Lebanon Economy Profile - Doing Business 2019

Page created by Jamie Stephens
 
CONTINUE READING
Lebanon Economy Profile - Doing Business 2019
Doing Business 2019   Lebanon

                                Economy Profile

                                Lebanon

                                                  Page 1
Lebanon Economy Profile - Doing Business 2019
Doing Business 2019       Lebanon

                                            Economy Profile of Lebanon

                                          Doing Business 2019 Indicators
                                     (in order of appearance in the document)

Starting a business                 Procedures, time, cost and paid-in minimum capital to start a limited liability company

Dealing with construction permits   Procedures, time and cost to complete all formalities to build a warehouse and the quality
                                    control and safety mechanisms in the construction permitting system

Getting electricity                 Procedures, time and cost to get connected to the electrical grid, and the reliability of the
                                    electricity supply and the transparency of tariffs

Registering property                Procedures, time and cost to transfer a property and the quality of the land administration
                                    system

Getting credit                      Movable collateral laws and credit information systems

Protecting minority investors       Minority shareholders’ rights in related-party transactions and in corporate governance

Paying taxes                        Payments, time, total tax and contribution rate for a firm to comply with all tax regulations as
                                    well as post-filing processes

Trading across borders              Time and cost to export the product of comparative advantage and import auto parts

Enforcing contracts                 Time and cost to resolve a commercial dispute and the quality of judicial processes

Resolving insolvency                Time, cost, outcome and recovery rate for a commercial insolvency and the strength of the
                                    legal framework for insolvency

Labor market regulation             Flexibility in employment regulation and aspects of job quality

                                                                                                                                       Page 2
Doing Business 2019           Lebanon

About Doing Business

The Doing Business project provides objective measures of business regulations and their enforcement across 190 economies and selected
cities at the subnational and regional level.

The Doing Business project, launched in 2002, looks at domestic small and medium-size companies and measures the regulations applying
to them through their life cycle.

Doing Business captures several important dimensions of the regulatory environment as it applies to local firms. It provides quantitative
indicators on regulation for starting a business, dealing with construction permits, getting electricity, registering property, getting credit,
protecting minority investors, paying taxes, trading across borders, enforcing contracts and resolving insolvency. Doing Business also
measures features of labor market regulation. Although Doing Business does not present rankings of economies on the labor market
regulation indicators or include the topic in the aggregate ease of doing business score or ranking on the ease of doing business, it does
present the data for these indicators.

By gathering and analyzing comprehensive quantitative data to compare business regulation environments across economies and over time,
Doing Business encourages economies to compete towards more efficient regulation; offers measurable benchmarks for reform; and serves
as a resource for academics, journalists, private sector researchers and others interested in the business climate of each economy.

In addition, Doing Business offers detailed subnational reports, which exhaustively cover business regulation and reform in different cities and
regions within a nation. These reports provide data on the ease of doing business, rank each location, and recommend reforms to improve
performance in each of the indicator areas. Selected cities can compare their business regulations with other cities in the economy or region
and with the 190 economies that Doing Business has ranked.

The first Doing Business report, published in 2003, covered 5 indicator sets and 133 economies. This year’s report covers 11 indicator sets
and 190 economies. Most indicator sets refer to a case scenario in the largest business city of each economy, except for 11 economies that
have a population of more than 100 million as of 2013 (Bangladesh, Brazil, China, India, Indonesia, Japan, Mexico, Nigeria, Pakistan, the
Russian Federation and the United States) where Doing Business also collected data for the second largest business city. The data for these
11 economies are a population-weighted average for the 2 largest business cities. The project has benefited from feedback from
governments, academics, practitioners and reviewers. The initial goal remains: to provide an objective basis for understanding and improving
the regulatory environment for business around the world.

More about Doing Business (PDF, 5MB)

                                                                                                                                                   Page 3
Doing Business 2019                Lebanon

         Ease of Doing Business in                                                                                             DB 2019 Rank
                                               Region                 Middle East & North Africa
                                                                                                              190                                         1
               Lebanon
                                               Income Category        Upper middle income                                   142
                                                                                                                       DB 2019 Ease of doing business score
                                               Population             6,082,357
                                                                                                                0                               100

                                               City Covered           Beirut                                                            54.04

                                                            DB 2019 Ease of Doing Business Score

                       0                                                                                                                100
                                                                                             63.50: Saudi Arabia (Rank: 92)

                                                                                           60.98: Jordan (Rank: 104)

                                                                                         58.56: Egypt, Arab Rep. (Rank: 120)

                                                                                       58.30: Regional Average (Middle East & North Africa)

                                                                                  54.04: Lebanon (Rank: 142)

                                                                 41.57: Syrian Arab Republic (Rank: 179)

Note: The ease of doing business score captures the gap of each economy from the best regulatory performance observed on each of the indicators across all economies
in the Doing Business sample since 2005. An economy’s ease of doing business score is reflected on a scale from 0 to 100, where 0 represents the lowest and 100
represents the best performance. The ease of doing business ranking ranges from 1 to 190.

Rankings on Doing Business topics - Lebanon

         1

         28

         55

         82
 Rank

                                                               105
        109                                                                                                    113
                                               124                              124
                                                                                                                                                135
        136                                                                                        140
                146                                                                                                            150                              151

        163                    170

        190

              Starting       Dealing         Getting        Registering        Getting         Protecting    Paying         Trading           Enforcing        Resolving
                 a            with          Electricity      Property          Credit           Minority     Taxes          across            Contracts       Insolvency
              Business     Construction                                                        Investors                    Borders
                             Permits

Ease of Doing Business Score on Doing Business topics - Lebanon

        100

               78.63
        80
                                                                                                              67.94
                                             62.75
                                                              59.44                                                            57.90
Score

        60
                              52.69
                                                                                                                                                49.85

                                                                               40.00             41.67
        40
                                                                                                                                                                29.55

        20

         0

              Starting       Dealing         Getting        Registering        Getting         Protecting     Paying          Trading         Enforcing        Resolving
                 a            with          Electricity      Property          Credit           Minority      Taxes           across          Contracts       Insolvency
              Business     Construction                                                        Investors                      Borders
                             Permits

                                                                                                                                                                           Page 4
Doing Business 2019           Lebanon

     Starting a Business

This topic measures the number of procedures, time, cost and paid-in minimum capital requirement for a small- to medium-sized limited
liability company to start up and formally operate in each economy’s largest business city.

To make the data comparable across 190 economies, Doing Business uses a standardized business that is 100% domestically owned, has
start-up capital equivalent to 10 times the income per capita, engages in general industrial or commercial activities and employs between 10
and 50 people one month after the commencement of operations, all of whom are domestic nationals. Starting a Business considers two
types of local limited liability companies that are identical in all aspects, except that one company is owned by 5 married women and the
other by 5 married men. The ranking of economies on the ease of starting a business is determined by sorting their scores for starting a
business. These scores are the simple average of the scores for each of the component indicators.

The most recent round of data collection for the project was completed in May 2018. See the methodology for more information.

 What the indicators measure                              Case study assumptions

Procedures to legally start and formally operate        To make the data comparable across economies, several assumptions about the
a company (number)                                      business and the procedures are used. It is assumed that any required information is
                                                        readily available and that the entrepreneur will pay no bribes.
• Preregistration (for example, name verification or
  reservation, notarization)
                                                        The business:
• Registration in the economy’s largest business        - Is a limited liability company (or its legal equivalent). If there is more than one type
  city
                                                        of limited liability company in the economy, the most common among domestic firms
• Postregistration (for example, social security        is chosen. Information on the most common form is obtained from incorporation
  registration, company seal)                           lawyers or the statistical office.
                                                        - Operates in the economy’s largest business city. For 11 economies the data are
• Obtaining approval from spouse to start a
  business or to leave the home to register the         also collected for the second largest business city.
  company                                               - The entire office space is approximately 929 square meters (10,000 square feet).
                                                        - Is 100% domestically owned and has five owners, none of whom is a legal entity;
• Obtaining any gender specific document for            has a start-up capital of 10 times income per capita and has a turnover of at least
  company registration and operation or national        100 times income per capita.
  identification card
                                                        - Performs general industrial or commercial activities, such as the production or sale
                                                        of goods or services to the public. The business does not perform foreign trade
Time required to complete each procedure
                                                        activities and does not handle products subject to a special tax regime, for example,
(calendar days)
                                                        liquor or tobacco. It does not use heavily polluting production processes.
• Does not include time spent gathering                 - Leases the commercial plant or offices and is not a proprietor of real estate and the
  information                                           amount of the annual lease for the office space is equivalent to the income per
                                                        capita.
• Each procedure starts on a separate day (2
  procedures cannot start on the same day)              - Does not qualify for investment incentives or any special benefits.
                                                        - Has at least 10 and up to 50 employees one month after the commencement of
• Procedures fully completed online are recorded        operations, all of whom are domestic nationals.
  as ½ day                                              - Has a company deed that is 10 pages long.
• Procedure is considered completed once final
  document is received                                  The owners:

• No prior contact with officials                       - Have reached the legal age of majority. If there is no legal age of majority, they are
                                                        assumed to be 30 years old.
Cost required to complete each procedure (% of          - Are sane, competent, in good health and have no criminal record.
income per capita)                                      - Are married and the marriage is monogamous and registered with the authorities.
                                                        - Where the answer differs according to the legal system applicable to the woman or
• Official costs only, no bribes                        man in question (as may be the case in economies where there is legal plurality), the
• No professional fees unless services required by      answer used will be the one that applies to the majority of the population.
  law or commonly used in practice

Paid-in minimum capital (% of income per
capita)

• Funds deposited in a bank or with third party
  before registration or up to 3 months after
  incorporation

                                                                                                                                                     Page 5
Doing Business 2019         Lebanon

Starting a Business - Lebanon

  Standardized Company

 Legal form                                                             Socièté a Responsabilité Limitée (SARL)

 Paid-in minimum capital requirement                                    LBP 5,000,000

 City Covered                                                           Beirut

  Indicator                                             Lebanon            Middle East &          OECD high             Best Regulatory
                                                                           North Africa           income                Performance

 Procedure – Men (number)                              8                   7.2                   4.9                    1 (New Zealand)

 Time – Men (days)                                     15                  20.5                  9.3                    0.5 (New Zealand)

 Cost – Men (% of income per capita)                   40.0                22.6                  3.1                    0.0 (Slovenia)

 Procedure – Women (number)                            8                   7.9                   4.9                    1 (New Zealand)

 Time – Women (days)                                   15                  21.2                  9.3                    0.5 (New Zealand)

 Cost – Women (% of income per capita)                 40.0                22.6                  3.1                    0.0 (Slovenia)

 Paid-in min. capital (% of income per capita)         38.9                8.1                   8.6                    0.0 (117 Economies)

 Figure – Starting a Business in Lebanon and comparator economies – Ranking and Score

                                                    DB 2019 Starting a Business Score

       0                                                                                           100

                                                                                  84.43: Jordan (Rank: 106)

                                                                                  84.11: Egypt, Arab Rep. (Rank: 109)

                                                                              82.00: Regional Average (Middle East & North Africa)

                                                                             80.99: Syrian Arab Republic (Rank: 136)

                                                                            80.07: Saudi Arabia (Rank: 141)

                                                                           78.63: Lebanon (Rank: 146)

Note: The ranking of economies on the ease of starting a business is determined by sorting their scores for starting a business. These scores
are the simple average of the scores for each of the component indicators.

                                                                                                                                                Page 6
Doing Business 2019   Lebanon

  Figure – Starting a Business in Lebanon – Procedure, Time and Cost

                                                   Time (days)        Cost (% of income per capita)
                                                                                                                                        30
               14

                                                                                                                                             Cost (% of income per capita)
                                                                                                                                        25
               12

               10                                                                                                                       20
 Time (days)

               8
                                                                                                                                        15

               6
                                                                                                                                        10
               4

                                                                                                                                        5
               2

               0                                                                                                                        0
                    1          2              3               4               5               6               *7              *8
                                                              Procedures (number)

* This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure.

Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men and
women, the graph shows the time for women. For more information on methodology, see the Doing Business website
(http://doingbusiness.org/en/methodology ). For details on the procedures reflected here, see the summary below.

                                                                                                                                                                             Page 7
Doing Business 2019         Lebanon

Details – Starting a Business in Lebanon – Procedure, Time and Cost

No.    Procedures                                                                           Time to Complete   Associated Costs

1     Designate a Lebanese lawyer                                                           1 day              LBP 3,000,000
      Agency : Lawyer                                                                                          (attorney startup
      Each newly formed company must retain and pay an attorney on an annual                                   fees) + LBP 150,000
      basis. On April 26 2012, the Beirut Bar Association increased the minimum
                                                                                                               (Legalization of the
      annual retainer to LBP 9,000,000 effective as of January 2013. This retainer can
                                                                                                               Power of Attorney
      be paid by the company during the year. Startup fees are set by the Beirut Bar
                                                                                                               before the Bar
      Association at LBP 3,000,000.
                                                                                                               Association)

2     Deposit the capital in a bank                                                         2 days             no charge
      Agency : Bank
      This procedure can be carried out on the basis of a signed and notarized copy of
      the articles of association.

3     Register at the Company Registry                                                      2 days             see comments
      Agency : Commercial Register
      The applicant submits the following documents to the company registrar at the
      Commercial Court, along with the total amount of required fees:
      • Articles of association
      • Commercial circulars
      • Minutes of the first general meeting of the partners
      • Registration application and a draft of the registration certificate to be issued
      • Document attesting the capital deposit
      • Partners’ identity cards or passports (copy)
      • Documents evidencing that the company is entitled to occupy the premises
      where it exercises its activities

      Fee schedule for company registration:
      • Tax for the magistrates’ mutual fund: LBP 375,000 lump tax + 0.15% of the
      capital+ LBP 1,000 flat registration fee + LBP 500 application fee + LBP 1,000
      certified copy + LBP 500 commercial publication fee
      • Stamp duty: equal to 0.4% of capital + LBP 750,000 lump sum stamp duty +
      LBP 2,000 flat registration fee + LBP 1,000 application fee + LBP 2,000 certified
      copy + enrollment fee (Qaydeyia) LBP 250+ LBP 1,000 commercial publication
      fee

      If the Bylaws are not signed before the Commercial Registry, additional fees are
      levied as follows:
      • Notarization of the articles of association: LBP 8,500 for each page.
      • Notarization fee: LBP 100,000 lump sum.
      • Notary public tax: 0.1% of capital.

4     Notify the Ministry of Finance of commencement of business operations                 2 days             no charge
      Agency : Ministry of Finance
      Within 2 months of registration, the company must submit a notification of
      commencement of business activities to the Ministry of Finance in order to
      register for income tax and VAT.

5     Register at the National Social Security Fund (NSSF)                                  1 day              no charge
      Agency : National Social Security Fund
      This procedure has two functions: “Registration” of a new employee and
      “Confirmation” by the system.

      The “Registration” function entails submitting a file for each new employee at the
      NSSF regional office closest to the company premises and obtaining a file
      reference number (or a receipt acknowledging the registration) immediately upon
      the submission. Once this “Registration” function is completed, the business is
      considered to have fulfilled its legal obligations with the NSSF. The benefits to
      the newly registered employees, under NSSF rules, will also become
      immediately effective. The Time to complete this procedure is 1 day at no cost to
      the employer or the employee.

      The “Confirmation” function consists of issuing a hard copy document (printed on
      a special size sheet) in the name of the registered employee along with his/her
      unique NSSF ID. Due to the lack of printing equipment at NSSF, the confirmation
      documents are printed in batches every few days or so. Therefore, it could take
      up to 30 days for a confirmation sheet to be received by the newly registered
      employee.

6     File internal labor regulations (règlement intérieur) with the Ministry of            1 day              no charge
      Labor
      Agency : Ministry of Labor
      When the number of employees at a company reaches 15 then the company will
      have to file internal labor regulations (règlement intérieur) with the Ministry of
      Labor according to Art. 66 of the Labor Code.
                                                                                                                                      Page 8
Doing Business 2019          Lebanon

 7    Register for VAT                                                                       one week              no charge
      Agency : VAT Department                                                                (simultaneous with
      Registration for VAT is done at the VAT Department. To obtain a VAT certificate        previous procedure)
      of registration, it may take between 7 and 10 days. There are specific forms to fill
      out for each kind of registration. The VAT department is independent from the
      taxes’ department. The registration in both departments is free of charge.

 8    Obtain a company seal                                                                  1 day (simultaneous   LBP 20,000-35,000
      Agency : Seal maker                                                                    with previous
      Although not mandated by law, the majority of companies prefer to have                 procedure)
      company stamps.
      they can be order at any seal-making company.

Takes place simultaneously with previous procedure.

                                                                                                                                       Page 9
Doing Business 2019              Lebanon

     Dealing with Construction Permits

This topic tracks the procedures, time and cost to build a warehouse—including obtaining necessary the licenses and permits, submitting all
required notifications, requesting and receiving all necessary inspections and obtaining utility connections. In addition, the Dealing with
Construction Permits indicator measures the building quality control index, evaluating the quality of building regulations, the strength of
quality control and safety mechanisms, liability and insurance regimes, and professional certification requirements. The most recent round of
data collection was completed in May 2018. See the methodology for more information

 What the indicators measure                              Case study assumptions

Procedures to legally build a warehouse                 To make the data comparable across economies, several assumptions about the
(number)                                                construction company, the warehouse project and the utility connections are used.

• Submitting all relevant documents and obtaining       The construction company (BuildCo):
  all necessary clearances, licenses, permits and
  certificates                                          - Is a limited liability company (or its legal equivalent) and operates in the economy’s
                                                        largest business city. For 11 economies the data are also collected for the second
• Submitting all required notifications and receiving   largest business city.
  all necessary inspections
                                                        - Is 100% domestically and privately owned; has five owners, none of whom is a
• Obtaining utility connections for water and           legal entity. Has a licensed architect and a licensed engineer, both registered with
  sewerage                                              the local association of architects or engineers. BuildCo is not assumed to have any
                                                        other employees who are technical or licensed experts, such as geological or
• Registering and selling the warehouse after its
  completion                                            topographical experts.
                                                        - Owns the land on which the warehouse will be built and will sell the warehouse
Time required to complete each procedure                upon its completion.
(calendar days)
                                                        The warehouse:
• Does not include time spent gathering
  information                                           - Will be used for general storage activities, such as storage of books or stationery.
                                                        - Will have two stories, both above ground, with a total constructed area of
• Each procedure starts on a separate day—              approximately 1,300.6 square meters (14,000 square feet). Each floor will be 3
  though procedures that can be fully completed
                                                        meters (9 feet, 10 inches) high and will be located on a land plot of approximately
  online are an exception to this rule
                                                        929 square meters (10,000 square feet) that is 100% owned by BuildCo, and the
• Procedure is considered completed once final          warehouse is valued at 50 times income per capita.
  document is received                                  - Will have complete architectural and technical plans prepared by a licensed
                                                        architect. If preparation of the plans requires such steps as obtaining further
• No prior contact with officials
                                                        documentation or getting prior approvals from external agencies, these are counted
Cost required to complete each procedure (% of          as procedures.
income per capita)                                      - Will take 30 weeks to construct (excluding all delays due to administrative and
                                                        regulatory requirements).
• Official costs only, no bribes
                                                        The water and sewerage connections:
Building quality control index (0-15)
                                                        - Will be 150 meters (492 feet) from the existing water source and sewer tap. If there
• Quality of building regulations (0-2)                 is no water delivery infrastructure in the economy, a borehole will be dug. If there is
• Quality control before construction (0-1)             no sewerage infrastructure, a septic tank in the smallest size available will be
                                                        installed or built.
• Quality control during construction (0-3)             - Will have an average water use of 662 liters (175 gallons) a day and an average
• Quality control after construction (0-3)              wastewater flow of 568 liters (150 gallons) a day. Will have a peak water use of
                                                        1,325 liters (350 gallons) a day and a peak wastewater flow of 1,136 liters (300
• Liability and insurance regimes (0-2)                 gallons) a day.
• Professional certifications (0-4)                     - Will have a constant level of water demand and wastewater flow throughout the
                                                        year; will be 1 inch in diameter for the water connection and 4 inches in diameter for
                                                        the sewerage connection.

                                                                                                                                                   Page 10
Doing Business 2019                     Lebanon

Dealing with Construction Permits - Lebanon

       Standardized Warehouse

    Estimated value of warehouse                                                              LBP 643,352,551.10

    City Covered                                                                              Beirut

       Indicator                                                           Lebanon                  Middle East &          OECD high            Best Regulatory
                                                                                                    North Africa           income               Performance

    Procedures (number)                                                   22                        16.6                   12.7                None in 2017/18

    Time (days)                                                           277                       137.4                  153.1               None in 2017/18

    Cost (% of warehouse value)                                           7.1                       4.7                    1.5                 None in 2017/18

    Building quality control index (0-15)                                 13.0                      12.1                   11.5                15.0 (3 Economies)

  Figure – Dealing with Construction Permits in Lebanon and comparator economies – Ranking and Score

                                                                DB 2019 Dealing with Construction Permits Score

                     0                                                                                                      100

                                                                                               75.71: Saudi Arabia (Rank: 36)

                                                                                            71.77: Egypt, Arab Rep. (Rank: 68)

                                                                                 60.47: Jordan (Rank: 139)

                                                                                59.17: Regional Average (Middle East & North Africa)

                                                                          52.69: Lebanon (Rank: 170)

                             0.00: Syrian Arab Republic (Rank: 186)

Note: The ranking of economies on the ease of dealing with construction permits is determined by sorting their scores for dealing with
construction permits. These scores are the simple average of the scores for each of the component indicators.

  Figure – Dealing with Construction Permits in Lebanon – Procedure, Time and Cost

                                                                      Time (days)           Cost (% of warehouse value)
                                                                                                                                                                     2

               250                                                                                                                                                         Cost (% of warehouse value)

                                                                                                                                                                     1.5
               200
 Time (days)

               150
                                                                                                                                                                     1

               100

                                                                                                                                                                     0.5
               50

                0                                                                                                                                                    0
                         1      *2    *3     4     5     *6    7      8    9     10    11      12         13   * 14   15   16      17   18   * 19   * 20   21   22
                                                                                  Procedures (number)

* This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure.

Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men and
women, the graph shows the time for women. For more information on methodology, see the Doing Business website
(http://doingbusiness.org/en/methodology ). For details on the procedures reflected here, see the summary below.

                                                                                                                                                                                                         Page 11
Doing Business 2019                       Lebanon

Figure – Dealing with Construction Permits in Lebanon and comparator economies – Measure of Quality

              15                                       14.0
                               13.0
                                                                                                       12.0                                         12.1
                                                                               11.0
Index score
              10

                  5

                  0
                                                                                                                          No Practice
                             Lebanon             Egypt, Arab Rep.             Jordan               Saudi Arabia       Syrian Arab Republic Middle East & North Africa

Details – Dealing with Construction Permits in Lebanon – Procedure, Time and Cost

  No.                 Procedures                                                                                  Time to Complete         Associated Costs

1                     Obtain a geotechnical study / soil test                                                     15 days                 USD 2,225
                      Agency : Geotechnical engineer
                      BuildCo will request a soil test for the structural calculations for the foundation.
                      While the soil test is not required by law, it is done in practice as it is used for the
                      structural calculations for the foundation.

              2       Obtain a recent planning certificate                                                        10 days                 LBP 24,600
                      Agency : Directorate General of Urban Planning (DGU)
                      BuildCo must submit a recent planning certificate (they are usually valid for 3
                      months) among the necessary documents to request a building permit. BuildCo
                      must have a receipt from the municipality and should pay the value of the stamps
                      for this procedure.

                      The cost is as follows:
                      1- Land certificate stating the dimension and the content of the land: LBP 10,500
                      2- Cadastral plan showing the positioning of the land: LBP 10,000
                      3- Receipt from the municipality of the planning certificate: LBP 4,100

              3       Obtain a topographic study                                                                  7 days                  USD 500
                      Agency : Topographic engineer
                      BuildCo needs to obtain a topographic study at the beginning of the construction
                      in order to have accurate details about the levels and limitations of the land plot.
                      This study is required for the construction permit application.

4                     Hire a technical auditor and obtain approval of drawings                                    3 days                  USD 5,000
                      Agency : Technical Auditor
                      Based on Decision No. 1/1192 dated November 23, 2012, companies must hire a
                      technical auditor accredited by the government who must review and approve the
                      drawings related to the project before the building permit can be issued. They
                      may request that modifications be made to the drawings. Throughout the
                      construction phase, the auditors must also ensure that construction works are
                      duly performed through inspections at different stages of the construction. And
                      upon completion of the works, they must attest that the construction work was
                      carried out properly.

5                     Obtain approval of file by Order of Engineers (where engineer is registered)                4 days                  LBP 1,950,900
                      and pay duties to Order
                      Agency : Beirut Order of Engineers
                      The file must be submitted to the Order of Engineers if the engineer is registered
                      (Beirut Order of Engineers or Tripoli Order of Engineers). The file should include
                      the following:
                      • A construction permit application signed by that same civil engineer or architect
                      jointly with the real estate owner,
                      • The design plans,
                      • An agreement between the property owner and the architect or engineer
                      responsible for the project described.

                      In order to be submitted as part of the application for a building permit, the file
                      must bear the seal and registration number of the relevant Order of Engineers.
                      The Order of Engineers meets twice a week.

                      A fee schedule for the permit to start construction works from the Order of
                      Architects and Engineers has been implemented in Beirut since 2010:
                      • For the area between 1 and 3,000 sq. m., the cost is de LBP 1,500.00 per sq.
                      m.
                      • For the area between 3,001 and 6,000 sq. m., the fee is LBP 3,000.00 per sq.
                      m.
                      • For the area between 6,001 and 9,000 sq. m., the fee is LBP 4,500.00 per sq.
                      m.
                      • Above 9,001sq. m., the fee is LBP 6,000.00 per sq. m.
                                                                                                                                                                        Page 12
                      The cost is LBP 1,950,900.00.
Doing Business 2019            Lebanon

    6   Request and receive inspection from Électricité du Liban for approval                   15 days    no charge
        Agency : Électricité du Liban (Electricity of Lebanon – EDL) also need to go to
        the EDL to make sure you have the electrical post or a transformer first, you must
        go to municipality to obtain a document that shows the parcel’s value as they will
        need this to issue the approval, then you must go to the Electricity company to
        see if Electricite du Liban will be able to supply electricity
        Before submitting the building permit application, Electricité du Liban has to verify
        if the construction site can be connected to an electrical post or transformer.

7       Submit building permit application to Urban Development Department                      1 day      no charge
        Agency : Urban Development Department, Directorat Général d'Urbanisme
        (DGU)
        BuildCo must submit the file described in the previous procedure to the Urban
        Development Department. In Beirut and Tripoli, the file is referred to the
        municipal engineering departments. The process takes up to 6 months. The
        Urban Development Department is a subdivision of the Directorate General of
        Urbanism.

8       Request and receive pre–approval inspection from Urban Development                      40 days    no charge
        Department
        Agency : Urban Development Department, Directorat Général d'Urbanisme
        (DGU)
        The Urban Development Department inspects the property and the plans to
        ensure that they are consistent with the construction laws and regulations, and
        then issues its clearance for the issuance of the building permit and calculates
        the building permit taxes. The inspection itself is completed in a day, but it takes
        a while from the date BuildCo requests the inspection until the date the inspector
        arrives.

9       Pay building permit taxes to the municipality                                           1 day      LBP 10,316,123
        Agency : Municipality
        The Urban Development Department refers the file to the relevant municipality (in
        the case of the city of Beirut, to the Administrator of the City of Beirut). The
        municipality collects the construction permit taxes and issues the construction
        permit in the name of the property owner. Payment is made at the municipality.

        According to Decree No. 60 of 1988 on Municipal Taxes, the building permit
        taxes paid to the Municipality are a certain value per square meter of the
        building. However, this value per square meter is calculated based on the value
        of 1 square meter of construction as follows:

        - From the value of LBP 1 - 25,000: 1.5% of the construction value of 1 square
        meter
        - From the value between LBP 25,000 - 100,000: 2% of the construction value of
        1 square meter
        - From the value greater than LBP 100,000: 1% of the construction value of 1
        square meter

        In the case of Doing Business, the value of 1 square meter of construction is the
        total construction value / 1,300.6 sq. m.

        Therefore, the value per square meter without taxes to be paid is calculated as
        follows: (1.5% * 25,000) + (2% * 75,000) + (1% * [total construction value -
        100,000]).

        Then a 15% municipal tax is added to the value above + 0.05% of the
        construction value of 1 square meter to obtain the total value to be paid per sq.
        m. as a municipal contribution.

        A second tax of 12% of the value above must be paid per square meter as a
        national tax.

        A contribution of 5% of the value above must be paid per square meter to the
        Order of Engineers and Architects.

        Therefore, the above values would all be added to obtain the total cost per
        square meter paid to the municipality for all building permit fees, which is then
        multiplied by 1,300.6 sq. m. for the purposes of the Doing Business case study.

10      Obtain building permit                                                                  120 days   no charge
        Agency : Municipality
        By law, construction work can start if no decision about the building permit
        application has been made 15 days after the submission date. In practice,
        however, this is not applied, and people wait 4 months on average.

11      Obtain starting order permit from Order of Engineers                                    3 days     LBP 200,000
        Agency : Beirut Order of Engineers
        To start construction the engineer and/or architect must pay the dossier fee
        according to the number of professionals involved in the construction work (civil
        engineer, mechanic engineer, electrical engineer, geotechnical engineer, among                                      Page 13
        others). The fee should not exceed LBP 200,000.00
Doing Business 2019          Lebanon

13    Request and receive inspection from the Water of Beirut and Mount                     10 days   no charge
      Lebanon for water connection
      Agency : Water of Beirut and Mount Lebanon
      With follow-up, it takes 10 days from the time an inspection is requested until an
      inspection begins. Without follow-up, however, the inspection might never take
      place.

      Request and receive inspection from the Municipality of Beirut for sewage             10 days   no charge
14    Agency : Municipality of Beirut
      While the inspection for water connection is done by the Water of Beirut and
      Mount Lebanon agency, the inspection for sewage connection is done by the
      Municipality of Beirut. Both inspections can be done simultaneously.

      With follow-up, it takes 10 days from the time an inspection is requested until an
      inspection begins. Without follow-up, however, the inspection might never take
      place.

15    Submit application and receive approval for an occupancy permit from the              4 days    LBP 300,000
      Order of Engineers
      Agency : Beirut Order of Engineers
      Following completion of construction, an application for approval of an occupancy
      permit must be submitted to the Order of Engineers. The Order must give a
      written and stamped approval first.

16    Submit application and receive approval for an occupancy permit from the              1 day     no charge
      Directorate General of Urban Planning (DGU)
      Agency : Urban Development Department, Directorate General of Urban
      Planning (DGU)
      Once construction has been completed, an application for approval of an
      occupancy permit must be submitted to the Urban Development Department.
      The Urban Development Department performs an on-site inspection of the
      building to ensure that it is in compliance with the construction permit and
      approved plans.

      The application for an occupancy permit must be accompanied by the plans
      related to the completed construction, signed by the engineer in charge, and
      stamped by the Order of Engineers. Following the clearance from the Urban
      Development Department, the file is forwarded to the relevant municipality (in the
      case of Beirut, to the Administrator of the City of Beirut) that will issue the
      occupancy permit in the name of the property owner. According to the law, the
      occupancy permit must be issued within a month. However, this time limit is not
      enforced in practice.

17    Receive on-site inspection from the Directorate General of Urban Planning             1 day     no charge
      (DGU)
      Agency : Urban Development Department, Directorate General of Urban
      Planning (DGU)
      It takes about a week to schedule the inspection.

18    Obtain occupancy permit                                                               45 days   LBP 25,000
      Agency : Urban Development Department, Directorate General of Urban
      Planning (DGU)
      By law, the time limit for the procedure is 30 days, but in practice, it takes much
      longer to obtain the occupancy permit -- about 45 days with follow-up.

      Obtain water connection                                                               14 days   LBP 2,260,000
19    Agency : Water of Beirut and Mount Lebanon
      BuildCo must submit an application for water connection accompanied by various
      documents.

      Obtain sewage connection                                                              14 days   USD 7,500
20    Agency : Municipality

21    Receive onsite inspection from the Ministry of Finance and obtain estimate            1 day     LBP 5,000
      of leasing value of the warehouse
      Agency : Ministry of Finance
      Once the occupancy permit is issued, an inspector from the Ministry of Finance
      visits the site to prepare an estimate of the leasing value of the warehouse. This
      estimate is necessary to register the building.

22    Register the building with the Real Estate Registry                                   14 days   LBP 7,122,702
      Agency : Real Estate Registry
      According to Tables 1 and 2 attached to the Decree Law No. 148 dated
      12/6/1959 and its amendments, the registration fees consist of: (i) 1% of the
      leasing value of the warehouse (ii) minor taxes such as topography tax
      (approximately LBP 250,000) and deed and contract taxes (approximately LBP
      100,000). There is an additional Municipality tax (5% of the total taxes in the
      aforementioned costs above), provided in Article 90 of the Law of the Municipality
      Duties and Taxes No. 60/88 dated 12/8/1988 and its amendments.
                                                                                                                      Page 14
Takes place simultaneously with previous procedure.
Doing Business 2019         Lebanon

Details – Dealing with Construction Permits in Lebanon – Measure of Quality

                                                                                                      Answer               Score

Building quality control index (0-15)                                                                                      13.0

Quality of building regulations index (0-2)                                                                                2.0

  How accessible are building laws and regulations in your economy? (0-1)                             Available online;    1.0
                                                                                                      Free of charge.

  Which requirements for obtaining a building permit are clearly specified in the building            List of required     1.0
  regulations or on any accessible website, brochure or pamphlet? (0-1)                               documents; Fees
                                                                                                      to be paid;
                                                                                                      Required
                                                                                                      preapprovals.

Quality control before construction index (0-1)                                                                            1.0

  Which third-party entities are required by law to verify that the building plans are in             Licensed             1.0
  compliance with existing building regulations? (0-1)                                                architect;
                                                                                                      Licensed
                                                                                                      engineer; Private
                                                                                                      firm.

Quality control during construction index (0-3)                                                                            2.0

  What types of inspections (if any) are required by law to be carried out during construction?       Inspections by       1.0
  (0-2)                                                                                               external engineer
                                                                                                      or firm;
                                                                                                      Unscheduled
                                                                                                      inspections;
                                                                                                      Inspections at
                                                                                                      various phases.

  Do legally mandated inspections occur in practice during construction? (0-1)                        Mandatory            1.0
                                                                                                      inspections are
                                                                                                      always done in
                                                                                                      practice.

Quality control after construction index (0-3)                                                                             3.0

  Is there a final inspection required by law to verify that the building was built in accordance     Yes, final           2.0
  with the approved plans and regulations? (0-2)                                                      inspection is
                                                                                                      done by
                                                                                                      government
                                                                                                      agency; Yes,
                                                                                                      external engineer
                                                                                                      submits report for
                                                                                                      final inspection.

  Do legally mandated final inspections occur in practice? (0-1)                                      Final inspection     1.0
                                                                                                      always occurs in
                                                                                                      practice.

Liability and insurance regimes index (0-2)                                                                                2.0

  Which parties (if any) are held liable by law for structural flaws or problems in the building      Architect or         1.0
  once it is in use (Latent Defect Liability or Decennial Liability)? (0-1)                           engineer;
                                                                                                      Professional in
                                                                                                      charge of the
                                                                                                      supervision;
                                                                                                      Construction
                                                                                                      company; Owner
                                                                                                      or investor.

  Which parties (if any) are required by law to obtain an insurance policy to cover possible          No party is          1.0
  structural flaws or problems in the building once it is in use (Latent Defect Liability Insurance   required by law
  or Decennial Insurance)? (0-1)                                                                      to obtain
                                                                                                      insurance ;
                                                                                                      Owner or
                                                                                                      investor;
                                                                                                      Insurance is
                                                                                                      commonly taken
                                                                                                      in practice.

Professional certifications index (0-4)                                                                                    3.0

                                                                                                                                   Page 15
Doing Business 2019         Lebanon

 What are the qualification requirements for the professional responsible for verifying that the   Minimum number       2.0
 architectural plans or drawings are in compliance with existing building regulations? (0-2)       of years of
                                                                                                   experience;
                                                                                                   University degree
                                                                                                   in architecture or
                                                                                                   engineering;
                                                                                                   Being a
                                                                                                   registered
                                                                                                   architect or
                                                                                                   engineer.

 What are the qualification requirements for the professional who supervises the construction      University degree    1.0
 on the ground? (0-2)                                                                              in engineering,
                                                                                                   construction or
                                                                                                   construction
                                                                                                   management;
                                                                                                   Being a
                                                                                                   registered
                                                                                                   architect or
                                                                                                   engineer.

                                                                                                                              Page 16
Doing Business 2019              Lebanon

     Getting Electricity

This topic measures the procedures, time and cost required for a business to obtain a permanent electricity connection for a newly
constructed warehouse. Additionally, the reliability of supply and transparency of tariffs index measures reliability of supply, transparency of
tariffs and the price of electricity. The most recent round of data collection for the project was completed in May 2018. See the methodology
for more information.

 What the indicators measure                                Case study assumptions

Procedures to obtain an electricity connection             To make the data comparable across economies, several assumptions about the
(number)                                                   warehouse, the electricity connection and the monthly consumption are used.

• Submitting all relevant documents and obtaining          The warehouse:
  all necessary clearances and permits
                                                           - Is owned by a local entrepreneur and is used for storage of goods.
• Completing all required notifications and                - Is located in the economy’s largest business city. For 11 economies the data are
  receiving all necessary inspections
                                                           also collected for the second largest business city.
• Obtaining external installation works and possibly       - Is located in an area where similar warehouses are typically located and is in an
  purchasing material for these works                      area with no physical constraints. For example, the property is not near a railway.
                                                           - Is a new construction and is being connected to electricity for the first time.
• Concluding any necessary supply contract and
                                                           - Has two stories with a total surface area of approximately 1,300.6 square meters
  obtaining final supply
                                                           (14,000 square feet). The plot of land on which it is built is 929 square meters
Time required to complete each procedure                   (10,000 square feet).
(calendar days)
                                                           The electricity connection:
• Is at least 1 calendar day
                                                           - Is a permanent one with a three-phase, four-wire Y connection with a subscribed
• Each procedure starts on a separate day                  capacity of 140-kilo-volt-ampere (kVA) with a power factor of 1, when 1 kVA = 1
• Does not include time spent gathering                    kilowatt (kW).
  information                                              - Has a length of 150 meters. The connection is to either the low- or medium-voltage
                                                           distribution network and is either overhead or underground, whichever is more
• Reflects the time spent in practice, with little         common in the area where the warehouse is located and requires works that involve
  follow-up and no prior contact with officials
                                                           the crossing of a 10-meter road (such as by excavation or overhead lines) but are all
Cost required to complete each procedure (% of             carried out on public land. There is no crossing of other owners’ private property
                                                           because the warehouse has access to a road.
income per capita)
                                                           - Does not require work to install the internal wiring of the warehouse. This has
• Official costs only, no bribes                           already been completed up to and including the customer’s service panel or
• Value added tax excluded                                 switchboard and the meter base.

The reliability of supply and transparency of              The monthly consumption:
tariffs index (0-8)
                                                           - It is assumed that the warehouse operates 30 days a month from 9:00 a.m. to 5:00
• Duration and frequency of power outages (0–3)            p.m. (8 hours a day), with equipment utilized at 80% of capacity on average and that
• Tools to monitor power outages (0–1)                     there are no electricity cuts (assumed for simplicity reasons) and the monthly energy
                                                           consumption is 26,880 kilowatt-hours (kWh); hourly consumption is 112 kWh.
• Tools to restore power supply (0–1)                      - If multiple electricity suppliers exist, the warehouse is served by the cheapest
• Regulatory monitoring of utilities’ performance          supplier.
  (0–1)                                                    - Tariffs effective in January of the current year are used for calculation of the price of
                                                           electricity for the warehouse. Although January has 31 days, for calculation
• Financial deterrents limiting outages (0–1)              purposes only 30 days are used.
• Transparency and accessibility of tariffs (0–1)
Price of electricity (cents per kilowatt-hour)*

• Price based on monthly bill for commercial
  warehouse in case study

*Note: Doing Business measures the price of
electricity, but it is not included in the ease of doing
business score nor the ranking on the ease of
getting electricity.

                                                                                                                                                         Page 17
Doing Business 2019           Lebanon

Getting Electricity - Lebanon

  Standardized Connection

 Price of electricity (US cents per kWh)                                  13.2

 Name of utility                                                          Electricité du Liban (EDL)

 City Covered                                                             Beirut

  Indicator                                              Lebanon              Middle East &          OECD high          Best Regulatory
                                                                              North Africa           income             Performance

 Procedures (number)                                     4                   4.7                    4.5                3 (25 Economies)

 Time (days)                                             89                  72.4                   77.2               18 (3 Economies)

 Cost (% of income per capita)                           119.4               479.9                  64.2               0.0 (3 Economies)

 Reliability of supply and transparency of tariff        0                   4.2                    7.5                8.0 (27 Economies)
 index (0-8)

 Figure – Getting Electricity in Lebanon and comparator economies – Ranking and Score

                                                       DB 2019 Getting Electricity Score

        0                                                                                             100

                                                                                 80.49: Jordan (Rank: 62)

                                                                              79.89: Saudi Arabia (Rank: 64)

                                                                       71.41: Egypt, Arab Rep. (Rank: 96)

                                                                      69.45: Regional Average (Middle East & North Africa)

                                                                 62.75: Lebanon (Rank: 124)

                                                       52.07: Syrian Arab Republic (Rank: 158)

Note: The ranking of economies on the ease of getting electricity is determined by sorting their scores for getting electricity. These scores are
the simple average of the scores for all the component indicators except the price of electricity.

                                                                                                                                                    Page 18
Doing Business 2019          Lebanon

  Figure – Getting Electricity in Lebanon – Procedure, Time and Cost

                                                          Time (days)     Cost (% of income per capita)
                                                                                                                                            140

                   80
                                                                                                                                            120

                                                                                                                                                  Cost (% of income per capita)
                   70
                                                                                                                                            100
                   60
 Time (days)

                   50                                                                                                                       80

                   40
                                                                                                                                            60

                   30
                                                                                                                                            40
                   20

                                                                                                                                            20
                   10

                   0                                                                                                                        0
                                  1                         2                            *3                              4
                                                                   Procedures (number)

* This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure.

Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men and
women, the graph shows the time for women. For more information on methodology, see the Doing Business website
(http://doingbusiness.org/en/methodology ). For details on the procedures reflected here, see the summary below.

  Figure – Getting Electricity in Lebanon and comparator economies – Measure of Quality

                   8
                   7
                                                                    6                    6
                   6
     Index score

                   5
                                                                                                                                     4.2
                   4
                                             3
                   3
                   2
                   1
                          0                                                                                   0
                   0

                        Lebanon        Egypt, Arab Rep.          Jordan             Saudi Arabia      Syrian Arab Republic Middle East & North Africa

                                                                                                                                                                                  Page 19
Doing Business 2019           Lebanon

Details – Getting Electricity in Lebanon – Procedure, Time and Cost

No.     Procedures                                                                             Time to Complete   Associated Costs

1       Obtain neighbor's electricity bill (for address of closest building)                   1 calendar day     LBP 0
        Agency : Neighbor
        The customer needs to obtain an electricity bill from their neighbor or the
        identification number of the neighbor’s meter box (showing the address of the
        closest building. This is needed when applying for electricity connection because
        it allows the electricity company, Electricité du Liban, locate the construction.

2       Submit application to EDL and await estimate                                           18 calendar days   LBP 11,000
        Agency : Electricité du Liban (EDL), Beirut
        The customer submits an application for electricity connection at Electricité du
        Liban’s offices.
        In addition to the application form, the client needs to submit:
        • copy of the title deed
        • copy of the ID card
        • the original building permit, and
        • electricity bill from the closest building (or meter box number) and its address

    3   Receive external inspection by EDL                                                     1 calendar day     LBP 451,143.69
        Agency : Electricité du Liban (EDL), Beirut
        The application is forwarded to the relevant department at the utility for review. A
        site inspection is usually carried out to determine the details of the connection.

        The inspector then prepares a report with the specifics of the connection and
        awaits clearance from the relevant authority at the utility.

        Once clearance is obtained and the inspector has prepared an estimate of the
        connection fees, the client will need to make the necessary payment at Electricité
        du Liban’s offices. The client is then given the approved file back along with a
        “C23” card (with the number of connections and the temporary meter, if needed).

4       Await and receive external works and meter installation from EDL’s service             70 calendar days   LBP 14,907,000
        provider
        Agency : Electricité du Liban (EDL), Beirut
        External works start after the client has paid the connection fees. For a
        connection of 3x200A, if the warehouse is less than 200 meters away from the
        closest distribution substation, the works will consist of laying out an underground
        cable from the building to that substation. Otherwise, a substation would be
        needed.

        Any permits needed for the works are obtained by the utility directly. The utility
        picks a contractor to do the external works, and possibly install the meter and
        turn the electricity on too. The utility however, always supervises the works.

        No inspection of the entire internal wiring is done during the process.

Takes place simultaneously with previous procedure.

                                                                                                                                     Page 20
Doing Business 2019           Lebanon

 Details – Getting Electricity in Lebanon – Measure of Quality

                                                                                                                            Answer

 Reliability of supply and transparency of tariff index (0-8)                                                              0

 Total duration and frequency of outages per customer a year (0-3)                                                         0

    System average interruption duration index (SAIDI)                                                                     ..

    System average interruption frequency index (SAIFI)                                                                    ..

    What is the minimum outage time (in minutes) that the utility considers for the calculation of SAIDI/SAIFI             N/A

 Mechanisms for monitoring outages (0-1)                                                                                   0

    Does the distribution utility use automated tools to monitor outages?                                                  No

 Mechanisms for restoring service (0-1)                                                                                    0

    Does the distribution utility use automated tools to restore service?                                                  No

 Regulatory monitoring (0-1)                                                                                               0

    Does a regulator—that is, an entity separate from the utility—monitor the utility’s performance on reliability of      No
    supply?

 Financial deterrents aimed at limiting outages (0-1)                                                                      0

    Does the utility either pay compensation to customers or face fines by the regulator (or both) if outages              No
    exceed a certain cap?

 Communication of tariffs and tariff changes (0-1)                                                                         1

    Are effective tariffs available online?                                                                                Yes

    Link to the website, if available online                                                                               http://www.edl.gov.lb/
                                                                                                                           ABOUTEDL.htm

    Are customers notified of a change in tariff ahead of the billing cycle?                                               Yes

Note:

If the duration and frequency of outages is 100 or less, the economy is eligible to score on the Reliability of supply and transparency of tariff
index.

If the duration and frequency of outages is not available, or is over 100, the economy is not eligible to score on the index.

If the minimum outage time considered for SAIDI/SAIFI is over 5 minutes, the economy is not eligible to score on the index.

                                                                                                                                                    Page 21
Doing Business 2019           Lebanon

     Registering Property

This topic examines the steps, time and cost involved in registering property, assuming a standardized case of an entrepreneur who wants to
purchase land and a building that is already registered and free of title dispute. In addition, the topic also measures the quality of the land
administration system in each economy. The quality of land administration index has five dimensions: reliability of infrastructure, transparency
of information, geographic coverage, land dispute resolution, and equal access to property rights. The most recent round of data collection for
the project was completed in May 2018. See the methodology for more information.

 What the indicators measure                               Case study assumptions

Procedures to legally transfer title on                  To make the data comparable across economies, several assumptions about the
immovable property (number)                              parties to the transaction, the property and the procedures are used.

• Preregistration procedures (for example,               The parties (buyer and seller):
  checking for liens, notarizing sales agreement,
  paying property transfer taxes)                        - Are limited liability companies (or the legal equivalent).
                                                         - Are located in the periurban area of the economy’s largest business city. For 11
• Registration procedures in the economy's largest       economies the data are also collected for the second largest business city.
  business city.
                                                         - Are 100% domestically and privately owned.
• Postregistration procedures (for example, filling      - Have 50 employees each, all of whom are nationals.
  title with municipality)                               - Perform general commercial activities.

Time required to complete each procedure                 The property (fully owned by the seller):
(calendar days)
                                                         - Has a value of 50 times income per capita, which equals the sale price.
• Does not include time spent gathering                  - Is fully owned by the seller.
  information                                            - Has no mortgages attached and has been under the same ownership for the past
• Each procedure starts on a separate day -              10 years.
  though procedures that can be fully completed          - Is registered in the land registry or cadastre, or both, and is free of title disputes.
  online are an exception to this rule                   - Is located in a periurban commercial zone, and no rezoning is required.
                                                         - Consists of land and a building. The land area is 557.4 square meters (6,000
• Procedure is considered completed once final           square feet). A two-story warehouse of 929 square meters (10,000 square feet) is
  document is received
                                                         located on the land. The warehouse is 10 years old, is in good condition, has no
• No prior contact with officials                        heating system and complies with all safety standards, building codes and legal
                                                         requirements. The property, consisting of land and building, will be transferred in its
Cost required to complete each procedure (% of           entirety.
property value)                                          - Will not be subject to renovations or additional construction following the purchase.
                                                         - Has no trees, natural water sources, natural reserves or historical monuments of
• Official costs only (such as administrative fees,
  duties and taxes).                                     any kind.
                                                         - Will not be used for special purposes, and no special permits, such as for
• Value Added Tax, Capital Gains Tax and illicit         residential use, industrial plants, waste storage or certain types of agricultural
  payments are excluded                                  activities, are required.
                                                         - Has no occupants, and no other party holds a legal interest in it.
Quality of land administration index (0-30)

• Reliability of infrastructure index (0-8)
• Transparency of information index (0–6)
• Geographic coverage index (0–8)
• Land dispute resolution index (0–8)
• Equal access to property rights index (-2–0)

                                                                                                                                                     Page 22
Doing Business 2019      Lebanon

Registering Property - Lebanon

       Indicator                                            Lebanon                Middle East &          OECD high       Best Regulatory
                                                                                   North Africa           income          Performance

    Procedures (number)                                    8                      5.6                  4.7                1 (4 Economies)

    Time (days)                                            37                     29.7                 20.1               1 (New Zealand)

    Cost (% of property value)                             6.0                    5.7                  4.2                0.0 (Saudi Arabia)

    Quality of the land administration index (0-30)        16.0                   14.2                 23.0               None in 2017/18

  Figure – Registering Property in Lebanon and comparator economies – Ranking and Score

                                                        DB 2019 Registering Property Score

                    0                                                                                     100

                                                                                     81.61: Saudi Arabia (Rank: 24)

                                                                        66.40: Jordan (Rank: 72)

                                                                   62.11: Regional Average (Middle East & North Africa)

                                                                  59.44: Lebanon (Rank: 105)

                                                            55.00: Egypt, Arab Rep. (Rank: 125)

                                                      46.88: Syrian Arab Republic (Rank: 157)

Note: The ranking of economies on the ease of registering property is determined by sorting their scores for registering property. These
scores are the simple average of the scores for each of the component indicators.

  Figure – Registering Property in Lebanon – Procedure, Time and Cost

                                                        Time (days)          Cost (% of property value)
                                                                                                                                               7
               35

                                                                                                                                               6
               30

                                                                                                                                                   Cost (% of property value)
                                                                                                                                               5
               25
 Time (days)

                                                                                                                                               4
               20

                                                                                                                                               3
               15

               10                                                                                                                              2

               5                                                                                                                               1

               0                                                                                                                               0
                        1        2                3                *4                   5             6               7              8
                                                                    Procedures (number)

* This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure.

Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men and
women, the graph shows the time for women. For more information on methodology, see the Doing Business website
(http://doingbusiness.org/en/methodology ). For details on the procedures reflected here, see the summary below.

                                                                                                                                                                                Page 23
Doing Business 2019                       Lebanon

Figure – Registering Property in Lebanon and comparator economies – Measure of Quality

              30

              25                                                               22.5
Index score
              20
                               16.0
              15                                                                                                                                    14.2
                                                                                                      10.5                   10.5
              10                                       9.0

                  5

                  0

                             Lebanon             Egypt, Arab Rep.            Jordan                Saudi Arabia       Syrian Arab Republic Middle East & North Africa

Details – Registering Property in Lebanon – Procedure, Time and Cost

  No.                 Procedures                                                                                  Time to Complete         Associated Costs

1                     Obtain a copy of the ownership deed from the Land Registry                                  1 day                   LBP 10,000
                      Agency : Land Registry
                      The parties apply for a copy of ownership deeds. The deed details provide the
                      location, number, and size of the plot, who is registered owner, whether there are
                      any disputes over ownership or pending legal cases. Importantly there is a
                      compulsory government order on the property or, for example, whether any
                      roads are planned through the area.

                      The procedure to obtain the Real Estate Certificate is a straight forward one
                      which only requires submission of the request, and the certificate is immediately
                      issued thereafter. Starting in 2016, there is a possibility to obtain the certificate
                      online by going to http://www.lrc.gov.lb/en/content/viewing-title-register.

2                     Obtain an official cadastral map and a location map of the property                         1 day                   LBP 20,000
                      Agency : Cadastre Administration (Da'irat al Massaha)
                      If the area is not specified in the real estate certificate and in the title deed, which
                      is often the case, an official cadastral map and a location map of the property
                      must be obtained from the cadastre administration (in Arabic “Dairat al
                      Massaha”).

3                     Obtain an urban plan certificate from the Urban Planning Authority and the                  10 days                 LBP 6,000
                      Municipality
                      Agency : Urban Planning Authority and Municipality
                      Parties obtain an urban plan certificate from the Urban Planning Authority and
                      the Municipality. This is not strictly required by the law, but it is usually requested
                      by the buyer in order to make sure that no special easement or expropriation is
                      planned on the property that he intends to purchase.

              4       Obtain a Municipal Tax Clearance (Bara’et Zimma)                                            3 days                  LBP 8,000
                      Agency : Municipality
                      Obtain clearance from the Municipality to make sure that municipal taxes prior to
                      the sale agreement have been paid. This is not required by law, but it is usually
                      requested by the buyer.

5                     Preparation of the sale agreement by a lawyer                                               2 days                  LBP 1,500,000; (LBP
                      Agency : Lawyer                                                                                                     1,500,000 (minimum
                      An attorney prepares the sale agreement on an official form. The participation of                                   set by the Beirut Bar
                      a lawyer is not mandatory, but it is preferred to avoid any mistakes. The sale
                                                                                                                                          Association))
                      contract is often drafted by the notary public or by a qualified facilitator.
                      However, for complex and delicate real estate transactions where either or both
                      parties need to protect their rights, the contract is usually negotiated and drafted
                      by both parties’ attorneys.

                      The Beirut Bar Association on its decision of April 26th, 2012 has set a minimum
                      fee of LBP 1,500,000 for the drafting of a contract. Such minimum fee shall be
                      subject to an increase taking into consideration the contract's value and
                      importance.

6                     Obtain an official estimate of the property rental value from the Tax                       10 days                 LBP 5,000
                      Authority
                      Agency : Ministry of Finance
                      An official estimate of the rental value of the property is requested together with a
                      tax discharge (clearance). The Tax Authority at the Ministry of Finance orders an
                      inspection of the property by a controller to obtain an official estimate of the
                      rental value of the property. A copy of the sale agreement should be submitted to
                      the Ministry of Finance to obtain the official estimate of the rental value.

                                                                                                                                                                        Page 24