Hearnes Lake/Sandy Beach - Development Control Plan ABN 79 126 214 487 - Amazon AWS
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Hearnes Lake/Sandy Beach Source: National Marine and Science Centre Development Control Plan ABN 79 126 214 487
CONTENTS PART 1 – THE PLAN ..........................................................................................................1 PREAMBLE ............................................................................................................................1 AMENDMENTS.......................................................................................................................1 OBJECTIVES .........................................................................................................................1 HOW TO USE THIS DCP.........................................................................................................1 PROCEDURES........................................................................................................................2 PART 2 – PLANNING STRATEGY: MASTERPLAN...............................................................3 OBJECTIVES .........................................................................................................................3 SPECIFIC STRATEGIES ..........................................................................................................3 HOUSING STRATEGY.............................................................................................................5 URBAN DESIGN STRATEGY ....................................................................................................5 SERVICING STRATEGY ..........................................................................................................5 BUSINESS STRATEGY ............................................................................................................7 COMMUNITY FACILITIES STRATEGY ......................................................................................7 TRAFFIC AND TRANSPORT STRATEGY ...................................................................................7 NATURAL ENVIRONMENT STRATEGY .....................................................................................8 OPEN SPACE AND RECREATION STRATEGY ............................................................................9 PART 3 - PLANNING CONTROLS.....................................................................................11 DENSITY............................................................................................................................. 11 GENERAL CONTROLS........................................................................................................... 11 URBAN DESIGN................................................................................................................... 11 TIMING OF DEVELOPMENT .................................................................................................. 11 WATER QUALITY................................................................................................................. 12 ENERGY EFFICIENT DESIGN ................................................................................................ 12 FLOODPLAIN MANAGEMENT ................................................................................................ 12 CULTURAL HERITAGE.......................................................................................................... 15 NATURAL AND HABITAT AREAS ........................................................................................... 16 BUSHFIRE HAZARD ............................................................................................................. 16 NOISE ................................................................................................................................ 18 ROAD DESIGN AND ACCESS CONTROL................................................................................. 18 ROAD DESIGN FOR BUS ACCESS.......................................................................................... 18 PEDESTRIAN AND CYCLEWAY PATHS ................................................................................... 18 HEARNES LAKE ROAD.......................................................................................................... 19 PART 4 – GENERAL DEVELOPMENT CONTROLS .............................................................20 RESIDENTIAL LOW DENSITY ............................................................................................... 20 SUBDIVISION...................................................................................................................... 26 OFF-STREET CAR PARKING.................................................................................................. 30 SIGNS................................................................................................................................. 35 NOTIFICATION ...................................................................................................................38 APPENDIX A – WATER QUALITY TARGETS.....................................................................40 HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE i
PART 1 – THE PLAN PREAMBLE Environmental Sustainability To ensure development complements the This Development Control Plan (DCP) conservation of biodiversity by protecting applies to land in Hearnes Lake / Sandy areas of high conservation value. Beach under the Coffs Harbour City Local To ensure that development takes into Environmental Plan 2000 (as shown in account environmental constraints Map 1). including soil erosion, flooding and This Plan came into force on 7 December bushfire risk, and protects areas of natural 2005. and cultural significance. To ensure that development incorporates AMENDMENTS best practice urban water management techniques relating to stormwater quality This Plan was amended on 7 February 2008. and quantity, water conservation and re- This DCP repeals any other DCP made use, and ecosystem health; before this DCP, this DCP prevails to the To ensure that future development does extent of any inconsistency. not conflict with the objectives of the Solitary Islands Marine Park. OBJECTIVES To ensure that development does not conflict with the intended outcomes for The controls in this DCP seek to achieve the ‘Healthy Modified Lakes’ as specified in the following objectives. Healthy Rivers Commission Final Report on Coastal Lakes. Economic Sustainability To ensure that development is consistent To ensure that the existing community is with the aims and objectives of State not burdened by the provision of public Environmental Planning Policy 71 – Coastal utilities and facilities required as a result of Protection. future development. To equitably provide public utilities in a HOW TO USE THIS DCP timely, cost-efficient and effective manner. To ensure development contributes to the The DCP is divided into three parts: economic growth of the City and provides links to local employment opportunities. Part 1 - The Plan; introduction; Part 2 - Planning Strategy; sets out the Social Sustainability overall strategy for the area; To provide safe and attractive Part 3 - Planning Controls; details the neighbourhoods that meet the diverse specific controls for development within needs of the community and offer a wide the release area; and choice of housing and leisure Part 4 – General Development Controls opportunities, as well as associated includes general building, subdivision, community facilities. environmental and servicing guidelines for To improve the accessibility of public development within the study area. transport services and provide infrastructure to encourage walking and Applicants are to comply with the overall cycling, and to lessen the dependence on Planning Strategy and detailed Planning cars. Controls unless it can be demonstrated that, To provide a network of well distributed in the opinion of Council, an alternative to parks and recreation areas that offer a any or all of the controls will meet the variety of safe, appropriate and attractive objectives. public open spaces. HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 1
PROCEDURES Development generally requires the consent of Council. This consent is sought through Part 3 of this DCP contains the specific the lodgement of a development application. controls applying to Development within the Hearnes Lake/Sandy Beach area. Applicants should follow the step-by-step process shown in the procedures flow chart. Part 4 of this DCP provides more detailed PROCEDURES FLOW CHART controls in relation to subdivision and low- Step 1 density residential development. Tourist Read this DCP and obtain any relevant information sheets development is to comply with the prevailing guidelines. Step 2 Undertake site analysis Step 3 Prepare draft proposal in accordance with the Master Plan (Map 2) and Planning Controls (Parts 2, 3 and 4) Step 4 Discuss the draft proposals with Council staff and any other organisations i.e. DoP*, RTA, DEC, DNR, MPA, LALC Step 5 Check the development meets the general controls in this DCP and is consistent with the Master Plan (Map 2) Step 6 Check environmental constraints for: Flood prone land Significant vegetation Acid sulfate soils Fire hazard Cultural Heritage Threatened and/or Endangered Species, Populations, Ecological Communities Noise Step 7 Consult with adjoining land owners – consider their opinions on the proposal Step 8 Consult with Council’s Technical Liaison Committee if appropriate Step 9 Prepare plans/report in accordance with discussions and guidance provided MAP 1 LOCALITY Step 10 Lodge development application with Council/Consent Authority Applicants are also required to comply with Where approval granted the requirements of the Building Step 11 Sustainability Index (BASIX) for certain types Commence work in accordance with the conditions of approval of development. Liaison with the Department of Planning is recommended to assist with * State Environmental Planning Policy (SEPP) No. 71 – Coastal Protection applies to land within the DCP Study development proposals. Area. Liaison with the Department of Planning is recommended to assist with development proposals. HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 2
PART 2 – PLANNING STRATEGY: MASTERPLAN OBJECTIVES Environmental Sustainability To provide a framework for a community Restrict development from environmental that is sustainable, safe and vibrant. protection areas (see Master Plan) and require the dedication of such land to To provide an overall plan for the area Council as part of development proposals. that enables the integration of existing Require developers to provide perimeter and proposed development. roads adjacent to environmental protection areas for fire fighting purposes, SPECIFIC STRATEGIES access for maintenance, and for passive surveillance of parkland by residents. Economic Sustainability Ensure development proposals provide Provide for an additional population of bush fire buffers, which do not encroach approximately 1,352 people. on environmental protection areas or Enable sustainable residential housing and involve the removal of native vegetation. low-key ecotourism opportunities (refer to Encourage the use of bush fire buffers for Map 5 Target Densities). passive recreational activities and/or Require developers to provide reticulated community facilities where it does not water and sewer to new development by involve negative impacts on environmental extending the existing network (refer to values. Map 3 Servicing Strategy). Ensure development demonstrates the Require developers to forward fund any achievement of the Stormwater works required ahead of Council’s Management Strategy for the release area Developer Servicing Plans. (see attachment A). Provide access to retail and commercial Utilise innovative Water Sensitive Urban services in the townships of Woolgoolga Design strategies to reduce nutrient and Moonee Beach. loading, sedimentation and chemical contamination of local waterways. Social Sustainability Restrict urban development from land identified with a significant flood risk. Require developers to construct a collector road system accordance with the Master Utilise acoustic design to ensure highway Plan. traffic and Industrial noise does not exceed acceptable levels within residential Require developers to provide pedestrian areas. access in a timely manner, linking residential areas to the public open space Provide landscaped buffers (utilising local network. native species) between future residences and the highway/industrial land, and Ensure that developers provide bus where practicable incorporate essential shelters so that all residential areas are service corridors. generally within 500m from the nearest shelter. To ensure that development does not conflict with the intended outcomes for Provide a sporting field, which ‘Healthy Modified Lakes’ as specified in the incorporates a playground and BMX track Healthy Rivers Commission Final Report on (as shown in the Master Plan). Coastal Lakes. Ensure that developers provide children’s To ensure that development is consistent playgrounds so that all residential areas with the aims and objectives of State are no further than 500m from the nearest Environmental Planning Policy 71 – Coastal facility. Protection. HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 3
HOUSING STRATEGY SERVICING STRATEGY Optimise dwelling yield on areas suitable Require developers to extend water and for urban development; sewer from the nearest point identified in Ensure densities comply with those Council’s Water and Wastewater Developer specified on Map 5 – Target Densities; Servicing Plans (see Map 3); Where services identified in Council’s URBAN DESIGN STRATEGY Water and Wastewater Servicing Plans are not in place at the time the developer Urban form is to create three precincts as wishes to proceed, it will be the shown on the Master Plan (Map 2); developer’s responsibility to forward fund these services; Each precinct is to provide for compact walkable neighbourhoods with access to Development should enable efficient social opportunities and public open space provision of utility services to new areas; localities, and should ensure that innovations in Water Sensitive Urban A variety of lot sizes and types should be Design can be incorporated, either at the provided to facilitate housing diversity and time of development or in the future. choice to meet the requirements of people with different housing needs; Urban form is to ensure a site-responsive Northern Precinct approach that supports and enhances the context in which it is located, particularly Require developers to provide pump the topography and environmental stations as shown on Map 3; constraints of the land; Additional pump stations should be Development shall strengthen local avoided where other alternatives are character and identity and promote a available. sense of community through a range of design techniques. Eastern Precinct Public access is to be provided to the existing pump station in the Eastern Precinct for maintenance purposes (see Map 3). HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 5
BUSINESS STRATEGY Bosworth Road/Pacific Highway Development of the Northern Precinct Provide strong links between proposed being limited to a maximum of 80 lots until neighbourhoods and the town centres of such time as Highway Upgrade works are Woolgoolga and Moonee; completed or alternative access is Provide good accessibility through street provided via the Pacific Highway layouts and promote walking and cycling; /Bosworth Road Intersection. Enable the development of a low-key Development of the northern precinct Restaurant/Café or General Store in the above 80 lots being restricted to the Northern Precinct. number of lots to be accommodated by the Pacific Highway/Bosworth Road Intersection in terms of safety and intersection capacity, until such time as COMMUNITY FACILITIES the Pacific Highway Bypass works are STRATEGY complete. Investigate the feasibility of relocating Graham Drive/Pacific Highway and/or improving the existing car parking area near the entrance to Hearnes Lake to Major development ahead of the Pacific cater for the increased visitors to the area. Highway upgrade within the Western Precinct is subject to: Develop a Plan of Management in consultation with the Department of Lands the upgrade of the Graham Drive/Pacific for the foreshore area to enable the Highway intersections; provision of low-key community facilities. the construction of two new intersections Provide adequate transport and pedestrian off Graham Drive to service the linkages to community facilities and open development (as shown in the Master space areas. Plan); - the upgrade of the Morgans Road Intersection. TRAFFIC AND TRANSPORT Eastern Precinct STRATEGY It will be the responsibility of the Hearnes Lake Road developer to undertake a Traffic Impact The DCP assumes that the Roads and Statement to determine any works required to mitigate impacts of the Traffic Authority (RTA) will upgrade the Hearnes Lake Road/Pacific Highway development on the existing local road Intersection as part of the Coffs Harbour network; Highway Planning Strategy. Hearnes Lake The Traffic Impact Statement shall provide Road may be closed at the Pacific Highway emphasis on the following as part of this upgrade. roads/intersections: Investigate the feasibility of closing - Ti Tree Road sections of Hearnes Lake Road to provide - Maple Road for environmental benefit to the lake, - Chestnut Avenue subject to alternative access being - Pine Crescent provided to residents. - Diamond Head Drive It will be the responsibility of the developer to provide facilities (such as cycleways, bus shelters, pedestrian cross over points) identified as being necessary in the Traffic Impact Statement or considered necessary by Council. HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 7
General Exclude urban development from known Habitat for Wallum Froglet and other It will be the responsibility of the endangered fauna species, and provide developer to provide a collector road sufficient buffers to development; system that reduces the reliance on the Pacific Highway for local trips. Provide bush fire buffers between environmental protection areas and future Provide bus shelters as identified in the development without the need to remove Master Plan (Map 2) to service the entire high value native vegetation; area; Dedicate land that cannot be developed Provide a bus turning area on Hearnes due to the required bush fire buffers to Lake Road as shown in the Master Plan Council and incorporate into environmental (Map 2); protection areas; It will be the responsibility of the Where practicable, enable the use of bush developer to: fire buffers for activities ancillary to tourist - extend local road access to the development; identified collector road system; - ensure pedestrian and cycleway Require the dedication of environmental linkages are provided to the northern protection areas to Council as beaches cycleway, local schools, development occurs; shops, playing field, parks and Where practicable, seek to incorporate beaches; environment protection areas into the - implement traffic calming devices at Coffs Coast Regional Park; cycleway crossover points on the Manage environmental protection areas collector road system; not incorporated into the Coffs Coast - utilise minimum road and verge Regional Park in accordance with the widths for Hearnes Lake Road to relevant Plan of Management (PoM): prevent impacts on significant - Natural Areas PoM; roadside ecology. - Coffs Harbour Coastal Reserves PoM; Manage environmental protection areas in NATURAL ENVIRONMENT consultation with the Department of Lands STRATEGY where the land is Crown Land under the management of Council or Vacant Crown Protect and enhance environmental Land; protection areas as identified on the Manage foreshore areas in consultation Master Plan and Map 4 (includes bush fire with the Marine Parks Authority and buffers, creek buffers, development ensure that education and/or buffers, significant vegetation and other interpretation signage is provided for constrained land); residents and visitors to the area; Exclude urban development from sensitive Ensure that future development does not areas to protect riparian vegetation, degrade the environmental values of the maintain water quality, and provide Solitary Islands Marine Park and that habitat linkages; future development is consistent with the Eliminate adverse impacts of development objectives of the Solitary Islands Marine upon the aesthetic, recreational and Park Zoning Plan for Hearnes Lake: ecological value of the flood plain; Habitat Protection Zone Objectives Protect and enhance high value - The protection of biological diversity, vegetation; habitat, ecological processes, natural and cultural features; and Exclude urban development from areas with a high water table where there is - Opportunities for recreational and likely to be adverse impacts on commercial activities, scientific groundwater or surface water quality; research, and educational activities. HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 8
OPEN SPACE AND RECREATION STRATEGY Incorporate environmental protection areas into a network of public open space, as shown on Map 4. Establish a sporting field, playground and BMX track with adequate linkages to existing and future residences, open space areas and Sandy Beach Primary School (Map 4). Provide children’s playgrounds within reasonable walking distance (500m) of all future housing (Map 4). Manage open space areas and community land in accordance with the relevant Plan of Management. Encourage passive recreation within open space areas (including bush fire buffers) where it does not involve the removal of native vegetation and/or damage to the environmental values of the area. Investigate the use of 4WD Vehicles on Hearnes Lake Beach and prohibit such use where it is found to be damaging to significant environmental values of the Solitary Islands Marine Parks and/or surrounding environments. Investigate the relocation of the existing car parking area at the entrance to the Lake and the rehabilitation of the area with local native species. HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 9
MAP 4 OPEN SPACE NETWORK HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 10
PART 3 - PLANNING CONTROLS DENSITY URBAN DESIGN The density of development within each Subdivision layouts should establish legible precinct is to be in accordance with the street and open space networks, and target densities specified on Map 5. should generally provide for buildings fronting streets to ensure safe, attractive and efficient circulation of pedestrians, HEIGHT cyclists and drivers. Development shall connect well to existing Buildings are not to exceed 6m in height. or proposed development on adjacent sites. Note: Height means the distance measured Development shall provide open space vertically from any point on the eaves/ linkages to adjacent environmental gutter line of the building to the natural protection and/or open space areas. ground level immediately below that point. A landscape plan is required detailing treatment of the streetscape utilising local native species and shall include a three- HOUSING MIX year maintenance plan. The landscape plan shall be submitted to Council prior to General Controls the release of the Subdivision Certificate. Landscaping requirements shall not be Development is to comply with the reliant on Council land and is to occur on controls provided below and Part 4 of this public land only at the request of Council. DCP; Residential development utilising ‘gated’ Lots must have appropriate area and street formats is strongly discouraged. dimensions to enable efficient siting and construction of a dwelling and ancillary Where retirement or other lifestyle buildings, provision of private outdoor developments are proposed, these must space, convenient vehicle access to a incorporate the majority of their public road and adequate parking. development on public streets, with good linkages to surrounding areas. Tourist development should be in accordance with the prevailing guidelines; Where practicable bush fire buffers can be utilised for recreational activities, TIMING OF DEVELOPMENT community facilities and stormwater No development is to occur until adequate treatment. road access and reticulated water and sewerage services are available to the land. HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 11
WATER QUALITY ENERGY EFFICIENT DESIGN Development involving earthworks or Lots are to be orientated to facilitate the vegetation removal shall be accompanied siting of dwellings that will have adequate by an Erosion and Sediment Control Plan solar access. in accordance with Council's Policy. A minimum of 75% of lots in any proposed To ensure protection of water quality, the subdivision for single dwelling allotments, following buffers are to be provided (as shall be orientated so that the long axis of determined by Council and shown on the the lot is within the range shown in the Master Plan): Diagram. - A minimum of 50m from an RL Level of 3.5 around Hearnes Lake and Double Crossing Creek; - 50m from SEPP26 Littoral Rainforests; - 50m from SEPP14 Wetlands; - 50m from Willis Creek, - 20m from all other creeks, As part of development proposals the buffers specified above are to be rehabilitated and revegetated using local native species, in accordance with a detailed plan approved by Council, and dedicated as environmental protection land (refer to Master Plan and Map 4); Development applications for subdivision are to be accompanied by water quality Residential development shall be designed modelling to assess the impact of in accordance with Council's Energy development in accordance with the Efficiency Information Sheet. Stormwater Strategy for each precinct (refer to attachments A); Development is to incorporate Water FLOODPLAIN MANAGEMENT Sensitive Urban Design in accordance with Council’s adopted policy. General Development applications for low lying areas are to be accompanied by Development will be required to comply with groundwater monitoring over 12 months Council’s Flood Prone Land Policy, parts of and an assessment of the impacts of which are summarised below. proposed development, particularly placement of fill, drainage and stormwater Subdivision facilities with regards to groundwater quality and levels, and the impacts on the All lots within a Flood prone Area (as estuary. defined by Council) must have a house site with a minimum area of 400m2, with a minimum width of 15m, above the 100 year flood level. Any portion of the lot lower than the 100 year flood level will have a restriction on the construction of non exempt structures. HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 12
Where development involves landform Where Site Assessment Reports, Remedial modification below the 1% flood level, the Action Plan’s, or Validation Reports are proposed development shall comply with required as part of development the following provisions: applications, these are to be prepared in - A flooding analysis is to be submitted accordance with relevant guidelines with the development application and prepared by the NSW Environment approved by Council’s Flooding Protection Authority (EPA) including the Engineer prior to issue of consent. following: - No filling will be permitted within the - Guidelines for Assessing Banana High Flood Risk Precinct. Plantation Sites (EPA 1997) and; - Minor filling may be permitted within - Guidelines for Consultants Reporting the 1% flood extent subject to an on Contaminated Sites. engineers report certifying the The National Environmental Protection development will not result in any Council’s National Environment Protection increased flood affectation elsewhere (Assessment of Site Contamination) and results in a better planning Measure (1999) shall also be considered solution. Minor filling being regarded as as part of assessment reports. filling resulting in the 1% flood line having a more regular shape and/or Where the detailed site assessment minor movement of the line to facilitate indicates that a Remedial Action Plan a more practicable and/or efficient (RAP) is required, this Plan shall development. accompany Development Applications. - No adverse change to the flood These reports are to be prepared by behaviour will be permitted, either on suitably qualified and experienced properties adjoining the site or professionals. elsewhere including upstream and Where the aggregate area to be downstream of the site. remediated is more than 3 hectares, the Local perimeter roads should be above the development becomes designated 1% flood level. development and requires the preparation Internal road layouts and subdivision of an Environmental Impact Statement. design shall consider flood evacuation No remediation is to occur without Council issues for pedestrians and vehicles. approval; compliance with the Roads across waterways are to be abovementioned guidelines; and constructed to Council standards. compliance with SEPP 55 – Remediation of Land. In designing subdivisions, consideration must be given to the requirement for General dwelling floor levels to be 500mm above the 1% flood level. Development applications for land being potentially contaminated and/or previously used for banana cultivation shall include as POTENTIALLY CONTAMINATED a minimum, consideration of site history LAND and the potential of soil contamination from previous land use. The following requirements apply to any Where this consideration identifies soil land with a history of Banana Cultivation contamination and/or cannot exclude the and/or Potentially Contaminated Land possibility of contaminated land, then a identified. detailed site assessment shall be A detailed site assessment report with undertaken as above. regard to potential soil and groundwater contamination shall be submitted with development applications for the above land. HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 13
MAP 5 TARGET DENSITIES HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 14
CULTURAL HERITAGE A comprehensive inspection and assessment of the site area; Northern Precinct Management options are to be developed on the basis of an interpretation and Site HL1 (see Map 6) investigation of the results by a person deemed suitably qualified by Council. It will be the responsibility of the developer to undertake an Archaeological Western and Eastern Precincts Investigation into Site HL1 identified on Map 6. General The investigation is to involve: An Archaeological Assessment must be - The removal of grass cover by undertaken as part of the development controlled burning to minimise ground application process. disturbance; - A comprehensive inspection and Archaeological Assessments must: assessment of the site area following - be undertaken by person(s) deemed to the removal of the grass cover to be suitably qualified by Council and the determine the need for subsurface local Aboriginal Land Council. testing, artefact salvage and/or site Note: consultants must have an appropriate protection; knowledge/attachment to the Hearnes It will be the responsibility of the developer Lake/Sandy Beach area. to obtain an appropriate permit from the - Comply with the National Parks and Department of Environment and Wildlife Act 1974 and Environmental Conservation before undertaking any Planning and Assessment Act 1979. subsurface testing and/or artefact salvage; - Consider specific ‘links’, which are The Archaeological Investigation must be important to the Gumbaingirr Aboriginal in accordance with the National Parks and community. Wildlife Act 1974 and Environmental Consultation is to be undertaken with the Planning and Assessment Act 1979; Local Aboriginal Land Council, Yarrawarra Aboriginal Corporation & Elders of relevant Site HL2 – Natural Mythological Site Aboriginal Communities throughout the preparation of the assessment. All development is excluded from land within Site HL2 as shown on Map 6. Cultural Heritage Studies are to be forwarded to the LALC and YAC for Adjacent development shall not impact on comments prior to their finalisation. the spiritual/sacred significance of this site and an appropriate buffer between the site A copy of the finalised Cultural Heritage and future development is to be provided. Study is to be given to the LALC and YAC. The requirements of the National Parks Spur Crests and Wildlife Act 1974 must be followed if Lot 21 DP 714858, Lot 1 DP 253878 & cultural/sites places are identified on the Lot 202 DP 1066412 site and a Section 90 Heritage Impact Permit obtained from the Department of It will be the responsibility of the developer Environment and Conservation ahead of to undertake an Archaeological any site disturbance or destruction. Investigation to determine the status of the Spur Crest identified on Map 6 before Lot 22 DP 1070182 – Historic Campsite any disturbance works commence. (Peron Camp) The investigation is to involve: - The removal of grass cover by The Archaeological Assessment must also manually ‘scrapping off’ (to minimise include an inspection of the former Peron ground disturbance); campsite. HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 15
NATURAL AND HABITAT AREAS - The VMP is to incorporate the treatment of the highway buffer, using local native Environmental protection areas are to be species, with an aim to providing a protected through the provision of buffers scenic buffer for the travelling public; (see Water Quality) and by excluding - Initial works identified within the VMP development from flood liable land. are to be completed prior to release of Land within 100m of any Osprey nest shall Subdivision Certificate; be added to environmental protection land - Works may be staged but must be and dedicated to Council as development commensurate with staging of occurs. subdivision; and Development applications shall require - Follow up maintenance works identified assessment of natural and habitat areas. within the VMP are to be costed and contribution paid to Council at the time Development or works on land with Known of dedication. Habitat for Wallum Froglet and other endangered fauna species will require Protected areas are to be fenced off prior assessment under the Threatened Species to commencement of works to prevent Conservation Act 1995. Habitat areas shall degradation of natural vegetation during be dedicated to Council for environmental construction works. protection as development occurs. Development shall have regard to Council’s Koala Habitat Information Sheet. BUSHFIRE HAZARD Where practicable, perimeter roads shall All proposals for subdivision must be be provided adjacent to all environmental accompanied by a Bush Fire Assessment in protection areas to provide a separation accordance with Council’s Bush Fire distance between residential development Information Sheet. and natural areas. Perimeter roads may be incorporated into bush fire buffers. Bush fire buffers are to be maintained at all times with minimal fuel loads. For all environmental protection land required to be dedicated to Council the Eastern Precinct following applies: - A detailed Vegetation Management Plan Beach access is to be provided by the (VMP) for the rehabilitation/revegetation Developer where identified in the Master of environmental protection land is to Plan and on Map 4. be submitted and approved by Council; - The VMP is to incorporate bush fire buffers and provide management measures for the required buffers; Note: Bush fire buffers can be utilised for Stormwater Quality Treatment. HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 16
MAP 6 CULTURAL HERITAGE HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 17
NOISE Roads are to be constructed in accordance with the standards in the following table: Applications for subdivision within 300m of the Pacific Highway and/or land adjoining Collector Local Minor Road industrial areas will be required to be Road accompanied by an acoustic report, Road Reserve 20m 15-16m 13.5-15m identifying measures (mounding, acoustic Width barriers, building design, building Carriageway Width 9-11m 7-8m 5.5-7m materials, etc) to ensure future residents are not subject to unacceptable noise Verge 4.5 – 5.5m 2 x 4.0m 2 x 4.0m levels. Minimum Design Speed 50km/h 40km/h 25km/h Assessment is to be undertaken by an appropriately qualified person, having 4.5 9- 11 4.5 Collector regard to the following guidelines: NSW Industrial Noise Policy (EPA 2000) and the 4.0 7-8 4.0 Local NSW Environmental Criteria for Road Traffic Noise (EPA 1999). 4.0 5.5-7 4.0 Minor Road (cul-de-sac) Western Precinct/Northern Precinct ROAD DESIGN FOR BUS Development applications for land shown ACCESS as an urban investigation area on the Master Plan are to submit a detailed acoustic report (identifying the above Development is to provide for: measures) and are to be referred to the The safe and efficient movement of buses Roads and Traffic Authority for comment. through the subdivision. Staged development which takes into account bus access. ROAD DESIGN AND ACCESS CONTROL Appropriate road widths on roads likely to form part of a bus route. Development shall be designed in Bus turning area (Map 7) and bus shelters accordance with the Traffic and Transport (Map 4). Strategy. Linking bus routes and bus stops to the Development shall be designed to pedestrian network. incorporate the collector roads shown in The preservation of significant roadside the Master Plan (Map 2). vegetation, particularly along Hearnes Lake Land required for a local road shall be Road. dedicated to Council. Road design and construction works are to conform to Council’s Development PEDESTRIAN AND CYCLEWAY Design Specification. PATHS Road and footpath treatments are to be designed throughout the subdivision to The developer is to provide cycleways create an attractive streetscape. where they pass through the development Local native street trees are to be planted in accordance with Map 4. and protected with tree guards and The developer is to provide footpaths in maintained for a period of three years. accordance with Council’s requirements. HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 18
HEARNES LAKE ROAD Properties affected by the realignment of Hearnes Lake Road to provide for a bus turning bay (see Map 7) are to dedicate the required land as development occurs to ensure the provision of public access to beach foreshore areas. MAP 7 HEARNES LAKE ROAD HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 19
PART 4 – GENERAL DEVELOPMENT CONTROLS RESIDENTIAL LOW DENSITY OBJECTIVES SITE ANALYSIS The controls in this DCP seek to: Site analysis is required to identify opportunities and constraints for building. encourage innovative housing which is pleasant to live in, relates to the desired A site analysis plan (at scale 1:200) is to future neighbourhood character, is include: responsive to the site and is environmentally sensitive; and site dimensions (length, width); improve the quality and choice of housing spot levels or contours; and residential environments to suit the north point; diversity of people’s needs and to meet existing site drainage; community expectations about health, any contaminated soils or filled areas; safety and amenity. services (easements, utilities); existing trees (height, spread, species); SITE ANALYSIS views to and from site; Cool summer breeze prevailing winds; and Good surrounding development (where three or Winter sun path views more dwellings proposed). N 35m Significant trees Neighbour’s Neighbour’s Living Space Requires Poor overlooks Living Space privacy privacy overlooks 6m setback line Street trees Street trees Major Cold winter wind Road Continuous vehicular noise DESIGN RESPONSE Retain significant Provide trees for trees privacy Outdoor living to North No windows to avoid overlooking Living spaces 6m setback line Trees will reduce noise HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 20
A minimum area of 185m2 is to be GENERAL SETBACKS provided for each dwelling for landscaping. For dual occupancy development, the floor area of the proposed dwellings is not to exceed a floor space ratio of 0.4:1. Primary Road The following diagram indicates this. Area A (2nd storey) Area B (1st storey) 6m 0.9m 3m 6m Area C (allotment) Secondary Road Buildings are to be setback 20m from Area A + Area B must not exceed 0.4 creeks and major watercourses. Area C Side and rear setbacks are generally 900mm from walls and 675mm to outer Note: edge of roof gutter and eaves. - The floor area is the sum of the areas of each floor of both dwellings excluding Buildings can be built to side and rear verandahs, all parking areas, storage boundaries (zero setbacks) where: sheds and the like. The floor area is to - the building has maximum boundary be measured from the outer face of the wall height of 3m, unless matching an external enclosing walls. existing or simultaneously constructed - The floor space ratio is the floor area of wall; the proposed dwellings, divided by the - satisfactory legal arrangements for area of the existing lot. maintenance of boundary walls are in place; For three or more dwellings the frontage - there is no adverse impact upon the of the property is to be at least 5.5m amenity of the adjoining properties; wide, so as to provide sufficient area to - there is no interruption to overland the side of the driveway for services such drainage paths; as water meter and mail box, as well as - generally, should only occur on landscaping. For every additional southern boundary; dwelling over three, the width of the - there are no openings in the boundary frontage of the property to the street is to wall; and be increased by 1m (i.e. four dwellings, - the wall is of fire rated masonry frontage of 6.5m). construction. Note: Landscaping is that part of the lot not used ZERO SETBACK for driveways, car spaces or buildings. Boundary No windows or openings SETBACKS 3.5m Buildings are to be generally setback a minimum of 6m from the front boundary. On corner lots buildings can be setback 3m from the secondary street boundary. HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 21
Make the design of buildings interesting Minimise direct overlooking of living areas and livable by incorporating some or all of and private open space of other these elements: dwellings. - decks; Building design should provide an - pergolas; appropriate scale to the streetscape. - verandahs; - eaves; Garages and parking structures are to be - lattice; and sited and designed so as not to dominate - climate control windows (i.e. louvres the street frontage. or small windows, selected glass). Where dual occupancy development is Use pier or pole construction on slopes in proposed and both dwellings will have excess of 20%. A maximum of 1m cut or frontage to the street, the dwellings are fill is allowed outside the buildings not to be mirror reversed. external walls. Buildings are to be designed to enhance the street, by eliminating blank, featureless walls, which detract from the appearance of the street. DESIRABLE DESIGN FOR DUAL OCCUPANCY Mirror reversing: unacceptable design solution Fencing is not to be located along a boundary adjoining public land unless it is Garages/parking areas do not detract from the streetscape no greater than 1.5m high, and includes either a setback for landscaping purposes, or recesses for this same purpose. Note: Council is not bound to enforce S88B instruments in private matters such as density and developer preferred building materials. SOLAR ACCESS Buildings should be designed to allow at least two hours of sunshine upon the living areas of adjacent dwellings and open space areas between 9.00 am and Entry facing the 3.00 pm on 22 June. Driveway widening street to front of the Where the possibility of overshadowing allotment may occur, shadow diagrams are to be submitted to illustrate the shadows cast Buildings should allow for some outlook by the proposed building at 9.00am, to streets, lanes or other public space 12.00 noon and 3.00pm on 22 June. areas to increase surveillance and thereby provide for a safer environment. HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 22
PRIVATE OPEN SPACE VEHICLE ACCESS AND PARKING Each dwelling is to have private open Parking space with direct connection to indoor living areas through sliding glass doors or Car parking is to be provided behind the other similar openings. This space should front setback at the following rate: be oriented to provide for maximum year round use. Dwelling Type Parking (Floorspace) Requirement A minimum of 90m2 is to be provided for per dwelling each dwelling, preferably provided in one area. Consideration may be given to the Small dwellings (≤100m2) 1 space Large dwellings (>100m2) 2 spaces division of this area into two areas, with the smallest portion being no less than Car parking areas should be incorporated 40m2. into the building or provided at, or Each open space area is to have a behind, the front setback of the building. minimum dimension of 4m and a slope Where more than one space is required not greater than 1 in 8. one parking space is allowed between the Private open space (including swimming dwelling and the front boundary. pools) is not to be located at the front of The minimum dimensions of car parking a development adjoining public road, spaces should be 2.4m x 5.5m. unless details of satisfactory fencing are included with the proposal. Driveways N To reduce the impacts of stormwater runoff, improve visual amenity, and maintain on-street car parking driveways should be minimised. 90m2 A driveway, which serves a maximum of 90m2 three dwellings, is to have a minimum paved width of 2m. A shared driveway, which serves three or more dwellings, is to have a minimum paved width of 4.5m at the street, continuing at this width to a depth of 6m. 50m2 Long driveways may require ‘passing points’ (particularly on busy roads). 90m2 40m2 Provision is to be made for vehicles to enter and leave the site in a forward direction, where the site is: - steep; - fronts a busy road; - has three or more dwellings on it; - subject to high pedestrian use; or - where driveways are more than 30m in length. Turning areas are to be designed to allow the 85% Design Car Turning Path. Dwellings are not to unreasonably compromise the private open space of nearby dwellings. HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 23
Driveways should have gradients less For proposals for two or less dwellings than 20% and the driveway grade should the following is required: not change by more than 11% for every - three strips of turf parallel to, and 1.4m of driveway. against, the kerb; - coarse gravel to define a single DRIVEWAYS (3 OR MORE DWELLINGS) construction access no more than 3m wide; - install sediment fence: along the road frontage 2m immediately upslope of the turf strips or around the low side of the area of construction if the site slopes away from the road; around the low side of stockpiles; and with the ends of the fences turned upslope; - all stockpiles of topsoil, sand, aggregate, spoil, vegetation or other 6m 4.5m material capable of being moved by running water shall be stored clear of any drainage lines, easements or natural watercourses, footpath, kerb Note: or road surface; For minimum lot frontages and width of battleaxe handles also refer Council’s - before roofing material is laid, Subdivision DCP. temporary or permanent guttering and downpipes shall be installed and connected to an approved stormwater DEVELOPER CONTRIBUTIONS disposal system; and - all disturbed areas shall be rendered Developer contributions are payable for erosion resistant by revegetation or any development creating two or more landscaping within four weeks of dwellings on one lot. building activities being completed or suspended. Note: Developer contributions are a monetary payment to fund increased demand for public facilities generated by the development. 3.5 Re-vegetate disturbed areas EROSION AND SEDIMENT CONTROL Topsoil Silt fence stockpil Turf strip 3m if For proposals for three or more dwellings sloping towards an Erosion and Sediment Control Plan is street required to be submitted to and approved New trees by Council prior to the release of the construction certificate; refer “Erosion and 4 Sediment Control on Building and Development Sites – Policy and Code of Provide coarse gravel for temporary ROAD Practice”. construction access HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 24
SERVICES Water Meters A separate water meter is to be provided for each dwelling and is to be readily accessible to Council’s meter reader. Stormwater All stormwater is to be directed to the street drainage system, or to an interallotment drainage easement where available. Surface water is not to be directed to neighbouring properties. Stormwater to kerb connections are to be via kerb adapter units. House fencing should not obstruct overland flows of water. House floor levels must be at least 300mm above finished ground level. Note: Interallotment drainage via easements may be required. HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 25
SUBDIVISION OBJECTIVES SITE ANALYSIS steep land The controls in this DCP seek to: provide measures to protect and enhance school the natural and built environment by ensuring that subdivision patterns relate fauna to site conditions; corridor ensure that subdivisions do not detract from the desired future neighbourhood character of the locality; and electricity easement promote the orderly development of land by ensuring that the appropriate form of subdivision is used (i.e. Torrens, community, strata title) while ensuring that it is adequately serviced. creek SITE ANALYSIS A site analysis plan is required to identify DESIGN RESPONSE opportunities and constraints relating to pedestrian the subdivision pattern and potential end access to retain fauna use of the land. school corridor A site analysis plan should be prepared Community lot having regard to the following, where (recreation area) relevant: - waterways (creeks, rivers, streams); - significant vegetation/habitat/ fauna corridors; - flood liable land; Community title - steep land/land slip; subdivision - fire hazard; - access points (vehicles, pedestrians, cyclists); - soil conditions (acid sulfate, contaminated); maintain - surrounding land uses; Conventional creek buffer - service connections; subdivision Fire Protection - easements; Zone - archaeological sites; - topography (contours to Australian Height Datum at 1m intervals); - aspect; - drainage systems; - existing buildings, driveways, septic tanks and disposal areas; and - street and lot layout of locality. HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 26
DENSITY A subdivision which will involve a lot having vehicular access to a lane will only Residential and Tourist Development be permitted after the lot has been shall comply with the target densities in substantially developed (i.e. vacant lots maps of this DCP. off laneways are not to be created), and the lot adjoining the lane is to have 2m Environmental Protection 7A wide frontage fenced and paved to the The minimum lot size is 40 hectares. primary road, to provide for pedestrian Environmental Protection 7B access, mailbox, services (water, sewer, There is no minimum lot size within this electricity, communication). zone. Lot size is determined having Where a subdivision will create more than regard to the merit of the subdivision. two lots or two dwellings using a common All lots are to have a minimum 4m driveway, then the form of subdivision is frontage* to public road**, except: to be either strata or community title. In - where two ‘battle axe handle’ shaped this situation, the common driveway is to lots in a (Torrens title) subdivision will be constructed in concrete a minimum of share a single driveway, then the 4.5m wide at the street, continuing at this combined widths of the ‘handles’ of width to a depth of 6m, and thereafter of the lots are to be at least 4m wide, minimum width 2m, prior to the issue of and each lot is to have room at its the Subdivision Certificate. Adequate frontage for a water meter and letter room at the frontage to accommodate box, in addition to accommodating a water meters and letterboxes is also driveway; required. - lots which have frontage to a cul-de- sac head; these lots are to have a minimum frontage of 10m. * = strata and community title lots may May only be achieve such frontage via their common subdivided in strata or property. community title ** = not including a lane. fashion 4m 4mwide wide handle handle >10m frontage road Subdivisions are not permitted where three or more ‘battle axe handles’ will directly adjoin. Lots fronting a cul-de-sac head road HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 27
SERVICES Utility Services General Utility services must be extended to all lots within a subdivision in accordance with the Urban Areas following table (except for common property Subdivisions in urban areas are generally in community title and strata subdivisions): required to provide infrastructure to all lots including: Utility Urban Rural Rural - road; Service Area Residential area - footpath; Area - kerb and gutter; Council’s Yes No No - drainage; water main Council’s Yes No No - reticulated sewer and water; sewer main - telecommunications; Telephone Yes* Yes* No - street lighting; and Electricity Yes* Yes* Yes** - electricity. * = In greenfield subdivisions these services Stormwater Drainage must be underground. ** =Unless the applicant can demonstrate Stormwater drainage shall be designed and that alternative methods of providing electricity exists or that the provision of this provided in accordance with the Precinct service is cost prohibitive. Specific Stormwater Strategy (refer to Attachment A). Conditions on the development consent will outline how, when and to what standard, The design details will need to be approved these services are to be provided. by Council before the drainage is provided, and will need to be completed to Council’s Street Tree Masterplan satisfaction prior to the issue of the Subdivision Certificate. A Street Tree Masterplan will be required for subdivisions on greenfield sites*. The Stormwater is to be gravity drained to Masterplan aims to guide street tree planting, Council’s drainage system. In some providing for a more colourful City which circumstances inter-allotment drainage complements its natural setting. easements over downstream properties may be required. This will necessitate a letter of * = Where public road is proposed, and may consent from the owner(s) of the downstream be required for community title subdivisions. properties to be submitted with the development application. Planting proposed by the Masterplan is to be determined having regard to: Drainage from sites should reflect the pre- existing or natural situation in terms of site and dwelling boundaries; location, quantity, quality and velocity. location and canopy of existing trees, noting any trees that overhang the sit; adjacent streets and trees; any connection to open space networks or proposed public reserves; paving materials and drainage treatment; details of any existing fencing and walls; and location of underground services. HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN PAGE 28
You can also read