Forward Plan of key decisions, 20 September 2021

Notice of forthcoming Key Decisions

Local authorities are required by law to give 28 days’ notice of any key decisions to be made. The
Forward Plan sets out information about the key decisions that Cabinet, individual Cabinet Members, the
Health and Wellbeing Board and the Better Places Joint Committee intend to make in forthcoming
months. It ensures public notice of all key decisions is provided at least 28 days’ in advance of the
decision date.

The Forward Plan contains information about each forthcoming key decision and is published to the
Council website every week, usually on a Monday.

What is a Key Decision?

The Lambeth Council Constitution defines a key decision as an executive decision that:

1)   Requires an amendment to the Community Plan Outcomes Framework or requires a
     recommendation to Full Council to amend the Budget and Policy Framework;
2)   Results in the local authority incurring expenditure, raising income or the making of savings in
     excess of £500,000; or,
3)   Has a significant impact on:
     a)   communities living or working in an area comprising two or more wards in Lambeth;
     b)   the wellbeing of the community or the quality of service provided to a significant number of
          people living or working in an area; or,
     c)   Communities of interest.

The majority of key decisions are taken by the Cabinet or individual Cabinet Members (the Executive).
Each Key Decision will be communicated via a comprehensive report which must be published at least
five clear days before the decision is taken. Published reports can be accessed through Decisions
Online. Cabinet reports will also be available in Cabinet agenda packs, which are published five clear
days before the meeting.

The Executive cannot consider key decisions that have not been included on the Forward Plan.
However, the Council Constitution sets out procedures that can be used if a decision that has not been
advertised on the Forward Plan must be taken immediately. Urgency procedures can only be used in
exceptional circumstances. For further information on Access to Information procedure rules please see
Part 3, Section 2 of the Council Constitution or contact Democratic Services.

What information is included on the Forward Plan?

The Forward Plan gives information about:
  key decisions that are likely to be considered in forthcoming months;
  the earliest date a key decision can be taken;
  who will make a decision;
  what consultation will be undertaken;
  whether the forthcoming report is likely to include exempt or confidential information;

                                                                                                 Page 2
Forward Plan of key decisions, 20 September 2021

     A list of background documents to be submitted to the decision maker for consideration in relation
      to the forthcoming decision; and,
     who you can contact for further information.

Public representations and further information

Each Forward Plan entry gives the name of the relevant officer to contact about that particular decision.
Where possible, a contact name, e-mail address and telephone number are provided.

Members of the public can make representations about forthcoming decisions by:
  Contacting the Lead Officer responsible for the report;
  Contacting the decision maker or relevant Cabinet Member (details can be found on the council
    website); and,
  Contacting Democratic Services.

Any document listed in the Forward Plan can be requested via the Lead Officer or by contacting
Democratic Services. The reader is encouraged to access any such documents electronically, however
copies or extracts may be made available at the following address on request: Lambeth Town Hall,
Brixton Hill, SW2 1RW.

When making representations, members of the public may submit to the decision maker any further
documents relevant to the decision.

All decision dates given in the Forward Plan are subject to change. Therefore, please ensure that you
always consult the latest version of the Forward Plan for the most up to date information. Any further
queries can be directed to Democratic Services.

Notice of decisions likely to contain confidential or exempt information

Local authorities are required to specify 28 days in advance of a Cabinet meeting all the reports that are
likely to contain confidential or exempt information. Should this be the case, a private ‘Part 2’ report will
be produced to accompany the main report but will not be published. The public and press may also be
asked to leave the Cabinet meeting for part of the proceedings. Any person is able to make
representations if they believe the decision should instead be made in the open part of the meeting.

If you wish to make any such representation please contact Democratic Services. All representations will
be documented in the relevant agenda a minimum of five clear days before the Cabinet meeting takes
place. This will also include any response to the representations and a statement of the reasons why the
meeting is be held in private.

For further information about exempt or confidential information please see the Access to Information
Procedure Notes in Part 3, Section 2 of the Council Constitution or contact Democratic Services.

                                                                                                      Page 3
Forward Plan of key decisions, 20 September 2021

                                   Contents
Regulation 18 draft Site Allocations Development Plan Document                     6
SEND and Inclusion Strategy                                                        7
Leisure Services Provision from April 2022                                         8
Adoption of CIL Charging Schedule 2022                                             8
Revised Lambeth Local Plan                                                         9
Lambeth Made Safer Violence Against Women and Girls (VAWG) Strategy 2021-27        9
Voluntary and Community Sector (VCS) Asset Strategy                                10
The November Financial Planning and Medium Term Strategy Report                    10
Responsible Procurement Policy 2021-2024                                           11
Revenue and Capital Budget 2022-23                                                 11
49 Brixton Station Road/6 Canterbury Crescent - Decision to Award Contract to      12
Preferred Delivery Partner
Care and support services in Lambeth’s extra care housing schemes                  12
Procedure for allocating Lambeth Council’s Section 106 Carbon Offset Funds         13
Tenancy Support Service                                                            14
Construction of Modular Units for Temporary Accommodation                          14
Delivery of Housing Contracts after 2020                                           15
Vehicle Leasing for the Direct Labour Organisation                                 15
National Net Zero Retrofit Accelerator (NNZRA)                                     16
Leigham Court Road – Amesbury and Barcombe Avenue                                  16
Purser House - Refurbishment of vacant former community centre to form 3 x 2 bed   17
flats
External Works Programme and Replacement of External Wall Insulation Cladding      18
Systems Procurement – Capital Works
Vassall Road Heating Replacement Project                                           18
Oaklands Estate Lift Refurbishment Project                                         19
Brixton Road Heating Replacement Project                                           20
Replacement of Kitchens and Bathrooms                                              20
Asbestos Removals Contract                                                         21
Asbestos Surveys and Analytical Works Contract                                     21
Claremont East Environmental Improvements                                          22
Total Asset Solution – Strategic Asset Partner                                     22
Total Asset Solution – Asset Delivery Partners                                     23
Workwise Project – St Mungo’s – Extension                                          24
Provision of a Dynamic Purchasing System for Housing Planned Capital               24
Maintenance Projects
Lambeth Housing Strategy                                                           25
External Refurbishment Works and Fire Safety Works to No.1- No.44 Meath House      26
Award of a contract for Electric Vehicle Ultra Rapid Charge Points                 26
Capital Studio, Infrastructure and Capital Delivery Salaries CIL                   27
Procurement for Highways Professional Services – Traffic Order Making              27
Fleet Maintenance Contract Procurement                                             28
Transport Strategy Programme - Phase 1 Capital Funding                             29
Parking Fees and Charges Inflationary uplift 2021/22                               29
Procurement of electric small mechanical brooms                                    30

                                                                                        Page 4
Forward Plan of key decisions, 20 September 2021

Sustainable Travel – The Big Shift                                                    30
Upper Norwood Joint Library                                                           31
Data Network Services – Extension                                                     31
PSR - External Works and replacement of Town Hall roof                                32
Network and Telephony Services Procurement                                            32
ITSM Replacement Plan                                                                 33
Procurement - Minor Works Framework                                                   33
Digital Delivery - capital budget allocation                                          34
Digital Lambeth Programme - Project capital budget allocations                        35
Laptops, associated products, and services procurement                                35
Insurance Legal Services                                                              36
Property Liability and Terrorism Insurance                                            36
Procurement of Managed Print Service for Print and Reprographics                      37
Capital Maintenance – Cuttle Construction Ltd Contract variation and extension        37
New contract and commissioning arrangements for Youth Services                        38
Supervised Contact Service                                                            38
Local Safeguarding Arrangements: changes and key issues                               39
Semi-independent living for care leavers                                              40
Capital Funding for field drainage and renovation of Stockport Road Playing fields,   40
Woodmansterne School
Early Years Commissioning                                                             41
School admissions policy and arrangements for 2021/22 entry                           41
Extension of Supervised Contact Services                                              42
6 Schools Roofing Works                                                               42
Housing-related support pathway for young people                                      43
School Capital Maintenance – Variation to Current Consultant Contract                 44
Re-procurement of community support services                                          44
Implementation of PHE Section 31Grant - Drug treatment and crime reduction            45
proposals
Reprovision of Community Support Approved Provider Spot Contract Arrangements         45
Stop Smoking Services – Proposed single year extensions to current contracts with     46
GSTT and community pharmacies
Re-procurement of community support services                                          47
Extension of the Approved Provider List framework agreement for community             47
support providers
Conversion of Brixton Recreation Centre storage space to work space                   48
Oval and Prince’s Co-operative Local Investment Plan                                  48
South Lambeth Estate – Enabling Works for the Phase 1 Development                     49
Westbury estate – Making of Compulsory Purchase Order                                 49
South Lambeth estate – Making of Compulsory Purchase Order                            50
Funding Allocation for Completion of LJ Works                                         50
Local Lettings Plan – South Lambeth Estate                                            51
Local Lettings Plan – Knight’s Walk                                                   51
Local Lettings Plan – Fenwick Estate                                                  52
Fenwick South – Variation to the Development Agreement                                52
Estate Regeneration – Buyback Programme – Dispute Resolution                          53
Land at 53 Elliott Road - Appropriation for Planning Purposes                         53
Brixton Townscape Heritage Initiative: Building Contractor Appointment                54

                                                                                           Page 5
Forward Plan of key decisions, 20 September 2021

Land at 53 Elliott Road - Appropriation for Planning Purposes                         54
Fenwick Place – Appropriation for Planning Purposes                                   55
Hydethorpe Road – Appropriation for Planning Purposes                                 55
Land at 2 Roman Rise - Appropriation for Planning Purposes                            56
Allocation of Neighbourhood CIL to projects within the South Bank and Waterloo        56
Neighbours (SoWN) Neighbourhood area.
Approval of CIL Social Housing Relief for 17/02936/FUL Graphite Square SE11 5EE       57
Appointment of the Principal Contractor for the Redevelopment of 114-118 Lower        57
Marsh
Westbury – Phase 2 – Appropriation for Planning Purposes                              58
Knights Walk – Phase 2, Appropriation for Planning Purposes                           59
Somerleyton Road – Block F – Appropriation for Planning Purposes                      59
Somerleyton Road – Phase 1 – Deed of Variation & Lettings                             60
Lambeth Local Development Scheme                                                      60
Waterloo Undercroft. Agreement for Lease                                              61
LJ Works Landscaping Contract Award Report                                            61
Lambeth Annual Infrastructure Funding Statement 2020/21                               62
Lambeth Annual Infrastructure Funding Statement 2020/21                               62
Updates to CIL Discretionary Relief Policy Statements                                 63
Proposal regarding the site at the former Clapham Old Library                         63
Transfer of the Greek Enclosure from the Greek Cathedral trust of St Stephen’s        64
Chapel to the Council
Events Strategy Review                                                                65
Appointment of Consultants for Brockwell Hall Restoration                             65
Approval of purchase of two new cremators                                             66
ELEVATE Strategic Plan 2020-23                                                        66
Expenditure Arising from London Eye Section 106 Receipts                              67
Extension of FMS contract – for Lambeth’s cremators                                   67
Kennington Park Funding Allocation                                                    68
West Norwood Cemetery National Heritage Lottery (NLHF) Project: procurement and       69
award of works for Package A1
Brockwell Hall Restoration Decarbonisation Project: procurement and award of          69
works
Brockwell Hall Restoration NLHF Project: procurement and award of works for the       70
Ground maintenance Depot Building
Business Case – Myatts Fields Depot Redevelopment – Request for Additional            71
Funding
Leisure Services Provision                                                            71
Leisure Services Contract - Covid-19 Support Payment (Phase 2)                        71
Vauxhall One Business Improvement District Re-ballot 2021                             72
Essential Maintenance works at Carnegie Library                                       72
Kickstart Scheme                                                                      73
Decision: Regulation 18 draft Site Allocations Development Plan Document

To agree to commence consultation on the Regulation 18 draft of the Site Allocations DPD which will
eventually, on adoption, form part of the statutory Development Plan for the borough.

Ward(s) affected: All Wards

                                                                                                Page 6
Forward Plan of key decisions, 20 September 2021

Exempt or confidential information:           Consultation details:

Decision to be taken by:                      Decision date:
Cabinet                                       Not before 23 Dec 2020

Background documents:
Regulation 18 draft Site Allocations Development Plan Document

For further information about this key decision, please contact:
Catherine Carpenter, Planning Strategy and Policy Manager
ccarpenter@lambeth.gov.uk
1st Floor, Phoenix House, 10 Wandsworth Road
Tel: 020 7926 1251

Decision: SEND and Inclusion Strategy

The SEND and Inclusion strategy informs how Lambeth Council will further develop the SEND and
Inclusion offer in Lambeth over the next 3 years (2021 to 2024). This builds on the many strengths in
the local area and updates the strategy following the successful Ofsted/ CQC inspection in January
2020.

The strategy has been co-produced over a period of three years with input from young people,
parents, carers, service users, stakeholders and service providers across Education, Health and
Social Care.

Ward(s) affected: All Wards

Exempt or confidential information:           Consultation details:

Decision to be taken by:                      Decision date:
Cabinet                                       13 Sep 2021

Background documents:
SEND and Inclusion Strategy

For further information about this key decision, please contact:
Jo Sullivan-Lyons, Assistant Director, Education Strategy, Access and Inclusion
jsullivanlyons@lambeth.gov.uk

                                                                                                  Page 7
Forward Plan of key decisions, 20 September 2021

Decision: Leisure Services Provision from April 2022

The report will recommend the delivery model for leisure services provision after the current contract
with GLL ends on 31 March 2022

Ward(s) affected: All Wards

Exempt or confidential information:            Consultation details:
Part exempt
Information relating to the financial or
business affairs of any particular person
(including the authority holding that
information)

Decision to be taken by:                       Decision date:
Cabinet                                        13 Sep 2021

Background documents:
Leisure Services Delivery from 2022

For further information about this key decision, please contact:
Kevin Crook, Assistant Director: Neighbourhoods, Environment and Streetscene
kcrook@lambeth.gov.uk
Blue Star House - 4th Floor
Tel: 020 7926 8973

Decision: Adoption of CIL Charging Schedule 2022

To adopt the new CIL Charging Schedule with effect from 1 January 2022. The new CIL Charging
Schedule will replace Lambeth's current CIL Charging Schedule which was adopted in 2014.

Ward(s) affected: All Wards

Exempt or confidential information:            Consultation details:

Decision to be taken by:                       Decision date:
Cabinet                                        13 Sep 2021

Background documents:
Adoption of CIL Charging Schedule 2022

For further information about this key decision, please contact:
Benny Clutario, CIL/S106 Manager
                                                                                                   Page 8
Forward Plan of key decisions, 20 September 2021

bclutario1@lambeth.gov.uk

Decision: Revised Lambeth Local Plan

To adopt the revised Lambeth Local Plan following the receipt of the Inspector's report.

Ward(s) affected: All Wards

Exempt or confidential information:           Consultation details:

Decision to be taken by:                      Decision date:
Cabinet                                       13 Sep 2021

Background documents:
Revised Lambeth Local Plan

For further information about this key decision, please contact:
Catherine Carpenter, Planning Strategy and Policy Manager
ccarpenter@lambeth.gov.uk
1st Floor, Phoenix House, 10 Wandsworth Road
Tel: 020 7926 1251

Decision: Lambeth Made Safer Violence Against Women and Girls (VAWG) Strategy 2021-
27

To adopt the new VAWG Strategy which outlines our commitment as a partnership to a six-year vision
for tackling all forms of Violence Against Women and Girls. The Strategy is our third iteration in ten
years and outlines our vision, goals, and commitments to work together and with our residents and
communities to prevent and respond to all forms of VAWG so Lambeth is a borough where everyone
is safe.

Ward(s) affected: All Wards

Exempt or confidential information:           Consultation details:

Decision to be taken by:                      Decision date:
Cabinet                                       4 Oct 2021

Background documents:

                                                                                                 Page 9
Forward Plan of key decisions, 20 September 2021

For further information about this key decision, please contact:
Rose Parker, Violence Against Women and Girls Programme and Commissioning Manager
rparker1@lambeth.gov.uk

Decision: Voluntary and Community Sector (VCS) Asset Strategy

To adopt the Voluntary and Community Sector (VCS) Asset Strategy, including the Letting Policy, VCS
Rent Matrix model, and Social Value reporting mechanism. And to approve funding of the shortfall in
the rent during the implementation phase.

Ward(s) affected: All Wards

Exempt or confidential information:           Consultation details:
Part exempt
Information relating to the financial or
business affairs of any particular person
(including the authority holding that
information)

Decision to be taken by:                      Decision date:
Cabinet                                       4 Oct 2021

Background documents:
Voluntary and Community Sector (VCS) Asset Strategy

For further information about this key decision, please contact:
Yvonne Hardy, Assistant Head - Directorates, Valuation and Strategic Assets
yhardy@lambeth.gov.uk

Tel: 0207 926 2984

Decision: The November Financial Planning and Medium Term Strategy Report

The November Financial Planning and Medium Term Strategy Report will provide an update on the
economic outlook, pressures, risk areas and set out the revenue funding deficit for 2021-26 together
with proposals to close the funding gap. Together with a refreshed Medium Term Financial Strategy,
and Financial Management Strategy.

Ward(s) affected: All Wards

Exempt or confidential information:           Consultation details:

                                                                                                Page 10
Forward Plan of key decisions, 20 September 2021

Decision to be taken by:                    Decision date:
Cabinet                                     22 Nov 2021

Background documents:

For further information about this key decision, please contact:
Amaris Wong, Group Manager Strategic Finance
awong@lambeth.gov.uk

Decision: Responsible Procurement Policy 2021-2024

Refresh of the Responsible Procurement Policy to guide how Social Value and Borough Plan
outcomes should be included within procurement and contracts.

Ward(s) affected: All Wards

Exempt or confidential information:         Consultation details:

Decision to be taken by:                    Decision date:
Cabinet                                     22 Nov 2021

Background documents:
Responsible Procurement Policy 2021-2024

For further information about this key decision, please contact:
Genine Whitehorne, Interim Head of Procurement
gwhitehorne@lambeth.gov.uk

Decision: Revenue and Capital Budget 2022-23

The Revenue and Capital Budget report will set out the General Fund budget for 2022-23 and
Treasury Management Strategy.

Ward(s) affected: All Wards

Exempt or confidential information:         Consultation details:

                                                                                             Page 11
Forward Plan of key decisions, 20 September 2021

Decision to be taken by:                      Decision date:
Cabinet                                       7 Feb 2022

Background documents:

For further information about this key decision, please contact:
Amaris Wong, Group Manager Strategic Finance
awong@lambeth.gov.uk

Decision: 49 Brixton Station Road/6 Canterbury Crescent - Decision to Award Contract to
Preferred Delivery Partner

The council is seeking to appoint a delivery partner to develop two council-owned sites in Brixton town
centre to support its future growth and economic and community resilience. This process was agreed
by Cabinet in February 2020, following which the council undertook a competitive negotiation process
as part of the procurement exercise. A preferred bidder has now been identified as the most suitable
development partner to deliver these two sites.

The council is seeking approval to award this contract for the development partner to deliver on the
council’s ambitions and objectives to support the social and economic needs of the local community.

Ward(s) affected: Coldharbour

Exempt or confidential information:           Consultation details:

Decision to be taken by:                      Decision date:
Cabinet                                       7 Feb 2022

Background documents:
49 Brixton Station Road/6 Canterbury Crescent - Decision to Award Contract to Preferred Delivery
Partner

For further information about this key decision, please contact:
Alessia Montero, Principal Area Regeneration Officer
amonterocastro@lambeth.gov.uk

Decision: Care and support services in Lambeth’s extra care housing schemes

                                                                                                 Page 12
Forward Plan of key decisions, 20 September 2021

To commence the redesign and procurement of the current Extra Care Housing contracts which all
expire towards the end of June 2022.

The current contracts provide care and support services, giving older and vulnerable people the
opportunity to live more independently in the community through the provision of accessible
accommodation, combined with 24-hour, on-site care and support services.

Ward(s) affected: All Wards

Exempt or confidential information:           Consultation details:

Decision to be taken by:                      Decision date:
Cabinet                                       21 Mar 2022

Background documents:
Care and support services in Lambeth’s extra care housing schemes

For further information about this key decision, please contact:
Ramone Nurse
rnurse@lambeth.gov.uk

Decision: Procedure for allocating Lambeth Council’s Section 106 Carbon Offset Funds

To implement a procedure for allocating Lambeth Council’s Section 106 Carbon Offset Funds. The
procedure will continue up to the end of 2025, subject to a review following lessons learnt from an
initial 12-month pilot phase.

Ward(s) affected: All Wards

Exempt or confidential information:           Consultation details:

Decision to be taken by:                      Decision date:
Leader of the Council                         Not before 5 Oct 2021

Background documents:

For further information about this key decision, please contact:
Joe Walsh, Climate Change, Energy and Buildings - Senior Project Officer, Susatianable Growth and

                                                                                                  Page 13
Forward Plan of key decisions, 20 September 2021

Opportunity
jwalsh2@lambeth.gov.uk

Decision: Tenancy Support Service

The decision to extend the current contract will enable the Council to continue to provide tenancy
support to residents while Housing colleagues plan the future structure of the service.

Ward(s) affected: All Wards

Exempt or confidential information:           Consultation details:

Decision to be taken by:                      Decision date:
Cabinet Member for Housing and                Not before 19 Feb 2018
Homelessness

Background documents:

For further information about this key decision, please contact:
Andy Radice, Social Housing Liaison Manager
aradice@lambeth.gov.uk
Hambrook House
Tel: 020 7926 3611

Decision: Construction of Modular Units for Temporary Accommodation

To approve capital funding for the construction of modular units for use as Temporary Accommodation
for homeless households.

Ward(s) affected: Streatham Hill

Exempt or confidential information:           Consultation details:

Decision to be taken by:                      Decision date:
Cabinet Member for Housing and                Not before 12 Nov 2019
Homelessness

Background documents:

For further information about this key decision, please contact:
                                                                                                 Page 14
Forward Plan of key decisions, 20 September 2021

Andy Radice, Social Housing Liaison Manager
aradice@lambeth.gov.uk
Hambrook House
Tel: 020 7926 3611

Decision: Delivery of Housing Contracts after 2020

To commence the redesign and reprocurement of all of the current housing repair, maintenance and
capital work contracts which all expire towards the end of 2020.

These soon-to-expire contracts include: major works, housing repairs, estate and grounds
maintenance, estate block cleaning, voids, gas servicing, electrical/water supplies, door entry systems
and other housing based services.

Ward(s) affected: All Wards

Exempt or confidential information:            Consultation details:

Decision to be taken by:                       Decision date:
Cabinet Member for Housing and                 Not before 13 Dec 2019
Homelessness

Background documents:

For further information about this key decision, please contact:
Andrew Jacques, Head of Contract Scrutiny and Cost Management
AJacques@lambeth.gov.uk

Decision: Vehicle Leasing for the Direct Labour Organisation

Agree to the procurement of the vehicle leasing of 35 vehicles via the councils existing Fleet
Management Framework for the necessary hybrid/electric vehicles

DLO staff will require vehicles to move around the borough to transport materials and tools to carry out
their repairing or inspecting duties. The vehicles will be consistent with the Council’s commitment to
being Zero Carbon by 2030. All vehicles leased from the leasing company will be Cat 6 compliant(EU
Standard) the hybrid vehicles will emit less than 75g/km CO2, or will be ultra-low emission. This is
ensuring the DLO only leases vehicle which are meeting the Lambeth carbon reduction standard.

Ward(s) affected: All Wards

Exempt or confidential information:            Consultation details:

                                                                                                  Page 15
Forward Plan of key decisions, 20 September 2021

Decision to be taken by:                     Decision date:
Cabinet Member for Housing and               Not before 1 Sep 2020
Homelessness

Background documents:

For further information about this key decision, please contact:
Andrew Jacques, Head of Contract Scrutiny and Cost Management
AJacques@lambeth.gov.uk

Decision: National Net Zero Retrofit Accelerator (NNZRA)

The council was invited to bid and was successful in November 2020 for funding to decarbonise 40
homes as part of stage two National Net Zero Retrofit Accelerator (NNZRA). The funding was agreed
with the Greater London Authority (GLA) and monitored by Business, Energy and Industrial Strategy
(BEIS). NNZRA is a major step towards goal of delivering self-financing, performance guaranteed, net
zero retrofit at scale across the UK and to reach our net zero target by 2030.

Ward(s) affected: All Wards

Exempt or confidential information:          Consultation details:

Decision to be taken by:                     Decision date:
Cabinet Member for Housing and               Not before 13 Apr 2021
Homelessness

Background documents:

For further information about this key decision, please contact:
Michael Axtell, Water Quality Officer
maxtell@lambethliving.org.uk
Housing Property Services, 10 Somerleyton Road,, LONDON, SW9 8ND
Tel: 020 7926 2084

Decision: Leigham Court Road – Amesbury and Barcombe Avenue

To award to Engie Regeneration the contract for works consisting of external refurbishment and
maintenance items, including roof repairs/ replacement, chimney and parapet repairs, window and
main entrance door repairs, fabric repairs including brickwork, concrete, stonework, and external

                                                                                               Page 16
Forward Plan of key decisions, 20 September 2021

decorations. in the sum of is £2,368,740, for 2021/22

Ward(s) affected: All Wards

Exempt or confidential information:           Consultation details:

Decision to be taken by:                      Decision date:
Cabinet Member for Housing and                Not before 5 May 2021
Homelessness

Background documents:

For further information about this key decision, please contact:
Paul Ingram, Capital Works Manager
PIngram1@lambeth.gov.uk

Decision: Purser House - Refurbishment of vacant former community centre to form 3 x 2
bed flats

This recommendation is for the council to approve the refurbishment of the vacant former community
centre into 3 self-contained 2-bedroom flats.

Ward(s) affected: Tulse Hill

Exempt or confidential information:           Consultation details:
Part exempt
Information relating to the financial or
business affairs of any particular person
(including the authority holding that
information)

Decision to be taken by:                      Decision date:
Cabinet Member for Housing and                Not before 22 Jun 2021
Homelessness

Background documents:

For further information about this key decision, please contact:
Paul Ingram, Capital Works Manager
PIngram1@lambeth.gov.uk

                                                                                              Page 17
Forward Plan of key decisions, 20 September 2021

Decision: External Works Programme and Replacement of External Wall Insulation Cladding
Systems Procurement – Capital Works

To approve the upcoming capital works programme which will include external works and replacement
of external wall insulation cladding systems intended to be delivered within 2021/22 financial year. The
proposed method of obtaining mini tenders is primarily via Construction Line, whilst utilising the route
of Gold Membership of suppliers. Competition to obtain value for money will be a consistent thread.

The works will include but not limited to the following:

• external fabric repairs
• communal electrics
• lift renewal
• door entry installation
• heating & hot water upgrade
• communal electric upgrade
• cold water tank renewal
• boiler room upgrades
• new fire doors to tenanted properties
• sprinklers to sheltered blocks
• Kitchen & Bathroom Installations plus associated electrical re-wires
• Residential and communal fire doors replacements

The works will be funded from the £35m Lambeth Housing Standard budget.

Ward(s) affected: All Wards

Exempt or confidential information:             Consultation details:

Decision to be taken by:                        Decision date:
Cabinet Member for Housing and                  Not before 13 Jul 2021
Homelessness

Background documents:

For further information about this key decision, please contact:
Adelle Pobee
apobee@lambeth.gov.uk
2nd Floor, Hambrook House, Porden Road, London SW2 5RW

Decision: Vassall Road Heating Replacement Project

                                                                                                  Page 18
Forward Plan of key decisions, 20 September 2021

To instruct Regen (UK) Construction Ltd to undertake the replacement of the Communal Heating
system with Individual Combi Boilers in the sum of £917,020.24. Works to be completed in the new
financial year 1 April 2021.

Ward(s) affected: Vassall

Exempt or confidential information:             Consultation details:
Part exempt
Information relating to the financial or
business affairs of any particular person
(including the authority holding that
information)

Decision to be taken by:                        Decision date:
Cabinet Member for Housing and                  Not before 20 Jul 2021
Homelessness

Background documents:

For further information about this key decision, please contact:
Darren Bradford, Technical Services Electrical Project Manager
dbradford@lambeth.gov.uk

Decision: Oaklands Estate Lift Refurbishment Project

To instruct Precision Lifts Ltd to undertake the refurbishment of the lifts in the sum of £629,253.88.
Works to be completed in the new financial year 1 April 2021

Ward(s) affected: Clapham Common

Exempt or confidential information:             Consultation details:
Part exempt
Information relating to the financial or
business affairs of any particular person
(including the authority holding that
information)

Decision to be taken by:                        Decision date:
Cabinet Member for Housing and                  Not before 20 Jul 2021
Homelessness

Background documents:

For further information about this key decision, please contact:

                                                                                                    Page 19
Forward Plan of key decisions, 20 September 2021

Paul Ingram, Capital Works Manager
PIngram1@lambeth.gov.uk

Decision: Brixton Road Heating Replacement Project

To instruct TBrown Group Ltd to undertake the replacement of the Communal Heating system with
individual Combi Boilers in the sum of £903,100.00. Works to be completed in the new financial year 1
April 2021

Ward(s) affected: Vassall

Exempt or confidential information:          Consultation details:
Part exempt
Information relating to the financial or
business affairs of any particular person
(including the authority holding that
information)

Decision to be taken by:                     Decision date:
Cabinet Member for Housing and               Not before 20 Jul 2021
Homelessness

Background documents:

For further information about this key decision, please contact:
Darren Bradford, Technical Services Electrical Project Manager
dbradford@lambeth.gov.uk

Decision: Replacement of Kitchens and Bathrooms

The report recommends the Council proceeds with a direct award to SER contractor from an existing
framework, LHC 46581 and is accessing WH2, Workstream 1, Lot 2 (K&Bs) for the replacement of
various kitchens and bathrooms in tenanted homes, up to a value of £2m.

Ward(s) affected: All Wards

Exempt or confidential information:          Consultation details:

Decision to be taken by:                     Decision date:
Cabinet Member for Housing and               Not before 27 Jul 2021
Homelessness

                                                                                               Page 20
Forward Plan of key decisions, 20 September 2021

Background documents:

For further information about this key decision, please contact:
Paul Ingram, Capital Works Manager
PIngram1@lambeth.gov.uk

Decision: Asbestos Removals Contract

To approve the procurement and awarding of a new contract to undertake Asbestos Removal Works
to communal areas of Lambeth structures including hostels, sheltered accommodation and community
centres.

Ward(s) affected: All Wards

Exempt or confidential information:        Consultation details:

Decision to be taken by:                   Decision date:
Cabinet Member for Housing and             Not before 17 Aug 2021
Homelessness

Background documents:
Asbestos Removals Contract

For further information about this key decision, please contact:
Jamie Sud, Asbestos Advisor
jsud@lambeth.gov.uk

Decision: Asbestos Surveys and Analytical Works Contract

To approve the procurement and award of a new contract to undertake Asbestos Surveys and
Analytical Works to the communal areas of Lambeth structures including hostels, sheltered
accommodation and community centres.

Ward(s) affected: All Wards

Exempt or confidential information:        Consultation details:

Decision to be taken by:                   Decision date:
                                                                                            Page 21
Forward Plan of key decisions, 20 September 2021

Cabinet Member for Housing and                  Not before 17 Aug 2021
Homelessness

Background documents:
Procurement for an Asbestos Removals Contract

For further information about this key decision, please contact:
Jamie Sud, Asbestos Advisor
jsud@lambeth.gov.uk

Decision: Claremont East Environmental Improvements

It is proposed to carry out environmental improvements to Claremont Estate East with funds totalling
£504,226.56 received via a signed deed of release from the sale of land to Nottingham Hill Housing
Association in July 2017.

If approved a procurement exercise will be carried out in accordance with the Council’s procurement
rules, and relevant legislation, to appoint a contractor to complete the proposed work.

Ward(s) affected: Streatham Hill

Exempt or confidential information:             Consultation details:

Decision to be taken by:                        Decision date:
Cabinet Member for Housing and                  Not before 8 Sep 2021
Homelessness

Background documents:

For further information about this key decision, please contact:
Lesley Ambler, Housing Project Coordinator
lambler@lambeth.gov.uk

Decision: Total Asset Solution – Strategic Asset Partner

To approve the strategic direction to procure a Strategic Asset Partner that will join up strategic asset
management, stock condition surveying, investment planning, social and economic equality, carbon
reduction, compliance, disrepair and procurement.

Ward(s) affected: All Wards

                                                                                                    Page 22
Forward Plan of key decisions, 20 September 2021

Exempt or confidential information:           Consultation details:

Decision to be taken by:                      Decision date:
Cabinet Member for Housing and                Not before 11 Sep 2021
Homelessness

Background documents:

For further information about this key decision, please contact:
Andrew Jacques, Head of Contract Scrutiny and Cost Management
AJacques@lambeth.gov.uk

Decision: Total Asset Solution – Asset Delivery Partners

To approve the strategic direction to procure 2 x Asset Delivery Partners (North and South) that will
manage and administer major works and statutory compliance work programmes; and broaden the
client technical skills base.
Two technical delivery partnerships (North and South – 3-year duration) with two principal functions:
a) Specify and manage major work projects (planned and procured by the strategic asset partner –
using the DPS).
b) Empower and train the client team to self-manage major work projects (removing the continuous
reliance on third-party consultants).

Ward(s) affected: All Wards

Exempt or confidential information:           Consultation details:

Decision to be taken by:                      Decision date:
Cabinet Member for Housing and                Not before 11 Sep 2021
Homelessness

Background documents:

For further information about this key decision, please contact:
Andrew Jacques, Head of Contract Scrutiny and Cost Management
AJacques@lambeth.gov.uk

                                                                                                 Page 23
Forward Plan of key decisions, 20 September 2021

Decision: Workwise Project – St Mungo’s – Extension

The St Mungo’s Workwise service provides employment and training services. The service is primarily
targeted at those in rented housing (Council tenants, private sector tenants and homeless in
temporary accommodation) who are in receipt of benefits and adversely affected by welfare reforms.
Welfare reforms including the Size Criteria, Benefit Cap and Universal Credit. The proposed report is
requesting for the service to be extended from 1st of May 2021 to 29th of April 2022. The service has
been very successful in supporting Lambeth residents into sustained employment and training
opportunities and has been instrumental in assisting Lambeth residents who have been furloughed or
lost their jobs due to the Covid-19 pandemic.
The cumulative value of the contracts from February 2015 to April 2021 is £560,295.89. A further
extension for the 2021/22 financial year will increase that value by a further £100,000.

Ward(s) affected: All Wards

Exempt or confidential information:           Consultation details:

Decision to be taken by:                      Decision date:
Cabinet Member for Housing and                Not before 11 Sep 2021
Homelessness

Background documents:

For further information about this key decision, please contact:
Lionel Ighodaro, Housing Support Team Manager
lighodaro@lambeth.gov.uk

Decision: Provision of a Dynamic Purchasing System for Housing Planned Capital
Maintenance Projects

To approve the implementation of a dynamic purchasing system (DPS) to manage the Council’s £35m
planned maintenance spend for Housing.

It is recognised that the Council needs to refresh its approach to the management of its assets and
delivery of planned programmes and major works to better meet its legal and statutory obligations.
Underpinned by the Council’s Asset Management Strategy, a Total Asset Solution is being
implemented, in pursuit of better quality, socially responsible and digitally driven services.
The bespoke DPS will support a more co-ordinated and agile project purchasing process for the
delivery of the Total Asset Solution and will also provide:
- a compliant procurement vehicle to manage tenders for the Council’s housing planned capital
maintenance project contracts,

                                                                                                Page 24
Forward Plan of key decisions, 20 September 2021

- focus on enabling a more diverse range of suppliers to compete for contract opportunities within
Lambeth and encourage the participation of local suppliers,
- encourage small business and those owned and operated by underrepresented groups to compete
for Council contracts.

Ward(s) affected: All Wards

Exempt or confidential information:          Consultation details:

Decision to be taken by:                     Decision date:
Cabinet Member for Housing and               Not before 12 Oct 2021
Homelessness

Background documents:

For further information about this key decision, please contact:
Cordelia Asamoah, Project Lead
CAsamoah@lambeth.gov.uk

Decision: Lambeth Housing Strategy

For cabinet to approve the Housing Strategy. Member approval is required to adopt the strategy.

Ward(s) affected: All Wards

Exempt or confidential information:          Consultation details:

Decision to be taken by:                     Decision date:
Cabinet Member for Housing and               Not before 19 Oct 2021
Homelessness

Background documents:

For further information about this key decision, please contact:
Calum Davidson, Housing Strategy and Policy Officer
cdavidson1@lambeth.gov.uk

                                                                                                  Page 25
Forward Plan of key decisions, 20 September 2021

Decision: External Refurbishment Works and Fire Safety Works to No.1- No.44 Meath House

The award of contract to the successful bidder to carry out essential fire safety works including
replacement of external wall cladding system with external wall insulation system (EWI) and
refurbishment of external façade including roof repairs and redecoration. These works will ensure
compliance with fire safety regulations and prolong the useful life of the building.

Ward(s) affected: Herne Hill

Exempt or confidential information:            Consultation details:

Decision to be taken by:                       Decision date:
Cabinet Member for Housing and                 Not before 19 Oct 2021
Homelessness

Background documents:

For further information about this key decision, please contact:
Mohammed Ullah, Capital Works - Project Manager
mullah@lambeth.gov.uk

Decision: Award of a contract for Electric Vehicle Ultra Rapid Charge Points

Approval to award a contract for installation of Electric Vehicle Rapid Charge Points

To award a contract for 14 ultra-rapid charge points as part of the development of an effective electric
charge point network and meet Council commitments set out in the transportation strategy and climate
change agenda

Ward(s) affected: All Wards

Exempt or confidential information:            Consultation details:
Part exempt
Information relating to the financial or
business affairs of any particular person
(including the authority holding that
information)

Decision to be taken by:                       Decision date:
Cabinet Member for Sustainable Transport,      Not before 9 Feb 2021
Environment and Clean Air (job-share)

                                                                                                  Page 26
Forward Plan of key decisions, 20 September 2021

Background documents:

For further information about this key decision, please contact:
Dan Thomas, Programme Manager (Parks & Special Projects)
dthomas4@lambeth.gov.uk

Decision: Capital Studio, Infrastructure and Capital Delivery Salaries CIL

The Capital Studio is the delivery arm of the Resident Services area, covering design and
construction of public realm and built environment projects. The service delivers large
programmes such as the Highways Investment Programme and major public realm and green
space schemes, such as in parks and cemeteries. The service is primarily funded through third
party grants, such as through Transport for London, and from within allocated project budgets.

The report seeks an allocation of £1,076m from the Lambeth Community Infrastructure Levy (CIL)
receipts to fund costs associated with staff costs for the Resident Services Capital Programme
delivered via the Capital Studio (Infrastructure and Capital Delivery).

This report seeks funding to cover establishment salaries which can’t be covered by project
budgets. The identified source of funding for this infrastructure is CIL, with other sources of
external and internal funding already having been secured to fund Capital Studio staff.

Ward(s) affected: All Wards

Exempt or confidential information:             Consultation details:

Decision to be taken by:                        Decision date:
Cabinet Member for Sustainable Transport,       Not before 6 Apr 2021
Environment and Clean Air (job-share)
                                                Not before 6 Apr 2021

Background documents:

For further information about this key decision, please contact:
Dan Thomas, Programme Manager (Parks & Special Projects)
dthomas4@lambeth.gov.uk

Decision: Procurement for Highways Professional Services – Traffic Order Making

                                                                                                  Page 27
Forward Plan of key decisions, 20 September 2021

The purpose of this procurement is to provide the necessary information to award a contract for the
provision of Highways Professional Services for public realm schemes within Lambeth. The works will
primarily be focused on the administration and work to develop the full range of traffic orders. The
schemes that this work supports includes Controlled Parking Zones, Major and minor Traffic schemes
as well as schemes supporting Transport for London (TfL) Streetscapes initiatives such as Low Traffic
Neighbourhoods.

Ward(s) affected: All Wards

Exempt or confidential information:           Consultation details:
Part exempt
Information relating to the financial or
business affairs of any particular person
(including the authority holding that
information)

Decision to be taken by:                      Decision date:
Cabinet Member for Sustainable Transport,     Not before 20 Apr 2021
Environment and Clean Air (job-share)

Background documents:

For further information about this key decision, please contact:
Shannon Consses, Head of Service Development and Street Management
sconsses@lambeth.gov.uk

Decision: Fleet Maintenance Contract Procurement

Approval of contract award following competitive tender.

Ward(s) affected: All Wards

Exempt or confidential information:           Consultation details:

Decision to be taken by:                      Decision date:
Cabinet Member for Sustainable Transport,     Not before 18 May 2021
Environment and Clean Air (job-share)

Background documents:

For further information about this key decision, please contact:
Jonathan Pook, Parking and Enforcement Operations Manager

                                                                                               Page 28
Forward Plan of key decisions, 20 September 2021

JPook@lambeth.gov.uk

Decision: Transport Strategy Programme - Phase 1 Capital Funding

To authorise the drawdown of capital funding to support the delivery of the Transport Strategy
Programme

Ward(s) affected: All Wards

Exempt or confidential information:           Consultation details:

Decision to be taken by:                      Decision date:
Cabinet Member for Sustainable Transport,     Not before 27 Jul 2021
Environment and Clean Air (job-share)

Background documents:

For further information about this key decision, please contact:
Simon Phillips, Transport Manager - Planning, Transport & Development
SPhillips2@lambeth.gov.uk

Decision: Parking Fees and Charges Inflationary uplift 2021/22

This report details the increase to the parking permit and on-street parking charges. The Mayor of
London’s Transport Strategy as provided by sections 142 and 144(1)(a) Greater London Authority Act
1999, emphasises the importance of reducing emissions and improving air quality.

Where possible Lambeth encourages a move away from vehicle use and ownership and promotes the
use of public transport, cycling and walking as sustainable and greener alternatives. Increasing
charges would contribute to achieving this so it is essential that through our permit and on-street
parking pricing that vehicle ownership is not seen as more economical than using sustainable methods
of transport. This report recommends advertising a notice and undertaking a consultation to increase
these charges.

Ward(s) affected: All Wards

Exempt or confidential information:           Consultation details:

                                                                                                 Page 29
Forward Plan of key decisions, 20 September 2021

Decision to be taken by:                      Decision date:
Cabinet Member for Sustainable Transport,     22 Sep 2021
Environment and Clean Air (job-share)

Background documents:

For further information about this key decision, please contact:
Jonathan Pook, Parking and Enforcement Operations Manager
JPook@lambeth.gov.uk

Decision: Procurement of electric small mechanical brooms

To approve the purchase of eight electric small mechanical brooms directly from the only supplier of
the type specified and needed to deliver the new Recycling, Waste Collection and Cleansing Services
Contract, due to commence on 1 October 2021

Ward(s) affected: All Wards

Exempt or confidential information:           Consultation details:

Decision to be taken by:                      Decision date:
Cabinet Member for Sustainable Transport,     Not before 21 Sep 2021
Environment and Clean Air (job-share)

Background documents:

For further information about this key decision, please contact:
Cormac Stokes, Head of Environmental Services
cstokes@lambeth.gov.uk

Decision: Sustainable Travel – The Big Shift

To authorise the expenditure of revenue funding to support the take up of sustainable modes of travel

Ward(s) affected: All Wards

Exempt or confidential information:           Consultation details:

                                                                                                Page 30
Forward Plan of key decisions, 20 September 2021

Decision to be taken by:                      Decision date:
Cabinet Member for Sustainable Transport,     Not before 12 Oct 2021
Environment and Clean Air (job-share)

Background documents:

For further information about this key decision, please contact:
Simon Phillips, Transport Manager - Planning, Transport & Development
SPhillips2@lambeth.gov.uk

Decision: Upper Norwood Joint Library

To grant a 25 year lease to Upper Norwood Library Trust at a peppercorn rent

Ward(s) affected: Gipsy Hill

Exempt or confidential information:           Consultation details:

Decision to be taken by:                      Decision date:
Cabinet Member for Finance and                Not before 17 Jul 2017
Performance

Background documents:

For further information about this key decision, please contact:
Yvonne Hardy, Assistant Head - Directorates, Valuation and Strategic Assets
yhardy@lambeth.gov.uk

Tel: 0207 926 2984

Decision: Data Network Services – Extension

Ward(s) affected: All Wards

Exempt or confidential information:           Consultation details:
Part exempt
Information relating to the financial or
business affairs of any particular person
(including the authority holding that
information)

                                                                               Page 31
Forward Plan of key decisions, 20 September 2021

Decision to be taken by:                     Decision date:
Cabinet Member for Finance and               Not before 25 Nov 2020
Performance

Background documents:

For further information about this key decision, please contact:
Clive Redington, ICT Manager Contract Management, Business Transformation
credington@lambeth.gov.uk
Olive Morris House (2nd Floor)
Tel: 020 7926 4021

Decision: PSR - External Works and replacement of Town Hall roof

To approve the request to use the LHC Flat Roofing Framework (FR2) route of procurement to appoint
a contractor to carry out the works to renew the Lambeth town hall roof.

Ward(s) affected: Brixton Hill

Exempt or confidential information:          Consultation details:

Decision to be taken by:                     Decision date:
Cabinet Member for Finance and               Not before 2 Mar 2021
Performance

Background documents:
PSR - External Works and replacement of Town Hall roof

For further information about this key decision, please contact:
Andre Gordon, Senior Project Manager
agordon2@lambeth.gov.uk

Decision: Network and Telephony Services Procurement

Agreement to award contracts for the replacement of the existing services delivered under the
networks contract with Virgin Media Business and the telephony solution delivered under a hosted
service managed by Telefonica.

Ward(s) affected: All Wards

Exempt or confidential information:          Consultation details:
Part exempt
Information relating to the financial or
                                                                                              Page 32
Forward Plan of key decisions, 20 September 2021

business affairs of any particular person
(including the authority holding that
information)

Decision to be taken by:                      Decision date:
Cabinet Member for Finance and                Not before 22 May 2021
Performance

Background documents:

For further information about this key decision, please contact:
Paul Headington, ICT Procurement Coordination Lead
pheadington@lambeth.gov.uk

Decision: ITSM Replacement Plan

Award of the contract for the ITSM Replacement of an existing help desk software system that
supports the recording and allocation of service calls to IT and other departments in Lambeth Council.

Ward(s) affected: All Wards

Exempt or confidential information:           Consultation details:
Part exempt
Information relating to the financial or
business affairs of any particular person
(including the authority holding that
information)

Decision to be taken by:                      Decision date:
Cabinet Member for Finance and                Not before 8 Jun 2021
Performance

Background documents:

For further information about this key decision, please contact:
Paul Headington, ICT Procurement Coordination Lead
pheadington@lambeth.gov.uk

Decision: Procurement - Minor Works Framework

To procure a Call Off Framework agreement for Minor Works and Projects with an estimated contract
value of £8m. The framework will be for a duration of 4 years.

                                                                                                Page 33
Forward Plan of key decisions, 20 September 2021

The framework will be open to local companies and tradespeople to apply for appointment.

Ward(s) affected: All Wards

Exempt or confidential information:          Consultation details:
Part exempt
Information relating to the financial or
business affairs of any particular person
(including the authority holding that
information)

Decision to be taken by:                     Decision date:
Cabinet Member for Finance and               Not before 28 Jun 2021
Performance

Background documents:

For further information about this key decision, please contact:
Patricia Anamoah, AD FM, Property and Projects
PAnamoah@lambeth.gov.uk
1st Floor, Olive Morris House, 18 Brixton Hill, London, SW2 1RL

Decision: Digital Delivery - capital budget allocation

To seek approval to allocate funds from the capital budget approved by Cabinet in March 2021 for
Resident services projects that will deliver against objectives prioritised in Digital strategy.

Ward(s) affected: All Wards

Exempt or confidential information:          Consultation details:

Decision to be taken by:                     Decision date:
Cabinet Member for Finance and               Not before 13 Jul 2021
Performance

Background documents:

For further information about this key decision, please contact:
Matt Gunn, Programme Manager
mgunn@lambeth.gov.uk

                                                                                              Page 34
Forward Plan of key decisions, 20 September 2021

Decision: Digital Lambeth Programme - Project capital budget allocations

To seek approval of allocation of capital funding for the individual schemes being delivered under the
Digital Lambeth programme to achieve the outcomes from the Digital Strategy

Ward(s) affected: All Wards

Exempt or confidential information:            Consultation details:

Decision to be taken by:                       Decision date:
Cabinet Member for Finance and                 Not before 24 Aug 2021
Performance

Background documents:

For further information about this key decision, please contact:
Adrian Thompson, Housing Project Coordinator
athompson3@lambeth.gov.uk

Decision: Laptops, associated products, and services procurement

There is an ongoing requirement for purchasing laptops and other end user computing products and
services for new joiners above establishment baselines, replacing out-of-support laptops and fulfilling
the requirement of other transformation projects. The current contract agreement with XMA Ltd (for
laptops) will end on 31st May 2021 and the contract for Insight (UK) Direct (for desktops) already
ended on 31st May 2020. ICT have ensured that there’s sufficient hardware stock procured to cover
the period from expiry of the old contract to commencement of new arrangements. It is proposed to
undertake procurement of these services to deliver the Resident Services Business Plan. The
proposed plan also supports “Excellent Workforce” theme from “Your Future Lambeth”.

Ward(s) affected: All Wards

Exempt or confidential information:            Consultation details:

Decision to be taken by:                       Decision date:
Cabinet Member for Finance and                 Not before 21 Sep 2021
Performance

Background documents:

                                                                                                  Page 35
Forward Plan of key decisions, 20 September 2021

For further information about this key decision, please contact:
Neeraj Mittra, Senior ICT Officer Contract Management, Business Transformation
NMittra@lambeth.gov.uk

Tel: 020 7926 9274

Decision: Insurance Legal Services

Insurance legal services framework is outsourced to allow the council to deal with civil claims received.
The council has a legal obligation to comply with the Civil Procedure Rules (CPR) under which such
claims are required to be dealt with.
The current business model is still relevant as we will continue to receive claims for compensation, we
also must comply with our insurer’s requirements which state we must have a panel for claims that are
handled in house by our own claim handlers within our policy excess where necessary. The services
of the law firms on the framework are essential. Not having recourse to such legal support is not an
option and would leave the Council exposed to significant risk and increased costs. This is the case in
respect of the Redress Scheme or civil litigation cases.

Ward(s) affected: All Wards

Exempt or confidential information:            Consultation details:

Decision to be taken by:                       Decision date:
Cabinet Member for Finance and                 Not before 12 Oct 2021
Performance

Background documents:

For further information about this key decision, please contact:
Maureen Dennie, Insurance Manager
mdennie@lambeth.gov.uk
1st Floor, Olive Morris House
Tel: 020 7926 9846

Decision: Property Liability and Terrorism Insurance

Lambeth is a member of the Insurance London Consortium (ILC). The members of ILC have been
very successful in procuring its insurance policies to date.
Whilst the Council accepts an element of risk with regards to insurance claims and maintains an
insurance fund to cover such eventualities, it also procures ‘catastrophe’ cover through the insurance
market. This is the case for the property and liability covers.

Ward(s) affected: All Wards