Nuclear energy in Spain ‐ historical development
                          and perspectives

                                                               MISCHA BECHBERGER.
          International Affairs Manager – Spanish Renewable Energy Association (APPA)
                                                                                    .

16th Meeting of the REFORM Group, Schloss Leopoldskron, Salzburg, Austria, August
29 2011
Outline:

  Development of the nuclear path in Spain (regarding shares in power production
and number of nuclear power plants (NPPs))
  Initial phase I (1945‐1955/56) & II (1955/56‐1968)
  Nuclear (planning) boom & 1st / 2nd generation NPPs (1968 – 1983)
  civil opposition against nuclear power in Spain since 1973
  Nuclear moratorium & related subsidies (1984; 1994/95 onwards)
  Present and future of nuclear power in Spain
   Nuclear energy in Spain after Fukushima
 The related risks of nuclear energy 1:
Most important incidents/accidents in Spain‘s nuclear history
  The related elated risks of nuclear energy 2: Spain’s secret nuclear weapon
programme (1963‐1981)
Development of the nuclear path in Spain ‐1‐:
        Share of nuclear power in gross electricity production in Spain 1968‐2010 (UNESA 2011)
                   Year         Share in %       Year             Share in %
                   1968            0.1           1990                 35.8
                   1969            1.6           1991                 34.9
                   1970            1.6           1992                 34.6
                   1971            4.0           1993                 34.8
                   1972            6.9           1994                 33.5
                   1973            8.6           1995                 32.8
                   1974            8.9           1996                 31.9
                   1975            9.1           1997                 29.2
                   1976            8.3           1998                 30.0
                   1977            6.9           1999                 28.0
                   1978            7.7           2000                 27.6
                   1979            6.3           2001                 26.8
                   1980            4.7           2002                 25.5
                   1981            8.6           2003                 23.3
                   1982            7.6           2004                 22.6
                   1983            9.1           2005                 19.5
                   1984            19.2          2006                 19.9
                   1985            22.0          2007                 17.6
                   1986            29.0          2008                 18.6
                   1987            30.9          2009                 17.6
                   1988            36.2          2010         20.2 (16th worldwide)
                   1989            38.0
Development of the nuclear path in Spain ‐2‐:
Nuclear power reactors in Spain (constructed and put into operation) 2010 (IAEA 201; Foro Nuclear 2011)
        Name            Type             Status              Location       Gross capacity   Date of grid     Date of
                                                                                 (MWe)       connection     expiration of
                                                                                                             operating
                                                                                                              license
   José Cabrera-1       PWR       Permanent shutdown        Guadalajara           150        1968/07/14      2006/04/30
      (Zorita)
   Santa María de       BWR            Operational            Burgos              466        1971/03/02      2013/05/07
      Garoña                                                                                                (Permanent
                                                                                                             shutdown)
     Vandellòs-1        GCR       Permanent shutdown         Tarragona            480        1972/05/06      1990/07/31

      Almaraz-1         PWR            Operational            Cáceres             977        1981/05/01       2020/06

        Ascó-1          PWR            Operational           Tarragona            995        1983/08/13      2011/01/01

      Almaraz-2         PWR            Operational            Cáceres             980        1983/10/08       2020/06

      Cofrentes         BWR            Operational            Valencia           1,064       1984/10/14       2021/03

        Ascó-2          PWR            Operational           Tarragona            997        1985/10/23      2011/01/01

     Vandellòs-2        PWR            Operational           Tarragona           1,045       1987/12/12       2020/07

        Trillo-1        PWR            Operational          Guadalajara          1,003       1988/05/23       2014/11
   PWR = Pressurised Water Reactor; BWR = Boiling Water Reactor; GCR = Gas‐Cooled Reactor
The initial phase ‐1‐ (1945‐1955/56):
1st phase of nuclear power (1): Start of exploration, R&D, institution building, formation & bilateral
collaboration
  1945: National Institute of Geology and Mining established a commission to explore possible uranium
deposits in Spain
  10/1945: (Order of 4th of October) => reserved the right of all possible uranium deposits in 14 Spanish
provinces to the Spanish State
  4/1948: Agreement of collaboration between Spain & Italy regarding nuclear R&D
  1949: Establishment of the Atomic Research Council (JIA) & of the company „Studies and Patents of
Special Alloys“ (EPALE) => training & formation of staff, exploration of domestic uranium deposits, research
on techniques for uranium extraction, uranium physics, geology, mining and chemistry.
   End of 1940s/beginning of 1950s: sending of young Spanish researchers to foreign nuclear research
institutes (mainly in the US, Germany and Italy) to create an own research infrastructure
  1951: Start of construction of a pilot plant for uranium refining in the Madrid Central University
  10/1951: Creation of the Nuclear Energy Board (Junta de Energía Nuclear ‐ JEN): First official public
nuclear R&D centre => main aim: development of an autonomous nuclear programme, including uranium
mining, production of fuel elements, design of nuclear reactors, etc. => First steps: Construction of a nuclear
R&D research centre within the Spanish seat of government (Moncloa) (start: 1954), first open cast uranium
mining in Saelices el Chico (Salamanca), first commercial uranium mill in Andújar (Andalusia) (start of
construction: 1956)
The initial phase ‐2‐ (1955/56 – 1966/67):

First phase of nuclear power (2): continuation of bilateral cooperation, first experimental
reactors, first nuclear law & first commercial reactor
  7/1955: cooperation agreement between Spain & the US: supply of enriched uranium
by the US to Spain for a first experimental reactor. In return, the US obtains the right to
control at any time all Spanish nuclear facilities => This agreement was updated & extended
several times until 1974
  1956: sales contract between the Spanish government and International General Electric
(US) about the parts of equipment for the experimental reactor which can’t be built by
Spanish firms (reactor core, control equipment, parts of the cooling system)
  1956‐1958: Construction of the first experimental nuclear reactor in Spain (JEN‐1)
  27th of November, 1958: Put into operation of JEN‐1 (a 3 MW swimming pool reactor
with 20% enriched uranium and light water) within the atomic research institute of the
Moncloa
  1959: Start of operation of the uranium mill in Andújar (until 1981)
The initial phase ‐2‐ (1955/56 – 1966/67):

   6/1962: Put into operation of 2 nuclear research reactors in Barcelona (Argos) and Bilbao
(Arbi), both moderated with graphite
  1962/63: works on a domestic nuclear reactor type, named DON (Deuterium, Organic,
Natural) based on a cooling system with liquid sodium, but abandoned in 1963
  3/1963: purchase contract (between Spanish government and Westinghouse) for the first
commercial nuclear reactor in Spain for the NPP Zorita
   4/1964: Law 25/1964 on nuclear energy => main basic regulation for civil use of nuclear
energy (amongst others basic obligations regarding nuclear waste or sanctions) => still in force
(even updated several times)
  6/1964: Start of construction of NPP Zorita
  10/1964: meeting between Spanish industry minister López Bravo & French atomic minister
Palewski => talks about construction of a NPP of French type & under participation of EdF in
Catalonia
  8/1966: start of tenders for the construction of the Spanish/French NPP in Catalonia
(Vandellòs‐1)
  1966: Start of uranium mining in La Haba (Badajóz, Extremadura) (until 1990)
Nuclear (planning) boom & 1st / 2nd generation NPPs (1968‐1983):

 7/1968 + 3/1971 + 8/1972: Start of operation of Spain‘s 1st generation NPP Zorita (150
MW, PWR), Santa María de Garoña (466 MW, BWR) & Vandellòs‐1 (480 MW, GCR)
  11/1973‐4/1975: Nuclear planning boom: nearly 30 claims for construction permits and
approved NPP projects within only 18 months
   1/1975: National energy plan 1975 (due to political changes never realised):
‐ Prospects for a NPP capacity of 24,000 MW in 1985
‐ expected share of nuclear power in gross electricity production in 1985: 57,1% (22% were
in fact reached)
 ‐ every further growth in electricity consumption form 1985 onwards should be covered by
 nuclear power !
  5/1981 & 8+10/1983: Put into operation of 2nd generation NPPs Almaraz I (977 MW),
Ascó I (985 MW) & Almaraz II (980 MW) (all PWR)
Planning & licensing history of Spanish NPPs (1963‐1980):

    Planned and / or approved NPP projects in Spain between 1963‐1980 (Costa Morata 2001: 18 et sq.)
                                 Date of apply for construction                               Date of apply for construction
       Name of NPP                  permit (a) or issuing of            Name of NPP              permit (a) or issuing of
                                    construction licence (i)                                     construction licence (i)
   José Cabrera (Zorita)                   3/1963 (i)                   Escatrón I & II                3/1974 (a)
   Sta. María de Garoña                    5/1955 (i)                   L‘Ametlla I & II               3/1974 (a)
        Vandellòs -1            ~ 1966 (i) (start of construction:      Lemóniz I & II                  3/1974 (i)
                                             6/1968)
         Trillo I & II                     7/1972 (a)                       Ascó I                      5/1974 (i)
    S. Vicente Barquera                    6/1973 (a)                       Ascò II                     3/1975 (i)
       Almaraz I & II                      7/1973 (i)                 Valencia Don Juan                4/1975 (a)
         Deva I & II                      11/1973 (a)                     Chalamera                    4/1975 (a)
           Tudela                         11/1973 (a)                     Cofrentes                     9/1975 (i)
 Oguella (Ea-Ispáster) I & II             11/1973 (a)                Valdecaballeros I & II             9/1975 (i)
      Moral de Sayago                     11/1973 (a)                    Vandellòs III                 2/1976 (a)
         Regodola                         11/1973 (a)                       Trillo I                    8/1979 (i)
           Águilas                        12/1973 (a)                    Vandellòs II                  12/1980 (i)
         Tarifa I & II                    12/1973 (a)
       Sástago I & II                      1/1974 (a)
       Almonte I & II                      1/1974 (a)
Civil opposition against nuclear power in Spain since 1973:
  11/1973: numerous (6) applications for new NPP projects in the Basque region and Navarre in only 1
 month => stimulus for the creation of a antinuclear movement, mainly of the local population
   Protests mainly because of the short distances between the projects and the fact that they would be
 build in a highly populated area
    NPP Lemóniz (Vizcaya): construction started already in summer 1972, but strong opposition against the
 NPP started not before 1975/76, when the Spanish anti nuclear movement was already well established =>
 1976: 150,000 signatures & first big demonstration with 50,000 participants against the project; 7/77: next
 big demonstration in Bilbao with 150,000 people
   8/77‐3/84: provincial government of Bizcaya votes in favour of the NPP Lemóniz => ETA starts to use the
 growing anti‐Lemóniz movement for its own purposes => kills three people in two bomb attacks inside the
 NPP (3/78 & 6/79) and shoots the responsible engineer of the NPP (1/81) & the chief of the PPP
 commission for the construction & operation of the NPP (4/82) => led to first strong protests against ETA
 but also to the complete stop of the construction => 9/1982 conservative central Spanish government
 orders (via degree) to restart the project => 10/1982: Socialist (PSOE) win the central elections and stop
 again the project => 3/84 nuclear moratorium for 5 NPPs, including Lemóniz
   1970s onwards: strong anti nuclear movement in the Basque region and Navarre create a national
 nuclear opposition, preventing most of the NPPs planned in other Spanish regions (mainly Andalusia and
 partly Catalonia) and establishing several anti‐nuclear NGOs, still active today (in the form of its successors
 Greenpeace & Ecologists in Action)
   Today: Spain as one of the country within the EU with highest amounts of the population against nuclear
 energy (Eurobarometer 2005, 2007, 2010)
Nuclear moratorium & and the related subsidies (1984; 1994/95 onwards)

    3/1984: Spanish government approved the National Energy Plan (PEN) 1983‐1992 =>
 cancellation of various planned NPPs and stop of construction of 5 NPP (Lemóniz I & II,
 Valdecaballeros I & II and Trillo II) => main arguments: high investment costs &
 overcapacities (no environmental or security reasons mentioned) => but PEN 1983‐1992
 also approved the completion of 4 other NPPs (Ascó II, Cofrentes, Vandellòs II & Trillo I) =>
 put into operation between 10/84‐5/1988
    12/94+ 12/05: New Electricity Law: in its 8. supplementary provision, the new law also
 decided the definitive stop of the 5 NPPs in moratorium since 1984 & and compensation
 for the respective sunk costs amounting to 729.309 billion Ptas (~ 4,383 billion €) to be
 financed via a maximum share of the average electricity tariff of 3.54% during a period not
 exceeding 25 years (at the latest until 2020). => The details were regulated by the Royal
 Decree (RD) 2202/1995 (amongst others it provided that the yearly compensations might
 be adapted to the real costs for the complete dismantling, which in fact led to a higher
 overall compensation)
   4/2006: RD 470/2006 => reduction of the compensation for sunk costs to 0.33% of the
 average electricity tariff until 2015
Nuclear moratorium & nuclear waste related subsidies (1984/85 / 1994/95 onwards)
          Compensation payments for NPPs in definitive moratorium 1995‐2010(BOEs 1996‐2011)
                                  Year                             Amount of compensation in €
                                  1995                                   446,998,223 €
                                  1996                                   499,024,508 €
                                  1997                                   464,427,217 €
                                  1998                                   454,730,050 €
                                  1999                                   457,860,489 €
                                  2000                                   475,397,020 €
                                  2001                                   482,124,596 €
                                  2002                                     529,075,065 €
                                  2003                                     538,998,546 €
                                  2004                                     557,599,212 €
                                  2005                                     592,829,857 €
                                  2006                                     296,066,722 €
                                  2007                                      31,112,877 €
                                  2008                                      7,214,506 €
                                  2009                                      9,386,692 €
                                  2010                                      86,396,139 €
                                  Total                                   5,890,914,336 €

⇒ Further subsidies for nuclear waste (as financed also as a share (0.8‐1.2%) of the average electricity tariff: 1,835 M€
between 1985‐3/2005 => since 4/2005 the NPP owners must set aside respective reserves
⇒ further windfall profits for the average price paid at the Spanish power exchange (OMEL) in comparison to the
marginal cost of nuclear electricity: following calculations of APPA/Deloitte those extra profits amounted to 6,725 M€ only
during 2007‐2009
Present and future of nuclear power in Spain ‐1‐

    Change of government in 3/2004 from conservative PP (pro nuclear) to socialists (PSOE) with
    proponents (Montilla, Clos) and opponents (Zapatero as prime minister)
    PSOE emphasised in its election programme of 2004 to gradually phase out nuclear (without putting
    at risk the security of supply), to replace nuclear by cleaner and less expensive types of energy & to
    elaborate a phase out plan
    first & oldest Spanish NPP Zorita definitely shut down at end of 4/2006 (although decision to close the
    NPP was taken already in 9/2002 under the PP government) after 38 years of operation
     Zapatero in various occasions (state of the nation speeches in 2005 and 2006) repeated its willingness
    to phase out nuclear & to come up with a detailed phase out plan still during this legislative period
    (until spring 2008) which he didn´t fulfill
     various announcements of the Spanish government to close 2nd oldest NPP Garoña in 7/2009 (but the
    NPP owners Endesa & Iberdrola already in 7/2006 applied for a prolongation of the production permit
    for a further 10 year period from 2009‐2019)
    11/2005‐5/2006: various meetings of the “nuclear round table” (mesa nuclear) of most important
    actors in the nuclear area in Spain => in its final meeting in 5/2006 the most important conclusions,
    structured in 4 different areas were presented:
Present and future of nuclear power in Spain ‐2‐

1)   Central Interim Storage Facility (ATC) for high radioactive waste (until ~ 2070): most of the participants
     of the round table in favour of an ATC, but precondition would be a brought political, institutional and
     social consensus at national & local level => but high resistance at local & national level against an ATC

2) To improve the information and participation of society in all crucial decision processes regarding the use
      of nuclear energy

3) Reform of the Nuclear Safety Commission (CSN): Aim: To increase its transparency & independency

4) Security of supply & future role of nuclear in Spain (most conflicting issue): low CO2 emissions on one side
       – generation of high radioactive waste on the other side (without long term solution up to now) => for
       a gradual substitution of nuclear power elaboration of an alternative scenario necessary (Greenpeace
       report “Renovables 2050” was already presented !)
=> if nuclear should also be used in the future, important technological progress (lower investment costs,
       higher safety standards, faster construction periods, less generation of nuclear waste & solution for
       the treatment of high radioactive waste) would be preconditions ‐ including a brought political and
       social consensus => debate on the future use of primary energy sources in Spain (including nuclear) –
       based on the conclusions of the nuclear round table – should be continued during a period of at least 2
       years in the Spanish parliament & results should be presented in the next legislative period => Haven’t
       been presented yet
Present and future of nuclear power in Spain ‐3‐

    No concrete nuclear phase out plan presented by ruling PSOE government, nor during the last election
    campaign beginning of 2008 nor during the present legislature period until late summer 2011
    Instead, in a new longer term energy scenario until 2035 prepared by a specific commission of the
    Spanish Parliament during 2010 the share of nuclear until 2020 was kept stable and for the period
    2020‐2035 the final document of the commission only stated that the decision about the future use of
    nuclear in Spain should be taken from around 2015 onwards taking into account all the inherent
    circumstances of this technology but in any case it would be “necessary to preserve the knowledge
    and technological and operating capabilities of these technologies, as they have a high strategic and
    economic value for our country”
    7/2009: View days before the expiration of operating license of Spain’s oldest operating NPP Santa
    María de Garoña, Spanish government opted for a compromise between proponents and opponents
    of a further prolongation of the production license for another 10 years: prolongation was approved
    for further 4 years until 7/2013 => owner of Garoña (Nuclenor => Iberdrola & Endesa) went to court
    against this decision not only asking for a 10 year prolongation of the operating license but also
    claiming compensation
    1/2011: Spanish government nominated Fabricio Hernández as new State Secretary for Energy:
    Hernández formerly worked for the consultancy which elaborated a study used as basis for the lawsuit
    of Nuclenor against the permanent shutdown of NPP Garoña in 2013 including a claim for
    compensation amounting to 950 M€
Present and future of nuclear power in Spain ‐4‐:
   Unsolved problem of high radioactive waste: no Central Interim Storage Facility (ATC) before
2015? =>Due to strong opposition of Spanish citizens against nuclear power high probability of
significant opposition with lengthy and expensive licensing procedures for an ATC

   process of a favourable location for ATC culminated for now in the selection of 7 possible
sites with the villages of Ascó (Tarragona) and Zarra (Valencia) with the highest possibilities to
be chosen. But presidents of Catalonia and Valencia opposed to these sites, besides strong local
opposition. After bringing forward the next general elections to 20th November 2011 (instead of
March 2012), the final decision will be taken during next legislature.

   After a court ruling caused by Greenpeace to make public concrete plans of the foreseen ATC
the Spanish government had to admit that no concrete plans exist but only a preliminary and
generic study on the security of the design of an ATC made by a French consultancy => Spanish
government was willing to choose the definitive ATC site without disposing of the basic
technical and security studies about it

   cost forecasts (made in the 6th General Radioactive Waste Plan, PGRR) of total nuclear waste
management until 2070 amount to 13,023 million € (thereof 47.9% resp. 6,238 million € for
spent fuel & high level waste) => cost estimates for and waste management & precise cost
calculation methodology is not publicly available
Present and future of nuclear power in Spain ‐5‐:
 But...
    fast increase of electricity consumption in Spain => ~ 65% between 1997‐2008 (one of the
 highest rises within EU) => although consumption dropped in 2009 by 4.5% due to the
 economic crisis in 2010 it increased again 3%

    strong pressure on Spain to fulfil its commitments in GHG reductions (+48% CO2 increase
 between 1990 and 2007 vs. +15% allowed increase => with a strong decrease since 2008,
 reaching + 20% in 2010) & clever strategy of the nuclear lobby to demonstrate nuclear as the
 climate solution

    Strong nuclear lobby (Foro Nuclear) claiming for both prolongation of the operating periods
 of the Spanish NPPs from 40 to 60 years & to built 11 new NPPs until 2030 to increase share of
 nuclear power from the present level of 20% to 35% (creating up to 172,00 new jobs,
 investments of 33 billion € and save up to 21 billion € for avoided CO2 emission) => main
 arguments: Spain’s climate commitments won’t be fulfilled without nuclear, the contribution
 of nuclear to the security of supply & Spain’s high energy import dependency, reaching 74% in
 2010 (not mentioning that since 2001 Spain import 100% of the uranium needed for the NPPs
 still in operation)
Nuclear energy in Spain after Fukushima

   7/2011: National High Court declared lawful the decision to definitely close oldest Spanish
NPP Garoña in mid 2013 arguing with the incompatibility of (high shares) of nuclear energy
and RES mainly because nuclear energy lacks required flexibility in rapidly adapting its load
factor in times of abrupt changes of power production of variable energy sources like wind
and solar energy => Nuclenor again will put forward a new lawsuit against the decision

   8/2011: Proposal of CSN (not binding for the Spanish government) to prolong operating
license for both reactors of NPP Ascó for further 10 years (until autumn 2021) without waiting
for results of the stress tests for all Spanish NPPs

  Since 6/2011: Stress tests for all Spanish NPP started
    ‐Results to be finalised until end of 2011
    ‐ tests include controls of the seismic security, but also analyses the risks of floods, loss
    of electric supply or the management of severe accidents like the meltdown of the
    reactor core, etc.
    ‐Critic: important risks won’t be tested like terroristic attacks with planes, etc. Besides,
    tests are not undertaken by a neutral body but by the plant owners
The related risks of nuclear energy ‐1‐
 Most important incidents/accidents in Spain‘s nuclear history (1)

   During 1960s & 1970s: high contamination of workers in the first Spanish nuclear mining
sector in Andújar (Andalusia) => 20% of the staff died of cancer (as shown by epidemiological
studies in 1999/2000 after closing of the Andújar mining complex) => Spanish government was
well informed about the high radioactive contamination since the 1960s but kept it secret

   During 1960s/1970s: more than 30 workers died in the Spanish uranium mining sites La Haba
(Badajóz), Albalá (Cáceres) & Cerdaña (Córdoba) in a period of 5 years, after being declared
incapacitated for work because of radiosilicosis => workers with same disease who survived
have never been compensated

   1/1966: collision between a U.S. B‐52 bomber (with 4 unarmed nuclear bombs) and a tanker
plane near the Spanish village of Palomares => The conventional explosives in two of the bombs
detonated causing radioactive plutonium to be spread over the village, and one bomb was
missing in the Mediterranean Sea for nearly 80 days => not before 1985 the local population got
access to their medical files: ~ 30% of the population of Palomares showed elevated levels of
plutonium => parts of the bombs were found by the Spanish military & gained information used
for Spain‘s secret atomic weapon programme
The related risks of nuclear energy ‐1‐
Most important incidents/accidents in Spain‘s nuclear history (2)
   11/1970: leakage of 40‐80 l of high radioactive liquid in the main office of the nuclear energy board (JEN
in Madrid, reaching the sewerage system and contaminating an area up to Toledo (~ 80 km far from Madrid)
=> incident was kept top secret

  10/1989: fire in the generator building of NPP Vandellòs I causing high material damages of the plant & its
definite closure in 7/1990 => dismantling started in 1991 and will last until ~ 2030

   8/2004 leakage in the cooling system of NPP Vandellòs II of 80 cm diameter because of long lasting
corrosion caused to the marine ambient of the NPP site (directly at the Mediterranean coast) => plant
owners Endesa (72%) and Iberdrola (28%) as well as the Nuclear Security Commission (CSN) both knew since
years of the corrosion inside the cooling system as well as played down the seriousness of the incident, later
qualified as a level 2 incident of the International Nuclear Event Scale (INES) (high level of contamination
inside the NPP) and/or high radiation exposure of staff) => second most serious incident in a Spanish NPP
after the fire in 1989 in Vandellòs I

   11/2007 Asco I: Leakage of radioactive steam. Plan owner only informs CSN in April 2008, after being
made public by Greenpeace. Released radioactivity up to 1,000 times higher as originally stated. In the
period between the accident and its becoming known more than 2,500 visited the contaminated area of the
plant and had all to be medically examined. Plant owner was finally be sentenced with a fine of 15.4 M€
 8/2008 Vandellòs II: fire in the turbine building => it took month to repair the damages
  4/2011 Ascó I: leakage of radioactive water within the reactor building contaminated 19 workers
The related risks of nuclear energy ‐2‐
Military use: Spain’s secret nuclear weapon programme (1963‐1981) (1)

    1963: First secret report of the Nuclear Energy Board (JEN) on the real possibilities for
 Spain to construct nuclear weapons => lack of technical knowledge and necessary amount of
 plutonium

   1/1966 Palomares accident with the detonation of the conventional explosives of 2
 uranium bombs => found by the Spanish military => provided insides in the technique of
 detonators & solved a lot of the hurdles the Spanish military was confronted with to
 construct a nuclear bomb

    1967: first dossier within the Spanish foreign ministry which pointed to the ability to build
 a nuclear weapon => but the necessary plutonium was still missing

    1968: installation of the first fast breeder in the office of JEN in Madrid which in 1969
 started – under utmost secrecy – to produce weapons‐grade plutonium
The related risks of nuclear energy ‐2‐
Military use: Spain’s secret nuclear weapon programme (1963‐1981) (2)

   1971: secret report showing Spain‘s immediate ability to start a nuclear weapon
 programme => plutonium to be produced mainly by the used uranium in the NPP Vandellòs I

   1976: start of the Nuclear Research centre CINSO in Soria including a fast breeder able to
 produce up to 140 of plutonium per year => possible use for nuclear weapons

    1977‐1981: under the presidency of Jimmy Carter the US – worried about the possibilities
 for Spain to become the next nuclear power – and the fact that Spain hasn‘t signed the Non‐
 Proliferation‐Treaty (NPT) => the US administration exerted high pressure on the Spanish
 government to allow controls inside CINSO => in case of refusal: stop of supply of enriched
 uranium for Spanish NPPs

   4/1981: Spain allowed controls of CINSO thereby definitely stopping its nuclear weapon
 ambitions

   10/1987: Spain finally ratifies the NPT
THANKS FOR YOUR ATTENTION