Quarterly Analyst Presentation First Quarter 2021 - 28 May 2021 - Chememan
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Disclaimer The information contained in our presentation is intended solely for reference only. Please do not circulate this material. If you are not an intended recipient, you must not read, disclose, copy, retain, distribute or take any action in reliance upon it. In addition, such information contains projections and forward-looking statements that reflect our current views with respect to future events, financial performance and result of CMAN's activities. These views are based on assumptions subject to various risks and uncertainties. No assurance is given that future events will occur, that projections will be achieved, or that our assumptions are correct. Actual results may differ materially from those projected. The information contained in this presentation is subject to change without notice and CMAN does not undertake any duty to update the forward-looking statements, and the estimates and assumptions associated with them, except to the extent required by applicable laws and regulations. Q1 2021 ANALYST PRESENTATION 2
Agenda Business Overview Financial Outlook Performance ▪ Company Overview ▪ Recap ▪ Strategic Framework ▪ Operating Assets ▪ Financial Results ▪ Capacity Statement Q&A Q1 2021 ANALYST PRESENTATION 3
Chememan Established in 2003, Chememan Plc (CMAN) is the world’s leading producer of lime and lime derivative chemical products having the largest production capacity in Asia of 1,000,000 TPA. At A Glance Being a fully-integrated lime producer with strong supply network, CMAN has been renowned as the preferred supplier of customers in over 30 countries for a myriad of uses across Asia, Australia, and Africa. 1 2 3 Mineral Mining Dressing Calcination Hydrator Plant Distribute Distribute Distribute Limestone Quicklime Hydrated Lime Grinding Grinding Plant Plant Distribute Distribute Ground Quicklime CAL Q1 2021 ANALYST PRESENTATION 4
Operating Assets (as of May 2021) Vietnam Ha Long QN Lime Quarry * Ha Long QN Lime Plant (Quang Ninh) * Thailand Tubkwang Quarry Kangkoi Plant CalMix *** India Prabuddhabaht Plant Easternbulk Lime Products ** Rayong Plant Siriman Chemicals India ** Australia Kwinana DC LEGEND Quarry * CMAN’s ownership interest is 80% of Ha Long QN Lime Quarry and Ha Long QN Lime Plant (Quang Ninh) Production Plant ** CMAN’s ownership interest is 50% of Easternbulk Lime Products and Siriman Chemicals India *** CMAN’s ownership interest is 51% of CalMix Co., Ltd. DC Q1 2021 ANALYST PRESENTATION 5
Capacity Statement (as of May 2021) Total Installed Capacity 2021: >1,000,000 TPA Tubkwang (TK) Quarry Tubkwang Crushing Plant Kangkoi (KK) Prabuddhabaht (PBB) Rayong (RY) Production Facility Production Facility Production Facility ▪ >100m MT limestone ▪ 3 million TPY capacity ▪ >500k TPY QL capacity ▪ >350k TPY QL capacity ▪ >87k TPY HL capacity mineable reserves ▪ Grinding limestone into ▪ 6 coal-fired lime kilns ▪ 2 natural gas-fired lime ▪ Hydrated lime plant ▪ The current mining smaller sizes kilns concession is valid until ▪ The largest and most ▪ Situating in the heart of 2040 cost-efficient production ▪ The 2nd largest production Thailand’s Eastern facility with most facility producing a higher- Seaboard region, one of ▪ Operating under strict advanced lime kiln grade end products Asia’s most successful mining standards and well technology from Maerz large-scale industrial above the Thai ▪ Production occurs for developments, which is government's ▪ Locating only 3 kms from more premium value only 27 kms away from environmental TK quarry, resulting in customers and to meet Laem Chabang deep requirements near seamless mining peak demand seaports and production integration CAL Station ▪ 300k TPY capacity combined from 3 locations ▪ Consuming undersized limestone as raw material to achieve mining material balance Q1 2021 ANALYST PRESENTATION 6
Capacity Statement (as of May 2021) Ha Long QN Lime (HLL) Ha Long QN Lime (HLL) Easternbulk Lime (EB) Siriman Chemicals India Kwinana Quarry Production Facility* Production Facility (Siriman) Super Distribution Center Production Facility ▪ 75m MT limestone ▪ >182k TPY QL capacity, ▪ >47k TPY QL capacity ▪ >47k TPY QL capacity ▪ COD: June 2021 mineable reserves 120k TPY HL capacity (current) (current) ▪ State-of-the-art DC designed ▪ The current mining ▪ 2 coal-fired lime kilns ▪ >47k TPY QL capacity ▪ >47k TPY QL capacity and built >500,000 TPY of concession is valid until (under construction) (under construction) QL imports by many world- 2046 ▪ The 2nd production base class customers in the capable for capacity ▪ 1 coal-fired lime kiln ▪ >35k TPY HL capacity region ▪ Operating well above the expansion to over 500k TPY Vietnam government’s ▪ Significant product demand ▪ 1 coal-fired lime kiln environmental ▪ Locating only 3 kms away from nearby plants resulted in requirements from HLL Quarry, resulting the immediate order for a 2nd ▪ Hydrated lime plant in near seamless mining and lime kiln to be completed in production integration Dec 2021 ▪ Market territory of Eastern India ▪ Situating close to 2 deep ▪ Market territory of Southern seaports – Cai Lan and Hai India Phong, offering highly competitive advantages for future market development Q1 2021 ANALYST PRESENTATION 7
Proven Performance Compelling growth through continuous capacity expansion, technological advancement and cost management Build-up Breakthrough Q1 2021 ANALYST PRESENTATION 8
Agenda Business Overview Financial Outlook Performance ▪ Company Overview ▪ Recap ▪ Strategic Framework ▪ Operating Assets ▪ Financial Results ▪ Capacity Statement Q&A Q1 2021 ANALYST PRESENTATION 9
An excellent quarter on all fronts 1Q21 Recap MAINTAINING SAFE & PROFITABLE OPERATIONS The World’s Leading Lime Producer ▪ Increase production levels to 55% from 30% in 3Q20 while maintaining COVID-19 protocols and strong safety record ▪ 1Q21 net income of Baht 55 million Cost ▪ Highest quarterly EBITDA (excluding special items) of Optimization Baht 161 million since listed on SET Advanced Vertical & Technology & Horizontal IMPLEMENTING OUR STRATEGY Automation Expansion ▪ Construction of Kwinana Super Distribution Center To be >80% complete and ready for operations by June 2021 >2 MTY Lime ▪ Start of commercial operations at Siriman in January 2021 Producer by ▪ Development of 2nd lime kiln expansion project at EB 2025 Agile Ways People Development POSITIONING FOR THE FUTURE of Working ▪ Introduction of new organization structure to align roles Sustainable and responsibilities with future plans Development ▪ Contact with local financial institutions in countries like with Good Australia and Vietnam to support business operations Governance ▪ Discussions on new joint ventures in multiple countries for limestone mining, lime production facilities, and downstream product expansion Q1 2021 ANALYST PRESENTATION 10
Strong Consolidated Financial Performance Q1 2021 ANALYST PRESENTATION 11
Q1 2021 Consolidated Sales Performance CAL 1Q20 2Q20 3Q20 4Q20 1Q21 (MT) 274,927 297,753 257,948 268,414 366,311 Key Highlight Key Highlight • The above chart includes only sales of QL and HL, and • QL sales revenue increased in 1Q21 from seasonal demand excludes CAL products of domestic sugar industry • 1Q21 CAL products’ sales revenue rose as CMAN acquired new customers from iron and steel industry Q1 2021 ANALYST PRESENTATION 12
Market Portfolio Key Highlights ▪ CMAN supplies to a broad array of industrial customers across Asia, Australia and Africa ▪ Market segmentation of CMAN has been shifted overtime and more well- diversified, where mining sectors, pulp & paper and sugar are major customers, presenting nearly 50% of total sales revenues Q1 2021 ANALYST PRESENTATION 13
Agenda Business Overview Financial Outlook Performance ▪ Company Overview ▪ Recap ▪ Strategic Framework ▪ Operating Assets ▪ Financial Results ▪ Capacity Statement Q&A Q1 2021 ANALYST PRESENTATION 14
Strategic Framework 1Q2021 2021 2022 onwards Thailand ▪ Emphasized on cost optimization ▪ Operating all lime kilns at their full ▪ Exploring new venture opportunity to ▪ Increased production utilization to production capacity enhance market-leading position and 60% from 30% to support demand ▪ Continuing additional cost efficiencies overall portfolio value recovery and debottlenecking key production areas ▪ Progressing and developing new product ▪ Intensively adjusted customer ▪ Studying new product expansion ▪ Building culture of continuous portfolios to mitigate the impact of opportunity improvement increasing freight cost ▪ Executing people development program ▪ Developed new organization structure to enhance alignment of roles and to align with future plans responsibilities with business strategy Vietnam ▪ Increased production utilization in ▪ Expanding production capacity by ▪ Starting operation of 3rd lime kiln at response to growing lime demand in multiple developing 3rd lime kiln at HLL HLL (4Q22) countries ▪ Penetrating additional markets in Asia ▪ Intensively adjusted customer portfolios to and Oceania mitigate the impact of increasing freight cost India ▪ Developed 2nd lime kiln and HL plant ▪ Starting operation of 2nd lime kiln and ▪ Starting operation of 2nd lime kiln at at EB after the latest kiln expansion has HL plant at EB (Dec) Siriman been sold out ▪ Studying new joint ventures and product ▪ Stabilizing kiln utilization at Siriman expansion opportunity in other territories ▪ Started operation at Siriman in Jan Australia ▪ Actively focused on construction of ▪ Starting operation of Kwinana Super DC, ▪ Growing a larger customer base while Kwinana Super DC to be ready for ready to manage up to 500,000 TPY maintaining excellent distribution services operation within June 2021 capacity to many world-class customers throughout Western Australia Health and safety protection measures for our employees and community remains our top priority as COVID-19 pandemic continues Q1 2021 ANALYST PRESENTATION 15
Agenda Business Overview Financial Outlook Performance ▪ Company Overview ▪ Recap ▪ Strategic Framework ▪ Operating Assets ▪ Financial Results ▪ Capacity Statement Q&A Q1 2021 ANALYST PRESENTATION 16
Thank you for your attention Contact Us: Investor Relation Department +66 2661-9734-8 ext. 110 IR@chememan.com Q1 2021 ANALYST PRESENTATION 17