Doing Business 2019 Iceland Economy Profile of Iceland Doing Business 2019 Indicators (in order of appearance in the document) Starting a business Procedures, time, cost and paid-in minimum capital to start a limited liability company Dealing with construction permits Procedures, time and cost to complete all formalities to build a warehouse and the quality control and safety mechanisms in the construction permitting system Getting electricity Procedures, time and cost to get connected to the electrical grid, and the reliability of the electricity supply and the transparency of tariffs Registering property Procedures, time and cost to transfer a property and the quality of the land administration system Getting credit Movable collateral laws and credit information systems Protecting minority investors Minority shareholders’ rights in related-party transactions and in corporate governance Paying taxes Payments, time, total tax and contribution rate for a firm to comply with all tax regulations as well as post-filing processes Trading across borders Time and cost to export the product of comparative advantage and import auto parts Enforcing contracts Time and cost to resolve a commercial dispute and the quality of judicial processes Resolving insolvency Time, cost, outcome and recovery rate for a commercial insolvency and the strength of the legal framework for insolvency Labor market regulation Flexibility in employment regulation and aspects of job quality Page 2
Doing Business 2019 Iceland About Doing Business The Doing Business project provides objective measures of business regulations and their enforcement across 190 economies and selected cities at the subnational and regional level. The Doing Business project, launched in 2002, looks at domestic small and medium-size companies and measures the regulations applying to them through their life cycle. Doing Business captures several important dimensions of the regulatory environment as it applies to local firms. It provides quantitative indicators on regulation for starting a business, dealing with construction permits, getting electricity, registering property, getting credit, protecting minority investors, paying taxes, trading across borders, enforcing contracts and resolving insolvency. Doing Business also measures features of labor market regulation. Although Doing Business does not present rankings of economies on the labor market regulation indicators or include the topic in the aggregate ease of doing business score or ranking on the ease of doing business, it does present the data for these indicators. By gathering and analyzing comprehensive quantitative data to compare business regulation environments across economies and over time, Doing Business encourages economies to compete towards more efficient regulation; offers measurable benchmarks for reform; and serves as a resource for academics, journalists, private sector researchers and others interested in the business climate of each economy. In addition, Doing Business offers detailed subnational reports, which exhaustively cover business regulation and reform in different cities and regions within a nation. These reports provide data on the ease of doing business, rank each location, and recommend reforms to improve performance in each of the indicator areas. Selected cities can compare their business regulations with other cities in the economy or region and with the 190 economies that Doing Business has ranked. The first Doing Business report, published in 2003, covered 5 indicator sets and 133 economies. This year’s report covers 11 indicator sets and 190 economies. Most indicator sets refer to a case scenario in the largest business city of each economy, except for 11 economies that have a population of more than 100 million as of 2013 (Bangladesh, Brazil, China, India, Indonesia, Japan, Mexico, Nigeria, Pakistan, the Russian Federation and the United States) where Doing Business also collected data for the second largest business city. The data for these 11 economies are a population-weighted average for the 2 largest business cities. The project has benefited from feedback from governments, academics, practitioners and reviewers. The initial goal remains: to provide an objective basis for understanding and improving the regulatory environment for business around the world. More about Doing Business (PDF, 5MB) Page 3
Doing Business 2019 Iceland Ease of Doing Business in DB 2019 Rank Region OECD high income 190 1 Iceland Income Category High income 21 DB 2019 Ease of doing business score Population 341,284 0 100 City Covered Reykjavik 79.35 DB 2019 Ease of Doing Business Score 0 100 84.64: Denmark (Rank: 3) 80.35: Finland (Rank: 17) 79.35: Iceland (Rank: 21) 78.90: Germany (Rank: 24) 77.80: Regional Average (OECD high income) 77.29: France (Rank: 32) Note: The ease of doing business score captures the gap of each economy from the best regulatory performance observed on each of the indicators across all economies in the Doing Business sample since 2005. An economy’s ease of doing business score is reflected on a scale from 0 to 100, where 0 represents the lowest and 100 represents the best performance. The ease of doing business ranking ranges from 1 to 190. Rankings on Doing Business topics - Iceland 1 13 12 15 30 33 31 28 53 55 59 71 73 82 Rank 109 136 163 190 Starting Dealing Getting Registering Getting Protecting Paying Trading Enforcing Resolving a with Electricity Property Credit Minority Taxes across Contracts Insolvency Business Construction Investors Borders Permits Ease of Doing Business Score on Doing Business topics - Iceland 100 90.72 92.24 86.61 84.64 86.71 81.85 80 71.64 70.00 69.10 60.00 Score 60 40 20 0 Starting Dealing Getting Registering Getting Protecting Paying Trading Enforcing Resolving a with Electricity Property Credit Minority Taxes across Contracts Insolvency Business Construction Investors Borders Permits Page 4
Doing Business 2019 Iceland Starting a Business This topic measures the number of procedures, time, cost and paid-in minimum capital requirement for a small- to medium-sized limited liability company to start up and formally operate in each economy’s largest business city. To make the data comparable across 190 economies, Doing Business uses a standardized business that is 100% domestically owned, has start-up capital equivalent to 10 times the income per capita, engages in general industrial or commercial activities and employs between 10 and 50 people one month after the commencement of operations, all of whom are domestic nationals. Starting a Business considers two types of local limited liability companies that are identical in all aspects, except that one company is owned by 5 married women and the other by 5 married men. The ranking of economies on the ease of starting a business is determined by sorting their scores for starting a business. These scores are the simple average of the scores for each of the component indicators. The most recent round of data collection for the project was completed in May 2018. See the methodology for more information. What the indicators measure Case study assumptions Procedures to legally start and formally operate To make the data comparable across economies, several assumptions about the a company (number) business and the procedures are used. It is assumed that any required information is readily available and that the entrepreneur will pay no bribes. • Preregistration (for example, name verification or reservation, notarization) The business: • Registration in the economy’s largest business - Is a limited liability company (or its legal equivalent). If there is more than one type city of limited liability company in the economy, the most common among domestic firms • Postregistration (for example, social security is chosen. Information on the most common form is obtained from incorporation registration, company seal) lawyers or the statistical office. - Operates in the economy’s largest business city. For 11 economies the data are • Obtaining approval from spouse to start a business or to leave the home to register the also collected for the second largest business city. company - The entire office space is approximately 929 square meters (10,000 square feet). - Is 100% domestically owned and has five owners, none of whom is a legal entity; • Obtaining any gender specific document for has a start-up capital of 10 times income per capita and has a turnover of at least company registration and operation or national 100 times income per capita. identification card - Performs general industrial or commercial activities, such as the production or sale of goods or services to the public. The business does not perform foreign trade Time required to complete each procedure activities and does not handle products subject to a special tax regime, for example, (calendar days) liquor or tobacco. It does not use heavily polluting production processes. • Does not include time spent gathering - Leases the commercial plant or offices and is not a proprietor of real estate and the information amount of the annual lease for the office space is equivalent to the income per capita. • Each procedure starts on a separate day (2 procedures cannot start on the same day) - Does not qualify for investment incentives or any special benefits. - Has at least 10 and up to 50 employees one month after the commencement of • Procedures fully completed online are recorded operations, all of whom are domestic nationals. as ½ day - Has a company deed that is 10 pages long. • Procedure is considered completed once final document is received The owners: • No prior contact with officials - Have reached the legal age of majority. If there is no legal age of majority, they are assumed to be 30 years old. Cost required to complete each procedure (% of - Are sane, competent, in good health and have no criminal record. income per capita) - Are married and the marriage is monogamous and registered with the authorities. - Where the answer differs according to the legal system applicable to the woman or • Official costs only, no bribes man in question (as may be the case in economies where there is legal plurality), the • No professional fees unless services required by answer used will be the one that applies to the majority of the population. law or commonly used in practice Paid-in minimum capital (% of income per capita) • Funds deposited in a bank or with third party before registration or up to 3 months after incorporation Page 5
Doing Business 2019 Iceland Starting a Business - Iceland Standardized Company Legal form Private Limited Liability Company Paid-in minimum capital requirement ISK 500,000 City Covered Reykjavik Indicator Iceland OECD high Best Regulatory income Performance Procedure – Men (number) 5 4.9 1 (New Zealand) Time – Men (days) 11.5 9.3 0.5 (New Zealand) Cost – Men (% of income per capita) 1.7 3.1 0.0 (Slovenia) Procedure – Women (number) 5 4.9 1 (New Zealand) Time – Women (days) 11.5 9.3 0.5 (New Zealand) Cost – Women (% of income per capita) 1.7 3.1 0.0 (Slovenia) Paid-in min. capital (% of income per capita) 6.7 8.6 0.0 (117 Economies) Figure – Starting a Business in Iceland and comparator economies – Ranking and Score DB 2019 Starting a Business Score 0 100 93.27: France (Rank: 30) 92.52: Denmark (Rank: 42) 92.43: Finland (Rank: 43) 91.19: Regional Average (OECD high income) 90.72: Iceland (Rank: 59) 83.58: Germany (Rank: 114) Note: The ranking of economies on the ease of starting a business is determined by sorting their scores for starting a business. These scores are the simple average of the scores for each of the component indicators. Page 6
Doing Business 2019 Iceland Figure – Starting a Business in Iceland – Procedure, Time and Cost Time (days) Cost (% of income per capita) 2 10 Cost (% of income per capita) 1.5 8 Time (days) 6 1 4 0.5 2 0 0 1 2 3 4 *5 Procedures (number) * This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure. Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men and women, the graph shows the time for women. For more information on methodology, see the Doing Business website (http://doingbusiness.org/en/methodology ). For details on the procedures reflected here, see the summary below. Page 7
Doing Business 2019 Iceland Details – Starting a Business in Iceland – Procedure, Time and Cost No. Procedures Time to Complete Associated Costs 1 Search for company name Less than one day no charge Agency : Register of Enterprises (Directorate of Internal Revenue) (online procedure) The company name database can be accessed at the Internal Revenue's website (www.rsk.is). 2 Deposit initial capital in bank account 1 day no charge Agency : Commercial Bank The initial capital can be deposited in any commercial bank. 3 Apply for registration with Register of Enterprises between 7-10 days ISK 130,800 Agency : Register of Enterprises To apply for registration with the Register of Enterprises, the company must provide five documents: 1. Notification of incorporation form 2. Agreement of incorporation 3. Record of the meeting of incorporation 4. Articles of Association 5. Affidavit on payment of share capital, issued by a certified public account The register is also in charge of advertising the incorporation notice in the Official Gazette, the official journal. The total registration fee is ISK 130,500, which includes the company identification number (ISK 5,000), and the fee for publishing the notification in the Official Gazette (ISK 1,000). Model incorporation documents and forms (in Icelandic) can be found on the Ministry of Industries and Innovation's website (www.atvinnuvegaraduneyti.is). The notification of incorporation form can be downloaded at no cost from the Internal Revenue Office website (www.rsk.is). 4 Obtain a VAT number Less than one day no charge Agency : Directorate of Internal Revenue (online procedure) Taxable parties must report their activities to the Director of Internal Revenue no later than 8 days after the activity begins. Companies that plan to sell goods or services valued at more than ISK 1,000,000 are required to collect and report VAT. Applicants can fill out form 5.02 which can be submitted online (https://www.rsk.is/atvinnurekstur/ad-hefja-rekstur/virdisaukaskattsskra/nr/160). The signed form and notification can also be sent via email to the Register of Enterprises and/or by visiting the offices of the Director of Internal Revenue. The Director of Internal Revenue will subsequently assign the applicant company with a VAT number which the company shall use in it’s economical activities. The notification can also be filed at www.skattur.is with a web key. 5 Notify tax authorities of employment of workers Less than one day no charge Agency : Tax authorities (online procedure) The notification can be filed at www.skattur.is with a web key. The signed form and notification can also be sent via email to the Register of Enterprises. Takes place simultaneously with previous procedure. Page 8
Doing Business 2019 Iceland Dealing with Construction Permits This topic tracks the procedures, time and cost to build a warehouse—including obtaining necessary the licenses and permits, submitting all required notifications, requesting and receiving all necessary inspections and obtaining utility connections. In addition, the Dealing with Construction Permits indicator measures the building quality control index, evaluating the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes, and professional certification requirements. The most recent round of data collection was completed in May 2018. See the methodology for more information What the indicators measure Case study assumptions Procedures to legally build a warehouse To make the data comparable across economies, several assumptions about the (number) construction company, the warehouse project and the utility connections are used. • Submitting all relevant documents and obtaining The construction company (BuildCo): all necessary clearances, licenses, permits and certificates - Is a limited liability company (or its legal equivalent) and operates in the economy’s largest business city. For 11 economies the data are also collected for the second • Submitting all required notifications and receiving largest business city. all necessary inspections - Is 100% domestically and privately owned; has five owners, none of whom is a • Obtaining utility connections for water and legal entity. Has a licensed architect and a licensed engineer, both registered with sewerage the local association of architects or engineers. BuildCo is not assumed to have any • Registering and selling the warehouse after its other employees who are technical or licensed experts, such as geological or completion topographical experts. - Owns the land on which the warehouse will be built and will sell the warehouse Time required to complete each procedure upon its completion. (calendar days) The warehouse: • Does not include time spent gathering information - Will be used for general storage activities, such as storage of books or stationery. - Will have two stories, both above ground, with a total constructed area of • Each procedure starts on a separate day— approximately 1,300.6 square meters (14,000 square feet). Each floor will be 3 though procedures that can be fully completed meters (9 feet, 10 inches) high and will be located on a land plot of approximately online are an exception to this rule 929 square meters (10,000 square feet) that is 100% owned by BuildCo, and the • Procedure is considered completed once final warehouse is valued at 50 times income per capita. document is received - Will have complete architectural and technical plans prepared by a licensed architect. If preparation of the plans requires such steps as obtaining further • No prior contact with officials documentation or getting prior approvals from external agencies, these are counted Cost required to complete each procedure (% of as procedures. income per capita) - Will take 30 weeks to construct (excluding all delays due to administrative and regulatory requirements). • Official costs only, no bribes The water and sewerage connections: Building quality control index (0-15) - Will be 150 meters (492 feet) from the existing water source and sewer tap. If there • Quality of building regulations (0-2) is no water delivery infrastructure in the economy, a borehole will be dug. If there is • Quality control before construction (0-1) no sewerage infrastructure, a septic tank in the smallest size available will be installed or built. • Quality control during construction (0-3) - Will have an average water use of 662 liters (175 gallons) a day and an average • Quality control after construction (0-3) wastewater flow of 568 liters (150 gallons) a day. Will have a peak water use of 1,325 liters (350 gallons) a day and a peak wastewater flow of 1,136 liters (300 • Liability and insurance regimes (0-2) gallons) a day. • Professional certifications (0-4) - Will have a constant level of water demand and wastewater flow throughout the year; will be 1 inch in diameter for the water connection and 4 inches in diameter for the sewerage connection. Page 9
Doing Business 2019 Iceland Dealing with Construction Permits - Iceland Standardized Warehouse Estimated value of warehouse ISK 375,120,675.10 City Covered Reykjavik Indicator Iceland OECD high Best Regulatory income Performance Procedures (number) 17 12.7 None in 2017/18 Time (days) 84 153.1 None in 2017/18 Cost (% of warehouse value) 0.4 1.5 None in 2017/18 Building quality control index (0-15) 8.0 11.5 15.0 (3 Economies) Figure – Dealing with Construction Permits in Iceland and comparator economies – Ranking and Score DB 2019 Dealing with Construction Permits Score 0 100 86.94: Denmark (Rank: 4) 79.30: France (Rank: 19) 78.16: Germany (Rank: 24) 75.79: Finland (Rank: 34) 75.41: Regional Average (OECD high income) 71.64: Iceland (Rank: 71) Note: The ranking of economies on the ease of dealing with construction permits is determined by sorting their scores for dealing with construction permits. These scores are the simple average of the scores for each of the component indicators. Figure – Dealing with Construction Permits in Iceland – Procedure, Time and Cost Time (days) Cost (% of warehouse value) 0.25 80 70 Cost (% of warehouse value) 0.2 60 Time (days) 50 0.15 40 0.1 30 20 0.05 10 0 0 1 2 *3 4 5 6 7 8 9 10 11 12 13 14 15 * 16 17 Procedures (number) * This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure. Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men and women, the graph shows the time for women. For more information on methodology, see the Doing Business website (http://doingbusiness.org/en/methodology ). For details on the procedures reflected here, see the summary below. Page 10
Doing Business 2019 Iceland Figure – Dealing with Construction Permits in Iceland and comparator economies – Measure of Quality 15 14.0 11.0 11.5 Index score 10.0 9.5 10 8.0 5 0 Iceland Denmark Finland France Germany OECD high income Details – Dealing with Construction Permits in Iceland – Procedure, Time and Cost No. Procedures Time to Complete Associated Costs 1 Obtain design approval 7 days ISK 440,165 Agency : Reykjavik Municipal Building Control Office The architectural drawings must be drawn to a scale of 1:100. A meeting of architects convenes every Tuesday to discuss the applications submitted subject to architectural drawing approval. The architects at Reykjavik Construction Agency compare their notes, and if the application is complete and follows the guidelines and regulations of the Building Code, the approval will be issued in 1 -- 2 weeks. The cost is ISK 110 per cubic meter and an application fee of ISK 11,000 for the approval of architectural drawings and designs. The approval is valid for 2 years within which BuildCo has to begin construction. 2 Obtain approval of structural, electrical, and mechanical design drawings 14 days ISK 220,000 Agency : Reykjavik Municipal Building Control Office BuildCo can present these design drawings all at once or separately. The mechanical design drawings include the potable water system, heating and ventilation, and sewerage system. At this stage when BuildCo receives the approval of the technical aspect of drawings it must pre-pay for the inspections to be conducted during construction. There are 8 inspections during construction. Each inspection costs ISK 11,000 in Reykjavik. There is also an application fee of ISK 132,000. Payment is made at this stage to ensure the inspections occur during construction. The approval is valid for 1 year within which BuildCo has to build the construction. 3 Obtain approval of site manager 3 days no charge Agency : Licensed engineer The site manager must be a professional engineer or a master builder. They are generally licensed by the Iceland Construction Authority. The application for this approval should include an application form, curriculum vitae, education certificate, and the liability insurance payment. 4 Obtain initial set out of building 5 days ISK 36,000 Agency : Reykjavik Public Works, Land Information Office, Reykjavík GIS The cost is ISK 36,000.00, including a tax for the final stake out of the building. For simple buildings, half of the fee is often collected for the first stake out prior to excavation. 5 Receive foundation work inspection 1 day no charge Agency : Reykjavik Municipal Building Control Office At each stage of construction before the work is covered, an inspection must be conducted by the Municipality. These inspections must be requested within a day’s notice, and construction work does not stop. The request can be made via e-mail. The actual inspection takes 2 hours on average. 6 Receive concrete work inspection 1 day no charge Agency : Reykjavik Municipal Building Control Office 7 Receive steel work for slabs inspection 1 day no charge Agency : Reykjavik Municipal Building Control Office 8 Receive frame inspection 1 day no charge Agency : Reykjavik Municipal Building Control Office 9 Receive drainage inspection 1 day no charge Agency : Reykjavik Municipal Building Control Office 10 Receive structure inspection 1 day no charge Agency : Reykjavik Municipal Building Control Office 11 Receive timber scaffolding inspection 1 day no charge Agency : Reykjavik Municipal Building Control Office Page 11
Doing Business 2019 Iceland 12 Receive plumbing inspection 1 day no charge Agency : Reykjavik Municipal Building Control Office 13 Request occupancy permit and await final inspection 21 days ISK 19,500 Agency : Reykjavik Municipal Building Control Office The Reykjavik Construction Authority contacts all the other agencies that must inspect the building. The number of inspections depends on the size and purpose of the building. For a small warehouse, only the fire, health, and labor inspections are necessary. The Municipality coordinates these inspections. 14 Receive final inspection 7 days ISK 22,000 Agency : Reykjavik Municipal Building Control Office The final inspection includes inspections of employee facilities by Icelandic OSHA (Occupational Safety and Health Agency), inspection of hygienic conditions by the Reykjavik Environmental and Hygiene Agency, and the fire system inspection. 15 Register the building with the Municipality 15 days ISK 34,000 Agency : Reykjavik Municipal Building Control Office Once the occupancy permit is issued, BuildCo can register it with the Municipality. The Building Control Office of Reykyavik updates the status of the building in an internal database on an ongoing basis using number codes to indicate the progress of the construction. After each stage of the construction process is completed and the inspection has verified the progress, the Building Control Office updates the building's status in its database. Once the building is completed, BuildCo registers the status of the completed building in the Reykjavik Municipal Building Control Office and in the meanwhile pays ISK 34,000 to the account of the National Registration Office in order to register the title over the newly constructed building and to obtain the relevant ID number for the building. The payment is done either via online payment method or via sending a check to the National Real Estate office. There is no need to have any interaction with the National Registration Office in order to register the building. Pay water connection fees to Orkuveita Reykjavíkur 1 day ISK 779,046 16 Agency : Reykjavik Energy (Orkuveita Reykjavíkur) Water connections are administered by Reykjavik Power Company based on a principle of a single window. Its operation and quality management are pursuant to ISO 9000. 17 Obtain water meter and final water connection 7 days no charge Agency : Reykjavik Energy (Orkuveita Reykjavíkur) Takes place simultaneously with previous procedure. Page 12
Doing Business 2019 Iceland Details – Dealing with Construction Permits in Iceland – Measure of Quality Answer Score Building quality control index (0-15) 8.0 Quality of building regulations index (0-2) 2.0 How accessible are building laws and regulations in your economy? (0-1) Available online; 1.0 Free of charge. Which requirements for obtaining a building permit are clearly specified in the building List of required 1.0 regulations or on any accessible website, brochure or pamphlet? (0-1) documents; Fees to be paid; Required preapprovals. Quality control before construction index (0-1) 1.0 Which third-party entities are required by law to verify that the building plans are in Licensed 1.0 compliance with existing building regulations? (0-1) architect; Licensed engineer. Quality control during construction index (0-3) 2.0 What types of inspections (if any) are required by law to be carried out during construction? Inspections by in- 1.0 (0-2) house engineer; Inspections at various phases. Do legally mandated inspections occur in practice during construction? (0-1) Mandatory 1.0 inspections are always done in practice. Quality control after construction index (0-3) 3.0 Is there a final inspection required by law to verify that the building was built in accordance Yes, final 2.0 with the approved plans and regulations? (0-2) inspection is done by government agency; Yes, in- house engineer submits report for final inspection. Do legally mandated final inspections occur in practice? (0-1) Final inspection 1.0 always occurs in practice. Liability and insurance regimes index (0-2) 0.0 Which parties (if any) are held liable by law for structural flaws or problems in the building No party is held 0.0 once it is in use (Latent Defect Liability or Decennial Liability)? (0-1) liable under the law. Which parties (if any) are required by law to obtain an insurance policy to cover possible No party is 0.0 structural flaws or problems in the building once it is in use (Latent Defect Liability Insurance required by law or Decennial Insurance)? (0-1) to obtain insurance . Professional certifications index (0-4) 0.0 What are the qualification requirements for the professional responsible for verifying that the University degree 0.0 architectural plans or drawings are in compliance with existing building regulations? (0-2) in architecture or engineering. What are the qualification requirements for the professional who supervises the construction University degree 0.0 on the ground? (0-2) in engineering, construction or construction management. Page 13
Doing Business 2019 Iceland Getting Electricity This topic measures the procedures, time and cost required for a business to obtain a permanent electricity connection for a newly constructed warehouse. Additionally, the reliability of supply and transparency of tariffs index measures reliability of supply, transparency of tariffs and the price of electricity. The most recent round of data collection for the project was completed in May 2018. See the methodology for more information. What the indicators measure Case study assumptions Procedures to obtain an electricity connection To make the data comparable across economies, several assumptions about the (number) warehouse, the electricity connection and the monthly consumption are used. • Submitting all relevant documents and obtaining The warehouse: all necessary clearances and permits - Is owned by a local entrepreneur and is used for storage of goods. • Completing all required notifications and - Is located in the economy’s largest business city. For 11 economies the data are receiving all necessary inspections also collected for the second largest business city. • Obtaining external installation works and possibly - Is located in an area where similar warehouses are typically located and is in an purchasing material for these works area with no physical constraints. For example, the property is not near a railway. - Is a new construction and is being connected to electricity for the first time. • Concluding any necessary supply contract and - Has two stories with a total surface area of approximately 1,300.6 square meters obtaining final supply (14,000 square feet). The plot of land on which it is built is 929 square meters Time required to complete each procedure (10,000 square feet). (calendar days) The electricity connection: • Is at least 1 calendar day - Is a permanent one with a three-phase, four-wire Y connection with a subscribed • Each procedure starts on a separate day capacity of 140-kilo-volt-ampere (kVA) with a power factor of 1, when 1 kVA = 1 • Does not include time spent gathering kilowatt (kW). information - Has a length of 150 meters. The connection is to either the low- or medium-voltage distribution network and is either overhead or underground, whichever is more • Reflects the time spent in practice, with little common in the area where the warehouse is located and requires works that involve follow-up and no prior contact with officials the crossing of a 10-meter road (such as by excavation or overhead lines) but are all carried out on public land. There is no crossing of other owners’ private property Cost required to complete each procedure (% of income per capita) because the warehouse has access to a road. - Does not require work to install the internal wiring of the warehouse. This has • Official costs only, no bribes already been completed up to and including the customer’s service panel or • Value added tax excluded switchboard and the meter base. The reliability of supply and transparency of The monthly consumption: tariffs index (0-8) - It is assumed that the warehouse operates 30 days a month from 9:00 a.m. to 5:00 • Duration and frequency of power outages (0–3) p.m. (8 hours a day), with equipment utilized at 80% of capacity on average and that • Tools to monitor power outages (0–1) there are no electricity cuts (assumed for simplicity reasons) and the monthly energy consumption is 26,880 kilowatt-hours (kWh); hourly consumption is 112 kWh. • Tools to restore power supply (0–1) - If multiple electricity suppliers exist, the warehouse is served by the cheapest • Regulatory monitoring of utilities’ performance supplier. (0–1) - Tariffs effective in January of the current year are used for calculation of the price of electricity for the warehouse. Although January has 31 days, for calculation • Financial deterrents limiting outages (0–1) purposes only 30 days are used. • Transparency and accessibility of tariffs (0–1) Price of electricity (cents per kilowatt-hour)* • Price based on monthly bill for commercial warehouse in case study *Note: Doing Business measures the price of electricity, but it is not included in the ease of doing business score nor the ranking on the ease of getting electricity. Page 14
Doing Business 2019 Iceland Getting Electricity - Iceland Standardized Connection Price of electricity (US cents per kWh) 10.0 Name of utility Orkuveita Reykjavíkur City Covered Reykjavik Indicator Iceland OECD high Best Regulatory income Performance Procedures (number) 4 4.5 3 (25 Economies) Time (days) 22 77.2 18 (3 Economies) Cost (% of income per capita) 9.3 64.2 0.0 (3 Economies) Reliability of supply and transparency of tariff index (0-8) 7 7.5 8.0 (27 Economies) Figure – Getting Electricity in Iceland and comparator economies – Ranking and Score DB 2019 Getting Electricity Score 0 100 98.79: Germany (Rank: 5) 92.24: Iceland (Rank: 13) 92.01: France (Rank: 14) 90.22: Denmark (Rank: 21) 88.98: Finland (Rank: 25) 85.47: Regional Average (OECD high income) Note: The ranking of economies on the ease of getting electricity is determined by sorting their scores for getting electricity. These scores are the simple average of the scores for all the component indicators except the price of electricity. Page 15
Doing Business 2019 Iceland Figure – Getting Electricity in Iceland – Procedure, Time and Cost Time (days) Cost (% of income per capita) 10 20 Cost (% of income per capita) 8 15 Time (days) 6 10 4 5 2 0 0 1 *2 3 4 Procedures (number) * This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure. Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men and women, the graph shows the time for women. For more information on methodology, see the Doing Business website (http://doingbusiness.org/en/methodology ). For details on the procedures reflected here, see the summary below. Figure – Getting Electricity in Iceland and comparator economies – Measure of Quality 8 8 8 8 7.5 7 7 7 6 Index score 5 4 3 2 1 0 Iceland Denmark Finland France Germany OECD high income Page 16
Doing Business 2019 Iceland Details – Getting Electricity in Iceland – Procedure, Time and Cost No. Procedures Time to Complete Associated Costs 1 Submit application to Veitur Utilities PLC, await inspection and receive 7 calendar days ISK 0 estimate Agency : Orkuveita Reykjavíkur An application can be submitted online. The following documents are needed with the application: Siteplan of the warehouse in scale 1:500 - to see how it is located to the existing electricity system, location of electrical fuse/switch board - to see where the cable is coming into the warehouse and single line diagram of the electrical fuse/switch board. There is no notarization needed of the documents. There is no internal inspection. However, the electrician who is in charge for the internal wiring must be qualified (having the right examination) and be approved by the Icelandic Construction Authority (a governmental agency responsible for the safety of electrical housing installation) and registered on a list. The Icelandic Construction Authority is now responsible for administration of law and regulations regarding Electrical Safety and took over these responsibilities from the Consumer Agency. The utility has this list and the list is renewed monthly. If the electrician applying for the 200A connection is not on the list, the utility refuses the application for connection. When a new customer applies for a new connection to OR's distribution system, he/she can apply for a supply contract with the sales department (OR) or the customer can inform the sales department that he/she wants to make a supply contract with another electricity company/supplier. 2 Receive site inspection by Orkuveita Reykjavik 5 calendar days ISK 0 Agency : Orkuveita Reykjavíkur An external inspection is conducted to confirm that the given information in the submitted documents and drawings is accurate. The external inspection is not necessary to prepare an estimate. There is no extra fee for the inspection, the cost is included in the application fee. It is the main rule that someone from the customer's party is present during the inspection, in case that OR is having remarks on the site and the customer needs to fix them before the external connection works start. 3 Pay connection fee and await completion of external works 14 calendar days ISK 698,041 Agency : Orkuveita Reykjavíkur When the customer has given all necessary documents/drawings to the utility and the site inspection confirms that it fulfills the requirement of the utility, then the utility sends the invoice to the customer. The customer can pay the connection fee only via a bank. The customer gets an invoice/giro from the bank. This is always before the external work is done. If the site inspection is according to given documents, then there should be no waiting time until external works can start. The external connection works involve the following: the utility makes a ditch/trench from the nearest cable distribution cabinet to the warehouse's fuse board, a cable is laid in the trench and cable terminations are made to the cable end which is connected to the distribution cabinet (without fuse). The utility obtains the excavation permit during this step. All material for the external connection is provided by the utility. 4 Receive meter installation by Frumherji and submit electrician's notification 1 calendar day ISK 0 to Construction Authority Agency : Frumherji hf. The meter is installed when the customer requires it. It is installed by another company which is responsible for this service since this service was outsourced a few years ago. OR has outsourced the meter-department to Frumherji. Frumherji owns the meters and rents them to OR. There is no charge for the installation of the meter, this is included in the connection fee. The customer has no direct interaction with Frumherji. When all connections are finished (electrical fuse board + distribution cabinet) and the meter is installed, then the current can start flowing. When the utility has done the connection of the warehouse to the distribution system, the electrician of the contractor who built the warehouse must fill out a form and send it to the Iceland Construction Authority which is now responsible for the safety of electrical housing installation. The utility also informs this agency that this house is now connected to the distribution system. The electricity can start flowing before the electrician sends the form to the Iceland Construction Authority. Takes place simultaneously with previous procedure. Page 17
Doing Business 2019 Iceland Details – Getting Electricity in Iceland – Measure of Quality Answer Reliability of supply and transparency of tariff index (0-8) 7 Total duration and frequency of outages per customer a year (0-3) 3 System average interruption duration index (SAIDI) 0.5 System average interruption frequency index (SAIFI) 0.4 What is the minimum outage time (in minutes) that the utility considers for the calculation of SAIDI/SAIFI 0.0 Mechanisms for monitoring outages (0-1) 1 Does the distribution utility use automated tools to monitor outages? Yes Mechanisms for restoring service (0-1) 1 Does the distribution utility use automated tools to restore service? Yes Regulatory monitoring (0-1) 1 Does a regulator—that is, an entity separate from the utility—monitor the utility’s performance on reliability of Yes supply? Financial deterrents aimed at limiting outages (0-1) 0 Does the utility either pay compensation to customers or face fines by the regulator (or both) if outages No exceed a certain cap? Communication of tariffs and tariff changes (0-1) 1 Are effective tariffs available online? Yes Link to the website, if available online http://www.or.is/vorur -thjonusta/verdskra- og-skilmalar http://www.on.is/fyrirt aeki Are customers notified of a change in tariff ahead of the billing cycle? Yes Note: If the duration and frequency of outages is 100 or less, the economy is eligible to score on the Reliability of supply and transparency of tariff index. If the duration and frequency of outages is not available, or is over 100, the economy is not eligible to score on the index. If the minimum outage time considered for SAIDI/SAIFI is over 5 minutes, the economy is not eligible to score on the index. Page 18
Doing Business 2019 Iceland Registering Property This topic examines the steps, time and cost involved in registering property, assuming a standardized case of an entrepreneur who wants to purchase land and a building that is already registered and free of title dispute. In addition, the topic also measures the quality of the land administration system in each economy. The quality of land administration index has five dimensions: reliability of infrastructure, transparency of information, geographic coverage, land dispute resolution, and equal access to property rights. The most recent round of data collection for the project was completed in May 2018. See the methodology for more information. What the indicators measure Case study assumptions Procedures to legally transfer title on To make the data comparable across economies, several assumptions about the immovable property (number) parties to the transaction, the property and the procedures are used. • Preregistration procedures (for example, The parties (buyer and seller): checking for liens, notarizing sales agreement, paying property transfer taxes) - Are limited liability companies (or the legal equivalent). - Are located in the periurban area of the economy’s largest business city. For 11 • Registration procedures in the economy's largest economies the data are also collected for the second largest business city. business city. - Are 100% domestically and privately owned. • Postregistration procedures (for example, filling - Have 50 employees each, all of whom are nationals. title with municipality) - Perform general commercial activities. Time required to complete each procedure The property (fully owned by the seller): (calendar days) - Has a value of 50 times income per capita, which equals the sale price. • Does not include time spent gathering - Is fully owned by the seller. information - Has no mortgages attached and has been under the same ownership for the past • Each procedure starts on a separate day - 10 years. though procedures that can be fully completed - Is registered in the land registry or cadastre, or both, and is free of title disputes. online are an exception to this rule - Is located in a periurban commercial zone, and no rezoning is required. - Consists of land and a building. The land area is 557.4 square meters (6,000 • Procedure is considered completed once final square feet). A two-story warehouse of 929 square meters (10,000 square feet) is document is received located on the land. The warehouse is 10 years old, is in good condition, has no • No prior contact with officials heating system and complies with all safety standards, building codes and legal requirements. The property, consisting of land and building, will be transferred in its Cost required to complete each procedure (% of entirety. property value) - Will not be subject to renovations or additional construction following the purchase. • Official costs only (such as administrative fees, - Has no trees, natural water sources, natural reserves or historical monuments of duties and taxes). any kind. - Will not be used for special purposes, and no special permits, such as for • Value Added Tax, Capital Gains Tax and illicit residential use, industrial plants, waste storage or certain types of agricultural payments are excluded activities, are required. - Has no occupants, and no other party holds a legal interest in it. Quality of land administration index (0-30) • Reliability of infrastructure index (0-8) • Transparency of information index (0–6) • Geographic coverage index (0–8) • Land dispute resolution index (0–8) • Equal access to property rights index (-2–0) Page 19
Doing Business 2019 Iceland Registering Property - Iceland Indicator Iceland OECD high Best Regulatory income Performance Procedures (number) 3 4.7 1 (4 Economies) Time (days) 3.5 20.1 1 (New Zealand) Cost (% of property value) 3.6 4.2 0.0 (Saudi Arabia) Quality of the land administration index (0-30) 26.5 23.0 None in 2017/18 Figure – Registering Property in Iceland and comparator economies – Ranking and Score DB 2019 Registering Property Score 0 100 89.88: Denmark (Rank: 11) 86.61: Iceland (Rank: 15) 80.73: Finland (Rank: 28) 77.17: Regional Average (OECD high income) 65.70: Germany (Rank: 78) 63.33: France (Rank: 96) Note: The ranking of economies on the ease of registering property is determined by sorting their scores for registering property. These scores are the simple average of the scores for each of the component indicators. Figure – Registering Property in Iceland – Procedure, Time and Cost Time (days) Cost (% of property value) 3.5 2.5 3 Cost (% of property value) 2 2.5 Time (days) 1.5 2 1.5 1 1 0.5 0.5 0 0 1 2 3 Procedures (number) * This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure. Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men and women, the graph shows the time for women. For more information on methodology, see the Doing Business website (http://doingbusiness.org/en/methodology ). For details on the procedures reflected here, see the summary below. Page 20
Doing Business 2019 Iceland Figure – Registering Property in Iceland and comparator economies – Measure of Quality 30 26.5 26.5 24.5 24.0 25 23.0 22.0 Index score 20 15 10 5 0 Iceland Denmark Finland France Germany OECD high income Details – Registering Property in Iceland – Procedure, Time and Cost No. Procedures Time to Complete Associated Costs 1 The buyer obtains a non-encumbrance certificate from the Land Registry Less than one day, ISK 8,480; (ISK 1,500 Agency : Magistrate's Office online each mortgage The buyer requests to receive a certificate of mortgages and other possible rights and certificates if obligations in relation to the property. Anyone can request a certificate in writing. It costs completed at the ISK 1.500 and it takes one visit to the Icelandic Property Registry. Real-estate agencies Registry's office (2 have on-line access to this information at a cost of ISK 850 per certificate. Other due required) diligence checks are performed using online databases of the Property Registry and Land ISK 700 for certificate Registry under the Icelandic Property Registry. Some of the checks include: (i) A list of options, purchase rights, and warrants issued by the Company specifying the name of the from the Property holder, rights or warrants issued, the date granted, the purchase price, and the position of Registry the holder with the Company; (ii) An address list of the locations of all land, buildings, ISK 630 for online and other improvements either leased or owned by the Company; (iii) Status of properties certificate of status owned (eignastöðuvottorð) and the history of properties owned (eignasöguvottorð). (eignastöðuvottorð) ISK 2,600 (for physical certificate) ISK 2,900 ownership history ISK 1250 Certificate from the National Register Total ISK 8,480) 2 Authorized real estate agent prepares and executes the sale-purchase 1 day ISK 7,502,413.5; agreement (1.5-2.5% of property Agency : Real Estate Agent value (real estate It is not mandatory to use an authorized real estate agent, but almost everyone does. The agent fees)) agent's fees will be around 1.5% and 2.5% of the property value. The sale-purchase agreement is usually registered at the Property Registry if the property is not paid in full at the time of the agreement. The deed is first signed when the property is paid in full. Registration of the sale-purchase agreement protects the rights of the purchaser. The total extra cost of registering the sale-purchase agreement is ISK 2.000. The process takes about 2 days. In this case there is no need to register the sale-purchase agreement and it is not a formal requirement. The conditions for registry of the sale purchase agreement are that it contains the following information: (i) the name of the property as officially registered by the municipal authorities, (ii) unique property reference number of the land and the property, (iii) the legal description set forth by the planning and building authorities and (iv) the land and the building’s number which has direct reference to its coordinates. This information can be obtained from the Land Registry office in the property’s district or from Icelandic Property Register (Cadaster authority). If an authorized real estate agent handles the sale this information is available to him via an electronic data and information system. It is common that the buyer notifies the insurance company. Insurance companies have electronic access to the database at Icelandic Property Register and there is a daily processing of the title of transfers. The title of the fire-insurance changes the same day as the transfer of title is registered. 3 Transfer of title is prepared and registered at the Magistrates office 2 days ISK 6,003,930.8; (ISK Agency : Magistrate's Office and Associates of attorney's 2000 + 0,8% When the buyer has fulfilled his obligations in relation to the sale purchase agreement (individuals) or 1,6% and the conditions for registrations, the transfer of title is prepared and registered at the (companies) of the Magistrates office. The deed shall be delivered in two signed copies (including one copy official property value on a special accredited paper). The documentation should include the deed signed by the (usually lower than seller and the purchaser and certified by a notary public, or an attorney, a certified real- purchase price) for estate agent or two witnesses. In practice a notary public is hardly ever used. Stamp Duty) Takes place simultaneously with previous procedure. Page 21
Doing Business 2019 Iceland Details – Registering Property in Iceland – Measure of Quality Answer Score Reliability of infrastructure index (0-8) 7.0 What is the institution in charge of immovable property registration? District Commisioner of Reykjavik In what format are the majority of title or deed records kept in the largest business city—in a Computer/Scann 1.0 paper format or in a computerized format (scanned or fully digital)? ed Is there an electronic database for checking for encumbrances (liens, mortgages, restrictions Yes 1.0 and the like)? Institution in charge of the plans showing legal boundaries in the largest business city: Reykjavik City Council In what format are the majority of maps of land plots kept in the largest business city—in a Computer/Fully 2.0 paper format or in a computerized format (scanned or fully digital)? digital Is there an electronic database for recording boundaries, checking plans and providing Yes 1.0 cadastral information (geographic information system)? Is the information recorded by the immovable property registration agency and the cadastral Different 1.0 or mapping agency kept in a single database, in different but linked databases or in separate databases but databases? linked Do the immovable property registration agency and cadastral or mapping agency use the Yes 1.0 same identification number for properties? Transparency of information index (0–6) 4.0 Who is able to obtain information on land ownership at the agency in charge of immovable Anyone who 1.0 property registration in the largest business city? pays the official fee Is the list of documents that are required to complete any type of property transaction made Yes, online 0.5 publicly available–and if so, how? Link for online access: www.keldan.is, www.skra.is Is the applicable fee schedule for any property transaction at the agency in charge of Yes, online 0.5 immovable property registration in the largest business city made publicly available–and if so, how? Link for online access: http://www.syslu menn.is/gjaldtaka / Does the agency in charge of immovable property registration commit to delivering a legally Other 0.5 binding document that proves property ownership within a specific time frame–and if so, how does it communicate the service standard? Link for online access: By law, 10 business days Is there a specific and separate mechanism for filing complaints about a problem that No 0.0 occurred at the agency in charge of immovable property registration? Contact information: Are there publicly available official statistics tracking the number of transactions at the Yes 0.5 immovable property registration agency? Number of property transfers in the largest business city in 2017: A total of 7,411 for 2017 in the Reykjavík municipality. Who is able to consult maps of land plots in the largest business city? Freely accessible 0.5 by anyone Is the applicable fee schedule for accessing maps of land plots made publicly available— Yes, online 0.5 and if so, how? Page 22
Doing Business 2019 Iceland Link for online access: http://reykjavik.is/ gjaldskrar/lukr- gjaldskra Does the cadastral or mapping agency commit to delivering an updated map within a No 0.0 specific time frame—and if so, how does it communicate the service standard? Link for online access: Is there a specific and separate mechanism for filing complaints about a problem that No 0.0 occurred at the cadastral or mapping agency? Contact information: Geographic coverage index (0–8) 8.0 Are all privately held land plots in the economy formally registered at the immovable property Yes 2.0 registry? Are all privately held land plots in the largest business city formally registered at the Yes 2.0 immovable property registry? Are all privately held land plots in the economy mapped? Yes 2.0 Are all privately held land plots in the largest business city mapped? Yes 2.0 Land dispute resolution index (0–8) 7.5 Does the law require that all property sale transactions be registered at the immovable Yes 1.5 property registry to make them opposable to third parties? Is the system of immovable property registration subject to a state or private guarantee? Yes 0.5 Is there a specific compensation mechanism to cover for losses incurred by parties who Yes 0.5 engaged in good faith in a property transaction based on erroneous information certified by the immovable property registry? Does the legal system require a control of legality of the documents necessary for a property Yes 0.5 transaction (e.g., checking the compliance of contracts with requirements of the law)? If yes, who is responsible for checking the legality of the documents? Registrar; Does the legal system require verification of the identity of the parties to a property Yes 0.5 transaction? If yes, who is responsible for verifying the identity of the parties? Registrar; Lawyer; Is there a national database to verify the accuracy of identity documents? Yes 1.0 For a standard land dispute between two local businesses over tenure rights of a property District court of worth 50 times gross national income (GNI) per capita and located in the largest business Reykjavik city, what court would be in charge of the case in the first instance? How long does it take on average to obtain a decision from the first-instance court for such a Less than a year 3.0 case (without appeal)? Are there any statistics on the number of land disputes in the first instance? No 0.0 Number of land disputes in the largest business city in 2017: Equal access to property rights index (-2–0) 0.0 Do unmarried men and unmarried women have equal ownership rights to property? Yes Do married men and married women have equal ownership rights to property? Yes 0.0 Page 23