Ready to Ride the Copper Wave - 2018 AGM June 12, 2018 - NGEx Resources
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
LONG TERM DEMAND PICTURE IS STRONG GOING GREEN REQUIRES A LOT OF COPPER China to invest $356 billion in clean energy Source: The Virtual Capitalist
SUPPLY- MORE LIMITED THAN MANY BELIEVE PRODUCTION AND GRADES AT EXISTING MINES DECLINING Produc5on declining Grades declining
SUPPLY- MORE LIMITED THAN MANY BELIEVE PROJECT PIPELINE IS THE LOWEST IN DECADES NEW PROJECTS ARE NEEDED
JUNIOR MARKET UNDERVALUED DESPITE THE ROBUST OUTLOOK JUNIOR STOCKS HAVE LAGGED COPPER AND MAJOR COMPANY STOCKS Major Miners Index Copper Price NGEX TSX Venture (Junior Company Index) A CATCH-UP IS OVERDUE!
BUSINESS MODEL RETURNING TO OUR ROOTS • Lundin Group Explorer/Project Incubator • Focused on the high reward part of the mining value chain • Creating value from discovery and definition of new deposits • Discover – Define – Create Value - REPEAT High Risk /High Reward Perceived Lower risk Full Value Produc5on from deple5ng asset Josemaria/Los Helados Rela5ve Share Price Discovery Commercial Produc5on Nacimientos Early Stage Explora5on Ini5al drilling Deposit Engineering Construc5on Produc5on defini5on Studies
NGEX ADVANCED PROJECTS WELL POSITIONED TO FILL THE GAP Central processing plant • 150,000 tonnes of copper • 180,000 ounces of gold • 1,200,000 ounces of silver per year JOSEMARIA for 48 years NPV8 IRR Payback $2.6 B 16.6% 3.6 aZer tax aZer tax years Recoveries $3 Cu C1 Costs 88% Cu $1275 Au $1.05/lb Cu 73% Au 8 LOS HELADOS For details please see the Project Constella5on Report which is available under the Company’s profile at www.sedar.com
PROJECT CONSTELLATION SENSITIVITIES STRONG LEVERAGE TO POSITIVE CHANGES SINCE STUDY COMPLETED IN 2016 After-Tax, NPV Sensitivity, US $Million (rounded) Sensi0vity to Discount $2.50/lb Copper $3.00/lb Copper $3.50/lb Copper Rate & Copper Prices (USD billion) (USD billion) (USD billion) Pre-Tax AZer-Tax Pre-Tax AZer-Tax Pre-Tax AZer-Tax Discounted at 5% 4.95 3.08 7.77 4.99 10.59 6.87 Discounted at 8% 2.57 1.36 4.43 2.61 6.28 3.84 Discounted at 10% 1.60 0.66 3.07 1.65 4.54 2.62 Table shows the sensitivity of estimated NPV’s for the Project’s cash flows at various copper prices and discount rates (Au and Ag held flat at $1,275/oz and $20/oz respectively). PEA base case highlighted. Note: For details please see the Project Constella5on Report which is available under the Company’s profile at www.sedar.com …since completion of the PEA in 2016 • NGEX interest in Josemaria increased from 60% to 100% – Josemaria provides all of the initial cash flow from the project • Argentina corporate tax rate reduced from 35% to 25% • Copper price has increased from $2.00 to $3.25 9
WORKING ON DE-RISKING PATH TO PRODUCTION FOCUS ON LOW COST OPTIONS TO CREATE VALUE Los Helados surface rights acquisi5on Baseline environmental studies Focus Engineering op0miza0ons Engagement with partners and possible acquirers
Copper - Contained Tonnes 5,000,000 0 10,000,000 20,000,000 30,000,000 40,000,000 15,000,000 25,000,000 35,000,000 Andina Division Escondida El Teniente Collahuasi SCARCITY = VALUE Olympic Dam Chuquicamata 118,900,000 Grasberg KGHM Polska Miedz Pebble SOURCE: SNL Metals & Mining, Company Reports Pampa Escondida 69,600,000 Los Pelambres Taimyr Peninsula Radomiro Tomic Buenavista Los Bronces Baimskaya Udokanskoe Kamoa Andina Project Resolution Project Oyu Tolgoi Udokanskoe Reko Diq OperaDivision Kamoa La Granja Constellation Central Region Antamina Quebrada Blanca Cons tellation - NGEx Toqui Cluster Toquepala Los Sulfatos Konkola Morenci Cobre Panama Cerro Verde ting - Held by ma jor or s tate owned company El Pachon Undeveloped - Held by major or state owned company Salvador Tampakan World's 50 Largest Copper Resources Project Constellation Kamoto JV NGEX Project Corridor Mina Ministro Hales Quellaveco Undeveloped - Controlled by a junior company (i .e. available for a cquisition) Taca Taca Frieda River Centinela Sulfide Las Bambas Spence ONE OF THREE TOP 50 RESOURCES HELD BY A JUNIOR KSM Cerro Colorado Oroyek Aynak La Caridad Twin Metals El Abra 11
NEXT STEPS TWO TRACK APPROACH Advanced Projects Explora5on • Fast track a simpler open pit project at • Acquired 2 district scale copper-gold Josemaria projects in Argentina • Targeting PFS by Q1 2019 • Fast tracked one to scout drilling phase in • Then start process for permitting; water Q1 2018 rights etc • Encouraging results to date • Maintain optionality of Los Helados • Evaluating other opportunities • Continue to pursue regional synergies 12
ADVANCED PROJECTS - JOSEMARIA STRONG PROJECT WITH A LOT OF OPTIONALITY AND FLEXIBILITY • 100% owned • Straightforward open pit operation with a low strip ratio; shallow high-grade • Simple metallurgy - clean concentrate • Good permitting regime; no local population • Opportunities to improve on original Constellation design – Capex can be optimized and refined – More compact site layout – Chile power? – Smaller closer tailings facility – Nearby water source • Plan: Complete a PFS, Q1 2019 • …then; start permitting, apply for water license, etc. 13
NACIMIENTOS COPPER GOLD PROJECT FAST TRACKED TO DRILL STAGE- RESULTS PENDING COVER SILICA GOLD TARGET COPPER TARGET 14
NACIMIENTOS SUMMARY HIGH POTENTIAL UNEXPLORED COPPER GOLD SYSTEM • Large scale system with both porphyry copper-gold and epithermal gold targets • Good location in a possible Gold target extension of the Veladero - El Indio gold belt. Copper-Gold target • Easy access and proximity to Copper-gold target paved roads sped up targeting work • Three scout holes drilled at end of season to test geological model. • Model confirmed. Assays pending - expected end of Q2 • More drilling planned for Q4 15
CATALYSTS • Additional exploration drilling new projects -Q4 • Josemaría water drilling- Q4 • Josemaría PFS - Q1 2019 • Initiate Josemaría permits - Q1? • Acquire additional exploration projects - ongoing 16
PATIENCE WILL BE REWARDED THE BIGGEST RETURNS HAVE BEEN FROM EXPLORATION/DEVELOPMENT PLAYS
THE NEXT NGEX DISCOVER-DEFINE-CREATE VALUE - REPEAT 18
You can also read