REBO Edition OCTOBER 2019 offshore wind Terminal PORT OOSTENDE Installation www.reboostende.be www.portofoostende.be
Renewable Energy Base O o stende Founded in October 2010 © Otary The Rebo terminal is the perfect terminal for: > handling goal > lifting Invests in existing and > storage INVEST new port infrastructure. > assembling > transportation of offshore components. 15 ha concession of Port Oostende CONCESSION to REBO from 1/1/2011 to 31/12/2035. Acts as a landlord for project LANDLORD developers, manufacturers and EPCI-contractors. REBO IS A MEMBER OF 2 3
OFFSHORE WIND extenSion IN BELGIUM BELGIAN ENERGY TARGETS 2030 BELGIAN Marine Spacial Plan Source: Belgian Offshore Platform TO BE REALISED BY THE FEDERAL BELGIAN GOVERNMENT by 2030 2,2 GW + 1,8 GW = energy of 1 nuclear reactor installed by 2030 installed in 2020 Belgian 1556 MW installed today territorial waters Wind farms in the Dutch part of the 6 wind farms: Norther, C-Power, Rentel, North Sea Northwind, Belwind, Nobelwind sa ilin g SeaMade 2 Borssele 5 Borssele 1 = 318 wind turbines New concession zone ro ut es Borssele 4 for wind farms 2,2 GW installed in 2020 Operational and Northwester II planned wind farms Borssele 3 = 399 wind turbines Borssele 2 = 8,5 TWh > covers about half of the EU at 35 km from the coast Nobelwind at 23 km from the coast obligations for 2020 for the electricity sector Belwind SeaMade 1 = 225 km² Northwind Nature reserve 4 GW installed by 2030 ‘Vlakte van de Raan’ Belgian Rentel territorial Island for waters C-Power coastal Norther 1,8 GW extra on 221 km² extra space protection Fishing zone 15000 jobs Zone for shooting for construction and operations & practice ‘Parking’ maintenance of the wind farms for ships Knokke-Heist Zones for wave 4 Zeebrugge th highest and tidal energy, aquaculture, cultivation sailing routes of seaweed, mussels Belgium is in fourth place in global ranking of and oysters countries with highest installed capacity Wind farms in the Oostende French part of after the UK, Germany and Denmark the North Sea Nieuwpoort De Panne source: De Tijd / tijd.be / 21-04-2018 Source: De Tijd / tijd.be / 21-04-2018 4 5
PORT OF ROTTERDAM wind farms in the Dutch part of the North Sea THE NETHERLANDS wind farms in the Belgian 51° 44’ N BORSSELE 5 part of the North Sea 002° 58’ E BORSSELE 4 BORSSELE 1 SEAMADE 2 NORTHWESTER 2 BELWIND BORSSELE 3 NORTH SEA NOBELWIND BORSSELE 2 29.14 SEAMADE 1 Blighbank nautical miles NORTHWIND RENTEL 51° 34’ N Lodewijkbank 003° 03’ E C-POWER Thorntonbank NORTHER operational wind farm 21.89 nautical miles wind farm under construction PORT OF VLISSINGEN 51° 26’ N 003° 36’ E 29.14 20.47 connection nautical miles to Zeebrugge nautical miles TERNEUZEN PORT OF ANTWERPEN © C-Power ZEEBRUGGE BELGIUM connection to Oostende ANTWERPEN PORT OOSTENDE 51° 14’ N more info: www.reboostende.be 002° 55’ E COUNTRY KM to Oostende WIND FARM CAPACITY INSTALLED (MW) # TURBINES CONNECTION BE 23 Norther 370 MW 370 MW 44 x 8.4 MW MHI Vestas Zeebrugge BE 30 C-Power 325 MW 325 MW 6 x 5 MW Senvion Oostende 48 x 6.15 MW Senvion BE 40 Rentel 309 MW 309 MW 42 x 7.35 MW Siemens Zeebrugge (MOG) GENT BE 43 Northwind 216 MW 216 MW 72 x 3 MW MHI Vestas Zeebrugge BE 46 SeaMade 252 MW under construction 58 x Siemens Gamesa 8 MW Zeebrugge (MOG) 57 + 235 MW start 2020 FRANCE BE 50 Belwind 171 MW 171 MW 55 x 3 MW MHI Vestas Zeebrugge 1 x 6 MW GE BE 50 Nobelwind 165 MW 165 MW 50 x 3.3 MW MHI Vestas Zeebrugge BE 55 Northwester 2 224 MW under construction 23 x 9.5 MW MHI Vestas Zeebrugge (MOG) operational in 2020 TOTAL 2259 MW 1556 MW in September 2019: 318 turbines operational NL Borssele 1 & 2 752 MW under construction 94 x 8 MW Siemens Gamesa Vlissingen NL Borssele 3 & 4 680 MW under construction 77 x 9,5 MW MHI Vestas Vlissingen 6 7
EASY ACCESS to port oostende HEAVY LIFTING at the REBO TERMINAL • 51°14’ N - 2° 56’ E • no locks, no bridges • warehouse space of 50 000 - 80 000 m2 • mobilisation or demobilisation MARITIME ACCESS • draught: -8.4 LAT m • priority for installation vessels STORAGE • 90 ha open storage for breakbulk of vessels/ barges • harbour width: 270 m • sailing time to open sea 10 minutes activities (inner & outer port) reinforced quay 300 m up to 20 t/m² 270 m 150 m reinforced seabed REBO offshore wind terminal E40/A10 • airport and heliport at 5 kms • railway to terminal • quay length: 800 m • berth for installation vessels LOCATION • no aircraft restrictions • waterway connection with inner port HEAVY LIFT • 15 ha of terminal surfaces • jack up facilities next to the quay • direct connection to highway CAPACITY (with heavy lift capacity) Ì 8 9
references references 2008 2012-2013 2018 C-Power I: project management + installation (2008) + O&M Rentel: project management + C-Power II & III: installation (2018) + O&M © Robert Pirotte project management + © Northwind installation (2012 - 2013) + O&M 2013 2014 2019 Belwind - GE Haliade 150 6 MW: installation (2013) + O&M Northwester 2: project management + installation (2019) + O&M Northwind: storage of unused cable (2013) Belwind & Northwind: project management (2014) + O&M © GE © Parkwind 2016 2017 2020 Nobelwind: project management + Seamade: installation (2016) + O&M project management + installation (2020) + O&M Kriegers Flak: construction (2017) © Otary © Jan De Nul 10 11
OFFSHORE installation vessels & barges operatiNG from the REBO terminal WIND PIONEER NEPTUNE GOLIATH THOR Project: Nobelwind Project: C-Power II&III Project: C-Power II&III Project: C-Power II&III Client: Jan De Nul Client: DEME Client: DEME Client: DEME Length: 57 m Length: 60 m Length: 60 m Length: 70 m BOKABARGE RAMBIZ APOLLO EIDE BARGE 42 FLINTER ROSE Project: NORTHWESTER 2 Project: C-Power I Project: SEAMADE Project: C-Power II&III Project: Haliade 6MW on Belwind Client: PARKWIND Client: DEME Client: DEME Client: DEME Client: Alstom / GE Length: 84 m Length: 85 m Length: 87.5 m Length: 100 m Length: 101 m 14 15
OFFSHORE installation vessels & barges operatiNG from the REBO terminal © Vlaams Gewest JUMBO VISION BOLD TERN SEA INSTALLER INDUSTRIAL REVOLUTION Project: Haliade 6MW on Belwind Project: Haliade 6MW on Belwind Project: Rentel Client: Alstom / GE Client: Alstom / GE Client: SIEMENS GAMESA Project: Nobelwind Length: 110 m Length: 132 m Length: 132 m Client: Jan De Nul Length: 135 m © Jan De Nul TAILLEVENT VOLE AU VENT ROTRA VENTE BOABARGE 37 Project: Nobelwind Project: Rentel Project: Kriegers Flak Client: Jan De Nul Client: Jan De Nul Client: Siemens Client: JAN DE NUL Length: 139 m Length: 140 m Length: 141 m Length: 152 m 16 17
PRE-installation & storage activities Transition Piece Nacelles Transition Piece weight: 230 t weight: 400 t weight: 230 t LOADING & STORAGE UNLOADING NACELLES VIA LOADING & STORAGE OF TRANSITION PIECES RORO OF monopiles and TRANSITION PIECES © Parkwind © Jan De Nul © Jan De Nul LOADING MONOPILES construction storage of blades & PRE-ASSEMBLY storage of gravity based foundation TOWER ELEMENTS OFFSHORE HIGH voltage Monopile length: 80 m GBF 1 = 6000 t station GBF 2 = 9000 t Blades Tower element length: 25 m length: 75 m height: 87 m width: 25 m weight: 962 t Nobelwind Kriegers flak RENTEL Northwester 2 by Parkwind (Danish Baltic Sea) by OTARY by parkwind 18 19
REBO Edition OCTOBER 2019 offshore wind Terminal PORT OOSTENDE REBO offshore wind terminal PORT OF OOSTENDE Operations & maintenance www.reboostende.be www.portofoostende.be
operations, maintenance & REPAIR © Otary 2500 2000 Local Employment FTE goal ± 50 companies ± 800 jobs 1500 1000 800 FUTURE 500 Be the reference hub in O&M for offshore wind farms. 466 0 Provide the most suitable accommodation and 2010 2012 2014 2016 2018 2020 ... 2030 the best possible business climate for companies 2,2 GW 4 GW installed capacity active in the Blue Economy. Offshore related O&M traffic 2015 2016 2017 2018 Contribute to the inflow of local and skilled staff. Crew Transfer Vessels 2129 2652 3234 4568 Service Operation Vessels 57 96 2 3
o&m activities Crew Transfer vessels & overnight berthing for CTV’s seRvice operaTion vessels njord curlew geo ocean IV Offshore Turbine BEFORE THE LOCK geosurveyor XIX Services Quay 605 -606: 7 pontoons & 1 boatlanding windcat IV bluefort geosurveyor XIX RYCO 14 pontoons bunkering station for CTV’s BEHIND THE LOCK esvagt mercator omalius SIEM MOXIE Visserijdok Vlotdok 4 5
offices & storage area TRAINING & EDUCATION fully equipped offices & storage with direct access to the quay GeoSea | Parkwind | MHI Vestas RelyOn Nutec center on site Siemens Gamesa | Norther Senvion Benelux Elia Group Deme Offshore fully equipped sanitary complex for up to 100 offshore technicians new warehouses and offices under development 6 7
Offshore companies active in Oostende Related services on the REBO terminal Port & maritime services Wind turbine manufacturers Offshore concessionaires Recruitment of qualified staff Offshore technical services Weather forecasting Training & education on site Network organisations Easy accessibility Emergency services Heliport General technical services Focus on Blue Growth Business events City Life www.reboostende.be REBO nv | Slijkensesteenweg 2 BE 8400 Oostende | +32 59 34 07 11 Emmanuël Timmermans Business Development Manager e.timmermans@reboostende.be OWI 8 9 © NHV
You can also read