ADANI GROUP – THE PROMOTERS ADANI ENTERPRISES LIMITED INFRASTRUCTURE GROUP Adani Wilmar Ltd. Mundra Port & SEZ Adani Power Dahej SCPT Adani Real Estate Dholera Port & SEZ Adani Agrifresh & Adani Logistics Ltd. Agrilogistics Gujarat Adani Energy Ltd Inland Conware Pvt Ltd Group Turnover is US $ 3.6 billion 2
MUNDRA PORT & SPECIAL ECONOMIC ZONE Our Vision To evolve as an international calibre business port on the foundations of technological excellence, state-of-the-art infrastructure and logistics and a competitive customer focus. Our Mission To develop, assimilate and manage knowledge; to apply the acquired expertise across the globe for the benefit of stakeholders; to do so profitably. 3
Mundra – Focussed on Growth Second Container Terminal Two berths having a total quay length of 632 meters Capable of berthing 8000+ TEU containers vessels Estimated terminal handling capacity of 0.9 million Teus 4 RMQCs & 12 RTGs from the 1st year of commissioning Huge backup area for Container Yard & Rail Terminal 4
Unloading facilities Coal berth has 2 Mobile Harbor cranes (Gottwald) with a handling capacity of 750 TPH each 7
The Conveyor Mechanized Handling System 3.5 kms long conveyor system with a import capacity of 1500 TPH and export capacity of 1000 TPH 8
MUNDRA PORT INDIA’S LARGEST PRIVATE SECTOR PORT NATURAL DEEP DEPTH OF 17.5 METERS CLOSEST PORT TO THE NORTHERN AND WESTERN HINTERLAND INDIA’S FIRST PORT TO DEVELOP ITS OWN PRIVATE RAILWAY LINE INDIA’S FIRST NOTIFIED MULTI-PRODUCT SPECIAL ECONOMIC ZONE 10
But even this is not enough for our future needs : Adani 2600 MW Tata 4000 MW Power Plants 11
Presenting Mundra Bulk Terminal, Wandh The biggest Coal Handling Terminal in the World 12
Planned capacities • Can handle upto 40 Million Tonnes of Coal per year • Estimated requirement for the Adani and TATA Power Plants is 26 Million Tonnes • Marine facilities planned to berth full Capesize vessels 13
JETTY / UNLOADING FACILITY Type of Jetty : ‘L’ Type (‘T’ type for Phase-II) Berth Length : 636 Meters. Berth Width : 26 Meters. Available Draft : 21 Meters. Max. Size of Ship : 2,00,000 DWT Type of Unloader : Grab Bucket No.of Unloader : 6 Nos (Phase -1) Cap of Unloader : 2000 TPH Each (Rated) Conveyor Cap : 6000 TPH x 2 Nos (Rated) Unloading Cap : 80000 TPD / Berth. 14
STORAGE YARD This consists of Dredge sand filling of yard, GSB layer, Ground improvement, Yard drainages, Stacker rail foundations, Rails & fixtures, Storm anchors and wind shield. Dimension of Yard : 1500 x 600 Mtr. Storage Capacity : 24 Lakh CUM Stacking Height : 8 to 10 Mtr. No. of track : 4 Nos + 1 No. * No. of Yards : 8 Nos + 2 Nos * No.of Eqpts : 6 Nos + 2 Nos * Type of Eqpts : Stacker cum Reclaimers *+ for Phase -II 15
STORAGE YARD WINDSHIELD To contain dust nuisance and spread of coal cargo. Wind shield / fence will be provided all around the stock yard area. Tentative Height of wind shield is about 18 to 20 Mtr. Multi Perforated transparent sheets are provided to break the velocity of wind and to create eco - friendly environment. 16
SHIP UNLOADER Type of Unloader : Grab Bucket No.of Unloaders : 6 Nos Cap of Unloadesr : 2000 TPH each Ship size : Capesize 17
CONVEYORS, FOUNDATIONS AND STRUCTURES. • Total length of conveyor 35 Kms. includes, - 6000 TPH conveyor of length 27 Kms with belt width 2200mm. - 4000 TPH conveyor of length 8 Kms. with belt width 1800mm. • Coal will be conveyed from jetty to the stack yard by two streams of Conveyor 6000 TPH each. • Stacking will be carried out in the yard @ 6000 TPH. • Reclaiming will be carried out @ 4000 TPH. • Single gallery with two conveyor streams (one working & one stand by) will be provided to cater the need of UMPP, APPL, Trading and Steel plant. 18
STACKER / RECLAIMER Stacking Cap : 6000 TPH Reclaiming Capacity : 4000 TPH 19
RAPID WAGON LOADING SYSTEM • Time require to load the rake : 60 to 90 minutes 20
DUST SUPPRESSION SYSTEM State-of-Art Dust Suppression system will be provided at the stockpiles and at the Discharge point as well as Feed point of conveyors in the transfer towers to control the dust generated during loading & unloading Operations. 21
INFRASTRUCTURE FACILITIES Green Belt Development – A commitment to the Environment 22
MUNDRA Port & Coal Terminal Committed to Environmental Excellence 23