Redevelopment of Brimscombe Port - Stroud District Council

Page created by Floyd Moody
 
CONTINUE READING
Redevelopment of Brimscombe Port - Stroud District Council
Redevelopment of Brimscombe
           Port
Redevelopment of Brimscombe Port - Stroud District Council
Redevelopment of Brimscombe Port - Stroud District Council
Redevelopment of Brimscombe Port - Stroud District Council
Redevelopment of Brimscombe Port - Stroud District Council
Redevelopment of Brimscombe Port - Stroud District Council
The Vision
Brimscombe Port - the destination at the eastern end of the canal

                        Vision to deliver a sustainable new
                   residential-led mixed use community that
                  meets the needs of both existing and future
                  residents. By responding to the site’s unique
                  characteristics with innovative and inspiring
                     design, the Council aspires to create an
                   exemplar scheme that integrates with the
                  existing surroundings and expands upon the
                      site’s constraints and opportunities to
                         enhance the residents’ daily lives.
                     The scheme will respond to the district’s
                  post-COVID economic recovery strategy and
                   its ambition to be carbon neutral by 2030.
Redevelopment of Brimscombe Port - Stroud District Council
Background

                                                                  Port became
                     Created to transfer                       redundant and was
   4ha (10a) site
                      goods from large                           in-filled in the    Bensons – 600-700
 formerly largest                              Nationally
                      sea going Severn                         1930’s and latterly       employees –
inland port in the                             important
                      barges (Trows) to                         developed as an       largest employer
  Country dating                           transhipment port
                     smaller, narrower                          industrial estate       in the district
back to the 1780’s
                       Thames barges                               during the
                                                                    1960/70s.
Redevelopment of Brimscombe Port - Stroud District Council
Background
Industrial estate now in poor repair, legacy of contamination following the tipping of
waste into the old canal and basin.

Brownfield site, of significant cultural and historical value in the industrial heritage
conservation area in a spectacular setting with dramatic views from and down to the site

Occupied on a temporary basis by valued community enterprises

Allocated in the local plan to deliver 150 dwellings, canal related tourism development and employment
uses and associated community and open space uses, together with enabling infrastructure.
https://www.stroud.gov.uk/media/1455/stroud-district-local-plan_november-2015_low-res_for-web.pdf

Reinstatement of the canal and basin is required for flood alleviation measures to enable
any redevelopment – not a ‘nice to have’.
Redevelopment of Brimscombe Port - Stroud District Council
Background
                                              Canal Project

                        Acquired from BW                                                Canal project was
 Originally part of                             Stroud Valleys                                                   Valuation/
                        by SWRDA in 2009                           After the property   scaled back to end
the Cotswold Canal                             Canal Company                                                      viability
                       - the expectation at                          crash in 2009,      at Bowbridge and
    Regeneration                              (SVCC) was set up                                                undertaken in
                        that time was that                                                prospects of the
project to reinstate                                                  subsequent
  the canals from
                          it would deliver    by 4 key partners,                             Port being      2013 and again in
                       both a redeveloped                          marketing in 2011        redeveloped
Stonehouse ‘Ocean’                               including the                                                 2015 – funding
                         Port and provide                          proved the site to      without public
   to Brimscombe                               council, to hold                                              gap still at similar
                         funding for other                            be unviable.         funding were
         Port.                                   the property.                                                     levels.
                         sections of canal.                                                  negligible.
Redevelopment of Brimscombe Port - Stroud District Council
Background
                                 Canal Project

Council decided to de risk the
   site further to assist with
                                   Successful bid to Homes
viability and make the scheme
                                   England in 2015 for a £2   Project back on track
more attractive for developers
                                        million loan
 to invest and contributed £1
         million to do so.
Background
        Management
Transfer of the site from SVCC to SDC took place
in April 2020

Vacant possession required of all units (apart
from the Mill and Salt House which will remain)
to put in the necessary infrastructure

Listed Mill building will remain. Recent
refurbishments and water source heat pump

Surplus income generated is accumulated
towards the redevelopment
The Industrial Estate

The Business Park
                                            The Mill
Relocation of
               Stakeholder                   current tenants
              requirements                                              Reinstatement
                 (SVCC, B&TPC,                                           of canal and
              Community centre) –                                            basin
              Output Specification
              (Development Brief)

3rd Party land                                                                    EA designation
   impacted                                                                        Flood Zone 3
 (now acquired)                            Redevelopment
                                           considerations

       Levels
   (Site is level but                                                             Ecology
   significant drop
      from A419)
                           Listed buildings &           Contamination
                           Industrial Heritage           (History of industrial
                           Conservation Area            uses and coal storage.
                                                        Asbestos, particularly
                               ( Listed Building          infilled canal, some
                              Consent received)                  gassing)
Delivery Strategy for Phase 1
                           Select a partner to
  Develop the site
                             work with the             Dispose on the open
  ourselves – risk/
                           Council to develop             market – loose
funding - £40 million
                          the Port and deliver               control
   development
                              on its vision
                           Continue to de risk by
                         demolishing the units and
                        tendering the infrastructure
                                   works

                         Approach supported by
                         Homes England and our
                          procurement advisors
Council current expenditure of
 £1.2million to de risk the site
        Extensive surveys

        Demolition of Unit 5

        Infrastructure design (Atkins engineers)

        Planning Permission and Listed Building
        Consent for infrastructure
        Stakeholder consultation - discussions
        regarding the community facilities

        Bids for public funding

        Land transfer/ purchase of The Ship Inn
Surveys

Ground investigation
CCTV and ground penetrating
radar
Ecology – habitat surveys
completed, bat house built
Archaeology
Infrastructure Design

            Essential to take the site out of the flood
            plain

            Atkins design

            Modelling with the EA

            Bourne Mill to Gough’s Orchard lock

            New access road, canal & basin, road and
            bridge works, river and canal crossing
Atkins proposed canal infrastructure
Planning Approach
                                                         Decided to proceed with
                                                          planning permission for
                                                          the infrastructure only
                                                         due to detail required for
      Hybrid planning                                     outline application in a
 application considered –                                     IHCA will prevent
   detailed design of the                                    innovation coming
infrastructure and outline                               forward from the private
  on the redevelopment.                                            sector.

                              Community consultation                                   Instead developed with
                             on this basis in December                                   key stakeholders the
                             2018 with a master plan –                                   Output Specification
                             overall positive feedback                                   (Development Brief)
                                 to our proposals.                                    against which bids will be
                                                                                               assessed.
Planning for Infrastructure and
                 Demolition
Detailed planning received on the 24 March 2021 for
infrastructure and demolition.
• Listed building consent for demolition of the modern additions to the mill
  building and the Port House received on the same date.
• Includes thirty moorings including some for residential use. They will be the
  only such moorings on the Stroudwater canal and will add to the housing
  diversity in the area.
• Allowance has been made in the design of the infrastructure to enable boats
  to be craned into the basin until the canal is fully opened up.
Phasing
Phase 1
 • Everything east of Brimscombe Hill – i.e. the canal, basin, new access road off
   the A419 and the redevelopment of the Port
 • Procurement of a partner for this phase only at this stage
 • Planning permission for the infrastructure, public funding and viability
   assessed for this phase
Phase 2
 • Road and bridge works to take the river and canal under Brimscombe Hill and
   connect up to Goughs Orchard Lock
 • Planning permission received and flood modelling complete
 • Once the Port is developed more likely that funding will be successful for
   Phase 2
Phase 3
 • Connection up to the rest of the canal – flood modelling complete
Connection of the canal to the national
               network
Always been done in sections as funding allows

Phase 1a completed from Stonehouse to Stroud
Brewery – Ebley is still adjacent to unconnected
canal

A38 roundabout works

Work on the Ocean Bridge

Phase 1b – successful bid to HLF - £8.9 million -
Stonehouse to Saul Junction

Canal videos
https://youtu.be/tCTIR26vt5s
https://youtu.be/e9HHtYgjSxY
Ebley - Before
Ebley - After
Output Specification

                                                  Social value – local
                         Sustainability – Net
 Sets out vision for                                    labour,                    Accreditation with
                         zero homes - 2030
      the site                                   apprenticeships and              Building with Nature.
                              Strategy
                                                       training

  30% affordable                                 1000m2 commercial
                         50% rent and 50%                                           Land for free for
housing – approx. 50                             space – retail, office
                         shared ownership                                          community space
      homes.                                        workshop etc

                          Active travel -       https://www.stroud.gov.uk/medi
                                                 a/1485658/brimscombe-port-
                        pedestrian and cycle     output-specification-nov-2019-
                              routes                       final.pdf
Community Engagement
Drop in event in December 2018 – well attended

Key stakeholders involved in the development of the Output Specification

Website – FAQs, Committee reports, Output Specification
https://www.stroud.gov.uk/environment/brimscombe-port

Once selected the developer with the Council will prepare the planning application for
the redevelopment with community engagement a key part of that process

Discussing with the Parish about how we continue after today to keep the community
informed, engaged and to hear their views

Community centre – Parish – develop plans
Public Subsidy
Funding Source                        Funding    Expenditure
                                                 to 2021/22

SDC Capital                            £2.600m

HE Loan and LRF                        £2.776m

SDC Revenue to end of 2021/22          £0.397m

Total funding                          £5.773m

Less expenditure (excl. demolition)               £1.349m

Funding available/Subsidy                         £4.424m
Key Milestones
Key Milestones
Activity                               Estimated Date
Marketing of development opportunity           Sep-21
Commencement of procurement
process to select a developer partner          Oct-21
Demolition start                               Oct-21
Procurement of infrastructure contract         Oct-21
Demolition complete                            Apr-22
Approval to appoint developer partner          May-22
Development Agreement completed                Jun-22
Infrastructure can start                       Jun-22
Planning application submission                 Jan-23
Redevelopment commences                        Oct-23
Redevelopment completes                        Oct-25