Energy Absolute Energy for us all, Energy for the FUTURE

Page created by Sylvia Snyder
 
CONTINUE READING
Energy Absolute Energy for us all, Energy for the FUTURE
Energy Absolute
  Energy for us all, Energy for the FUTURE
Energy Absolute Energy for us all, Energy for the FUTURE
E@ at Glance
                                                                     At 20 March 2020
Established
In 2006 to produce palm oil                                     Others,
                                                                22.62%                         Somphote
Core Business                                                                                   Ahunai
                                                                                                (CEO),
Energy (Renewable and Utilities)                                                                43.61%
                                                                          Shareholder
Secondary Market                                   Foreign                 Structure
The Stock Exchange of Thailand since 30 Jan 2013   Juristic,
                                                   18.90%
Market Capitalization (as of 15/05/20)
Approximately THB 148.27 bil. (US$ 4.63 bil.)                        Domestic                Amorn
                                                                       Fund,              Sapthaweekul
                                                                      11.35%
                                                                                          (CFO) , 3.53%

                                                               Total Board Members = 11
Credit Rating                 CG Rating
Corporate rating : A          Excellent            Independent             Executive        Other
                                                     Directors             Directors   Non - Executive
                                                     = 6 (55%)             = 2 (18%)     = 3 (27%)

                                                                                                         2
Energy Absolute Energy for us all, Energy for the FUTURE
Safeguard for
                         all stakeholders

Using application
                                        E@ Measurement during   Knowledge
 to track & trace
                                        the COVID-19 period     Sharing

                    #NON-CONTACT

                                            Provide & Support
                                            Medical staff

                                                                            3
Energy Absolute Energy for us all, Energy for the FUTURE
Highlight of Operating Performance
                    Q1/2020               Q1/2019
Total Revenue

                THB 4,761 mil.        THB 3,088 mil.
                increase 54% YOY      increase 19% YOY
Net Profit

                THB 1,452 mil.        THB 1,211 mil.
                increase 20% YOY      increase 38% YOY

                                                         4
Energy Absolute Energy for us all, Energy for the FUTURE
“A leader in alternative energy business,
                      by using the modern technology and environmentally friendly”

  Palm Oil                Renewable               Energy               Electric           Charging
   Based                    Power                 Storage              Vehicle            Network
(1) B100 & Glycerin      (1) COD               (1) Amita Taiwan      (1) MPV car : Mine   (1) Station
(2) Bio-PCM &                 • Solar 278 MW       400 MWh           (2) Ferry            (2) Equipment
    Green Diesel              • Wind 386 MW    (2) Amita Thailand    (3) Bus & Truck      (3) Online App
(3) Other Related        (2) New Projects          1 GWh (by 2020)   (4) Other Related

                                                                                                           5
Energy Absolute Energy for us all, Energy for the FUTURE
Our
Performance
   Energy Absolute PCL.
Energy Absolute Energy for us all, Energy for the FUTURE
Total Revenue of Q1/2020
                 Revenue for Q1/2020 period increased from Wind Power and Biodiesel unit
                                     Total Revenue increased 54% YoY
                               Total Operating Revenue increased 53% YoY

                                                                               •   Amount of revenue contributed from power
    Mil.bt.                                                                        business is increasing YoY after completion
16,000         Accounting gain                              14,955                 of 260 MW wind power, Hanuman Project.
                                                               -               •   Stronger demand of B100 as required to use
               Other revenue                                  235
14,000                                                                             B10 caused the increase in B100 selling price
               Other Businesses                    12,490                          122% YoY.
12,000         Power
               BiodieselGlycerin                    360                                                    Others
                                                                      Others           Biodiesel            2%
10,000                                                                 2%                29%                                   Biodiesel
                                                             10,974                                                              39%
 8,000
                                                    7,681
 6,000                                                                    Q1/2019                                   Q1/2020
                                           4,761
                                   4,109    106                       Power
 4,000   2,773 3,088                55
                                           2,766
                                                                       69%                                  Power
                                                                                                             59%
              130        80
 2,000                             3,047
          1,839        2,120                        3,511    3,678
                                    982    1,860
    -      787          885
         Q4/2018 Q1/2019 Q4/2019 Q1/2020            2018     2019

                                                                                                                                           7
Energy Absolute Energy for us all, Energy for the FUTURE
Gross Profit of 1Q2020
         Mil.bt.
    10,000                Power BU.                                                                        Gross Profit Margin                    Q1/19             Q1/20
     9,000                Biodiesel BU.                                      8,135                Biodiesel Business                                2%                5%
                                                                                    51
     8,000                Others BU.                                                              • Higher demand of CPO from the government measurement announcing B10 to
                                                                                                    be used as regular diesel while there was shrunk from drought in 2019.
     7,000
                                                              5,884                               • B100 specification change to Mono Glyceride content at 0.4% for use as B10
     6,000                                                             212                          caused price to increase.

     5,000
                                                                                                  Power Business
                                                                                                                                      Solar        82%               82%
     4,000                                                                   8,442
                                                                                                                                      Wind         64%               66%
     3,000                     2,377                           5,888                              • Increasing of power production was due to higher solar radiation.
                                       67   2,09391
     2,000        1,604                                                                           • Revenue was fully recognized from Hanuman wind power project
                          13                                                                      • Increasing of power production from Hadkunghan wind power plant due to
      1,000                    2,436        2,075                                                   strong wind compare to the last year.
                  1,629
         -                                                                                                     Total GPM                          52%               44%
                   (38)        (126)         (73)              (216)         (358)
     (1,000)
                     Q1/19      Q4/19        Q1/20              2018         2019

Note: Total Revenue and Net Profit are excluded Accounting Gain, Other Income, Gain/Loss from exchange rate.
                                                                                                                                                                                 8
Energy Absolute Energy for us all, Energy for the FUTURE
Total Expense & Net Profit of 1Q2020
    YoY                                                                                                       160
                                          Solar (81)
    (Mil.Bt)
                                          Gross                          (865)              (14)                                                    11
                                          Profit                                                                             (1,386)
                                    8,135
                                        Increase
                  5,884                                                                                                                                              6,082                5,148

               Gross Profit 2018 Gross Profit 2019 Selling Expense   Admin Expense     Share of Loss in    FX Gain (Loss)    Financial Cost         Tax            Net Profit 2019   Net Profit 2018
                                                                                         investment

    YoY
    (Mil.Bt)
                                                     (20)                                                 (14)                           (433)
                                                                     (269)              24                                  36                                1
                   1,604            2,063
                                                                                                                                                                            1,452            1,211
                  Gross Profit     Gross Profit   Selling Expense Admin Expense       Gain on         Share of loss   FX Gain (Loss)   Financial Cost        Tax             Net Profit      Net Profit
                   Q1/2019          Q1/2020                                       remeasurement           from                                                               Q1/2020         Q1/2019
                                                                                    of financial      investments
                                                                                    instrument

• Administrative expenses: for 1Q2020, were Baht 269 mil., increased by Baht 72 mil. From the personnel expense with new hiring of employee and executive were increased by Baht 41 mil. and
  also Office expenses were Baht 24 mil. following the new business.
• Financial Cost: increased by Baht 170 million. This is mainly due to long term loan from financial institutions for payment of some part of supplier credits for Hanuman wind power plants project.
• FX Gain: Due to buying Forward for payment of supplier credits for Battery plant project

                                                                                                                                                                                                          9
Energy Absolute Energy for us all, Energy for the FUTURE
Total Liability, Equity, D/E Ratio and Net D/E Ratio
THB Mil.

80,000                                                                                                3.50
                      2.88
                                                                                                      3.00
                                    2.64
60,000                                                                                      26,422
             2.28     2.25                                                      24,866                2.50
                                    2.14              2.02
             1.82                                                 19,518 2.03    1.82
                                                                                             1.80     2.00
40,000                                                1.57
                                    11,389                                      1.41
                                                      14,744                                 1.21     1.50
                                                                   1.16
                      8,510
                                                                                45,353       47,619   1.00
20,000                                                            39,690
             5,897                  30,118            29,786
                      24,547                                                                          0.50
             13,429
     -                                                                                                0.00
             2014     2015          2016              2017         2018         2019        Q1/2020

                      Liabilities            Equity            D/E Ratio          Net D/E
                                                                                                             10
Financial Cost and Payment Profile
   Total Interest Bearing Debt

                   Current
                                                                                                                     A
                  portion of
                 Debentures
                 & ST-Debt
                    13%                   Mil.Bt.
                                                                                                                  Bond       LT-Loan

          42,664
                                       9,000
LT-Debt                                                   6,272 6,715
 54%
            Mil.Bt.       Debentures
                             33%
                                       6,000
                                                 4,467    2,272
                                                                                  4,855           5,074
                                                                                                                               4,000
                                                                  5,215   3,506                   2,074
                                                  1,467
                                                                                  3,355   2,660
                                       3,000
                                                          4,000                                           1,386                4,000
                                                  3,000                   3,506                   3,000
                                                                                          2,660
                                                                  1,500           1,500                   1,386          -
                                          -
          Interest Rate                          2020     2021    2022    2023    2024    2025    2026    2027      2028       2029
   Short Term Debt: 1.50 – 4.53%
              P/N: 1.41 – 3.50%
                                              On 16th October 2019, EA issued THB 3 billion 7-year bond to ADB
   Long Term Debt: 3 – 3.8%                    with 2.744% interest and was certified by CBI to be green bond.
             Bond: 2.09 – 3.15%
                                                                                                                                       11
Our Target in Y2020
                                 GD & PCM
                                EV
                                1%
                                    4%          E-Ferry & Charging 1%
                                                                          Capital Investment in 2020
                                                         Biodiesel              B100   Power
                                                           29%                   1%              Charging
                                                                                        2%
                                                                                                   3%
                                     Revenue
                                                                                           GD&PCM
                    Renewable         2020                                                   7%
                      Power
                       65%                                                                      EV Car
                                                                        LPH                      9%
                                                                        40%
         Others,
         235 , 1%                                                                THB
                                                                                                   E Ferry
                        Biodiesel,
                         3,678 ,                                              12,388 mil.           11%
                           25%
        Revenue
         2019                               Key milestone :
                                            GD & PCM, E ferry start     R&D            1 GWh Battery Factory
 Renewable                                  commercial operation         1%                   26%
   Power,                                   Q3/2020, EV start Q4/2020
10,974 , 74%

                                                                                                               12
Biodiesel Production
  Mil.liters                                                                   Baht/liter
                                                          Sales Volume      36.15
                               35.07                                                40.00
                       30.99                              Avg Price
300            28.60
       25.00                           24.18                                        30.00
                                               20.17
200                                                    17.69        16.27           20.00

100             175     188            174             193                          10.00
         134                   152             158
                                                                     50.2   49.8
  0                                                                                 0.00
        2013    2014   2015    2016    2017    2018    2019         Q1/19 Q1/20

Location       Kabinburi Industrial Estate, Prachinburi under BOI promotion & privileges
               • Biodiesel 800,000 Liters per day
Plant
               • Pilot production of green diesel/PCM 1 Ton per day
Capacity
               • Refined Glycerin 80 Tons per day (by product)

• B100 volume in Q1/20 = 49.8 mil.liters decreased 0.8% as compared to last year but the average
  selling price increased 122.2% from the announcement B10 to be used instead of B7
• Glycerin volume in Q1/20 = 3.77 mil.kg. decreased 0.03% as compared to last year and the average
  selling price decreased 26.49% due to the high competition in domestic and export market.

                                                                                                     13
Palm oil Market in Thailand
                             B100            Food and others   Domestic Consumption   Stock
                                                                                                        Unit : Ton
     100%                                                                                                  600,000
       90%
                                                                                                           500,000
       80%
       70%
                                                                                                           400,000
       60%
       50%                                                                                                 300,000
       40%
                                                                                                           200,000
       30%
       20%
                                                                                                           100,000
       10%
         0%                                                                                                -
                   Apr 19 May 19 Jun 19 Jul 19 Aug 19 Sep 19 Oct 19 Nov 19 Dec19 Jan 20 Feb 20 Mar 20

Source: Department of Internal Trade, Thailand
                                                                                                                     14
Advance Technology
in Biodiesel Business

       Energy Absolute PCL.
Biodiesel Business with advance technology of GD & PCM
                                                 BioPCM works as a thermal storage battery
                                       PCM       good for energy saving

                                                                                               Export
                                                                                               Market
               Green Diesel & PCM
               Production (38 : 62)

   CPO                                Green      Advance product of biodiesel
Purification                          Diesel     Enhancing diesel engine capacity
                                                                                             Domestic
                                                 Sell to major oil refinery companies         Market
                                       B100
                B100 & Glycerin
                  Production

                                                 Sell to pharmaceuticals ,
                                      Glycerin
                                                 Cosmetics, Personal products

                                                                                                        16
New Plant for
 Green Diesel &
PCM Production

                  17
Renewable Power
             EA Solar Lampang
                 (90 MW)
                                                       Production
                                                         664 MW
                                          EA Solar Phitsanulok
                                                (90 MW)
                   EA Solar Nakornsawan
                          (90 MW)

                       EA Solar Lopburi                          EA Wind Hanuman
                           (8 MW)                                    (260 MW)
                                                                     (Chaiyaphum)

                                                        COD
  EA Wind Hadkanghun                                     • HNM 1 & 8 = 90 MW 25 Jun 19
       (126 MW)                                          • HNM 5 = 48 MW 22 Mar 19
(Songkla & Nakornsri tammarat)
                                                         • HNM 9 = 42 MW 30 Mar 19
                                                         • HNM 10 = 80 MW 13 Apr 19
                                                        Adder       3.50 baht/kwh
                                                        Technology from Siemens Gamesa, Spain
Renewable Energy Production
                                 Total Capacity                                                                  Output Production

                                                                                              Mil.kWh
  MWh                             Solar                                                                                                    1,389
              Wind                42%                                                      1400          Solar
800                     664                                                664 664         1200          HGH
              58%                 278 MWh                                                                                                  469
                                                                                                         HNM                         894
600               386 MWh                                                                  1000
                                                        404 404            386      386     800                                      292   293
400                                           278                                           600
                                                        126       126                                              417   381
                                    188                                                     400    253
                                                                                                          336                  353
200                98       98                          278       278      278      278                   107      185   152   115   602   627
        8                                                                                   200     75 25 58        92   67    83
 0                                                                                                 153 171         140   162   155
                                                                                              0
      2012 2013 2014 2015 2016 2017 2018 2019 2020                                                Q1/19 Q2/19 Q3/19 Q4/19 Q1/20      FY18 FY19

        + 8MW      + 90MW           + 90MW     + 90MW         + 126MW       + 260MW
        Lopburi    Nakornsawan      Lampang    Phitsanulok    Had           Hanuman
                                                              Kanghan       (Chaiyaphum)
                                                              (Songkla &
                                                              Nakornsri
                                                              tammarat)

                                                                                                                                                 19
Energy Storage System : Core Technology for New Businesses

                                  EV      Electric    Electric
                               Charging   Vehicle      Ferry
                                Station     (EV)     (E-Ferry)

  Phase I   Next Phase
                                           Energy
 1 GWh      50 GWh              Energy
                                Trading
                                           Storage
                                           System
                                System
                                            (ESS)

                                                                 20
New era of Advance Technology ESS

                                                                                                        • Started investing in Amita Technologies Inc., Taiwan in
                                                                                                          Dec 2016 current shareholding = 74.71%
      Energy Storage System for
   a small renewable power plant                                                                        • Amita Technologies Inc. was established in March
                                                                                                          2000 to produce lithium-ion power battery with
                                                                                                          strong material science research and long test data
                                                                                                          accumulation supported by ITRI.*
                                                                                                        • Main Businesses
                                                                                                            •   High Power Battery for EV, E-Scooter, Power Plant
                                                              Battery for E-Scooter                         •   OEM (Original Equipment Manufacturer)
                                                                                                            •   PDCA- Post Dry Cell Battery
                                                                                                            •   Turnkeys of High Technology Battery Factory for EV in
                                                                                                                Beijing
                                                                                                        • Current production capacity and capability : 44Ah
                                                                                                          power battery cell over 400MWh per year

* ITRI, a nonprofit R&D organization of Taiwan, who played a vital role in Taiwan's economic growth,
strengthen capabilities of innovation and cooperation with international partners all over the world.
                                                                                                                                                                        21
Amita’s Products and Application
                                                                                       Accessories
                                                                   Camcorder

                                                       E-Bank
                                             Energy
                                             Storage
Cell                 Hard &                  System
                      Soft
                      pack

                                                                 Versatile Stationary Battery System with
                                                                 High Safety & Manageability for
                                                                 Industrial, Commercial, Power System

                                                                Model No.      AMITA 20FT-ESS
       Lithium–titanate Battery (LTO) Cell                      Typical
                                                                               0.5-1.5MW
       Fast-charging >10C                                       Capacity
                                                                Cycle Life     6,000 (NMC)▕ 20,000 (LTO)
       Ultra Lifespan >20,000 Cycles
                                                                Voltage        48-820V
       Non-burning and Safety Features

                                                                                                            22
Our EV
MINE SPA1
  Energy Absolute PCL.
MINE Mobility
EV Factory
                                          Overall - Front             Factory - Front
Free Zone

       Free Zone                         FGs Yard - Back              Overall - Back

 • Free Zone Register
 • Factory 28,800 SqM. @Banpho District
 • THB 1200+ mil. Construction >> Cars, Trucks, Buses, Battery Pack

                                                                                        26
Electric Ferries
To prove the high safety of battery system
Using our 800-KWh Lithium-ion battery capacity
to modernize and make a cleaner and safer
transportation for our community including tourist
who travel along Chao Phraya River, which is one of
the most impressive tourist destinations in Bangkok.

The electric ferry is designed by our own team and
using our technology.

                                                       27
Passenger Cabin for Social Distancing
                 Seat Distancing                           Standing Point Distancing

Seat Installed     Spacing 1.25 m.   Seat To Allow   Seat Installed   Spacing 1.2 m.   Seat To Allow
  100 Nos.                              36 Nos.        150 Nos.                           48 Nos.

                              UVPCO in
                         Air Return Duct
                                 2 Each

                                                                                                       28
Compatible with all EV Brands
                                          Battery: 30 kWh
22/150 kW AC/DC Combo Charger                  Lithium Ion : NMC
                                                  With STOBA
                                Water cooling less humidity (Short circuit cause)

                                                                                    Battery 30kWh
                                                Charging
                                           CCS Combo type2 (EU)
                                                                                    12 mins with DC Charger
                                               Home Charge                          for 200 km.
                                  AC charge & DC Fast charge (80% 12 mins)
                                         with EA Anywhere Charger
EA ANYWHERE Application
Owner Application Features:        Available now
        Users Traffic
       Energy usage
      Chargers Status
       Billing System
       Station Report

                                   Hom     Favorit   Calend
                                    e         e        ar

                                   Payme   Promoti   Repo
                                     nt       on      rt

                                   Log       Hel     Setting
                                    in        p

                                   About
                                    us
EA Anywhere – Charging Stations

Opening 384 stations
• BKK 185 stations
• Up-country 52 provinces
  with 199 stations

                                                              31
EA AnywhereAntiCovid19

To reduce the risk of COVID-19, EA ANYWHERE cares for all customers
by cleaning our all charging stations including all equipment. In order to
achieve the integration of the resistance against COVID-19 quickly.

                                                                             32
Our Target in Y2020
                     Biodiesel                                                  Renewable Power

                                            Avg.Price/Unit   Mil.MW
 Mil.liters
              24                                    30       2000                       79%                       100%
                                                                         73%
400                   20                            25       1500                                                 80%
                                 18                                                     1,389
                                                    20                    891           469                       60%
                                                             1000
              174               193                 15                   289            293                       40%
200                  162                                      500
                                                    10                   602            627                       20%
                                                    5           0                                                 0%
  0                                                 0                    2018          2019           F2020
              2017   2018      2019       2020                        Solar      Wind-HGH       Wind-HNM      GP (%)

         As the government promotes to use B100                        Wind power production will increase
             to be increased to 10% (from 7%),                          according to full year operation.
           the volume and price would increase.

                                                                                                                         33
Our Target in Y2020
         Electric Vehicle Car : MINE                                                E-Ferry
                                                                No. of E-Ferry
 No. of EV                                                     30
                                                                                   Total 42 units
3000
                 Total 5,000 cars
                                                               20
2000

1000
                                                               10
        180
   0                                                             0
       Q4/20    Q1/21    Q2/21      Q3/21   Q4/21                     Q2/20       Q3/20      Q4/20      Q1/21

EV production is going to start in Q4/2020 and ramp up        The two pilot E-Ferries will start operation in Q2/2020,
     to complete delivery of 5,000 units by 2021.        followed by the next 24 units within 2020 and the rest in 2021.

                                                                                                                           34
Our Target in Y2020
                              GD & PCM
                             EV
                             1%
                                 4%          E-Ferry & Charging 1%
                                                                       Capital Investment in 2020
                                                      Biodiesel              B100   Power
                                                        29%                   1%              Charging
                                                                                     2%
                                                                                                3%
                                  Revenue
                                                                                        GD&PCM
                 Renewable         2020                                                   7%
                   Power
                    65%                                                                      EV Car
                                                                     LPH                      9%
                                                                     40%
      Others,
      235 , 1%                                                                THB
                                                                                                E Ferry
                     Biodiesel
                     , 3,678 ,                                             12,388 mil.           11%
                       25%
      Revenue
       2019                              Key milestone :
                                         GD & PCM, E ferry start     R&D            1 GWh Battery Factory
Renewable                                commercial operation                              26%
                                                                      1%
 Power,                                  Q3/2020, EV start Q4/2020
 10,974 ,
   74%

                                                                                                            35
To invest in Land Prosperity Holding 19% and
                   land lease 91 rais for Battery Factory Phase I

                       Company                                        Company
                           A                                             B

                                 55%                            11%

                                                                                                                   Purchase 285,000,000 shares
  Other                                 Land Prosperity                            Prosperity                      @18.00 = THB 5.13 bil.
Investors          15%                     Holding                      19%           Gain                 19%
(Individual)                                                                        Holdings
                                        Capital : THB 15 bil.

                                 100%                       100%

               Wattanapiboon Land Co., Ltd               Double P Land Co.,Ltd
                   Capital : THB 2.03 bil.                 Capital : THB 10 bil.
                                                                                                Lease 91 rais for 15+15 years
                                                         Owner of Blue Tech City                = THB 1.25 bil.
                         Own 600 rais
                                                           Project 2,100 rais

                                                                                                                                                 36
Land Prosperity Holding Investment
Double P Land Co., Ltd                     Wattanapiboon Land Co., Ltd

                         64 km. from BKK                           58 km. from BKK

                                                                                     37
EA Investment through EA Mobility Holding (EMH)
                                                                                                        Mr.Kanit Sriwachiraprapa
                                                                                                        300 mil. shares

                                            670 mil. Shares = 40%
                  EMH
                 Subsidiary of                At 2.20 bath per share
                                                                                                            Mr.Boonaue Jittanom
                                                                                                            100 mil. shares
                                                                  Established
•   To jointly invest in quality development,                     In 1997 to produce high precision electronic parts
    manufacturing, assembling, and distributing,                  Core Business
    including the sales and aftersales services of                Manufacturing and selling electronic parts
    buses, commercial vehicle, and private vehicles.              and Buses and related service
                                                                  CG Rating
•   EMH will submit the request for waiver from                   Excellent
    mandatory tender offer by resolution of NEX
                                                                  Objectives of the capital increase
    shareholders’ meeting (Whitewash).
                                                                  •    Working capital 500 – 600 MB.
                                                                  •    Bus business and related 1,520 MB.
                                                                  •    Loan payment 30 MB.
                                                                  •    Others investment 200 MB.

                                                                                                                              38
Disclaimer

This presentation contains summary information about Energy Absolute Public Company Limited (“EA” or “the Company”) and its subsidiaries as at
31 March 2020 and, unless stated otherwise. The information does not purport to be complete or comprehensive.
This presentation contains forward looking statements that may be identified by use of words such as “anticipates,” “hopes,” “expects,” “estimates,”
“intends,” “projects,”“plans”, “predicts,” “projects”, “aims” or other similar expressions that are used to identify such statements. Forward looking
statements are based on certain assumptions and expectations of future events. No guarantee nor assurance is made that these assumptions and
expectations are accurate or will be realized. Such forward looking statements should be considered with caution, since actual results may differ
materially from those expressed or implied by such statements.
The information in this presentation were obtained from various external sources which has not verified through any independent source. No
representation or warranty, either express or implied, is made regarding the accuracy, completeness, correctness, reliability, or scope of the
information and disclaim all responsibility and liability for the information (including, without limitation, liability for negligence).
This presentation is provided for the sole purpose of enhancing understanding of the Company and should not be construed as a legal, tax or
investment recommendation or any other type of advice.
The Company does not provide any representation, warranty, endorsement, or acceptance, about opinion or statement of any analyst s or other third
parties; or the use of any such opinion, or statement of any analysts or other third parties.
This document is strictly confidential and being given solely for your information and may not be shared, copied, reproduced or redistributed to any
other person in any manner.
Energy Absolute
                             Energy for us all, Energy for the FUTURE

IR Contact:
IR@energyabsolute.co.th
+662-248-2488 ext. 19531
You can also read