NAESB WEQ Update Interchange Scheduling and Accounting Subcommittee May 21, 2019 Mike Steigerwald BPA
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Objective • Provide a broad overview of the activities of the NAESB Wholesale Electric Quadrant across the lifecycle of standards development. • Disclaimer: Presenter does not represent NAESB. I am BPA’s representative to the NAESB WEQ Executive Committee. I am also a co-chair of the OASIS subcommittee. NAESB WEQ @ ISAS 05/21/19 2
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N NAESB WEQ Standard Development Lifecycle Industry Industry Formal Comment Informal Comment to NAESB EC EC considers: to NAESB (30 days) WEQ Subcommittee 1. Standards approved by the (30 days) Executive Standard subcommittee in step 2. 2a Development 3 Committee 2. Formal comments filed by and Vote Vote industry in step 3. 2 4 Industry NAESB Approval WEQ NERC WEQ and Membership Triage and Prioritize 1 Initiation Publication 5 Segment Vote SRS Request (30 days) FERC Standard development Directive to NAESB 8 6 Standards Voluntary for jurisdictional FERC 7 Published & entities until ‘adopted by Order filed with FERC reference’ by FERC Order. 9 Implementation FERC (1-2 years) Issues Directive to Industry NOPR to Industry Industry has 60 days to comment to FERC on proposed standards. NAESB WEQ @ ISAS 05/21/19 3
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Approved in the Subcommittee Development Backlog 2019 Annual Plan. Topic Sub Description and Status Investigate whether standards are needed to apply DLT (eg, blockchain) to utility Distributed accounting functions such as power trading and Renewable Energy Certificates Ledger (REC). API 7a and 7b. WEQ Technology (DLT) Kickoff meeting June 7 from 1:00 to 3:30 central and a follow-up meeting on June 24 from 10-12 central. Review WEQ-004 and other tagging standards in light of NERC proposal to retire the INT CISS following: INT-004-3.1 and INT-010-2.1 in their entirety, as well as INT-006 (R3.1, Retirements R4, R5) and INT-009 (R2). MOD Review WEQ-023 Modeling standard in light of NERC proposal to retire MOD BPS Retirements standards (including withdrawal of MOD-001-2). Annual review of the Authorized Certification Authorities (ACA) accreditation (API ACA Cybr 4a). NERC CIP Cybr Annual review of the NERC CIP standards (API 4b). NAESB WEQ @ ISAS 05/21/19 4
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2 Subcommittee Development In-progress Topic Sub Description and Status Modifications to the original NITS standards based on learnings from the NITS NITS OS industry implementation (API 3c). Completed first phase dealing with minor corrections. Now considering more substantive changes. NITS OS Define rollover rights for NITS (API 3e). EIR OS Require OASIS to use EIR to validate request information (API 3a). Posting of additional curtailment information on OASIS per FERC Order 890 (API 2.a). Will establish NAESB standards that extend existing FERC posting Curtail Info OS requirements under 18 CFR 37.6 e3. Draft standards will only be applicable for on OASIS BPS interconnection-wide curtailment events. • Informal Comment period closed 03/19/19. Request to clarify tag timing requirements in WEQ-004. TPs and BAs are not meeting the strict approval windows defined in NAESB WEQ-004 and NERC INT- 006 due to misapplication of these timing requirements. (API 3h) Tag Timing CISS • Voted out of the Coordinate Interchange Scheduling Subcommittee 02/12/19. • Send back to the CISS on 03/26/19 by Executive Committee to coordinate with NERC. NAESB WEQ @ ISAS 05/21/19 5
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2a Subcommittee still Pending Informal Comment actively working. Topic Sub Description and Status NAESB WEQ @ ISAS 05/21/19 6
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 3 Subcommittee Pending Formal Comment passed to the EC. Topic Sub Description and Status NAESB WEQ @ ISAS 05/21/19 7
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 4 Next EC meeting Pending Executive Committee Vote will be Oct’19. Topic Sub Description and Status Improve transmission planning models by making visible a complete path associated with long-term firm interchange when partial path requests are made (API 3d). The eastern regional coordination committee driving this has since found other ways of Interchange OS getting the needed planning information. Modeling • “No Action” recommendation passed by OS on 04/17/19. • Formal Comment period closed on 05/20/19. NAESB WEQ @ ISAS 05/21/19 8
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 5 30 day vote by all Pending Membership Segment Vote NAESB members Topic Sub Description and Status NAESB WEQ @ ISAS 05/21/19 9
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 6 No publication date Pending NAESB Publication announced. Topic Sub Description and Status Redispatch Cost Posting to allow for posting on OASIS of 3rd party offers of Planning Redispatch services per FERC Order 890 (API 2.a.i.2). The TP is 3rd Party obligated to provide the posting mechanism on OASIS for 3rd party offers of OS Planning Planning Redispatch. There is no obligation for any party to use this functionality. BPS Redispatch • Voted out of the OASIS and Business Practice Subcommittees on 01/23/18. • Voted out of the Executive Committee on 04/24/18. • Voted out of the Segment Membership on 05/25/18. Update OASIS Query/Response templates to allow more flexible and efficient queries for some templates (API 3b). Templates OS • Voted out of the OASIS subcommittee on 06/19/18. • Voted out of the WEQ Executive Committee on 08/21/18. • Voted out of the Segment Membership vote on 09/24/18. Update OASIS to ensure that capacity reserved for untagged Pseudo-ties is preserved for that purpose (API 3e). The basic requirement does not apply to BPA as Pseudo-ties are tagged in the west. But the proposed standards define a Untagged generic way to encumber a TSR for ad-hoc use (i.e., beyond Resale, Redirect, etc). OS Pseudo-ties BPA may indeed find a use for such a capability in the future. • Voted out of the OASIS subcommittee on 08/22/18. • Voted out of the Executive Committee on 10/09/18. • Voted out of the Segment Membership on 11/15/18. NAESB WEQ @ ISAS 05/21/19 10
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 6 No publication date Pending NAESB Publication (continued) announced. Topic Sub Description and Status Automatically notify customers when PTP renewal deadline approaches (API 3b). • Voted out of the OASIS Subcommittee 11/17/18. PTP Rollover OS • Formal Comment period closed 12/28/18 with no opposition. Notification • Voted out of the Executive Committee on 03/26/19. • Voted out of the Segment Membership on 04/30/19. Updates to the Dynamic Notification (email) on OASIS to provide a more generic notification capability (API 3.f). Developed in conjunction with updates for PTP Rollover Notification above (API 3f). Dynamic OS • Voted out of the OASIS Subcommittee 11/17/18. Notification • Formal Comment period closed 12/28/18 with no opposition. • Voted out of the Executive Committee on 03/26/19. • Voted out of the Segment Membership on 04/30/19. Modify Next Hour Market (NHM) service to be more applicable to the western EIM (API 3.g). Draft changes make it clear that the tag priority 0-NX can be used for purposes other than Next-hour Market (NHM) service, such as EIM. NHM OS • Voted out of the OASIS Subcommittee 02/19/19. • Formal Comment period closes 03/20/19. • Voted out of the Executive Committee on 03/26/19. • Voted out of the Segment Membership on 04/30/19. NAESB WEQ @ ISAS 05/21/19 11
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N FERC NOPR issued on 05/16/19 on NAESB v3.2 • NOPR: Notice of Proposed Rulemaking • 60 day industry comment period opens once published in the Federal Register • Scope of the NOPR: – NAESB standards v3.2 (published12/08/17). – Also includes NAESB standards v3.1 (published 09/30/15). The v3.1 standards already went through a NOPR that closed back in Sept 2016. However, FERC never issued a Final Rule on the v3.1 standards. FERC says it is not necessary to refile comments on the v3.1 standards. – It seems likely that FERC intends to issue a Final Order that includes both v3.1 and v3.2 standards. • Out of Scope: – The NAESB Modeling/ATC standards (WEQ-023) are in a separate docket. • The one area in which entities may wish to file further comments on the v3.1 standards is related to the Dynegy ruling involving Redirects. – The NOPR leaves open the question of whether a Redirect is permitted from a parent reservation that is conditional (still subject to preemption and competition). NAESB WEQ @ ISAS 05/21/19 12
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 7 v003.2 published by FERC NOPR on 05/16/19 NAESB 12/08/17. Topic Sub Description and Status New OASIS request type that will be used to consolidate multiple “like” reservations into a single reservation for easier tagging. Replaces current practice of customers Consolidation OS reselling TSR’s to themselves. Aggregation of Resales will still be allowed, but Reseller and Assignee must be different customers. Approved by NAESB Nov’16. Changes needed to WEQ-002 (S&CP), WEQ-004 (Coordinate Interchange), and Market CISS Electric Industry Registration (EIR) to support the Market Operator role for eTag Operator 1.8.3. Approved by NAESB Sep’16. Remove all NERC references from WEQ-022 (which govern the EIR). Approved by EIR CISS NAESB Mar’17. Retire WEQ-006 (Manual Time Error Correction) due to NERC retirement of BAL- Manual Time 004. Approved by NAESB Mar’17. Error BPS Correction Separate FERC NOPR closed fall 2018. Dynamic & Modify WEQ-004 following proposed retirement of NERC INT-004-3.1 (API 1.d.i). Pseudo-tie CISS NAESB standards to require RFI for Dynamic and Pseudo-ties mimic the previous Tagging NERC standards. Approved by NAESB Sept’17. Modifications to WEQ-008, which are the TLR standards that only apply to the Eastern TLR BPS Eastern Interconnection. NAESB WEQ @ ISAS 05/21/19 13
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 7 v003.2 published by FERC NOPR (continued) NAESB 12/08/17. Topic Sub Description and Status Five year effort to develop standards for Short-term Preemption and Competition was completed per FERC Order 890. Approved by NAESB Nov’17. Short-term Preemption/ OS This includes a late amendment pushed by the west and led by BPA to resolve a Competition gap in how certain Defenders with ROFR were treated if they were unable to exercise ROFR. Amendment adopted by the EC despite opposition from Duke and Southern. In July, the OASIS subcommittee also approved various changes to OASIS Consistency standards (WEQ-001, 002, 003, and 013). These are considered “consistency” OS Changes changes to remove NERC references, ensure language alignment between NERC/NAESB, etc. Approved by NAESB Nov’17. In Aug, the DSM-EE subcommittee approved various changes to WEQ-015, 018, Consistency DSM and 020. These are also “consistency” changes to ensure alignment between Changes -EE NERC/NAESB. Approved by NAESB Nov’17. NAESB WEQ @ ISAS 05/21/19 14
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 8 v003.1 published Pending FERC Final Order 09/30/15. NOPR closed Sept’16. Topic Sub Description and Status Entergy / Standards for treatment of Parent reservation when Redirect is lost to Preemption OS Dynegy and Competition per FERC Order 676-H. Lots of NOPR comments to FERC. ATC NAESB standards to complement NERC ATC MOD A. In the NOPR, FERC declined BPS Standards to adopt these NAESB standards pending separate ATC proceedings. DUNS OS Make the use of DUNS numbers optional. Little NOPR comment. WEQ-004 CISS Modify WEQ-004 to require tagging of intra-BA transactions (replace INT-011-1). Source/Sink OS Source/Sink will be unmasked once a TSR is in any final state. AFC/TFC OS Updates templates for posting of AFC and TFC information (like ATC/TTC). Resales OS Resales will now be submitted as ACCEPTED rather than CONFIRMED. CF OS TP’s will be able to extend the period for Biennial Reassessment of Conditional Firm. 1d Narrative OS Clarifies that TP’s will have 1 business day to post a narrative for zero ATC. Secondary Clarifies that a TP may invalidate a request to terminate Secondary Network service OS Network that exceeds the capacity that is unscheduled. Clarifies how reservations included in a Coordinated Request are handled if SAMTS OS displaced. NAESB WEQ @ ISAS 05/21/19 15
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 9 Implementation In-progress Topic Sub Description and Status NAESB WEQ @ ISAS 05/21/19 16
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 9 Implementation Complete Topic Sub Description and Status NAESB WEQ @ ISAS 05/21/19 17
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Contact With questions or feedback Mike Steigerwald (360) 418-2113 mlsteigerwald@bpa.gov NAESB WEQ @ ISAS 05/21/19 18
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Background NAESB WEQ @ ISAS 05/21/19 19
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N North American Energy Standards Board (NAESB) Wholesale Retail • An industry forum for the development and Wholesale Electric Quadrant Retail Electric Quadrant promotion of (WEQ) (REQ) standards which will lead to a seamless Electric Co-chairs: Roy True (ACES) marketplace for Josh Phillips (SPP) wholesale and retail natural gas an electricity. Wholesale Gas Quadrant Retail Gas Quadrant • 4 quadrants (WGQ) (RGQ) • BPA participates in the Wholesale Gas Electric Quadrant (WEQ). NAESB WEQ @ ISAS 05/21/19 20
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Summary of WEQ Subcommittees • OASIS (OS): Owns processing of TSR’s and posting requirements on OASIS. – By far the most active subcommittee in WEQ. – Standards and communication protocols for OASIS (WEQ-000, 001, 002, 003, 013). • Coordinate Interchange Scheduling (CISS): Owns tagging. – Interchange scheduling (tagging) standards (WEQ-004) and the e-Tag Functional Specification. – Standards and enhancements to the Electric Industry Registry (EIR). • Cybersecurity (CSS): Ensure secure exchange of market data across the internet. – Owns the Public Key Infrastructure (PKI) standards (WEQ-012) and the Accreditation Specification that together govern vetting of Authorized Certificate Authorities (ACA). – Also performs Annual Reviews of NERC/CIP. • Demand-side Management/Energy Efficiency (DSM-EE): Emerging standards. – Standards for Demand Response, SmartGrid, and Energy Efficiency (WEQ-015, 018, 020, 021). • Business Practice (BPS): Owns standard development for areas not covered above. – Takes the lead for standards development not clearly owned by another subcommittee. • Standards Review (SRS): Support for other standard development subcommittees. – Reviews changes to NERC standards in order to assess impact on NAESB WEQ standards. – Reviews proposed WEQ standards for consistency and uniformity. • Other subcommittees are ad-hoc or process-related: Annual Plan, Parliamentary, Triage, FERC Forms, etc. NAESB WEQ @ ISAS 05/21/19 21
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Implementation of Prior Implementation Complete major NAESB items. Topic Sub Description and Status April 2015: Changes to tagging and Curtailment Manager to manage overlapping eTag 1.8.2 CISS Reliability Limits from different TP’s. May 2015: Enables customers to coordinate transmission requests across multiple SAMTS OS TP’s per FERC Order 676-H. Rollover May 2015: Grants Rollover Rights to firm Redirects per FERC Order 676-H. Also OS Rights allows a customer to explicitly waive such rights. March 2017: Implementation of wide-ranging standards for Network Integration NITS OS Transmission Service. Oct 2017: Functional Specification approved to split Market Operator out as a new eTag 1.8.3 CISS role, separate from TP and BA. Implemented industry-wide on 10/10/17. eTag 1.8.2 retired on 11/07/17. NAESB WEQ @ ISAS 05/21/19 22
You can also read