Lao PDR Economy Profile - Doing Business 2019
Doing Business 2019   Lao PDR

                                Economy Profile

                                Lao PDR

                                                  Page 1
Lao PDR Economy Profile - Doing Business 2019
Doing Business 2019       Lao PDR

                                            Economy Profile of Lao PDR

                                          Doing Business 2019 Indicators
                                     (in order of appearance in the document)

Starting a business                 Procedures, time, cost and paid-in minimum capital to start a limited liability company

Dealing with construction permits   Procedures, time and cost to complete all formalities to build a warehouse and the quality
                                    control and safety mechanisms in the construction permitting system

Getting electricity                 Procedures, time and cost to get connected to the electrical grid, and the reliability of the
                                    electricity supply and the transparency of tariffs

Registering property                Procedures, time and cost to transfer a property and the quality of the land administration
                                    system

Getting credit                      Movable collateral laws and credit information systems

Protecting minority investors       Minority shareholders’ rights in related-party transactions and in corporate governance

Paying taxes                        Payments, time, total tax and contribution rate for a firm to comply with all tax regulations as
                                    well as post-filing processes

Trading across borders              Time and cost to export the product of comparative advantage and import auto parts

Enforcing contracts                 Time and cost to resolve a commercial dispute and the quality of judicial processes

Resolving insolvency                Time, cost, outcome and recovery rate for a commercial insolvency and the strength of the
                                    legal framework for insolvency

Labor market regulation             Flexibility in employment regulation and aspects of job quality

                                                                                                                                       Page 2
Doing Business 2019           Lao PDR

About Doing Business

The Doing Business project provides objective measures of business regulations and their enforcement across 190 economies and selected
cities at the subnational and regional level.

The Doing Business project, launched in 2002, looks at domestic small and medium-size companies and measures the regulations applying
to them through their life cycle.

Doing Business captures several important dimensions of the regulatory environment as it applies to local firms. It provides quantitative
indicators on regulation for starting a business, dealing with construction permits, getting electricity, registering property, getting credit,
protecting minority investors, paying taxes, trading across borders, enforcing contracts and resolving insolvency. Doing Business also
measures features of labor market regulation. Although Doing Business does not present rankings of economies on the labor market
regulation indicators or include the topic in the aggregate ease of doing business score or ranking on the ease of doing business, it does
present the data for these indicators.

By gathering and analyzing comprehensive quantitative data to compare business regulation environments across economies and over time,
Doing Business encourages economies to compete towards more efficient regulation; offers measurable benchmarks for reform; and serves
as a resource for academics, journalists, private sector researchers and others interested in the business climate of each economy.

In addition, Doing Business offers detailed subnational reports, which exhaustively cover business regulation and reform in different cities and
regions within a nation. These reports provide data on the ease of doing business, rank each location, and recommend reforms to improve
performance in each of the indicator areas. Selected cities can compare their business regulations with other cities in the economy or region
and with the 190 economies that Doing Business has ranked.

The first Doing Business report, published in 2003, covered 5 indicator sets and 133 economies. This year’s report covers 11 indicator sets
and 190 economies. Most indicator sets refer to a case scenario in the largest business city of each economy, except for 11 economies that
have a population of more than 100 million as of 2013 (Bangladesh, Brazil, China, India, Indonesia, Japan, Mexico, Nigeria, Pakistan, the
Russian Federation and the United States) where Doing Business also collected data for the second largest business city. The data for these
11 economies are a population-weighted average for the 2 largest business cities. The project has benefited from feedback from
governments, academics, practitioners and reviewers. The initial goal remains: to provide an objective basis for understanding and improving
the regulatory environment for business around the world.

More about Doing Business (PDF, 5MB)

                                                                                                                                                   Page 3
Doing Business 2019               Lao PDR

         Ease of Doing Business in                                                                                             DB 2019 Rank
                                               Region                 East Asia & Pacific
                                                                                                                190                                         1
               Lao PDR
                                               Income Category        Lower middle income                                   154
                                                                                                                         DB 2019 Ease of doing business score
                                               Population             6,858,160
                                                                                                                 0                                100

                                               City Covered           Vientiane                                                         51.26

                                                            DB 2019 Ease of Doing Business Score

                       0                                                                                                                100
                                                                                                                 80.60: Malaysia (Rank: 15)

                                                                                                              78.45: Thailand (Rank: 27)

                                                                                                          73.64: China (Rank: 46)

                                                                                                67.96: Indonesia (Rank: 73)

                                                                                            63.41: Regional Average (East Asia & Pacific)

                                                                            51.26: Lao PDR (Rank: 154)

Note: The ease of doing business score captures the gap of each economy from the best regulatory performance observed on each of the indicators across all economies
in the Doing Business sample since 2005. An economy’s ease of doing business score is reflected on a scale from 0 to 100, where 0 represents the lowest and 100
represents the best performance. The ease of doing business ranking ranges from 1 to 190.

Rankings on Doing Business topics - Lao PDR

         1

         28

         55
                                                                                  73                                            76
                                                               85
         82
 Rank

                               99

        109

        136
                                              156                                                               155
                                                                                                                                                 162
        163                                                                                                                                                       168
                                                                                               174
                180

        190

              Starting       Dealing         Getting        Registering      Getting         Protecting        Paying         Trading         Enforcing          Resolving
                 a            with          Electricity      Property        Credit           Minority         Taxes          across          Contracts         Insolvency
              Business     Construction                                                      Investors                        Borders
                             Permits

Ease of Doing Business Score on Doing Business topics - Lao PDR

        100

                                                                                                                               78.12
        80
                              67.94
                                                              64.93
               60.93                                                          60.00
Score

        60                                                                                                      54.22
                                             52.77

                                                                                                                                                 41.99
        40
                                                                                               31.67

        20

                                                                                                                                                                   0.00
         0

              Starting       Dealing         Getting        Registering       Getting        Protecting         Paying        Trading           Enforcing        Resolving
                 a            with          Electricity      Property         Credit          Minority          Taxes         across            Contracts       Insolvency
              Business     Construction                                                      Investors                        Borders
                             Permits

                                                                                                                                                                             Page 4
Doing Business 2019           Lao PDR

     Starting a Business

This topic measures the number of procedures, time, cost and paid-in minimum capital requirement for a small- to medium-sized limited
liability company to start up and formally operate in each economy’s largest business city.

To make the data comparable across 190 economies, Doing Business uses a standardized business that is 100% domestically owned, has
start-up capital equivalent to 10 times the income per capita, engages in general industrial or commercial activities and employs between 10
and 50 people one month after the commencement of operations, all of whom are domestic nationals. Starting a Business considers two
types of local limited liability companies that are identical in all aspects, except that one company is owned by 5 married women and the
other by 5 married men. The ranking of economies on the ease of starting a business is determined by sorting their scores for starting a
business. These scores are the simple average of the scores for each of the component indicators.

The most recent round of data collection for the project was completed in May 2018. See the methodology for more information.

 What the indicators measure                              Case study assumptions

Procedures to legally start and formally operate        To make the data comparable across economies, several assumptions about the
a company (number)                                      business and the procedures are used. It is assumed that any required information is
                                                        readily available and that the entrepreneur will pay no bribes.
• Preregistration (for example, name verification or
  reservation, notarization)
                                                        The business:
• Registration in the economy’s largest business        - Is a limited liability company (or its legal equivalent). If there is more than one type
  city
                                                        of limited liability company in the economy, the most common among domestic firms
• Postregistration (for example, social security        is chosen. Information on the most common form is obtained from incorporation
  registration, company seal)                           lawyers or the statistical office.
                                                        - Operates in the economy’s largest business city. For 11 economies the data are
• Obtaining approval from spouse to start a
  business or to leave the home to register the         also collected for the second largest business city.
  company                                               - The entire office space is approximately 929 square meters (10,000 square feet).
                                                        - Is 100% domestically owned and has five owners, none of whom is a legal entity;
• Obtaining any gender specific document for            has a start-up capital of 10 times income per capita and has a turnover of at least
  company registration and operation or national        100 times income per capita.
  identification card
                                                        - Performs general industrial or commercial activities, such as the production or sale
                                                        of goods or services to the public. The business does not perform foreign trade
Time required to complete each procedure
                                                        activities and does not handle products subject to a special tax regime, for example,
(calendar days)
                                                        liquor or tobacco. It does not use heavily polluting production processes.
• Does not include time spent gathering                 - Leases the commercial plant or offices and is not a proprietor of real estate and the
  information                                           amount of the annual lease for the office space is equivalent to the income per
                                                        capita.
• Each procedure starts on a separate day (2
  procedures cannot start on the same day)              - Does not qualify for investment incentives or any special benefits.
                                                        - Has at least 10 and up to 50 employees one month after the commencement of
• Procedures fully completed online are recorded        operations, all of whom are domestic nationals.
  as ½ day                                              - Has a company deed that is 10 pages long.
• Procedure is considered completed once final
  document is received                                  The owners:

• No prior contact with officials                       - Have reached the legal age of majority. If there is no legal age of majority, they are
                                                        assumed to be 30 years old.
Cost required to complete each procedure (% of          - Are sane, competent, in good health and have no criminal record.
income per capita)                                      - Are married and the marriage is monogamous and registered with the authorities.
                                                        - Where the answer differs according to the legal system applicable to the woman or
• Official costs only, no bribes                        man in question (as may be the case in economies where there is legal plurality), the
• No professional fees unless services required by      answer used will be the one that applies to the majority of the population.
  law or commonly used in practice

Paid-in minimum capital (% of income per
capita)

• Funds deposited in a bank or with third party
  before registration or up to 3 months after
  incorporation

                                                                                                                                                     Page 5
Doing Business 2019         Lao PDR

Starting a Business - Lao PDR

  Standardized Company

 Legal form                                                             Private Limited Liability Company

 Paid-in minimum capital requirement                                    LAK 7,000

 City Covered                                                           Vientiane

  Indicator                                             Lao PDR            East Asia &            OECD high             Best Regulatory
                                                                           Pacific                income                Performance

 Procedure – Men (number)                              10                  6.8                    4.9                  1 (New Zealand)

 Time – Men (days)                                     174                 25.9                   9.3                  0.5 (New Zealand)

 Cost – Men (% of income per capita)                   6.6                 17.8                   3.1                  0.0 (Slovenia)

 Procedure – Women (number)                            10                  6.9                    4.9                  1 (New Zealand)

 Time – Women (days)                                   174                 26.0                   9.3                  0.5 (New Zealand)

 Cost – Women (% of income per capita)                 6.6                 17.8                   3.1                  0.0 (Slovenia)

 Paid-in min. capital (% of income per capita)         0.0                 4.0                    8.6                  0.0 (117 Economies)

 Figure – Starting a Business in Lao PDR and comparator economies – Ranking and Score

                                                    DB 2019 Starting a Business Score

       0                                                                                            100

                                                                                          93.52: China (Rank: 28)

                                                                                         92.72: Thailand (Rank: 39)

                                                                                 83.29: Regional Average (East Asia & Pacific)

                                                                                 82.78: Malaysia (Rank: 122)

                                                                             81.22: Indonesia (Rank: 134)

                                                             60.93: Lao PDR (Rank: 180)

Note: The ranking of economies on the ease of starting a business is determined by sorting their scores for starting a business. These scores
are the simple average of the scores for each of the component indicators.

                                                                                                                                                Page 6
Doing Business 2019       Lao PDR

  Figure – Starting a Business in Lao PDR – Procedure, Time and Cost

                                                   Time (days)        Cost (% of income per capita)
                                                                                                                                        3.5
               160
                                                                                                                                        3

                                                                                                                                              Cost (% of income per capita)
               140

                                                                                                                                        2.5
               120
 Time (days)

               100                                                                                                                      2

               80
                                                                                                                                        1.5

               60
                                                                                                                                        1
               40

                                                                                                                                        0.5
               20

                0                                                                                                                       0
                     1         2         3          4            5          *6            7           8           *9          * 10
                                                              Procedures (number)

* This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure.

Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men and
women, the graph shows the time for women. For more information on methodology, see the Doing Business website
(http://doingbusiness.org/en/methodology ). For details on the procedures reflected here, see the summary below.

                                                                                                                                                                              Page 7
Doing Business 2019          Lao PDR

Details – Starting a Business in Lao PDR – Procedure, Time and Cost

No.    Procedures                                                                                Time to Complete   Associated Costs

1     Obtain the Business Location confirmation from the Village Chief Authority                 1 day              LAK 200,000 -
      Agency : Village Chief Authority                                                                              500,000
      Prior to applying for the Enterprise Registration Certificate (ECR), entrepreneurs
      must obtain the Office location certificate and the Map signed and sealed by the
      Village Chief. The position and duties of the Village Chief are defined in the Law
      on Local Administration (2003).

      Vientiane is divided into 9 Districts: Chanthabouly, Sikhottabong, Xaysettha,
      Sisattanak, Naxaithong, Xaythany, Hadxaifong, Sangthong & Pak Ngum. Those
      9 districts are divided into 481 villages and each village has a Village Chief.

      The applicant submits the lease agreement or the the letter from the landlord to
      the Village Chief to have it approved and stamped.

      There is no official fees schedule for sign-off of the document, and the cost varies
      depending on the village. For instance, here are the approximate fees for location
      certification in the following villages:
      Xieng Yeun Village, Chanthabouly District, would be around LAK 300,000 - LAK
      400,000;
      Phonexay Village or Kaongod Village or Dongpalane Thong Village, in Sisattanak
      would be around LAK 500,000.

      The map is provided free of charge to indicate the direction to the business in
      case the government wants to visit the location.

2     Obtain the Enterprise Registration Certificate (ERC)                                       2-3 months         LAK 30,000
      Agency : Department of Industry and Commerce Vientiane Capital                                                (Incorporation form) +
      Applicants apply for the Enterprise Registration Certificate (ERC) at the                                     LAK 60,000
      Department of Industry and Commerce Vientiane Capital. The unique application
                                                                                                                    (Application form) +
      form used for the name reservation and the ERC must list three potential names
                                                                                                                    LAK 500,000
      for the company to be established. A signed Contract of Incorporation (if there
                                                                                                                    (Registration service
      are multiple shareholders) in the format approved by the Ministry of Industry and
                                                                                                                    fee for companies
      Commerce (MOIC) must be submitted to obtain the ERC. The approved format
      can be downloaded at the MOIC website. Founders shall complete the                                            with registered capital
      application form for the ERC in the MOIC standard application form attaching the                              of LAK 100,000,000-
      following required documents:                                                                                 400,000,000)

      (i) 3 copies of the Contract of Incorporation,
      (ii) 3 original copies of the signed Articles of Association in the MOIC standard
      template,
      (iii) 3 copies of the resolution of founders of the company,
      (iv) 3 copies of the Power of Attorney in the MOIC standard template (if another
      person is assigned to submit the application),
      (v) 3 copies of ID card/passport of founders (only for foreigners) or business
      licenses for entities,
      (vi) Office location certificate and the Map signed and sealed by the village chief,
      (vii) 6 photos size 3cmx4cm of the nominated Managing Director,
      (viii) Compliance letter stating that the founders of this company will comply with
      the rules of law.

      When issuing the ERC, the Department of Industry and Commerce Vientiane
      Capital issues (1) a letter for the tax office to register for a Tax ID and (2) a letter
      of approval for the Public Security Office for the company seal.

      Presidential Order N 003, of December 26, 2012 regulates the fees related to
      obtaining the ERC.

3     Register the Articles of Association                                                       1 week             LAK 40,000
      Agency : State Asset Management Office, Ministry of Finance                                                   (registration of AOA)
      Once the company obtains the Enterprise Registration Certificate, it shall                                    + LAK 40,000
      thereafter register its Articles of Association with the State Assets Management
                                                                                                                    (Contract of
      Department (SAMD), Ministry of Finance. For registration the following are
                                                                                                                    Incorporation) + LAK
      required: letter request, the original signed Articles of Association, and copy of
                                                                                                                    10,000 (Service fee)
      ERC.

                                                                                                                                              Page 8
Doing Business 2019            Lao PDR

4       Apply for Tax Registration Certificate                                                   about 1 month         LAK 25,000
        Agency : Tax Department                                                                                        (Registration form for
        Enterprises operating in the Lao PDR are subject to direct and indirect taxes.                                 taxes) + LAK 100,000
        You need to submit the following documents:
                                                                                                                       (Tax certificate)

        1. Application form
        2. Resident certificate of managers
        3. List of assets
        4. List of employees and estimates salaries
        5. Copy of lease agreement
        6. Office location certificate and Map signed and sealed by the village chief
        8. 2 photos 3x4 of the managing directors
        9. Copy of the resolution of formation
        10. Copy of the ERC
        11. Copy of ID cards
        12. Registered AOA

5       Attend to a Tax Orientation meeting and obtain Tax Identification Number                 about 1 month         no charge
        (TIN)
        Agency : Tax Division
        Once The Tax Certificate is issued, the Tax Division will arrange for a Tax
        Orientation meeting to explain all the different taxes that a company will have to
        pay, how to calculate them and how to keep your books in order. This is to
        ensure that companies prepare their tax return properly and pay the correct
        amount. After the Tax Orientation meeting, the Tax Division will start processing
        the TIN number. After the Tax Orientation meeting, the Tax Department prepares
        the Tax Identification Number (TIN) for the newly registered company.

    6   Carve a company seal                                                                     2 weeks               LAK 10,000
        Agency : Ministry of Industry and Commerce and Ministry of Public Security               (simultaneous with    (application form for
        After the Enterprise Registry Office issued the ERC and a letter for the seal            previous procedure)   making the company
        carving, entrepreneurs need to submit these documents with the application form
                                                                                                                       seal) + LAK 60,000
        at the Seal carving Unit within the Ministry of Industry and Commerce and
                                                                                                                       (the certificate
        Ministry of Public Security. Once the seal is carved, a letter for registration the
                                                                                                                       authorizing the
        seal is issued by the seal carving unit. Entrepreneurs can submit these to the
                                                                                                                       design) + LAK 50,000
        seal carving unit for the approval of official use.
                                                                                                                       (carving of a seal in
                                                                                                                       Lao language only) or
                                                                                                                       LAK 53,000 (the
                                                                                                                       carving of a seal in
                                                                                                                       Lao and in another
                                                                                                                       language)

7       Register company seal at the department of public security                               1 to 2 weeks          no charge
        Agency : Department of Public Security
        After the seal is carved, the company needs to register it at the department of
        public security in order to use it.

8       Obtain Approval of Content on the Company Signage                                        1 to 2 weeks          LAK 10,000
        Agency : Ministry of Information Culture and Tourism
        The company must obtain content approval of the signage. For the content
        approval application, the company must complete the application form in MICT
        standard form and provide the following: (i) the name of the company in Lao,
        enterprise code provided under the enterprise registration certificate, office
        location and contact detail of the company; (ii) the color in red for the letters, and
        yellow for the background (these colors applied to domestic companies); and (ii)
        the size shall not exceed 2mx4m.

    9   Register the workers for social security                                                 1 week                no charge
        Agency : Social Security Office                                                          (simultaneous with
        The application form to register workers for social security insurance is available      previous procedure)
        at the agency in charge of registration. Employees and employers must
        participate in the compulsory social security regime. They may not enter into
        mutual agreements to avoid participation in the social security regime. The social
        security regime for company employees is established on the principle of state-
        guaranteed insurance. Contributions to the social security regime are paid by
        both the employers and employees: 6.0% of gross salary is to be contributed for
        social security by the employer and another 5.5%, by the employee. The
        maximum ceiling for calculating these contributions is LAK 2,000,000 (6% and
        5.5% of LAK 2,000,000).

        Register for VAT                                                                         3 weeks               no charge
10      Agency : Tax authority                                                                   (simultaneous with
        As per Article 9 of Law of Value added tax of 26 December 2006, all companies            previous procedure)
        with a turnover higher than 400,000,000 Kip are are subject to value-added tax
        registration with the tax authority.

Takes place simultaneously with previous procedure.

                                                                                                                                                Page 9
Doing Business 2019              Lao PDR

     Dealing with Construction Permits

This topic tracks the procedures, time and cost to build a warehouse—including obtaining necessary the licenses and permits, submitting all
required notifications, requesting and receiving all necessary inspections and obtaining utility connections. In addition, the Dealing with
Construction Permits indicator measures the building quality control index, evaluating the quality of building regulations, the strength of
quality control and safety mechanisms, liability and insurance regimes, and professional certification requirements. The most recent round of
data collection was completed in May 2018. See the methodology for more information

 What the indicators measure                              Case study assumptions

Procedures to legally build a warehouse                 To make the data comparable across economies, several assumptions about the
(number)                                                construction company, the warehouse project and the utility connections are used.

• Submitting all relevant documents and obtaining       The construction company (BuildCo):
  all necessary clearances, licenses, permits and
  certificates                                          - Is a limited liability company (or its legal equivalent) and operates in the economy’s
                                                        largest business city. For 11 economies the data are also collected for the second
• Submitting all required notifications and receiving   largest business city.
  all necessary inspections
                                                        - Is 100% domestically and privately owned; has five owners, none of whom is a
• Obtaining utility connections for water and           legal entity. Has a licensed architect and a licensed engineer, both registered with
  sewerage                                              the local association of architects or engineers. BuildCo is not assumed to have any
                                                        other employees who are technical or licensed experts, such as geological or
• Registering and selling the warehouse after its
  completion                                            topographical experts.
                                                        - Owns the land on which the warehouse will be built and will sell the warehouse
Time required to complete each procedure                upon its completion.
(calendar days)
                                                        The warehouse:
• Does not include time spent gathering
  information                                           - Will be used for general storage activities, such as storage of books or stationery.
                                                        - Will have two stories, both above ground, with a total constructed area of
• Each procedure starts on a separate day—              approximately 1,300.6 square meters (14,000 square feet). Each floor will be 3
  though procedures that can be fully completed
                                                        meters (9 feet, 10 inches) high and will be located on a land plot of approximately
  online are an exception to this rule
                                                        929 square meters (10,000 square feet) that is 100% owned by BuildCo, and the
• Procedure is considered completed once final          warehouse is valued at 50 times income per capita.
  document is received                                  - Will have complete architectural and technical plans prepared by a licensed
                                                        architect. If preparation of the plans requires such steps as obtaining further
• No prior contact with officials
                                                        documentation or getting prior approvals from external agencies, these are counted
Cost required to complete each procedure (% of          as procedures.
income per capita)                                      - Will take 30 weeks to construct (excluding all delays due to administrative and
                                                        regulatory requirements).
• Official costs only, no bribes
                                                        The water and sewerage connections:
Building quality control index (0-15)
                                                        - Will be 150 meters (492 feet) from the existing water source and sewer tap. If there
• Quality of building regulations (0-2)                 is no water delivery infrastructure in the economy, a borehole will be dug. If there is
• Quality control before construction (0-1)             no sewerage infrastructure, a septic tank in the smallest size available will be
                                                        installed or built.
• Quality control during construction (0-3)             - Will have an average water use of 662 liters (175 gallons) a day and an average
• Quality control after construction (0-3)              wastewater flow of 568 liters (150 gallons) a day. Will have a peak water use of
                                                        1,325 liters (350 gallons) a day and a peak wastewater flow of 1,136 liters (300
• Liability and insurance regimes (0-2)                 gallons) a day.
• Professional certifications (0-4)                     - Will have a constant level of water demand and wastewater flow throughout the
                                                        year; will be 1 inch in diameter for the water connection and 4 inches in diameter for
                                                        the sewerage connection.

                                                                                                                                                   Page 10
Doing Business 2019      Lao PDR

Dealing with Construction Permits - Lao PDR

       Standardized Warehouse

    Estimated value of warehouse                                            LAK 970,289,111.80

    City Covered                                                            Vientiane

       Indicator                                           Lao PDR              East Asia &            OECD high         Best Regulatory
                                                                                Pacific                income            Performance

    Procedures (number)                                    12                  15.1                    12.7              None in 2017/18

    Time (days)                                            92                  133.5                   153.1             None in 2017/18

    Cost (% of warehouse value)                            4.9                 1.9                     1.5               None in 2017/18

    Building quality control index (0-15)                  6.5                 9.1                     11.5              15.0 (3 Economies)

  Figure – Dealing with Construction Permits in Lao PDR and comparator economies – Ranking and Score

                                                DB 2019 Dealing with Construction Permits Score

                    0                                                                                   100

                                                                                        86.96: Malaysia (Rank: 3)

                                                                          71.86: Thailand (Rank: 67)

                                                                         70.71: Regional Average (East Asia & Pacific)

                                                                       67.94: Lao PDR (Rank: 99)

                                                                     66.57: Indonesia (Rank: 112)

                                                                   65.16: China (Rank: 121)

Note: The ranking of economies on the ease of dealing with construction permits is determined by sorting their scores for dealing with
construction permits. These scores are the simple average of the scores for each of the component indicators.

  Figure – Dealing with Construction Permits in Lao PDR – Procedure, Time and Cost

                                                     Time (days)         Cost (% of warehouse value)
                                                                                                                                              3
               90

               80
                                                                                                                                              2.5
                                                                                                                                                    Cost (% of warehouse value)

               70

               60                                                                                                                             2
 Time (days)

               50
                                                                                                                                              1.5
               40

               30                                                                                                                             1

               20
                                                                                                                                              0.5
               10

               0                                                                                                                              0
                        1   *2      *3      4          5           6           7           8            9           10    11       * 12
                                                                 Procedures (number)

* This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure.

Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men and
women, the graph shows the time for women. For more information on methodology, see the Doing Business website
(http://doingbusiness.org/en/methodology ). For details on the procedures reflected here, see the summary below.

                                                                                                                                                                                  Page 11
Doing Business 2019                      Lao PDR

Figure – Dealing with Construction Permits in Lao PDR and comparator economies – Measure of Quality

              15
                                                                            13.0                   13.0
                                                     11.1                                                               11.0
Index score
              10                                                                                                                            9.1

                               6.5

                  5

                  0

                            Lao PDR                  China                Indonesia              Malaysia              Thailand      East Asia & Pacific

Details – Dealing with Construction Permits in Lao PDR – Procedure, Time and Cost

  No.                 Procedures                                                                             Time to Complete     Associated Costs

1                     Obtain a Soil Test from the State Enterprise                                           11 days              LAK 18,451,948
                      Agency : State Enterprise
                      By Law, any building measuring more than 1000 sq m, requires a soil test, which
                      is obtained from a state enterprise and used for the design of the building
                      foundation.

              2       Obtain Neighbors Consent for Construction                                              5 days               no charge
                      Agency : Village Chief Authority
                      Obtaining the consent of neighbors is mandatory in practice. A document
                      reporting that consultations were made with neighbors is attached to the request
                      for a building permit.

              3       Hire an external engineer to conduct building inspection                               1 day                LAK 22,860,429
                      Agency : External Engineer
                      Any building of more than 1000 square meters requires an external engineer who
                      is responsible for inspecting the process of construction. The Vientiane capital
                      Ministry of Works and Transports will verify that the engineer undertook regular
                      inspections when the final report is submitted at the end of the construction
                      process.

4                     Purchase the application forms for a building permit                                   1 day                LAK 25,000
                      Agency : Vientiane Capital Department of Public Works and Transports
                      BuildCo must purchase the application forms to apply for a building permit from
                      the Vientiane Capital department of Public Works and Transports. The Vientiane
                      Capital is divided into nine districts, which are further subdivided into 481
                      villages.The forms are a complete set of documents which also provide the list of
                      requirements and the costs associated with the building permitting process.

5                     Request and obtain residence certificate from Village Chief                            1 day                LAK 30,000
                      Agency : Village Chief
                      BuildCo must obtain 3 copies of a residence certificate certifying that the
                      applicant (the company's manager) has a permanent address. The certificates
                      are should be stamped and signed by the Village Chief who checks the history of
                      the land and location. Costs may vary by village and are at the discretion of the
                      Village Chiefs.

6                     Submit building permit application to the District Construction Division               1 day                no charge
                      Agency : District Construction Division
                      BuildCo must submit the application for a building permit, along with the following
                      documents: structural and architectural plans, electrical and sewer plans, a
                      location plan certified by the Villeage Chird, a copy of the ownership certificate
                      and 2 copies of the land title. When the applicant deposits all the required
                      documentation at the one stop service window, all documents are checked for
                      completeness. The documents are then bound into one file and reviewed by an
                      engineer at the Ministry of Public Works. The engineer will sign and stamp the
                      cover letter to indicate his approval if the submission meets all technical
                      requirements.

7                     Receive setting-out inspection from Department of Urban Planning &                     1 day                no charge
                      Environment
                      Agency : Vientiane Capital Department of Public Works and Transport
                      Within one week after the application has been submitted the Department of
                      Urban Planning will visit the property and conduct an inspection to ensure that
                      the boundaries are correct and measure the set-back. At the same time they will
                      also verify if there are any environmental issues to be taken into account. If there
                      are, the Ministry of the Environment would be asked to participate in the building
                      permitting process and conduct an environmental assessment. In practice,
                      environmental assessments are only conducted for much larger buildings than a
                      warehouse.

                                                                                                                                                           Page 12
Doing Business 2019         Lao PDR

8     Obtain building permit from Vientiane Capital                                          30 days   LAK 3,251,500
      Agency : Vieintiane Capital Department of Public Works and Transport
      The approval process of buildings of less than 400 square meters are handled by
      the District Level while those above 400 square meters by the Vientiane Capital.
      The initial permit allows for the construction process to begin.

9     Receive half completion inspection from Department of Urban Planning &                 1 day     no charge
      Environment
      Agency : Department of Urban Planning & Environment
      The Urban Planning department conducts an inspection during construction
      when the process is about half way through. The external engineer is responsible
      for inspecting the construction during the entire process and must report to the
      authorities is there are any issues that need to be brought to their attention.

10    Request and receive final inspection from Committee for Management of                  1 day     no charge
      Construction
      Agency : Committee for Management of Construction
      After construction is completed, the project owner or building owner must submit
      a request in writing to the Construction Management Committee (CMC) to
      inspect the construction according to the issued building permit. A report from the
      external engineer is submitted and assessed, whether there are issues reported
      or not. If the construction complies with construction regulations, the Housing and
      Urban Planning Department, in coordination with State Asset and Housing
      Department, officially issues a correct construction certificate.

11    Request and receive connection to water and sewage services                            45 days   LAK 3,000,000
      Agency : Water Supply Authority of Lao PDR (WASA)
      To obtain a water and sewerage connection to the land where the building will be
      constructed, BuildCo must enclose the building permit or a correct construction
      certificate with the application.

      Obtain certificate of completion of building works                                     7 days    no charge
12    Agency : Housing and Urban Planning Department
      The certificate of completion of building works, sometimes referred to as the 'final
      building permit', is delivered once the final inspection takes place within one
      week by the Housing and Planning Committee if all conditions are met. The
      document consists on a single page which is signed and stamped by the agency.

Takes place simultaneously with previous procedure.

                                                                                                                       Page 13
Doing Business 2019         Lao PDR

Details – Dealing with Construction Permits in Lao PDR – Measure of Quality

                                                                                                      Answer               Score

Building quality control index (0-15)                                                                                      6.5

Quality of building regulations index (0-2)                                                                                0.0

  How accessible are building laws and regulations in your economy? (0-1)                             Not easily           0.0
                                                                                                      accessible.

  Which requirements for obtaining a building permit are clearly specified in the building            List of required     0.0
  regulations or on any accessible website, brochure or pamphlet? (0-1)                               documents.

Quality control before construction index (0-1)                                                                            1.0

  Which third-party entities are required by law to verify that the building plans are in             Licensed             1.0
  compliance with existing building regulations? (0-1)                                                architect;
                                                                                                      Licensed
                                                                                                      engineer.

Quality control during construction index (0-3)                                                                            2.0

  What types of inspections (if any) are required by law to be carried out during construction?       Inspections by in-   1.0
  (0-2)                                                                                               house engineer;
                                                                                                      Inspections at
                                                                                                      various phases.

  Do legally mandated inspections occur in practice during construction? (0-1)                        Mandatory            1.0
                                                                                                      inspections are
                                                                                                      always done in
                                                                                                      practice.

Quality control after construction index (0-3)                                                                             3.0

  Is there a final inspection required by law to verify that the building was built in accordance     Yes, final           2.0
  with the approved plans and regulations? (0-2)                                                      inspection is
                                                                                                      done by
                                                                                                      government
                                                                                                      agency.

  Do legally mandated final inspections occur in practice? (0-1)                                      Final inspection     1.0
                                                                                                      always occurs in
                                                                                                      practice.

Liability and insurance regimes index (0-2)                                                                                0.5

  Which parties (if any) are held liable by law for structural flaws or problems in the building      Construction         0.5
  once it is in use (Latent Defect Liability or Decennial Liability)? (0-1)                           company.

  Which parties (if any) are required by law to obtain an insurance policy to cover possible          No party is          0.0
  structural flaws or problems in the building once it is in use (Latent Defect Liability Insurance   required by law
  or Decennial Insurance)? (0-1)                                                                      to obtain
                                                                                                      insurance .

Professional certifications index (0-4)                                                                                    0.0

  What are the qualification requirements for the professional responsible for verifying that the     Being a              0.0
  architectural plans or drawings are in compliance with existing building regulations? (0-2)         registered
                                                                                                      architect or
                                                                                                      engineer.

  What are the qualification requirements for the professional who supervises the construction        Being a              0.0
  on the ground? (0-2)                                                                                registered
                                                                                                      architect or
                                                                                                      engineer.

                                                                                                                                   Page 14
Doing Business 2019              Lao PDR

     Getting Electricity

This topic measures the procedures, time and cost required for a business to obtain a permanent electricity connection for a newly
constructed warehouse. Additionally, the reliability of supply and transparency of tariffs index measures reliability of supply, transparency of
tariffs and the price of electricity. The most recent round of data collection for the project was completed in May 2018. See the methodology
for more information.

 What the indicators measure                                Case study assumptions

Procedures to obtain an electricity connection             To make the data comparable across economies, several assumptions about the
(number)                                                   warehouse, the electricity connection and the monthly consumption are used.

• Submitting all relevant documents and obtaining          The warehouse:
  all necessary clearances and permits
                                                           - Is owned by a local entrepreneur and is used for storage of goods.
• Completing all required notifications and                - Is located in the economy’s largest business city. For 11 economies the data are
  receiving all necessary inspections
                                                           also collected for the second largest business city.
• Obtaining external installation works and possibly       - Is located in an area where similar warehouses are typically located and is in an
  purchasing material for these works                      area with no physical constraints. For example, the property is not near a railway.
                                                           - Is a new construction and is being connected to electricity for the first time.
• Concluding any necessary supply contract and
  obtaining final supply                                   - Has two stories with a total surface area of approximately 1,300.6 square meters
                                                           (14,000 square feet). The plot of land on which it is built is 929 square meters
Time required to complete each procedure                   (10,000 square feet).
(calendar days)
                                                           The electricity connection:
• Is at least 1 calendar day
                                                           - Is a permanent one with a three-phase, four-wire Y connection with a subscribed
• Each procedure starts on a separate day                  capacity of 140-kilo-volt-ampere (kVA) with a power factor of 1, when 1 kVA = 1
• Does not include time spent gathering                    kilowatt (kW).
  information                                              - Has a length of 150 meters. The connection is to either the low- or medium-voltage
                                                           distribution network and is either overhead or underground, whichever is more
• Reflects the time spent in practice, with little         common in the area where the warehouse is located and requires works that involve
  follow-up and no prior contact with officials
                                                           the crossing of a 10-meter road (such as by excavation or overhead lines) but are all
Cost required to complete each procedure (% of             carried out on public land. There is no crossing of other owners’ private property
income per capita)                                         because the warehouse has access to a road.
                                                           - Does not require work to install the internal wiring of the warehouse. This has
• Official costs only, no bribes                           already been completed up to and including the customer’s service panel or
• Value added tax excluded                                 switchboard and the meter base.

The reliability of supply and transparency of              The monthly consumption:
tariffs index (0-8)
                                                           - It is assumed that the warehouse operates 30 days a month from 9:00 a.m. to 5:00
• Duration and frequency of power outages (0–3)            p.m. (8 hours a day), with equipment utilized at 80% of capacity on average and that
• Tools to monitor power outages (0–1)                     there are no electricity cuts (assumed for simplicity reasons) and the monthly energy
                                                           consumption is 26,880 kilowatt-hours (kWh); hourly consumption is 112 kWh.
• Tools to restore power supply (0–1)                      - If multiple electricity suppliers exist, the warehouse is served by the cheapest
• Regulatory monitoring of utilities’ performance          supplier.
  (0–1)                                                    - Tariffs effective in January of the current year are used for calculation of the price of
                                                           electricity for the warehouse. Although January has 31 days, for calculation
• Financial deterrents limiting outages (0–1)              purposes only 30 days are used.
• Transparency and accessibility of tariffs (0–1)
Price of electricity (cents per kilowatt-hour)*

• Price based on monthly bill for commercial
  warehouse in case study

*Note: Doing Business measures the price of
electricity, but it is not included in the ease of doing
business score nor the ranking on the ease of
getting electricity.

                                                                                                                                                         Page 15
Doing Business 2019           Lao PDR

Getting Electricity - Lao PDR

  Standardized Connection

 Price of electricity (US cents per kWh)                                  12.9

 Name of utility                                                          Électricité du Laos (EDL)

 City Covered                                                             Vientiane

  Indicator                                              Lao PDR              East Asia &          OECD high               Best Regulatory
                                                                              Pacific              income                  Performance

 Procedures (number)                                     7                   4.3                   4.5                    3 (25 Economies)

 Time (days)                                             105                 65.0                  77.2                   18 (3 Economies)

 Cost (% of income per capita)                           763.4               625.1                 64.2                   0.0 (3 Economies)

 Reliability of supply and transparency of tariff        2                   4.0                   7.5                    8.0 (27 Economies)
 index (0-8)

 Figure – Getting Electricity in Lao PDR and comparator economies – Ranking and Score

                                                       DB 2019 Getting Electricity Score

        0                                                                                            100

                                                                                               99.27: Malaysia (Rank: 4)

                                                                                               98.57: Thailand (Rank: 6)

                                                                                         92.01: China (Rank: 14)

                                                                                     86.38: Indonesia (Rank: 33)

                                                                          75.06: Regional Average (East Asia & Pacific)

                                                        52.77: Lao PDR (Rank: 156)

Note: The ranking of economies on the ease of getting electricity is determined by sorting their scores for getting electricity. These scores are
the simple average of the scores for all the component indicators except the price of electricity.

                                                                                                                                                    Page 16
Doing Business 2019         Lao PDR

  Figure – Getting Electricity in Lao PDR – Procedure, Time and Cost

                                                   Time (days)         Cost (% of income per capita)
                                                                                                                                        800
                   100
                                                                                                                                        700

                                                                                                                                                Cost (% of income per capita)
                   80                                                                                                                   600
 Time (days)

                                                                                                                                        500
                   60
                                                                                                                                        400

                   40                                                                                                                   300

                                                                                                                                        200
                   20
                                                                                                                                        100

                       0                                                                                                                0
                             1         2            3                  4                 5                *6                7
                                                              Procedures (number)

* This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure.

Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men and
women, the graph shows the time for women. For more information on methodology, see the Doing Business website
(http://doingbusiness.org/en/methodology ). For details on the procedures reflected here, see the summary below.

  Figure – Getting Electricity in Lao PDR and comparator economies – Measure of Quality

                                                                                     8                     8
                   8
                   7
                                            6                5.8
                   6
     Index score

                   5
                                                                                                                                 4.0
                   4
                   3
                             2
                   2
                   1
                   0

                           Lao PDR         China           Indonesia              Malaysia              Thailand          East Asia & Pacific

                                                                                                                                                                                Page 17
Doing Business 2019         Lao PDR

Details – Getting Electricity in Lao PDR – Procedure, Time and Cost

No.    Procedures                                                                              Time to Complete   Associated Costs

1     Obtain the location clearance from the Village Chief Authority                           1 calendar day     LAK 30,000
      Agency : Village Chief Authority
      Vientiane is divided into 9 Districts: Chanthabouly, Sikhottabong, Xaysettha,
      Sisattanak, Naxaithong, Xaythany, Hadxaifong, Sangthong & Pak Ngum. Those
      9 districts are further divided into 481 villages and each village has a Village
      Chief. Prior to submission of the application for electricity connection to EDL, a
      Village Chief Authority must be informed about the be request for an electricity
      connection. Upon the receipt of the notification, the Village Chief will sign and
      stamp the application form, which can further be submitted to Électricité du Laos
      (EDL).

2     Submit application to EDL and await site inspection                                      5 calendar days    LAK 0
      Agency : EDL
      The application for an electricity connection can be submitted to EDL by the
      construction company or by the building owner (it is more common that the
      construction company submits the application).

      Usually the application is submitted in person with attached documents in hard
      copies. The following documents must be attached (1) Application for a
      connection as a new user; (2) Load and in house wiring designs; (3) Distribution
      panel design; (4) Building location approved by the Village Chief; (5) in some
      cases other clearances (wire designs + panel designs + estimate of how much
      the warehouse is going to consume).

      EDL reviews the documents and responds with the following information: (1) the
      nearest substation or the point where the connection can be made (2) distance
      between the substation and the building (3) recommendation of suitable
      transformers, a power transformer (PT) and a current transformer (CT), and
      ground resistance for the transformer.

      The distribution officer will send an engineer to the site to check how far it is from
      the distribution network, check the load and then issue a cost estimate. The utility
      obtains the neighbors consent to install electric poles on their property. It takes
      on average 1 week to obtain consent from all neighbors.

3     Receive site inspection by EDL and await estimate and technical                          32 calendar days   LAK 0
      specifications
      Agency : EDL
      EDL will visit the site to determine arrangements for an optimal connection and
      aid the preparation of technical conditions. The engineer will check how far it is
      from the distribution network, check the load and then issue a cost estimate. It is
      required that someone from the applicant’s party is present at the site during the
      inspection.

4     Await preparation and approval of detailed technical design and installation             30 calendar days   LAK 3,650,000
      plan
      Agency : Electrical contractor
      The electrical contractor/construction company in charge of the external
      connection works prepares a detailed technical design of the external connection
      and an installation plan.

      When the electrical contractor/construction company submits the technical
      design to EDL for approval, registration documents for the chief engineer have to
      be submitted as well. The construction company must propose and assign
      someone to be the chief electrical engineer who is responsible for designing and
      supervision of the project. The assignment has to be approved by EDL. The
      registration of the chief electrical engineer is valid only for the proposed project.
      The construction company has to register a chief electrical engineer for every
      project it carries out.

      The approval of the technical design is granted together with the proposal of the
      consumption fees so arrangements for the supply of electricity are completed at
      this stage as well.

5     Await completion of external works by electrical contractor                              30 calendar days   USD 16,500
      Agency : Electrical Contractor
      Once the electrical design is approved by EDL the electrical installation company
      can start the external connection works.

      The meter can be installed during the final stage of the external connection works
      by the electrical contractor.

                                                                                                                                     Page 18
Doing Business 2019            Lao PDR

    6   Testing of the Voltage Transformer by EDL                                             1 calendar day    LAK 2,400,000
        Agency : EDL
        The Voltage Transformer must be tested at the Testing Laboratory of EDL prior
        to the installation. A letter notifying EDL about the proposed date for testing the
        Voltage Transformer must be sent in advance.

7       Receive external inspection by EDL and then electricity flow                          7 calendar days   LAK 1,000,000
        Agency : EDL
        After the external connection works are completed by the electrical contractor
        there is an external inspection by EDL.
        During the inspection a representative of the construction company/electrical
        contractor has to be present.

        After the electrical installation is approved, the electricity can be supplied
        instantly.

Takes place simultaneously with previous procedure.

                                                                                                                                Page 19
Doing Business 2019           Lao PDR

 Details – Getting Electricity in Lao PDR – Measure of Quality

                                                                                                                           Answer

 Reliability of supply and transparency of tariff index (0-8)                                                              2

 Total duration and frequency of outages per customer a year (0-3)                                                         1

    System average interruption duration index (SAIDI)                                                                     1.0

    System average interruption frequency index (SAIFI)                                                                    5.0

    What is the minimum outage time (in minutes) that the utility considers for the calculation of SAIDI/SAIFI             1.0

 Mechanisms for monitoring outages (0-1)                                                                                   0

    Does the distribution utility use automated tools to monitor outages?                                                  No

 Mechanisms for restoring service (0-1)                                                                                    0

    Does the distribution utility use automated tools to restore service?                                                  No

 Regulatory monitoring (0-1)                                                                                               0

    Does a regulator—that is, an entity separate from the utility—monitor the utility’s performance on reliability of      No
    supply?

 Financial deterrents aimed at limiting outages (0-1)                                                                      0

    Does the utility either pay compensation to customers or face fines by the regulator (or both) if outages              No
    exceed a certain cap?

 Communication of tariffs and tariff changes (0-1)                                                                         1

    Are effective tariffs available online?                                                                                Yes

    Link to the website, if available online                                                                               http://edl.com.la/

    Are customers notified of a change in tariff ahead of the billing cycle?                                               Yes

Note:

If the duration and frequency of outages is 100 or less, the economy is eligible to score on the Reliability of supply and transparency of tariff
index.

If the duration and frequency of outages is not available, or is over 100, the economy is not eligible to score on the index.

If the minimum outage time considered for SAIDI/SAIFI is over 5 minutes, the economy is not eligible to score on the index.

                                                                                                                                                    Page 20
Doing Business 2019           Lao PDR

     Registering Property

This topic examines the steps, time and cost involved in registering property, assuming a standardized case of an entrepreneur who wants to
purchase land and a building that is already registered and free of title dispute. In addition, the topic also measures the quality of the land
administration system in each economy. The quality of land administration index has five dimensions: reliability of infrastructure, transparency
of information, geographic coverage, land dispute resolution, and equal access to property rights. The most recent round of data collection for
the project was completed in May 2018. See the methodology for more information.

 What the indicators measure                               Case study assumptions

Procedures to legally transfer title on                  To make the data comparable across economies, several assumptions about the
immovable property (number)                              parties to the transaction, the property and the procedures are used.

• Preregistration procedures (for example,               The parties (buyer and seller):
  checking for liens, notarizing sales agreement,
  paying property transfer taxes)                        - Are limited liability companies (or the legal equivalent).
                                                         - Are located in the periurban area of the economy’s largest business city. For 11
• Registration procedures in the economy's largest       economies the data are also collected for the second largest business city.
  business city.
                                                         - Are 100% domestically and privately owned.
• Postregistration procedures (for example, filling      - Have 50 employees each, all of whom are nationals.
  title with municipality)                               - Perform general commercial activities.

Time required to complete each procedure                 The property (fully owned by the seller):
(calendar days)
                                                         - Has a value of 50 times income per capita, which equals the sale price.
• Does not include time spent gathering                  - Is fully owned by the seller.
  information                                            - Has no mortgages attached and has been under the same ownership for the past
• Each procedure starts on a separate day -              10 years.
  though procedures that can be fully completed          - Is registered in the land registry or cadastre, or both, and is free of title disputes.
  online are an exception to this rule                   - Is located in a periurban commercial zone, and no rezoning is required.
                                                         - Consists of land and a building. The land area is 557.4 square meters (6,000
• Procedure is considered completed once final           square feet). A two-story warehouse of 929 square meters (10,000 square feet) is
  document is received
                                                         located on the land. The warehouse is 10 years old, is in good condition, has no
• No prior contact with officials                        heating system and complies with all safety standards, building codes and legal
                                                         requirements. The property, consisting of land and building, will be transferred in its
Cost required to complete each procedure (% of           entirety.
property value)                                          - Will not be subject to renovations or additional construction following the purchase.
• Official costs only (such as administrative fees,      - Has no trees, natural water sources, natural reserves or historical monuments of
  duties and taxes).                                     any kind.
                                                         - Will not be used for special purposes, and no special permits, such as for
• Value Added Tax, Capital Gains Tax and illicit         residential use, industrial plants, waste storage or certain types of agricultural
  payments are excluded                                  activities, are required.
                                                         - Has no occupants, and no other party holds a legal interest in it.
Quality of land administration index (0-30)

• Reliability of infrastructure index (0-8)
• Transparency of information index (0–6)
• Geographic coverage index (0–8)
• Land dispute resolution index (0–8)
• Equal access to property rights index (-2–0)

                                                                                                                                                     Page 21
Doing Business 2019      Lao PDR

Registering Property - Lao PDR

       Indicator                                         Lao PDR                East Asia &          OECD high      Best Regulatory
                                                                                Pacific              income         Performance

    Procedures (number)                                 6                       5.4                  4.7            1 (4 Economies)

    Time (days)                                         28                      72.6                 20.1           1 (New Zealand)

    Cost (% of property value)                          3.1                     4.5                  4.2            0.0 (Saudi Arabia)

    Quality of the land administration index (0-30)     10.5                    16.3                 23.0           None in 2017/18

  Figure – Registering Property in Lao PDR and comparator economies – Ranking and Score

                                                      DB 2019 Registering Property Score

                    0                                                                                 100

                                                                                  80.80: China (Rank: 27)

                                                                                 80.38: Malaysia (Rank: 29)

                                                                        69.47: Thailand (Rank: 66)

                                                                    64.93: Lao PDR (Rank: 85)

                                                                  61.67: Indonesia (Rank: 100)

                                                             57.56: Regional Average (East Asia & Pacific)

Note: The ranking of economies on the ease of registering property is determined by sorting their scores for registering property. These
scores are the simple average of the scores for each of the component indicators.

  Figure – Registering Property in Lao PDR – Procedure, Time and Cost

                                                      Time (days)          Cost (% of property value)
                                                                                                                                         3.5

               25
                                                                                                                                         3

                                                                                                                                               Cost (% of property value)
               20                                                                                                                        2.5
 Time (days)

                                                                                                                                         2
               15

                                                                                                                                         1.5
               10
                                                                                                                                         1

               5
                                                                                                                                         0.5

               0                                                                                                                         0
                        1                2                    3                        4                     5             6
                                                                  Procedures (number)

* This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure.

Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men and
women, the graph shows the time for women. For more information on methodology, see the Doing Business website
(http://doingbusiness.org/en/methodology ). For details on the procedures reflected here, see the summary below.

                                                                                                                                                                            Page 22
Doing Business 2019                   Lao PDR

Figure – Registering Property in Lao PDR and comparator economies – Measure of Quality

              30                                                                                  27.5

              25                                   23.7

Index score                                                                                                           19.0
              20
                                                                                                                                         16.3
                                                                           14.5
              15
                            10.5
              10

              5

              0

                         Lao PDR                  China                 Indonesia               Malaysia             Thailand      East Asia & Pacific

Details – Registering Property in Lao PDR – Procedure, Time and Cost

  No.              Procedures                                                                               Time to Complete    Associated Costs

1                  Purchase a set of documents for the sale/purchase agreement                              1 day               LAK 15,000
                   Agency : Vientiane Capital National Resources and Environment Division, Land
                   Management Sector
                   The buyer or seller will purchase a set of documents containing all the required
                   forms to complete the entire process. Notably, there is a form to be certified by
                   the Village Chief Authority, two sale/purchase agreement, one for the buyer and
                   one for the seller. The form to request the non-encumbrance certificate as well.
                   The agency will also provide a guideline on how to complete this form.

2                  Obtain the Village Chief certification on application form for the Land Title            1 day               LAK 30,000
                   Accuracy Certificate
                   Agency : Village Chief Authority
                   The seller will take the application form (purchased in procedure 1) to the Village
                   Chief to be certified. This certification is the proof that the seller is the rightful
                   owner of the land and that there is no dispute on this land. This form will be
                   submitted to the District Natural Resources and Environment Office to obtain the
                   accuracy certificate.

3                  Obtain the Land Title Accuracy Certificate ("Certificate")                               3 days              LAK 50,000
                   Agency : Vientiane Capital National Resources and Environment Division, Land
                   Management Sector
                   The buyer or their appointees submit the application form signed by the village
                   chief where the land is located to the Vientiane Capital National Resources and
                   Environment Division, Land Management Sector for verification of correctness of
                   the land title. After receiving the application form, the Land Management Sector
                   will verify the correctness of the land title compared with the Land Registry Book,
                   Land Map and other related documents. If it is correct, the Certificate of
                   Correctness of the land title will be issued.

4                  Complete the LMA sale-purchase agreement form and the Registration                       2 days              LAK 500,000
                   Request Application
                   Agency : Village Chief Authority
                   The authorized representatives of the seller-company and buyer-company must
                   execute a sale and purchase agreement in a form provided by the District Natural
                   Resources and Environment Office, which is signed by three witnesses and by
                   the village chief where the land is located.
                   At the same time, the registration form is also certified by the Village Chief
                   Authority.

5                  Notarize of sale-purchase agreement                                                      3 days              LAK 40,000; (LAK
                   Agency : Notary's Office                                                                                     20,000 + LAK 5,000
                   The Instruction No. 873/MoJ, dated October 10, 2014on the Implementation of                                  per page)
                   the Notary Law requires for the parties (or their duly authorized representatives)
                   to be present at the Notary Office in order to have the sale-purchase agreement
                   notarized. They submit the Certificate of Correctness of Land Title to Notary
                   Office along with the original sale-purchase agreement. The signed sale and
                   purchase agreement is certified by the Notary Office to attest that land use rights
                   have been appropriately transferred according to the agreement.