MMAALLDDIIVVEESS PPRROOFFIILLEE - KURIHARA KOGYO CO., LTD Mechanical & Electrical Services

Page created by Jordan Crawford
 
CONTINUE READING
MMAALLDDIIVVEESS PPRROOFFIILLEE - KURIHARA KOGYO CO., LTD Mechanical & Electrical Services
MALDIVES PROFILE
   KURIHARA KOGYO CO., LTD
   Mechanical & Electrical Services
MMAALLDDIIVVEESS PPRROOFFIILLEE - KURIHARA KOGYO CO., LTD Mechanical & Electrical Services
1|Page
MMAALLDDIIVVEESS PPRROOFFIILLEE - KURIHARA KOGYO CO., LTD Mechanical & Electrical Services
TABLE OF CONTENTS

   A.   Our Company Profile………………………………………………………………………..3

   B.   Main Office / Branch Office / Sales Office…………………………….………….4

   C.   Our Mission, Policy and Achievements…………………………………………….5

   D.   Kurihara Kogyo Co. Ltd in Maldives…………………………………………………6

   E.   Hulhule Island Hotel, Male, Maldives………………………………………………7

   F.   Bandos Island Resort…………………………………………………………………………10

   G.   Four Seasons Resort (Maldives at Kuda Huraa…………………………………10

   H.   Kandooma Tourist and Rhivelli Beach Resort…………………………………..10

   I.   Four Seasons Resort, Maldives at Landaa Giraavaru…………………………12

   J.   Hulhule Island Hotel Maldives, New Guestrooms Extension…………..18

   K.   Holiday Inn Hotel Male, Maldives……………………………………………………24

   L.   White Sands Resort and Spa – Phase 2…………………………………………….32

   M.   Second Girls’ Secondary Girl School at Maldives……………………………..38

   N.   Proposed Island Resort at Falhumaafushi………………………………………..43

   O.   Konotta Island Resort at Maldives……………………………………………………47

   P.   Maldives Project Reference……………………………………………………………….50

                                                                   2|Page
MMAALLDDIIVVEESS PPRROOFFIILLEE - KURIHARA KOGYO CO., LTD Mechanical & Electrical Services
OUR COMPANY AND PRODUCT OVERVIEW

KURIHARA KOGYO CO., LTD was
Founded in Osaka, Japan since 1919
and is listed as top ten (10) leading
Company in Mechanical & Electrical
Engineering Industrial and Social
Fields according to the Japan
Construction Data Research Institute.

With more than 80 years history in
the industrial, prominent position,
abundant experience and extensive
engineering resources in advance
technology    application   in  the
industrial and building sectors,
Kurihara is fully equipped and
prepared to face any challenge.

Kurihara’s lines of business include
engineering material supply, project
management,      construction    and
maintenance.

The company offers total engineering
solutions throughout the world from

Planning, designing, material supply, erection, supervision to testing and commissioning.

Kurihara Kogyo has, over the decades, participated in plant and equipment exports since
inception. Thus, far it has rendered technical cooperation in the construction of numerous
projects in various countries such as Asia and elsewhere worldwide.

The company’s policy of providing advanced quality engineering and technologies that
meet the local conditions of the respective countries, at its disposal, an enormous
manpower resource of licensed and experienced engineers to meet this end.

In the unique position, Kurihara Kogyo has handled all kinds of project including mega-
projects that require sophisticated and specialized technolologies, through its well-
organized task forces and project teams at anytime and anywhere.

The company is driven to provide reliable and complete engineering and construction
solution with worldwide reputation. It has endeavoured and will continue its endeavours
to meet the requirements of plant manufacturers and users all over the world in
contributing towards the development of the international community.

                                                                                3|Page
MMAALLDDIIVVEESS PPRROOFFIILLEE - KURIHARA KOGYO CO., LTD Mechanical & Electrical Services
MAIN OFFICE / BRANCH OFFICE / SALES OFFICE

JAPAN / SINGAPORE / MALAYSIA / CAMBODIA / VIETNAM / THAILAND / SHANGHAI

                                                 Japan    : Kurihara Kogyo Co., Ltd
                                                            Headquarters
                                                            Higashi-Hankyu Bldg
                                                            1-1 Kakuda-Cho, Kita-Ku
                                                            Osaka Japan 530-0017

                                                 Singapore : Kurihara Kogyo Co., Ltd
                                                             168 Jalan Bukit Merah
                                                             Connection One Building
                                                             Tower 3 #05 – 07, Singapore

                                                 Malaysia : Kurihara(Malaysia)Sdh Bhd
                                                            No 16 Lorong 1/137C
                                                            Bedford Business Park,
                                                            Batu 5, Jln Kelang Lama
                                                            58200 Kuala Lumpur,
                                                            Malaysia

                                                 Cambodia : Kurihara Kogyo Co., Ltd
                                                            No 85 Str 214
                                                            Sangkat Boeung Pralit
                                                            7 Makara Districe
                                                            Phnom Penh Cambodia

                                                 Thailand : Kurihara(Thailand) Co Ltd
                                                            19th Floor Unit C-D SSP
                                                            Tower 555/50-51 Sol
                                                            Sukhumvit 63 (Ekamai),
                                                            Sukhumvit Road Klongton-
                                                            Nua, Wattana District,
                                                            Bangkok 10110 Thailand

Vietnam : Hanoi Head Office                      Shanghai : Kurihara Kogyo Co., Ltd
          3rd & 4th Floor, 73 Tran Duy                     Central Place Room No 211
          Hung Street Cau Giay District 1                  No 16 Henan Road South
          Hanoi – Vietnam                                  Shanghai, china

           Ho Chi Minh Branch Office
           4th & 5th Floor 185 Dien
           Bien Ohu Street District 1
           Ho Chi Minh City- Vietnam

                                                                                4|Page
MMAALLDDIIVVEESS PPRROOFFIILLEE - KURIHARA KOGYO CO., LTD Mechanical & Electrical Services
Many countries of the world, particularly developing countries are actively promoting
industrialization. With the company decades of foundation, technology, resources and
management, Kurihara Kogyo has expanded its organization and operation with highly
advanced technologies and quality in various countries such as Asia and elsewhere
worldwide.

                            OUR MISSION, OUR POLICY, OUR ACHIEVEMENTS

                                ISO ACHIEVEMENTS

  Our Mission:
  “PROMOTE A QUALITY-IN-ALL-WE-DO PHILOSOPHY WITH A TOTAL COMPANY DEDICATED
  EFFORT AND COMMITMENT TO CONTINUOUS IMPROVEMENT.”

  Our Policy:
  “FOCUS ON ‘CUSTOMER FIRST’ BY PROVIDING SERVICES THAT MEET OR EXCEED
  CUSTOMER NEEDS AND EXPECTATIONS.”

        Monitor Customer Satisfaction
        Reduce Quality Cost And Maintain Improvement Through Innovation

                                                                            5|Page
MMAALLDDIIVVEESS PPRROOFFIILLEE - KURIHARA KOGYO CO., LTD Mechanical & Electrical Services
KURIHARA KOGYO CO., LTD IN MALDIVES

Kurihara Kogyo has venture into Maldives more than a decade ago.

Maldives is scattered like exotic pearls on a vast aquamarine canvas painted by the Indian
Ocean. A Chain of 1190 little coral islands that forms the archipelago of the Maldives in
80- 120km wide, stretching 860 km from latitude 7o6"N to 0o41"S and lying between
72o32" and 73o45" E.

With the local survey and study of Maldives Geography, History & Culture, the company is
well equipped with the close communication network between the operation team in
Maldives and Singapore Head Office. Kurihara Kogyo has maintained its technologies and
logistic link-up to meet the local conditions and requirement and not discounting on the
company MISSION & POLICY of delivering it’s quality and standard.

The company is expanding its operation and services in Maldives from Project
Management, Construction to Engineering Materials Supply and After Sales Maintenance.

                                                                                 6|Page
MMAALLDDIIVVEESS PPRROOFFIILLEE - KURIHARA KOGYO CO., LTD Mechanical & Electrical Services
HULHULE ISLAND HOTEL, MALE, MALDIVES

Far before year 2000, Kurihara Kogyo was invited to manage and construct the Mechanical
and Electrical systems for the Airport Island Hotel, Hulhule, Maldives.

With the foundation and solid planning, the company mobilized a management team to
the island for site survey and preparation work.

Kurihara Kogyo has participated in the preliminary project management, with the
strategic local alliances formed over the years, in plant and equipment exports in order to
meet the hotel completion schedule.

                                                                                 7|Page
MMAALLDDIIVVEESS PPRROOFFIILLEE - KURIHARA KOGYO CO., LTD Mechanical & Electrical Services
Hulhule Island Hotel

Couple with the complete engineering and technologies solution, the company has
successfully delivered a timely schedule and completion of the project with no comprising
on the services and quality through its well-organized task forces and project management
team.

                                                                               8|Page
MMAALLDDIIVVEESS PPRROOFFIILLEE - KURIHARA KOGYO CO., LTD Mechanical & Electrical Services
Hulhule Island Hotel

Kurihara Kogyo has serve the clients as a reliable business partner, providing the clients
with the loyalty of a trusted business ally with unfaltering cost effectiveness. The
company has thrived on the success of the clients business; ensure the clients what it
takes to run the business efficiently and effectively time after time.

                                                                                9|Page
BANDOS ISLAND RESORT, FOUR SEASONS RESORT (MALDIVES AT KUDA HURAA)
               KANDOOMA TOURIST RESORT AND RIHIVELI BEACH RESORT

                                       After the Tsunami occurrence,
                                       Kurihara Kogyo was assigned by
                                       Hotel Properties Leisure Group
                                       (owner of Hilton Hotel Singapore and
                                       the Famous Hard Rock Café and
                                       Hotels in Asia) for the survey and
                                       investigation on the damages of
                                       Mechanical and Electrical system
                                       including the plant generators, RO
                                       plants, sewerage plants caused by
                                       the tidal wave

Due to the emergency needs for
refurbishment     of  the    resorts
damages; with very short notice, the
company mobilized a competent
team of engineers and supervisors to
conduct Due Diligence sites survey,
testing and report.

                                       All necessary tools, testing sets and
                                       equipments were pre-prepared and
                                       hand carried by the team with the
                                       understanding     of   the    limited
                                       resources of the country.

                                       The survey and all necessary testing
                                       of the plants and systems report plus
                                       the proposed budgetary costing for
                                       the refurbishment works were well
                                       carried out and conduct as per
                                       schedule.

                                                                   10 | P a g e
Bandos Island, Four Seasons, Kandooma Tourist and Rihivelli Beach Resort

The Due Diligence reports with all
the test results, endorsed by the
company Professional Engineer, and
photos attached were delivered
timely to the clients in less than a
week. Meetings and presentations on
the report were conducted together
with the clients and representative
of Insurance Professional Engineer.

                                         Kurihara Kogyo was awarded for the
                                         repair and refurbishment works for
                                         Rihiveli Beach Resort. With the
                                         company social field and readiness
                                         of all resources including tools,
                                         materials, the people and know
                                         how, it form a team of Engineer,
                                         supervisors    with     hands      on
                                         experience, close logistic network
                                         and personnel for the repair works

Electrical engineering work was
calculated and all damage panels
were rectified and face-lift. Sub-
main cables with leakage were
track and repair with quality resin
compound. All outlets and circuitry
were tested and replaced.

The assigned task force complete
the M&E repair work of the resort in
less than a month with the resort re-
launch and back in operation at
minimum down time and minimum
lost of income.

                                                                      11 | P a g e
FOUR SEASONS RESORT, MALDIVES AT LANDAA GIRAAVARU

With an enormous manpower resource
from licensed and competent managers,
engineers to workers, the company
carefully selected a project team with
the knowledge of details components of
each and every system.

The personnel know how and hands on
knowledge make the big difference in
the execution and schedule of the
project requirements

                                         All proper tools and machineries, from
                                         excavator, cable hoist, compressors to
                                         hand tools were bought and delivered.
                                         All bracketing and supports were
                                         tailored to site requirements.

                                         With the experience and knowledge of
                                         Maldives condition and nature of the
                                         water tide and water table for
                                         underground work, Kurihara Kogyo
                                         adopted Vacuum system for the
                                         Sanitary System.

                                         The system eliminates the need for
                                         flow gradient in the waste discharge.

                                                                       12 | P a g e
Four Seasons Resort, Maldives at Landaa Giraavaru

                                               Landaa Giraavaru is sited in the BAA Atoll
                                               North of the Main Capital, Male. The distance
                                               between Male, in North Male Atoll to the
                                               project site is 121km which takes 3 hrs
                                               traveling with speed launch or 9 hrs with the
                                               local boats, or dhonis.

                                               Studies and understanding that logistic is the
                                               one of the main feature for the execution of
                                               the project, the company set up and
                                               maintain a close communication network
                                               both in Singapore and Maldives, not
                                               excluding the close co-operation with its
                                               associated forwarders and suppliers.

The main mode of transportation and
delivery of equipments and materials is by
the sea. With the knowledge on the climate
and the transportation mode of Maldives,
the company engages 100% check on proper
packing and labelling of every material
delivered with the forwarders and suppliers.

Due to Maldives geographical isolation, all
materials from equipments to bolts and nuts
are controlled and accountable with a stock
list monitoring system.

                                                                                    13 | P a g e
Four Seasons Resort, Maldives at Landaa Giraavaru

The fire Hydrant pipe works were pre
erected in Singapore work shop with all
brackets and supports, simulation of the
calculated pump room area, and re-
assembled on site. This methodology
eliminates any missing out of parts.

All systems were tested with proper
record and endorsement through the
company licensed and competent
engineers, witnessed by the client’s
representative engineers.

                                           With a systematic documentation and
                                           handing over, the resort maintenance
                                           team was given one week of former
                                           training on all the systems by our
                                           engineers and two months of operation
                                           interfacing period.

                                                                         14 | P a g e
Four Seasons Resort, Maldives at Landaa Giraavaru

The whole execution work from planning, designing, materials supply, delivery,
supervision, testing and commissioning, training, documentation and submission
was completed in 2 years. The resort was officially launched and operated on Oct
2006.

                                                                          15 | P a g e
Four Seasons Resort, Maldives at Landaa Giraavaru

           Diving Centre, Four Seasons Resort at Landaa Giraavaru

             Linear Villa, Four Seasons Resort at Landaa Giraavaru

                                                                     16 | P a g e
Four Seasons Resort, Maldives at Landaa Giraavaru

               Aerial View of Four Seasons Resort at Landaa Giraavaru

Kurihara Kogyo has drawn the trust from the developer and received numerous
compliments from the Resort management on its organization, operation and
technologies.

The company has successfully completed the execution works for the entire M&E
system.

                                                                        17 | P a g e
HULHULE, ISLAND HOTEL MALDIVES, NEW GUESTROOMS EXTENSION

Being a reliable and trustworthy business partner couple with its past records and
active participation in plants and equipment exports, Kurihara Kogyo was invited
and awarded for the M&E construction work for New Guestroom Extension for
Hulhule, Island Hotel Maldives on June 2006.

With the engineering details established, the company set up the site in two weeks.

                                                                           18 | P a g e
Hulhule, Island Hotel Maldives, New Guestrooms Extension

                                         A site survey and co-ordination was
                                         planned and executed.

                                         With the site mark-up and pipes
                                         length requirement measure to site,
                                         all necessary materials are shipped
                                         and delivered in the shortest time.

ACMV, Data/Tel, Fire Protection,
Electrical services support are colour
coded as per the consultant
requirement      couple    with    the
specified     quality,     engineered
calculated     gauging    and    salty
environmental coating.

                                         All services   are   co-ordinate   in
                                         details.

                                         Standard installation practice is
                                         carried out and witness by the
                                         clients representative.

                                                                     19 | P a g e
Hulhule, Island Hotel Maldives, New Guestrooms Extension

ELV and MV services lines are segregated, duct work are insulated with standard
insulation materials as according to British Standard of practice.

Two different Guestroom type were mocked up as per schedule.

All M&E fittings and outlets are delivered and installed as per architectural and
designer details.

                                                                         20 | P a g e
Hulhule, Island Hotel Maldives, New Guestrooms Extension

             The Re-Trolifted Reception Lobby of the Existing Hotel

                                                                      21 | P a g e
Hulhule, Island Hotel Maldives, New Guestrooms Extension

                The Sky Restaurant of the New Wing Extension

                      Inner View of the Sky Restaurant

                                                               22 | P a g e
Hulhule, Island Hotel Maldives, New Guestrooms Extension

                     External View of the New Hotel Extension

Kurihara Kogyo has drawn the trust from the developer and received numerous
compliments from the Hotel management on its organization, operation and
technologies.

The company has successfully completed the execution works for the entire M&E
system. The Hotel Extension was opened in October 2007.

                                                                      23 | P a g e
HOLIDAY INN HOTEL MALE, MALDIVES

Mobilisation and Site Set-up for the Holiday Inn Hotel, Male – December 2007

                                                                        24 | P a g e
Holiday Inn Hotel Male, Maldives

        Basement Site Work of the Holiday Inn Hotel, Male – June 2008

                                                                        25 | P a g e
Holiday Inn Hotel Male, Maldives

  Basement Site Work (Night Lifting) of the Holiday Inn Hotel, Male – June 2008

                                                                           26 | P a g e
Holiday Inn Hotel Male, Maldives

                                   27 | P a g e
Holiday Inn Hotel Male, Maldives

                                   28 | P a g e
Holiday Inn Hotel Male, Maldives

                                   29 | P a g e
Holiday Inn Hotel Male, Maldives

                                   30 | P a g e
Holiday Inn Hotel Male, Maldives

                                   31 | P a g e
WHITE SANDS RESORT AND SPA – PHASE 2

         M&E Works at White Sands Resort & Spa – March 2008

 Delivery of Materials                       Site Costing Work

    Work at Disco                              Work at Disco

                                                                   32 | P a g e
White Sands Resort and Spa – Phase 2

                                       33 | P a g e
White Sands Resort and Spa – Phase 2

                                       34 | P a g e
White Sands Resort and Spa – Phase 2

                                       35 | P a g e
White Sands Resort and Spa – Phase 2

                                       36 | P a g e
White Sands Resort and Spa – Phase 2

                                       37 | P a g e
SECOND GIRLS’ SECONDARY GIRL SCHOOL AT MALDIVES

Basement Site Work of the Second Girls’ Secondary School, Male – June 2008

                                                                      38 | P a g e
Second Girls’ Secondary Girl School at Maldives

  Basement Site Work of the Second Girls’ Secondary School, Male – June 2008

                                                                        39 | P a g e
Second Girls’ Secondary Girl School at Maldives

                                                  40 | P a g e
Second Girls’ Secondary Girl School at Maldives

                                                  41 | P a g e
Second Girls’ Secondary Girl School at Maldives

                                                  42 | P a g e
PROPOSED ISLAND RESROT AT FALHUMAAFUSHI, MALDIVES

Falhumaafushi Island Resort – Top Island View

                                                                43 | P a g e
Island Resort at Falhumaafushi, Maldives

                                           44 | P a g e
Island Resort at Falhumaafushi, Maldives

                                           45 | P a g e
Island Resort at Falhumaafushi, Maldives

                                           46 | P a g e
PROPOSED KONOTTA ISLAND RESORT, MALDIVES

                                 47 | P a g e
Konotta Island Resort, Maldives

                                  48 | P a g e
Konotta Island Resort, Maldives

                                  49 | P a g e
KURIHARA PROJECT LISTS (MALDIVES PROJECT REFERENCE)

                                                              Project            Value of Works
  Particulars of Contract                Services                                                        Name of Client          Name Of Consultant
                                                            Completion               (US$)

Vadoo Diving Paradise
                                                                                                      Sun Maldives
Resort, South Male Atoll,      Electrical Installation      October 1988                500,000.00                              Tak Institute of Architect
                                                                                                      International Ltd.
Maldives

Hulhule Island Hotel, Male,
                               M&E Installation            September 2000              2,812,500.00   SIA Properties            Meinhardt(S) Pte Ltd
Maldives

Hulhule Island Hotel, Male,
Maldives – Maintenance and     M&E Installation              March 2001                  113,750.00   HIH Hotel                 N/A
Upgrading Work

                               Rehabilitation of M&E
Rihiveli Resort, South Male                                                                           Hotel Properties
                               Work due to Tsunami           March 2005                 196,346.00                              Hotel Properties Limited
Atoll, Maldives                                                                                       Limited
                               Damage

                                                                                                      Landaa Giraavaru Pte
Proposed Landaa Giraavaru      Mechanical & Electrical
                                                            August 2006                6,561,875.00   Ltd/Hotel Properties      J.P.R Sdn Bhd
Resort, Baa Atoll, Maldives    Services Installation
                                                                                                      Limited

                                                                                                      Maldives Inflight
Hulhule Island Hotel New       Mechanical & Electrical       Completed                                                          Bescon Consulting
                                                                                      2,070,000.00    Catering Pte Ltd / SIA
Guest Wing, Maldives           Services Installation        October 2007                                                        Engineers Pte
                                                                                                      Properties

15 Storey Holiday Inn Hotel,   Mechanical & Electrical   Expected Completion                          Male Hotel Associates /
                                                                                       3,577,450.00                             PCR Consulting Pte Ltd
Male, Maldives                 Services Installation          July 2009                               Holiday Inn

                                                                                                                                        44 | P a g e
Particulars of Contract             Services              Project           Value of Works          Name of Client       Name Of Consultant
                                                          Completion              (US$)

White Sands Resort & Spa     Mechanical & Electrical   Completed    October         2,883,473.00   White Sands Resort &   GMF International Ltd
Pvt Ltd (Phase 2)            Services Installation             2008                                Spa Pvt Ltd

The Second Girls Secondary   Mechanical & Electrical       Completed                 885,000.00    Japan Aid Fund         Mohri, Architect &
School, Male, Maldives       Services Installation         March 2009                                                     Associates, Inc.

Proposed Island Resort at    Mechanical & Electrical      Feb’10 – Mar’12        S$16,000,000.00   Keong Hong             Ace Tech Design Pte Ltd
Falhumaafushi, Maldives      Services Installation                                                 Construction Pte Ltd

Konotta Island Resort        Mechanical & Electrical        March 2010              1,000,000.00   AIMA Construction      AIMA Construction
                             Services Installation

                                                                                                                                  45 | P a g e
KURIHARA PROJECT LISTS (MALDIVES PROJECT REFERENCE)

                                                              Project            Value of Works
  Particulars of Contract                Services                                                        Name of Client          Name Of Consultant
                                                            Completion               (US$)

Vadoo Diving Paradise
                                                                                                      Sun Maldives
Resort, South Male Atoll,      Electrical Installation      October 1988                500,000.00                              Tak Institute of Architect
                                                                                                      International Ltd.
Maldives

Hulhule Island Hotel, Male,
                               M&E Installation            September 2000              2,812,500.00   SIA Properties            Meinhardt(S) Pte Ltd
Maldives

Hulhule Island Hotel, Male,
Maldives – Maintenance and     M&E Installation              March 2001                  113,750.00   HIH Hotel                 N/A
Upgrading Work

                               Rehabilitation of M&E
Rihiveli Resort, South Male                                                                           Hotel Properties
                               Work due to Tsunami           March 2005                 196,346.00                              Hotel Properties Limited
Atoll, Maldives                                                                                       Limited
                               Damage

                                                                                                      Landaa Giraavaru Pte
Proposed Landaa Giraavaru      Mechanical & Electrical
                                                            August 2006                6,561,875.00   Ltd/Hotel Properties      J.P.R Sdn Bhd
Resort, Baa Atoll, Maldives    Services Installation
                                                                                                      Limited

                                                                                                      Maldives Inflight
Hulhule Island Hotel New       Mechanical & Electrical       Completed                                                          Bescon Consulting
                                                                                      2,070,000.00    Catering Pte Ltd / SIA
Guest Wing, Maldives           Services Installation        October 2007                                                        Engineers Pte
                                                                                                      Properties

15 Storey Holiday Inn Hotel,   Mechanical & Electrical   Expected Completion                          Male Hotel Associates /
                                                                                       3,577,450.00                             PCR Consulting Pte Ltd
Male, Maldives                 Services Installation          July 2009                               Holiday Inn

                                                                                                                                        44 | P a g e
Particulars of Contract             Services              Project           Value of Works          Name of Client       Name Of Consultant
                                                          Completion              (US$)

White Sands Resort & Spa     Mechanical & Electrical   Completed    October         2,883,473.00   White Sands Resort &   GMF International Ltd
Pvt Ltd (Phase 2)            Services Installation             2008                                Spa Pvt Ltd

The Second Girls Secondary   Mechanical & Electrical       Completed                 885,000.00    Japan Aid Fund         Mohri, Architect &
School, Male, Maldives       Services Installation         March 2009                                                     Associates, Inc.

Proposed Island Resort at    Mechanical & Electrical      Feb’10 – Mar’12        S$16,000,000.00   Keong Hong             Ace Tech Design Pte Ltd
Falhumaafushi, Maldives      Services Installation                                                 Construction Pte Ltd

Konotta Island Resort        Mechanical & Electrical        March 2010              1,000,000.00   AIMA Construction      AIMA Construction
                             Services Installation

                                                                                                                                  45 | P a g e