Joint
Transportation
    Board
            Mrs A D Allen MBE (KCC) – Chairman
          Councillor K M Kelly (DBC)–Vice-Chairman

                      Mr D Butler (KCC)
                      Mrs P Cole (KCC)
                     Mr P Harman (KCC)
                     Mr J Kite MBE(KCC)
                      Mr J Ozog (KCC)

                Councillor J A Hayes (DBC)
               Councillor E J Lampkin (DBC)
               Councillor Mrs J A Ozog (DBC)
                 Councillor D Page (DBC)
                Councillor R J Wells (DBC)

          Parish representative – Councillor R Lees

         A meeting of the above Board will be held on

                 Tuesday 5 March 2019

            at 7.00pm at the Civic Centre, Dartford

                      Managing Director
                      25 February 2019

      Civic Centre, Home Gardens, Dartford, Kent, DA1 1DR
Tel: 01322 343434 Fax: 01322 343422 Web:www.dartford.gov.uk
This page is intentionally left blank
JOINT TRANSPORTATION BOARD
                              AGENDA

                          Tuesday 5 March 2019

1.   Apologies for Absence.

2.   Declarations of Interest

     To receive declarations of interest from Members including the
     terms(s) of the Grant of Dispensation (if any).

3.   To confirm the Minutes of the meeting of the Dartford Joint            (Pages 1 - 8)
     Transportation Board held on 4 December 2018

4.   Urgent Items

     The Chairman will announce his decision as to whether there are any
     urgent items and their position on the agenda.

5.   Matters Arising                                                       (Pages 9 - 12)
                                                                                    KCC

     This report advises Members on the progress of matters raised at
     previous meetings of the Board.

6.   References from other Committees (if any)

7.   Proposed Amendment of Waiting Restrictions Princes Road                 (Pages 13 -
                                                                                    22)
     Dartford

8.   Traffic Issues within Swanscombe and Greenhithe

     Mr Harman has asked if the following could be placed on the Agenda
     for consideration for traffic management schemes.

     (a) Eynsford Road/Knockhall Road - corner protection required.
     (b) London Road/Knockhall Road - corner protection required.
     (c) Port Avenue/Mounts Road - corner protection required.
     (d) Stoneley Crescent/Ingress Park Avenue - stop sign required.
     (e) Ingress Park development - extension of 20 mph zone required.
     (f) Ingress Park Avenue - repeater 20 mph speed signage required.

     The Board’s instructions are requested.
9.    Members Enquiry Items

      Members have the opportunity to raise the following: -

              Questions in relation to capital and revenue funded works
               programmes
              Suggestions for future traffic regulation orders or street
               management proposals
              Questions on policies, plans and strategies related to
               highways, road traffic and public transport.
              Suggestion of a future agenda item (subject to the Chairman’s
               approval)

ITEMS FOR INFORMATION

10.   Road Works in the Borough of Dartford                                    (Pages 23 -
                                                                                      36)

      Members will be advised of the roadworks which were currently being
      undertaken or expected within the Borough.

11.   KCC - Environment, and Transport Cabinet Committee                       (Pages 37 -
                                                                                      50)

      For Members information the following has been attached for
      Members information: -

             Environment, and Transport Cabinet Committee – Minutes 17
              January 2019

      NB: If a Member wishes to discuss any of these items at the meeting,
      please advise the Member Services Section (01322) 343251 prior to
      the meeting.
DARTFORD BOROUGH COUNCIL

                         JOINT TRANSPORTATION BOARD

MINUTES of the meeting of the Joint Transportation Board held on Tuesday 4
December 2018 at 7.00 pm

PRESENT:     Mrs A Allen (Chairman)
             Councillor K M Kelly (Vice-Chairman)
             Mrs P Cole
             Mr J Ozog
             Mr P Harman

             Councillor J A Hayes
             Councillor E J Lampkin
             Councillor Mrs J A Ozog
             Councillor T A Maddison
             Councillor R J Wells

             Mr L Boudville, Mr K Longfield and Mrs T Smith (Dartford Borough
Also         Council), Ms E Green and Ms D Sutton (Kent Highways) Mr D Bruce
Present      and P Lightowler (KCC Public Transport) and Mr J Barkway and Mr C
             Vinson Southeastern Rail)

27.   APOLOGIES FOR ABSENCE.

      The Board received apologies for absence from Councillors Page and Lees,
      and Messrs Baker and Kite.

      The Board noted the appointment of Councillor T Maddison as a substitute for
      Councillor Page

28.   DECLARATIONS OF INTEREST

      There were no interests declared by Board Members.

29.   TO CONFIRM THE MINUTES OF THE MEETING OF THE DARTFORD
      JOINT TRANSPORTATION BOARD HELD ON 4 SEPTEMBER 2018.

      That the minutes of the Joint Transportation Board held on 4 September 2018
      be confirmed as a correct record of that meeting.

30.   URGENT ITEMS

      The Chairman confirmed that there were no urgent issues for the Board to
      consider.

                                           1
JOINT TRANSPORTATION BOARD

                             TUESDAY 4 DECEMBER 2018

31.   REFERENCES FROM OTHER COMMITTEES (IF ANY)

      It was noted that there were no matters referred for the Board to consider.

32.   MATTERS ARISING

      The Board received a report on progress made on a number of issues
      outstanding from previous meetings.

      Arising from the report the feedback was received:

      Item 10.
      Councillor Ozog reported that Yellow lines had now been installed in Maiden
      Lane and he hoped that this would alleviate the problems caused by
      inconsiderate parking.

      Additionally it was noted that the Working Group on School Safety mentioned
      at our last meeting had now met, and the Chairman asked if the minutes of
      the Group be appended to the Board Agenda in future.

33.   CHAIRMAN'S UPDATE

      The Chairman had requested information on the following matters

         a) Delays in the completion of road works at St Clements Way,
            Greenhithe:

            It was reported that work on this scheme was on target but that traffic
            congestion had been worsened by the closure of Greenhithe Station
            approach road and the necessary traffic detours for this. It was also
            noted that work was progressing well but completion may be affected
            by re surfacing works in the vicinity.

         b) Progress on the introduction of Residents Parking Schemes across the
            Borough.

            The Chairman informed Members that while inquiries had been made
            relating to a number of Residents parking schemes, there were none
            for which approval had been given by Members.

34.   PROPOSED  WAITING    RESTRICTIONS, CHASTILIAN ROAD AND
      WENTWORTH DRIVE , DARTFORD, KENT

      Ms Emma Green Kent County Council Highways Engineer introduced a report
      on proposed parking restrictions to be introduced in Chastilian Road and
      Wentworth Drive Dartford.

                                             2
JOINT TRANSPORTATION BOARD

                               TUESDAY 4 DECEMBER 2018

      It was explained that Wentworth Primary School had recently undergone an
      expansion and that one of the impacts of this has been an increase in vehicle
      traffic at this location.

      In response to that and to reduce the danger to persons and vehicles using
      this road Kent County Council had proposed introducing waiting restrictions in
      Chastilian Road and Wentworth Drive, and conducted public consultation
      thereon.

      Following numerous objections by local residents to initial proposals which
      included the introduction of double yellow lines in these roads, a second
      amended proposal was published which attracted a much reduced level of
      opposition.

      Having considered the proposal and having noted the support of the local
      Councillor for the area the Board,

      RESOLVED to

       Recommend the approval of the Traffic Regulation Order, detailed in the
       report of Officers, to install both double yellow lines and waiting restriction in
       Chastilian Avenue and Wentworth Drive Dartford in order to:

        i.    Improve safety for pedestrians, including school children, and vehicles
              using this road.

       ii.    Reduce the safety problems associated with the current inconsiderate
              parking, exacerbated by the expansion of the primary school.

       iii.   Improve visibility at junctions by reducing the extent of parked cars that
              are causing obstructions.

35.   FASTRACK REPORT

      The Board received a report from Mr Daniel Bruce on developments which
      had taken place on Fastrack since the June 2018 meeting.

      Mr Bruce highlighted the following points

      Fastrack Busway Enforcement
      A trial of a system of camera enforcement is to be held on the Ingress Park /
      Greenhithe Station busway in December - January 2018/2019.

      The trial will be testing technical and viability aspects of an installation and will
      survey levels of non – compliance. No actual enforcement will take place. A
      report on the outcome should be available for the March meeting of the
      Board.

                                               3
JOINT TRANSPORTATION BOARD

                             TUESDAY 4 DECEMBER 2018

      While there were no current plans to extend the trial to other busways it was
      accepted that the Darenth Road busway was much abused and may also
      merit camera enforcement if it proves viable.

      Ingress Park: Tiltman Avenue to Manor Way Link
      Fastrack service B has commenced using the link following confirmation that
      ongoing works would not compromise the route.

      A new time table has been introduced and new stops have been provided,
      (with shelters to follow in some locations), although some issues are being
      experienced with inconsiderate parking on the route. It is understood that
      Crest Nicholson are planning an extension to the current TRO to overcome
      this.

      Ingress Abbey Bus Stop
      It has been necessary to undertake a consultation exercise relating to the
      siting of this stop as adjacent properties are populated. Of the 20 responses
      received only one objection has been received. As the location of the Stop
      would have been known as part of the planning process, and there was not a
      viable alternative it had been agreed to retain the position as proposed.

      Operating Contract for Fastrack B
      The current operating contract expires in April 2019 and a short term
      extension of 4 months will be in place with the current provider while the
      tendering exercise for the contract is completed.

      Representation at the Board
      Mr Bruce also reported that a new Officer had been appointed by KCC to deal
      with Fastrack – Mr Shane Hymers- – and that he would be presenting this
      report at future meetings.

36.   VEHICLE CROSSOVERS

      The Board was reminded that at its meeting held on 4 September 2018
      Members had requested that a report be prepared on the cost and provision
      of necessary amendments to Traffic Regulation Orders TRO following the
      approval of the installation of vehicle crossovers by Kent County Council
      (KCC).

      It was noted that currently KCC, as Highway Authority, consider applications
      for vehicle footway crossings, but that responsibility for amendments to any
      TRO and physical signage that may apply, lies with District Authorities.

      This obviously places a financial burden on District Authorities when
      applications be approved

      Accordingly the Principal Transport Planner, introduced a report which set out
      details of proposed costings for a range of amendments to TRO together with
      removal or amendment of “on road” markings linked to the amendments.
                                            4
JOINT TRANSPORTATION BOARD

                             TUESDAY 4 DECEMBER 2018

      It was noted that while the proposed charges for the work were relatively high,
      their publication would at least present transparency to the process and allow
      residents a full picture of the cost of their footway crossing.

      The Board therefore

      RESOLVED

      1. To note the implications of Kent County Council’s policy and its impact
         on Dartford Borough Council resources

      2. To RECOMMEND to the Cabinet that the scheme as set out in
         paragraph 3.6 of the Report be further developed and implemented.

37.   DARTFORD TOWN CENTRE: TRANSPORT AND PUBLIC REALM
      IMPROVEMENTS

      The Board received a report which set out the transport and public realm
      improvements proposed as part of the redevelopment of Dartford town centre.

      It was noted that the report detailed progress achieved since April 2018 and
      set out the finalised outline design for Market Street summarised activities
      completed and set out the planned schedule of work through to the
      completion of the scheme.

      Members were generally pleased at the proposals and the progress achieved
      and reported that a number of local businesses had similar views. However
      concerns were expressed at the following matters

            The re - routing of local “Hoppa” bus routes away from the Town
             Centre. This could be problematic as this service is used by large
             numbers of elderly shoppers coming into the Town Centre and re -
             routing would impact upon them.

            The levels of parking provision once the works were complete

            Proposed speed limits in Market Street and its use as a shared
             pedestrian / vehicle area

            Measures to maintain the current and new pedestrianised area as
             vehicle free, as access is to be allowed for deliveries to shops in the
             area.

      In response to these issues the following points were made:

                                            5
JOINT TRANSPORTATION BOARD

                             TUESDAY 4 DECEMBER 2018

          While some bus services were being re - routed to Home Gardens the
           “Hoppa” routes were to retain their current route and thus have little
           impact on the elderly.

          Once the improvement scheme is complete there will be more parking
           spaces available for shoppers and Town Centre users.

          Market Street is to remain a highway and not be a shared pedestrian /
           vehicle space. It will be significantly narrower than before and this
           should deter vehicles from travelling at inappropriate speeds in the
           area.

          It is recognised that unauthorised use of the pedestrianised areas of
           Market Street and High Street is currently a problem. It is proposed to
           allow access for deliveries to shops but to exclude other traffic by use
           of electric bollards and other physical methods.

      Having considered the report and the responses to the points raised the
      Board agreed to note the information provided.

38.   PETITION: REZONING DARTFORD RAILWAY STATION

      The Board was informed that a petition had been submitted to the Council
      seeking the re - location of Dartford Railway Station, which is currently in
      Travel Card Zone 8, to Zone 7. The petition cited the differing fare levels
      between local neighbouring stations and that there was currently not a Zone 7
      in the area.

      It was noted that rail operators accepted that there were major inconsistencies
      in the arrangement of the zoning for travel cards across London and that
      Dartford had been placed in Zone 8 when the Travelcard system was
      extended some three years ago. At that time the zoning produced a reduced
      fare for Travelcard users.

      Mr Vinson of Southeastern Rail informed the Board that currently there was
      an ongoing review of fares and stations led by the Managing director of
      Southeastern Rail and he would pass this request to the review team for
      consideration.

      The Board therefore agreed to

         1. Note the petition and await the outcome of the Review process.

         2. Inform the head petitioner accordingly

39.   SOUTHEASTERN RAIL: VERBAL UPDATE

      The Board received a verbal update on points relating to rail services from Mr
      Chris Vinson – Public Relations Manager Southeastern Rail, and Mr John
      Barkway – Commercial Manager, Southeastern Rail.
                                            6
JOINT TRANSPORTATION BOARD

                              TUESDAY 4 DECEMBER 2018

      Mr Vinson informed the Board that a bid had been submitted to the
      Department of Transport for the upgrading of Swanscombe Station. This had
      been identified as being of high priority following recent consultations with
      Dartford Council.

      In response to a request by Councillor Mrs Ozog, Messrs Vinson and
      Barkway explained why there were no services from London Cannon Street to
      Dartford after 17.19 each evening.

      It was explained that in an effort to increase the capacity of train services into
      London a revised programme of trains had been introduced. However in
      order to accommodate this on the current aging rail network, it was necessary
      to reduce services from Cannon Street to Dartford.

40.   MEMBERS ENQUIRY ITEMS

      Members raised the following issues:

      Mr P Harman
      Mr Harman reported that he had a number of matters relating to Traffic
      Regulation Orders in Greenhithe and Swanscombe that he wished to be
      discussed by the Board. He asked how this could be progressed.

      The Chairman informed Mr Harman that he should write to the Clerk to the
      Board and the Chairman and a decision would be taken on whether these
      should be added to the Agenda.

      Mr J Ozog
      Mr Ozog enquired about the cost of renovation of “Dog Bone” markings. A
      resident in Blenheim Close had received a very high quotation for works
      outside their property and Mr Ozog queried this.

      While there seemed to be some question regarding the ownership of the
      Road surface the Principal Transport Planner explained that the quotation
      provided seemed to relate to the frontage of two adjoining properties, and if
      this was not required then a lesser cost would be incurred.

      Additionally Mr Ozog drew the Board’s attention to the constant misuse of a
      disabled parking bay in Nelson and Wellington Road by a commercial vehicle.

      Principal Transport Planner stressed that enforcement might not be an option
      if this were a discretionary bay but that if it were constantly misused then
      removal may be an option.

      Mr Maddison
      Mr Maddison asked if problems relating to congestion in Central Road
      Dartford could be investigated. He was aware that works in the road were
      now complete but congestion problems persisted.

                                              7
JOINT TRANSPORTATION BOARD

                             TUESDAY 4 DECEMBER 2018

      Ms Sutton agreed to investigate the matter but stressed that if problems were
      due to incomplete / unsatisfactory Statutory Undertakers works then this
      would need to be logged onto the Kent Traffic fault system.

41.   DARTFORD WINTER WORKS

      The Board received and noted a report on the winter works programme
      adopted by Kent County Council.

42.   WELL MANAGED HIGHWAYS

      The Board received a report which detailed the Strategy which is to be
      adopted by Kent County Council for the implementation of a new code of
      practice for highway maintenance management.

      The Board noted the information contained in the report.

43.   DARTFORD HIGHWAYS WORKS PROGRAMME

      The Board received and noted a report from KCC Highways which informed
      Members regarding the roadworks currently being undertaken or proposed in
      the Borough.

44.   KCC - ENVIRONMENT AND TRANSPORT CABINET COMMITTEE

      The Board received and noted the Minutes of the Kent County Council
      Environment and Transport Cabinet Committee held on 20 September 2018.

                                                 The meeting closed at 9.13 am

                                                 Mrs A Allen MBE CHAIRMAN

                                            8
JOINT TRANSPORTATION BOARD
                                 5 March 2019

MATTERS ARISING

1. Summary

1.1 This report advises Members on the progress of matters arising at previous
    meetings of the Board.

2. RECOMMENDATION

2.1    That Members note the comments in the “Update/Outcome” column of the
       Appendix A to this report

      3 Background and Discussion

      3.1    Previously, the Joint Transportation Board requested that a report on
             matters arising be placed on future agendas of this Board.

      3.2    The matters arising are as detailed in the Appendix A to this report.

      3.3    A verbal update, where applicable, will be given at the meeting of this
             Board.

 4    Details of Exempt Information Category

      Not applicable

 5. Appendices

      Appendix A: Matters Arising

      BACKGROUND PAPERS:

      None

      Contact Officers : As detailed in the Appendix to this report

                          KCC Highways & Transportation       08458 247 800
      Contact Number:
                          Dartford Borough Council 01322 343251
Dartford Joint Transportation Board

                                                          5 March 2019

      Action                                          Current Situation                  Update / Outcome
 1    Fast Track – Future Developments   A twice yearly update to be made to the         KCC Officers may wish to update Members
                                         Board.                                          verbally at the meeting.

 2.   Sensible Street Lighting           Dartford LED conversions are substantially      Once further information is available KCC will
                                         complete.                                       invite Members to a briefing session and will
                                                                                         be updating the programme on the KCC
                                                                                         website.

14.
 3.   Bob Dunn Way.
        a) Access Issues                 It is understood that contractor difficulties   The latest plan is that construction should be
                                         are delaying works, KCC Officers agreed to      starting in April.
                                         expedite matters

         b) Flood alleviation            KCC have decided to commission their own        A Pump is located on site and this will remain
                                         survey to allow the drainage works to           until the works are complete.
                                         commence.

15.
 4.   Removal of Redundant Lamp          Members have agreed to monitor the              Members have been invited to pass details of
      columns and Stumps                 progress made in removal.                       redundant columns to KCC for removal

16.
 5.   Parking Issues Ingress Park    This matter was considered at the June              Mr Harman has asked that this matter be
                                     2017 meeting and representations received           placed on the Agenda for Member discussion.
                                     from the Developer and the Parking
                                     contractor.
17.
 6.   Misuse of Busways by Motorists The possible deployment of a mobile CCTV            A pilot is to be introduced at Ingress Park and
                                     camera to aid in deterring and prosecuting          results will be reported to Members once
                                     motorists who misuse the busways was to             available.
                                     be investigated by KCC and that a report be
                                     presented.
18.
 7    Parking Control Issues: Common A number of measures have now been                  Members have asked that this area be
      Lane Wilmington                introduced and further work is ongoing.             monitored
Dartford Joint Transportation Board

                                                             5 March 2019

      Action                                             Current Situation                Update / Outcome
19.
 8    Traffic Congestion arising from the   This issue was referred to Cabinet for        A report was presented on 5 June which
      Dartford Crossing                     Consideration.                                updated Members on planned mitigations.

20.
 9    Pedestrian Safety Fastrack Routes     The Chairman had undertaken to contact
                                            the Fastrack operators on this matter.

21.
 10   Maiden Lane Dartford                  This issue has been raised on a number of     TRO have been introduced and it is hoped
22.   Traffic / Parking Issues              occasions by Members at Board meetings        that these will alleviate problems with
                                                                                          inconsiderate parking.
23.
 11   Leigh Technical College area,         The Board agreed to monitor the area with a The Transport Services Manager has been
      Parking Issues                        view to traffic regulation if problems do not asked to provide an update on this matter to
                                            improve.                                      the Board Members between meetings

24.
 12   Feedback on various traffic           Heath Lane, Dartford. At the meeting held
      regulation issues                     on 5 June concern was raised over
                                            proposed KCC works and the Board
                                            resolved to form a working group to assess
                                            issues further.

25.
 13   Access Gate between Fastrack and      This gate has now been fixed closed with a    Proposals for the Acacia Hall site will impinge
      Darenth Road                          padlock and chain.                            on this and the Board asked that the matter
                                                                                          be kept under review.
26.
 14   Increased Pavement Provision for      The Board considered a request for better     The Board was advised that a costed
      A225 Dartford Road at Sutton at       footway provision.                            proposal from the relevant KCC Member
      Hone and Hawley                                                                     would be considered favourably by KCC.
27.
 15   Dropped Kerbs / Amendments to         The Board asked for a report on this to be    This matter was discussed at the December
      TRO                                   presented as soon as possible                 meeting and a report is to be put to Cabinet
                                                                                          on proposals.
PROPOSED AMENDMENT OF RESTRICTIONS, PRINCES ROAD, DARTFORD

To:                    Dartford Joint Transportation Board – 5TH March 2019

By:                    Tim Read, Head of Transportation, Kent County Council

Classification:        Unrestricted

Ward:                  Heath Ward, Dartford District

Summary:               This report gives details of proposed waiting restrictions in
                       Princes Road, Dartford and the effect is to offer exemptions for
                       the Business Properties 701 – 709 Princes Road in allowing the
                       exhibition of motor vehicles.

For Recommendation

1.0     Introduction and Background

1.1     Kent County Council is proposing an improvement scheme to install a shared use
        pedestrian/cycle route on the northern side of Princes Road between the roundabout
        Junction with the A282 and its junction with Watling Street.

1.2     The scheme is to provide a safe route for both Pedestrians and Cyclists as a link and
        improvement to the NCR1 and encourage further sustainable travel modes. Kent
        County Council has proposed to clarify the waiting restrictions allowing for an
        exemption within this order for the businesses as stated above.

2.0     The Proposal

2.1
2.1     There have been two consultations relating to the scheme proposal. This highlighted
        the need to clarify waiting restrictions.

2.2     The consultation proposed the extension of double yellow lines, which included an
        exemption to allow the exhibition of motor vehicles as specified on the attached plan
        (appendix A), access to the commercial properties and loading and unloading of
        vehicles only.

2.3     The proposal is for the north side of Princes Road, Dartford, from a point 72 metres
        west of its junction with Watling Street and from a point 4.5 metres north of the
        carriageway kerb line, northwards, to the highway boundary for a distance of 42.5
        metres, westwards.

2.4     The new proposals have been recommended to improve road user safety by
        preventing vehicle obstruction related to the new Pedestrian/Cycle scheme.

2.5     It is stated in the exemption that KCC have conceded in allowing one car length of
        vehicle exhibition on Highway Land directly in front of the Business Premises (see
        Appendix A). The space agreed will not impede on the new pedestrian/cycle
        scheme. However, any motor vehicles waiting outside the agreed exception area will
        have a detrimental effect on the road user safety.
2.6     These proposals received three objections for the business owners who access their
        premises via Princes Road.

3.0     Consultation

3.1     The proposals were placed on deposit at Dartford Borough Council and Public
        Notices were put on display at the site location. The deadline for responses was 10th
        December 2018. A copy of the Consultation Document can be seen in Appendix B.

3.2     A total of 4 responses were received, 2 were from the same business. No response
        has been received from Kent Police. None of the responses received were in total
        support of the proposals. A summary of the comments is made below.

        Respondent            Support/Object        Comments
        Kent Police                                    No response received
        3 x Businesses (all   Object                   Concerned it would have an
        with similar                                     impact on business due to
        comments)                                        removal       of    customer
                                                         parking directly in front of
                                                         the businesses.
                                                       Due to the size of the
                                                         business premises there is
                                                         limited capacity for vehicle
                                                         display,     movement        of
                                                         vehicles     and    customer
                                                         parking within the site.
                                                       The area proposed for the
                                                         scheme has been used by
                                                         businesses and customers
                                                         since the 1940’s and up
                                                         until this point has been
                                                         tolerated by KCC.
                                                       The introduction of yellow
                                                         lines is in an attempt to limit
                                                         the increased potential for
                                                         accidents arising from the
                                                         introduction of the cycle
                                                         route.
                                                       The impact on how the
                                                         business can function may
                                                         result in a closure and loss
                                                         of jobs.

3.3     The main concerns appear to be that the businesses will not be able utilise the area
        of Highways owned land directly in front of the business entrances for customer
        parking and also manoeuvring of vehicles stored within these premises.

4.1     Financial and VAT

4.1.1   None for Dartford Borough Council.

4.2     Legal
4.2.1   None for Dartford Borough Council.

4.3     Corporate

4.3.1   None for Dartford Borough Council.
5.0    Recommendation(s)

5.1    Agree to overturn the objections and progress the Traffic Regulation Order to install
       double yellow lines and waiting restriction with the proposed exemption for parking in
       the area shown in Appendix A. The introduction of this Order is recommended on the
       grounds of safety for pedestrians and cyclists using the proposed shared
       pedestrian/cycle path.

Contact Officer:     Robert Fletcher, TRO Co-ordinator, Schemes Planning & Delivery
                     Team
Reporting to:        Tim Read, Head of Transportation, Kent County Council, 03000
                     418181

Background Papers

Title                                    Details of where to access copy
Whole file                               Highway Services, Kent County Council
N                                                                                                                                                                         © Crown Copyright and database right 2018.
                                                                                                                                                                                          Ordnance Survey 100019238.

                Garage
                                                                                                     709
                                                       701 - 707

                                                                                           1018.1

                                                                                                                                                                        72m
                                                                                                                                         1018.1
                                         1018.1                                         42.5m
                                                                                     NO PARKING

                                                                                                               PARKING

                                                                                                                 4.5m
                                                                                                                                                                 PRINCES ROAD

                                                                                                                  NO

KEY:                                                                                                                     Project                                                                      Kent County Council
1018.1   Continuous double yellow line 100mm wide spaced 100mm apart with a perpendicular 450mm                                    end mark.      Princes Road                                         Ashford Highway Depot
                                                                                                                                                                                                      Henwood Industrial Estate
         KCC Highway Boundary                                                                                                                                                                            Ashford TN24 8AD
                                                                                                                                                     Dartford                                            Tel: 03000 418181

         Agreed business parking area                                                                                    Drawing title                                    Drawing status
                                                                                                                                                                                                Consultation
                             Consultation
   0        14/08/2018                                                                        amf                                                                         Scale            NTS at A4                     Do not scale
                                                                                                                                                Proposed
  Rev      Revision Date                        Purpose of revision                         Drawn   Checked   Approved                                                    Drawing number                                                Rev
                                                                                                                                   Double Yellow Carriageway Markings
 This drawing is not to be used in whole or part other than for the intended purpose and project
 as defined on this drawing. Refer to the contract for full terms and conditions.                                                                                             Princes Road / TRO                                         0
Princes Road, Dartford Cycle Route Consultation Report

Introduction

This report details the responses to the consultation on the proposal to provide a
cycle route along Princes Road (A296) in Dartford. The public consultation was open
between 30 April and 10 June 2018.

Kent County Council (KCC) is keen to encourage active travel by making it an
attractive and realistic choice for short journeys in Kent. By developing and
promoting Kent’s cycling and walking infrastructure in the county, KCC aims to
reduce congestion, improve air quality, increase levels of physical activity and
improve the health of its residents.

KCC’s Active Travel Strategy supports Dartford Borough Council’s (DBC) Core
Strategy which: aims to implement an integrated walking and cycling network joining
communities with the facilities they need to access, including public transport
facilities, primarily through the Green Grid and including the Public Rights of Way
network.

Dartford has the potential, through large scale mixed use development, to
significantly increase the levels of cycling and walking among its residents thereby
reducing reliance on motorised modes for local travel. However, the cycling and
walking network must be enhanced and expanded if there is to be a significant
increase in the number choosing to travel using sustainable modes.

Through the Local Growth Fund, KCC has been awarded funding to deliver
substantial enhancements to pedestrian, cycle and public transport facilities and
infrastructure to make these modes more attractive when compared to the private
car.

The purpose of this consultation was to invite comments on a proposal to construct a
new a shared use pedestrian and cycle path along the section of Princes Road
(A296) to the East of M25 Junction 1b. The length of the path will be approximately
900m.

The scheme proposed a shared use path to be constructed through widening the
existing northern footway between the Princes Road Interchange Roundabout and
the Peanut Roundabout. This has been identified as a suitable route because, the
new path will provide a more direct route for cyclists travelling in the area than the
existing cycle route (that forms part of National Cycle Route 1) which currently takes
a path around the housing estate to the south of Princes Road. At its eastern end the
new path will join up with an existing high quality shared use path linking to
Bluewater and Ebbsfleet Garden City.

The proposed cycle route design would meet all national minimum design
standards, including:
 • Widening of the existing footpaths to a minimum of 2.5m.
 • The installation of shared pedestrian footway/cycleway signage where
    necessary throughout the length of the route.
• Removal of build out located outside of ‘Vauxhall Dartford’ to facilitate the
   delivery of vehicles to the commercial sites and to allow the shared use path
   to remain in a straight line.
 • The relocation of existing sign posts and street furniture to ensure pedestrian
   and cyclist movement is relatively unobstructed.

An initial design stage safety audit was completed and available from the
consultation directory. Another audit will be carried out at the construction stage.

Consultation Process

The consultation for the proposed cycle route ran from 30 April to 10 June 2018.
The consultation and supporting documents were hosted on the KCC Consultation
Directory.

The consultation leaflet was downloaded 67 times in PDF format and 17 times in
Word. The road safety audit was downloaded 29 and each section of the design plan
was downloaded 38, 31 and 37 times respectively. In addition, the Equalities Impact
Assessment was downloaded 27 times in PDF and 9 times in Word. Consultees
were able to provide feedback to the scheme via email or post.

A consultation poster was circulated directly to 200 homes and businesses in the
roads adjacent to the proposed cycle route. Posters were displayed on the route of
the proposed location and in Dartford Library. An extensive list of stakeholders,
including Darenth Valley Hospital, local schools and Dartford and Gravesend Cycling
Forum were also contacted directly to alert them to the consultation. A press release
advertising the consultation was published, and local elected County and District
Members were contacted individually.

All publicity material included a phone number and email address for people to
request hard copies and alternative formats of the consultation material.

Respondents

Seven responses were received, via email direct to the designated mailbox. No
information in relation to the demographics of the respondents was requested,
however, six of these responses were from local residents or businesses along the
proposed cycle route. Therefore, the majority of respondents would be directly
impacted by the proposed route, the other response was from Dartford and
Gravesham Cycling Forum. There were no responses from the ward councillors.

Consultation Reponses

Of the seven responses, six (86%) had an overall positive view on the proposed
scheme. However, further comments from the six responses were provided about
the detail of the scheme and where improvements could be made.

The positive comments recognised that the scheme would have an impact on
improving the local cycle infrastructure and proving greater choice of route.
There were nine themes identified in the comments received:

                       Theme                               Positive         Negative
                                                          Comments         Comments
                                                           Received        Received/
                                                                           Suggested
                                                                         Improvements
 Improvement to existing cycle infrastructure         6
 More Direct Route for NCR1                           2
 Shared Use Path/Segregated Path                                        4
 2.5m Width Insufficient                                                2
 Dangerous Crossing Point – Watling Street                              2
 Parking                                                                4
 Position of Bus Shelter Relocation                                     2
 Small Section – Insufficient for Mode Shift                            2
 Bus Lane Unnecessary                                                   1

The main concerns from respondents are:
   1. A shared use path for both cyclists and pedestrians can be unsafe due to the
      differing speeds and direction of travel. Segregated paths are more beneficial
      as they provide a separate space for each travel mode and often allow for a
      cyclist to feel safer in their movements.
   2. Current parking behaviour could render the scheme unusable. Parking in the
      area is limited and some businesses do not have onsite parking.
   3. 2.5m width for the shared use pathway is not sufficient. Current
      recommended guidelines state a width of 3m is required where there is no
      segregation between pedestrians and cyclists.
   4. The current courtesy crossing point at Watling Street is dangerous. A
      signalised crossing on the proposed re-alignment of NCR1 is required as part
      of this scheme to ensure the safety of all users.

Equality Analysis

Within the comments received, the conflict between cyclists and pedestrians sharing
a pathway was raised as a concern. It was felt that this could potentially impact
vulnerable groups such as the elderly, disabled, young children and parents/carers
more than the wider population. Unfortunately, whilst a segregated pathway would
be preferred, due to the lack of space available this is not a feasible option. It is
common practice for shared use pathways to be provided where space is restricted
and in general these are well received with cyclists restricting the requirements of
other users. Signage along the length of the route will alert both pedestrians and
cyclists to the dual use of the pathway. In addition, following feedback from the
consultation there are also proposals for additional signage alerting road and cycle
path users to the vehicle movements around the businesses.
Post Consultation

Following the consultation, the main concern raised was in relation to parking, in
particular around some of the businesses that trade along Princes Road. To
address this specific issue a meeting has been held with the business owners in
order to discuss the concerns raised in more detail and allow KCC to work to resolve
or reduce any of the issues identified. Following this meeting KCC will formalise any
agreement reached with the business owners. As there is a need to control parking
in this area, a new Traffic Regulation Order will be required with a further
consultation period before this is implemented.

Whilst KCC appreciates the comments received, in particular in relation to
segregated space and the width of the shared use path, the space available for the
scheme to be constructed within limits the ability to address some of these
concerns. However, where possible, design adjustments will be considered to try to
accommodate these elements.

Next Steps

Feedback from the consultation, along with the additional information above, has
been considered by officers at KCC and DBC, and has been used to inform the
finalisation of the proposal.

Taking into account the benefit of the scheme to enhance the strategic cycling and
walking network in Dartford in accordance with KCC and DBC policy objectives,
together with consultation feedback, KCC officers have concluded to proceed with
the scheme and implementation is now being planned.

The scheme and results of the consultation will also be submitted to the Dartford
Joint Transportation Board for information on 4 September 2018.

Following this, we are planning to build the scheme in Spring 2019. In order for the
scheme to be built, lane closures will be required but it is intended that two way
traffic flow will be maintained and it is therefore unlikely any full road closures will be
required. Advance Notice Boards will be put up two weeks prior to construction and
local residents will receive a start of works notice that will include the full traffic
management plan. In addition, if necessary Variable Message Signs may be used to
ensure information can be updated during the construction period. We will continue
to liaise with all local businesses to ensure that construction minimises any
disruption to their activities. We will endeavour to ensure that any inconvenience
during the build is kept to a minimum.
To:                     Dartford Joint Transportation Board

By:                     KCC Highways, Transportation and Waste

Date:                   5th March 2019

Subject:                Highway Works Programme 2018/19

Classification:         Information Only

Summary: This report updates Members on the identified schemes approved for
construction in 2018/19

1. Introduction

This report provides an update and summarises schemes that have been programmed
for delivery in 2018/19

Footway and Carriageway Improvement Schemes – see Appendix A

Drainage Repairs & Improvements – see Appendix B

Street Lighting – see Appendix C

Transportation and Safety Schemes – see Appendix D
    Local Growth Fund

Developer Funded Works – see Appendix E

Bridge Works – see Appendix F

Traffic Systems – see Appendix G

Combined Member Fund – see Appendix H

Conclusion

      1. This report is for Members information.
Contact Officers:

The following contact officers can be contacted on 03000 418181

Carol Valentine                   Highway Manager West Kent
Denise Sutton                     Dartford District Manager
Alan Casson                       Senior Asset Manager
Earl Bourner                      Drainage & Structures Asset Manager
Sue Kinsella                      Street Light Asset Manager
Toby Butler                       Traffic & Network Solutions Asset Manager
Jamie Hare                        Development Agreements Manager
Jamie Watson                      Schemes Programme Manager
Appendix A – Footway and Carriageway Improvement Schemes

The delivery of these schemes is weather dependent; should it prove not possible to carry out these
works on the planned dates, new dates will be arranged and the residents will be informed by a
letter drop to their homes.

 Machine Resurfacing – Contact Officer Mr Byron Lovell

      Road Name                   Parish              Extent of Works            Current Status

                                                    St Clements Road to        To be programmed
      London Road               Greenhithe
                                                       Knockhall Road

                                                  Littlebrook Interchange to       Completed
    A206 Crossways                                     Anchor Boulevard
                                  Dartford
      Boulevard                                    Roundabout (including
                                                          roundabout)

 Footway Improvement - Contact Officer Mr Neil Tree

      Road Name                   Parish         Extent and Description of       Current Status
                                                          Works

                                                 From its junction with New
                                                  Barn Road to its junction
    Longfield Avenue             Longfield         with Nurstead Avenue.           Completed
                                                    (Footway protection
                                                         treatment)

 Surface Treatments – Contact Officer Mr Clive Lambourne

 No works currently planned

Appendix B – Drainage

 Drainage Works – Contact Officer Earl Bourner

      Road Name               Parish          Description of Works                Current Status

                                 No Drainage works planned over £5000
Appendix C – Street Lighting

Structural testing of KCC owned street lights has identified the following as requiring replacement. A
status of complete identifies that the column replacement has been carried out. Programme dates
are identified for those still requiring replacement.

 Street Lighting Column Replacement – Contact Officer Sue Kinsella

       Road Name                 Parish                 Description of Works                  Status

                                                                                          On hold due to
                                                                                              asset
       Junction 1A               Dartford          Replacement of 1 no street light
                                                                                           ownership
                                                                                             dispute
                                                                                           Works started
                                                                                           but awaiting a
                                                                                           fault repair on
     Home Gardens               Dartford          Replacement of 3 no street lights
                                                                                           UKPN system
                                                                                                before
                                                                                             completing
        Mounts Rd             Greenhithe          Replacement of 8 concrete L/Col’s          Completed
                                                                                             1 remaining
                                                                                                due to
                                                 Replacement of 4 no concrete lamp            boundary
        Park Way               Wilmington                    columns                           dispute
                                                                                           completion by
                                                                                            March 2019
  Heathview Crescent            Dartford          Replacement of 9 no street lights        All completed
   Heathlands Rise              Dartford          Replacement of 1 Lamp column               Completed
                                Dartford          Replacement of 1 Lamp column                 Works
                                                                                            programmed
        Orchard St                                                                         completion by
                                                                                             April 2019
                                Dartford          Replacement of 3 Lamp columns                Works
                                                                                            programmed
     Summerville Rd                                                                        completion by
                                                                                             April 2019
                                Dartford          Replacement of 2 Lamp columns                Works
                                                                                            programmed
        Lavinia Rd                                                                         completion by
                                                                                             April 2019
                                Dartford          Replacement of 4 Lamp columns                Works
                                                                                            programmed
      Gladstone Rd                                                                         completion by
                                                                                             April 2019
                                Dartford          Replacement of 4 Lamp columns                Works
                                                                                            programmed
        Tufnail Rd                                                                         completion by
                                                                                             April 2019
                                Dartford          Replacement of 5 Lamp columns                Works
      Westview Rd                                                                           programmed
                                                                                           completion by
April 2019
                               Dartford         Replacement of 13 Lamp columns              Works
                                                                                         programmed
     Great Queen St                                                                     completion by
                                                                                          April 2019
                               Dartford           Replacement of 1 Lamp column              Works
                                                                                         programmed
       Almond Rd                                                                        completion by
                                                                                          April 2019
                               Dartford          Replacement of 2 Lamp columns              Works
                                                                                         programmed
       Sharp Way                                                                        completion by
                                                                                          April 2019
                               Dartford          Replacement of 2 Lamp columns              Works
                                                                                         programmed
     Strickland Ave                                                                     completion by
                                                                                          April 2019
                               Dartford          Replacement of 6 Lamp columns              Works
                                                                                         programmed
       Howard Rd                                                                        completion by
                                                                                          April 2019
                               Dartford           Replacement of 2 Lamp column              Works
                                                                                         programmed
      Barnham Rd                                                                        completion by
                                                                                          April 2019
                               Dartford           Replacement of 2 Lamp column              Works
                                                                                         programmed
        Ivy Close                                                                       completion by
                                                                                          April 2019
                                                  Replacement of 2 Lamp column             Awaiting
        Charles St               Stone                                                     statutory
                                                                                           drawings

Appendix D – Local Transport Plan funded (named schemes) and externally funded schemes

Local Growth Fund

Appendix – Local Growth Fund

Local Growth Fund programme update for the Dartford Borough.

The Department for Transport (DfT) added £100m to the Local Growth Fund (LGF) pot in order to
fund Local Sustainable Transport Fund Style schemes. KCC subsequently submitted four Local
Sustainable Transport Fund (LSTF) capital bids 1) East Kent – A network for Growth, 2) Kent
Thameside – Integrated door-to-door journeys and 3) West Kent – Tackling Congestion. The fourth
was for Tonbridge Town Centre Regeneration, which included a highway improvements scheme in
the Lower High Street as well as additional LSTF style measures. The objective of all of the capital
bids is to boost economic growth by decreasing carbon emissions and reducing congestion.

The Kent Thameside, West Kent and Tonbridge Town Centre Regeneration bids were all
successful. The schemes aim to:

                   improve access to employment and services
   reduce the need to travel by the private car
                 enhance pedestrian, cycle and public transport facilities
                 improve sustainable transport connections

The following schemes have been submitted as part of the successful Kent Thameside LSTF this
financial year.

 Local Growth Fund (Transport Innovations)

 Scheme Name                 Description of Works                        Current Status

                                                                Initial consultation with Members
                                                                sent by email in December 2016
                                                                and only positive comments were
                                                                received. Minor amendments to
                                                                the design have since been
                                                                completed and a further
                                                                consultation followed. This
                                                                consultation closed on 10th June
                                                                2018. Seven responses were
                                                                received, six (86%) had an overall
                                                                positive view on the proposed
                                                                scheme. The positive comments
                                                                recognised that the scheme would
                                                                have an impact on improving the
                                                                local cycle infrastructure and
                   Installation of new shared use cycle route
                                                                providing greater choice of route.
                   on Princes Road (this scheme was
  Princes Road                                                  The decision made by KCC/DBC
                   previously reported to the JTB on 3rd
  Cycle Route                                                   officers is to proceed with the
                   December 2013). Delivery to be jointly
                                                                implementation of the scheme.
                   funded by S106 and LGF.
                                                                The final report is available at
                                                                www.kent.gov.uk/princesroad and
                                                                was presented at the Sept JTB and
                                                                approved. However, following a
                                                                recent consultation relating to the
                                                                Proposed Amendment of
                                                                Restrictions Order related to
                                                                Princes Road, concerns were
                                                                raised by 3 affected businesses.
                                                                Therefore, a decision has been
                                                                made to return the scheme to the
                                                                March JTB for a final decision, a
                                                                report is attached. The works are
                                                                on hold until a decision has been
                                                                made.
Appendix E – Developer Funded Works

Developer Funded Works (Section 278 Agreement Works) – Contact Officer Dave Miles
(unless shown otherwise)

 Scheme Name        MasterGov     Parish     Description of Works             Current Status
                    File Ref No

                                                 Provision of new
                                             access on north side of
                                             existing Mill Pond Road      Substantially complete.
Former GSK Site                              Roundabout to facilitate       First Cert. issued.
                      DA087       Dartford
  – Junction A                                     development.           Awaiting street lighting
                                                    Associated                 certification.
                                                 improvements to
                                              existing roundabout.

                                                Provision of new
                                             carriageway, footway,
  Hedge Place                                   drainage & street            Works in progress
                      DA091        Stone
     Road                                    lighting along frontage          (Natalie Peach)
                                                   of residential
                                                   development

                                               Minor carriageway
                                             widening and provision
                                                                          Substantially complete.
                                              of footpath and street
 Southfleet Road,                                                         Awaiting completion of
                     DA2102        S&G              lighting to
  Swanscombe                                                                remedials, as built
                                               accommodate new
                                                                              drawing. etc.
                                                access to Eastern
                                              Quarry development.

                                                                             First Cert. issued.
                                             Installation of signalised
   St Clements                                                            Awaiting street lighting
                     DA2131        Stone       junction to serve new
       Way                                                                certification and as built
                                               housing development
                                                                                  information

                                              Alterations to existing
                                             highway and formation
   Cotton Lane                               of new access to serve         Submission Rec’d.
                     DA3021        Stone
  (Gantry Place)                              Stone PC community             (Natalie Peach)
                                               centre & residential
                                                   development

                                              Provision of footway
                                                                           First Cert. issued. Will
                                                and alterations to
                                                                            not be signed off until
  Hedge Place                                  existing highway to
                     DA3026        Stone                                  road is no longer in use
     Road                                        accommodate
                                                                           for construction traffic.
                                              proposed residential
                                                                               (Natalie Peach)
                                                  development

                                               Construction of new        Substantially complete.
Former GSK Site                               roundabout at Temple            Interim First Cert.
                     DA3028       Dartford
  - Junction D                                 Hill and installation of    issued. Awaiting street
                                                 associated traffic       lighting certification etc.
signals

Southfleet Road                        Provision of accesses
                                                                  First certificate issued
(Former N.Grid    DA3029    S&G          to serve proposed
                                                                       (Jamie Hare)
     site)                            residential development
                                          Provision of new
                                                                  Works completed. On
Powdermill Lane   DA3031   Dartford    culvert under existing
                                                                     Maintenance.
                                              highway
                                          Improvement to
                                          existing junction,
   Darenth                                                         Works in progress.
                                        construction of new
Road/Powdermill   DA3032   Darenth                               Awaiting street lighting
                                         footway as part of
     Lane                                                        install. (Natalie Peach)
                                        adjacent residential
                                           development.
                                      Formation of bell mouth          Houses being
Central Road –                        accesses for residential    constructed on former
                  DA3037   Dartford
Junctions E & F                        development by Ward        site compound before
                                             Homes.               works can be finished.

                                                                    First Cert. issued.
                                       New signalised cross
Former GSK Site                                                   Awaiting completion of
                  DA3050   Dartford   road junction in Central
  – Junction B                                                      remedials and HF
                                              Road.
                                                                         Surfacing

                                       Alterations to existing   Substantially complete
                                        highway to provide       awaiting documentation
 Instone Road     DA3051   Dartford
                                      access to proposed Lidl
                                                store.               (Natalie Peach)

                                        Provision of traffic
                                                                    First Cert. issued.
                                      signals to existing Mill
Former GSK Site                                                   Awaiting completion of
                  DA3052   Dartford     Pond Road, Overy
  – Junction C                                                      remedials and HF
                                      Street & Central Road
                                                                         Surfacing
                                             junction

                                       Alteration to existing    Substantially complete.
 Joyce Green                             highway to serve           Street lighting &
                  DA3061   Dartford
 Lane (west)                          development on former      remedials outstanding.
                                          GSK car park.             (Natalie Peach)

                                                                 Substantially complete.
                                       Alteration to existing       Minor remedials
                                      highway in conjunction      outstanding. (Natalie
 Central Road     DA3070   Dartford
                                       with development by               Peach)
                                         Bellway Homes.

                                          Provision of new         Works substantially
Halcrow Avenue                         footway and alteration    complete, awaiting minor
 Phase 3 (The     DA3081   Dartford   to existing carriageway      remedials & as built
    Bridge)                                for Phase 3 of               records.
                                             residential
development.

                                       Provision of pedestrian
                                         crossing facilities in    Works completed. On
Charles Street –
                   DA3094    Stone      conjunction with new       maintenance (Natalie
Stone Crossing
                                       footbridge over railway           Peach)
                                           by Network Rail.

                                          Provision of new
                                             access and
 Lower Hythe                                                      Works due to commence
                   DA3090   Dartford      improvements to
   Street                                                                04/02/19.
                                         existing footway by
                                           Weston Homes

                                        Provision of access          Awaiting amended
 Darenth Road
                   DA3091   Dartford    crossing Fastrack to        submission. (Natalie
 (Acacia Hall)
                                         serve Acacia Hall                Peach)

  Green Street                            Provision of new
     Green                             footway to frontage of     Submission rec’d. (Jamie
                   DA3092   Darenth
  Road/Wood                            former Fox & Hounds                 Hare)
 Lane, Darenth                                  PH.

                                        Alteration to existing
                                                                     Submission being
Churchill Close    DA3093   Darenth     vehicular access for
                                                                       negotiated.
                                          Winners Chapel

                                          Provision of new
                                                                  Awaiting H & S file & as
                                            access and
                                                                    built drgs. (Natalie
                                        reconstruction of ex
  Spring Vale                                                              Peach)
                   DA3094   Dartford    carriageway due to
    (South)
                                       subsidence caused by
                                         excavation by Lidl
                                             contractor

  Littlebrook                             Provision of two
                                                                  Works due to commence
  Manorway         DA3096   Dartford   accesses for proposed
                                                                        04/02/19..
    (North)                             Mercedes showroom

                                          Provision of new
                                        footway and turning
   Coleridge
                                        facility and vehicular
Road/Shaftsbury    DA3099   Dartford                                 Works in progress.
                                          access as part of
     Lane
                                               residential
                                            development.

                                         Provision of new
Brunel Way (The                                                    Works completed. On
                   DA3101   Dartford   footway etc. for Leigh
    Bridge)                                                           Maintenance
                                               UTC.

                                          Improvements to
                                         highway as part of        Awaiting submission of
 Market Street,    DA3106   Dartford
                                            Town Centre              design & details
                                           Regeneration.
Residential
                                                   development by
 Lowfield Street,   DA3129        Dartford                                   Awaiting submission
                                               Bellway Homes at north
                                                end of Lowfield Street

                                                   New access for
                                                     commercial
                                                                           TA issued. Temp. access
                                                development at Plot 4
   Littlebrook                                                             constructed. Permanent
                    DA3149        Dartford       “Quadron Park” and
   Manorway                                                                 works not due for some
                                                  closure of existing
                                                                                   months.
                                                  access in Halcrow
                                                       Avenue.

                                                   Provision of traffic
  London Road,                                  signal junction to serve   Submission rec’d. (Jamie
                    DA3156            Stone
   Stone Pit 2                                  proposed development                Hare)
                                                     in Stone Pit 2

   Hook Green                                    New access to Hook          Agreement in place.
                    DA3157       Southfleet
     Road                                        Green Farm House              (Natalie Peach)

                                                  Proposed Zebra
                                                  Crossing to serve
 Southfleet Road    DA3166     Swanscombe                                    Awaiting submission
                                                   Eastern Quarry
                                                    development

Appendix F – Bridge Works

Bridge Works – Contact Officer Earl Bourner

      Road Name              Parish           Description of Works               Current Status

                                         No works planned
Appendix G – Traffic Systems

There is a programme of scheduled maintenance to refurbish life expired traffic signal equipment across
the county based upon age and fault history. The delivery of these schemes is dependent upon school
terms and holiday periods; local residents, businesses and schools will be informed verbally and by a letter
drop of the exact dates when known.

 Traffic Systems - Contact Officer: Toby Butler

                  Location                        Description of Works             Current Status

                                                  Refurbishment of traffic     Completed September
     A225 Lowfield Street/ Oakfield Lane
                                                 signal controlled junction           2018

Appendix H – Combined Member Fund

Member Highway Fund programme update for the Dartford District.
The following schemes are those, which have been approved for funding by both the relevant
Member and by Simon Jones, Director of Highways, Transportation and Waste. The list only
includes schemes, which are
          in design
          at consultation stage
          about to be programmed
          recently completed on site

The list is up to date as of 30th January 2019
The details given below are for highway projects only, this report does not detail;
          Contributions Members have made to other groups such as parish councils
          Highway studies
          Traffic & non-motorised user surveys funded by Members.

More information on the schemes listed below contact the Project Manager for the Combined
Member Grant or the District Manager for Dartford.

Ann Allen (Wilmington)
                                  Details of Scheme                                          Status
 Proposed corner protection                                                              Objections
 Joydens Wood Road j/w Maryfields Close and Wood Close                                   received via
                                                                                         public
                                                                                         consultation.
                                                                                         To be
                                                                                         reviewed.
 Proposed corner protection                                                              No
 High Road Wilmington j/w The Close                                                      objections
                                                                                         received via
                                                                                         public
                                                                                         consultation.
                                                                                         To be
reviewed.

 Proposed corner protection                                                           No
 Hawley Road/Access to Eloise Court                                                   objections
                                                                                      received via
                                                                                      public
                                                                                      consultation.
                                                                                      TRO has
                                                                                      been sealed

Penny Cole (Dartford East)
                                   Details of Scheme                                  Status
 London Road Stone o/s The Brent Primary School                                       Data
 Proposed zebra crossing                                                              assessed
                                                                                      from ATC.
                                                                                      Design to be
                                                                                      progressed.

Peter Harman (Swanscombe & Greenhithe)
                                   Details of Scheme                                  Status
 No current highway schemes

Jeremy Kite MBE (Dartford Rural)
                                   Details of Scheme                                  Status
 No current highway schemes

David Butler (Dartford North East)
                                   Details of Scheme                                  Status
 Joyce Green Lane north of Bob Dunn Way
 Installation of verge marker posts in the carriageway on both sides of the road to     Works
 prevent lorries parking overnight and eliminate the problem of fly tipping.           complete

 Marsh Street (north)                                                                 Design
                                                                                      completed
 1 x Build out to be removed to bring it in line with design standards
                                                                                      Works
                                                                                      ordered
 Halcrow Avenue                                                                       Concept
 Prohibition of Driving - to prevent rat running                                      design
Henderson Drive Temple Hill                                            Concept
Looking into various methods to reduce speed                           design

Footpath from Brunel Way to Joyce Green Lane via footbridge            Concept
Investigating a lighting scheme                                        design

Jan Ozog (Dartford West)
                                  Details of Scheme                    Status
Heather Drive j/w Shepherds Lane
                                                                       Concept
Looking at options to prevent HGV’s turning left into Heather Drive.   design

          1.1     Legal Implications

          1.1.1   Not applicable.

          1.2     Financial and Value for Money Considerations

          1.2.1   Not applicable.

          1.3     Risk Assessment

          1.3.1   Not applicable.

          Contacts: Carol Valentine / Denise Sutton 03000 418181
KENT COUNTY COUNCIL

      ENVIRONMENT & TRANSPORT CABINET COMMITTEE
MINUTES of a meeting of the Environment & Transport Cabinet Committee held in the
Darent Room - Sessions House on Thursday, 17 January 2019.

PRESENT:      Mr M A C Balfour   (Chairman),   Mr M D Payne    (Vice-Chairman),
Mrs R Binks (Substitute for Mr A Booth), Mr T Bond, Mr A Cook, Mr N J Collor,
Mr S Holden, Mr A R Hills, Mr D L Brazier (Substitute for Mr R C Love, OBE),
Mr G Cooke (Substitute for Mr P J Messenger), Mr J M Ozog, Mr I S Chittenden,
Mr R H Bird (Substitute for Mr A J Hook), Mr B H Lewis, Mr M E Whybrow and
Mr H Rayner

ALSO PRESENT: Mr P M Hill, OBE and Mr M Whiting

IN ATTENDANCE: Mr S Jones (Director of highways, Transportation and Waste),
Miss G Little (Democratic Services Officer) and Ms S Holt (Head of Culture & Sport
Group)

                             UNRESTRICTED ITEMS

140. Chairman's Announcements
(Item1)

   1. The Chairman proposed that supporting documentation be no longer be printed
      in the agenda pack for the Environment and Transport Cabinet Committee as it
      was available electronically and that printed copies be provided to Members
      only on request.

   2. RESOLVED that in future, supporting documentation be provided electronically
      and not printed in the agenda pack for the Environment and Transport Cabinet
      Committee. Printed copies would however be provided on request.

141. Apologies and Substitutes
(Item 2)

      Apologies were received from Mr P Messenger, Mr A Hook, Mr R Love and Mr
      A Booth. Mr G Cooke, Mr R Bird, Mr D Brazier and Mrs R Binks attended as
      substitutes respectively.

142. Declarations of Interest by Members in items on the Agenda
(Item 3)

      There were no declarations of interest received.

143. Minutes of the meeting held on 28 November 2018
(Item 4)

                                          1
RESOLVED that the minutes of the meeting on 28 November 2019 are a
     correct record and that they be signed by the Chairman subject to the removal
     of minute 125.3 (Declaration of interest).

144. Verbal Update
(Item 5)

     1. Mr M Hill (Cabinet Member for Community and Regulatory Services) gave a
        verbal update on the following issues:

        Accuracy of Kent Police Crime Recording:
        Kent Police’s crime-recording arrangements that had previously been
        graded as inadequate had recently undergone inspection from Her Majesty’s
        Inspectorate of Constabulary and Fire & Rescue Services (HMICFRS) and
        were rated as outstanding. Mr Hill said that he written to the Chief Constable
        to congratulate Kent Police on behalf of Kent County Council.

        Update of the Preparations for Brexit:
        Within Mr Hill’s portfolio, the two areas that would sustain the greatest
        impact as a result of Brexit would be the Emergency Planning Service and
        Trading Standards.

        The Emergency Planning Service had been engaged in developing plans for
        the multi-agency Kent Resilience Forum and the operational plan had been
        trialled with further training exercises planned for February and March 2019.
        The existing mutual aid arrangements with the seven South East authorities
        were also in the process of being revised. Training in multiagency response
        and recovery had also been arranged for Duty Directors, Managers and
        other staff; and a command rota was being developed to cover Kent County
        Councils response over a six-month period and based on a 24/7-hour
        response rate. Kent County Council was also leading on its multiagency
        communications planning and an internal communications plan was being
        developed to raise staff awareness. Across the directorate, a resilience
        group had also been established and this would meet monthly with regular
        progress and monitoring reports. Kent County Council was also reviewing its
        business continuity plans and had set up a number of workshops which
        were also being held for Challenger and Environment Planning and
        Enforcement staff.

        The Trading Standards Service which was the area most affected by Brexit
        was undertaking recruitment for additional border force staff. Brexit may
        require multi-port operational activities which would have detrimental effect
        on the Council’s resources.

                                         2