PLANNING REPORT 21 EDMUND AVENUE, UNLEY MODIFICATIONS AND IMPROVEMENTS TO AN EXISTING PETROL FILLING STATION
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
PLANNING REPORT 21 EDMUND AVENUE, UNLEY MODIFICATIONS AND IMPROVEMENTS TO AN EXISTING PETROL FILLING STATION Prepared for: Date: Fitzsimons Group of Companies 28.03.2019 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
© Future Urban Pty Ltd, 2019 Proprietary Information Statement The information contained in this document produced by Future Urban Pty Ltd is solely for the use of the Client identified on the cover sheet for the purpose for which it has been prepared and Future Urban Pty Ltd undertakes no duty to or accepts any responsibility to any third party who may rely upon this document. All rights reserved. No section or element of this document may be removed from this document, reproduced, electronically stored or transmitted in any form without the written permission of Future Urban Pty Ltd. Document Control Revision Description Author Date V1 DRAFT TK 25/03/2019 V2 FINAL TK 28/03/2019 REF 0135 I 28 March 2019 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
CONTENTS 1. INTRODUCTION 1 2. BACKGROUND 1 3. THE PROPOSAL 1 4. THE SUBJECT SITE AND LOCALITY 2 5. PLANNING ASSESSMENT 3 5.1 LAND USE AND ZONING 4 5.2 DESIGN AND APPEARANCE 5 5.3 INTERFACE BETWEEN LAND USES 6 5.3.1 NOISE 6 5.3.2 LIGHT SPILL/GLARE 6 5.3.3 HOURS OF OPERATION 6 5.4 TRAFFIC IMPACTS 7 5.5 ORDERLY AND ECONOMIC DEVELOPMENT 7 5.6 TRANSPORTATION 7 6. CONCLUSION REF 0135 I 28 March 2019 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
1. INTRODUCTION We have been engaged by the applicant, Fitzsimons Group of Companies, to submit this Development Application. The applicant seeks consent to carry out modifications and improvements to the existing former workshop building, demolish the existing weatherboard shop (control building) and continue to use the land at No. 21 Edmund Avenue, Unley as a petrol filling station. In order to assist Council with its assessment of the proposal, the following documents and plans are submitted for Council's consideration: • Development Application Form; • Signed Powerline Declaration Form; • Certificate of Title; • Site Plan/Floor Plan, Landscaping Plan, External Elevations and External Perspective; • Traffic and Parking Assessment; and • Planning Assessment. 2. BACKGROUND The Council Assessment Panel (CAP) at its Special Meeting held on 20 December 2018 considered and determined the following applications for Nos. 21-23 Edmund Avenue. Unley. 1. "Construction o f an integrated service station complex and associated fencing, landscaping, carparking and illuminated signage (including one 6m high pylon sign) and the removal o f two (2) street trees along Duthy Street;" and 2. "Change o f use from service station and motor repair workshop to office and restaurant (including take way) and associated car parking." The first application was REFUSED and the second APPROVED. The present proposal relates to No. 21 Edmund Avenue only, being Allotment 96 in Filed Plan 214679. 3. THE PROPOSAL Following demolition of the existing weatherboard control building (shop), which has previously received approval, it is proposed to carry out modifications to the existing workshop building for conversion to a control building in association with the ongoing existing use of the premises as a petrol filling station. The completed development comprises a control building of 49.5 square metres, fuel canopy, two double sided fuel dispensers (four fuel filling points), underground fuel and LPG tanks, two (2) back-lit company logo signs attached to the canopy, associated car parking and landscaping. Further, and for the purposes of the present application, the Environmental Protection Authority has requested that in accordance with sound environmental practice, the underground tanking system be upgraded to modern day standards. The present proposal meets this request. A REF 0135 I 28 March 2019 1 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
4. THE SUBJECT SITE AND LOCALITY The subject land, being Allotment 96 in Filled Plan 214679 and known as No. 21 Edmund Avenue, is located on the south-western corner of Duthy Street and Edmund Avenue, has frontages of 42.82 metres and 15.24 metres to Duthy Street and Edmund Avenue respectively and an area of approximately 653 square metres. Figure 1.1 Subject Site and Locality. The land has been used historically (circa 1932) as a petrol filling station and motor repair station, including the testing of high performance engines, and enjoys existing use rights for such purposes. The locality is generally residential in character comprising primarily of what may be described as Victorian and Turn-of-the-Century villas on relatively generous allotment sizes. However, there are a number of existing non-residential land uses in the locality that form part of and impact upon the character and amenity of the locality. Diagonally opposite the subject land on the eastern side of Duthy Street in the direction of Fairford Street is a group of shops including the Duthy Street Deli and Cafe, a hairdressing salon, a picture framing business and a Thai restaurant. There are a number of other commercial activities fronting Duthy Street in the broader locality. The Unley Oval/Sturt Bowling and Tennis complex is approximately 105 metres north-west of the subject land. REF 0135 I 28 March 2019 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
5. PLANNING ASSESSMENT The subject land is within the Residential Historic (Conservation) Zone and more particularly, Policy Area 6 — Spacious Historic Unley and Malvern Trimmer Estate of the Unley (City) Development Plan consolidated on 19 December 2017 within which the proposal is neither complying nor non-complying and, accordingly, is for consideration on its merits. The following provisions of the Development Plan have been taken into consideration in the preparation of this report. COUNCIL WIDE Crime Prevention. Objective: 1 PDC's: 1 and 2. Design and Appearance. Objectives: 1 and 2. PDC's: 1 -3, 9, 10, 12, 13 - 15, 18 - 20, 22 and 23. Energy Efficiency. Objective: 1 PDC's: 1 -4. Form o f Development. Objectives: 1 and 7. PDC's: 1, 2, 4, 7, 8, 12 and 13. Hazards. Objectives: 3 - 6. PDC's: 1 - 6. Heritage. Objectives 3 and 5. PDC's: 2, 3, 4 and 6. Interface Between Land Uses. Objectives: 1, 2, and 3. PDC's: 1, 2, 6 and 7. REF 0135 I 28 March 2019 3 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
Landscaping. Objective: 1. PDC's: 1 and 2. Natural Resources. Objectives: 2, 5, 6, 7 and 10. PDC's: 1, 5, 7, 8, 9, 10, 11, 12, 14, 15, 33 and 38. Outdoor Advertisements. Objectives: 1 and 3. PDC's: 1 — 9, 11, 14 - 22. Transportation. Objectives: 1, 3, 6, 7 and 11. PDC's: 1, 3, 10, 12, 13, 1 8 - 21 and 32. Waste. Objectives:1 and 2. PDC's: 1 -5, 10, 11, and 13. RESIDENTIAL HISTORIC (CONSERVATION) ZONE Objectives: 1 and 2. PDC's: 1, 2, 7, 9, 10 and 11. In consideration of all the above, the following have been identified as the primary matters to be addressed: • Land Use and Zoning; • Design and Appearance; • Interface Between Land Uses; • Orderly and Economic Development; and • Transportation. 5.1 LAND USE AND ZONING It is an agreed fact, as evidenced by the reports presented to and considered by the CAP, that No. 21 Edmund Avenue, has longstanding existing use rights as a petrol filling station. A REF 0135 I 28 March 2019 4 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
It is equally clear that the present proposal constitutes an improvement on the existing situation to permit the practical continuation of the existing use by improving and better adapting conditions of the use to address contemporary conditions. Further, and in accordance with the decision of the Full Court of the Supreme Court of South Australia in Caltex Petroleum Pty Ltd v City o f Holdfast Bay [2014] the proposed development is properly characterised as a 'merit' form of development being the reasonable development of an existing non-complying use. It is also noted that Council Wide PDC 7, Form of Development, Non-Residential Development in a Residential Zone, provides that: PDC 7 The expansion or redevelopment o f a building to be used f o r non-residential purposes in a residential zone may be appropriate where the proposed non-residential use is confined to a site used, in whole or in part, for non-residential purposes, and: (a) the proposed use is non-intensive and primarily serves, or has long established direct associations with, the local community and improves the range and quality o f the community facilities or other services to that local community; or (b) (c) improves existing unsatisfactory site conditions. (emphasis added) There can be no doubt that the present proposal fulfils this policy intent noting that a number of the representations made in respect of the integrated service station application referred to above promoted the revamping of the site as a petrol filling station. In these circumstances, the present proposal is, in effect, for building work in pursuance of the existing use of the site as a petrol filling station and we respectfully suggest that it may validly be held that, as such, the proposal is a Category 1 form of development. 5.2 DESIGN AND APPEARANCE We accept that the subject site, and more particularly the properties fronting Edmund Avenue, are located in a reasonable quality residential area. However, the locality does experience some impacts from the traffic on Duthy Street, the longstanding existing use of the subject site as a petrol filling station and the presence and functioning of the nearby shops and the Unley Oval complex, which all form part of and impact on the existing character and amenity of the locality. As noted above the present proposal is essentially for the modification of an existing building to address contemporary South Australian socio-economic conditions. To this extent, the existing boundary wall development, as it relates to the adjoining land to the west at No. 23 Edmund Avenue, will remain the same and, accordingly, visual impacts, as such, will be no different than currently experienced. Further, we say that the overall changes proposed for the building, which are relatively minor, will generally improve and not detract from the appearance of the site. REF 0135 I 28 March 2019 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
Pursuant to Clause 2 (B) (c) of Schedule 5 to the Development Regulations 2008, as amended, a detailed report describing the prevailing character attributes and design elements within the locality and the extent to which the then proposed development was consistent with such attributes and elements, prepared by DASH Architects, accompanied the application for the integrated service station application. The report concluded that: • all reasonable measures had been taken to minimise any adverse character impacts; and • the proposed development was an improvement to the existing prevailing character. The present proposal which has been significantly reduced in size and scale of operation now only relates to No. 21 Edmund Avenue and is for the modification of the existing building only. This reinforces the fact that all reasonable measures have now been taken to minimise any adverse character impacts and that the proposed development will be an improvement to the existing prevailing character. 5.3 INTERFACE BETWEEN LAND USES The present proposal has been further refined to minimise adverse impacts and conflict between land uses. In effect the existing building will be retained and adapted to address contemporary South Australian socio-economic conditions. Intensive and strategically placed landscaping is proposed along the western boundary to soften the appearance of the built form, provide micro-climate benefits of shade and shelter and appropriately screen service and parking areas. 5.3.1 NOISE An Environmental Noise Assessment was carried out by Sonus, a respected and suitably qualified expert, in respect of the previous application for an integrated service station complex. The assessment recommended specific acoustic treatments, including specific fence and mechanical plant barrier constructions, installation of acoustic absorbing material and restricting times of rubbish collection and fuel deliveries. The report concluded that with such treatments in place the then proposed development would achieve the relevant provisions of the Development Plan related to environmental noise. The present proposal adopts all the relevant recommendations. 5.3.2 LIGHT SPILL/GLARE Council Wide PDC 1, Crime Prevention, provides that development should promote the personal safety of people by, inter alio, adequate lighting. In this instance lighting is proposed to provide a safe operating area and to act as a visual deterrent to vandalism and crime. Lighting, in its own right, does not constitute development, as such. Notwithstanding, the external lighting systems associated with the proposed development will be designed to comply with Australian Standard 4282 — Control of the Obtrusive Effects of Outdoor Lighting — 2019. 5.3.3 HOURS OF OPERATION The proposed development will operate daily between the hours of 6:00 a.m. and 9:00 p.m. A REF 0135 I 28 March 2019 6 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
NEA In reference to the hours of operation, the following extracts from the Caltex case referred to above are considered most pertinent to the present application. "The general relaxation in trading hours over several decades also mitigates against categorising pre-existing uses by reference to times o f operation. To my mind against that general relaxation, the extension o f trading hours can be seen as "a natural change" in the use o f the land." "There is no basis in the Development Plan, in land use practices or in the nature o f shops and petrol filling stations in contemporary South Australian socio-economic conditions to classify the use o f the Caltex site differently by reference to whether or not it trades overnight." For this purpose, it is noted that the Caltex site was within a Residential Zone and the locality surrounding the site was reported as being predominantly detached dwellings with some group dwellings and residential flat buildings. 5.4 TRAFFIC IMPACTS The traffic impacts are addressed in Section 5.9 below. 5.5 ORDERLY AND ECONOMIC DEVELOPMENT In this instance it is considered that the proposed development: • is supportive of the local community by improving the range of services available; • does not remove land currently used for residential purposes; • occurs in an orderly sequence enabling the efficient provision of public services and facilities; • does not prejudice the achievement of the provisions of the Development Plan; and • does not jeopardise the continuance of adjoining authorised land uses. In this sense the proposed development is orderly and economic. 5.6 TRANSPORTATION A comprehensive Traffic Impact Assessment prepared by Phil Weaver and Associates, a recognised and appropriately qualified expert in this field, accompanies the application. There is no need to rehearse the contents here suffice it to say that all relevant traffic matters have been properly addressed. In summary, the report concludes that the proposed development will: • provide an appropriate quantity of six (6) on site car parking spaces, exceeding Council's Development Plan guidelines; • provide a design standard which is appropriate and essentially meets the requirement of the relevant Australian / New Zealand Standard for off street car parking areas; • not result in adverse traffic impacts on the adjoining road network, particularly given the small scale of the proposed development; and • provide one-way access points only and a reduction in the overall width of the various crossovers, while maintaining an appropriate level of access for all traffic required to access the site including 14.9 metre fuel delivery vehicles. REF 0135 I 28 March 2019 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
6. CONCLUSION It is an agreed fact that No. 21 Edmund Avenue has longstanding existing use rights as a petrol filling station and where it is proposed to continue to operate a remodelled petrol filling station on the land there will be no change in land use. The use of the land as a petrol filling station will continue. It was previously reported by Council's Administration that the former application for an integrated service station complex, as a standalone development, displayed satisfactory design principles. The site layout was co-ordinated and orderly. The design was typical of this form of development and in general design terms suitable and inoffensive. The present proposal, which is reduced in size and scale of operation and confined to No. 21 Edmund Avenue, has these same attributes. In these circumstances we say that the proposed development is not seriously at variance with the provisions of the Development Plan and is a reasonable form of development that makes a positive contribution to the local economy and is not likely to cause adverse impact to the amenity of the locality. REF 0135 I 28 March 2019 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
APPENDIX 4. PLANNING DRAWINGS AND PERSPECTIVES STARTARI ARCHITECTURE AND PROJECT MANAGEMENT R E F r 0135 I 28 March 2019 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
SIZE S H E T C i f ) A 3 Ij STOBIE j 1 I r I 1 EXISTING TREE TO REMAIN c‘i AVENUE 5940 42820 1 • CONTROL M D E N U BOH SERVICE BUILDING YARD 49.78 m2 UNISEX \ 1800 MM HGI H COLORBOND TOILET 7 FENCE TO ALL BOUNDARIES LO I // \\ I --' CR c‘i 8 SIGN N S G E T IX I Q LINE O F PERIMETER CREST TO E N R T Y BUNDED FORECOURT DRAINAGE D W E 1=1 O N L CD N O ENTRY SIGN N O ENTRY SIGN MODIFIED EXISTING CROSSOVER NARROWED EXISTING CROSSOVER STOBIE 4 6850 > 3050 3050 3050 3050 10000 EXISTING TREES APPRAIMATE LOCAJIO NO F NEW UNDERGROUND EXISTING FUEL PRICE STAND TO REMAIN TANKS: 2 X 45,000 KL TANKS (90,000 KL TOTAL STORAGE CAPACITY) 0 0 DUTHY STREET 2019 S T A R T A RI 0 2000 4000 6000mm © UNLEY PETROL STATION 21 EDMUND AVENUE, UNLEY SA 5061 GROUND SITE / FLOOR PLAN 028 A100 14/03/19 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
II LI 11111 1 1 1.1 11111111111 AVENUE PP(X10) BL 111 WENN= PP(X6) , t =EMU= : =MENNEN= .." =MENNEN= •.. ,: =MENNEN= • , ENNUI-MIME= - irEEEEELIEEEEE M D E N U EMMEN= ELEMEEMIEEEE • °I TIEEEE r / / \ 111111111 - / / 0 ) 1111111111 I 1 \ \ 1 1111111 \ \ i , _, 111111111 1111111111111. 111111111 1 1 111 1 1 1 111111 111 PLANTING SCHEDULE: 11111111111111111111 1 1 I J11111 11111111 11 1 111111111111111111111111111111111111111111111111 1111 SM SENSATION MAPLE 1111 11 1y 1111111 (ACER NEG UNDO SENSATION) NR NATIVE ROSEMARY (VVESTRINGIA FRUTICOSA) BL BLUE FLAX LILY - M P -MP (DIANELLA CAERULEA) H I INDIAN HAWTHORN (RHAPHIOLEPIS INDICA) MP MANCHURIAN PEAR (PYRUS USSERIENSIS) DUTHY STREET PP PENCIL PINE (CUPRESSUS SEMPERVIRENS 'GLAUCA) 2019 S T A R T A RI 0 2000 4000 6000mm 0 UNLEY PETROL STATION 21 EDMUND AVENUE, UNLEY SA 5061 LANDSCAPING PLAN 028 A101 14/03/19 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
BACK-LIT SIGNAGE PANEL REPLACE EXISTING STEEL CLADDING WITH LYSAGHT 'LONGLINE 305' - COLOUR: MONUMENT REPLACE EXISTING ROOF SHEETING WITH NEW COLORBOND ROOF SHEETING COLOUR: MONUMENT EXISTING BLOCK WALL ON ';'1414111111k BOUNDARY P M=M11•0W. GROUND (51500) \IF EXISTING BRICK WALL - MAKE GOOD EXISTING FUEL PRICE STAND DEMOLISH EXISTING GARAGE DOOR DEMOLISH EXISTING WINDOW, DOOR AND REPAINT TO MATCH EXISTING AND CLADDING TO CREATE NEW AND CLADDING AND PROVIDE NEW DRIVEWAY OPENINGS PAINTED BRICK WALL TO MATCH EXISTING NORTH ELEVATION 1 : 100 REPLACE EXISTING ROOF SHEETING WITH NEW COLORBOND ROOF SHEETING COLOUR: MONUMENT NEW PAINTED BRICK WALL TO MATCH EXISTING IN BACKGROUND e=opliatiana. 1800 MM HIGH COLORBOND FENCE TO ALL BOUNDARIES GROUND (51500) V. ALUMINIUM BATTEN CLADDING BACK-LIT SIGNAGE P NEL NEW CL R GLAZING NEW S DING ENTRY CREATE OPENINGS NI EXISTING BRICK WALL (4 OFF) (CEDAR PRINT FINISH) SH PFRONT IN DOORS IN MAKE GOOD EXISTING WALL AS REQUIRED AND BACKGROUND BACKGROUND PAINT TO MATCH EXISTING EAST ELEVATION 2019 S T A RT A R I 0 1000 2000 3000mm 0 UNLEY PETROL STATION 21 EDMUND AVENUE, UNLEY SA 5061 EXTERNAL ELEVATIONS 028 A200 14/03/19 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
REPLACE EXISTING STEEL CLADDING BACK-LIT SIGNAGE PANEL WITH LYSAGHT 'LONGLINE 305 - COLOUR: MONUMENT DEMOLISH EXISTING GARAGE DOOR AND CLADDING AND PROVIDE NEW PAINTED BRICK WALL TO MATCH EXISTING EXISTING BLOCK WALL ON 450 BOUNDARY GROUND (51500) V 1800 MM HIGH COLORBOND FENCE — — ALUMINIUM BATTEN CLADDING DEMOLISH EXISTING GARAGE DOORS EXISTING BRICK WALL - MAKE GOOD TO ALL BOUNDARIES (CEDAR PRINT FINISH) AND CLADDING TO CREATE NEW AND REPAINT TO MATCH EXISTING DRIVEWAY OPENINGS 1 SOUTH ELEVATION NO ENTRY SIGN A100 1 : 100 20 EXISTING BLOCK WALL ON BOUNDARY A = = = L - A M 1 = = = = = = 1 = 1 • = = = = = = = = = = = = = = = = ====IMI I M = = = = = / • = 1 = = = = = = = = = = = = = = = 1 = =====11 1 1 = = = = = = = = = = = = = = = = = = = = = = = = ====M11 I M = = = = = = = = = = = = = = = = = = = = = = = =====11 1 1 = = = = = = = = = = = = = = = = = = = = = = = = ====M11 I M = = = = = = = = = = = = = = = = = = = = = = = =====11 11=====================-1E— = = = = = = = = = = = = = = = = = = = = = = = = =====M 1 1 = = = = = = = = = = = = = = = = = = = = = = = = ====M11 I M = = = = = = = = = = = = = = = = = = = = = = = =====l1 11 II 11' lilt M = = = = = = = = = = = = = = = = = = = = = = = = I M = = = = = = = = = = = = = = = = = = = = = = = 1 1 = = = = = = = = = = = = = = = = = = = = = = = = =====I =====11 ====M11 I M = = = = = = = = = = = = = = = = = = = = = = = =====11 1 1 = = = = = = = = = = = = = = = = = = = = = = = = ====M11 I M = = = = = = = = = = = = = = = = = = = = = = = =====11 GROUND (51500) 1800 MM HIGH COLORBOND FENCE TO ALL BOUNDARIES 2 WEST ELEVATION 2019 S T A RT A R I 0 1000 2000 3000mm 0 UNLEY PETROL STATION 21 EDMUND AVENUE, UNLEY SA 5061 EXTERNAL ELEVATIONS 028 A201 14/03/19 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
PM 44 24 3 2 0 13 41 '9 7Zr 16:11111.16:„ _tttgttr 711 II .. riEsEL L,E UNLEY PETROL STATION 21 EDMUND AVENUE, UNLEY SA 5061 EXTERNAL PERSPECTIVE 028 A400 14/03/19 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
APPENDIX 5. TRAFFIC AND PARKING ASSESSMENT PREPARED BY PHIL WEAVER & ASSOCIATES R E F r 0135 I 28 March 2019 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
PHIL WEAVER & ASSOCIATES Consultant Traffic Engineers ABN 67 093 665 680 204 Young Street Unley SA 5061 P: 08 8271 5999 F: 08 8271 5666 E: maiMphilweaver.com.au File: 19-037 22 March 2019 Mr Tony Kelly Urban Planner Future Urban Group Pty Ltd Level 1, 89 King William Street ADELAIDE SA 5000 Dear Mr Kelly PROPOSED SERVICE STATION REDEVELOPMENT — 21 EDMUND AVENUE, UNLEY — TRAFFIC AND PARKING ASSESSMENT I refer to our recent discussions with respect to the proposed redevelopment of the existing service station on the above site. I understand that it is proposed to no longer provide the motor vehicle repair component of the site. As requested, I have undertaken the following review of the traffic and parking related aspects of the subject development. EXISTING SITUATION The subject site is located on the south-western corner of the intersection of Duthy Street with Edmund Avenue, Unley. The land is located within a Residential Historic Conservation Zone as identified on Unley (City) Zones Map Un/5 within the Unley (City) Development Plan as consolidated 19th December 2017. The subject site has frontages of 15.24m to Edmund Avenue and 48.76m to Duthy Street, inclusive of a 5.94m wide right-of-way at the rear (south) of the site which also provides access to the property located at 23 Edmund Avenue. There are three existing access points associated with the subject land. These include two crossovers on Duthy Street comprising an approximately 6m access point adjacent to the right-of- way at the southern boundary of the site and an 18m access point adjacent to the northern boundary of the site. An additional crossover is provided on Edmund Avenue. The Edmund Avenue crossover is approximately 14.9m wide and extends along most of the frontage of the site and is shared with the adjacent property at 23 Edmund Avenue. Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
Duthy Street provides a single traffic lane, a bicycle lane and a parking lane in each direction separated by a narrow painted median, adjacent to the subject site. The painted median is approximately 900mm wide and contains pavement bars. Parking is unrestricted on both sides of Duthy Street in the vicinity of the subject site with parking permitted between the two crossovers along the eastern boundary of the site. Duthy Street has a posted speed limit of 50km/h. Edmund Avenue, adjacent to the subject site, has a kerb to kerb width of approximately 12m with verge widths of approximately 4m on each side of this roadway. A pavement bar treatment is provided within the painted median on the approach to Duthy Street directly adjacent to the subject site. Parking is unrestricted on both sides of Edmund Avenue in the vicinity of the subject site. Edmund Avenue has a posted speed limit of 40km/h. The intersection of Duthy Street and Edmund Avenue forms a T-junction which is controlled by a Give Way sign installed facing traffic entering the intersection from the west along Edmund Avenue. Details of traffic volumes on the adjoining road network have previously been obtained from the City of Unley. Council conducted surveys of traffic volumes on Duthy Street between Edmund Avenue and Fairford Street in September 2017. The following traffic volumes were recorded during this survey: • A two-way traffic volume of 10,013 vpd recorded on Tuesday 5th September 2017; and • A two-way traffic volume of 12,998 vpd recorded on Thursday 7th September 2017 The above traffic volumes indicate a significant variation in the weekday volume on Duthy Street. We have previously obtained details of a Vehicle Turning Movement Summary recorded by the Department of Planning Transport and Infrastructure (DPTI) at the intersection of Greenhill Road and George Street, Parkside, between the subject site and the Adelaide Central Business District (CBD). This survey identified an Annual Average Daily Traffic (AADT) volume of 11,800 vpd on George Street, which is essentially an extension of Duthy Street to the north. Hence, I consider that the AADT volume on Duthy Street in the vicinity of the subject site would be of the order of 11,800 vpd. Council has also provided details of traffic counts recorded on Edmund Avenue to the west of the subject site, namely: • 4,484 vpd recorded on Tuesday 29th April 2014.9, between Trimmer Terrace and Cambridge Terrace; • 2,432 vpd recoded on Tuesday 27th September 2016 between Trimmer Terrace and Rugby Terrace; and • 2,472 vpd recorded on Wednesday 28th September 2016 also between Trimmer Terrace and Rugby Terrace. In order to identify peak hour volumes on Edmund Avenue within the vicinity of the subject site, traffic surveys were undertaken in 2017 as detailed below. 2 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
TRAFFIC SURVEYS Counts of traffic entering and exiting Duthy Street to and from Edmund Avenue were previously conducted over the following periods: • From 3.00pm to 6.00pm on Thursday 30th November 2017; and • From 7.30am to 9.00am on Friday 1st December 2017. The survey results identified that the peak periods occurred between 3.00pm and 4.00pm on the Thursday afternoon and between 8.00 am and 9.00 am on the Friday morning. Figure 1 below shows the peak hour traffic volumes entering and exiting Edmund Avenue at the intersection with Duthy Street. 82(83) Edmund Avenue 84(73) 35(49) 68(69) Figure 1: Existing peak hour traffic volumes entering / exiting Edmund Avenue Analysis of the results of the traffic surveys identifies that: • 269 vehicles accessed Edmund Avenue (150 in / 1 1 9 out) in the am peak period; • 274 vehicles accessed Edmund Avenue (152 in / 122 out) in the pm peak period; and • Only minimal queuing occurred in Edmund Street with a maximum of 3 cars queued in either survey period. It is anticipated that there would have been minimal change to the volumes of the above turning movements since the above surveys were undertaken. From the results of the above surveys it is estimated that the Average Weekday Traffic Volume on Edmund Avenue, west of Duthy Street would be of the order of 2,700 vpd, corresponding closely to the volumes of traffic recorded by Council between Trimmer Terrace and Rugby Street. 3 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
PROPOSED REDEVELOPMENT The proposed redevelopment is identified on a Ground Site / Floor Plan prepared by Startari Architecture dated March 2019. The proposed development will provide: • A control building of 49.78m2 adjacent to the western boundary of the site; • Two double sided fuel dispensers (pumps) in a tandem arrangement providing refuelling opportunities on each side of the two dispensers i.e. 4 refuelling positions, underneath an overhead canopy. The traffic flow in this area will be from south to north and will be linemarked to identify such a flow; and • Six on-site car parking spaces, including one accessible space and associated shared area. Given the one-way traffic flow through the site, entry will occur only from the southern access point on Duthy Street with the remaining access points restricted to exit only, i.e. the northernmost access point on Duthy Street and the Edmund Avenue access point. Given the relatively small size of the proposed development, refuelling will be undertaken by an approximately 14.9m long semi-trailer. The proposed car parking spaces will each be 5.4m in length and 2.6m in width, with the exception of the accessible space and associated shared area which will each be 2.4m in width. As such, I consider that the design of the on-site car parking areas would conform to the relevant off-street car parking standards (AS/NZS 2890.1:2004 and AS/NZS 2890.6:2009). The proposed development will trade from 6.00 am to 9.00 pm seven days a week. PARKING ASSESSMENT Table Un/5 Off-Street Vehicle Parking Requirements within the Unley Council Development Plan identifies car parking provisions relevant to the subject site as follows: Kind of Number of Vehicle Parks Required Subject Site Parking Development Requirement Motor Repair 3 for each vehicle service bay plus where a No service bays 0 Showroom / development incorporates a shop or Petrol Filling restaurant not supplying goods associated Station with motor services additional parking at the rate applicable to a shop or restaurant. Shop Outside centre zones: 49.78m2 4 • 7 per 100 square metres of total floor area On the above basis, the proposed service station development would require the provision of only 4 on-site car parking spaces. As such, I consider that the provision of 6 on-site car parking spaces will comfortably satisfy the on- site car parking requirements for the proposed service station. 4 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
While I understand that there is no specific requirement for bicycle parking associated with the subject development there be an opportunity to provide at least two spaces within the north-eastern corner of the site. TRAFFIC ASSESSMENT The 'Guide to Traffic Generating Developments' report produced by the (former) Roads and Traffic Authority of NSW identifies trip generation rates which are either directly relevant of comparable to both the previous and proposed use of the subject site : Form of Area / units Trip Generation rate Resultant evening development peak hour traffic generation Proposed Service Station Development Site area 650m' 0.04A(S)* 26 trips Control building area 49.78m2 0.3A(F)** 15 trips Sub total 41 trips Existing development Workshop facility 400m2 1 trip per 100m2 of 4 trips building area*** Service station 250m2 0.04A(S) 10 trips component site — area Control building area 20m2 0.03A(F) 6 trips Sub total 20 trips Net increase 21 trips * A(S) = area of site (m2). ' A(F) = gross floor area of convenience store (m2). ' (Same rate as a Car tyre retail outlet) On the above basis, there would theoretically be an increase of approximately 21 evening weekday peak hour trips from the previous land use (20) to a total of 41 evening weekday peak hour trips associated with the subject site. I note that Council staff had queried the traffic generation rates applied to the larger service station development (DA 090/51/2018/C3) as previously proposed on the subject land (and that of the adjoining land to the immediate west of the subject site) and had subsequently recommended consideration of the trip generation rates within the report prepared by Parsons Brinkerhoff for the Department of Planning, Transport and Infrastructure, titled 'Trip generation rates for assessment of development proposals'. 5 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
The Parsons Brinkerhoff report identifies a weighted average of 18 peak hour trips per pump. This would correspond to a total of 72 trips in the pm peak hour and, while conservative, this figure has been adopted in assessing the traffic implications of the proposed development. I anticipate that the majority of the above movements in the morning period would be left in/left out with at most 33% of the traffic entering the site during the am peak period turning right into the site or right out of the site. In the pm peak hour period, the majority of traffic entering the site will turn right in from Duthy Street and would then turn right out of the site in order to continue travelling southbound. There should be only low volumes of traffic turning out of the site from Edmund Avenue given that most drivers will elect to turn left (or right) out of the northern (exit only) access point on Duthy Street. Figure 2 below identifies future traffic volumes accessing the subject site. E d m u n d Avenue 3(7) 23(7) Proposed 7(19) Service Station Development 13(23) 23f13 Figure 2: Forecast am (pm) peak h o u r traffic volumes accessing the subject site Delays to through traffic within the southbound traffic lane on Duthy Street would be minimal given both the low volume of traffic turning into the site and the volume of traffic using this roadway. An assessment of the traffic impact of vehicles turning right into the southern access point on Duthy Street in both the am and pm peak hour periods has been undertaken using SIDRA intersection analysis software. 6 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
The SIDRA assessment identifies that there would be an average delay of 10 seconds and a maximum of only one vehicle (at the 95th percentile) probability level, in both the am and pm peak hour periods, associated with drivers turning right from Duthy Street into the southern (entry only) access point of the subject development. There should also be minimal traffic impact on the current operation of the intersection of Edmund Avenue with Duthy Street as a result of the proposed development given:- • The relatively low volumes of traffic to be generated by the proposed development, of which only a small proportion would access this intersection directly to or from Edmund Avenue, and • Many of the vehicles anticipated to access the proposed development would currently be using the adjoining road network. As previously identified deliveries of fuel will be made by 14.9m long semi-trailer tankers with these vehicles accessing the fuel filler points on either side of the row of fuel pumps in the fuel dispensing area. Typically there would be one to two deliveries of fuel per week and these fuel delivery movements will be undertaken outside of peak trading periods. There will be relatively infrequent deliveries undertaken by rigid body trucks. These are anticipated to comprise a small number of deliveries to the control building and collection of waste and recyclables from the site. These movements would typically be undertaken by a Medium Rigid Vehicle (MRV) or smaller trucks and vans with access in a similar manner to semi-trailers undertaking deliveries of fuel to the subject site. I recommend that the refuse collection should occur outside of peak trading periods. ACCESS ASSESSMENT There will be minor alterations to the existing access points associated with the subject site as identified below: • Duthy Street (southern) — widening of this crossover on the northern side to provide a total of 6.85m to accommodate 14.9m articulated fuel delivery vehicle entry movements. This crossover will permit entry movements into the service station only and will be line marked accordingly, and; • Duthy Street (northern) — reduce the width of this access point to 9.0m which would still maintain 14.9m articulated fuel delivery vehicle movements. This access point will permit exit movements only and will therefore require the installation of No Entry signs facing traffic on Duthy Street; and • Edmund Avenue — narrow this crossover to 4.0m. This access point will also permit exit movements only and will therefore require the installation of No Entry signs facing traffic on Duthy Street. As a result of the proposed modifications, all access points will become one-way and the total width of kerb crossovers adjacent to the subject site will be reduced, particularly on the Edmund Avenue (local road) frontage. 7 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
Narrowing of the Edmund Avenue crossover will permit this crossover to be located in accordance with Section 3.2.3 Access driveway location of AS/NZS 2890.1:2004 i.e. 6m clear of the tangent point along the southern of Edmund Avenue. While the northern (exit only) crossover on Duthy Street would extend into the equivalent area on this corner, this reflects the need to accommodate exit movements associated with tankers turning onto Duthy Street. I do not believe that this should be an issue at this location, given:- • Currently the crossover extends further to the north, • The low volumes of traffic movements forecast to exit at this location, and • The open nature of this corner of the development site, together with a relatively wide verge along the southern side of Edmund Street. Fuel deliveries will be conducted by 14.9m long vehicles travelling north on Duthy Street and turning left into the southernmost Duthy Street access point. These vehicles will travel through the eastern 'lane' to the existing fuel fill points and then turn left out of the northern Duthy Street access point. Such a movement is identified in Figure 3 below. DUTHY STREET Figure 3: Fuel delivery vehicle movement 8 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
SUMMARY AND CONCLUSIONS The above traffic and parking assessment relates to the proposed redevelopment of the existing service station on the above site on the south-western corner of the intersection of Duthy Street with Edmund Avenue, Unley. The proposed development will provide:- • A control building of 49.78m2 adjacent to the western boundary of the site; • Two double sided fuel dispensers (pumps) in a tandem arrangement providing refuelling opportunities on each side of the two dispensers i.e. 4 refuelling positions, underneath an overhead canopy. The traffic flow in this area will be from south to north and will be linemarked to identify such a flow; and • Six on-site car parking spaces, including one accessible space and associated shared area. The proposed service station development would require the provision of only 4 on-site car parking spaces, based upon Council's Development Plan provisions. This requirement would be exceeded by the provision of 6 on-site car parking spaces. Hence the proposed development will comfortably satisfy the on-site car parking requirements for the proposed service station. Vehicular entry will occur only from the southern access point on Duthy Street with the remaining access points restricted to exit only, i.e. the northernmost access point on Duthy Street and the Edmund Avenue access point. Given the relatively small size of the proposed development, refuelling will be undertaken by an approximately 14.9m long semi-trailer. These vehicles will turn left into and left out of the site and will not occur from Edmund Avenue. It is anticipated that there would generally be one tanker delivery per week, with this occur outside of peak commuter periods and peak usage of the subject development. An assessment of the traffic generation associated with the proposed development, based upon the 'Guide to Traffic Generating Developments' report produced by the (former) Roads and Traffic Authority of NSW, has identified a peak traffic generation of only 41 trips in the pm peak hour on a weekday. Such a volume would be equivalent to approximately 21 additional evening weekday peak hour trips from that the previous land use (service station and workshop) on the subject land. However, for the purpose of the traffic assessment of the proposal, a more conservative trip generation rate presented in the report prepared by Parsons Brinkerhoff for the Department of Planning, Transport and Infrastructure, titled 'Trip generation rates for assessment of development proposals' has been adopted. The Parsons Brinkerhoff report identifies a weighted average of 18 peak hour trips per pump. This would correspond to a total of 72 trips in the pm peak hour. Notwithstanding such a conservative approach the above assessment has identified that:- • Delays to through traffic within the southbound traffic lane on Duthy Street would be minimal given both the low volume of traffic turning into the site and the volume of traffic using this roadway. 9 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019
• that there would be an average delay of 10 seconds and a maximum of only one vehicle (at the 95th percentile) probability level, in both the am and pm peak hour periods, associated with drivers turning right from Duthy Street into the southern (entry only) access point of the subject development, and • There should also be minimal traffic impact on the current operation of the intersection of Edmund Avenue with Duthy Street as a result of the proposed development given:- The relatively low volumes of traffic to be generated by the proposed development, of which only a small proportion would access this intersection directly to or from Edmund Avenue, and Many of the vehicles anticipated to access the proposed development would currently be using the adjoining road network. In conclusion, I note that the proposed development will: • Provide an appropriate quantity of 6 on-site car parking spaces, exceeding Council's Development Plan requirements; • Provide a design standard which is appropriate and essentially meets the requirement of the relevant Australian / New Zealand Standard for off-street car parking areas; • Not result in adverse traffic impacts on the adjoining road network, particularly given the small scale of the proposed development; and • Provide one-way access points only and a reduction in the overall width of the various crossovers, while maintaining an appropriate level of access for all traffic required to access the site including 14.9m fuel delivery vehicles. Yours sincerely Phil Weaver Phil Weaver and Associates Pty Ltd 10 Document Set ID: 4046722 Version: 1, Version Date: 29/03/2019