Israel Economy Profile - Doing Business 2019

Page created by Wesley Gonzalez
 
CONTINUE READING
Israel Economy Profile - Doing Business 2019
Doing Business 2019   Israel

                               Economy Profile

                                 Israel

                                                 Page 1
Israel Economy Profile - Doing Business 2019
Doing Business 2019       Israel

                                               Economy Profile of Israel

                                          Doing Business 2019 Indicators
                                     (in order of appearance in the document)

Starting a business                 Procedures, time, cost and paid-in minimum capital to start a limited liability company

Dealing with construction permits   Procedures, time and cost to complete all formalities to build a warehouse and the quality
                                    control and safety mechanisms in the construction permitting system

Getting electricity                 Procedures, time and cost to get connected to the electrical grid, and the reliability of the
                                    electricity supply and the transparency of tariffs

Registering property                Procedures, time and cost to transfer a property and the quality of the land administration
                                    system

Getting credit                      Movable collateral laws and credit information systems

Protecting minority investors       Minority shareholders’ rights in related-party transactions and in corporate governance

Paying taxes                        Payments, time, total tax and contribution rate for a firm to comply with all tax regulations as
                                    well as post-filing processes

Trading across borders              Time and cost to export the product of comparative advantage and import auto parts

Enforcing contracts                 Time and cost to resolve a commercial dispute and the quality of judicial processes

Resolving insolvency                Time, cost, outcome and recovery rate for a commercial insolvency and the strength of the
                                    legal framework for insolvency

Labor market regulation             Flexibility in employment regulation and aspects of job quality

                                                                                                                                       Page 2
Doing Business 2019           Israel

About Doing Business

The Doing Business project provides objective measures of business regulations and their enforcement across 190 economies and selected
cities at the subnational and regional level.

The Doing Business project, launched in 2002, looks at domestic small and medium-size companies and measures the regulations applying
to them through their life cycle.

Doing Business captures several important dimensions of the regulatory environment as it applies to local firms. It provides quantitative
indicators on regulation for starting a business, dealing with construction permits, getting electricity, registering property, getting credit,
protecting minority investors, paying taxes, trading across borders, enforcing contracts and resolving insolvency. Doing Business also
measures features of labor market regulation. Although Doing Business does not present rankings of economies on the labor market
regulation indicators or include the topic in the aggregate ease of doing business score or ranking on the ease of doing business, it does
present the data for these indicators.

By gathering and analyzing comprehensive quantitative data to compare business regulation environments across economies and over time,
Doing Business encourages economies to compete towards more efficient regulation; offers measurable benchmarks for reform; and serves
as a resource for academics, journalists, private sector researchers and others interested in the business climate of each economy.

In addition, Doing Business offers detailed subnational reports, which exhaustively cover business regulation and reform in different cities and
regions within a nation. These reports provide data on the ease of doing business, rank each location, and recommend reforms to improve
performance in each of the indicator areas. Selected cities can compare their business regulations with other cities in the economy or region
and with the 190 economies that Doing Business has ranked.

The first Doing Business report, published in 2003, covered 5 indicator sets and 133 economies. This year’s report covers 11 indicator sets
and 190 economies. Most indicator sets refer to a case scenario in the largest business city of each economy, except for 11 economies that
have a population of more than 100 million as of 2013 (Bangladesh, Brazil, China, India, Indonesia, Japan, Mexico, Nigeria, Pakistan, the
Russian Federation and the United States) where Doing Business also collected data for the second largest business city. The data for these
11 economies are a population-weighted average for the 2 largest business cities. The project has benefited from feedback from
governments, academics, practitioners and reviewers. The initial goal remains: to provide an objective basis for understanding and improving
the regulatory environment for business around the world.

More about Doing Business (PDF, 5MB)

                                                                                                                                                   Page 3
Doing Business 2019               Israel

         Ease of Doing Business in                                                                                            DB 2019 Rank
                                                Region                 OECD high income
                                                                                                               190                                       1
                 Israel
                                                Income Category        High income                                                            49
                                                                                                                        DB 2019 Ease of doing business score
                                                Population             8,712,400
                                                                                                                 0                               100

                                                City Covered           Tel Aviv                                                               73.23

                                                             DB 2019 Ease of Doing Business Score

                       0                                                                                                               100
                                                                                                                     84.64: Denmark (Rank: 3)

                                                                                                                  82.65: United Kingdom (Rank: 9)

                                                                                                              78.57: Austria (Rank: 26)

                                                                                                             77.80: Regional Average (OECD high income)

                                                                                                            77.29: France (Rank: 32)

                                                                                                         73.23: Israel (Rank: 49)

Note: The ease of doing business score captures the gap of each economy from the best regulatory performance observed on each of the indicators across all economies
in the Doing Business sample since 2005. An economy’s ease of doing business score is reflected on a scale from 0 to 100, where 0 represents the lowest and 100
represents the best performance. The ease of doing business ranking ranges from 1 to 190.

Rankings on Doing Business topics - Israel

         1
                                                                                               23
                                                                                                                                                                29
         28
                45             41

         55                                                                        60                                          64
                                                78
         82                                                     89                                              90                             90
 Rank

        109

        136

        163

        190

              Starting       Dealing          Getting        Registering          Getting   Protecting        Paying         Trading         Enforcing        Resolving
                 a            with           Electricity      Property            Credit     Minority         Taxes          across          Contracts       Insolvency
              Business     Construction                                                     Investors                        Borders
                             Permits

Ease of Doing Business Score on Doing Business topics - Israel

        100
               92.35

                                                                                                                              82.85
        80                    75.10           76.24
                                                                                              73.33            72.56                                           72.73
                                                               64.19              65.00
                                                                                                                                               57.93
Score

        60

        40

        20

         0

              Starting       Dealing          Getting        Registering          Getting   Protecting         Paying        Trading         Enforcing        Resolving
                 a            with           Electricity      Property            Credit     Minority          Taxes         across          Contracts       Insolvency
              Business     Construction                                                     Investors                        Borders
                             Permits

                                                                                                                                                                          Page 4
Doing Business 2019           Israel

     Starting a Business

This topic measures the number of procedures, time, cost and paid-in minimum capital requirement for a small- to medium-sized limited
liability company to start up and formally operate in each economy’s largest business city.

To make the data comparable across 190 economies, Doing Business uses a standardized business that is 100% domestically owned, has
start-up capital equivalent to 10 times the income per capita, engages in general industrial or commercial activities and employs between 10
and 50 people one month after the commencement of operations, all of whom are domestic nationals. Starting a Business considers two
types of local limited liability companies that are identical in all aspects, except that one company is owned by 5 married women and the
other by 5 married men. The ranking of economies on the ease of starting a business is determined by sorting their scores for starting a
business. These scores are the simple average of the scores for each of the component indicators.

The most recent round of data collection for the project was completed in May 2018. See the methodology for more information.

 What the indicators measure                              Case study assumptions

Procedures to legally start and formally operate        To make the data comparable across economies, several assumptions about the
a company (number)                                      business and the procedures are used. It is assumed that any required information is
                                                        readily available and that the entrepreneur will pay no bribes.
• Preregistration (for example, name verification or
  reservation, notarization)
                                                        The business:
• Registration in the economy’s largest business        - Is a limited liability company (or its legal equivalent). If there is more than one type
  city
                                                        of limited liability company in the economy, the most common among domestic firms
• Postregistration (for example, social security        is chosen. Information on the most common form is obtained from incorporation
  registration, company seal)                           lawyers or the statistical office.
                                                        - Operates in the economy’s largest business city. For 11 economies the data are
• Obtaining approval from spouse to start a
  business or to leave the home to register the         also collected for the second largest business city.
  company                                               - The entire office space is approximately 929 square meters (10,000 square feet).
                                                        - Is 100% domestically owned and has five owners, none of whom is a legal entity;
• Obtaining any gender specific document for            has a start-up capital of 10 times income per capita and has a turnover of at least
  company registration and operation or national        100 times income per capita.
  identification card
                                                        - Performs general industrial or commercial activities, such as the production or sale
                                                        of goods or services to the public. The business does not perform foreign trade
Time required to complete each procedure
                                                        activities and does not handle products subject to a special tax regime, for example,
(calendar days)
                                                        liquor or tobacco. It does not use heavily polluting production processes.
• Does not include time spent gathering                 - Leases the commercial plant or offices and is not a proprietor of real estate and the
  information                                           amount of the annual lease for the office space is equivalent to the income per
                                                        capita.
• Each procedure starts on a separate day (2
  procedures cannot start on the same day)              - Does not qualify for investment incentives or any special benefits.
                                                        - Has at least 10 and up to 50 employees one month after the commencement of
• Procedures fully completed online are recorded        operations, all of whom are domestic nationals.
  as ½ day                                              - Has a company deed that is 10 pages long.
• Procedure is considered completed once final
  document is received                                  The owners:

• No prior contact with officials                       - Have reached the legal age of majority. If there is no legal age of majority, they are
                                                        assumed to be 30 years old.
Cost required to complete each procedure (% of          - Are sane, competent, in good health and have no criminal record.
income per capita)                                      - Are married and the marriage is monogamous and registered with the authorities.
                                                        - Where the answer differs according to the legal system applicable to the woman or
• Official costs only, no bribes                        man in question (as may be the case in economies where there is legal plurality), the
• No professional fees unless services required by      answer used will be the one that applies to the majority of the population.
  law or commonly used in practice

Paid-in minimum capital (% of income per
capita)

• Funds deposited in a bank or with third party
  before registration or up to 3 months after
  incorporation

                                                                                                                                                     Page 5
Doing Business 2019          Israel

Starting a Business - Israel

  Standardized Company

 Legal form                                                              Private limited company

 Paid-in minimum capital requirement                                     ILS 0

 City Covered                                                            Tel Aviv

  Indicator                                                     Israel                    OECD high                 Best Regulatory
                                                                                          income                    Performance

 Procedure – Men (number)                                       4                        4.9                        1 (New Zealand)

 Time – Men (days)                                              12                       9.3                        0.5 (New Zealand)

 Cost – Men (% of income per capita)                            2.8                      3.1                        0.0 (Slovenia)

 Procedure – Women (number)                                     4                        4.9                        1 (New Zealand)

 Time – Women (days)                                            12                       9.3                        0.5 (New Zealand)

 Cost – Women (% of income per capita)                          2.8                      3.1                        0.0 (Slovenia)

 Paid-in min. capital (% of income per capita)                  0.0                      8.6                        0.0 (117 Economies)

 Figure – Starting a Business in Israel and comparator economies – Ranking and Score

                                                    DB 2019 Starting a Business Score

       0                                                                                           100

                                                                                          94.58: United Kingdom (Rank: 19)

                                                                                         93.27: France (Rank: 30)

                                                                                         92.52: Denmark (Rank: 42)

                                                                                        92.35: Israel (Rank: 45)

                                                                                       91.19: Regional Average (OECD high income)

                                                                                 83.21: Austria (Rank: 118)

Note: The ranking of economies on the ease of starting a business is determined by sorting their scores for starting a business. These scores
are the simple average of the scores for each of the component indicators.

                                                                                                                                                Page 6
Doing Business 2019   Israel

  Figure – Starting a Business in Israel – Procedure, Time and Cost

                                                   Time (days)        Cost (% of income per capita)
               12                                                                                                                       1.6

                                                                                                                                        1.4

                                                                                                                                              Cost (% of income per capita)
               10

                                                                                                                                        1.2

               8
 Time (days)

                                                                                                                                        1

               6                                                                                                                        0.8

                                                                                                                                        0.6
               4

                                                                                                                                        0.4

               2
                                                                                                                                        0.2

               0                                                                                                                        0
                         1                            2                               3                              *4
                                                              Procedures (number)

* This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure.

Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men and
women, the graph shows the time for women. For more information on methodology, see the Doing Business website
(http://doingbusiness.org/en/methodology ). For details on the procedures reflected here, see the summary below.

                                                                                                                                                                              Page 7
Doing Business 2019           Israel

Details – Starting a Business in Israel – Procedure, Time and Cost

No.     Procedures                                                                                Time to Complete      Associated Costs

1       Obtain company registration documents certified by an attorney                            3 days
        Agency : Attorney
        The following company certification documents must be certified by an attorney:                                 NIS 1,859 + VAT
        • Application to register the company.
                                                                                                                        (recommended
        • Declaration by the initial director(s) of competence to serve.
                                                                                                                        minimum fee by the
        • Initial shareholders’ signatures on articles of association.
                                                                                                                        Israeli Bar)
        The company's initial Articles of Association must be signed by the initial
        shareholders and their signature needs to be authenticated by an attorney.

2       File with the registrar of companies, Ministry of Justice                                 2 days                NIS 2,150 (online
        Agency : Ministry of Justice                                                                                    process) or NIS 2,614
        To register a company, the promoter must:                                                                       (paper process)
        1) File the articles of association;
        2) The directors must sign a declaration stating that they have the capacity to
        serve and their signatures must be authenticated by an attorney;
        3) The shareholders must also sign a declaration stating that they have the
        capacity to hold shares in a company and their signatures must be authenticated
        by an attorney.

3       Register for taxes at Ministry of Finance, Income Tax Department and at the               7 days                no charge
        National Insurance Institute
        Agency : Ministry of Finance
        To register for company taxation, the promoter must file the company deed and
        identity certificate of registration. Upon registration at the Ministry of Finance, the
        company is automatically registered for social security at the National Insurance
        Institute

    4   Register for VAT at Ministry of Finance, Customs and VAT Department                       1 day, simultaneous   no charge
        Agency : Ministry of Finance                                                              with procedure 3
        The regional VAT office also operates under Ministry of Finance. To register for
        VAT, the promoter must file the certificate of incorporation, identity documents for
        all directors, a lease agreement, and other information.

        The VAT authority generally asks for a bank account for VAT refund purposes (or
        for VAT payment). It takes a few minutes to open a bank account, assuming that
        the company provided all required documents, including a company resolution to
        open the account and the rights of signature. There are no fees to open the
        account, but bank commissions may vary according to the bank and bank
        account features.

Takes place simultaneously with previous procedure.

                                                                                                                                                Page 8
Doing Business 2019              Israel

     Dealing with Construction Permits

This topic tracks the procedures, time and cost to build a warehouse—including obtaining necessary the licenses and permits, submitting all
required notifications, requesting and receiving all necessary inspections and obtaining utility connections. In addition, the Dealing with
Construction Permits indicator measures the building quality control index, evaluating the quality of building regulations, the strength of
quality control and safety mechanisms, liability and insurance regimes, and professional certification requirements. The most recent round of
data collection was completed in May 2018. See the methodology for more information

 What the indicators measure                              Case study assumptions

Procedures to legally build a warehouse                 To make the data comparable across economies, several assumptions about the
(number)                                                construction company, the warehouse project and the utility connections are used.

• Submitting all relevant documents and obtaining       The construction company (BuildCo):
  all necessary clearances, licenses, permits and
  certificates                                          - Is a limited liability company (or its legal equivalent) and operates in the economy’s
                                                        largest business city. For 11 economies the data are also collected for the second
• Submitting all required notifications and receiving   largest business city.
  all necessary inspections
                                                        - Is 100% domestically and privately owned; has five owners, none of whom is a
• Obtaining utility connections for water and           legal entity. Has a licensed architect and a licensed engineer, both registered with
  sewerage                                              the local association of architects or engineers. BuildCo is not assumed to have any
• Registering and selling the warehouse after its       other employees who are technical or licensed experts, such as geological or
  completion                                            topographical experts.
                                                        - Owns the land on which the warehouse will be built and will sell the warehouse
Time required to complete each procedure                upon its completion.
(calendar days)
                                                        The warehouse:
• Does not include time spent gathering
  information                                           - Will be used for general storage activities, such as storage of books or stationery.
                                                        - Will have two stories, both above ground, with a total constructed area of
• Each procedure starts on a separate day—              approximately 1,300.6 square meters (14,000 square feet). Each floor will be 3
  though procedures that can be fully completed
                                                        meters (9 feet, 10 inches) high and will be located on a land plot of approximately
  online are an exception to this rule
                                                        929 square meters (10,000 square feet) that is 100% owned by BuildCo, and the
• Procedure is considered completed once final          warehouse is valued at 50 times income per capita.
  document is received                                  - Will have complete architectural and technical plans prepared by a licensed
                                                        architect. If preparation of the plans requires such steps as obtaining further
• No prior contact with officials
                                                        documentation or getting prior approvals from external agencies, these are counted
Cost required to complete each procedure (% of          as procedures.
income per capita)                                      - Will take 30 weeks to construct (excluding all delays due to administrative and
                                                        regulatory requirements).
• Official costs only, no bribes
                                                        The water and sewerage connections:
Building quality control index (0-15)
                                                        - Will be 150 meters (492 feet) from the existing water source and sewer tap. If there
• Quality of building regulations (0-2)                 is no water delivery infrastructure in the economy, a borehole will be dug. If there is
• Quality control before construction (0-1)             no sewerage infrastructure, a septic tank in the smallest size available will be
                                                        installed or built.
• Quality control during construction (0-3)             - Will have an average water use of 662 liters (175 gallons) a day and an average
• Quality control after construction (0-3)              wastewater flow of 568 liters (150 gallons) a day. Will have a peak water use of
                                                        1,325 liters (350 gallons) a day and a peak wastewater flow of 1,136 liters (300
• Liability and insurance regimes (0-2)                 gallons) a day.
• Professional certifications (0-4)                     - Will have a constant level of water demand and wastewater flow throughout the
                                                        year; will be 1 inch in diameter for the water connection and 4 inches in diameter for
                                                        the sewerage connection.

                                                                                                                                                   Page 9
Doing Business 2019      Israel

Dealing with Construction Permits - Israel

       Standardized Warehouse

    Estimated value of warehouse                                              ILS 7,182,044.50

    City Covered                                                              Tel Aviv

       Indicator                                                    Israel                     OECD high                  Best Regulatory
                                                                                               income                     Performance

    Procedures (number)                                            13                          12.7                   None in 2017/18

    Time (days)                                                    207                         153.1                  None in 2017/18

    Cost (% of warehouse value)                                    1.8                         1.5                    None in 2017/18

    Building quality control index (0-15)                          14.0                        11.5                   15.0 (3 Economies)

  Figure – Dealing with Construction Permits in Israel and comparator economies – Ranking and Score

                                                DB 2019 Dealing with Construction Permits Score

                     0                                                                                    100

                                                                                          86.94: Denmark (Rank: 4)

                                                                                  80.29: United Kingdom (Rank: 17)

                                                                                 79.30: France (Rank: 19)

                                                                              75.41: Regional Average (OECD high income)

                                                                              75.10: Israel (Rank: 41)

                                                                              75.08: Austria (Rank: 42)

Note: The ranking of economies on the ease of dealing with construction permits is determined by sorting their scores for dealing with
construction permits. These scores are the simple average of the scores for each of the component indicators.

  Figure – Dealing with Construction Permits in Israel – Procedure, Time and Cost

                                                     Time (days)          Cost (% of warehouse value)
                                                                                                                                             0.9
               200
                                                                                                                                             0.8   Cost (% of warehouse value)

                                                                                                                                             0.7
               150
                                                                                                                                             0.6
 Time (days)

                                                                                                                                             0.5
               100
                                                                                                                                             0.4

                                                                                                                                             0.3

               50                                                                                                                            0.2

                                                                                                                                             0.1

                0                                                                                                                            0
                         1   *2    3        4        5        6           7           8         *9         10        11         12      13
                                                                  Procedures (number)

* This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure.

Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men and
women, the graph shows the time for women. For more information on methodology, see the Doing Business website
(http://doingbusiness.org/en/methodology ). For details on the procedures reflected here, see the summary below.

                                                                                                                                                                                 Page 10
Doing Business 2019                     Israel

Figure – Dealing with Construction Permits in Israel and comparator economies – Measure of Quality

              15              14.0                                                                14.0
                                                      13.0
                                                                           11.0                                                               11.5
Index score
              10                                                                                                        9.0

                  5

                  0

                              Israel                 Austria             Denmark                 France            United Kingdom      OECD high income

Details – Dealing with Construction Permits in Israel – Procedure, Time and Cost

  No.                 Procedures                                                                          Time to Complete          Associated Costs

1                     File a request for information regarding the land                                   30 days                   ILS 193
                      Agency : Municipality
                      BuildCo should file a request for information regarding the land. An updated
                      survey of the land, signed by an authorized surveyor, should be attached to the
                      request. The survey should be marked by the local committee engineer and sent
                      back to BuildCo, together with the requested information.

              2       Obtain a survey map                                                                 7 days                    ILS 1,710
                      Agency : Authorized Surveyor
                      BuildCo must hire an authorized surveyor who inspects the site, marks the plots
                      and gives BuildCo the survey of the land. The authorized surveyor also obtains
                      the land extract from the Land Registry on behalf of BuildCo. Since this
                      procedure is actioned by the previous one, and it is done by the same
                      organization, it can be simultaneous.

3                     Obtain building permit from Local Committee                                         135 days                  ILS 42,556
                      Agency : Local Committee
                      BuildCo must file an application for a building permit. The application should be
                      signed by:
                      • BuildCo
                      • An authorized engineer
                      • The planner of the frame of the building
                      • The person in charge of frame construction
                      • The person in charge of the audit

                      The documents obtained in the previous procedures should also be attached to
                      the application, as should the building scheme and a schematic diagram of the
                      construction area.

                      According to the Planning and Building Regulations Amendments (Request for
                      Building Permit, Conditions and Fees) of 2014, the fee is ILS 32.72 per square
                      meter. BuildCo must notify the regional Work Supervisor at the Local Committee
                      and the person(s) in charge of the supervision.

4                     Obtain marking report from authorized surveyor                                      7 days                    no charge
                      Agency : Authorized Surveyor
                      Once the building permit is obtained, BuildCo will request a marking report from
                      an authorized surveyor. This marking report is to reflect the footprint of the
                      building on the land.

5                     Hire a certified building inspection agency                                         1 day                     ILS 24,600
                      Agency : Certified Building Inspection Agency
                      BuildCo must hire a certified external building inspector who will handle the
                      following inspections:

                      Concrete inspection: This aims to test the quality of the concrete used and its
                      conformity to standard
                      Pipe inspection: This also aims to examine the quality of pipes used to ensure
                      conformity with standards
                      Sanitation inspection: This is carried out after pipe inspection, to assess the
                      general quality of the sanitary conditions.

                      Upon completion of the inspections, the external certified inspector prepares a
                      report for each inspection for BuildCo who will then submit same to the Local
                      Authority.

                                                                                                                                                          Page 11
Doing Business 2019            Israel

6       File an application for certificate of completion                                       1 day     no charge
        Agency : Local Committee
        An authorized engineer or architect conducts several inspections during the
        construction period and produces reports on the outline of the building, the
        foundations, the frame, and on completion of the building. These reports are
        submitted when filing for the certificate of completion. The application must be
        signed by BuildCo, the engineer, and the architect. This filing can only be
        processed after the certified laboratory has granted its certification.

7       Receive inspection from the Fire Department                                             1 day     no charge
        Agency : Fire Department
        The inspection from the Fire Department happens only when the certificate of
        completion has been granted.

8       Obtain certification from the Fire Department                                           2 days    no charge
        Agency : Fire Department
        The certification of the Fire Department inspection only happens when the
        inspection took place.

    9   Obtain approval from the Home Front Command                                             2 days    no charge
        Agency : Home Front Command
        BuildCo must obtain the approval of Home Front Command on the quality of
        construction to ensure bomb shelter and other safe guards are factored in during
        construction.

10      Receive final inspection from the local authority                                       1 day     no charge
        Agency : Local Authority
        Before issuing the final certification, the local authority inspects the building.

11      Obtain certification of completion                                                      7 days    no charge
        Agency : Local Authority
        Final inspection is conducted.

12      Obtain occupancy certificate                                                            7 days    no charge
        Agency : Local Authority
        All the documents listed in previous procedures should be attached to the
        application for an occupancy certificate. This certificate is required for installing
        water and electricity.

13      Obtain water and sewage connection                                                      14 days   ILS 57,000
        Agency : Mei-Avivim (Water Company of the City of Tel Aviv-Jaffa)
        Only once the occupancy certificate is granted one can request and obtain the
        water and sewage connection.

Takes place simultaneously with previous procedure.

                                                                                                                       Page 12
Doing Business 2019         Israel

Details – Dealing with Construction Permits in Israel – Measure of Quality

                                                                                                      Answer               Score

Building quality control index (0-15)                                                                                      14.0

Quality of building regulations index (0-2)                                                                                2.0

  How accessible are building laws and regulations in your economy? (0-1)                             Available online;    1.0
                                                                                                      Free of charge.

  Which requirements for obtaining a building permit are clearly specified in the building            List of required     1.0
  regulations or on any accessible website, brochure or pamphlet? (0-1)                               documents; Fees
                                                                                                      to be paid;
                                                                                                      Required
                                                                                                      preapprovals.

Quality control before construction index (0-1)                                                                            1.0

  Which third-party entities are required by law to verify that the building plans are in             Licensed             1.0
  compliance with existing building regulations? (0-1)                                                architect;
                                                                                                      Licensed
                                                                                                      engineer.

Quality control during construction index (0-3)                                                                            2.0

  What types of inspections (if any) are required by law to be carried out during construction?       Inspections at       1.0
  (0-2)                                                                                               various phases.

  Do legally mandated inspections occur in practice during construction? (0-1)                        Mandatory            1.0
                                                                                                      inspections are
                                                                                                      always done in
                                                                                                      practice.

Quality control after construction index (0-3)                                                                             3.0

  Is there a final inspection required by law to verify that the building was built in accordance     Yes, final           2.0
  with the approved plans and regulations? (0-2)                                                      inspection is
                                                                                                      done by
                                                                                                      government
                                                                                                      agency.

  Do legally mandated final inspections occur in practice? (0-1)                                      Final inspection     1.0
                                                                                                      always occurs in
                                                                                                      practice; Final
                                                                                                      inspection occurs
                                                                                                      most of the time.

Liability and insurance regimes index (0-2)                                                                                2.0

  Which parties (if any) are held liable by law for structural flaws or problems in the building      Architect or         1.0
  once it is in use (Latent Defect Liability or Decennial Liability)? (0-1)                           engineer;
                                                                                                      Construction
                                                                                                      company.

  Which parties (if any) are required by law to obtain an insurance policy to cover possible          No party is          1.0
  structural flaws or problems in the building once it is in use (Latent Defect Liability Insurance   required by law
  or Decennial Insurance)? (0-1)                                                                      to obtain
                                                                                                      insurance ;
                                                                                                      Insurance is
                                                                                                      commonly taken
                                                                                                      in practice.

Professional certifications index (0-4)                                                                                    4.0

  What are the qualification requirements for the professional responsible for verifying that the     Minimum number       2.0
  architectural plans or drawings are in compliance with existing building regulations? (0-2)         of years of
                                                                                                      experience;
                                                                                                      University degree
                                                                                                      in architecture or
                                                                                                      engineering;
                                                                                                      Being a
                                                                                                      registered
                                                                                                      architect or
                                                                                                      engineer.

                                                                                                                                   Page 13
Doing Business 2019        Israel

 What are the qualification requirements for the professional who supervises the construction   Minimum number      2.0
 on the ground? (0-2)                                                                           of years of
                                                                                                experience;
                                                                                                University degree
                                                                                                in engineering,
                                                                                                construction or
                                                                                                construction
                                                                                                management;
                                                                                                Being a
                                                                                                registered
                                                                                                architect or
                                                                                                engineer.

                                                                                                                          Page 14
Doing Business 2019              Israel

     Getting Electricity

This topic measures the procedures, time and cost required for a business to obtain a permanent electricity connection for a newly
constructed warehouse. Additionally, the reliability of supply and transparency of tariffs index measures reliability of supply, transparency of
tariffs and the price of electricity. The most recent round of data collection for the project was completed in May 2018. See the methodology
for more information.

 What the indicators measure                                Case study assumptions

Procedures to obtain an electricity connection             To make the data comparable across economies, several assumptions about the
(number)                                                   warehouse, the electricity connection and the monthly consumption are used.

• Submitting all relevant documents and obtaining          The warehouse:
  all necessary clearances and permits
                                                           - Is owned by a local entrepreneur and is used for storage of goods.
• Completing all required notifications and                - Is located in the economy’s largest business city. For 11 economies the data are
  receiving all necessary inspections
                                                           also collected for the second largest business city.
• Obtaining external installation works and possibly       - Is located in an area where similar warehouses are typically located and is in an
  purchasing material for these works                      area with no physical constraints. For example, the property is not near a railway.
                                                           - Is a new construction and is being connected to electricity for the first time.
• Concluding any necessary supply contract and
  obtaining final supply                                   - Has two stories with a total surface area of approximately 1,300.6 square meters
                                                           (14,000 square feet). The plot of land on which it is built is 929 square meters
Time required to complete each procedure                   (10,000 square feet).
(calendar days)
                                                           The electricity connection:
• Is at least 1 calendar day
                                                           - Is a permanent one with a three-phase, four-wire Y connection with a subscribed
• Each procedure starts on a separate day                  capacity of 140-kilo-volt-ampere (kVA) with a power factor of 1, when 1 kVA = 1
• Does not include time spent gathering                    kilowatt (kW).
  information                                              - Has a length of 150 meters. The connection is to either the low- or medium-voltage
                                                           distribution network and is either overhead or underground, whichever is more
• Reflects the time spent in practice, with little         common in the area where the warehouse is located and requires works that involve
  follow-up and no prior contact with officials
                                                           the crossing of a 10-meter road (such as by excavation or overhead lines) but are all
Cost required to complete each procedure (% of             carried out on public land. There is no crossing of other owners’ private property
income per capita)                                         because the warehouse has access to a road.
                                                           - Does not require work to install the internal wiring of the warehouse. This has
• Official costs only, no bribes                           already been completed up to and including the customer’s service panel or
• Value added tax excluded                                 switchboard and the meter base.

The reliability of supply and transparency of              The monthly consumption:
tariffs index (0-8)
                                                           - It is assumed that the warehouse operates 30 days a month from 9:00 a.m. to 5:00
• Duration and frequency of power outages (0–3)            p.m. (8 hours a day), with equipment utilized at 80% of capacity on average and that
• Tools to monitor power outages (0–1)                     there are no electricity cuts (assumed for simplicity reasons) and the monthly energy
                                                           consumption is 26,880 kilowatt-hours (kWh); hourly consumption is 112 kWh.
• Tools to restore power supply (0–1)                      - If multiple electricity suppliers exist, the warehouse is served by the cheapest
• Regulatory monitoring of utilities’ performance          supplier.
  (0–1)                                                    - Tariffs effective in January of the current year are used for calculation of the price of
                                                           electricity for the warehouse. Although January has 31 days, for calculation
• Financial deterrents limiting outages (0–1)              purposes only 30 days are used.
• Transparency and accessibility of tariffs (0–1)
Price of electricity (cents per kilowatt-hour)*

• Price based on monthly bill for commercial
  warehouse in case study

*Note: Doing Business measures the price of
electricity, but it is not included in the ease of doing
business score nor the ranking on the ease of
getting electricity.

                                                                                                                                                         Page 15
Doing Business 2019           Israel

Getting Electricity - Israel

  Standardized Connection

 Price of electricity (US cents per kWh)                                   11.9

 Name of utility                                                           The Israel Electric Corporation Ltd.

 City Covered                                                              Tel Aviv

  Indicator                                                       Israel                     OECD high                Best Regulatory
                                                                                             income                   Performance

 Procedures (number)                                              5                         4.5                       3 (25 Economies)

 Time (days)                                                      102                       77.2                      18 (3 Economies)

 Cost (% of income per capita)                                    13.9                      64.2                      0.0 (3 Economies)

 Reliability of supply and transparency of tariff index (0-8)     6                         7.5                       8.0 (27 Economies)

 Figure – Getting Electricity in Israel and comparator economies – Ranking and Score

                                                        DB 2019 Getting Electricity Score

        0                                                                                             100

                                                                                              96.45: United Kingdom (Rank: 7)

                                                                                           92.01: France (Rank: 14)

                                                                                         90.22: Denmark (Rank: 21)

                                                                                       87.72: Austria (Rank: 28)

                                                                                      85.47: Regional Average (OECD high income)

                                                                            76.24: Israel (Rank: 78)

Note: The ranking of economies on the ease of getting electricity is determined by sorting their scores for getting electricity. These scores are
the simple average of the scores for all the component indicators except the price of electricity.

                                                                                                                                                    Page 16
Doing Business 2019         Israel

  Figure – Getting Electricity in Israel – Procedure, Time and Cost

                                                            Time (days)      Cost (% of income per capita)

                   100                                                                                                                     16

                                                                                                                                           14

                                                                                                                                                 Cost (% of income per capita)
                   80
                                                                                                                                           12
 Time (days)

                                                                                                                                           10
                   60

                                                                                                                                           8

                   40                                                                                                                      6

                                                                                                                                           4
                   20
                                                                                                                                           2

                       0                                                                                                                   0
                                 1                      2                    *3                       4                       5
                                                                      Procedures (number)

* This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure.

Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men and
women, the graph shows the time for women. For more information on methodology, see the Doing Business website
(http://doingbusiness.org/en/methodology ). For details on the procedures reflected here, see the summary below.

  Figure – Getting Electricity in Israel and comparator economies – Measure of Quality

                                                                                            8                     8
                   8                                                                                                                7.5
                                                7                     7
                   7
                             6
                   6
     Index score

                   5
                   4
                   3
                   2
                   1
                   0

                           Israel             Austria              Denmark               France              United Kingdom   OECD high income

                                                                                                                                                                                 Page 17
Doing Business 2019            Israel

Details – Getting Electricity in Israel – Procedure, Time and Cost

No.     Procedures                                                                               Time to Complete   Associated Costs

1       Submit application to Israel Electric Corporation and await initial estimate             11 calendar days   ILS 0
        Agency : The Israel Electric Corporation Ltd.
        The application for an electricity connection can be submitted by phone, by fax,
        by mail or by arriving to the Israel Electric Corporation offices. The application
        should include: the building permit, accurate information concerning the required
        power connection, the building specifications, the location of the building, the
        designation of the business and the date when the power is requested.

        After getting all the essential information from the customer concerning the
        connection, the Israel Electric Corporation will indicate the initial expected costs.
        Along with the response, IEC will attach a bill for 10% of the initial estimate costs
        (“advance payment”).

2       Await completion of technical coordination of project by Israel Electric                 30 calendar days   ILS 0
        Corporation
        Agency : The Israel Electric Corporation Ltd.
        The customer should pay the advance payment in order to start the project
        planning. The payment can be done at the bank or at the utility. After the
        payment, the Israel Electric Corporation opens an order file and works on
        technical coordination.

        After the technical coordination is completed a written agreement between the
        customer and the Israel Electric Corporation regarding the process of connection
        works, their schedule and costs is signed. It also specifies the responsibilities of
        the applicant and the utility and the final estimate.

        At the completion of the technical coordination process, the IEC would send to
        the customer a bill for 70% of the final estimate.

    3   Await and receive site inspection by Israel Electric Corporation                         3 calendar days    ILS 0
        Agency : The Israel Electric Corporation Ltd.
        An external inspection carried out by the Israel Electric Corporation is required
        during the technical coordination. Someone from the applicant's party has to be
        present for the inspection.

4       Await completion of external works by Israel Electric Corporation                        60 calendar days   ILS 19,902.95
        Agency : The Israel Electric Corporation Ltd.
        The customer should pay 70% of the final estimate (minus the “advance
        payment”) to begin the external works and 30% at their completion. The
        customer pays only for the connection fees which are determined by the Public
        Utility Authority for Electricity. All the additional works are at the Israel Electric
        Corporation expense.

        An underground connection is the only available option.

5       Await and receive internal wiring inspection, meter installation and final               1 calendar day     ILS 0
        connection
        Agency : The Israel Electric Corporation Ltd.
        An inspection of the internal wiring by the Israel Electric Corporation’s examiner
        is required. The licensed electrician should submit to the IEC the plans of the
        internal wiring. The electrician may request the inspection before the completion
        of the external connection works by the Israel Electric Corporation, so that the
        internal inspection would be conducted immediately after their completion. The
        electrician should be present during the inspection.

        If there is no problem with the internal wiring, the examiner will install the meter
        at the same day and the final connection will be completed.

Takes place simultaneously with previous procedure.

                                                                                                                                       Page 18
Doing Business 2019           Israel

 Details – Getting Electricity in Israel – Measure of Quality

                                                                                                                           Answer

 Reliability of supply and transparency of tariff index (0-8)                                                              6

 Total duration and frequency of outages per customer a year (0-3)                                                         2

    System average interruption duration index (SAIDI)                                                                     1.2

    System average interruption frequency index (SAIFI)                                                                    1.5

    What is the minimum outage time (in minutes) that the utility considers for the calculation of SAIDI/SAIFI             1.0

 Mechanisms for monitoring outages (0-1)                                                                                   1

    Does the distribution utility use automated tools to monitor outages?                                                  Yes

 Mechanisms for restoring service (0-1)                                                                                    1

    Does the distribution utility use automated tools to restore service?                                                  Yes

 Regulatory monitoring (0-1)                                                                                               1

    Does a regulator—that is, an entity separate from the utility—monitor the utility’s performance on reliability of      Yes
    supply?

 Financial deterrents aimed at limiting outages (0-1)                                                                      1

    Does the utility either pay compensation to customers or face fines by the regulator (or both) if outages              Yes
    exceed a certain cap?

 Communication of tariffs and tariff changes (0-1)                                                                         0

    Are effective tariffs available online?                                                                                Yes

    Link to the website, if available online                                                                               https://www.iec.co.il/
                                                                                                                           EN/IR/Documents/tar
                                                                                                                           iff_1.4.12.pdf

    Are customers notified of a change in tariff ahead of the billing cycle?                                               No

Note:

If the duration and frequency of outages is 100 or less, the economy is eligible to score on the Reliability of supply and transparency of tariff
index.

If the duration and frequency of outages is not available, or is over 100, the economy is not eligible to score on the index.

If the minimum outage time considered for SAIDI/SAIFI is over 5 minutes, the economy is not eligible to score on the index.

                                                                                                                                                    Page 19
Doing Business 2019           Israel

     Registering Property

This topic examines the steps, time and cost involved in registering property, assuming a standardized case of an entrepreneur who wants to
purchase land and a building that is already registered and free of title dispute. In addition, the topic also measures the quality of the land
administration system in each economy. The quality of land administration index has five dimensions: reliability of infrastructure, transparency
of information, geographic coverage, land dispute resolution, and equal access to property rights. The most recent round of data collection for
the project was completed in May 2018. See the methodology for more information.

 What the indicators measure                               Case study assumptions

Procedures to legally transfer title on                  To make the data comparable across economies, several assumptions about the
immovable property (number)                              parties to the transaction, the property and the procedures are used.

• Preregistration procedures (for example,               The parties (buyer and seller):
  checking for liens, notarizing sales agreement,
  paying property transfer taxes)                        - Are limited liability companies (or the legal equivalent).
                                                         - Are located in the periurban area of the economy’s largest business city. For 11
• Registration procedures in the economy's largest       economies the data are also collected for the second largest business city.
  business city.
                                                         - Are 100% domestically and privately owned.
• Postregistration procedures (for example, filling      - Have 50 employees each, all of whom are nationals.
  title with municipality)                               - Perform general commercial activities.

Time required to complete each procedure                 The property (fully owned by the seller):
(calendar days)
                                                         - Has a value of 50 times income per capita, which equals the sale price.
• Does not include time spent gathering                  - Is fully owned by the seller.
  information                                            - Has no mortgages attached and has been under the same ownership for the past
• Each procedure starts on a separate day -              10 years.
  though procedures that can be fully completed          - Is registered in the land registry or cadastre, or both, and is free of title disputes.
  online are an exception to this rule                   - Is located in a periurban commercial zone, and no rezoning is required.
                                                         - Consists of land and a building. The land area is 557.4 square meters (6,000
• Procedure is considered completed once final           square feet). A two-story warehouse of 929 square meters (10,000 square feet) is
  document is received
                                                         located on the land. The warehouse is 10 years old, is in good condition, has no
• No prior contact with officials                        heating system and complies with all safety standards, building codes and legal
                                                         requirements. The property, consisting of land and building, will be transferred in its
Cost required to complete each procedure (% of           entirety.
property value)                                          - Will not be subject to renovations or additional construction following the purchase.
• Official costs only (such as administrative fees,      - Has no trees, natural water sources, natural reserves or historical monuments of
  duties and taxes).                                     any kind.
                                                         - Will not be used for special purposes, and no special permits, such as for
• Value Added Tax, Capital Gains Tax and illicit         residential use, industrial plants, waste storage or certain types of agricultural
  payments are excluded                                  activities, are required.
                                                         - Has no occupants, and no other party holds a legal interest in it.
Quality of land administration index (0-30)

• Reliability of infrastructure index (0-8)
• Transparency of information index (0–6)
• Geographic coverage index (0–8)
• Land dispute resolution index (0–8)
• Equal access to property rights index (-2–0)

                                                                                                                                                     Page 20
Doing Business 2019      Israel

Registering Property - Israel

       Indicator                                                    Israel                   OECD high                Best Regulatory
                                                                                             income                   Performance

    Procedures (number)                                           6                         4.7                       1 (4 Economies)

    Time (days)                                                   37                        20.1                      1 (New Zealand)

    Cost (% of property value)                                    7.2                       4.2                       0.0 (Saudi Arabia)

    Quality of the land administration index (0-30)               19.0                      23.0                      None in 2017/18

  Figure – Registering Property in Israel and comparator economies – Ranking and Score

                                                      DB 2019 Registering Property Score

                    0                                                                                 100

                                                                                          89.88: Denmark (Rank: 11)

                                                                                79.97: Austria (Rank: 32)

                                                                              77.17: Regional Average (OECD high income)

                                                                             75.34: United Kingdom (Rank: 42)

                                                                  64.19: Israel (Rank: 89)

                                                                 63.33: France (Rank: 96)

Note: The ranking of economies on the ease of registering property is determined by sorting their scores for registering property. These
scores are the simple average of the scores for each of the component indicators.

  Figure – Registering Property in Israel – Procedure, Time and Cost

                                                      Time (days)        Cost (% of property value)
                                                                                                                                           7
               35

                                                                                                                                           6
               30

                                                                                                                                               Cost (% of property value)
                                                                                                                                           5
               25
 Time (days)

                                                                                                                                           4
               20

                                                                                                                                           3
               15

               10                                                                                                                          2

               5                                                                                                                           1

               0                                                                                                                           0
                        1                  *2                3                       *4                     5                      6
                                                                 Procedures (number)

* This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure.

Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men and
women, the graph shows the time for women. For more information on methodology, see the Doing Business website
(http://doingbusiness.org/en/methodology ). For details on the procedures reflected here, see the summary below.

                                                                                                                                                                            Page 21
Doing Business 2019                       Israel

Figure – Registering Property in Israel and comparator economies – Measure of Quality

              30
                                                                              24.5                                            25.5
              25                                        23.0                                          24.0                                           23.0
Index score                     19.0
              20

              15

              10

                  5

                  0

                               Israel                  Austria              Denmark                  France               United Kingdom      OECD high income

Details – Registering Property in Israel – Procedure, Time and Cost

  No.                     Procedures                                                                             Time to Complete          Associated Costs

1                     Obtain a land registration extract from the Land Registry Office                           Less than one day,        ILS 15
                      Agency : Land Registry office                                                              online
                      In order to verify that the property is registered in the name of the seller and that
                      no other rights of any kind of third parties are registered, the buyer obtains a land
                      registration extract relating to the property from the regional land registry office. It
                      is possible to retrieve an extract online (costing approximately NIS 15). The
                      extract is electronically signed and constitutes a binding legal document in every
                      respect.

              2       Check the Municipality record relating to the property                                     Less than one day,        no charge
                      Agency : Municipality                                                                      online
                      The Municipality records show the right to build on the land of the property, and
                      can indicate whether the building was constructed according to the applicable
                      building permits, whether there are any legal proceedings relating to the
                      construction and use of the building, etc.

3                     File a report on the transaction with the Municipality and obtain tax                      25 days                   ILS 110
                      clearance from the Municipality
                      Agency : Tax Department of the Municipality
                      The Municipal Certificate for transfer of title confirms that all the Municipal Taxes
                      relating to the use of the property were paid and that there is no Municipality
                      Appreciation Levy liability or that such liability was discharged.
                      The Municipality Appreciation Levy (Hetel Hashbacha) is paid on the
                      appreciation in the value of the property due to change of the permitted use of
                      the property ("the Appreciation"). The Hetel Hashbacha is imposed in the
                      following cases.
                      Hetel Hashbacha is imposed in the fallowing cases.
                      1) When a city building plan is approved.
                      2) When the city provides relief construction rights.
                      3) Resulting from the resolution of the original zoning conforming use of the
                      property
                      Hetel Hashbacha shall be paid to the municipality only if there has been a
                      change of zoning for a neighborhood which causes the value of the property to
                      rise.
                      The assumptions in this case study do not indicate that such a change was
                      made, so there is no Municipality Appreciation Levy liability. The rate of the
                      Municipal Appreciation Levy payable is 50% of the Appreciation.

              4       File a report on the transaction with the tax authority and their obtain tax               21 days                   ILS 430,922.67; (6%
                      clearance                                                                                                            of property tax)
                      Agency : Tax Authority
                      After the sale agreement has been prepared and signed by the parties, they have
                      30 days to file a report on the transaction based on self-assessment with the tax
                      authorities. It should include all details of the transaction including the tax amount
                      and calculation. Following the filing of the report on the transaction a voucher will
                      be sent by the tax authority. Usually the self-assessment is prepared by the
                      company's lawyers and accountants and the report on the transaction is filed by
                      the lawyer that handles the transaction.

                      .

                                                                                                                                                                 Page 22
Doing Business 2019          Israel

5     Lawyer drafts sale deed                                                                 4 days   ILS 82,593.51;
      Agency : Lawyer                                                                                  (0.8%-1.5% of
      After filing a report on the transaction with the tax authority, the following taxes,            property value)
      based on self-assessments, must be paid:

      (1) Capital Gains Tax (Mas Shevach) - paid by the seller on the difference
      between the purchase price and the original purchase price paid by the buyer in
      the current transaction. According to the Amendment No. 70 to the Land
      Taxation (Capital Gain and Purchase) Act 2011, starting on March 31, 2011 the
      purchaser makes an advance payment on account of CGT at the rate 7.5%-15%
      of the value of the transaction (the full amount of CGT is set off against the
      consideration of property and is regarded as if it was paid to the seller). The tax
      is up to 25 % for companies (Land Betterment Tax);
      (2) Purchase Tax (Mas Rechisha)- paid by the purchaser is a flat rate of 6% for a
      commercial property. Purchase tax is paid within 60 days after filing the self-
      assessment report;
      (3) Betterment Tax (Hetel Hashbacha) - only if there has been a change of
      zoning for a neighborhood which causes the value of the property to rise.

      The sale deed agreement is commonly prepared by the parties' lawyers. Lawyer
      fees for a commercial warehouse will be in the range of 1.0-2.0% of property
      value.

6     Apply for registration at the regional Land Registry Office                             7 days   ILS 37
      Agency : Land Registry office
      When all the certificates mentioned in Procedures 4 and 5 are obtained, the sale
      deed is signed by both parties.
      When the registration is made in the Land Registry, the signature of the parties
      on the deeds and other certain details relating thereto are required to be
      authenticated by a lawyer or the Land Registrar, after the nature of the
      transaction and the consequences thereof were explained to the parties and it
      was clear that the parties willingly signed it.

      The transaction is subject to a 17% VAT, paid normally on the 15th day of the
      month following the date of receipt of payment

      The documentation shall include:
      • Transfer deed (prepared by the parties or a lawyer)
      • Tax Authority Certificates confirming tax payments (obtained in Procedure 5)
      • Municipal tax clearance (obtained in Procedure 6)
      • Certificate of incorporation of the parties
      • Minutes of the companies’ board of directors with resolution to execute the
      transaction. (If a power of attorney was executed by the company and authorized
      by a notary that the subscriber is empowered to execute on behalf of the
      company- there is no need to attach the minutes).
      • Counsel’s or accountant’s certificate regarding both companies including the
      following details: existence of the company; the company is authorized to
      execute the transaction according to its articles of association; and the
      participants at the board of directors meeting as detailed in the abovementioned
      minutes are the directors of the company and empowered to act on behalf the
      company and to sign the deed of transaction.

Takes place simultaneously with previous procedure.

                                                                                                                         Page 23
Doing Business 2019          Israel

Details – Registering Property in Israel – Measure of Quality

                                                                                                    Answer                Score

Reliability of infrastructure index (0-8)                                                                                 7.0

  What is the institution in charge of immovable property registration?                             The Land
                                                                                                    Registration and
                                                                                                    Settlement of
                                                                                                    Rights
                                                                                                    Department

  In what format are the majority of title or deed records kept in the largest business city—in a   Computer/Scann        1.0
  paper format or in a computerized format (scanned or fully digital)?                              ed

  Is there an electronic database for checking for encumbrances (liens, mortgages, restrictions     Yes                   1.0
  and the like)?

  Institution in charge of the plans showing legal boundaries in the largest business city:         Survey of Israel

  In what format are the majority of maps of land plots kept in the largest business city—in a      Computer/Fully        2.0
  paper format or in a computerized format (scanned or fully digital)?                              digital

  Is there an electronic database for recording boundaries, checking plans and providing            Yes                   1.0
  cadastral information (geographic information system)?

  Is the information recorded by the immovable property registration agency and the cadastral       Different             1.0
  or mapping agency kept in a single database, in different but linked databases or in separate     databases but
  databases?                                                                                        linked

  Do the immovable property registration agency and cadastral or mapping agency use the             Yes                   1.0
  same identification number for properties?

Transparency of information index (0–6)                                                                                   4.0

  Who is able to obtain information on land ownership at the agency in charge of immovable          Anyone who            1.0
  property registration in the largest business city?                                               pays the official
                                                                                                    fee

  Is the list of documents that are required to complete any type of property transaction made      Yes, online           0.5
  publicly available–and if so, how?

  Link for online access:                                                                           https://www.gov.il
                                                                                                    /he/service/bill_of
                                                                                                    _sale

  Is the applicable fee schedule for any property transaction at the agency in charge of            Yes, online           0.5
  immovable property registration in the largest business city made publicly available–and if
  so, how?

  Link for online access:                                                                           http://www.justice
                                                                                                    .gov.il/Units/Land
                                                                                                    Registration/agro
                                                                                                    t/Pages/RishumF
                                                                                                    ees.aspx

  Does the agency in charge of immovable property registration commit to delivering a legally       Yes, online           0.5
  binding document that proves property ownership within a specific time frame–and if so, how
  does it communicate the service standard?

  Link for online access:                                                                           https://www.gov.il
                                                                                                    /he/service/bill_of
                                                                                                    _sale
                                                                                                    https://www.gov.il
                                                                                                    /he/service/bill_of
                                                                                                    _sale
                                                                                                    https://www.gov.il
                                                                                                    /he/service/land_
                                                                                                    registration_extra
                                                                                                    ct

  Is there a specific and separate mechanism for filing complaints about a problem that             No                    0.0
  occurred at the agency in charge of immovable property registration?

  Contact information:

  Are there publicly available official statistics tracking the number of transactions at the       No                    0.0
  immovable property registration agency?
                                                                                                                                  Page 24
Doing Business 2019           Israel

  Number of property transfers in the largest business city in 2017:

  Who is able to consult maps of land plots in the largest business city?                          Freely accessible     0.5
                                                                                                   by anyone

  Is the applicable fee schedule for accessing maps of land plots made publicly available—         No cost               0.5
  and if so, how?

  Link for online access:

  Does the cadastral or mapping agency commit to delivering an updated map within a                Yes, online           0.5
  specific time frame—and if so, how does it communicate the service standard?

  Link for online access:                                                                          http://mapi.gov.il/
                                                                                                   newsandupdates/
                                                                                                   documents/aman
                                                                                                   a2017.pdf

  Is there a specific and separate mechanism for filing complaints about a problem that            No                    0.0
  occurred at the cadastral or mapping agency?

  Contact information:

Geographic coverage index (0–8)                                                                                          2.0

  Are all privately held land plots in the economy formally registered at the immovable property   No                    0.0
  registry?

  Are all privately held land plots in the largest business city formally registered at the        No                    0.0
  immovable property registry?

  Are all privately held land plots in the economy mapped?                                         No                    0.0

  Are all privately held land plots in the largest business city mapped?                           Yes                   2.0

Land dispute resolution index (0–8)                                                                                      6.0

  Does the law require that all property sale transactions be registered at the immovable          Yes                   1.5
  property registry to make them opposable to third parties?

  Is the system of immovable property registration subject to a state or private guarantee?        Yes                   0.5

  Is there a specific compensation mechanism to cover for losses incurred by parties who           No                    0.0
  engaged in good faith in a property transaction based on erroneous information certified by
  the immovable property registry?

  Does the legal system require a control of legality of the documents necessary for a property    Yes                   0.5
  transaction (e.g., checking the compliance of contracts with requirements of the law)?

  If yes, who is responsible for checking the legality of the documents?                           Registrar;

  Does the legal system require verification of the identity of the parties to a property          Yes                   0.5
  transaction?

  If yes, who is responsible for verifying the identity of the parties?                            Registrar; Notary;
                                                                                                   Lawyer;

  Is there a national database to verify the accuracy of identity documents?                       Yes                   1.0

  For a standard land dispute between two local businesses over tenure rights of a property        Tel Aviv
  worth 50 times gross national income (GNI) per capita and located in the largest business        Magistrate Court
  city, what court would be in charge of the case in the first instance?

  How long does it take on average to obtain a decision from the first-instance court for such a   Between 1 and 2       2.0
  case (without appeal)?                                                                           years

  Are there any statistics on the number of land disputes in the first instance?                   No                    0.0

  Number of land disputes in the largest business city in 2017:

Equal access to property rights index (-2–0)                                                                             0.0

  Do unmarried men and unmarried women have equal ownership rights to property?                    Yes

  Do married men and married women have equal ownership rights to property?                        Yes                   0.0

                                                                                                                               Page 25
You can also read