Public Works City of Sequim 2021 Budget

Page created by Gloria Stevenson
 
CONTINUE READING
Public Works City of Sequim 2021 Budget
City of Sequim
 2021 Budget

Public Works
Public Works City of Sequim 2021 Budget
City of Sequim
                                                    Department Description

                           Public Works Administration, Streets, Parks, and Utilities

                                                          Public Works
                                                            Director
                                                         David Garlington

    Operations                Utilities             Parks                                                     PW Management
                                                                         Engineering          Resources
                                                   Charisse                                                       Analyst
     Ty Brown              Pete Tjemsland                                 Matt Klontz         Ann Soule
                                               Deschenes (CMO)                                                Sarah VanAusdle

ƒ   Streets and        ƒ   Water Supply and    ƒ   Coordinate Park   ƒ     GIS            ƒ  Storm and        ƒ   Budget Prep
    Stormwater             Distribution            Docents           ƒ     Traffic           Surface Water        and Compliance
    Maintenance        ƒ   Water Rights        ƒ   Parks Board             Engineering       Management       ƒ   Purchasing and
    and Repair             Management              Liaison           ƒ     Development    ƒ Stormwater            Acquisition
ƒ   Right of Way       ƒ   Sewer Collections   ƒ   Parks Master            Reviews           Compliance       ƒ   Utility Rate and
    Landscaping        ƒ   Sewerage                Planning          ƒ     Site           ƒ Reclaimed             Fee Review
ƒ   Safety                 Systems             ƒ   Donations               Construction      Water            ƒ   Fiscal Data
ƒ   Lighting           ƒ   Water                                           Inspections       Utilization          Analysis
ƒ   Traffic Signals        Reclamation                               ƒ     Emergency         Management       ƒ   Fleet
ƒ   Traffic Signs          Facility (WRF)                                  Management     ƒ Natural               Management
ƒ   Sidewalks          ƒ   Reclaimed Water                                 Logistics         Resource         ƒ   General
ƒ   Snow and Ice           and Biosolids                                                     Sustainability       Administrative
    Control                Distribution                                                    ƒ Governmental         Services
ƒ   Striping and       ƒ   Industrial Pre-                                                   Tribal/Public    ƒ   Finance Dept.
    Traffic Controls       Treatment                                                         Resource             Liaison
ƒ   Facilities         ƒ   Radio                                                             Liaison          ƒ   Emergency
    Management             Communication                                                   ƒ Emergency            Management
ƒ   Janitorial         ƒ   Emergency                                                         Management           Logistics
    Service                Management                                                        Planning
ƒ   Parks                  Operations
    Operations
ƒ   Water and
    Sewer
    Operations &
    Maintenance
ƒ   Utility Locates
ƒ   Emergency
    Management
    Logistics

    2021 Adopted Budget                                                  103                                                         11/23/2020
Public Works City of Sequim 2021 Budget
Public Works Operating Budget Detail

                              2017        2018           2019         2020            2020         2021          2021-2020
                              Actual      Actual         Actual      Forecast        Budget       Budget       Amount          %

Revenues
 Facilities Maintenance          14,762      15,022         24,895           7,770      39,400       18,000       (21,400) (54.3)%
  Parks Unrestricted            212,123     187,185        176,501      204,518        226,542      195,070       (31,472) (13.9)%
  PW Administration              -                 (1)      32,608       -              -            -            -                -%
  Street Operations             926,743     908,490        873,005      799,209        926,181      909,029       (17,152) (1.9)%
  Storm Water Operations        240,873     160,858        161,548      160,950        160,475      160,475       -                -%
  Water Overview              2,145,475   2,241,710      2,453,691    2,433,204       2,478,687    2,471,385          (7,302) (0.3)%
  Sewer Overview              4,124,177   4,403,112      4,524,858    4,585,115       4,659,136    4,864,647     205,511       4.4%

             Total Revenues   7,664,153   7,916,376      8,247,106    8,190,766       8,490,421    8,618,606     128,185       1.5%

Expenses
 Facilities Maintenance         685,832     692,048        917,760      742,809        774,316      762,480       (11,836) (1.5)%
  Parks Unrestricted            301,924     204,441        249,953      297,649        382,342      276,631      (105,711) (27.6)%
  PW Administration             677,854     688,268        942,019      770,922        874,981      842,447       (32,534) (3.7)%
  Street Operations             830,775     794,371        935,678      848,710        926,004      908,647       (17,357) (1.9)%
  Storm Water Operations        221,117     152,880        106,024      120,857        135,146      142,200           7,054    5.2%
  Water Overview              2,077,168   2,312,914      2,317,266    2,398,369       2,450,183    2,424,251      (25,932) (1.1)%
  Sewer Overview              3,740,514   4,979,337      4,069,702    4,423,738       4,653,935    4,679,763      25,828       0.6%

             Total Expenses   8,535,184   9,824,259      9,538,402    9,603,054      10,196,907   10,036,419     (160,488) (1.6)%

2021 Adopted Budget                                         104                                                 11/23/2020
Public Works City of Sequim 2021 Budget
Facilities Maintenance Budget Detail

The Facilities Maintenance Division includes building repairs, maintenance, and janitorial services for all City owned
properties and the Clallam Transit Center. Facilities staff also assists with a variety of highly technical "one-off" projects
throughout the City as well as the community clean-up events, including “Rally in the Alley”. Current "jack-of-all-trades"
personnel will be difficult to replace upon retirement.

Key Goals
     Continue property improvements that will accommodate day to day operations as well as emergency needs
     Perform scheduled maintenance and upgrades at the Civic Center
     Paint and recondition the public bathrooms (skate park and Sequim Ave.)
     Cross train new staff in Facilities Maintenance in preparation for upcoming retirements

                                 2017           2018           2019            2020          2020          2021           2021-2020
                                 Actual         Actual         Actual         Forecast      Budget        Budget        Amount          %

Expenses
 Salaries & Wages                   62,995         82,044         84,432          87,172       84,179       104,024        19,845 23.6%
    Personnel Benefits              31,309         40,633         41,536          44,279       44,790        54,807        10,017 22.4%
    Supplies                        21,801         42,048         27,504          63,668       42,950        41,650            (1,300) (3.0)%
    Service Charges                149,906        145,579        172,898         179,313      222,567       222,069             (498) (0.2)%
    Intergovernmental Services            439            515            516           309           430           530            100 23.3%
    Capital Outlay                  27,732         -              -               31,649       40,000        -             (40,000)(100.0)%
    Non-Expense & Transfers        391,650        381,229        590,874         336,419      339,400       339,400        -                -%
               Total Expenses      685,832        692,048        917,760         742,809      774,316       762,480        (11,836) (1.5)%

2021 Adopted Budget                                               105                                                    11/23/2020
Public Works City of Sequim 2021 Budget
Facilities Maintenance Budget Detail
Expenditure Summary
The Facilities budget decreased by $12k (2%) from the 2020 Amended Budget. Salaries and benefits increased in this
department by $30k (23%) due to the movement of FTE from other departments for cross training in preparation for
upcoming retirements. This increase will not be ongoing. This new allocated time to Facilities will allow staff members to
work together on unusual/unique facility related projects that are not day-to-day operations but require attention. This
increase in staffing is more than offset by the elimination of capital improvements of $40k for the Guy Cole kitchen that
were purchased in 2020. All other expenses are flat with prior year budgets.

2021 Adopted Budget                                     106                                                11/23/2020
Public Works City of Sequim 2021 Budget
Parks Unrestricted Budget Detail

The Parks Division is responsible for the maintenance of eight (8) City-owned parks, including the James Center for the
Performing Arts, and the Guy Cole Event Center. Some of the maintenance is shared with non-profit organizations. Total
park area property is approximately 117 acres. The City also maintains approximately 4 miles of the Olympic Discovery
Trail system located in the City of Sequim. In addition to the Carrie Blake Park complex, the City maintains the relatively
undeveloped Keeler and Gerhardt Parks as well as several smaller parks scattered throughout the City. The Parks
Division also coordinates with community groups who provide scheduling and some maintenance of various park play and
leisure areas.

Key Goals
     Plant trees and develop park amenities such as ponds and paths
     Tree removal for safety concerns/power line interference/private property trespass
     Increase maintenance at Gerhardt Park

                                2017        2018           2019            2020         2020        2021         2021-2020
                                Actual      Actual         Actual         Forecast     Budget      Budget      Amount        %

Expenses
 Salaries & Wages                  66,349      73,390         98,283         102,875     103,220     110,863        7,643    7.4%
    Personnel Benefits             38,351      41,141         51,543          54,557      55,791      57,728        1,937    3.5%
    Supplies                       43,664      34,594         38,568          25,223      45,200      23,800      (21,400) (47.3)%
    Service Charges                46,413      47,989         54,559          50,244      58,131      67,240        9,109 15.7%
    Capital Outlay                 -           -              -               -           -           10,000      10,000         -%
    Non-Expense & Transfers       107,148          7,328          7,000       64,750     120,000       7,000     (113,000) (94.2)%
               Total Expenses     301,925     204,442        249,953         297,649     382,342     276,631     (105,711) (27.6)%

2021 Adopted Budget                                           107                                               11/23/2020
Public Works City of Sequim 2021 Budget
Parks Unrestricted Budget Detail

Expenditure Summary
The total Parks budget deceased by $105k (28%) from the 2020 Amended Budget. This decrease is the net result of
salary increases for staff in accordance with union contracts and the elimination of transfers out for “The People’s Project”
of $63k, as this participatory budgeting exercise is suspended during the COVID-19 public health emergency. Supplies
and services were also reduced $12k. Also contributing to the decrease was the movement of a $50k transfer out to the
Parks Master Plan Update. It has been moved to the non-departmental budget.

2021 Adopted Budget                                      108                                                  11/23/2020
Public Works City of Sequim 2021 Budget
PW Administration Budget Detail

The Public Works Department has the primary responsibility to provide and maintain the infrastructure, facilities, and
services that meet the needs of the City of Sequim and comply with the state, federal and Council established standards
and priorities. Public Works Administration provides the overall management and support for these functions. The Public
Works office coordinates with outside jurisdictions, oversees contract management and consultant agreements,
administers grant and loan agreements, facilitates transportation and infrastructure planning, assists in development
review and answers customer inquiries. It oversees budget preparation and administration and ensures compliance with
purchasing regulations.

Mission
The Public Works Department mission is to build community by maintaining and enhancing the City’s infrastructure in a
way that meet the needs of the City and complies with state, federal and Council established standards.

Key Goals
     Focus on the success of City Council Goals
     Continue to foster working partnerships with legislators, local and regional governmental entities, and other private
      organizations
     Manage employee succession to capture institutional knowledge
     Develop long-term water sources and rights
     Increase employee training and development
     Complete conversion to Cartegraph Asset Management System and strengthen asset documentation

                                2017        2018        2019         2020           2020         2021         2021-2020
                                Actual      Actual      Actual      Forecast       Budget       Budget      Amount          %

Expenses
 Salaries & Wages                 309,211     325,688     414,768      424,761       428,900      431,060          2,160   0.5%
    Personnel Benefits            130,976     136,589     183,310      187,594       195,629      201,325          5,696   2.9%
    Supplies                       92,531     122,380     128,744      105,268       149,001      109,400      (39,601) (26.6)%
    Service Charges                42,136      40,610     152,197       37,548        38,450       37,662           (788) (2.0)%
    Capital Outlay                 -           -           -                   1            1      -                  (1)(100.0)%
    Non-Expense & Transfers       103,000      63,000      63,000       15,750        63,000       63,000      -                -%
               Total Expenses     677,854     688,267     942,019      770,922       874,981      842,447      (32,534) (3.7)%

2021 Adopted Budget                                        109                                               11/23/2020
Public Works City of Sequim 2021 Budget
PW Administration Budget Detail

Expenditure Summary
The PW Administration budget has decreased by $33k (4%) from the 2020 Amended Budget. Salaries and benefits
increased by $8k (1%) due to cost of living and negotiated pay raises. Supplies and small tools decreased by $40k (27%)
due to the elimination of significant expenses in 2020 related to the overhaul of aging equipment. These expenses have
been deferred in light of the Covid-19 public health emergency. All other expenses are either deceased or flat due to the
COVID-19 emergency.

2021 Adopted Budget                                    110                                                11/23/2020
Public Works City of Sequim 2021 Budget
Street Operations Budget Detail

The Streets Operations and Maintenance Division supports general operations for maintaining a transportation network
that safely combines motorized (including transit services) and non-motorized elements for the public. Primary
responsibilities include maintaining the roadway and right-of-way, snow and ice control, providing traffic control for
motorized traffic and pedestrians (such as street signs, traffic signals, and pavement markings), maintaining sidewalks
and trails, street landscaping, street lighting, parking facilities, and other maintenance-related services. Unrestricted
revenues come from: General Fund, motor vehicle tax and arterial fuel tax.

Key Goals
     Emphasize non-motorized improvements
     Continuous emphasis on employee safety
     Develop innovative maintenance methods of right of way and park strips outside city core
     Extend record of zero accidents related to snow and ice
     Continue roadside vegetation removal, sidewalk replacement and improvements

                                 2017           2018           2019            2020            2020        2021            2021-2020
                                 Actual         Actual         Actual         Forecast        Budget      Budget         Amount        %

Revenues
 Licenses & Permits                     4,847          1,548      14,829          11,865         20,000          6,500      (13,500) (67.5)%
    Intergovernmental
      Revenues                     160,662        169,621        175,906         102,793        169,705     156,609         (13,096) (7.7)%
    Charges for Goods &
     Services                      128,305         39,312         22,970          25,667         23,656      23,100             (556) (2.4)%
    Miscellaneous Revenues              6,222      10,993         12,127              5,217      10,820      10,820         -              -%
    Other Increases in fund
      resources                         1,778            300          1,364       -              -           -              -              -%
    Other Financing Sources        624,928        686,715        645,810         653,667        702,000     712,000         10,000     1.4%
               Total Revenues      926,742        908,489        873,006         799,209        926,181     909,029         (17,152) (1.9)%

Expenses
 Salaries & Wages                  228,206        225,794        223,972         228,365        221,857     252,727         30,870 13.9%
    Personnel Benefits             112,106        114,432        110,702         113,740        114,819     127,347         12,528 10.9%
    Supplies                       130,139        108,970        215,920         133,227        124,500     154,996         30,496 24.5%
    Service Charges                 74,407         73,198         92,377          97,163         91,876      70,876         (21,000) (22.9)%
    Intergovernmental Services      -                  2,534          2,370           2,415      -           -              -              -%
    Capital Outlay                  12,229         -              -               -              -           -              -              -%
    Other Services: Interfund      225,897        217,143        236,176         223,800        233,952     263,701         29,749 12.7%
    Non-Expense & Transfers         47,791         52,300         54,162          50,000        139,000      39,000        (100,000) (71.9)%
               Total Expenses      830,775        794,371        935,679         848,710        926,004     908,647         (17,357) (1.9)%

2021 Adopted Budget                                               111                                                     11/23/2020
Street Operations Budget Detail

Revenue Summary
2021 Street Operations Funding Sources: General Fund - $560k, Reuse - $20k, TBD - $130k, Motor Vehicle Tax - $157k
and Miscellaneous - $42k
Revenue - Significant Changes: Decrease of $13k from the Motor Vehicle Fuel tax (COVID-19), decrease of $13k from
Licenses and Permits (COVID-19) and an increase of $10k from Insurance Recoveries (street light poles).

Expenditure Summary
The Streets Operations budget decreased by $18k (2%) primarily due to the elimination of transfers out of $100k from
2020 for the City Shop Fuel Station. This decrease is balanced against increases salaries and benefits of $43k (12%) due
to movement of staff and negotiated wages and benefits. Finally, charges for good and services decreased by $21k
(23%) in light of the Covid public health emergency.

2021 Adopted Budget                                    112                                               11/23/2020
Storm Water Operations Budget Detail

Stormwater Operations manages risk and increases resiliency by protecting water quality, water resources/ supplies, and
preventing damage from floods. Stormwater operations and maintenance staff includes field personnel who maintain the
City stormwater system and respond to flooding issues during storms, and office personnel who track compliance,
coordinate with commercial, residential, and irrigation facility owners, provide planning and technical support, and apply
for grant funding.
Field operations currently entail maintaining and repairing City-owned facilities: In-pipe cameras are used to assess
infrastructure condition, the vac truck is used to clean catch basins and clear infiltration lines and dry wells, staff or
contractors maintain stormwater ponds to ensure they are functioning as designed and the street sweeper is utilized
weekly on all streets per a regular schedule.
The City’s inventory and mapping of its stormwater (and other in-ground) facilities is ongoing. With the planned expansion
of GIS capabilities this information will be made available department-wide for tracking and scheduling maintenance.
Periodic work responding to storms includes sandbagging to direct runoff into appropriate storm drains, clearing trash
racks and culverts when they are clogged, etc. The most problematic clogs are usually resolved with the vac truck.
Mutual assistance contracts with Sequim Prairie Tri-Irrigation Association and Highland Irrigation District to expedite storm
response.

Key Goals
     Track the sixth year of implementation of Tier A activities from the Stormwater Plan adopted in early 2016
     Continue to document expenses relating to Stormwater Operations
     Continue to partner with regional water managers to identify opportunities for increased water supply resilience, such
      as finding funding sources for stormwater capture and infiltration components of the storage reservoir on River Road
     Manage the Stormwater grant from State Department of Ecology:
      o 85% reimbursable, 15% City match (non-cash, using seasonal/intern staff)
      o Design and other pre-construction activities for two facility retrofits
      o Continue to develop and implement a private facility guidance program for Stormwater Compliance

                               2017           2018           2019            2020          2020          2021           2021-2020
                               Actual         Actual         Actual         Forecast      Budget        Budget        Amount        %

Revenues
 Charges for Goods &
   Services                             392            289      -               -            -             -             -              -%
    Miscellaneous Revenues              481            569          1,548           950           475           475      -              -%
    Other Financing Sources      240,000        160,000        160,000         160,000      160,000       160,000        -              -%
              Total Revenues     240,873        160,858        161,548         160,950      160,475       160,475        -              -%

2021 Adopted Budget                                             113                                                    11/23/2020
Storm Water Operations Budget Detail
                              2017        2018          2019         2020          2020        2021         2021-2020
                              Actual      Actual        Actual      Forecast      Budget      Budget      Amount        %

Expenses
 Salaries & Wages                96,359      54,349        34,092       36,031       36,182      39,162       2,980     8.2%
  Personnel Benefits             49,703      29,056        18,587       19,067       19,401      20,323         922     4.8%
  Supplies                       14,560      24,319        16,515       26,927       33,000      31,800       (1,200) (3.6)%
  Service Charges                 1,747            46       2,353           435       2,750       2,500        (250) (9.1)%
  Other Services: Interfund      58,747      45,111        34,476       38,397       43,813      48,415       4,602 10.5%
             Total Expenses     221,116     152,881       106,023      120,857      135,146     142,200       7,054     5.2%

Revenue Summary
The Stormwater Operations budget is, and has historically been, funded by transfers from the Water (33%) and Sewer
(67%) Funds proportionately by fund revenue. For 2021 the transfer amount from the Water Fund is $53k and from the
Sewer fund is $107k. This amount covers only the operational activities of the Stormwater Program.

Expenditure Summary
Stormwater operations expenses increased $7k (5%) from the 2020 Amended Budget. Salaries and benefits increased
$3k (6%) due to negotiated pay increases. All other expenditures are reduced or flat with 2020.

2021 Adopted Budget                                        114                                             11/23/2020
Water Overview Budget Detail

The Water Unrestricted Fund receives revenues from monthly water usage charges. These revenues are used to cover
the cost of operating the water utility, which includes producing potable water, monitoring water quality, small
infrastructure improvements, and maintaining existing water lines, wells, booster stations, reservoirs, and other
infrastructure to store and transport water. Three months of operating expenses are maintained in the fund for
emergency purposes. Revenues received over the cost of planned expenses and operating reserves are transferred to
the Water Replacement Reserve fund for future replacement of the water infrastructure and equipment.
Management oversight and support is provided by the PW Director, Operations Manager, Utilities Manager and other staff
in Public Works Administration. Utility billing and administrative support is provided by Finance. The General Fund
finances a portion of management oversight and all of Finance Department services. Services provided by departments
outside of the Water Fund are charged to the Water Fund through an Interfund Professional Services Charge
(Allocations).
Approximately 1,350,000 gallons per day (gpd) of potable water are provided to the citizens and businesses of Sequim
during the summer months and approximately 712,000 gpd during late fall and winter. In addition to this water production
and treatment, staff also maintains approximately 59 miles of water line, four reservoirs that provide a total of 3.4 million
gallons of storage, and three water sources. The Department of Ecology and Department of Health regulate water rights
and water quality through state-mandated daily, monthly and yearly reports that guarantee the steady flow of quality water
to citizens.

Key Goals
     Comply with all state, federal, and city requirements and regulations
     Continuous emphasis on employee safety
     Research and implement water conservation measures
     Work to minimize necessary rate adjustments
     Identify and repair leaking pipes
     Implement succession planning for retiring personnel

                                2017        2018        2019          2020         2020         2021          2021-2020
                                Actual      Actual      Actual      Forecast      Budget       Budget       Amount           %

Revenues
 Charges for Goods &
   Services                     2,077,648   2,163,360   2,299,530     2,339,097    2,354,187    2,353,947           (240)        -%
    Miscellaneous Revenues          3,542      15,280      19,757       13,458       14,000       14,000       -                 -%
    Enterprise & Fiduciary         62,185      61,670      37,940       40,974       60,000       52,938           (7,062) (11.8)%
    Other Increases in fund
      resources                     2,100       1,400      96,465       39,675       50,500       50,500       -                 -%
               Total Revenues   2,145,475   2,241,710   2,453,692     2,433,204    2,478,687    2,471,385          (7,302) (0.3)%

2021 Adopted Budget                                        115                                                11/23/2020
Water Overview Budget Detail
                               2017        2018        2019         2020         2020         2021          2021-2020
                               Actual      Actual      Actual      Forecast     Budget       Budget       Amount          %

Expenses
 Salaries & Wages                350,123     352,941     388,575      411,811     411,141      403,270           (7,871) (1.9)%
  Personnel Benefits             162,516     166,822     179,114      200,014     208,494      197,281       (11,213) (5.4)%
  Supplies                        91,381     113,579     118,554      101,545     112,050      120,842           8,792    7.8%
  Service Charges                245,886     216,726     199,193      222,223     224,167      206,491       (17,676) (7.9)%
  Intergovernmental Services     255,281     281,344     299,387      306,439     297,645      297,645       -                -%
  Other Services: Interfund      462,096     450,462     441,254      462,064     488,886      535,922       47,036       9.6%
  Non-Expense & Transfers        509,885     731,040     691,189      694,273     707,800      662,800       (45,000) (6.4)%
             Total Expenses    2,077,168   2,312,914   2,317,266    2,398,369    2,450,183    2,424,251      (25,932) (1.1)%

Revenue Summary
Total budgeted revenues for 2021 are flat with 2020 as staff anticipate Council will not elect to increase fees
recommended by the utility rate study currently in process. Staff are recommending a 4% increase, consistent with the
study.

Expenditure Summary
Overall expenses in Water Operations decreased $26k (1%) from the 2020 Amended Budget. Of this amount, $19k (4%)
is salaries and benefits due to movement of crew members to other departments based upon our annual analysis of staff
time, as well as the retirement of a seasoned staff member whose replacement is anticipated at a lower wage rate. A
reduction in service charges and transfers out also contribute to a reduced COVID conscientious budget.

2021 Adopted Budget                                       116                                              11/23/2020
Sewer Overview Budget Detail

The Sewer Unrestricted Fund receives revenues from monthly sewer usage charges. These revenues are used to cover
the cost of operating the sewer utility, which includes operation of the Water Reclamation Facility (WRF), influent, effluent,
and biosolids testing, maintaining sewer lines, lift stations and other infrastructure to transport wastewater. Three months
of operating expenses are maintained in the fund for emergency purposes. Revenues received over the cost of planned
expenses and operating reserves are transferred to the Sewer Replacement Reserve fund for future replacement of the
sewer infrastructure and equipment.
Management oversight and support is provided by the PW Director, Operations Manager, Utilities Manager and other staff
in Public Works Administration. Utility billing and administrative support is provided by Finance. The General Fund
finances a portion of management oversight and all of Finance Department services. Services provided by departments
outside of the Sewer Fund are charged to the Sewer Fund through an Interfund Professional Services Charge
(Allocations).
This division maintains approximately 72 miles of sewer line, four lift stations, a 1.67 million gallon per day capacity WRF,
producing 100% Class “A” Reclaimed Water, a Class “A” (EQ) Biosolids, and 7,320 feet of outfall pipe measured from the
WRF to the diffuser located approximately 1,900 feet into the Strait of Juan de Fuca at a depth of 53 feet. The WRF is
required to meet stringent NPDES requirements. All infrastructure at the Reuse Demonstration Site is operated and
maintained by the WRF. All equipment must be maintained and upgraded as needed to satisfy state and federal
permitting requirements.

Key Goals
    Continue the City’s vision of the state of the art Water Reclamation Facility
    Comply with all state, federal, and city requirements and regulations
    Operate infiltration system and pilot project at Reuse Demonstration Site and Bell Creek
    Reduce infiltration and infill into the system
    Participate in the demonstration of uses for reclaimed water for irrigation and appropriate recreation use, and ground
     water aquifer re-charge
    Explore alternative uses for biosolids
    The City of Sequim’s collection system and Water Reclamation Facility will continue to improve and expand in
     conjunction with customer service, collections sustainability, and sewage treatment. The City’s vision has resulted in
     the investment of a great deal of time and funds; City staff will continue with this vision. Training to maintain
     certifications and professional growth will give the City staff needed knowledge of current technology and will help to
     develop well informed ideas.

2021 Adopted Budget                                        117                                                 11/23/2020
Sewer Overview Budget Detail
                            2017           2018        2019            2020           2020         2021               2021-2020
                            Actual         Actual      Actual         Forecast       Budget       Budget       Amount               %

Revenues
 Charges for Goods &
   Services                 4,113,127      4,374,020   4,382,126       4,522,562      4,587,136    4,792,647     205,511                4.5%
  Miscellaneous
    Revenues                   10,077         29,093      34,232          24,768        22,000       22,000       -                      -%
  Other Increases in fund
    resources                        974      -          108,500          37,785        50,000       50,000       -                      -%
        Total Revenues      4,124,178      4,403,113   4,524,858       4,585,115      4,659,136    4,864,647     205,511                4.4%

Expenses
 Salaries & Wages             600,877        601,834     737,040         777,618       838,708      778,176       (60,532)          (7.2)%
  Personnel Benefits          270,901        291,917     368,014         385,782       403,584      396,870           (6,714)       (1.7)%
  Supplies                    269,219        341,468     352,768         342,698       357,600      339,532       (18,068)          (5.1)%
  Service Charges             364,716        457,616     390,961         444,885       453,484      437,636       (15,848)          (3.5)%
  Intergovernmental
    Services                  362,794        432,847     433,345         437,613       447,600      447,600       -                      -%
  Capital Outlay                     921      23,610      50,111                 1            1       9,001           9,000 900,000.0%
  Other Services:
    Interfund               1,041,515      1,107,787   1,062,200       1,238,468      1,272,453    1,340,443      67,990                5.3%
  Non-Expense &
   Transfers                  829,571      1,722,258     675,261         796,673       880,505      930,505       50,000                5.7%
         Total Expenses     3,740,514      4,979,337   4,069,700       4,423,738      4,653,935    4,679,763      25,828                0.6%

2021 Adopted Budget                                             118                                                    11/23/2020
Sewer Overview Budget Detail
Revenue Summary
2021 budgeted revenues increased by $205k (4%) reflecting new/expanding regional partnerships and services. Other
budgeted revenues for 2021 are flat with 2020 as staff anticipate Council will not elect to increase fees recommended by
the utility rate study currently in process. Staff are recommending a 2.25% increase in rates, consistent with the study.

Expenditure Summary
Overall expenses in Sewer Operations increased by $26k (1%) from the 2020 Amended Budget. However, there was a
$66k decrease in salaries and benefits due to the retirement of a seasoned staff member whose replacement is
anticipated at a lower wage rate and reduction of previously budgeted succession related staffing. A reduction in supplies
contribute to a reduced COVID conscientious budget. These reductions are offset by an increases in overhead charges
and transfers out to reserve funds.

2021 Adopted Budget                                     119                                                11/23/2020

                                                                                
     8WLOLWLHV'LYLVLRQ :DWHUDQG6HZHU 2SHUDWLRQV                                        
     8WLOLW\5DWH2YHUYLHZ
                                                                                 
     7KHJRDORIDPXQLFLSDOXWLOLW\LVWRSURYLGHFXVWRPHUVZLWKVXVWDLQDEOHVDIHHTXLWDEOHVHUYLFHWRGD\DQGIRUJHQHUDWLRQVLQWKHIXWXUH
     0XQLFLSDOXWLOLWLHVDUHUHTXLUHGWRDWOHDVWEUHDNHYHQDQGDQ\DGGLWLRQDOIXQGVDUHKHOGLQUHVHUYHIRUIXWXUHXWLOLW\XVH&LWLHVKDYHEURDG
     DXWKRULW\WRVHWUDWHVDQGIHHVIRUWKHRSHUDWLRQRIXWLOLW\V\VWHPV7KHSULPDU\IXQGLQJVRXUFHVIRUXWLOLW\RSHUDWLRQVDQGLPSURYHPHQWVDUH
     XVHUUDWHVDQGIHHVRUFRQQHFWLRQFKDUJHV
     
           x 8VHUIHHVDUHRQJRLQJUHYHQXHVJHQHUDWHGIURPPRQWKO\UDWHVSHQDOWLHVODWHIHHVDQGRWKHUVHUYLFHV7KLVRQJRLQJUHYHQXH
                VRXUFHLVXVHGWRIXQGPDLQWHQDQFHRSHUDWLRQVDGPLQLVWUDWLRQGHEWDQGUHVHUYHDFFRXQWV IRULQIUDVWUXFWXUHSURMHFWV 
     
           x &RQQHFWLRQFKDUJHVDUHRQHWLPHUHYHQXHV7KH&LW\RI6HTXLPUHIHUVWRFRQQHFWLRQFKDUJHVDV*HQHUDO)DFLOLW\&KDUJHV *)&V 
                *UDQWVORDQVDQGUHVHUYHVDUHRWKHUVRXUFHVRIRQHWLPHUHYHQXHV2QHWLPHUHYHQXHVDUHXWLOL]HGIRUVWXGLHVDQGFDSLWDOSURMHFWV
                ZKLFKXSJUDGHDQGH[SDQGWKHV\VWHP
                
     ,WLVWKH&LW\RI6HTXLP·VJRDOWRKDYHVXVWDLQDEOHXWLOLW\SUDFWLFHV
           x 3UHGLFWDEOHELOOVIRUFXVWRPHUV
           x 3UHGLFWDEOHUHYHQXHDQGH[SHQGLWXUHVIRUWKHXWLOLW\
           x $YRLGGUDVWLFUDWHLQFUHDVHV
           x 3ODQIRUIXWXUHUHSODFHPHQW
           x %DODQFHEHWZHHQH[LVWLQJDQGIXWXUHFXVWRPHUV
     
     ,QWKH&LW\FRQGXFWHGD8WLOLW\5DWH6WXG\ZLWK)&6*URXS7KHVWXG\DQDO\]HGWKHH[LVWLQJUHYHQXHVRXUFHE\FXVWRPHUFODVVWKH
     H[LVWLQJRSHUDWLRQDOFRVWVDQGGHEWVHUYLFHRIHDFKXWLOLW\DQGWKH\HDU&DSLWDO,PSURYHPHQW3ODQDVUHFRPPHQGHGE\WKH:DWHUDQG
     6HZHU0DVWHU3ODQV7KHVWXG\FRQFOXGHGWKDWDQDQQXDOUHYHQXHUHTXLUHPHQWLQFUHDVHRIIRUWKHZDWHUXWLOLW\DQGIRUWKHVHZHU
     XWLOLW\DORQJZLWKGHEWIXQGLQJIRUHOLJLEOHSURMHFWVDQGPRGLILFDWLRQRIWKH&LW\¶VH[LVWLQJUHVHUYHSROLFLHVZRXOGPHHWERWKRIWKHXWLOLWLHV¶ORQJ
     WHUPQHHGV7KHVWXG\DOVRLGHQWLILHGDVHWRIUDWHVWUXFWXUHFKDQJHVWRSURPRWHHTXLW\DPRQJYDULRXVFXVWRPHUFODVVHVDFFRUGLQJWRWKH
     DPRXQWRIWKHXVDJHIRUWKHSDUWLFXODUXWLOLW\$GGLWLRQDOO\)&6*URXSUHFRPPHQGHGFKDQJHVWRWKHFXUUHQW*)&VIRUERWKWKHZDWHUDQG
     VHZHUXWLOLWLHV
     
     )L[HGYV9ROXPH
     $WWKHFRUHRIUDWHHTXLW\LVKRZPXFKRIDFXVWRPHU¶VPRQWKO\ELOOZLOOEHIL[HG HJZDWHUPHWHUEDVHFKDUJH YHUVXVKRZPXFKZLOOEH
     EDVHGRQDFWXDOZDWHUFRQVXPSWLRQRUVHZHUIORZ
     
           x RIDOODQQXDORSHUDWLRQFRVWVDUHW\SLFDOO\GXHWRODERU VDODULHV EHQHILWV 
           x 7KHPDMRULW\ W\SLFDOO\ RIDQQXDORSHUDWLQJFRVWVDUHIL[HGWKH\ZLOORFFXUHYHQLIZDWHURUVHZHUIORZVFKDQJHGUDPDWLFDOO\
           x )L[HGFRVWVDUHXVXDOO\DVVRFLDWHGZLWKWKHQXPEHURIFXVWRPHUVVL]HRIWKHV\VWHP
     
           ,QJHQHUDODXWLOLW\¶VUHYHQXHVDUHPRUHYRODWLOHWKDQLWVH[SHQVHV
           (;([SHQVHV )L[HG9DULDEOH
                5HYHQXHV )L[HG9DULDEOH
     
     
     7KHUHDUHOLPLWHGELOOLQJDOWHUQDWLYHVIRUHTXLWDEO\DOORFDWLQJIL[HGH[SHQVHVWRFXVWRPHUUDWHV
                    x :DWHU±SHUFRQQHFWLRQPHWHUVL]HPXOWLIDPLO\ 0) XQLWV
                    x 6HZHU±SHUFRQQHFWLRQHVWLPDWHGVHZHUYROXPH ZLQWHUZDWHUXVH 0)XQLWV
                

                                                                                                                      

2021 Adopted Budget                                                  120                                                            11/23/2020

    
                                                    8OWLPDWHO\5DWH'HVLJQPXVW 5HYHQXH&ROOHFWLRQ
                                                                              
    7KHUHDUHWKUHHFRPPRQUDWHVWUXFWXUHV
          )ODWUDWH
                       'RHVQRWYDU\ZLWKZDWHUXVH
          %DVHYROXPHUDWH WKLVLVWKH&LW\¶VFXUUHQWVWUXFWXUH 
                       %DVHUDWHLVIL[HG E\PHWHU 
                       9ROXPHYDULHVE\ZDWHUXVH
          9ROXPHUDWH
                       9DULHVE\ZDWHUXVH
    
    7KHJRDOLVWRVWULNHDEDODQFHZKLFKLQFOXGHV
        x )L[HGDQGYDULDEOHFRVWV
        x 3UHGLFWDEOHFXVWRPHUELOOV
        x 3UHGLFWDEOHXWLOLW\UHYHQXH
    
    7KHRYHUDOOJXLGLQJSULQFLSOHWRVHWWLQJEDVHIHHVLVWKHFRQFHSWRIFDSDFLW\DWDQ\JLYHQWLPHWKHFRVWRISURYLGLQJVXFKFDSDFLW\DQG
    DYDLODELOLW\VRFLDOREMHFWLYHV DIIRUGDELOLW\HFRQRPLFGHYHORSPHQWFRQVHUYDWLRQ DQGWKHOHYHORIUHYHQXHVWDELOLW\GHVLUHGE\DQDJHQF\

                                                                                                                                            

                                                                                                                 

          2021 Adopted Budget                                              121                                                          11/23/2020
City of Sequim
                                                       Department Description

                                                       Public Works Capital
                                                  Engineering and Capital Facilities

                                                       Public Works Director
                                                         David Garlington

                        Engineering and Capital                                        PW Management Analyst
                               Projects                     Resources
                                                            Ann Soule                     Sarah VanAusdle
                              Matt Klontz

                           ƒ   Project Management          ƒ    Water Rights            ƒ      Capital Improvement
                           ƒ   Construction                     Management                     Program Development
                               Management                  ƒ    Citywide Grant and Loan ƒ      Capital Projects Tracking
                           ƒ   Grants and Loans                 Applications and Admin. ƒ      Contract Administration
                           ƒ   Capital Improvement                                      ƒ      Grant and Loan
                               Program                                                         Management

     The City of Sequim adopted a Capital Improvement Planning Policy on February 28, 2011 and a Capital Improvement Program (CIP)
     on September 8, 2014. The CIP was updated for 2021-2026 and adopted by Council on July 13, 2020. Adhering to this policy and program
     will ensure that the City preserves, maintains, and improves buildings, parks, roads, potable water, sewers, equipment and other capital
     investments. This policy will also help the City avoid emergency and unexpected major costs in the future. The 2020 capital budget follows
     the 2020 programmed CIP.

     Capital Project Criteria
     A capital project is included if it meets any of the following criteria:
         x Projects that exceed $50,000 in total cost
         x Projects that involve the purchase of land, buildings, building improvements or building components
         x Projects where the City is responsible for the purchase and/or development
         x Projects included in the City’s Comprehensive Plan, Capital Improvement Program, or related system plans

     2021 Goals
        x Delivery of the 2021 Capital Projects on time, on budget, and on target
        x Establish outside funding mechanisms for capital projects
        x Work with local legislators for project specific appropriations
        x Integrate capital projects as a method of neighborhood improvement
        x Project tracking to provide continuous information on physical progress, schedule, and budget

2021 Adopted Budget                                             122                                                        11/23/2020
Public Works Capital Budget Detail

                              2017        2018        2019          2020         2020         2021          2021-2020
                              Actual      Actual      Actual       Forecast     Budget       Budget       Amount        %

Expenses
 GIS/Engineering                390,797     388,795     488,650       585,449     624,778      536,381       (88,397) (14.1)%
  Streets Restricted          1,513,898   2,211,746    3,300,374    6,107,216    7,322,569    3,261,387   (4,061,182) (55.5)%
  Storm Water Restricted         -           -           93,880       142,083     380,791      418,528       37,737     9.9%
  Parks Restricted              676,886     382,634      20,201       109,367     409,738      698,821      289,083 70.6%
  Capital Facilities Fund       823,744     158,330      49,960       617,445    1,170,522     761,283      (409,239) (35.0)%
  Water Restricted            1,080,245   1,428,626    1,894,918    1,577,281    2,072,721    1,882,667     (190,054) (9.2)%
  Sewer Restricted            2,013,266   1,465,596    9,234,109    2,566,821    3,636,297    3,919,294     282,997     7.8%

             Total Expenses   6,498,836   6,035,727   15,082,092   11,705,662   15,617,416   11,478,361   (4,139,055) (26.5)%

2021 Adopted Budget                                      123                                               11/23/2020
GIS/Engineering Budget Detail

Engineering provides design and construction management services for general Public Works, Street, Water, Sewer, and
Stormwater, and Facilities Capital Projects. Engineering also assists other City departments as needed and responds to
questions from the general public. The GIS element of the Engineering department is responsible for maintaining a
detailed informational data base of City assets and geographic data to facilitate inventory control, utility locates, and
develop maintenance schedules.

Key Goals
     Provide timely support and engineering review for development applications
     Deliver on time and on budget capital projects
     Continue development of in-house design capabilities
     Increase GIS capabilities and support to all City departments
     Perform site construction inspections for development and capital projects

                                2017        2018           2019         2020          2020        2021         2021-2020
                                Actual      Actual         Actual      Forecast      Budget      Budget      Amount         %

Revenues
 Licenses & Permits                 7,305      17,417         29,741       76,281       70,000      52,000      (18,000) (25.7)%
               Total Revenues       7,305      17,417         29,741       76,281       70,000      52,000      (18,000) (25.7)%

Expenses
 Salaries & Wages                 239,218     231,276        301,205      356,618      345,029     299,320      (45,709) (13.2)%
    Personnel Benefits            132,648     123,860        148,875      165,433      181,747     164,561      (17,186) (9.5)%
    Supplies                        2,677            502       1,997        1,922        3,300       2,800          (500) (15.2)%
    Service Charges                13,855      30,758         34,173       60,876       92,302      67,300      (25,002) (27.1)%
    Non-Expense & Transfers         2,400       2,400          2,400           600       2,400       2,400      -               -%
               Total Expenses     390,798     388,796        488,650      585,449      624,778     536,381      (88,397) (14.1)%

2021 Adopted Budget                                           124                                             11/23/2020
GIS/Engineering Budget Detail

Expenditure Summary
This budget decreased by $88k (14%) from the 2020 Amended Budget. This change is due to the movement of .25 FTE
for the Development Review Engineer 100% to Community Development. Additional reductions include reduced outside
services for development review and reduced training related travel due to the COVID-19 public health emergency.

2021 Adopted Budget                                125                                            11/23/2020
Streets Restricted Budget Detail

The Streets Restricted Fund is comprised of special revenues, private development contributions, and grants. These
funds are restricted by state and/or federal regulations, agreements, or restrictions created by City Council. The funds
are used to improve the transportation network which addresses safety, mobility preservation, and functional use needs.
Restricted Street funded projects that require a match of city funds may be financed from Streets Unrestricted, General
Funds, REET 2 (Real Estate Excise Tax), TBD service charges, and other sources.

Key Goals
    South Sequim Complete Streets - $205k: Once complete, the 12-block (1.5-mile) corridor in South Sequim, centered
     upon Prairie Street, will directly connect our two Economic Opportunity Areas (EOAs), from the west side to the east
     side of the downtown area.
    City Wide Pavement Rehabilitation - $190K: Perform pavement repair, overlay, or reconstruction of City streets.
    US 101 East Corridor Improvements (designed and constructed by WSDOT with financial support from the City) -
     $490k: The US Highway 101 East Sequim Corridor Improvements aims to improve safety, mobility, and economic
     development opportunities. with the design elements including completing the Simdars Road interchange to fully
     support economic development in the recently created Emerald Coast Economic Opportunity Zone, constructing a
     frontage road connecting Palo Alto and Happy Valley Roads to the Simdars interchange and landscaping the Sequim
     bypass between Simdars and River Roads.
    Washington Street Pavement Rehabilitation - $1.1ml: This project includes HMA overlay of roughly 15,000 linear feet
     of Washington Street between River Road and Simdars Road. The project also includes replacement of non-
     compliant ADA curb ramps and driveways.
    City Wide Pedestrian/Bike Improvements - $53k: This annual city-wide program will support the construction of
     pedestrian and bicycle improvement projects.
    Sequim Ave Roundabout and Sidewalk Infill between Old Olympic Hwy and Hendrickson- $251K: The primary need
     for this project is mobility, filling a 3,000-foot gap is sidewalk facilities for pedestrians along the west side of Sequim
     Ave. and by providing bike lanes between Port Williams Road and Deytona Street on Sequim Ave. The project also
     includes retrofitting the roundabout at the intersection of the N. Sequim Ave and Port Williams Road to include safe
     pedestrian and bicycle crossings.

2021 Adopted Budget                                        126                                                   11/23/2020
Streets Restricted Budget Detail
                                               2017          2018                 2019         2020         2020         2021          2021-2020

                                               Actual        Actual               Actual      Forecast     Budget       Budget       Amount         %

Expenses
  Salaries & Wages                                       6      -                    -            -           -            -            -               -%
  Personnel Benefits                                    16      -                    -            -           -            -            -               -%
  Supplies                                        -             -                    -            17,693      20,000       -            (20,000)(100.0)%
  Service Charges                                238,165       477,876               70,209      484,266     750,000      998,500      248,500     33.1%
  Intergovernmental Services                      -                 2,211            -            -           -            -            -               -%
  Capital Outlay                                 789,617       822,968            2,295,801    2,606,026    3,695,000    1,290,297   (2,404,703) (65.1)%
  Debt Service-Interest & Issuance Costs          -             -                    -           121,474      -            -            -               -%
  Other Services: Interfund                      306,096       428,690              629,363    1,052,757     907,569      392,590      (514,979) (56.7)%
  Non-Expense & Transfers                        180,000       480,000              305,000    1,825,000    1,950,000     580,000    (1,370,000) (70.3)%

                              Total Expenses   1,513,900     2,211,745            3,300,373    6,107,216    7,322,569    3,261,387   (4,061,182) (55.5)%

2021 Adopted Budget                                                         127                                                      11/23/2020
Storm Water Restricted Budget Detail

The Stormwater Restricted Fund was established in 2014 for the development of the first Stormwater Master Plan,
adopted in 2016, which identifies capital projects and operations to control and/or treat stormwater within the City.
Revenues from the Water and Sewer Utility funds cover the costs of capital projects; this is justifiable since effective
stormwater management can benefit the City’s water supply, water quality, and sewer system. Grants are sometimes
obtained to offset City costs.

Key Goals
     Dungeness Off-Stream Reservoir Stormwater Improvements-Capture stormwater from Burnt Hill south of the City and
      redirect it to the future off-channel reservoir site for infiltration.
     Stormwater upgrades to protect Bell Creek and reduce urban flooding.

                                2017     2018         2019         2020        2020         2021          2021-2020
                                Actual   Actual      Actual      Forecast     Budget       Budget       Amount         %

Expenses
 Salaries & Wages                  -        -           11,352        8,840       8,840       -              (8,840)(100.0)%
    Personnel Benefits             -        -            1,012        1,900       1,512       -              (1,512)(100.0)%
    Capital Outlay                 -        -           60,584       90,020     302,215      357,250        55,035 18.2%
    Other Services: Interfund      -        -           20,932       41,323      68,224       61,278         (6,946) (10.2)%
               Total Expenses      -        -           93,880      142,083     380,791      418,528        37,737     9.9%

2021 Adopted Budget                                     128                                               11/23/2020
Parks Restricted Budget Detail

This Special Revenue Fund was established in 2005. The expenditures are restricted to park maintenance and the
acquisition of future equipment, park lands and open space. This fund has expanded to include other special revenues,
such as "in lieu/impact fees", and a portion of money received by the City for the abandonment of public rights of way.
Sub-funds are used to track large park projects.

Key Goals
      Pave Re-Use Demo Parking Lot: This project will pave the parking area located at the south end of the Albert Haller
       playfields at the Reuse Demonstration Site. It will also widen the access at North Rhodefer Rd. to allow two-way
       traffic to enter and exit from the parking area.
      Carrie Blake Park Bridges: This project includes the replacement of four timber pedestrian bridges between Carrie
       Blake Park and the Reuse Demonstration Site across Bell Creek. The new bridges will be ADA compliant and at
       least one will have the ability to have mowers cross. The new bridges will be engineered and properly anchored to
       withstand high-water flooding periodically experienced in Bell Creek during wet weather months.
      Parks Impact Fee Study and Master Plan Update: This project will update the City's Park Master Plan and Impact
       Fee Study.
                                                 2017         2018                 2019            2020            2020        2021         2021-2020

                                                 Actual       Actual               Actual         Forecast        Budget      Budget      Amount           %

Expenses
  Salaries & Wages                                        2      -                    -               -              -           -           -                 -%
    Personnel Benefits                                    5      -                    -               -              -           -           -                 -%
    Supplies                                         7,186           3,830                6,316           5,000      15,001      10,000          (5,001) (33.3)%
    Service Charges                                 30,000       40,000               -                      76      50,000      50,000      -                 -%
    Capital Outlay                                 426,831      238,071               -               80,901        273,301     532,001     258,700      94.7%
    Other Services: Interfund                      143,330      100,733               13,886          23,390         71,436     106,820      35,384      49.5%
    Non-Expense & Transfers                         69,532       -                    -               -              -           -           -                 -%

                                Total Expenses     676,886      382,634               20,202         109,367        409,738     698,821     289,083      70.6%

2021 Adopted Budget                                                          129                                                          11/23/2020
Capital Facilities Fund Budget Detail

This Fund was created for the purpose of paying and tracking the costs associated with Facility Capital projects.

Key Goals
     Account for and monitor Facility Capital projects.

                                2017           2018           2019            2020            2020          2021           2021-2020
                                Actual         Actual         Actual         Forecast        Budget        Budget        Amount        %

Revenues
 Intergovernmental
   Revenues                       347,997         88,503         -               75,000         -            300,000       300,000         -%
    Miscellaneous Revenues             1,534            906          3,147           1,457           205           205      -              -%
    Other Increases in fund
      resources                    -              -              -               66,453         -            100,000       100,000         -%
    Other Financing Sources       360,000        135,000        140,000         286,000       1,176,000      325,063       (850,937) (72.4)%
               Total Revenues     709,531        224,409        143,147         428,910       1,176,205      725,268       (450,937) (38.3)%

Expenses
 Supplies                                142          1,877      -               -              -             -             -              -%
    Capital Outlay                678,948        119,229         40,428         451,734        936,000       570,000       (366,000) (39.1)%
    Other Services: Interfund     144,654         37,225             9,533      107,376        134,522        91,283        (43,239) (32.1)%
    Non-Expense & Transfers        -              -              -               58,335        100,000       100,000        -              -%
               Total Expenses     823,744        158,331         49,961         617,445       1,170,522      761,283       (409,239) (35.0)%

2021 Adopted Budget                                              130                                                      11/23/2020
Capital Facilities Fund Budget Detail
Revenue Summary
Revenues in this Fund typically are composed of transfers in from other funds and grants. The 2021 budget includes a
$300k grant for a Broadband project, yet to be defined. Other revenues consist of transfers in from REET, Water and
Sewer for Civic Center and City Shop Improvements

Expenditure Summary
The 2021 budget of $761k includes the following projects: $20k for possible Civic Center improvements - used only if
needed. $250k for City Shop Improvements - this project includes expansion and facility development in the existing shop
area and the City owned undeveloped area between the shop and 3rd Ave. Improvements include designated areas for
material stockpiles, salt storage, police vehicle staging, a greenhouse, a fuel station, and future buildings for offices and
equipment storage and maintenance. $300k for a Broadband project, yet to be fully defined. $100k in possible
Construction Retention.

2021 Adopted Budget                                      131                                                  11/23/2020
Water Restricted Budget Detail

The Water Restricted Fund is comprised of several sub-funds. These funds are restricted by state and/or federal
regulations, agreements or restrictions created by City Council. General Facility Charges (GFCs) are assessed for new
connections to the system and are used for new construction and improvements to the system. Revenues from rates are
transferred to the Water Restricted Fund to cover the cost of repairing and/or replacing infrastructure and equipment.
Revenues from rates are also transferred into this fund to cover debt service.

Key Goals
     AC/GALV Replacement - $200k: This project provides an annual allotment to replace undersized or failing AC and
      galvanized iron water mains throughout the distribution system with piping of sufficient diameter to meet future
      demands, using state-of-the-art materials and construction techniques.
     West Washington Isolation Valves - $115k: The City will add isolation valves to the existing 10-inch diameter water
      main on West Washington Street at its intersections with 2nd Avenue, 3rd Avenue and 4th Avenues. This will reduce
      the number of customers losing service in the event of repairs to the line. This project will add four-way gate valve
      clusters on the existing 6-inch diameter cross-street mains to allow future upsizing.
     New Deep Well - $139k: The City plans to drill and develop an additional well within the water system. Location is
      tentatively identified as at the Silberhorn site in the lower aquifer.
     General Water System Update - $25K: The General Water System Plan provides a long-term planning strategy for
      the City's sewer utility for the 6-year and 20-year planning periods.
     New SCADA Installation - $420k: This project will connect numerous remote Public Works sites to a central location
      where an operator will be able to observe, record, and change process control parameters at the remote site.

                                 2017          2018        2019            2020         2020         2021          2021-2020
                                 Actual        Actual      Actual         Forecast     Budget       Budget       Amount        %

Expenses
 Salaries & Wages                         8       30,473      20,887          21,084      21,602       21,309           (293) (1.4)%
    Personnel Benefits                    21      15,123      10,602          10,732      11,212       11,310             98   0.9%
    Service Charges                 54,768       420,070     326,862         408,358     393,801      165,000      (228,801) (58.1)%
    Intergovernmental Services      11,216        13,098          8,176        5,044       6,000        6,000       -              -%
    Capital Outlay                 547,344       475,834     886,734         398,842     580,000      835,000      255,000 44.0%
    Debt Service-Principal          66,444        60,000     157,566         100,857     100,857      100,857       -              -%
    Debt Service-Interest &
     Issuance Costs                 55,115        52,625      98,748         101,339      54,883       54,883       -              -%
    Other Services: Interfund      179,578       315,113     385,342         170,690     177,366      196,050       18,684 10.5%
    Non-Expense & Transfers        165,750        46,290      -              360,335     727,000      492,258      (234,742) (32.3)%
               Total Expenses    1,080,244     1,428,626   1,894,917       1,577,281    2,072,721    1,882,667     (190,054) (9.2)%

2021 Adopted Budget                                           132                                                 11/23/2020
Water Restricted Budget Detail

2021 Adopted Budget              133   11/23/2020
Sewer Restricted Budget Detail

The Sewer Restricted Fund is comprised of several sub-funds. These funds are restricted by state and/or federal
regulations, agreements or restrictions created by City Council. General Facility Charges (GFCs) are assessed for new
connections to the system and can be used for new construction and improvements to the system. Revenues from rates
are transferred from the Operating budget to cover the cost of replacing or repairing the infrastructure and equipment.
Revenues from rates are also transferred into this fund to cover debt service.

Key Goals
     Aerobic Digester Capacity Upgrades - $1.1ml: This project will increase the capacity of the aerobic digestion system
      and includes constructing two new 100,000-gallon digester cells with blowers and diffusers for aeration and installing
      a rotary screen thickener to thicken Waste Activated Sludge (excess biological material) upstream of the digesters at
      the Water Reclamation Facility.
     WRF Headworks Modifications No 2 - $71k: This project will replace or potentially rebuild the existing HYCOR
      mechanical fine screen at the WRF headworks. The existing screen was installed in 1998 and will be nearing the end
      of its service life. Following its installation, this new or rebuilt screen will serve as the primary headworks screen.
     Willow/Blake Sewer Line Improvement - $87k: This project includes replacing under sized mains and manholes that
      have been damaged from hydrogen sulfide corrosion.
     City Wide Inflow and Infiltration Reduction - $150k: This project will rehabilitate sewer collection mains and manholes
      where inflow and infiltration (I/I) is entering into the collection system during periods of high groundwater and storm
      events.

                                 2017          2018        2019         2020         2020         2021          2021-2020
                                 Actual        Actual      Actual      Forecast     Budget       Budget       Amount          %

Expenses
 Salaries & Wages                         6       -           -            -           -            -            -                -%
    Personnel Benefits                    17      -           -            -           -            -            -                -%
    Service Charges                353,730       377,089      71,844      211,277     211,050      211,050       -                -%
    Intergovernmental Services      16,870        16,022      12,343       12,094      17,200       17,200       -                -%
    Capital Outlay                  42,632        20,681   1,061,694    1,224,261    1,949,201    1,620,870     (328,331) (16.8)%
    Debt Service-Principal         680,962       631,814   3,957,917      399,515     332,276      384,906       52,630 15.8%
    Debt Service-Interest &
     Issuance Costs                147,305       154,579      72,682      116,617      76,706       89,179       12,473 16.3%
    Other Services: Interfund      120,992       177,714     357,630      259,222     339,364      330,342           (9,022) (2.7)%
    Non-Expense & Transfers        650,750        87,697   3,700,000      343,835     710,500     1,265,747     555,247 78.1%
               Total Expenses    2,013,264     1,465,596   9,234,110    2,566,821    3,636,297    3,919,294     282,997       7.8%

2021 Adopted Budget                                           134                                              11/23/2020
Sewer Restricted Budget Detail

Expenditure Summary
Some additional equipment related expenditures which are not capital projects but are budgeted from Sewer Reserve
Funds in 2021 include: $40k - I&I: This to purchase equipment for city crews and to hire a contractor to replace pipe or
manholes that city crew are not able to. $25k - WRF Lab: Improvements to the WRF lab that was constructed in 1984.
$49k - Portable 6” pump: Purchase new 6” pump that will be used to transfer mixed liquids between aeration trains, and
augment pumping during storm events or equipment failures. $40k - 6005 panel upgrade: This will update electronics
that operate reclaimed water side of the plant that is experiencing issues and equipment is not available to replace. This
system was constructed in 1998. $20k - Hydrorangers for EQB: This will be to replace the level sensors in the EQB with
a more accurate and reliable system that is not affected by foam. $20k - Scum pump #3 clarifier: This new pump will be
designed to handle foam with very little water. The present pump is not capable of pumping foam.

2021 Adopted Budget                                     135                                                11/23/2020
2021 Capital Project List

                                                                                     Project
                      Project Number                      2021                                      Funding Source
                                                                                      Cost

                                       Parks
                       PRK-051RR       Pave Re-use Demo Parking Lot                    $442,000         Sewer
                       PRK-052RR       Carrie Blake Park Bridges - PE                   $65,000         Grant
                       PRK-053PL       Parks Impact Fee Study/Master Plan Update        $50,000      General Fund
                                       Total Parks Projects                            $557,000
                                       Building Facilities
                       CFL-012NC       City Shop Upgrade and Expansion                 $250,000   REET/GF/Water/Sewer
                       CFL-016NC       City Wide Broadband Accommodation               $300,000         Grant
                                       Total Capital Facilities                        $550,000
                                       Stormwater
                                       Dungeness Off-Stream Reservoir Stormwater
                       SMR-001CU       Improv.                                         $265,000    Grant/Water/Sewer
                       SMR-003RR       7th Ave and Washington Upgrade                   $92,500    Grant/Water/Sewer
                                       Total Stormwater Projects                       $357,500
                                       Streets
                       STR-031CU       South Sequim Complete Streets                  $205,000        Impact Fees
                       STR-041RR       City Wide Pavement Rehabilitation              $190,000       Water/Sewer
                       STR-053CU       US 101 East Sequim Corridor Improvements       $489,500     Grant/Impact Fees
                       STR-065RR       Washington Street Pavement Rehabilitation     $1,100,297       REET/Grant
                       STR-072CU       City wide Pedestrian/Bike Improvements           $53,000           TBD
                                       Sequim Ave Roundabout and Sidewalk Infill
                        STR-074SF      between Old Olympic Hwy and Hendrickson        $251,000           Grant
                                       Total Streets Projects                        $2,288,797
                                       Water
                                       Emergency                                       $100,000         Water
                       WTR-027CU       AC/GALC Replacement                             $200,000         Water
                       WTR-031NC       West Washington Isolation Valves                $115,000         Water
                       WTR-040CU       New Deep Well                                   $139,400         Water
                       WTR-060PL       General Water System Update                      $25,000         Water
                       WTR-071NC       New SCADA Installation                          $420,000       Water/Sewer
                                       Total Water Projects                            $999,400
                                       Sewer
                                       Emergency                                      $200,000          Sewer
                       SRR-035CU       Aerobic Digester Capacity Upgrades            $1,118,480 Sewer/County/Jamestown
                       SRR-036RR       WRF Headworks Mod. No 2                          $71,390 Sewer/County/Jamestown
                       SRR-043CU       Willow/Blake Sewer Line Improvement              $87,000 Sewer/County/Jamestown
                       SRR-082RR       City-wide Inflow and Infiltration Reduction    $150,000          Grant
                                       Total Sewer Projects                          $1,626,870
                                       Total All Capital Projects                    $6,379,567

2021 Adopted Budget                                              136                                             11/23/2020
You can also read