible for approving the project plan, allocating
                            the necessary resources, and monitoring performance against the identified milestones.
                            Any changes to the project’s scope or timing must be approved by the steering committee
                            because they will inevitably impact both budget and resource availability. This body also
                            resolves any conflicts with other activities or issues associated with organizational or
                            business process changes.

                            The project team needs to be cross-functional, with representation from the major busi-
                            ness functions, affected geographies, and the IT department. Ideally, the project leader
                            should not be someone from the IT organization because it is very important to send the
                            message that the ERP upgrade project is a business process improvement activity, not an
                            IT exercise. In situations where the company has decided to use external consulting or
                            technical resources, they should be embedded in the project team parallel or reporting to
                            internal personnel.

                            Companies that have an existing ERP competency center or center of excellence (COE)
                            frequently choose to have that organization run the upgrade project. It typically has many
                            of the right ingredients to drive a successful project, including functional expertise, busi-
                            ness process knowledge, technical skills, and experience with project management, change
                            management, and employee training. For companies that don’t have a permanent COE,
                            the upgrade project may be an ideal time to establish one since there is strong correlation
                            between COEs and the value derived from the ERP system.

                            Resources, services, and tools available for upgrades
                            Over the past 25 years, ERP software has grown into a $28B per year market that serves
                            hundreds of thousands of companies worldwide. This success created a parallel market of
                            companies that provide tools and services to help implement, manage, and upgrade ERP
                            systems. Companies evaluating or planning ERP upgrades should take the time to famil-
                            iarize themselves with the resources available from the ERP vendors and their partners. In
                            many cases, these resources can significantly lower the cost, minimize the risk, and reduce
                            the impact on key internal personnel. There are hundreds of methodologies, sizing
                            analyzers, testing tools, data management utilities, and consulting services proven to
                            deliver excellent ROI investment, but are chronically underutilized.

10   © 2007 AMR Research, Inc.                                                             Enterprise Strategies Report | June 2007
Companies should first look to the ERP vendors. In most cases, the vendors have
comprehensive information available to help companies evaluate upgrades. This will
generally include release notes, comparisons to prior releases, and tools to estimate
the cutover times, database sizes, and processor impacts of new releases. Many of the
vendors also have standardized upgrade methodologies, such as the Oracle Upgrade
Assistant or SAP’s ASAP for Upgrades, which include sample project plans, procedural
guides, and other tools to facilitate the project.

ERP vendors also offer a variety of specialized consulting services to help. These may
start with two- or three-day onsite evaluations to help identify business opportunities
from an upgrade that may be followed up by a project to build a financial justification.
The ERP vendor’s consulting arms will generally offer project assistance or specialized
expertise for the upgrade project. In some cases, these upgrade services can be delivered
from a remote site. Lawson, for instance, claims that upgrade services may be as much
as 30% less expensive when they are sourced through its Global Solution Centers.

A wide variety of software tools have been developed to assist companies with ERP
upgrades. Here are some of the most popular categories and vendors:

Release and customization analysis tools

These products compare your existing ERP system to a specified new version and identify
changes, modifications, and potential problem areas. Since customizations and testing are
among the most time-consuming and expensive parts of an ERP upgrade, these tools can
easily pay for themselves in a single project.
• IntelliCorp—LiveCompare
• Intelligroup—Uptimizer
• Compuware—SAP Functional Realization
• Wipro—1Up
• Hewlett-Packard (HP)—Mercury Deployment Manager

Enterprise Strategies Report | June 2007                                                    © 2007 AMR Research, Inc.   11
Testing and test management tools

                            Experienced ERP customers always single out testing as the most difficult aspect of
                            upgrade projects. Determining what to test, developing and maintaining test scripts, and
                            administering the multiple rounds of integration and performance tests are extremely
                            challenging. While ERP vendors provide some support for testing, we recommend that
                            companies invest in comprehensive testing software to support both upgrade projects
                            and routine software patching.
                            • Wipro—PowerAn
                            • AutoTester—AutoTester ONE
                            • HP—Mercury LoadRunner; Mercury QuickTest Professional
                            • Genpact—Appready
                            • Compuware—QACenter

                            Data management tools

                            One of the keys to successful upgrade projects is the creation of sandbox systems, test
                            systems, and quality assurance systems that can be used for a variety of activities during
                            the upgrade projects. In order to be useful for testing and training, these systems need
                            to be populated with current production data, with all the complex relationships intact.
                            Specialized data management tools provide the select, extract, and load software to
                            clone and move master data or transactional data between ERP instances.
                            • Gamma Enterprise Technologies—InfoShuttle
                            • SymSoft—Gold Client
                            • IntelliCorp—DataWorks
                            • Compuware—File-AID

                            In addition to the ERP and tools vendors, hundreds of consulting and IT services firms
                            offer ERP upgrade services. Almost any firm that does ERP implementations will also
                            do upgrade projects for the services, ranging from full turnkey projects to staff augmen-
                            tation and specialized expertise. The largest global firms, like IBM, Accenture, Deloitte,
                            and BearingPoint, tend to have specific service offerings for SAP and Oracle upgrades.
                            Smaller firms, such as Wipro, Intelligroup, and Ciber, also offer comprehensive upgrade
                            services and a variety of tools and templates. In addition to global and local consulting
                            firms, there are thousands of experienced contractors frequently used on upgrade proj-
                            ects. For companies that are comfortable running their own projects, contractors are a
                            relatively inexpensive way to temporarily add staff with specific skills and expertise.

12   © 2007 AMR Research, Inc.                                                           Enterprise Strategies Report | June 2007
Not a necessary evil
ERP upgrades are an essential process that helps organizations derive greater value from
their ERP software and prolong the useful life of this very important asset. Companies
need to recognize the importance of upgrades and develop an appropriate strategy for
them that aligns with the realities of their IT and business environments. This strategy is
vital because ERP upgrades can be expensive and disruptive, and the business needs to be
able to plan, budget, and coordinate these projects with other activities and initiatives.

Actual projects to upgrade an ERP system need to be treated as smaller versions of an
implementation project rather than just another IT program. Many of the methodologies,
processes, and governance structures required for an effective ERP implementation should
be employed as an upgrade project, albeit on a smaller scale. Most organizations have the
resources and skills necessary to run an upgrade project, but the quality of planning dis-
tinguishes truly successful upgrades. Defining the scope, determining the project tasks,
securing the resources, and preparing the organization are all planning activities that can
shorten the duration, lower the cost, and minimize the risks of an upgrade.

Too often we see companies underestimate the level of effort and the broad impact of an
ERP upgrade. These projects can potentially affect most of the critical business processes
and a high percentage of employees. They need to be planned for very carefully and
deserve significant management attention.

At the same time, both users and the vendor community are improving this process. The
products are more easily upgraded, and there is a wide range of tools and services to assist.
The emergence of the option to do a true technical upgrade followed by gradual adop-
tion of new functionality revolutionized the ERP upgrade process. We now see even large
companies with massive ERP deployments able to periodically upgrade their systems in
an orderly way with very little trauma. These organizations generally have long-term ERP
strategies with standardized upgrade processes and the discipline to develop very detailed
project plans.

We don’t expect to see a time when users will welcome ERP upgrades, but we believe that
we will reach a point where they can be treated as routine business activities. As users
develop their ERP lifecycle skills and vendors move closer to the goal of zero downtime
upgrades, we hope to reach a point where ERP upgrades can be seen as simply another
component of the continuous business process improvement program rather than a major
company event.

Enterprise Strategies Report | June 2007                                                        © 2007 AMR Research, Inc.   13
Research and Advice That Matter
Founded in 1986, AMR Research provides
subscription advisory services and peer
networking opportunities to operations
and IT executives in the consumer products,
life sciences, manufacturing, and retail
sectors. We are the No. 1 research firm
focused on the intersection of business
processes with value chain and enterprise
technologies.

AMR Research has published more than 15,000
pieces of research. Grounded in industry and
business process expertise, our analysts deliver
independent, leading-edge research on
                                                         This is printed on 100% post-consumer recycled fiber.
established and emerging technologies.             It is manufactured entirely with wind-generated electricity
This analysis is supported by the best research    and in accordance with a Forest Stewardship Council (FSC)
                                                          pilot program that certifies products made with high
data in the industry, expert-led Peer Forums,
                                                           percentages of post-consumer reclaimed materials.
and daily interaction with our members,
the most comprehensive community of
practitioners in the industry.

More information is available at
www.amrresearch.com. Your comments are
welcome. Reprints are available. Send any
comments or questions to:

AMR Research, Inc.
125 Summer Street
Boston, MA 02110
Tel: +1 (617) 542-6600
Fax: +1 (617) 542-5670                                                           AMR-R-20456
You can also read