  Development Control Plan

                                             ABN 79 126 214 487
Hearnes Lake/Sandy Beach - Development Control Plan ABN 79 126 214 487 - Amazon AWS
CONTENTS

PART 1 – THE PLAN ..........................................................................................................1
  PREAMBLE ............................................................................................................................1
  AMENDMENTS.......................................................................................................................1
  OBJECTIVES .........................................................................................................................1
  HOW TO USE THIS DCP.........................................................................................................1
  PROCEDURES........................................................................................................................2
PART 2 – PLANNING STRATEGY: MASTERPLAN...............................................................3
  OBJECTIVES .........................................................................................................................3
  SPECIFIC STRATEGIES ..........................................................................................................3
  HOUSING STRATEGY.............................................................................................................5
  URBAN DESIGN STRATEGY ....................................................................................................5
  SERVICING STRATEGY ..........................................................................................................5
  BUSINESS STRATEGY ............................................................................................................7
  COMMUNITY FACILITIES STRATEGY ......................................................................................7
  TRAFFIC AND TRANSPORT STRATEGY ...................................................................................7
  NATURAL ENVIRONMENT STRATEGY .....................................................................................8
  OPEN SPACE AND RECREATION STRATEGY ............................................................................9
PART 3 - PLANNING CONTROLS.....................................................................................11
  DENSITY............................................................................................................................. 11
  GENERAL CONTROLS........................................................................................................... 11
  URBAN DESIGN................................................................................................................... 11
  TIMING OF DEVELOPMENT .................................................................................................. 11
  WATER QUALITY................................................................................................................. 12
  ENERGY EFFICIENT DESIGN ................................................................................................ 12
  FLOODPLAIN MANAGEMENT ................................................................................................ 12
  CULTURAL HERITAGE.......................................................................................................... 15
  NATURAL AND HABITAT AREAS ........................................................................................... 16
  BUSHFIRE HAZARD ............................................................................................................. 16
  NOISE ................................................................................................................................ 18
  ROAD DESIGN AND ACCESS CONTROL................................................................................. 18
  ROAD DESIGN FOR BUS ACCESS.......................................................................................... 18
  PEDESTRIAN AND CYCLEWAY PATHS ................................................................................... 18
  HEARNES LAKE ROAD.......................................................................................................... 19
PART 4 – GENERAL DEVELOPMENT CONTROLS .............................................................20
  RESIDENTIAL LOW DENSITY ............................................................................................... 20
  SUBDIVISION...................................................................................................................... 26
  OFF-STREET CAR PARKING.................................................................................................. 30
  SIGNS................................................................................................................................. 35
  NOTIFICATION ...................................................................................................................38
APPENDIX A – WATER QUALITY TARGETS.....................................................................40

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN                                                                                  PAGE i
Hearnes Lake/Sandy Beach - Development Control Plan ABN 79 126 214 487 - Amazon AWS
PART 1 – THE PLAN
PREAMBLE                                             Environmental Sustainability
                                                       To ensure development complements the
  This Development Control Plan (DCP)                  conservation of biodiversity by protecting
  applies to land in Hearnes Lake / Sandy              areas of high conservation value.
  Beach under the Coffs Harbour City Local
                                                       To ensure that development takes into
  Environmental Plan 2000 (as shown in
                                                       account environmental constraints
  Map 1).
                                                       including soil erosion, flooding and
  This Plan came into force on 7 December              bushfire risk, and protects areas of natural
  2005.                                                and cultural significance.
                                                       To ensure that development incorporates
AMENDMENTS                                             best practice urban water management
                                                       techniques relating to stormwater quality
  This Plan was amended on 7 February 2008.            and quantity, water conservation and re-
  This DCP repeals any other DCP made                  use, and ecosystem health;
  before this DCP, this DCP prevails to the            To ensure that future development does
  extent of any inconsistency.                         not conflict with the objectives of the
                                                       Solitary Islands Marine Park.
OBJECTIVES                                             To ensure that development does not
                                                       conflict with the intended outcomes for
The controls in this DCP seek to achieve the           ‘Healthy Modified Lakes’ as specified in the
following objectives.                                  Healthy Rivers Commission Final Report on
                                                       Coastal Lakes.
Economic Sustainability
                                                       To ensure that development is consistent
  To ensure that the existing community is             with the aims and objectives of State
  not burdened by the provision of public              Environmental Planning Policy 71 – Coastal
  utilities and facilities required as a result of     Protection.
  future development.
  To equitably provide public utilities in a         HOW TO USE THIS DCP
  timely, cost-efficient and effective manner.
  To ensure development contributes to the           The DCP is divided into three parts:
  economic growth of the City and provides
  links to local employment opportunities.             Part 1 - The Plan; introduction;
                                                       Part 2 - Planning Strategy; sets out the
Social Sustainability                                  overall strategy for the area;
  To provide safe and attractive                       Part 3 - Planning Controls; details the
  neighbourhoods that meet the diverse                 specific controls for development within
  needs of the community and offer a wide              the release area; and
  choice of housing and leisure                        Part 4 – General Development Controls
  opportunities, as well as associated                 includes general building, subdivision,
  community facilities.                                environmental and servicing guidelines for
  To improve the accessibility of public               development within the study area.
  transport services and provide
  infrastructure to encourage walking and            Applicants are to comply with the overall
  cycling, and to lessen the dependence on           Planning Strategy and detailed Planning
  cars.                                              Controls unless it can be demonstrated that,
  To provide a network of well distributed           in the opinion of Council, an alternative to
  parks and recreation areas that offer a            any or all of the controls will meet the
  variety of safe, appropriate and attractive        objectives.
  public open spaces.
HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN                                           PAGE 1
Hearnes Lake/Sandy Beach - Development Control Plan ABN 79 126 214 487 - Amazon AWS
PROCEDURES                                          Development generally requires the consent
                                                    of Council. This consent is sought through
Part 3 of this DCP contains the specific            the lodgement of a development application.
controls applying to Development within the
Hearnes Lake/Sandy Beach area.                      Applicants should follow the step-by-step
                                                    process shown in the procedures flow chart.
Part 4 of this DCP provides more detailed
                                                                PROCEDURES FLOW CHART
controls in relation to subdivision and low-
                                                    Step 1
density residential development. Tourist            Read this DCP and obtain any relevant information sheets
development is to comply with the prevailing
guidelines.                                         Step 2
                                                    Undertake site analysis

                                                    Step 3
                                                    Prepare draft proposal in accordance with the Master Plan (Map
                                                    2) and Planning Controls (Parts 2, 3 and 4)

                                                    Step 4
                                                    Discuss the draft proposals with Council staff and any other
                                                    organisations i.e. DoP*, RTA, DEC, DNR, MPA, LALC

                                                    Step 5
                                                    Check the development meets the general controls in this DCP
                                                    and is consistent with the Master Plan (Map 2)

                                                    Step 6
                                                    Check environmental constraints for:
                                                       Flood prone land
                                                       Significant vegetation
                                                       Acid sulfate soils
                                                       Fire hazard
                                                       Cultural Heritage
                                                       Threatened and/or Endangered Species, Populations,
                                                       Ecological Communities
                                                       Noise

                                                    Step 7
                                                    Consult with adjoining land owners – consider their opinions on
                                                    the proposal

                                                    Step 8
                                                    Consult with Council’s Technical Liaison Committee if appropriate

                                                    Step 9
                                                    Prepare plans/report in accordance with discussions and
                                                    guidance provided
                                    MAP 1
                                 LOCALITY           Step 10
                                                    Lodge development application with Council/Consent Authority

Applicants are also required to comply with                             Where approval granted
the requirements of the Building
                                                    Step 11
Sustainability Index (BASIX) for certain types      Commence work in accordance with the conditions of approval
of development. Liaison with the Department
of Planning is recommended to assist with           * State Environmental Planning Policy (SEPP) No. 71 –
                                                    Coastal Protection applies to land within the DCP Study
development proposals.                              Area. Liaison with the Department of Planning is
                                                    recommended to assist with development proposals.

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN                                                          PAGE 2
Hearnes Lake/Sandy Beach - Development Control Plan ABN 79 126 214 487 - Amazon AWS
PART 2 – PLANNING STRATEGY: MASTERPLAN
OBJECTIVES                                          Environmental Sustainability

  To provide a framework for a community              Restrict development from environmental
  that is sustainable, safe and vibrant.              protection areas (see Master Plan) and
                                                      require the dedication of such land to
  To provide an overall plan for the area             Council as part of development proposals.
  that enables the integration of existing
                                                      Require developers to provide perimeter
  and proposed development.
                                                      roads adjacent to environmental
                                                      protection areas for fire fighting purposes,
SPECIFIC STRATEGIES                                   access for maintenance, and for passive
                                                      surveillance of parkland by residents.
Economic Sustainability
                                                      Ensure development proposals provide
  Provide for an additional population of             bush fire buffers, which do not encroach
  approximately 1,352 people.                         on environmental protection areas or
  Enable sustainable residential housing and          involve the removal of native vegetation.
  low-key ecotourism opportunities (refer to          Encourage the use of bush fire buffers for
  Map 5 Target Densities).                            passive recreational activities and/or
  Require developers to provide reticulated           community facilities where it does not
  water and sewer to new development by               involve negative impacts on environmental
  extending the existing network (refer to            values.
  Map 3 Servicing Strategy).                          Ensure development demonstrates the
  Require developers to forward fund any              achievement of the Stormwater
  works required ahead of Council’s                   Management Strategy for the release area
  Developer Servicing Plans.                          (see attachment A).
  Provide access to retail and commercial             Utilise innovative Water Sensitive Urban
  services in the townships of Woolgoolga             Design strategies to reduce nutrient
  and Moonee Beach.                                   loading, sedimentation and chemical
                                                      contamination of local waterways.
Social Sustainability                                 Restrict urban development from land
                                                      identified with a significant flood risk.
  Require developers to construct a collector
  road system accordance with the Master              Utilise acoustic design to ensure highway
  Plan.                                               traffic and Industrial noise does not
                                                      exceed acceptable levels within residential
  Require developers to provide pedestrian            areas.
  access in a timely manner, linking
  residential areas to the public open space          Provide landscaped buffers (utilising local
  network.                                            native species) between future residences
                                                      and the highway/industrial land, and
  Ensure that developers provide bus                  where practicable incorporate essential
  shelters so that all residential areas are          service corridors.
  generally within 500m from the nearest
  shelter.                                            To ensure that development does not
                                                      conflict with the intended outcomes for
  Provide a sporting field, which                     ‘Healthy Modified Lakes’ as specified in the
  incorporates a playground and BMX track             Healthy Rivers Commission Final Report on
  (as shown in the Master Plan).                      Coastal Lakes.
  Ensure that developers provide children’s           To ensure that development is consistent
  playgrounds so that all residential areas           with the aims and objectives of State
  are no further than 500m from the nearest           Environmental Planning Policy 71 – Coastal
  facility.                                           Protection.

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN                                             PAGE 3
Hearnes Lake/Sandy Beach - Development Control Plan ABN 79 126 214 487 - Amazon AWS
MAP 2
                                                    MASTERPLAN

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN         PAGE 4
Hearnes Lake/Sandy Beach - Development Control Plan ABN 79 126 214 487 - Amazon AWS
HOUSING STRATEGY                                    SERVICING STRATEGY

  Optimise dwelling yield on areas suitable           Require developers to extend water and
  for urban development;                              sewer from the nearest point identified in
  Ensure densities comply with those                  Council’s Water and Wastewater Developer
  specified on Map 5 – Target Densities;              Servicing Plans (see Map 3);
                                                      Where services identified in Council’s
URBAN DESIGN STRATEGY                                 Water and Wastewater Servicing Plans are
                                                      not in place at the time the developer
  Urban form is to create three precincts as          wishes to proceed, it will be the
  shown on the Master Plan (Map 2);                   developer’s responsibility to forward fund
                                                      these services;
  Each precinct is to provide for compact
  walkable neighbourhoods with access to              Development should enable efficient
  social opportunities and public open space          provision of utility services to new
  areas;                                              localities, and should ensure that
                                                      innovations in Water Sensitive Urban
  A variety of lot sizes and types should be
                                                      Design can be incorporated, either at the
  provided to facilitate housing diversity and
                                                      time of development or in the future.
  choice to meet the requirements of people
  with different housing needs;
  Urban form is to ensure a site-responsive         Northern Precinct
  approach that supports and enhances the
  context in which it is located, particularly        Require developers to provide pump
  the topography and environmental                    stations as shown on Map 3;
  constraints of the land;                            Additional pump stations should be
  Development shall strengthen local                  avoided where other alternatives are
  character and identity and promote a                available.
  sense of community through a range of
  design techniques.                                Eastern Precinct

                                                      Public access is to be provided to the
                                                      existing pump station in the Eastern
                                                      Precinct for maintenance purposes (see
                                                      Map 3).

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN                                            PAGE 5
Hearnes Lake/Sandy Beach - Development Control Plan ABN 79 126 214 487 - Amazon AWS
MAP 3
                                                    SERVICES

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN       PAGE 6
Hearnes Lake/Sandy Beach - Development Control Plan ABN 79 126 214 487 - Amazon AWS
BUSINESS STRATEGY                                   Bosworth Road/Pacific Highway
                                                      Development of the Northern Precinct
  Provide strong links between proposed               being limited to a maximum of 80 lots until
  neighbourhoods and the town centres of              such time as Highway Upgrade works are
  Woolgoolga and Moonee;                              completed or alternative access is
  Provide good accessibility through street           provided via the Pacific Highway
  layouts and promote walking and cycling;            /Bosworth Road Intersection.

  Enable the development of a low-key                 Development of the northern precinct
  Restaurant/Café or General Store in the             above 80 lots being restricted to the
  Northern Precinct.                                  number of lots to be accommodated by
                                                      the Pacific Highway/Bosworth Road
                                                      Intersection in terms of safety and
                                                      intersection capacity, until such time as
COMMUNITY FACILITIES                                  the Pacific Highway Bypass works are
STRATEGY                                              complete.

  Investigate the feasibility of relocating         Graham Drive/Pacific Highway
  and/or improving the existing car parking
  area near the entrance to Hearnes Lake to            Major development ahead of the Pacific
  cater for the increased visitors to the area.       Highway upgrade within the Western
                                                      Precinct is subject to:
  Develop a Plan of Management in
  consultation with the Department of Lands            the upgrade of the Graham Drive/Pacific
  for the foreshore area to enable the                Highway intersections;
  provision of low-key community facilities.           the construction of two new intersections
  Provide adequate transport and pedestrian           off Graham Drive to service the
  linkages to community facilities and open           development (as shown in the Master
  space areas.                                        Plan);
                                                      -   the upgrade of the Morgans Road
                                                          Intersection.
TRAFFIC AND TRANSPORT
                                                    Eastern Precinct
STRATEGY
                                                      It will be the responsibility of the
Hearnes Lake Road                                     developer to undertake a Traffic Impact
  The DCP assumes that the Roads and                  Statement to determine any works
                                                      required to mitigate impacts of the
  Traffic Authority (RTA) will upgrade the
  Hearnes Lake Road/Pacific Highway                   development on the existing local road
  Intersection as part of the Coffs Harbour           network;
  Highway Planning Strategy. Hearnes Lake             The Traffic Impact Statement shall provide
  Road may be closed at the Pacific Highway           emphasis on the following
  as part of this upgrade.                            roads/intersections:
  Investigate the feasibility of closing               - Ti Tree Road
  sections of Hearnes Lake Road to provide             - Maple Road
  for environmental benefit to the lake,               - Chestnut Avenue
  subject to alternative access being
                                                       - Pine Crescent
  provided to residents.
                                                       - Diamond Head Drive
                                                      It will be the responsibility of the
                                                      developer to provide facilities (such as
                                                      cycleways, bus shelters, pedestrian cross
                                                      over points) identified as being necessary
                                                      in the Traffic Impact Statement or
                                                      considered necessary by Council.

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN                                           PAGE 7
General                                             Exclude urban development from known
                                                    Habitat for Wallum Froglet and other
  It will be the responsibility of the
                                                    endangered fauna species, and provide
  developer to provide a collector road
                                                    sufficient buffers to development;
  system that reduces the reliance on the
  Pacific Highway for local trips.                  Provide bush fire buffers between
                                                    environmental protection areas and future
  Provide bus shelters as identified in the
                                                    development without the need to remove
  Master Plan (Map 2) to service the entire
                                                    high value native vegetation;
  area;
                                                    Dedicate land that cannot be developed
  Provide a bus turning area on Hearnes
                                                    due to the required bush fire buffers to
  Lake Road as shown in the Master Plan
                                                    Council and incorporate into environmental
  (Map 2);
                                                    protection areas;
  It will be the responsibility of the
                                                    Where practicable, enable the use of bush
  developer to:
                                                    fire buffers for activities ancillary to tourist
   - extend local road access to the                development;
       identified collector road system;
   - ensure pedestrian and cycleway                 Require the dedication of environmental
       linkages are provided to the northern        protection areas to Council as
       beaches cycleway, local schools,             development occurs;
       shops, playing field, parks and              Where practicable, seek to incorporate
       beaches;                                     environment protection areas into the
   - implement traffic calming devices at           Coffs Coast Regional Park;
       cycleway crossover points on the
                                                    Manage environmental protection areas
       collector road system;
                                                    not incorporated into the Coffs Coast
   - utilise minimum road and verge                 Regional Park in accordance with the
       widths for Hearnes Lake Road to              relevant Plan of Management (PoM):
       prevent impacts on significant
                                                     - Natural Areas PoM;
       roadside ecology.
                                                     - Coffs Harbour Coastal Reserves PoM;
                                                    Manage environmental protection areas in
NATURAL ENVIRONMENT                                 consultation with the Department of Lands
STRATEGY                                            where the land is Crown Land under the
                                                    management of Council or Vacant Crown
  Protect and enhance environmental                 Land;
  protection areas as identified on the             Manage foreshore areas in consultation
  Master Plan and Map 4 (includes bush fire         with the Marine Parks Authority and
  buffers, creek buffers, development               ensure that education and/or
  buffers, significant vegetation and other         interpretation signage is provided for
  constrained land);                                residents and visitors to the area;
  Exclude urban development from sensitive          Ensure that future development does not
  areas to protect riparian vegetation,             degrade the environmental values of the
  maintain water quality, and provide               Solitary Islands Marine Park and that
  habitat linkages;                                 future development is consistent with the
  Eliminate adverse impacts of development          objectives of the Solitary Islands Marine
  upon the aesthetic, recreational and              Park Zoning Plan for Hearnes Lake:
  ecological value of the flood plain;              Habitat Protection Zone Objectives
  Protect and enhance high value                    -   The protection of biological diversity,
  vegetation;                                           habitat, ecological processes, natural
                                                        and cultural features; and
  Exclude urban development from areas
  with a high water table where there is            -   Opportunities for recreational and
  likely to be adverse impacts on                       commercial activities, scientific
  groundwater or surface water quality;                 research, and educational activities.
HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN                                            PAGE 8
OPEN SPACE AND RECREATION
STRATEGY
  Incorporate environmental protection
  areas into a network of public open space,
  as shown on Map 4.
  Establish a sporting field, playground and
  BMX track with adequate linkages to
  existing and future residences, open space
  areas and Sandy Beach Primary School
  (Map 4).
  Provide children’s playgrounds within
  reasonable walking distance (500m) of all
  future housing (Map 4).
  Manage open space areas and community
  land in accordance with the relevant Plan
  of Management.
  Encourage passive recreation within open
  space areas (including bush fire buffers)
  where it does not involve the removal of
  native vegetation and/or damage to the
  environmental values of the area.
  Investigate the use of 4WD Vehicles on
  Hearnes Lake Beach and prohibit such use
  where it is found to be damaging to
  significant environmental values of the
  Solitary Islands Marine Parks and/or
  surrounding environments.
  Investigate the relocation of the existing
  car parking area at the entrance to the
  Lake and the rehabilitation of the area
  with local native species.

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN   PAGE 9
MAP 4
                                                    OPEN SPACE NETWORK

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN                 PAGE 10
PART 3 - PLANNING CONTROLS
DENSITY                                             URBAN DESIGN
  The density of development within each             Subdivision layouts should establish legible
  precinct is to be in accordance with the           street and open space networks, and
  target densities specified on Map 5.               should generally provide for buildings
                                                     fronting streets to ensure safe, attractive
                                                     and efficient circulation of pedestrians,
HEIGHT                                               cyclists and drivers.
                                                     Development shall connect well to existing
  Buildings are not to exceed 6m in height.          or proposed development on adjacent
                                                     sites.
Note: Height means the distance measured             Development shall provide open space
vertically from any point on the eaves/              linkages to adjacent environmental
gutter line of the building to the natural
                                                     protection and/or open space areas.
ground level immediately below that point.
                                                     A landscape plan is required detailing
                                                     treatment of the streetscape utilising local
                                                     native species and shall include a three-
HOUSING MIX                                          year maintenance plan. The landscape
                                                     plan shall be submitted to Council prior to
General Controls                                     the release of the Subdivision Certificate.
                                                     Landscaping requirements shall not be
  Development is to comply with the
                                                     reliant on Council land and is to occur on
  controls provided below and Part 4 of this
                                                     public land only at the request of Council.
  DCP;
                                                     Residential development utilising ‘gated’
  Lots must have appropriate area and
                                                     street formats is strongly discouraged.
  dimensions to enable efficient siting and
  construction of a dwelling and ancillary           Where retirement or other lifestyle
  buildings, provision of private outdoor            developments are proposed, these must
  space, convenient vehicle access to a              incorporate the majority of their
  public road and adequate parking.                  development on public streets, with good
                                                     linkages to surrounding areas.
  Tourist development should be in
  accordance with the prevailing guidelines;
  Where practicable bush fire buffers can be
  utilised for recreational activities,
                                                    TIMING OF DEVELOPMENT
  community facilities and stormwater
                                                     No development is to occur until adequate
  treatment.
                                                     road access and reticulated water and
                                                     sewerage services are available to the
                                                     land.

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN                                         PAGE 11
WATER QUALITY                                       ENERGY EFFICIENT DESIGN
   Development involving earthworks or                Lots are to be orientated to facilitate the
  vegetation removal shall be accompanied             siting of dwellings that will have adequate
  by an Erosion and Sediment Control Plan             solar access.
  in accordance with Council's Policy.
                                                      A minimum of 75% of lots in any proposed
  To ensure protection of water quality, the          subdivision for single dwelling allotments,
  following buffers are to be provided (as            shall be orientated so that the long axis of
  determined by Council and shown on the              the lot is within the range shown in the
  Master Plan):                                       Diagram.
   - A minimum of 50m from an RL Level
       of 3.5 around Hearnes Lake and
       Double Crossing Creek;
   - 50m from SEPP26 Littoral Rainforests;
   - 50m from SEPP14 Wetlands;
   - 50m from Willis Creek,
   - 20m from all other creeks,
  As part of development proposals the
  buffers specified above are to be
  rehabilitated and revegetated using local
  native species, in accordance with a
  detailed plan approved by Council, and
  dedicated as environmental protection
  land (refer to Master Plan and Map 4);
  Development applications for subdivision
  are to be accompanied by water quality              Residential development shall be designed
  modelling to assess the impact of                   in accordance with Council's Energy
  development in accordance with the                  Efficiency Information Sheet.
  Stormwater Strategy for each precinct
  (refer to attachments A);
  Development is to incorporate Water               FLOODPLAIN MANAGEMENT
  Sensitive Urban Design in accordance with
  Council’s adopted policy.                         General
  Development applications for low lying
  areas are to be accompanied by                    Development will be required to comply with
  groundwater monitoring over 12 months             Council’s Flood Prone Land Policy, parts of
  and an assessment of the impacts of               which are summarised below.
  proposed development, particularly
  placement of fill, drainage and stormwater        Subdivision
  facilities with regards to groundwater
  quality and levels, and the impacts on the          All lots within a Flood prone Area (as
  estuary.                                            defined by Council) must have a house
                                                      site with a minimum area of 400m2, with a
                                                      minimum width of 15m, above the 100
                                                      year flood level.
                                                      Any portion of the lot lower than the 100
                                                      year flood level will have a restriction on
                                                      the construction of non exempt structures.

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN                                         PAGE 12
Where development involves landform                 Where Site Assessment Reports, Remedial
  modification below the 1% flood level, the          Action Plan’s, or Validation Reports are
  proposed development shall comply with              required as part of development
  the following provisions:                           applications, these are to be prepared in
  - A flooding analysis is to be submitted            accordance with relevant guidelines
     with the development application and             prepared by the NSW Environment
     approved by Council’s Flooding                   Protection Authority (EPA) including the
     Engineer prior to issue of consent.              following:
  - No filling will be permitted within the            - Guidelines for Assessing Banana
     High Flood Risk Precinct.                             Plantation Sites (EPA 1997) and;
  - Minor filling may be permitted within              - Guidelines for Consultants Reporting
     the 1% flood extent subject to an                     on Contaminated Sites.
     engineers report certifying the                  The National Environmental Protection
     development will not result in any               Council’s National Environment Protection
     increased flood affectation elsewhere            (Assessment of Site Contamination)
     and results in a better planning                 Measure (1999) shall also be considered
     solution. Minor filling being regarded as        as part of assessment reports.
     filling resulting in the 1% flood line
     having a more regular shape and/or               Where the detailed site assessment
     minor movement of the line to facilitate         indicates that a Remedial Action Plan
     a more practicable and/or efficient              (RAP) is required, this Plan shall
     development.                                     accompany Development Applications.
  - No adverse change to the flood                    These reports are to be prepared by
     behaviour will be permitted, either on           suitably qualified and experienced
     properties adjoining the site or                 professionals.
     elsewhere including upstream and                 Where the aggregate area to be
     downstream of the site.                          remediated is more than 3 hectares, the
  Local perimeter roads should be above the           development becomes designated
  1% flood level.                                     development and requires the preparation
  Internal road layouts and subdivision               of an Environmental Impact Statement.
  design shall consider flood evacuation              No remediation is to occur without Council
  issues for pedestrians and vehicles.                approval; compliance with the
  Roads across waterways are to be                    abovementioned guidelines; and
  constructed to Council standards.                   compliance with SEPP 55 – Remediation of
                                                      Land.
  In designing subdivisions, consideration
  must be given to the requirement for
                                                    General
  dwelling floor levels to be 500mm above
  the 1% flood level.                                 Development applications for land being
                                                      potentially contaminated and/or previously
                                                      used for banana cultivation shall include as
POTENTIALLY CONTAMINATED                              a minimum, consideration of site history
LAND                                                  and the potential of soil contamination
                                                      from previous land use.
  The following requirements apply to any             Where this consideration identifies soil
  land with a history of Banana Cultivation           contamination and/or cannot exclude the
  and/or Potentially Contaminated Land                possibility of contaminated land, then a
  identified.                                         detailed site assessment shall be
  A detailed site assessment report with              undertaken as above.
  regard to potential soil and groundwater
  contamination shall be submitted with
  development applications for the above
  land.

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN                                         PAGE 13
MAP 5
                                                    TARGET DENSITIES

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN              PAGE 14
CULTURAL HERITAGE                                     A comprehensive inspection and
                                                      assessment of the site area;
Northern Precinct                                     Management options are to be developed
                                                      on the basis of an interpretation and
Site HL1 (see Map 6)                                  investigation of the results by a person
                                                      deemed suitably qualified by Council.
  It will be the responsibility of the developer
  to undertake an Archaeological                    Western and Eastern Precincts
  Investigation into Site HL1 identified on
  Map 6.                                            General
  The investigation is to involve:
                                                      An Archaeological Assessment must be
   - The removal of grass cover by
                                                      undertaken as part of the development
      controlled burning to minimise ground
                                                      application process.
      disturbance;
   - A comprehensive inspection and                   Archaeological Assessments must:
      assessment of the site area following           - be undertaken by person(s) deemed to
      the removal of the grass cover to                  be suitably qualified by Council and the
      determine the need for subsurface                  local Aboriginal Land Council.
      testing, artefact salvage and/or site         Note: consultants must have an appropriate
      protection;                                   knowledge/attachment to the Hearnes
  It will be the responsibility of the developer    Lake/Sandy Beach area.
  to obtain an appropriate permit from the            - Comply with the National Parks and
  Department of Environment and                         Wildlife Act 1974 and Environmental
  Conservation before undertaking any                   Planning and Assessment Act 1979.
  subsurface testing and/or artefact salvage;         - Consider specific ‘links’, which are
  The Archaeological Investigation must be              important to the Gumbaingirr Aboriginal
  in accordance with the National Parks and             community.
  Wildlife Act 1974 and Environmental                 Consultation is to be undertaken with the
  Planning and Assessment Act 1979;                   Local Aboriginal Land Council, Yarrawarra
                                                      Aboriginal Corporation & Elders of relevant
Site HL2 – Natural Mythological Site                  Aboriginal Communities throughout the
                                                      preparation of the assessment.
  All development is excluded from land
  within Site HL2 as shown on Map 6.                  Cultural Heritage Studies are to be
                                                      forwarded to the LALC and YAC for
  Adjacent development shall not impact on            comments prior to their finalisation.
  the spiritual/sacred significance of this site
  and an appropriate buffer between the site          A copy of the finalised Cultural Heritage
  and future development is to be provided.           Study is to be given to the LALC and YAC.
                                                      The requirements of the National Parks
Spur Crests                                           and Wildlife Act 1974 must be followed if
Lot 21 DP 714858, Lot 1 DP 253878 &                   cultural/sites places are identified on the
Lot 202 DP 1066412                                    site and a Section 90 Heritage Impact
                                                      Permit obtained from the Department of
  It will be the responsibility of the developer      Environment and Conservation ahead of
  to undertake an Archaeological                      any site disturbance or destruction.
  Investigation to determine the status of
  the Spur Crest identified on Map 6 before         Lot 22 DP 1070182 – Historic Campsite
  any disturbance works commence.                   (Peron Camp)
  The investigation is to involve:
   - The removal of grass cover by                    The Archaeological Assessment must also
      manually ‘scrapping off’ (to minimise           include an inspection of the former Peron
      ground disturbance);                            campsite.

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN                                             PAGE 15
NATURAL AND HABITAT AREAS                             - The VMP is to incorporate the treatment
                                                        of the highway buffer, using local native
  Environmental protection areas are to be              species, with an aim to providing a
  protected through the provision of buffers            scenic buffer for the travelling public;
  (see Water Quality) and by excluding                - Initial works identified within the VMP
  development from flood liable land.                   are to be completed prior to release of
  Land within 100m of any Osprey nest shall             Subdivision Certificate;
  be added to environmental protection land           - Works may be staged but must be
  and dedicated to Council as development               commensurate with staging of
  occurs.                                               subdivision; and
  Development applications shall require              - Follow up maintenance works identified
  assessment of natural and habitat areas.              within the VMP are to be costed and
                                                        contribution paid to Council at the time
  Development or works on land with Known               of dedication.
  Habitat for Wallum Froglet and other
  endangered fauna species will require               Protected areas are to be fenced off prior
  assessment under the Threatened Species             to commencement of works to prevent
  Conservation Act 1995. Habitat areas shall          degradation of natural vegetation during
  be dedicated to Council for environmental           construction works.
  protection as development occurs.
  Development shall have regard to Council’s
  Koala Habitat Information Sheet.                  BUSHFIRE HAZARD
  Where practicable, perimeter roads shall            All proposals for subdivision must be
  be provided adjacent to all environmental           accompanied by a Bush Fire Assessment in
  protection areas to provide a separation            accordance with Council’s Bush Fire
  distance between residential development            Information Sheet.
  and natural areas. Perimeter roads may be
  incorporated into bush fire buffers.                Bush fire buffers are to be maintained at
                                                      all times with minimal fuel loads.
  For all environmental protection land
  required to be dedicated to Council the           Eastern Precinct
  following applies:
  - A detailed Vegetation Management Plan             Beach access is to be provided by the
      (VMP) for the rehabilitation/revegetation       Developer where identified in the Master
      of environmental protection land is to          Plan and on Map 4.
      be submitted and approved by Council;
  - The VMP is to incorporate bush fire
      buffers and provide management
      measures for the required buffers;

  Note: Bush fire buffers can be utilised for
  Stormwater Quality Treatment.

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN                                         PAGE 16
MAP 6
                                                    CULTURAL HERITAGE

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN               PAGE 17
NOISE                                                 Roads are to be constructed in accordance
                                                      with the standards in the following table:
  Applications for subdivision within 300m of
  the Pacific Highway and/or land adjoining                        Collector
                                                                                 Local       Minor Road
  industrial areas will be required to be                           Road
  accompanied by an acoustic report,                Road Reserve
                                                                     20m        15-16m           13.5-15m
  identifying measures (mounding, acoustic             Width
  barriers, building design, building               Carriageway
                                                       Width         9-11m       7-8m             5.5-7m
  materials, etc) to ensure future residents
  are not subject to unacceptable noise                Verge       4.5 – 5.5m   2 x 4.0m         2 x 4.0m
  levels.                                             Minimum
                                                    Design Speed    50km/h      40km/h           25km/h
  Assessment is to be undertaken by an
  appropriately qualified person, having
                                                        4.5          9- 11        4.5      Collector
  regard to the following guidelines: NSW
  Industrial Noise Policy (EPA 2000) and the              4.0         7-8       4.0      Local
  NSW Environmental Criteria for Road
  Traffic Noise (EPA 1999).                               4.0        5.5-7      4.0      Minor Road
                                                                                         (cul-de-sac)

Western Precinct/Northern Precinct
                                                    ROAD DESIGN FOR BUS
  Development applications for land shown
                                                    ACCESS
  as an urban investigation area on the
  Master Plan are to submit a detailed
  acoustic report (identifying the above            Development is to provide for:
  measures) and are to be referred to the              The safe and efficient movement of buses
  Roads and Traffic Authority for comment.            through the subdivision.
                                                       Staged development which takes into
                                                      account bus access.
ROAD DESIGN AND ACCESS
CONTROL                                                Appropriate road widths on roads likely to
                                                      form part of a bus route.
   Development shall be designed in                    Bus turning area (Map 7) and bus shelters
  accordance with the Traffic and Transport           (Map 4).
  Strategy.
                                                       Linking bus routes and bus stops to the
   Development shall be designed to                   pedestrian network.
  incorporate the collector roads shown in
                                                       The preservation of significant roadside
  the Master Plan (Map 2).
                                                      vegetation, particularly along Hearnes Lake
   Land required for a local road shall be            Road.
  dedicated to Council.
   Road design and construction works are
  to conform to Council’s Development               PEDESTRIAN AND CYCLEWAY
  Design Specification.
                                                    PATHS
   Road and footpath treatments are to be
  designed throughout the subdivision to               The developer is to provide cycleways
  create an attractive streetscape.                   where they pass through the development
   Local native street trees are to be planted        in accordance with Map 4.
  and protected with tree guards and                   The developer is to provide footpaths in
  maintained for a period of three years.             accordance with Council’s requirements.

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN                                                 PAGE 18
HEARNES LAKE ROAD
   Properties affected by the realignment of
  Hearnes Lake Road to provide for a bus
  turning bay (see Map 7) are to dedicate
  the required land as development occurs to
  ensure the provision of public access to
  beach foreshore areas.

                          MAP 7
              HEARNES LAKE ROAD

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN   PAGE 19
PART 4 – GENERAL DEVELOPMENT CONTROLS
    RESIDENTIAL LOW DENSITY
    OBJECTIVES                                                                    SITE ANALYSIS

    The controls in this DCP seek to:                                             Site analysis is required to identify
                                                                                  opportunities and constraints for building.
        encourage innovative housing which is
        pleasant to live in, relates to the desired                               A site analysis plan (at scale 1:200) is to
        future neighbourhood character, is                                        include:
        responsive to the site and is
        environmentally sensitive; and                                                site dimensions (length, width);
        improve the quality and choice of housing                                     spot levels or contours;
        and residential environments to suit the                                      north point;
        diversity of people’s needs and to meet                                       existing site drainage;
        community expectations about health,                                          any contaminated soils or filled areas;
        safety and amenity.                                                           services (easements, utilities);
                                                                                      existing trees (height, spread, species);
     SITE ANALYSIS                                                                    views to and from site;
                                            Cool summer breeze                        prevailing winds; and
                                                          Good                        surrounding development (where three or
         Winter sun path                                  views                       more dwellings proposed).

N
                           35m

                                 Significant trees                                Neighbour’s
     Neighbour’s                                                                  Living Space
                                 Requires               Poor                        overlooks
     Living Space
                                  privacy              privacy
       overlooks

                                                     6m setback line
Street trees
                                                                         Street trees

                                                            Major
                                 Cold winter wind           Road

                             Continuous vehicular noise

                                                             DESIGN RESPONSE

                                                                                                                          Retain significant
                                                              Provide trees for                                                 trees
                                                                   privacy
                                                                                          Outdoor living to
                                                                                               North
                                                                                                                     No windows to
                                                                                                                    avoid overlooking

                                                                                                 Living
                                                                                                 spaces

                                                                                                                           6m setback line

                                                                                          Trees will reduce noise

    HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN                                                                              PAGE 20
A minimum area of 185m2 is to be
                                                                                       GENERAL SETBACKS
    provided for each dwelling for
    landscaping.
    For dual occupancy development, the
    floor area of the proposed dwellings is not
    to exceed a floor space ratio of 0.4:1.

                                                      Primary Road
    The following diagram indicates this.

                                Area A (2nd storey)
 Area B (1st storey)

                                                                        6m                     0.9m

                                                                                 3m                         6m

   Area C
 (allotment)                                                                               Secondary Road

                                                                     Buildings are to be setback 20m from
Area A + Area B
                       must not exceed 0.4                           creeks and major watercourses.
     Area C
                                                                     Side and rear setbacks are generally
                                                                     900mm from walls and 675mm to outer
Note:                                                                edge of roof gutter and eaves.
- The floor area is the sum of the areas of
  each floor of both dwellings excluding                             Buildings can be built to side and rear
  verandahs, all parking areas, storage                              boundaries (zero setbacks) where:
  sheds and the like. The floor area is to                           - the building has maximum boundary
  be measured from the outer face of the                                 wall height of 3m, unless matching an
  external enclosing walls.                                              existing or simultaneously constructed
- The floor space ratio is the floor area of                             wall;
  the proposed dwellings, divided by the                             - satisfactory legal arrangements for
  area of the existing lot.
                                                                         maintenance of boundary walls are in
                                                                         place;
    For three or more dwellings the frontage                         - there is no adverse impact upon the
    of the property is to be at least 5.5m                               amenity of the adjoining properties;
    wide, so as to provide sufficient area to                        - there is no interruption to overland
    the side of the driveway for services such                           drainage paths;
    as water meter and mail box, as well as                          - generally, should only occur on
    landscaping. For every additional                                    southern boundary;
    dwelling over three, the width of the                            - there are no openings in the boundary
    frontage of the property to the street is to                         wall; and
    be increased by 1m (i.e. four dwellings,                         - the wall is of fire rated masonry
    frontage of 6.5m).                                                   construction.

Note:
Landscaping is that part of the lot not used                           ZERO SETBACK
for driveways, car spaces or buildings.
                                                                                           Boundary
                                                                                                  No windows or
                                                                                                    openings
SETBACKS
                                                                                3.5m

    Buildings are to be generally setback a
    minimum of 6m from the front boundary.
    On corner lots buildings can be setback
    3m from the secondary street boundary.

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN                                                       PAGE 21
Make the design of buildings interesting         Minimise direct overlooking of living areas
          and livable by incorporating some or all of      and private open space of other
          these elements:                                  dwellings.
          - decks;
                                                           Building design should provide an
          - pergolas;
                                                           appropriate scale to the streetscape.
          - verandahs;
          - eaves;                                         Garages and parking structures are to be
          - lattice; and                                   sited and designed so as not to dominate
          - climate control windows (i.e. louvres          the street frontage.
             or small windows, selected glass).            Where dual occupancy development is
          Use pier or pole construction on slopes in       proposed and both dwellings will have
          excess of 20%. A maximum of 1m cut or            frontage to the street, the dwellings are
          fill is allowed outside the buildings            not to be mirror reversed.
          external walls.
          Buildings are to be designed to enhance
          the street, by eliminating blank,
          featureless walls, which detract from the
          appearance of the street.

DESIRABLE DESIGN FOR DUAL OCCUPANCY

                                                         Mirror reversing: unacceptable design
                                                                        solution
                                                           Fencing is not to be located along a
                                                           boundary adjoining public land unless it is
  Garages/parking areas do not
  detract from the streetscape

                                                           no greater than 1.5m high, and includes
                                                           either a setback for landscaping
                                                           purposes, or recesses for this same
                                                           purpose.

                                                        Note:
                                                        Council is not bound to enforce S88B
                                                        instruments in private matters such as
                                                        density and developer preferred building
                                                        materials.

                                                        SOLAR ACCESS

                                                           Buildings should be designed to allow at
                                                           least two hours of sunshine upon the
                                                           living areas of adjacent dwellings and
                                                           open space areas between 9.00 am and
                                 Entry facing the          3.00 pm on 22 June.
  Driveway widening                   street
    to front of the                                        Where the possibility of overshadowing
       allotment                                           may occur, shadow diagrams are to be
                                                           submitted to illustrate the shadows cast
           Buildings should allow for some outlook         by the proposed building at 9.00am,
           to streets, lanes or other public space         12.00 noon and 3.00pm on 22 June.
           areas to increase surveillance and thereby
           provide for a safer environment.

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN                                              PAGE 22
PRIVATE OPEN SPACE                                  VEHICLE ACCESS AND PARKING

   Each dwelling is to have private open            Parking
   space with direct connection to indoor
   living areas through sliding glass doors or         Car parking is to be provided behind the
   other similar openings. This space should           front setback at the following rate:
   be oriented to provide for maximum year
   round use.                                              Dwelling Type          Parking
                                                            (Floorspace)        Requirement
   A minimum of 90m2 is to be provided for                                      per dwelling
   each dwelling, preferably provided in one
   area. Consideration may be given to the          Small dwellings (≤100m2)       1 space
                                                    Large dwellings (>100m2)       2 spaces
   division of this area into two areas, with
   the smallest portion being no less than
                                                       Car parking areas should be incorporated
   40m2.
                                                       into the building or provided at, or
   Each open space area is to have a                   behind, the front setback of the building.
   minimum dimension of 4m and a slope
                                                       Where more than one space is required
   not greater than 1 in 8.
                                                       one parking space is allowed between the
   Private open space (including swimming              dwelling and the front boundary.
   pools) is not to be located at the front of
                                                       The minimum dimensions of car parking
   a development adjoining public road,
                                                       spaces should be 2.4m x 5.5m.
   unless details of satisfactory fencing are
   included with the proposal.
                                                    Driveways

                                       N               To reduce the impacts of stormwater
                                                       runoff, improve visual amenity, and
                                                       maintain on-street car parking driveways
                                                       should be minimised.
             90m2
                                                       A driveway, which serves a maximum of
                              90m2
                                                       three dwellings, is to have a minimum
                                                       paved width of 2m.
                                                       A shared driveway, which serves three or
                                                       more dwellings, is to have a minimum
                                                       paved width of 4.5m at the street,
                                                       continuing at this width to a depth of 6m.

          50m2                                         Long driveways may require ‘passing
                                                       points’ (particularly on busy roads).
                            90m2
          40m2                                         Provision is to be made for vehicles to
                                                       enter and leave the site in a forward
                                                       direction, where the site is:
                                                       -    steep;
                                                       -    fronts a busy road;
                                                       -    has three or more dwellings on it;
                                                       -    subject to high pedestrian use; or
                                                       -    where driveways are more than 30m
                                                            in length.
                                                       Turning areas are to be designed to allow
                                                       the 85% Design Car Turning Path.
   Dwellings are not to unreasonably
   compromise the private open space of
   nearby dwellings.

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN                                          PAGE 23
Driveways should have gradients less             For proposals for two or less dwellings
   than 20% and the driveway grade should           the following is required:
   not change by more than 11% for every
                                                    -   three strips of turf parallel to, and
   1.4m of driveway.
                                                        against, the kerb;
                                                    -   coarse gravel to define a single
DRIVEWAYS (3 OR MORE DWELLINGS)                         construction access no more than 3m
                                                        wide;
                                                    -   install sediment fence:
                                                            along the road frontage
                      2m                                    immediately upslope of the turf
                                                            strips or around the low side of the
                                                            area of construction if the site
                                                            slopes away from the road;
                                                            around the low side of stockpiles;
                                                            and
                                                            with the ends of the fences turned
                                                            upslope;
                                                    -   all stockpiles of topsoil, sand,
                                                        aggregate, spoil, vegetation or other
                                       6m
                    4.5m                                material capable of being moved by
                                                        running water shall be stored clear of
                                                        any drainage lines, easements or
                                                        natural watercourses, footpath, kerb
Note:                                                   or road surface;
For minimum lot frontages and width of
battleaxe handles also refer Council’s              -   before roofing material is laid,
Subdivision DCP.                                        temporary or permanent guttering
                                                        and downpipes shall be installed and
                                                        connected to an approved stormwater
DEVELOPER CONTRIBUTIONS                                 disposal system; and
                                                    -   all disturbed areas shall be rendered
   Developer contributions are payable for              erosion resistant by revegetation or
   any development creating two or more                 landscaping within four weeks of
   dwellings on one lot.                                building activities being completed or
                                                        suspended.
Note:
Developer contributions are a monetary
payment to fund increased demand for
public facilities generated by the
development.                                                                 3.5

                                                                                     Re-vegetate
                                                                                   disturbed areas
EROSION AND SEDIMENT CONTROL                                            Topsoil
                                                           Silt fence   stockpil        Turf strip 3m if
   For proposals for three or more dwellings                                            sloping towards
   an Erosion and Sediment Control Plan is                                                   street
   required to be submitted to and approved         New trees
   by Council prior to the release of the
   construction certificate; refer “Erosion and                     4
   Sediment Control on Building and
   Development Sites – Policy and Code of               Provide coarse gravel
                                                           for temporary                   ROAD
   Practice”.                                            construction access

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN                                              PAGE 24
SERVICES

Water Meters

   A separate water meter is to be provided
   for each dwelling and is to be readily
   accessible to Council’s meter reader.

Stormwater

   All stormwater is to be directed to the
   street drainage system, or to an
   interallotment drainage easement where
   available. Surface water is not to be
   directed to neighbouring properties.
   Stormwater to kerb connections are to be
   via kerb adapter units. House fencing
   should not obstruct overland flows of
   water. House floor levels must be at
   least 300mm above finished ground level.

Note:
Interallotment drainage via easements may
be required.

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN   PAGE 25
SUBDIVISION
OBJECTIVES                                           SITE ANALYSIS
                                                                                                 steep land
The controls in this DCP seek to:

   provide measures to protect and enhance          school
   the natural and built environment by
   ensuring that subdivision patterns relate                                          fauna
   to site conditions;                                                                corridor

   ensure that subdivisions do not detract
   from the desired future neighbourhood
   character of the locality; and                        electricity
                                                         easement
   promote the orderly development of land
   by ensuring that the appropriate form of
   subdivision is used (i.e. Torrens,
   community, strata title) while ensuring
   that it is adequately serviced.

                                                                                                            creek
SITE ANALYSIS

   A site analysis plan is required to identify                                  DESIGN RESPONSE
   opportunities and constraints relating to         pedestrian
   the subdivision pattern and potential end         access to         retain fauna
   use of the land.                                  school            corridor

   A site analysis plan should be prepared                                                              Community lot
   having regard to the following, where                                                                (recreation area)
   relevant:
   -   waterways (creeks, rivers, streams);
   -   significant vegetation/habitat/ fauna
       corridors;
   -   flood liable land;                                                                                Community title
   -   steep land/land slip;                                                                             subdivision
   -   fire hazard;
   -   access points (vehicles, pedestrians,
       cyclists);
   -   soil conditions (acid sulfate,
       contaminated);                                                                                          maintain
   -   surrounding land uses;                            Conventional                                          creek buffer
   -   service connections;                              subdivision                  Fire Protection
   -   easements;                                                                     Zone
   -   archaeological sites;
   -   topography (contours to Australian
       Height Datum at 1m intervals);
   -   aspect;
   -   drainage systems;
   -   existing buildings, driveways, septic
       tanks and disposal areas; and
   -   street and lot layout of locality.

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN                                                          PAGE 26
DENSITY                                                    A subdivision which will involve a lot
                                                           having vehicular access to a lane will only
   Residential and Tourist Development                     be permitted after the lot has been
   shall comply with the target densities in               substantially developed (i.e. vacant lots
   maps of this DCP.                                       off laneways are not to be created), and
                                                           the lot adjoining the lane is to have 2m
   Environmental Protection 7A
                                                           wide frontage fenced and paved to the
   The minimum lot size is 40 hectares.
                                                           primary road, to provide for pedestrian
   Environmental Protection 7B                             access, mailbox, services (water, sewer,
   There is no minimum lot size within this                electricity, communication).
   zone. Lot size is determined having
                                                           Where a subdivision will create more than
   regard to the merit of the subdivision.
                                                           two lots or two dwellings using a common
   All lots are to have a minimum 4m                       driveway, then the form of subdivision is
   frontage* to public road**, except:                     to be either strata or community title. In
   - where two ‘battle axe handle’ shaped                  this situation, the common driveway is to
        lots in a (Torrens title) subdivision will         be constructed in concrete a minimum of
        share a single driveway, then the                  4.5m wide at the street, continuing at this
        combined widths of the ‘handles’ of                width to a depth of 6m, and thereafter of
        the lots are to be at least 4m wide,               minimum width 2m, prior to the issue of
        and each lot is to have room at its                the Subdivision Certificate. Adequate
        frontage for a water meter and letter              room at the frontage to accommodate
        box, in addition to accommodating a                water meters and letterboxes is also
        driveway;                                          required.
   - lots which have frontage to a cul-de-
        sac head; these lots are to have a
        minimum frontage of 10m.
* = strata and community title lots may                  May only be
achieve such frontage via their common                   subdivided in
                                                         strata or
property.                                                community title
** = not including a lane.                               fashion

 4m
  4mwide
     wide
 handle
  handle                                      >10m
                                              frontage                              road

                                                           Subdivisions are not permitted where
                                                           three or more ‘battle axe handles’ will
                                                           directly adjoin.

       Lots fronting a cul-de-sac head

                                                                             road

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN                                              PAGE 27
SERVICES                                            Utility Services

General                                             Utility services must be extended to all lots
                                                    within a subdivision in accordance with the
   Urban Areas                                      following table (except for common property
   Subdivisions in urban areas are generally        in community title and strata subdivisions):
   required to provide infrastructure to all
   lots including:                                   Utility      Urban       Rural        Rural
   - road;                                           Service      Area      Residential    area
   - footpath;                                                                 Area
   - kerb and gutter;                               Council’s       Yes         No           No
   - drainage;                                      water main
                                                    Council’s       Yes         No           No
   - reticulated sewer and water;
                                                    sewer main
   - telecommunications;
                                                    Telephone      Yes*        Yes*         No
   - street lighting; and                           Electricity    Yes*        Yes*        Yes**
   - electricity.
                                                    * = In greenfield subdivisions these services
Stormwater Drainage                                 must be underground.
                                                    ** =Unless the applicant can demonstrate
Stormwater drainage shall be designed and           that alternative methods of providing
                                                    electricity exists or that the provision of this
provided in accordance with the Precinct
                                                    service is cost prohibitive.
Specific Stormwater Strategy (refer to
Attachment A).                                      Conditions on the development consent will
                                                    outline how, when and to what standard,
The design details will need to be approved         these services are to be provided.
by Council before the drainage is provided,
and will need to be completed to Council’s          Street Tree Masterplan
satisfaction prior to the issue of the
Subdivision Certificate.                            A Street Tree Masterplan will be required for
                                                    subdivisions on greenfield sites*. The
Stormwater is to be gravity drained to              Masterplan aims to guide street tree planting,
Council’s drainage system. In some                  providing for a more colourful City which
circumstances inter-allotment drainage              complements its natural setting.
easements over downstream properties may
be required. This will necessitate a letter of      * = Where public road is proposed, and may
consent from the owner(s) of the downstream         be required for community title subdivisions.
properties to be submitted with the
development application.                            Planting proposed by the Masterplan is to be
                                                    determined having regard to:
Drainage from sites should reflect the pre-
existing or natural situation in terms of              site and dwelling boundaries;
location, quantity, quality and velocity.              location and canopy of existing trees,
                                                       noting any trees that overhang the sit;
                                                       adjacent streets and trees;
                                                       any connection to open space networks or
                                                       proposed public reserves;
                                                       paving materials and drainage treatment;
                                                       details of any existing fencing and walls;
                                                       and
                                                       location of underground services.

HEARNES LAKE/SANDY BEACH DEVELOPMENT CONTROL PLAN                                           PAGE 28