MULBERRY HOMES - nineteen47
MULBERRY HOMES

            W E LC O M E
Mulberry Homes welcomes you to this public
exhibition of plans for the proposed residential
and associated development on Land Off
Broad Street, Clifton.

The site benefits from outline planning
permission, which was granted in December
2019 for the development of up to 80
dwellings (Local Authority Reference:
CB/18/01099/OUT). Mulberry Homes are
now preparing for the next stage, which
is the submission of a Reserved Matters
application. This will focus on the detailed
design of the scheme.

Mulberry Homes are committed to
engagement with the local Community. As
local residents of Clifton, we would like to hear
your feedback on the design of the scheme.

                                      © 2020 Google

                                      © 2020 Google
MULBERRY HOMES - nineteen47
ABOUT MULBERRY HOMES
Established in 2004, Mulberry Property               As well as our unique approach to the interiors and   All aspects of the meticulous planning and
Developments is a privately-owned company           exteriors of our properties, we are very sympathetic   development process contribute to an overall
that builds both residential and commercial         to the local surroundings and ensure we build in a     outstanding product, which is recognised by its
property across the wider Midlands.                 way that considers the environment at all times,       customers. From modern first-time buyer and down
                                                    whilst taking into account the most sustainable        sizer properties, to larger family homes, Mulberry
At Mulberry Homes we take the time to research      options for build.                                     continues to build on its strong reputation by
a local area before we build homes, ensuring                                                               providing a range of quality homes for all buyers.
that each step of the building process takes into
account its setting. We always seek to ensure
that we are enhancing the local areas we are
building in with our developments. We are
renowned for our quality craftmanship, which
we look forward to bringing to Clifton.
MULBERRY HOMES - nineteen47
THE SITE - BROAD STREE T CLIFTON
MULBERRY HOMES - nineteen47
kl
                                                                           Bric
                                                                                                                    Canada House, 3 Chepstow Street, Manchester M1 5FW
                                                                                                                    0161 228 7721 mail@randallthorp.co.uk www.randallthorp.co.uk

                                                                                     e

                                                                                           6
                                                                                 Plac

                                                                                         FP
                M
                    ile                                                                                              KEY:

                                                                                  kle
                       sD
                                riv

                                                                             Bric
                                   e                                                                                           Site boundary
                                                                                                                      Canada House,  3 Chepstow Street, Manchester M1 5FW
                                                                                               FP4                    0161 228 7721 mail@randallthorp.co.uk www.randallthorp.co.uk
                                                                                                                                 Public Right of Way (PRoW)
  CLIFTON
                                                                                                                                 Existing bus stops
                     M                                   t
                          ile                         sen                                                               KEY:
                              sD
                                   riv        s   Cre                                                                            Existing trees and hedgerows retained
                                      e     wi                 FP
                                                                 4                                                                 Site boundary
                                          Ne                                                    FP4                              Proposed vehicular access point
                                                                                                                                   Public Right of Way (PRoW)
      CLIFTON
                                                                                                                                 Proposed
                                                                                                                                   Existingindicative
                                                                                                                                            bus stops road
                                                           t
                                                     re sen                                                                      Proposed
                                                  sC                                                                               Existingfootpath/cycleway
                                                                                                                                            trees and hedgerows retained
                                  nt         wi                        4
                          e   Joi          Ne                       FP
                                                                                                                                 Proposed residential
                    Th                                                                                                             Proposed vehiculardevelopment
                                                                                                                                                      access point

                                                                                                             FP2                 Proposed amenity grass
                                                                                                                                   Proposed indicative road

                                                                                                                                 Proposed meadow planting
                                                                                                                                   Proposed footpath/cycleway
                                      t
                                   oin
                                eJ                                                                                               Proposed landscape focal feature
                                                                                                                                   Proposed residential development
                          Th
                                                                                                                                 Proposed structural
                                                                                                                                             amenityplanting
                                                                                                              FP2                  Proposed          grass
             Br                                                                                                                  Proposed attenuation basin: subject to
               oa
                 d                                                                                                               engineers
                                                                                                                                   Proposeddetails
                                                                                                                                             meadow planting
                     St
                          re
                             et
                                                                                                                                   Proposed landscape focal feature
  Lane
Hitchin

                                                                                                                                   Proposed structural planting
                Br                                                                                                                Proposed attenuation basin: subject to
                  oa
                      d                                                                                                           engineers details
                           St

                                                                                                        5
                                re                                                                                   Site Area = 5.3 ha

                                                                                                      FP
                                   et                                                                                Development Area = 2.3 ha
      Lane

                                                                                                                     Total dwellings = 80 @ 35 dw/ha
   Hitchin

                                                                                                         5
                                                                                                                       Site Area = 5.3 ha
                                                                                                       FP
                                                                                                                    Broad Street, Clifton
                                                                                                                       Development Area = 2.3 ha
                                                                                                                       Total dwellings = 80 @ 35 dw/ha

                                                                                                                    Development Framework Plan

                                                                                                                    Drwg No: 674A-30C                   Date: 08.01.18
                                                                                                                    Drawn by: YH/CD                     Checker: LC

                                                                                                                      Broad Street, Clifton
                                                                                                                    Rev by: CD       Rev checker: NJ
                                                                                                                    QM Status: Issue Approved
                                                                                                                                     Product Status:
                                                                                                                                                 Issue
                                                                                                                      Development
                                                                                                                    Scale: 1:2000 @ A3     Framework   Plan

                                                                                                                      Drwg No: 674A-30C                   Date: 08.01.18
                    Development Framework Plan, from the outline application showing how the scheme has evolved
                                                                                                         Drawn by: YH/CD
                                                                                                         Rev by: CD
                                                                                                                                                          Checker: LC
                                                                                                                                                          Rev checker: NJ
                                                                                                                                                                                     Drainage Strategy Plan              Feasibility Layout
                                                                                                                      QM Status: Issue Approved           Product Status:
                                                                                                                                                          Issue
                                                                                                                      Scale: 1:2000 @ A3

                           THE PROPOSAL
                           The scheme will include:
                           • 80 homes, of which 52 will be for market sale and 28                                                                        The scheme presented to you builds on what was              The entrances into the site is flanked by a row of trees
                             will be affordable homes;                                                                                                   established through the grant of outline planning           creating an attractive approach to the scheme with
                                                                                                                                                         permission with the framework plan (included above)         dwellings orientated to face this route when entering
                           • A mix of housing ranging from smaller 1 and 2 bedroom                                                                       setting the design parameters. The proposed scheme is       the scheme. The amenity of the surrounding existing
                             homes to larger 3-4 bedroom homes;                                                                                          a lower density than most housebuilders, with a green       properties has been protected by ensuring that all
                           • Generous swathes of public open space around the                                                                            buffer at the edge which will enhance biodiversity, but     separation distances meet those prescribed by the Local
                             periphery of the site and attractive small ‘greens’ within                                                                  also provide a soft edge to the development and prevent     Planning Authority. Due to the generous rear garden
                             the development;                                                                                                            encroachment into the countryside to the east of the        sizes most separation distances between new and
                                                                                                                                                         development.                                                existing properties far exceed minimum requirements.
                           • Sustainable urban drainage areas to carefully manage
                                                                                                                                                                                                                     Overall it is maintained that this Mulberry Homes
                             and store surface water on site;
                                                                                                                                                         We have liaised with Central Bedfordshire Council           development will create an attractive edge to village
                           • High quality designed new homes all 2 storey in height,                                                                     throughout the formulation of the proposals and we          and will sensitively integrate with the surrounding area.
                             excellent materials and sustainable construction                                                                            are keen to bring forward a scheme which incorporates
                             methods;                                                                                                                    greenery through trees and hedges, as well as pockets
                           • New pedestrian connections integrating with The Joint/                                                                      of open space. The site access was approved at the
                             existing PROW and new permissive paths through the                                                                          outline application stage, and has been proven to be safe
                             open space;                                                                                                                 for access and egress for the development. Necessary
                                                                                                                                                         visibility can be achieved and is in fact exceeded.
                           • Planning gain package to local social infrastructure
                             totalling £1.3 million.

                                We are keen to know what local residents think about our development proposals, so please let us know your views of the detailed scheme.
MULBERRY HOMES - nineteen47
F R E Q U E N T LY A S K E D Q U E S T I O N S

Q1 HAS WORK ALREADY BEGUN ON THE SITE?
You may have seen people digging on the site, this is not the development
starting. The conditions from the outline permission require archaeological
digging on the site to check if there are any archaeological remains on the site.
The works have been agreed with the Council’s archaeologist and need to be
completed prior to any development starting on site.

Q2 HOW WILL CONSTRUC TION VEHICLES
ACCESS THE SITE?
There is only one access proposed into the site which is off Broad Street.
Construction vehicles will access the site from the direction of Henlow, where
there is access to the A507 from the roundabout at Henlow, without having to
travel through the centre of Clifton Village. This will be detailed in a Construction
Management Plan that will be approved so that construction traffic will follow
the approved and most suitable route.

Q 3 W H AT A R E T H E T I M I N G S F O R T H E S I T E ’ S
CONSTRUC TION?
We anticipate work starting on site in Spring/Summer 2021. The main road
and drainage infrastructure will be the first development to be undertaken. The
first houses will be completed by the end of 2021 with a view to have all of the
homes built by Summer 2023.

Q 4 W H AT H A P P E N S N E X T ?

Alongside these consultation boards, a comments form is available at www.
nineteen47.co.uk/consultation which we would request is completed and
returned by Monday 9th November 2020. Alternatively, comments can be
emailed through to info@nineteen47.co.uk. Following this, a Reserved Matters
planning application will be submitted to Central Bedfordshire Council, seeking
consent on the detailed matters including appearance, landscaping, layout and
scale for 80 dwellings.