Quarterly Analyst Presentation First Quarter 2021 - 28 May 2021 - Chememan

Page created by Elmer Baldwin
 
CONTINUE READING
Quarterly Analyst Presentation First Quarter 2021 - 28 May 2021 - Chememan
Quarterly Analyst Presentation

First Quarter 2021

28 May 2021

                                 1
Quarterly Analyst Presentation First Quarter 2021 - 28 May 2021 - Chememan
Disclaimer

The information contained in our presentation is intended solely for reference only. Please do not circulate this material. If you are not an
intended recipient, you must not read, disclose, copy, retain, distribute or take any action in reliance upon it.

In addition, such information contains projections and forward-looking statements that reflect our current views with respect to future
events, financial performance and result of CMAN's activities. These views are based on assumptions subject to various risks and
uncertainties. No assurance is given that future events will occur, that projections will be achieved, or that our assumptions are correct.
Actual results may differ materially from those projected.

The information contained in this presentation is subject to change without notice and CMAN does not undertake any duty to update the
forward-looking statements, and the estimates and assumptions associated with them, except to the extent required by applicable laws
and regulations.

Q1 2021 ANALYST PRESENTATION                                                                                                                    2
Quarterly Analyst Presentation First Quarter 2021 - 28 May 2021 - Chememan
Agenda

                  Business Overview          Financial              Outlook
                                           Performance

                 ▪ Company Overview     ▪ Recap               ▪ Strategic Framework
                 ▪ Operating Assets     ▪ Financial Results
                 ▪ Capacity Statement

                                               Q&A

Q1 2021 ANALYST PRESENTATION                                                          3
Quarterly Analyst Presentation First Quarter 2021 - 28 May 2021 - Chememan
Chememan                                                         Established in 2003, Chememan Plc (CMAN) is the world’s leading producer of lime and lime derivative
                                                                      chemical products having the largest production capacity in Asia of 1,000,000 TPA.
     At A Glance                                                      Being a fully-integrated lime producer with strong supply network, CMAN has been renowned as the
                                                                      preferred supplier of customers in over 30 countries for a myriad of uses across Asia, Australia, and
                                                                      Africa.

                    1                            2                           3

                        Mineral
     Mining             Dressing                     Calcination                  Hydrator
                         Plant

      Distribute                    Distribute                      Distribute

                        Limestone                    Quicklime                   Hydrated
                                                                                   Lime

                        Grinding                      Grinding
                         Plant                         Plant

       Distribute                   Distribute

                                                 Ground Quicklime
                          CAL

Q1 2021 ANALYST PRESENTATION                                                                                                                                                  4
Quarterly Analyst Presentation First Quarter 2021 - 28 May 2021 - Chememan
Operating Assets (as of May 2021)
                                                                                                                   Vietnam
                                                                                                                   Ha Long QN Lime Quarry *

                                                                                                                   Ha Long QN Lime Plant (Quang Ninh) *

                                                                                                                                  Thailand
                                                                                                                                   Tubkwang Quarry

                                                                                                                                   Kangkoi Plant
                                                                                                                                   CalMix ***
                                                         India
                                                                                                                                   Prabuddhabaht Plant
                        Easternbulk Lime Products **
                                                                                                                                   Rayong Plant
                            Siriman Chemicals India **

                                                                                                      Australia
                                                                                                      Kwinana DC                                     LEGEND
                                                                                                                                                      Quarry
* CMAN’s ownership interest is 80% of Ha Long QN Lime Quarry and Ha Long QN Lime Plant (Quang Ninh)                                                  Production Plant
** CMAN’s ownership interest is 50% of Easternbulk Lime Products and Siriman Chemicals India
*** CMAN’s ownership interest is 51% of CalMix Co., Ltd.                                                                                              DC
Q1 2021 ANALYST PRESENTATION                                                                                                                                            5
Quarterly Analyst Presentation First Quarter 2021 - 28 May 2021 - Chememan
Capacity Statement (as of May 2021)                                        Total Installed Capacity 2021: >1,000,000 TPA

  Tubkwang (TK) Quarry         Tubkwang Crushing Plant                Kangkoi (KK)                  Prabuddhabaht (PBB)                  Rayong (RY)
                                                                    Production Facility              Production Facility              Production Facility

 ▪ >100m MT limestone          ▪ 3 million TPY capacity         ▪ >500k TPY QL capacity           ▪ >350k TPY QL capacity          ▪ >87k TPY HL capacity
   mineable reserves
                               ▪ Grinding limestone into        ▪ 6 coal-fired lime kilns         ▪ 2 natural gas-fired lime       ▪ Hydrated lime plant
 ▪ The current mining            smaller sizes                                                      kilns
   concession is valid until                                    ▪ The largest and most                                             ▪ Situating in the heart of
   2040                                                           cost-efficient production       ▪ The 2nd largest production       Thailand’s Eastern
                                                                  facility with most                facility producing a higher-     Seaboard region, one of
 ▪ Operating under strict                                         advanced lime kiln                grade end products               Asia’s most successful
   mining standards and well                                      technology from Maerz                                              large-scale industrial
   above the Thai                                                                                 ▪ Production occurs for            developments, which is
   government's                                                 ▪ Locating only 3 kms from          more premium value               only 27 kms away from
   environmental                                                  TK quarry, resulting in           customers and to meet            Laem Chabang deep
   requirements                                                   near seamless mining              peak demand                      seaports
                                                                  and production
                                                                  integration

                                                                       CAL Station
                                    ▪ 300k TPY capacity combined from 3 locations

                                    ▪ Consuming undersized limestone as raw material to achieve mining material balance

Q1 2021 ANALYST PRESENTATION                                                                                                                                     6
Quarterly Analyst Presentation First Quarter 2021 - 28 May 2021 - Chememan
Capacity Statement (as of May 2021)

Ha Long QN Lime (HLL)            Ha Long QN Lime (HLL)             Easternbulk Lime (EB)            Siriman Chemicals India               Kwinana
       Quarry                     Production Facility*              Production Facility                    (Siriman)              Super Distribution Center
                                                                                                       Production Facility
▪ 75m MT limestone             ▪ >182k TPY QL capacity,        ▪ >47k TPY QL capacity             ▪ >47k TPY QL capacity          ▪ COD: June 2021
  mineable reserves              120k TPY HL capacity            (current)                          (current)
                                                                                                                                  ▪ State-of-the-art DC designed
▪ The current mining           ▪ 2 coal-fired lime kilns       ▪ >47k TPY QL capacity             ▪ >47k TPY QL capacity            and built >500,000 TPY of
  concession is valid until                                      (under construction)               (under construction)            QL imports by many world-
  2046                         ▪ The 2nd production base                                                                            class customers in the
                                 capable for capacity          ▪ 1 coal-fired lime kiln           ▪ >35k TPY HL capacity            region
▪ Operating well above the       expansion to over 500k TPY
  Vietnam government’s                                         ▪ Significant product demand       ▪ 1 coal-fired lime kiln
  environmental                ▪ Locating only 3 kms away        from nearby plants resulted in
  requirements                   from HLL Quarry, resulting      the immediate order for a 2nd    ▪ Hydrated lime plant
                                 in near seamless mining and     lime kiln to be completed in
                                 production integration          Dec 2021                         ▪ Market territory of Eastern
                                                                                                    India
                               ▪ Situating close to 2 deep     ▪ Market territory of Southern
                                 seaports – Cai Lan and Hai      India
                                 Phong, offering highly
                                 competitive advantages for
                                 future market development

Q1 2021 ANALYST PRESENTATION                                                                                                                                       7
Quarterly Analyst Presentation First Quarter 2021 - 28 May 2021 - Chememan
Proven Performance
   Compelling growth through continuous capacity expansion, technological advancement and cost management

                                             Build-up                           Breakthrough

Q1 2021 ANALYST PRESENTATION                                                                                8
Quarterly Analyst Presentation First Quarter 2021 - 28 May 2021 - Chememan
Agenda

                  Business Overview          Financial              Outlook
                                           Performance

                 ▪ Company Overview     ▪ Recap               ▪ Strategic Framework
                 ▪ Operating Assets     ▪ Financial Results
                 ▪ Capacity Statement

                                               Q&A

Q1 2021 ANALYST PRESENTATION                                                          9
Quarterly Analyst Presentation First Quarter 2021 - 28 May 2021 - Chememan
An excellent quarter on all fronts

                                                                1Q21 Recap
                                                                MAINTAINING SAFE & PROFITABLE OPERATIONS
               The World’s Leading Lime Producer                 ▪ Increase production levels to 55% from 30% in 3Q20
                                                                    while maintaining COVID-19 protocols and strong safety
                                                                    record
                                                                 ▪ 1Q21 net income of Baht 55 million
                                   Cost                          ▪ Highest quarterly EBITDA (excluding special items) of
                               Optimization                         Baht 161 million since listed on SET
              Advanced                             Vertical &
            Technology &                           Horizontal   IMPLEMENTING OUR STRATEGY
             Automation                            Expansion      ▪ Construction of Kwinana Super Distribution Center
                                  To be
                                                                    >80% complete and ready for operations by June 2021
                               >2 MTY Lime                        ▪ Start of commercial operations at Siriman in January 2021
                               Producer by                        ▪ Development of 2nd lime kiln expansion project at EB
                                  2025
             Agile Ways                          People
                                              Development       POSITIONING FOR THE FUTURE
             of Working                                          ▪ Introduction of new organization structure to align roles
                                Sustainable                         and responsibilities with future plans
                               Development                       ▪ Contact with local financial institutions in countries like
                                with Good                           Australia and Vietnam to support business operations
                               Governance                        ▪ Discussions on new joint ventures in multiple countries
                                                                    for limestone mining, lime production facilities, and
                                                                    downstream product expansion

Q1 2021 ANALYST PRESENTATION                                                                                                     10
Strong Consolidated Financial Performance

Q1 2021 ANALYST PRESENTATION                 11
Q1 2021 Consolidated Sales Performance

          CAL      1Q20         2Q20      3Q20      4Q20      1Q21
         (MT)     274,927      297,753   257,948   268,414   366,311

     Key Highlight                                                     Key Highlight
     • The above chart includes only sales of QL and HL, and           • QL sales revenue increased in 1Q21 from seasonal demand
        excludes CAL products                                             of domestic sugar industry
                                                                       • 1Q21 CAL products’ sales revenue rose as CMAN acquired
                                                                          new customers from iron and steel industry

Q1 2021 ANALYST PRESENTATION                                                                                                       12
Market Portfolio

                               Key Highlights

                               ▪   CMAN supplies to a broad array of
                                   industrial customers across Asia,
                                   Australia and Africa

                               ▪   Market segmentation of CMAN has
                                   been shifted overtime and more well-
                                   diversified, where mining sectors, pulp
                                   & paper and sugar are major
                                   customers, presenting nearly 50% of
                                   total sales revenues

Q1 2021 ANALYST PRESENTATION                                                 13
Agenda

                  Business Overview          Financial              Outlook
                                           Performance

                 ▪ Company Overview     ▪ Recap               ▪ Strategic Framework
                 ▪ Operating Assets     ▪ Financial Results
                 ▪ Capacity Statement

                                               Q&A

Q1 2021 ANALYST PRESENTATION                                                          14
Strategic Framework
                                 1Q2021                                          2021                              2022 onwards
Thailand    ▪ Emphasized on cost optimization                  ▪ Operating all lime kilns at their full     ▪ Exploring new venture opportunity to
            ▪ Increased production utilization to                production capacity                          enhance market-leading position and
              60% from 30% to support demand                   ▪ Continuing additional cost efficiencies      overall portfolio value
              recovery                                           and debottlenecking key production areas   ▪ Progressing and developing new product
            ▪ Intensively adjusted customer                    ▪ Studying new product expansion             ▪ Building culture of continuous
              portfolios to mitigate the impact of               opportunity                                  improvement
              increasing freight cost                          ▪ Executing people development program
            ▪ Developed new organization structure               to enhance alignment of roles and
              to align with future plans                         responsibilities with business strategy

Vietnam     ▪ Increased production utilization in              ▪ Expanding production capacity by           ▪ Starting operation of 3rd lime kiln at
              response to growing lime demand in multiple        developing 3rd lime kiln at HLL              HLL (4Q22)
              countries                                        ▪ Penetrating additional markets in Asia
            ▪ Intensively adjusted customer portfolios to        and Oceania
              mitigate the impact of increasing freight cost

India       ▪ Developed 2nd lime kiln and HL plant             ▪ Starting operation of 2nd lime kiln and    ▪ Starting operation of 2nd lime kiln at
              at EB after the latest kiln expansion has          HL plant at EB (Dec)                         Siriman
              been sold out                                                                                 ▪ Studying new joint ventures and product
                                                               ▪ Stabilizing kiln utilization at Siriman      expansion opportunity in other territories
            ▪ Started operation at Siriman in Jan

Australia   ▪ Actively focused on construction of              ▪ Starting operation of Kwinana Super DC,    ▪ Growing a larger customer base while
              Kwinana Super DC to be ready for                   ready to manage up to 500,000 TPY            maintaining excellent distribution services
              operation within June 2021                         capacity to many world-class customers
                                                                 throughout Western Australia

            Health and safety protection measures for our employees and community remains our top priority as COVID-19 pandemic continues
Q1 2021 ANALYST PRESENTATION                                                                                                                                15
Agenda

                  Business Overview          Financial              Outlook
                                           Performance

                 ▪ Company Overview     ▪ Recap               ▪ Strategic Framework
                 ▪ Operating Assets     ▪ Financial Results
                 ▪ Capacity Statement

                                               Q&A

Q1 2021 ANALYST PRESENTATION                                                          16
Thank you for your attention

                                             Contact Us:
                                      Investor Relation Department
                               +66 2661-9734-8 ext. 110   IR@chememan.com

Q1 2021 ANALYST PRESENTATION                                                17
You can also read