External Painting Project - External Areas: $13,500.00 - Robertson's Remedial & Painting

Page created by Allen Wise
 
CONTINUE READING
External Painting Project - External Areas: ,500.00 - Robertson's Remedial & Painting
Quote No: Q34267-1

10th Sep 2020

To:      The Owners - Strata Plan 36241                        C/: VJ Ray Pty Ltd
         4 Gow Street                                              Attention: Moe Loane
         ABBOTSFORD, NSW                                           Email: mioane@vjray.com.au

                                  External Painting Project

                                    External Areas: $13,500.00

Note: All pricing stated above excludes GST
HBCF Insurance is included for all residential projects over $20,000 in value inclusive of GST

Prepared By: Andrew Shepherd
Email:       andrew@rpd.net.au
Phone:       0449 104 099
Our quotation is valid for a period of 6 months from date of issue.
Page 1
External Painting Project - External Areas: ,500.00 - Robertson's Remedial & Painting
Scope of Works & Specification
Following site establishment and surface preparation as listed below, the below areas have been allowed for in our
quotation:

All surfaces will be prepared by sanding and/or scrapping to remove any loose paint back to a sound edge. All external
surfaces will be washed where practicable. Surface imperfections will be filled with a suitable compound prior to sanding
and being primed. Areas of missing sealant will be gap filled prior to being finished with the suggested coating system
below. All surfaces will receive a minimum of 2 finish coats of Premium Products.

External Scope
External Repaint
Preparation and repainting to previously painted external eaves, fascia, barge boards, balcony ceilings and balcony
posts, soffits, rendered walls, walkway walls, weatherboard cladding, slab bands and x4 front doors/frames.
Surface                         Product
Concrete Slab Edging /          Low Sheen Dulux Weathershield or equivalent
Cement Render / Fibre
cement sheeting
Timberwork                      Dulux Weathershield or Dulux Aquanamel
Metalwork                       Dulux Metalshield or Premium Gloss Enamel or Dulux Weathershield or equivalent

External Scope
Entrance Gazebo
Preparation and repainting to previously entrance gazebo.
Surface                         Product
Timberwork                      Dulux Weathershield or Dulux Aquanamel

Page 2
Exclusions

The following items are excluded from our quotation:
Windows, lintels, metal railings and balustrades and all other areas/surfaces not mentioned above.
All pre-finished surfaces unless nominated in the above scope of works.

Additional Comments

The project has been priced to be painted in the existing colour scheme.

If a colour change is required and additional coats are needed due to coverage, this may be subject to a variance.

We have allowed for minor crack and timber repairs within our pricing.

Any major building repairs identified throughout the project, would be priced as a variation and provided tothe Owners
Corporation for approval

Price Breakdown
The following pricing schedule is inclusive of all labour, materials and access equipment for all works nominated within
our scope of works as listed above:

Area                                                                                                      Value
External Repaint                                                                                              $12,500.00
Entrance Gazebo                                                                                                 $1,000.00
                                                                                                 Total        $13,500.00
                                                                                                  GST           $1,350.00
                                                                                          Total + GST         $14,850.00

HBCF Insurance is included for all projects over $20,000 in value inclusive of GST

Our quotation is valid for a period of 6 months from date of issue.

Page 3
About Us
Robertson's has built an enviable reputation across the industry for consistently delivering high quality, award
winning painting and building services across Sydney and the wider NSW region.

At the heart of Robertson's is our qualified, multi-award winning team of experienced painters, builders and project
managers who have the expertise and experience to deliver a great outcome for your project. We have a dedicated and
well trained office support team always on hand for all inquiries.

Proudly family owned and operated for over 50 years, we are dedicated to our customers and we pride ourselves on our
professional and committed attitude.

• Member of Master Builders Association
• Member of Master Painters Association
• Public Liability Insurance $20M.
• Workers Compensation Fund
• Home Building Compensation Fund: up to $14M & $4M individual
• CM3 registered and qualified
• Australian Standard AS/NZS ISO 9001:2008 compliant
• Institute Strata Title Management supply member
Colour Consultation Services - Robertson's will provide colour samples on request and can assist customers with
colour schemes. For a more involved and detailed service we can refer you to one of our partner colour consultant
professionals - our sales team can advise you of the options or alternatively refer to robertsons.com.au for more
information and links.
Certificate of Completion - Robertson's will issue information on completion which covers the colours and paint
finishes used.
Robertson's Maintenance Programmes - are available to ensure longevity of your project - we can tailor a programme
specifically to your individual needs and budget.

Warranty
• 5 year warranty on Robertson's workmanship
• 10 year manufacturer's warranty on products and materials
Warranty does not apply to the following:

Coating failure due to water penetration or ingress.
Coating failure due to pre-existing rust damage.
Coating failure due to settlement cracking or other movement.
Coating failure due to pre-existing timber rot.
Coating failure due to pre-existing paint delaminating.
Damage resulting from general wear and tear.

Page 4
Terms and Conditions
• Robertson's quotes are valid for a period of 6 months from the date of issue - unless otherwise stated on the quote.
• All paint colours and finishes are to be confirmed in writing prior to commencement. Changes to colours or finishes
post commencement may incur additional charges.
• Robertson's work hours are generally from 7.00am to 4.00pm Monday to Saturday unless otherwise noted.
• Robertson's quotes are based on work being done during our normal business hours unless otherwise noted.
Additional charges will apply if work is to be carried out after these business hours.
• The customer is expected to provide free of charge to Robertson's electrical power, running water and toilet facilities
(where applicable) at the work site for the duration of the project.
• Pre-existing materials such as lead paints or asbestos particle materials will be subject to additional costs to prepare
or remove as appropriate unless otherwise stated in quote.
• Payment terms shall be as agreed and noted to in the works contract. Payment terms for all other projects are 14
days from the date of the invoice unless otherwise noted. For projects $5,000 and above late payment will be subject to
an initial 5% penalty and interest charges of 3% per calendar month.
• If the client defaults payment of any invoice when due the client will be responsible for all costs incurred by
Robertson's in pursuing the debt including legal costs.
• Robertson's may suspend or terminate the supply of goods if the client is at any time in breach of any obligation
including payment terms. Robertson's will not be liable to the client for any damage or loss incurred as a result.
• Robertson's will not be subject to liquidated damages unless specifically stated in the quote. Liquidated damages
shall be limited to 1% of the net price per week or to an overall 5% of the net price and shall only then be applied where
an act or omission of Robertson's directly causes such damages.
• Should any new laws or regulations be introduced by any level of government resulting in new changes being
introduced our invoices will be adjusted accordingly for any increases or decreases in cost associated with these
charges.
• Payments cannot be withheld for reasons relating to defects or related issues if the client or client representative fails
to notify Robertson's within 14 days of final invoice.

Page 5
You can also read