Expenditure forecast 2016/17 2020/21 - ECRC Meeting 18 March 2015 Ed Gaykema Branch Manager Gas Networks - Evoenergy

Page created by Crystal Phillips
 
CONTINUE READING
Expenditure forecast 2016/17 2020/21 - ECRC Meeting 18 March 2015 Ed Gaykema Branch Manager Gas Networks - Evoenergy
Expenditure forecast 2016/17 –
 2020/21

  ECRC Meeting 18 March 2015

Ed Gaykema
Branch Manager
Gas Networks
Expenditure forecast 2016/17 2020/21 - ECRC Meeting 18 March 2015 Ed Gaykema Branch Manager Gas Networks - Evoenergy
In this presentation
• Building blocks to our plan/ the submission
• Capital investment priorities 2016-2021
• Operational priorities 2016-2021
• ECRC input
Expenditure forecast 2016/17 2020/21 - ECRC Meeting 18 March 2015 Ed Gaykema Branch Manager Gas Networks - Evoenergy
Building blocks overall costs

• Capital (Capex)
   – Cost of Funding
     (WACC)
   – Regulatory Asset
     Base (RAB)
   – Capital
     Expenditure
• Depreciation
• Operational
  expenditure (Opex)
• Taxes and Charges

                        2014/15 figures (current level of service)
Expenditure forecast 2016/17 2020/21 - ECRC Meeting 18 March 2015 Ed Gaykema Branch Manager Gas Networks - Evoenergy
Expenditure forecast 2016/17 2020/21 - ECRC Meeting 18 March 2015 Ed Gaykema Branch Manager Gas Networks - Evoenergy
Capital Expenditure (part of the 49%)

• Additional capital expenditure of $1m p.a. on a long life
  asset (50 year life) will result in an additional $0.45 on a
  typical residential customers bill per annum over the five
  year period.
Expenditure forecast 2016/17 2020/21 - ECRC Meeting 18 March 2015 Ed Gaykema Branch Manager Gas Networks - Evoenergy
The balance
 CAPEX expenditures
   • Contribution to the overall costs of the network,                 Safety

   • Must meet minimum mandated requirements              Capital     Reliability

   • Equity for all customers                            Operations   Availability

– High cost we over invest and potential loss of returns loss
  of customers to other competing energy providers

– Prudent & Efficient cost we get the forecasts and
  estimates right and AER approve expenditure

– Low cost we have network constraints that limit customer
  connection, increase operational costs, increased outages
  and loss of customers to competing energy providers.
Expenditure forecast 2016/17 2020/21 - ECRC Meeting 18 March 2015 Ed Gaykema Branch Manager Gas Networks - Evoenergy
CAPEX project priorities 2016-2021

• During the 2016/17- 2020/21 period we have the
  following CAPEX priorities:
   – Growing (connecting New Customers)
      • West Belconnen
      • Prospect & Denman
      • Moncrieff secondary
   – Growing our capacity
      • Molonglo
      • West Belconnen
   – Stay in Business
      • Fyshwick station upgrade for high flow
      • Integrity assessments
      • Metering
Expenditure forecast 2016/17 2020/21 - ECRC Meeting 18 March 2015 Ed Gaykema Branch Manager Gas Networks - Evoenergy
Capex expenditure comparison

                                                                                CAPITAL COMPARISON AA11-15 $110m
       CAPITAL COMPARISON AA16-21 $90m
                                                                                                         1%
                                       1%

                                                                                                                    30%
                                                  32%                                              42%
                          48%

                                            21%                                                               28%

                                                                                Non Distribution                Stay In Business

Non Distribution   Stay In Business   Capacity Development   Market Expansion   Capacity Development            Market Expansion
Growth Areas
Market Expansion Projects $45m
Name                                        Description                                          Driver
                                                                                                 Extension of the network towards West Belconnen,
Gungahlin;                                  new reticulation of mains as well as connection of
Gungahlin town centre, Ngunnawal, Casey,                                                         to supply new estate areas beyond the current
                                            new homes, new medium density and high rise          coverage of the network.
Moncrieff, Bonner, Amaroo and Crace with
                                            residential and commercial customers
planning underway for Throsby

                                            new reticulation of mains as well as connection of   Extension of the network towards West Belconnen,
Belconnen;
Belconnen town centre, Lawson and Bruce     new homes, new medium density and high rise          to supply new estate area beyond the current
with planning underway for West             residential and commercial customers                 coverage of the network.
Belconnen.

Inner North;
Major redevelopments in City, Braddon and
Dickson along proposed light rail route,    new reticulation of mains as well as connection of
section 5 Campbell, Canberra Airport        new homes, new medium density and high rise          To support ongoing growth in Gungahlin.
commercial developments and planned         residential and commercial customers
redevelopment of Constitution Avenue and
City to Lake project
Molonglo Valley;                            new reticulation of mains as well as connection of
Wright, Coombs, North Weston and            new homes, new medium density and high rise          Support reliability of supply to local areas/streets
planning underway for Denman Prospect.      residential and commercial customers
Tuggeranong;
Greenway
 Woden Valley;
Woden town centre commercial and high       new reticulation of mains as well as connection of   The Belconnen area is forecast to develop quickly
rise developments.                          new homes, new medium density and high rise
 Inner South;                                                                                    in the industrially zoned area preferred, and this will
                                            residential and commercial customers                 secure the optimal location allowing deferral of
Yarralumbla Brickworks redevelopment,
Kingston Foreshore, Barton.                                                                      other works in the area.
 Queanbeyan;
Googong and Tralee
CDP Projects $30m
Name                                 Description                                                                 Driver
                                     Lay 3.5 kms of 250 mm ST main from Phillip PRS (Woden Town
                                     Centre) along Tuggeranong Parkway to Heysen Street.

                                     Lay 500 m of 100 mm ST to connect with the secondary network
Molonglo Primary Extension Stage 1   along Heysen Street.                                                        Support staged growth in the
(and PRS)                                                                                                        Molonglo area.
                                     The route is to be confirmed by a DA process.

                                     This will be operated at secondary pressures until the installation of a
                                     PRS at the end of Stage 3.

                                     Lay 2.4m of 150mm ST (secondary main) from the existing 150mm
                                     secondary in Gungahlin Drive along Horse Park Dr to the intersection with   To provide reliability of supply
                                     Mirrabei Dr, Moncrieff.                                                     to the new estates in
Moncrieff Secondary Extension CDP
                                                                                                                 Gungahlin (Casey, Moncrieff
                                     Install a new 7,000m3/hr SDRS and connect to the medium pressure            and Taylor).
                                     mains.
                                     Lay 4km of 200mm ST main from 100mm ST main in Streeton Drive               To provide capacity for growth
                                     to the Molonglo development.                                                and reliability of supply to the
Molonglo Secondary CDP Stage 1
                                                                                                                 new estates in Molonglo
                                     Install one 7,000m3/hr SDRS.                                                (Wright and Coombes).
                                     Lay 4.8km of 200mm ST continuing from Molonglo Stage 1 along
                                     either Coppins Crossing Road or proposed road extension of John             To provide capacity for growth
Molonglo Secondary CDP Stage 2       Gorton Drive.                                                               and reliability of supply to the
                                                                                                                 new estates in Molonglo
                                     Install one 7,000m3/hr SDRS in Denman Prospect at end of extension

                                     Secure Development Application (DA) approval for route.
                                                                                                                 To provide capacity for growth
Molonglo Secondary CD Project        (Lay 3.2 km of 200mm ST main continuing from Molonglo Secondary             and reliability of supply to the
Stage 3                              Extension Stage 2 along Coppins Crossings Rd to the proposed                new estates in Molonglo
                                     location of Molonglo PRS to the north of the Molonglo River)
CDP Projects
Name                                    Description                                             Driver
                                        Lay 3km of 200mm ST from end of existing                Extension of the network towards West Belconnen,
                                        secondary main on Southern Cross Drive in Holt.         to supply new estate areas beyond the current
West Belconnen Secondary Main
Extension (Southern Cross Drive West)   Install new 7,000scmh SDRS.                             coverage of the network.

                                        Secure Development Application (DA) approval for
                                        route and works.                                        Extension of the network towards West Belconnen,
West Belconnen Secondary Main
                                                                                                to supply new estate area beyond the current
Extension                               (Lay 3km of 200mm ST main westwards from end            coverage of the network.
(Southern Cross Drive East)             of existing secondary main on Stockdill Drive.

                                        Install a 7,000scmh DR)
                                        Secure Development Application (DA) approval for
                                        route and works.
Taylor Secondary Extension CDP          (Lay 4km of 150mm ST main along Horse Park              To support ongoing growth in Gungahlin.
                                        Drive from end of Moncrieff secondary extension.
                                        Install a DR at the end.)
                                        Medium Pressure projects are supported by
                                        indicative project listing mains in Capital Plan and
                                        allocations to support field and modelling identified
Medium Pressure Mains                   areas.                                                  Support reliability of supply to local areas/streets
                                        Actual projects can be expected to vary based on
                                        growth and usage due to the very localised nature
                                        of the Capacity modelling.
                                                                                                The Belconnen area is forecast to develop quickly
Belconnen Primary Regulating Station                                                            in the industrially zoned area preferred, and this will
                                        Secure land for future Belconnen PRS site
(PRS) – Secure Land                                                                             secure the optimal location allowing deferral of
                                                                                                other works in the area.
SIB Projects $34m
Name                                           Description                                       Driver
                                               Undertake relocation of ring mains to address
                                               implications from potential third party damage,   Reduce risk of potential gas build up in
100kPa Ring Mains
                                               building changes and/or pipework or meter set     enclosed areas
                                               regulator failure.
                                               Install a main line isolation valve on the        Support operations emergency management
Canberra Primary Main Isolation Valve
                                               Fyshwick to Watson Primary Main                   and possible repairs.
                                               Upgrade skid, flow control and Install second     Support increased load, throughput and supply
Hoskinstown CTS Upgrade
                                               run, additional valves and gas panel              nominations

Integrity Program                              Integrity and Validation digs                     Support integrity management

                                               Mixture of Planned and Reactive replacement,
                                               including statistical sampling to see if asset    Maintain accurate meters in accordance with
SIB Metering Program
                                               class life can be extended for optimal            current standards
                                               replacement
                                               Update Paddock markers to address
Paddock Markers – Primary and Secondary
                                               standards, visibility and support protection of   Support integrity management
Mains
                                               one-way feeds
                                               Replace non-conforming electrical equipment       Ensure compliance with standards improving
HP Station Electrical and Instrumental (E&I)
                                               at High Pressure (HP) Trunk and Primary           site safety, security and lower long term
Upgrade Program
                                               Facilities                                        operating costs through standardisation
                                               Assess requirements and design for future
Watson + Phillip PRS assessments               upgrade to provide price certainty for next AA    Meet future demand and supply security
                                               period
OPEX Costs 42% of our building block cost

• An additional Operations and Maintenance costs of $1m p.a. over a
  five-year period results in an additional $6.75 p.a. to a customers
  bill
OPEX priorities
During the 2016/17- 2020/21 period we have the
following OPEX priorities:

Routine Operations and maintenance
• Maintaining 4,900 km network, particularly trunk and Primary mains
  and associated pressure reduction facilities
• Attending to over 500 p.a. third party activities working near our
  assets
• Responding to 200 incidents p.a. that require make safe. Sometimes
  multiple on same day, Typically 15% of these require significant
  resources for > 1 day
• Routine overhauls and operational checks of 8 high pressure
  facilities and 93 district regulator sets and 798 major meter sets.
New OPEX priorities
Opex step changes                                    Requirement/ Driver               Non-recurrent/ recurrent

National B2B harmonisation                           Change in regulatory obligation   Recurrent

Access Arrangement review                            Regulatory obligation             Periodic

IT Asset Utilisation Fee                             Capex driven/net benefit          Five year one-off

National Energy Consumer Framework                   Change in Regulatory Obligation   Non Recurrent

Renegotiation of Hoskins town CTS O&M contracts      Good industry practice            Recurrent?

Emerging Retail Market Procedure changes             Change in regulatory obligation   Recurrent?

Compliance to revised technical codes for metering   Change in regulatory obligation   Recurrent

Exposed main inspections                             Good industry practice            Periodic

Fyshwick TRS Upgrade                                 Capex driven                      Recurrent

Hoskinstown CTS upgrade                              Capex driven                      Recurrent

Hume PRS                                             Capex driven                      Recurrent

Periodic water bath neater inspections               Capex driven                      Recurrent/ periodic

Annual OPEX cost increase $2.5m
Building blocks
• The Capex and Opex outlined are key
  components of determining our required
  revenue.
• next presentation will explore this
What can you do
– Tell us where you would feel we should or
  should not be investing in Canberra's future?
– Our plan aligns to our 5 year objectives
– Remember we are part of the competitive
  energy market
You can also read