MONTANA DEPARTMENT OF TRANSPORTATION HANDOUTS MDT was unable to join MACo for District Meetings this year, due to COVID-19 and the paring down of each meeting to accommodate holding the meetings virtually. The pages that follow include a spreadsheet showing the status of current FLAP projects; a memo regarding the FFY 2020 secondary system allocation percentages; the secondary system allocation summary (2020-2024); and priority lists. Below you will find a link to the Statewide Transportation Improvement Plan (STIP), which is usually provided in hard copy at each district meeting, and contact information if you have questions. DOWNLOAD THE STIP Click Here to Download the Statewide Transportation Improvement Plan (STIP). QUESTIONS ABOUT FLAP, SECONDARY ROADS, PRIORITY LISTS, OR THE STIP? PLEASE CONTACT: Andy White, Planning Division, Secondary Roads Engineer Montana Department of Transportation (MDT) (406) 444-9194 awhite@mt.gov
Status of Current FLAP Projects Partner Delivered Program Project_ID Project_Name Obligation Program_Status Delivered By Update/notes Year Pioneer Mountain Scenic Byway Pavement Project currently in Design - County will go to Ad once the NEPA is complete. MT BEAVERHEAD 73(1) 2019 In Design Beaverhead County Marking Probably in July or August this year MT BROADWATER 2016(1) Goose Bay Road 2021 In Environment Broadwater County Environmental working on this project. MT DOT 2(1) US 2 Hungry Horse West 2017 Still open Montana DOT Construction complete MT DOT 206(1) Slope Flatten S-206 2022 In Design Montana DOT Letting date is November 19, 2020 MT DOT 236(2) Winifred North 2020 Not Programmed Montana DOT Need to program project MT DOT 399(1) Boulder South 2020 In Construction Montana DOT Project awarded - constuction in 2020 MT DOT 569(1) MT 569 N & S of Moose Creek 2014 Complete Montana DOT Construction complete MT DOT 89(5) Hudson Bay Divide - South 2021 In Design Montana DOT Construction in 2021 MT DOT TR 2(1) Gateway to Glacier Trail 2015 Letting June 2020 Montana DOT Scheduled letting of June 18, 2020 MT LEWISCLARK 2015(4) Beaver Creek Road Resurfacing 2015 Not Programmed Lewis And Clark Cty Not programmed County working on the design to construct this FY - Environmmental is MT LEWISCLARK 2016(5) Snowdrift Road Surface Preservation 2019 In Design Lewis And Clark Cty working on NEPA documentation - Construction this year County working on the design to construct this FY - Environmental working MT LEWISCLARK 2016(7) Ferry Drive Surface Preservation 2019 In Design Lewis And Clark Cty on getting NEPA documentation - County working on the design to construct this FY - Environmental working MT LEWISCLARK 2016(8) Collins Drive Surface Preservation 2019 In Design Lewis And Clark Cty on getting NEPA documentation - County working on the design to construct - working on getting all of the MT LEWISCLARK 208(1) Sun Canyon Road Resurfacing 2019 In Design Lewis And Clark Cty NEPA documentation - moved to FY 2021 MT LEWISCLARK 695(1) Rimini Road Surfacing 2019 Closing Lewis And Clark Cty Working on closing out MT LINCOLN 2016(2) Sophie Lake Road Reconstruction 2022 Not obligated Lincoln County No updates In-house delivery Program Project_ID Project_Name Obligation Program_Status DeliveredBy Update status Year MT BIGHORN 46(1) Warman Loop Road 2021 Scoping Western Federal Lands 200,000 added for AE services - The match agreement was signed for $128,832. We’ve decided to change Obligated & Re- the project to crushing contract and have county place it over 3-4 years. MT BLAINE 2015(1) Cow Island Trail and Lloyd Road Preservation 2021 Western Federal Lands scoped We’ll rename project, revise the match agreement, and revise the project charter. MT DOT 14203(1) Maiden Road 2019 Bid Repackaging Western Federal Lands Bid cancelled - they will repackage and re-ad MT DOT 236(1) MT 236 South of Big Sandy 2016 In construction Western Federal Lands Project remains open for MDT to complete guardrail installation in 2020.
Status of Current FLAP Projects Project was completed in the fall of 2019 however some of the work with MT DOT 544(1) Biddle East 2018 Constructed Western Federal Lands the Calcium Chloride was not within contract specifications. It appears it will be necessary for additional work to stabilize some portions of the road. MT DOT 86(2) Bridger Canyon Road 2022 Scoping Western Federal Lands Match agreemenmt signed Will meet with partners and significantly reduce scope to align with match MT FLATHEAD 486(1) North Fork of the Flathead River 2021 In Design Western Federal Lands limitation. MT FLATHEAD 917(2) Blacktail Road Surface Improve - Phase 2 2017 Closing Western Federal Lands Waiting on culvert to see if it performs well this Spring MT FT PECK 2016(4) Yellowstone Road - Fort Peck 2022 Scoping Western Federal Lands Scoping MT GLACIER 14(1) Many Glacier Road 2019 Construction Western Federal Lands Awarded Drafting agreement. Project is CN funds only. Match coming from FLTP BLM MT GRANITE 8686(1) Georgetown Lake Road Rehabilitation 2022 Scoping Western Federal Lands project MT LIBERTY 366(1) Lake Elwell BOR Lands Access Not obligated Western Federal Lands Match sent - County wants to do inkind services. Cliff and Wade Lake Road Gravel Surface MT MADISON 2015(1) 2020 Scoping Western Federal Lands WFL to haul and stockpile - County wanting to do the construction work Preservation Project MT MUSSELSHELL 192(1) Old Divide & S Fattig Creek Road 2021 Construction Western Federal Lands Awarded Ole Tom Miner Creek Road Capital Improvements MT PARK 63(1) 2017 Claim Western Federal Lands Potential Claim. Project MT PHILLIPS 2015(1) Content Road Not obligated Western Federal Lands Needs to be re-scoped MT PHILLIPS 364(1) Short Oil Road 2019 Construction Western Federal Lands Awarded. MT POWDRRIVR 2016(6) Belle Creek Road Surface Preservation Not obligated Western Federal Lands Request to revise scope to crushing only option 4/3/20. MT PRAIRIE 2016(3) Milwaukee Bridge Resurfacing & Rehab 2021 Scoping Western Federal Lands Scoping report is due in June 2020. MT TETON 109(1) South Fork Teton River Road 2022 Scoping Western Federal Lands Match Agreement signed… MT TETON 144(2) North Fork Teton River Road Chip Seal 2022 Not obligated Western Federal Lands Match Agreement signed…In project development
Montana Department of Transportation Michael T. Tooley, Director 2701 Prospect Steve Bullock, Governor PO Box 201001 Helena MT 59620-1001 August 26, 2019 To: Lynn Zanto, Rail, Transit and Planning Bob Vosen, Missoula Jim Skinner, Program and Policy Analysis William Fogarty, Butte Nicole Pallister, Budget and Planning Doug Wilmot, Great Falls Paul Johnson, Project Analysis Shane Mintz, Glendive Rod Nelson, Billings Subject: FFY 2020 Secondary System Allocation Percentages The following are the Secondary Program FFY 2020 allocation percentages by financial district. For comparison purposes, I have included the FFY 2019 percentages by financial district. Financial District FFY 2020 FFY 2019 1 22.97845 22.97867 2 14.57181 14.49307 3 20.62348 20.68548 4 23.99669 24.0745 5 17.82959 17.76829 The allocations are derived pursuant to MCA 60-3-206 ( http://leg.mt.gov/bills/mca/60/3/60-3- 206.htm ). The allocation formula factors consist of 30% in the ratio of land area in each district to the total land area in the state; 35% in the ratio of the rural population in each district to the total rural population in the state; 30% in the ratio of the rural road mileage in each district to the total rural road mileage in the state; 5% in the ratio of the rural bridge square footage in each district to the total rural bridge square footage in the state. Ed Ereth Data and Statistics Bureau copies: Brian Andersen, Geospatial Information Supervisor Marisa Mailand, TIS/Road Log Manager Data and Statistics Bureau Rail, Transit and Planning Division Phone: (406) 444–3423 An Equal Opportunity Employer TTY: (800) 335–7592 Fax: (406) 444–7671 Web Page: www.mdt.mt.gov
Secondary System Allocation Summary (2020-2024) FFY 2020 FFY 2021 FFY 2022 FFY 2023 FFY 2024 Funding Level 1 - Missoula $7,284,185 $7,513,970 $7,743,755 $7,973,540 $8,203,325 2 - Butte $4,619,261 $4,764,979 $4,910,697 $5,056,415 $5,202,133 3 - Great Falls $6,537,650 $6,743,885 $6,950,120 $7,156,355 $7,362,590 4 - Glendive $7,606,954 $7,846,921 $8,086,888 $8,326,855 $8,566,822 5 - Billings $5,651,983 $5,830,279 $6,008,575 $6,186,871 $6,365,167 ------------ ------------ ------------ ------------ ------------ $31,700,000 $32,700,000 $33,700,000 $34,700,000 $35,700,000 Percentage 1 - Missoula 22.9785% 22.9785% 22.9785% 22.9785% 22.9785% 2 - Butte 14.5718% 14.5718% 14.5718% 14.5718% 14.5718% 3 - Great Falls 20.6235% 20.6235% 20.6235% 20.6235% 20.6235% 4 - Glendive 23.9967% 23.9967% 23.9967% 23.9967% 23.9967% 5 - Billings 17.8296% 17.8296% 17.8296% 17.8296% 17.8296% ------------ ------------ ------------ ------------ ------------ 100.00% 100.00% 100.00% 100.00% 100.00% Assumptions: Calculations utilize Apportioned amounts (not Obligation). No other reductions or increases to allocation amounts.
Secondary Roads Priority List 2020 MACo update DESIGN FINAL PROJ CONTRACT 1-Jun-20 DISTRICT 1 - MISSOULA 2006 LIST PRELIMINARY DESIGN PHASE DEVELOPMENT AWARD Bridge/Hydraulics Design Stake Centerline & R/W Preliminary R/W Plans Surfacing/Geometrics Prep Final R/W Plans Estimated Let Date Consultant Contract Geotechnical Eval. Final Bridge Plans Enviromental Info. Final Enviro. Doc. R/W Negotiations Alignment/Grade Hydraulic Study Public Hearing PIH Inspection Soils Studies Bridge SOW Final Plans Survey PROJECT ID CN PROJECT NAME COUNTY SCOPE OF WORK 722/786 380/570 230/240 502 460 450 216 354 566 710 656 220 604 806 580 810 824 508 STPS 203-1(15)4 6138 NORTH OF STEVENSVILLE - NORTH RAVALLI RECONSTRUCT N X X X X X X X X X X X X X X 20 21 21 X 25-Sep-21 STPS 317-1( )1 6140 WILLOW GLEN DRIVE FLATHEAD RECONSTRUCT & TB - - - - - - - - - - - - - - - - - - - DROPPED STPS 548-1(13)0 8134 OLD RESERVE - NW OF KALISPELL FLATHEAD RECONSTRUCT N X X X X X X X X 20 X X X X X 20 21 21 21 22-Nov-22 STPS 263-1(28)6 6141 WEST OF MISSOULA - NW MISSOULA RECONSTRUCT Y X X X X X X X X 20 X 20 21 20 20 21 23 21 21 2025 STPS 292-1(14)1 8078 WHITEFISH STAGE ROAD - KAL FLATHEAD-MDT RECONSTRUCT Y S T U D Y C O N C L U D I N G 2027 STPS 472-1( )10 xxxx 10 M N OF JCT MT 200-NORTH SANDERS RECONSTRUCT TO PAVE W O R K I N G O N A G R E E M E N T STPS 211-1( )0 xxxx RONAN - WEST LAKE REHABILITATION STPS 482-1( )3 xxxx FARM TO MARKET ROAD LINCOLN RECONSTRUCT STPS 348-1( )7 xxxx 7 M W OF PHILLIPBURG GRANITE REHABILITATION POWELL MINERAL LEGEND X=complete GREEN = Programmed
Secondary Roads Priority List 2020 MACo update DESIGN FINAL PROJ CONTRACT 1-Jun-20 District 2 - BUTTE 2005 List PRELIMINARY DESIGN PHASE DEVELOPMENT AWARD Bridge/Hydraulics Design Stake Centerline & R/W Preliminary R/W Plans Surfacing/Geometrics Prep Final R/W Plans Estimated Let Date Consultant Contract Geotechnical Eval. Final Bridge Plans Enviromental Info. Final Enviro. Doc. R/W Negotiations Alignment/Grade Hydraulic Study PIH Inspection Public Hearing Soils Studies Bridge SOW Final Plans Survey PROJECT ID CN PROJECT NAME COUNTY SCOPE OF WORK 722/786 380/570 810/876 230/240 502 460 450 216 354 566 710 656 220 604 806 580 824 508 STPS 569-1(4)15 4909 MOOSE CREEK RD - N&S DEER LODGE RECONSTRUCT X X X X X X X X X X X X X X X X X X X 25-Apr-14 STPS 276-1(12)4 7896 NORTH OF ROCKER INTERCHANGE -N SILVER BOW RECONSTRUCT TO PAVE N X X X X X X X X 20 X 21 X X X 20 21 21 20 25-Jun-21 ARRA-STPS 235-1(9)0 4470 JCT MT-85 - EAST GALLATIN RECONSTRUCT X X X X X X X X X X X X X X X X X X X 23-Sep-10 STPS 295-1(3)10 6096 SLIDE REPAIR, MISSION CREEK PARK SLIDE RECONSTRUCT DROPPED STPS 575-1(1)0 9202 PINE CREEK ROAD (S-575) PARK RECONSTRUCT N X X X 20 X X X X 20 X 20 20 21 X 21 21 21 21 25-Jan-23 STPS-FLA 399-1(8)10 6097 SOUTH OF BOULDER - SOUTH JEFFERSON RECONSTRUCT TO PAVE Y X X X X X X X X X X X X X X X X X X LET 12/12/2019 STPS 540-1( )4 6098 EAST RIVER ROAD-S OF EMIGRANT PARK-MDT RECONSTRUCT .1 MI L O N G P R O J STPS 278-1(35)20 9194 19 MILES WEST OF I-15 MDT MILL & OVERLAY X X X X X X X X X X X X X X X X X X X 13-Jul-17 STPS 288-1(9)6 9195 JCT SEC 347 TO JCT MT 84 MDT MILL & OVERLAY X X X X X X X X X X X X X X X X X X X 13-Jul-17 STPS 249-1( )3 9665 VARNEY RD - SOUTH OF ENNIS MADISON REHABILITATION P E J U S T P R O G R A M M E D 2025 MT DOT 569(3) WFL NORTH OF MOOSE CREEK NORTH DEER LODGE RECONSTRUCT C O M P L E T E D I N 2 0 1 9 STPS 324-1( )28 xxxx WEST OF GRANT WEST BEAVERHEAD RECONSTRUCT TO PAVE 2027 STPS 284-2( )30 xxxx WEST OF US 12 BROADWATER RECONSTRUCT 2029 STPS 294-1( )8 xxxx WEST OF LENNEP MEAGHER RECONSTRUCT CURVES 2031 LEGEND X=complete GREEN = Programmed
Secondary Roads Priority List 2020 MACo update DESIGN FINAL PROJ CONTRACT 3-Jun-20 District 3 - GREAT FALLS 2014 LIST PRELIMINARY DESIGN PHASE DEVELOPMENT AWARD Bridge/Hydraulics Design Stake Centerline & R/W Preliminary R/W Plans Surfacing/Geometrics Prep Final R/W Plans Estimated Let Date Consultant Contract Geotechnical Eval. Final Bridge Plans Enviromental Info. Final Enviro. Doc. R/W Negotiations Alignment/Grade Hydraulic Study Public Hearing PIH Inspection Soils Studies Bridge SOW Final Plans Survey PROJECT ID CN PROJECT NAME COUNTY SCOPE OF WORK 722/786 380/570 230/240 502 460 450 216 354 566 710 656 220 604 806 580 810 824 508 STPS 279-1(24)2 8939000 LINCOLN ROAD W OF GREEN MEADOW LEWIS & CLARK RECONSTRUCT N X X X X X 20 X X 21 20 20 X X 22 21 22 21 21 25-May-22 STPS 225-2(1)11 9519001 CASCADE COUNTY LINE - NORTH CHOUTEAU RECONSTRUCT TO PAVE N J U S T P R O G R A M M E D 2023+ STPS 232-1(15)1 9788001 HAVRE NORTHWEST (S-232) HILL RECONSTRUCT Y E A R L Y D E S I G N 2024+ STPS 234-1( )4 SOUTH OF HAVRE MDT MAJOR REHABILITATION STPS 366-2( )28 TOOLE COUNTY LINE EAST TOOLE RECONSTRUCT TO PAVE STPS 534-1( )0 DUPUYER EAST PONDERA RECONSTRUCT GRAVEL STPS 330-1( )17 17 MILES SOUTH OF ULM CASCADE RECONSTRUCT STPS 221-1( )0 CHOTEAU EAST TETON MAJOR REHABILITATION STPS 338-1( )15 HOGELAND SOUTH BLAINE RECONSTRUCT TO PAVE STPS 409-1( )6 NORTH OF JCT US 2 NORTH LIBERTY RECONSTRUCT TO PAVE STPS 444-1( )12 JCT S-213 SOUTH GLACIER RECONSTRUCT TO PAVE LEGEND X=complete GREEN = Programmed
Secondary Roads Priority List 2020 MACo update DESIGN FINAL PROJ CONTRACT 3-Jun-20 DISTRICT 4 - GLENDIVE 2000 LIST PRELIMINARY DESIGN PHASE DEVELOPMENT AWARD Bridge/Hydraulics Design Stake Centerline & R/W Preliminary R/W Plans Surfacing/Geometrics Prep Final R/W Plans Estimated Let Date Consultant Contract Geotechnical Eval. Final Bridge Plans Enviromental Info. Final Enviro. Doc. R/W Negotiations Alignment/Grade Hydraulic Study Public Hearing PIH Inspection Soils Studies Bridge SOW Final Plans Survey PROJECT ID CN PROJECT NAME COUNTY SCOPE OF WORK 722/786 380/570 230/240 502 460 450 216 354 566 710 656 220 604 806 580 810 824 508 STPS 253-1(9)23 2824 37 KM NW OF TERRY-NORTH PRAIRIE & MCCONE RECONSTRUCT X X X X X X X X X X X X X X X X X X X 25-Feb-05 STPS 323-1(16)25 4138 40 KM S OF EKALAKA-SOUTH CARTER RECONSTRUCT X X X X X X X X X X X X X X X X X X X 27-May-04 ARRA-STPS 208-1(6)0 4481 JCT US 191-WHITEWATER PHILLIPS RECONSTRUCT X X X X X X X X X X X X X X X X X X X 22-Oct-09 STPS 261-2(5)27 4482 RICHLAND COUNTY LINE-NORTH RICHLAND RECONSTRUCT X X X X X X X X X X X X X X X X X X X 29-Mar-07 STPS 254-1(18)45 4483 W OF RICHEY - WEST DAWSON & RICHLAND RECONSTRUCT X X X X X X X X X X X X X X X X X X X 23-May-13 STPS 261-1(8)9 2840 14 KM N OF WIBAUX - NORTH WIBAUX PAVE OVER GRAVEL X X X X X X X X X X X X X X X X X X X 25-Mar-04 STPS 327-1(8)1 4907 BAINVILLE - SOUTH ROOSEVELT RECONSTRUCT AND O'LAY X X X X X X X X X X X X X X X X X X X 9-Aug-18 STPS 336-1(2)0 4881 JCT MT 7 - EAST FALLON RECONSTRUCT X X X X X X X X X X X X X X X X X X X 24-Sep-15 STPS 261-2(9)31 8895 RICHLAND COUNTY LINE-NORTH RICHLAND MAJOR REHABILITATION N X X X X X X X X 20 X X X X 20 20 21 21 20 25-May-21 STPS 511-1(8)7 9756 WHITETAIL - NORTH DANIELS PULVERIZE N N N N N N N N N N N 20 2022-2023 STPS 258-1(8)0 8897000 RESERVE - EAST SHERIDAN RECONSTRUCT Y S T U D Y C O N C L U D I N G 2025 STPS 261-1( )41 8896 JCT MT 23 SOUTH RICHLAND MAJOR REHABILITATION STPS 462-2(8)24 7897 SOUTH OF JCT MT 200 - SOUTH GARFIELD GRAVEL RECON P O S T P O N E D / M O V E D D O W N STPS 332-1( )18 18 M SW OF JCT MT 59 - SW CUSTER RECONSTRUCT STPS 511-1( )0 FLAXVILLE - NORTH DANIELS RECONSTRUCT STPS 438-1( )43 SOUTH OF GLENTANA - SOUTH VALLEY RECONSTRUCT STPS 447-1( )16 16 M S OF ROSEBUD - SOUTH ROSEBUD RECONSTRUCT STPS 398-1( )0 BROADUS - NORTHEAST POWDER RIVER RECONSTRUCT - - - - - - - - - - - - - - - - - - - CHANGED MT DOT 544(1) WFL BIDDLE - EAST POWDER RIVER REGRAVEL/REHAB 2 0 1 9 C O N S T R U C T E D 25-Jan-18 STPS 201-1( )6 RICHLAND CO LINE WEST MCCONE REGRAVEL STPS-STPB 413-2( )18 JCT MT 7 EAST WIBAUX REGRAVEL/BRIDGE STPS 366-2( )13 JCT MT SEC 413 EAST WIBAUX REGRAVEL LEGEND X=complete GREEN = Programmed
Secondary Roads Priority List 2020 MACo UPDATE DESIGN FINAL PROJ CONTRACT 3-Jun-20 DISTRICT 5- BILLINGS 2017 LIST PRELIMINARY DESIGN PHASE DEVELOPMENT AWARD Bridge/Hydraulics Design Stake Centerline & R/W Preliminary R/W Plans Surfacing/Geometrics Prep Final R/W Plans Estimated Let Date Consultant Contract Geotechnical Eval. Final Bridge Plans Enviromental Info. Final Enviro. Doc. R/W Negotiations Alignment/Grade Hydraulic Study PIH Inspection Public Hearing Soils Studies Bridge SOW Final Plans Survey PROJECT ID CN PROJECT NAME COUNTY SCOPE OF WORK 722/786 380/570 230/240 502 460 450 216 354 566 710 656 220 604 806 580 810 824 508 STPS 478-1(9)0 9520001 JCT US - 191 - EAST (S-478) SWEET GRASS S&C (5.5), Re-Gravel (16.5) N / / / / / / / / / 20 / / 20 / / 20 / 2021 STPS 308-1(34)7 9799 BEARCREEK - EAST CARBON S&C (7.7) (capital construction) N / / / / / / / / / / 20 / / 20 / / 20 / 2021 STPS STWD (742) 9800 S-238 / S-300 RYEGATE GOLDEN VALLEY Recon Gravel (10.2) N X 19 20 20 19 / 20 20 21 / 20 / / / / / 22 21 2022 STPS 381-1(6)5 9801 SOUTH OF US 12 - SOUTH (S-381) MUSSELSHELL Recon Gravel (11.6) N X / / 20 X / 19 20 20 / 20 / / / / / 21 21 2024 STPS 310-2( )16 MUSSELSHELL CO LINE SOUTH YELLOWSTONE Recon Gravel STPS 421-1( )0 JCT MT 78 STILLWATER Reconstruct Intersection STPS 384-1( )41 15 M SOUTH JCT I94 MDT-DISTRICT Recon Pavement STPS 236-1( )24 WINIFRED NORTHWEST FERGUS Recon Gravel STPS 500-1( )11 MUSSELSHELL CO LINE NORTH PETROLEUM Recon Gravel (7.1), Re-Gravel (12.6) STPS 297-1( )9 8 M NORTH OF JCT US 12 WHEATLAND Recon Gravel STPS 207-1( )0 BENCHLAND - NORTH JUDITH BASIN Recon Gravel STPS 311-1( )15 YELLOWSTONE CO LINE EAST TREASURE Recon to Pavement STPS 313-1( )13 13 M SOUTH OF HARDIN BIG HORN Recon Pavement LEGEND X=complete GREEN = Programmed 2000 LIST STPS 313-1(16)0 5793 HARDIN - SOUTH BIG HORN RECONSTRUCT N X X X X X X X X X X X X 19 19 19 19 19 X 18-Jun-20 STPS 244-2(8)24 8077 MAIN ST - WINNETT PETROLEUM URBAN RECONSTRUCT Y X X X 19 X X X 20 20 20 19 20 20 X 20 X 21 20 25-Jan-23