MARIE ELIH MED PROFORBIOMED CAPITALIZATION PROCESS (GREECE)

Page created by Brad Higgins
 
CONTINUE READING
MARIE ELIH MED PROFORBIOMED CAPITALIZATION PROCESS (GREECE)
MARIE ‐ ELIH MED ‐ PROFORBIOMED CAPITALIZATION PROCESS
                           (GREECE)
            inputs for the Policy Paper 2nd version
                 19th September, Ljubljana

     Organised by Region of East Macedonia and Thrace

           Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
               Project co‐financed by European Regional Development Fund ‐ ERDF
MARIE ELIH MED PROFORBIOMED CAPITALIZATION PROCESS (GREECE)
POLICY
PAPER

 1. Working group meeting in Greece
    2. Greek pilot actions
    3. Reflections on Policy paper/ Strategic lines
       A Territorial and Financial Governance
       B Competitiveness, economic activities and
         employment
       C Market activation
       D Smart energy management systems and services

                 Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
                     Project co‐financed by European Regional Development Fund ‐ ERDF
MARIE ELIH MED PROFORBIOMED CAPITALIZATION PROCESS (GREECE)
POLICY
PAPER
    1. Working group meeting in Greece
        Date: 3rd of September 2013
        Place: Komotini
        Hosted by: Region of East Macedonia and Thrace
        Attended by: the Greek partners of the projects “ELIH‐Med”,
        “PROFORBIOMED” and “MARIE” and Mr Jean‐Claude Tourret, General
        Director from AVITEM

        ELIHMed                 PROFORBIOMED                                MARIE
                                                              ANKO SA ‐ West
Region of East Macedonia    Region of Western
                                                              Macedonia Development
and Thrace                  Macedonia
                                                              Company
Democritus University of    University of Western             Institute of Accelerating
Thrace                      Macedonia                         Systems and Applications
                            Agency for planning and
Centre for Renewable
                            development of Patras ‐
Energy Sources and Saving
                            ADEP

                                      Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
                                          Project co‐financed by European Regional Development Fund ‐ ERDF
MARIE ELIH MED PROFORBIOMED CAPITALIZATION PROCESS (GREECE)
POLICY
PAPER
   1. Working group meeting in Greece
 Sessions of the meeting:

   Press Conference
   Presentation of the Policy Paper
   Presentation of ELIH‐Med, MARIE and
   PROFORBIOMED pilot actions in Greece
   Visit of pilot project site – Students Residence,
   University Campus of Democritus University, Komotini
   Discussion on strategies to use pilot actions to
   improve the Policy Paper

                            Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
                                Project co‐financed by European Regional Development Fund ‐ ERDF
MARIE ELIH MED PROFORBIOMED CAPITALIZATION PROCESS (GREECE)
POLICY
PAPER
           2. Greek pilot actions

           5 Students’ residences buildings containing in total 630 flats,
           accommodating 700 students, within the Democritus
           University of Thrace campus of Komotini
ELIH MED

           Public Buildings owned and managed by DUTH
           Peri‐urban area (on the edge of the city of Komotini)
           Social Dwellings Æ selection of Students with social‐financial
           criteria
           Range in a size between: ~1400m2 up to ~3600m2
            Date of construction : 1985‐1988

                                 Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
                                     Project co‐financed by European Regional Development Fund ‐ ERDF
MARIE ELIH MED PROFORBIOMED CAPITALIZATION PROCESS (GREECE)
POLICY
PAPER
               2. Greek pilot actions
           Planned Energy‐saving measures / metering actions:
           ‐ External walls insulation,
           ‐ External insulation to floors above pilotis
           ‐ Roof‐mounted Solar hot water collectors
           ‐ Replacement of student rooms’ lighting
           ‐ Space heating controls
ELIH MED

           ‐ Replacement of (limited) broken window glazing
           ‐ Heat and electricity metering, temperature data loggers
           ‐ Replacement of boilers                       Expected results of energy retrofitting
                                                          experimentation:
                                                          ‐ Energy Class rise by up to 2 categories or
                                                          ‐ Energy consumption decrease ~ 35‐40%
                                                          Voluntary Agreements (2 so far)
                                                          Social Approach
                                                          ‐ Motivation of Students
                                                          ‐ TMG and PPCG meetings
                                                          ‐ Questionnaire
                                                          Communication activities
                                                          Evaluation Period
                                      Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
                                          Project co‐financed by European Regional Development Fund ‐ ERDF
MARIE ELIH MED PROFORBIOMED CAPITALIZATION PROCESS (GREECE)
POLICY
PAPER
        2. Greek pilot actions
        The goal of the project’s pilot activities is to indentify and
        select appropriate buildings of the Mediterranean territory
        in order to increase the energy efficiency and create
        sustainable and long‐term financing mechanisms for
MARIE

        energy conservation investments in buildings.

        The Greek partners selected the following public buildings:

        ‐ The Hospital of Ptolemaida “Bodosakio”

        ‐ The Administrative Building of Region of Western
          Macedonia in Kozani

                                    Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
                                        Project co‐financed by European Regional Development Fund ‐ ERDF
MARIE ELIH MED PROFORBIOMED CAPITALIZATION PROCESS (GREECE)
POLICY
PAPER
        2. Greek pilot actions
        State of art:
        The priliminary energy audits to the 2 selected buildings
        and the cost/benefit analysis of possible investment
        solutions have been concluded
        At the current phase, the partners are at the process of
MARIE

        setting up the specifications of the Call for the selection of
        an ESCO company.

        Next steps:
        ‐ Energy Auditing‐ Technical Report for the final selection of
        EEM‐ Financial Scheme
        ‐ Supply & Installation of equipment
        ‐ Evaluation of the results of the pilot actions

                                  Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
                                      Project co‐financed by European Regional Development Fund ‐ ERDF
MARIE ELIH MED PROFORBIOMED CAPITALIZATION PROCESS (GREECE)
POLICY
  PAPER
               2. Greek pilot actions
               Indicative actions already taking place in Greece:
PROFORBIOMED

               ‐ development of feasibility studies for specific bioenergy projects
               ‐ development of a system for more efficient management of forest
               residues through mapping with a GIS system all management studies in
               selected forests

               Selected bioenergy projects:

               ‐ Co‐firing in Kardia Power Plant located in Kozani, Region of West
               Macedonia

               ‐ Pellet factory combined with biogas plant in Servia‐Kozani, Region of
               West Macedonia

                                       Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
                                           Project co‐financed by European Regional Development Fund ‐ ERDF
MARIE ELIH MED PROFORBIOMED CAPITALIZATION PROCESS (GREECE)
POLICY
  PAPER
               2. Greek pilot actions
               AXIS I – Network building Up:
               The pilot action is focused on the organizational aspects of the forestry biomass production
PROFORBIOMED

               chains, developing tools to improve the non‐technical issues of the project.

               AXIS II – a. Biomass office
               will develop links with experts in Wood Biomass sectors and establish a comprehensive
               information service dedicated to biomass derived heat and energy technologies and supply chains.

               AXIS II – b. Web site‐ Tool for biomass use information in local level

               AXIS II – c. Best Practices

               The Region of West Macedonia will improve the Logistics in co‐firing or pellet factory Cost
               relation maps based on GIS
               The results of the exchange will be used for drawing the Guidelines for a more efficient Biomass
               Supply Chain.

                                             Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
                                                 Project co‐financed by European Regional Development Fund ‐ ERDF
POLICY
PAPER
     3. Reflections on Policy paper/ Strategic lines
     Sets of
                                  Strategic lines                                                                   Comments
 Strategic Lines
                1.1. Articulation of EEB policies giving to
                                                                          ELIH‐MED: REMTH has undertaken all the communication and
                regional authorities a central role in
                coordination at territorial level                         capitalisation activities and plays a key role at regional level
                1.2. Elaboration, coordination and
                implementation of differentiated policies
                and plans targeting the various typologies of                                                          ‐
                existing buildings and the different types of
                owners
                1.3. Development of financial engineering
 1. Territorial capabilities to leverage the European                     ELIH‐MED: Additional funding through innovative financing which
 and financial Regional Development Fund (ERDF) and                       could lead to leverage of ERDF fund ‐ Promotion of Voluntary
  governance other public funds on private financial                      Agreements (2 so far)
                resources
                                                                          ELIH‐MED: Two groups, TMG and PPCG, have been formulated,
                                                                          with the active involvement of final users (students) – A social
                                                                          approach is developed by CRES
                   1.4. Development of inclusive policies
                   involving final users                                  PROFORBIOMED: try to implement project that are closer to the
                                                                          citizens. e.g. the replacement of oil boiler in a hospital or the
                                                                          biomass solution for heating purposes in a swimming pool of a
                                                                          public athlete center.

                                         Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
                                             Project co‐financed by European Regional Development Fund ‐ ERDF
POLICY
PAPER
      3. Reflections on Policy paper/ Strategic lines
Sets of Strategic Lines                  Strategic lines                                                                Comments

                          2.1. Creation of dynamic energy efficiency            PROFORBIOMED: promotes the investments in Green energy (biomass)
                          economic ecosystems                                   ‐ solutions towards employability.

                          2.2. Promotion of training for existing and
                                                                                                                           ‐
                          new professional profiles

2. Competitiveness,       2.3. Use of public procurement as an
                                                                                                                           ‐
economic activities       energy–efficiency oriented investment tool
  and employment
                          2.4. To encourage innovative initiatives in
                                                                                                                           ‐
                          the social economy sector

                          2.5. To encourage and finance the research
                                                                                                                           ‐
                          on integrated energy construction.

                                             Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
                                                 Project co‐financed by European Regional Development Fund ‐ ERDF
POLICY
PAPER
                           3. Reflections on Policy paper/ Strategic lines
    Sets of
                          Strategic lines                                                                       Comments
Strategic Lines

                                                      ELIH‐MED: The TMG group is towards this direction. The ELIH‐MED Greek partners along with the
                                                      TMG group organised a workshop for stakeholders.

                  3.1. To raise awareness of the      Communication activities implemented by REMTH focus on raising awareness of stakeholders,
                  opportunities on energy             among several groups in regional level.
                  efficiency among the major
                  stakeholders                        MARIE: Through the RIG (Regional Interest Group) meetings that take place every year in the
                                                      Region of Western Macedonia in the framework of MARIE project.
  3. Market
                                                      PROFORBIOMED: Web portal to connect customers (individuals and small and medium‐sized power
  activation
                                                      plants) and suppliers of biomass.

                  3.2. Creation and
                  development of incentives to
                  overcome the main market
                  barriers
                  3.3. Lower the financial risk
                                                      MARIE: This S.L. is linked with the Pilot Action (PA 2.1) focused on ESCOs and TPF (Third Party
                  through guarantee system
                  and financial facilities            Financing).

                                                  Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
                                                      Project co‐financed by European Regional Development Fund ‐ ERDF
POLICY
PAPER
                   3. Reflections on Policy paper/ Strategic lines
  Sets of Strategic Lines          Strategic lines                                             Comments

                                                    ELIH‐MED: Meters (heat and electricity) and temperature data loggers have
                              4.1. Improvement of
                                                    been installed in the pilot buildings and the results with be linked with user
                              the available
                              information on energy behaviour and awareness
                              consumption for users
                                                    PROFORBIOMED: use of smart meters for measuring the CO2 footprint that
    4. Smart energy           and providers
                                                    their system has and the saving in CO2 achieved in a yearly basis.
  management systems
      and services

                              4.2. Developement of        PROFORBIOMED: WP 4 partners will select local communities with already
                              interconnected
                                                          developed supply side and prepare a pre‐feasibility study for a small or
                              intelligent energy
                              management systems          medium size biomass plant or district heating/cooling system with emphasis
                              at urban scale              on ESCOs

 ELIH-MED: 1.1, 1.3, 1.4, 3.1, 4.1
 MARIE: 3.1, 3.3
 Proforbiomed: 1.4, 2.1, 3.1,     4.1, 4.2
                           Projet cofinancé  par le Fonds Européen de Développement Régional ‐ FEDER
                               Project co‐financed by European Regional Development Fund ‐ ERDF
POLICY
PAPER
          3. Reflections on Policy paper/ Strategic lines

   Lack of coordination between EU funds and bureaucracy is the most
  significant identified barrier that lead to time consuming processes.
   The policy paper should take into consideration the Nearly Zero Energy
  Buildings and Sustainable building (energy and resources saving) adapted to
  the Mediterranean context.
   Biomass solutions, addressed by Proforbiomed could be included in the
  concept of Nearly Zero Buildings, since Renewable Energies are necessary to
  achieve zero energy balance.
  Local Authorities do not have the competence to deal with banks, ESCOs

                      Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
                          Project co‐financed by European Regional Development Fund ‐ ERDF
POLICY
PAPER
              3. Reflections on Policy paper/ Strategic lines
 The training of the beneficiaries is rather crucial in order to reduce the risk of
 the Regions when dealing with private funds.
 Local Authorities could play a key role in energy efficiency and could
 coordinate the different actors in the region (stakeholders, users, banks,
 engineers etc..)
  A secure legal and financial environment is necessary, at least for ESCO’s and
 for the first stages of development in a new market.
 AXIS 2 “Competitiveness, economic activities and employment” was
 characterized as the most challenging, since the renewable energy resources
 and energy efficiency could lead to new jobs and “green” entrepreneurship
 opportunities.
 The strategic lines of AXIS 2 is the most difficult to reach through the pilot activities

                            Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
                                Project co‐financed by European Regional Development Fund ‐ ERDF
POLICY
PAPER
            3. Reflections on Policy paper/ Strategic lines
  In order to succeed in the set goals the partners should:
    – Be consistent in long term
    – Train in order to create employment (MARIE project intention, self‐construction is
      a concept studied in ELIH‐MED)
    – Raise awareness regarding the issues that constitute the objectives of the 3
      projects
    – Increase the use of biomass in buildings for energy and heating purposes. This is a
      big challenge that could have a significant affection to the employment in long
      term.
  Local government does not have enough power and a strategy should be developed
 in order to involve them at a larger extent.
  We ask the amount of ERDF fund for Energy efficiency (4% today) to be raised, while
 we cannot absorb the existing fund in most cases – need for efficient policies and
 programmes

                         Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
                             Project co‐financed by European Regional Development Fund ‐ ERDF
POLICY
PAPER
           3. Reflections on Policy paper/ Strategic lines

   The issue of renewable energy should be introduced in the Policy Paper while the
   weak point is Capitalization and Dissemination.
    It was stressed out that if the projects do not develop tools, and don’t proceed in
   construction works, with deliverables that are limited to studies and reports, then
   the outputs remain unexploited.
    The real construction work undertaken in pilot projects in ELIH‐MED could lead to
   significant experience for MED programme, helping to the improvement of next
   programming calls.
   The projects should considered what actions/ results have added value after the
   closure of the projects – more focus on strategic projects and real construction
   pilots

                        Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
                            Project co‐financed by European Regional Development Fund ‐ ERDF
POLICY
PAPER
           3. Reflections on Policy paper/ Strategic lines

  It was proposed to include a 5th pillar to the 4 existing ones that could be “New
  knowledge‐ training ‐ dissemination” since the sharing of knowledge is rather
  important and could improve user behaviour. Capitalization plays a significant
  role in European projects.
  It was suggested that the national partners sign a formal agreement regarding
  the recommendations of the Policy Paper in order to validate it and diffuse them
  at regional and national level. This issue will be discussed further by the partners.

                        Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
                            Project co‐financed by European Regional Development Fund ‐ ERDF