Dublin 2 - 2 Cumberland Place

Page created by Beatrice Williamson
 
CONTINUE READING
Dublin 2 - 2 Cumberland Place
1.

Dublin 2
Dublin 2 - 2 Cumberland Place
3.

  Setting
    the
Right Tone

       Phase 2 of Cumberland Place is a
magnificent new eight storey over basement
   office building, adjacent to the recently
 refurbished existing phase 1 office building.
This modern design expands on the original
by adding a coffee pavilion to ground level
   along with 5,376 sq m of grade A office
      space with views across the city at
                  upper levels.

   The building is designed to meet LEED
 Platinum, WiredScore Platinum and Nearly
   Zero Energy Building (NZEB) standards.
Dublin 2 - 2 Cumberland Place
5.

Floors Available from
2,454 sq ft - 8,719 sq ft

                                                                              4                                          1
5,376 sq m                                                                     Lifts
                                                                  3 x 13 Person passenger lifts.
                                                                                                           Designated Loading Bay
                                                                                                           Capable of accommodating a

57,868 sq ft
                                                                 1 x Goods lift / Firefighting lift.      medium sized rigid delivery truck.

                                               1
           Office Area                Café Amenity On-Site

            10                                  1                 21 sec                                  150mm
     Car Parking Spaces              Electric Car Charge Point   Average Lift Waiting Time                   Raised Access Floors

               9                           134                                  1                      2.85 metres
            Showers
  Changing facilities, lockers and        Bicycle Spaces                  Green Roof
  other ancillary accommodation.                                                                        Minimum Floor to Ceiling Height
                                                                     With sedum covering.
Dublin 2 - 2 Cumberland Place
7.

A Vibrant
Neighbourhood
This is one of the most exciting locations    The abundant amenities of Grand
in the city. A true meeting of old and        Canal Dock are also just a few minutes'
new world architecture, commerce              walk away with the world famous Bord
and politics. Steeped in history, the         Gáis Energy Theatre and a plethora of
area boasts many noted popular                restaurants, cafés and bars stretching
establishments referenced in literature       from Cumberland Place to Trinity
such as James Joyce’s Ulysses.                College to the West and the Grand
                                              Canal to the East with numerous food
It is also close to the birthplace of Oscar   markets, canal side eateries and long
Wilde who is commemorated with a              established bars.
statue in the beautiful Merrion Square,
a 17th century formal park of almost 12
acres which is less than 2 minutes' walk
from Cumberland Place.                                                                  Merrion Square
Dublin 2 - 2 Cumberland Place
9.

                                                                                                              Government Buildings

   Merrion Square

At the Heart of the
City's Cultural District
Cumberland Place is located in the heart of              original glory including the stunning National Art
the Georgian district, near Merrion Square and           Gallery just 2 minutes' walk away.
Government Buildings. The entire area is well known
for its prosperous business, political and cultural      The neighbourhood is well serviced by good
history. Originally developed in the 1760s by the        quality bars, restaurants and hotels including The
Duke of Leinster, many local historical buildings have   Davenport, The Alex and The Mont, all less than a    Luas St. Stephen's Green
been recently refurbished and brought back to their      minute walk away.
Dublin 2 - 2 Cumberland Place
11.

A True Centre                                                                                                                        Neighbours
                                                                                                                                     01. Twitter                  08. HubSpot                           15. AIG Ireland              20. A&L Goodbody

of Business
                                                                                                                                     02. Travelport Digital       09. KBC Bank                          16. National Gallery         21.   Customs House
                                                                                                                                                                                                            of Ireland
                                                                                                                                     03. Pinsent Masons           10. William Fry                                                    22. PWC
                                                                                                                                                                                                        17. Trinity College Dublin
                                                                                                                                     04. Core Media               11.   Chartered Accountants Ireland                                23. Department of the Taoiseach
                                                                                                                                                                                                        18. Autodesk
                                                                                                                                     05. Stripe                   12.   Henry J Lyons
                                                                                                                                                                                                        19. The Convention
                                                                                                                                     06. Facebook                 13.	 Grant Thornton
                                                                                                                                                                                                            Centre Dublin
                                                                                                                                     07. RIAI                     14. IFSC House
Cumberland Place is central to everything in the capital and is surrounded with long established businesses,
International Embassies, Government buildings and new technology firms recently attracted to the area.

                                                                                                                   21                14

                                                                                                                                13
                                                                                                                                                                                                                            20
                                                                                                                                                                                                                                       15                       19
                                                                                                                                                                                        8
                                                                                                                                                                            4 3                                                                                        22
                                                                                                                                                                                    18
                                                                                                          17                           11 12

                                                                                                                                                                                                                                                                6
                                                                                                                                                                                                                                                           10

                                                                                                                        1
                                                                    16                                                      2

                                                                                                               7
                                                                                                                                                              9
                        23

                                                                                                                                                                                                              5
Dublin 2 - 2 Cumberland Place
13.

   The Alex Hotel

Immediately outside the door are some of
the most well known and popular hotel and
conferencing venues in Dublin as well as a fine   The Ginger Man Pub
array of local cafés and popular bars.
Dublin 2 - 2 Cumberland Place
15.

New Energy.
New Ideas. New Business.
Cumberland Place promotes a healthy working
environment that prioritises employee wellbeing.

The development is designed with wellness in mind and pours        In addition, there are a wealth of gyms, yoga venues,
both natural light and fresh air throughout the building, while    health clubs, several swimming pools and superb jogging
at the same time accommodating ample space for employee            routes, literally on the doorstep of Cumberland Place.
wellness with high quality shower facilities and changing rooms.
                                                                   Within a few minutes' walk is Grand Canal Dock which provides
The building boasts a generous bicycle store and is located in     a range of water sports. Also within 5 minutes' walk will be a
an area known for its cycle paths including a superb cycleway      new world class facility at George's Dock adjacent the River
along the Grand Canal extending westwards towards Kildare          Liffey catering for activities such as kayaking and canoeing.
and with future development to extend this northside across the
Liffey and along the Royal Canal.
Dublin 2 - 2 Cumberland Place
17.

In the Heart of
a Bustling City
      Red Luas Line                Dublin Bus                          Dublin Bikes                        Rail / DART

      Green Luas Line              Proposed MetroLink                  Aircoach/Airlink                    Taxi
                                                                       (747/757)

Restaurants & Cafés                     Hotels                                  Colleges
01. Steam Café @ The Alex               01. The Alex Hotel                      01. American College

02. The Ginger Man                      02. The Davenport Hotel                 02. Dublin Institute of Design

03. II Caffe Di Napoli                  03. The Mont Hotel                      03. Trinity College

04. Kennedy's Pub                       04. The Draper Rooms                    04. College of Psychiatrists of Ireland

05. The Square Ball                     05. Pearse St. Suites                   05. LA College of Creative Arts

06. 3FE                                 06. Maldron Hotel Pearse Street         06. CCT College

07. The Cellar Bar                      07. Trinity City Hotel                  07. Royal College of Surgeons
                                                                                    in Ireland
08. Restaurant Patrick Guilbaud         08. The Lombard

09. Pearl Brasserie                     09. The Kildare Street Hotel
                                                                                Wellness
10. Etto                                10. Buswells Hotel
                                                                                01. The Space Between
11.   Hugo’s Restaurant                 11.   Cliff Townhouse
                                                                                02. Dublin Sports Clinic
12.   BANG Restaurant & Bar             12.   The Shelbourne
                                                                                03. Trinity College Gym
13. FX Buckley Steakhouse               13. The Merrion Hotel
    Pembroke Street                                                             04. Core Fitness Club
                                        14. The Marker Hotel
14. Matt The Thresher                                                           05. Merrion Square
                                        15.   The Dawson Hotel
15.   L’Ecrivain Restaurant                                                     06. Flyfit Macken Street
                                        16. The Westbury
16. Osteria Lucio                                                               07. Educo Gym Pearse Street

17.   Il Valentino Bakery & Cafe                                                08. F45 Training Townsend Street

18. Herbstreet

19. The Ivy

20. One Pico Restaurant

21.   Milano

22. Fire Restaurant Dublin

23. The Greenhouse

24. WILDE Restaurant

25. Dax Restaurant
Dublin 2 - 2 Cumberland Place
19.

                                         Superbly Connected
                                         With swift access locally, nationally and
                                         internationally, Cumberland Place is
                                         superbly located in Dublin’s City Centre.
                                         Strategically positioned next to Pearse Street Dart & Rail
                                         Station and within minutes' of both Luas Tram Stops. In addition,
                                         there is a Dublin Bikes station across the street and numerous
                                         bus routes passing within 2 minutes' of the building.

               Dublin Bikes, Fenian St

                                            Cycling                                   Dart                            Buses                             Luas
                                                                                 Pearse St. Station          Served by a number of bus             Dawson Street
                                           Dublin Bikes
                                                                                    3 min walk                routes No. 26, 47, 61, 77A.           10 min walk
                                            1 min walk
                                                                                                                     2 min walk

                                         Port Tunnel                          Connolly Station                     Metrolink                          Airport
                                            10 min drive                            17 min walk                      Tara Street                     20 min drive
                                                                                                                     13 min walk            Airport bus routes No. 747, 757.
                                                                                                                                                      5 min walk

Westland Row
21.
23.

Grafton Street

                                  The Alex Hotel & The Davenport Hotel

                                                                         Cumberland Place is just a 5 minutes' walk from
                                                                         Grafton Street, one of Europe’s best shopping
                                                                         area as well as a number of beautiful Georgian
                 Merrion Square                                          squares including St. Stephen's Green, Fitzwilliam
                                                                         Square and Merrion Square.
25.

   Grand Canal Dock

In a Living Lab for
Smart Technology                                                                                        LEED Platinum

Cumberland Place is located within a major Smart City Lab,                                           WiredScore Platinum
The Smart Docklands.

This is a municipally funded initiative which      Hibernia REIT is hugely invested in this Smart
enables inhabitants to enjoy new advances          City initiative and as part of this, Cumberland
in smart lighting, Wi-Fi, integrated transport     Place has been designed with a WiredScore
systems and live data on everything from           rating of Platinum and has as many smart
environmental sustainability to the availability   technology features built into the design
of car parking spaces and free bike schemes        and operation of the entire campus. Indeed,
via a series of downloadable apps, amongst         1 Cumberland Place was also the first office
other innovations.                                 development to achieve a LEED Platinum
                                                   rating in Ireland.
27.

Contemporary Interiors
29.

Structure
                                58,000 sq ft of
                                Modern Light Filled
                                Accommodation

                                Floors Available
                                from 2,454 sq ft to 8,719 sq ft

                                 Level          IPMS 3 - m2   IPMS 3 - ft2

                                 Penthouse*     603           6,491

                                 Fifth          810           8,719

                                 Fourth         810           8,719

                                 Third          810           8,719

                                 Second         810           8,719

                                 First          804           8,654

                                 Ground         501           5,393

                                 Lower Ground   228           2,454

                                 Office Area    5,376         57,868

                                 *Terrace       183           1,970

Beautifully designed with its
bronzed mesh fins facade and
aluminium spandrels.
31.

Modern Interiors
33.

Ground
501 sq m/5,393 sq ft

                                                                             COURTYARD

                                                                 PHASE 2
                                               RECEPTION        ENTRANCE

                                                       MAIN
                                                     ENTRANCE                        OFFICE AREA

                 COFFEE SHOP

                                                LOADING AREA

                               FENIAN STREET                               FENIAN STREET

                                                                                                   N
                                                                                                       Not to scale.
                                                                                                       For indicative purposes only.
35.

Lower Ground
228 sq m/2,454 sq ft

                     COURTYARD

       BIKE STORE

                          OFFICE AREA

                                                     BIKE
                      SHOWERS                       STORE

                    FENIAN STREET

                                        N
                                            Not to scale.
                                            For indicative purposes only.
37.

First
804 sq m/8,654 sq ft

                                       OFFICE AREA

                       FENIAN STREET                 FENIAN STREET

                                                                     N
                                                                         Not to scale.
                                                                         For indicative purposes only.
39.

Typical Floor (2ND to 5TH)
810 sq m/8,719 sq ft

                                       OFFICE AREA

                       FENIAN STREET                 FENIAN STREET

                                                                     N
                                                                         Not to scale.
                                                                         For indicative purposes only.
41.
43.

Penthouse
603 sq m/6,491 sq ft
Terrace 183 sq m/1,970 sq ft

                                                          OFFICE AREA

                                               TERRACE

                               FENIAN STREET             FENIAN STREET

                                                                         N
                                                                             Not to scale.
                                                                             For indicative purposes only.
45.

Exceeding
Expectations
All materials and finishes used in the
building are to the highest international
standards and will add to the premier
experience your employees will enjoy
when working here.
47.

Specification
     Architectural Specification                            Structure                                          Windows and doors shall also be                       Reception
                                                                                                               manufactured from high performance
     Means of Escape                  1 person per 6 sq m   The superstructure is steel framed with seven      thermally broken aluminium with pressure              Walls
                                                            levels framed with composite concrete and          equalised, discretely self-draining and
     Internal Climate                 1 person per 8 sq m                                                                                                            Plasterboard wall linings with skimmed and
                                                            metal deck floor slabs over ground floor on a      internally beaded framing assemblies.
                                                                                                                                                                     painted finish.
     Sanitary Accommodation           1 person per 8 sq m
                                                            double bay grid of 9.6m x 7.5m and 6.0m x 7.5m.
                                                                                                               Main Entrance Doors
                                                                                                                                                                     Floors
     Structural Grid                                        At ground floor the building facade is set back    The entire premises is accessed through a
                                                                                                                                                                     Self finished architectural polished concrete
                                                            and the loads from above are transferred to        generously proportioned single reception
                                                                                                                                                                     screed to ground floor. Dark grey matwell with
     A double bay grid of 9.6m x 7.5m and 6.0m x            the foundations via transfer plate girders at      directly off Fenian Street. An expansive
                                                                                                                                                                     black mild steel surround at all entrance doors.
     7.5m providing flexible internal office space.         first floor level with a substantial structural    illuminated canopy outside the entrance
                                                            depth required given the long cantilevers.         over sails a full height glazed facade with
                                                                                                                                                                     Ceiling
                                                                                                               glass revolving door leading to a substantial
                                                                                                                                                                     Structural soffits and services at ceiling level
     Floor Loadings                                         External Finishes                                  reception desk and waiting area in
                                                                                                                                                                     with elements of suspended plasterboard and
                                                                                                               contemporary idiom. A discreet contemporary
     Office Floors       4.0 kN/sq m      4+1 kN/sq m                                                                                                                metal ceiling tiles. Acoustic ceiling panels fixed to
                                                            Facade                                             secure barrier line leads to the lifts, circulation
                                                                                                                                                                     exposed structural soffit by Ecophon.
     Reception Area      4.0 kN/sq m      4+1 kN/sq m       Provision of aluminium, double glazed curtain      area and office space beyond.

     Plant Areas         7.5 kN/sq m      7.0 kN            walling system to span between floors or
                                                                                                               Roof                                                  Columns
                                                            between head and sill of openings with black,
                                                                                                                                                                     Painted steel columns.
                                                            opaque powder coated aluminium surrounds           The roofs throughout are planted with a sedum
     Floor Heights                                          and spandrel panels together with vertical,        green roof of indigenous grasses to encourage
                                                                                                               biodiversity, assist in controlling surface water
                                                                                                                                                                     Turnstiles
                                                            powder coated aluminium perforated panels
     Reception Ceiling Height           4.45m                                                                  run-off and mitigate against urban heat               3 new powder coated black turnstiles
                                                            to face of glazing in random pattern.
     Ground Floor Ceiling Height        4.30m               A ceramic frit is proposed to the top and          build-up.                                             by Boon Edam and toughened glass
                                                            bottom of the glazed sections which will                                                                 security screens.
     1st – 6th Floor Ceiling Height     2.85m
                                                            fade out from opaque to clear over a height        Louvred plant enclosure with black finish flush
     Typical Floor to Floor Height      3.8m                of 450mm in each case. Additional interest         with concealed frame & fixings.                       Reception Desk
                                                            in terms of the modelling of the facade is                                                               Bespoke unit of high quality materials - black,
                                                            provided by way of bronze coated, vertical         U-Values                                              mild steel cladding, concrete effect render,
     Service Zones                                          steel mesh fins within a slim-line bronzed steel                                                         hardwood plywood panels with hardwood
                                                                                                               External Solid Wall         0.18W/M2K
                                                            frame which will be mounted perpendicular to                                                             lipping’s and Forbo finish to counter top.
     Raised Access Floor Void             119mm             the facade.                                        Floor                       0.15W/M2K
     Typical Floor to Ceiling Height      2,850mm                                                              Roof                        0.15W/M2K                 Internal Office Finishes
                                                            The curtain walling shall be manufactured from
     Ceiling Zone                         555mm                                                                Glazing                     1.4W/M2K
                                                            thermally broken aluminium with pressure                                                                 Walls
                                                            equalized, discretely self-draining and            Spandrels                   1.4W/M2K                  Plasterboard wall linings with skimmed and
                                                            internally beaded framing assemblies. Frames                                                             painted finish.
                                                                                                               Airtightness                2.75M3/M2 at 50Pa
                                                            shall be internally reinforced where required to
                                                            meet wind loads.
49.

Floors                                            Stairs                                             Ceiling                                             Bicycle, Electric Bicycle
600 x 600 metal floor tile.                                                                          Painted plasterboard with 600 x 600 mineral,        & Scooter Facilities
                                                  Walls                                              lay in ceiling tile.
Ceiling                                           Plasterboard wall linings with skimmed and                                                             134 secure bicycle parking spaces services
1200 x 300 perforated metal ceiling tile          painted finish.                                    Vanity Units                                        by complete bicycle repair stations. Charging
perforated body with acoustic pads, with 3000                                                        20mm Silestone Blanco white worktops on             stations for electric bicycles & scooters
x 300 imperforate metal c-channel.                Floors                                             powder coated square steel frame.                   are provided.

                                                  Vinyl.
Columns                                                                                              Sanitary Fitting                                    Shower and Changing
Painted steel columns.                            Ceiling                                            High quality sanitary ware and fittings
                                                                                                                                                         Facilities
                                                  Plasterboard bulkheads with skimmed and            throughout.
                                                                                                                                                         Shower and changing facilities consist
Joinery                                           painted finish.
                                                                                                                                                         of shower rooms, WC’s, drying room, and
Flush solid core timber paint grade doors and                                                        Joinery
                                                                                                                                                         changing areas.
frames with painted MDF skirtings.                Joinery                                            Flush solid core timber paint grade doors
                                                  Polyester powder coated aluminium glazed           and frames.
                                                                                                                                                         The facilities are supplemented by ironing
Lift Lobbies                                      doors & glazed partitions. Painted MDF skirting.                                                       station, shoe shining station & expansive
                                                                                                     Parking Provisions                                  vanity facilities.
Walls                                             Balustrades
                                                  Painted steel.                                     Vehicle set back / parking bays for taxi drop
Marmorino with metallic sparkle and anti                                                                                                                 Facilities are provided at lower ground floor
                                                                                                     off and collection visible from the reception
crack system.                                                                                                                                            level, easily accessible from the main core
                                                                                                     area. The existing kerb line to the front of the
                                                  Sanitary Accommodation                                                                                 & the 2 bicycle stores.
                                                                                                     site will be re-configured and the soft and
Floors                                                                                               hard landscaping elements to the south and
Self finished architectural polished concrete
                                                  Toilet Provision                                                                                       Shower Provision
                                                                                                     east of the site will be replaced to provide
screed to ground floor. Semi-solid oak            Toilet provisions are calculated on 1 person per
                                                                                                     an improved environment for both pedestrians        Unisex             8
herringbone flooring with clear varnish finish.   8 sq m. Toilet requirements are calculated on a
                                                                                                     and vehicle users alike.
                                                  floor by floor basis.                                                                                  Universal          1

Ceiling                                                                                              10 car parking spaces (located in the existing      Total              9
                                                  Walls
Bespoke suspended copper mesh ceiling                                                                car parking area to the rear of the site). There
with feature back lighting.                       Plasterboard wall linings with skimmed and         is already provision for 4 all access car parking
                                                  painted finish. Selected tiling.                                                                       Mechanical Services
                                                                                                     spaces in this area. 1 motorcycle parking space
Joinery                                                                                              (already provided in the existing car parking
                                                  Cubicles                                                                                               •   Provision of fresh air at a design occupancy
Polyester powder coated aluminium glazed                                                             area to the rear of the site).
                                                                                                                                                             of 1 person per 8 sq m via a high efficiency
doors & glazed partitions. Lacquered black        Venesta Unity High Pressure Laminate
                                                                                                                                                             thermal wheel heat recovery air handling
steel skirting.                                   Washroom System.                                   1 electric car charging point (already provided
                                                                                                                                                             unit located at basement level.
                                                                                                     in the existing car parking area to the rear of
                                                                                                     the site).                                          •   Provision of CO2 sensors for monitoring of
                                                  Floors
                                                                                                                                                             fresh air supply.
                                                  Selected ceramic tiles.
51.

•   Provision of a toilet extract system via a     Design Parameter                        •   Mains Water Supply (MWS)
    high efficiency plate heat exchanger heat
                                                                                                                                             Electrical Services
                                                   Winter Temperature                          All Water services feeds to tenant
    recovery air handling unit located at                                                      areas to be provided with flow meters
                                                                                                                                             The Electrical CAT A Installation
    roof level.                                    Outside            -4°C                     connected to landlord BMS.
                                                                                                                                             Consists of:
•   Provision of heating via high efficiency gas   Internal Office    21+/- 2°C            •   Mains Water Services (MWS)
    fired condensing boilers installed at
                                                   Toilets            21+/- 2°C                The incoming MWS feeds CWS & MWS 		           •   Provision of separated metered tenant
    basement level to generate low
                                                                                               break tanks at basement level, for local          supply. Two separate tenant boards
    temperature hot water (LTHW) to provide
                                                                                               storage until utilisation. The incoming           per floor.
    heating to landlord spaces and hot             Summer Temperature                          MWS also provides a back-up supply
    water generation.                                                                                                                        •   Provision of fire alarm repeater
                                                   Summer Temperature                          to the RWS storage tank, for topup
                                                                                                                                                 panels linked to landlord system that
•   Provision of space heating & cooling                                                       during periods of low rain fall.
                                                   Outside            27°C DB / 19°C WB                                                          offers provision for floor and ceiling void
    via high efficiency air source heat pumps                                                  A MWS break tank is also provided
                                                                                                                                                 detection in line with latest regulations.
    (complete VRF system) to provide heating       Internal Office    21+/- 2°C                (15 mins at full run capacity) to allow for
    and cooling to landlord lift lobbies &                                                                                                   •   Provision of under floor busbar system
                                                                                               boosted MWS to the tenant areas.
                                                   Toilets            21+/- 2°C                                                                  with space available for tenants future
    tenant floor spaces.
                                                                                           •   Cold Water Services (CWS)                         incumbent data supplier.
•   Provision of water services installation
                                                                                               Cold water stored in CWS Break Tank
    (mains, hot and cold water service) to core    Fresh Air Supply                                                                          •   WiredScore Platinum building – diverse
                                                                                               (located at basement level). The CWS
    areas and valved and capped metered                                                                                                          routes to floorplate via three separate
                                                   Office             10 l/s.person            break is designed to provide for 24hrs
    mains supply to each tenancy for                                                                                                             fibre intake positions.
                                                                                               CWS supply to each block. All CWS
    future connection.                             Toilets            7 Ac/hr
                                                                                               will be boosted throughout
                                                                                                                                             Design Criteria
•   Provision of complete Building                 Shower             15 Ac/hr                 the development.
    Management System (BMS) to control                                                                                                       The building shall be designed on the basis
                                                                                           •   Hot Water Services (HWS)                      of 1 person per 8 sq m.
    all primary Mechanical Plant and
                                                   Acoustic Level                              HWS water stored in HWS indirect
    Environmental Systems.
                                                                                               calorifiers fed from LPHW system              Lighting             8w per sq m
                                                   Open Plan Office       NR 35                (located at basement level). All              General Power        25w per sq m
                                                                                               HWS will be boosted throughout the
The Mechanical CAT A Installation                  Toilets                NR 40                                                              Small Power          25w per sq m
                                                                                               development (VIA CWS booster sets).
Consists of:                                       Reception Area         NR 40
•   Provision of fresh air and return air                                                  •   Recycled Rain Water Services (RWS)
                                                                                               Rain water run-off from roof level is         Lighting
    distribution ductwork to the tenant floor
    space and associated connection to             Water Services                              initially stored in a buried “bulk”
                                                                                                                                             Offices          600 x 600 LED
    landlord fresh air duct.                                                                   storage tank, below ground. The
                                                   All sanitary provision throughout the       recycled rain water is then pumped            Reception        Existing Linear LED
•   Provision of complete VRF system for space
                                                   development will be provided with the       through filtration systems. All RWS will      Toilets          IP44 Surface Mounted LED
    heating and cooling.
                                                   following (as appropriate):                 be boosted throughout the
•   Provision of ducted AC units and associated
                                                                                               development. A second rain water
    secondary ductwork, plenum boxes and
                                                   •   Cold Water Supply (CWS)                 system is provided to provide irrigation      Lighting Control
    grilles around the tenant floor space.
                                                   •   Hot Water Supply (HWS)                  to the developments green areas.              Dali lighting control system to landlord spaces.
•   Provision of tenant building AG200 VRF
    outstation.                                    •   Hot Water Services Return (HWSR)
                                                   •   Recycled Rain Water Supply (RWS)
53.

Standby Power                                         Goods Lift                                          Vegetation                                            Building Materials
250kVA life safety generator serving the campus.
                                                                                                          Green roof and planting areas will be provided        During construction, products and systems
                                                      1.   Manufacturer – Kone.                           with native and adaptive plant species                produced regionally, containing high levels of
Protective Services Installations                     2.   Internal finishes – brushed stainless steel.   prioritized, reducing the need for additional         recycled content, and those with sustainable
•    Fire alarm system.                                    Scottish quad textured steel doors.            watering, increasing site biodiversity, and           certification are being prioritised, reducing the
•    L1 addressable fire alarm system.                                                                    providing visual interest for occupants.              buildings ecological footprint.
                                                      3.   Floor – vinyl finish.
                                                      4.   Ceiling –Asturias Satin Stainless Steel with
Security Systems                                           recessed LED downlighters.                     Water Efficiency
Intruder alarm complete with PIRs and keypad          5.   Contract speed – 1.6m/s.                       Water efficient sanitary fixtures will be
in landlord areas. CCTV IP cameras externally                                                             specified, to reduce the overall building water
                                                      6.   Lifts to be arranged in Simplex.
and internally in landlord areas. Access control in                                                       consumption by 40% over the LEED baseline. In
landlord areas and wiring for future access control                                                       addition, rainwater harvesting to serve WCs &
in tenant spaces.                                                                                         urinals will also be specified within the building.
                                                      Building Management System
Communication                                                                                             Energy Efficiency
WiredScore Platinum.                                  BMS system to be provided to each tie into
                                                                                                          Energy efficient plant and lighting installations,
                                                      existing system. A BMS graphical front-end
                                                                                                          along with an efficient thermal envelope
                                                      interface shall be provided.
Earthing                                                                                                  will contribute to a 28% reduction in building
                                                      The BMS system shall monitor and control the        energy costs over the ASHRAE baseline, the
Accordance with ETCI National Rules for Electrical
                                                      following:                                          main contribution to the Platinum rating.
Installations ET101:2008.
                                                      1.   Tenant submetering for heating, ventilation
                                                           & water services.                              Waste Recycling
                                                      2.   Plant operation.
Passenger Lifts                                                                                           The building will provide excellent waste
                                                      3.   Temperature & CO2 control in tenant areas.     collection facilities that will enable tenants
                                                                                                          to streamline waste recycling and achieve
1.   Manufacturer – Kone.
                                                                                                          noteworthy landfill diversion rates.
2.   Internal finishes – black polyester powder       Sustainability
     coated steel. Half height mirror on rear wall.
                                                                                                          Healthy Indoor Environment
     Brushed stainless steel doors & surround to      Hibernia REIT’s Cumberland House building
     front wall.                                                                                          During construction low VOC paints, coatings,
                                                      Phase 2, located at Fenian Street, Dublin
                                                                                                          adhesives and sealants along with LEED
3.   Floor – Semi-solid oak herringbone flooring      will achieve the highly commendable LEED
                                                                                                          complaint flooring systems are being specified
     with clear varnish finish.                       Platinum Award.
                                                                                                          to prevent the introduction of air pollutants
4.   Ceiling – Asturias Satin Stainless Steel with                                                        which may cause irritation to occupants.
     recessed LED downlighters.                       Key Features Contributing to the LEED
5.   Contract speed – 1.6m/s.
                                                      Transport
6.   Lifts to be arranged in Triplex.
                                                      The building is served by an extensive public
                                                      transport network system. In addition extensive
                                                      cycle racks along with showering facilities and
                                                      changing rooms will be provided in order to
                                                      promote cycling to the building.
55.

About
Hibernia
Developer and Landlord
Hibernia REIT plc is a property                       The portfolio consists of some 34
investment company launched                           properties and currently there are
by way of an initial public offering                  more than 56 tenancies.
in December 2013 and listed on
Euronext Dublin and the London Stock
Exchange. The principal activity of
the company is to acquire, develop
and hold investments in Irish property
(primarily Central Dublin office
property) with a view to optimising
shareholder returns.

1 Windmill Lane, Dublin 2                                                  2 Windmill Lane, Dublin 2                                  1 Sir John Rogerson’s Quay, Dublin 2                    1 Cumberland Place, Dublin 2

Completed in 2017, this new development comprises                          Over 61,107 sq ft of Grade A office accommodation over 5   Modern and historic architecture combine to create a    The first office development to achieve LEED Platinum
130,000 sq ft of Grade A office space over six floors to                   floors, accessed via a double height reception at ground   new 112,882 sq ft workplace development. Completed in   rating in Ireland. This 130,000 sq ft building was fully
a LEED Gold standard.                                                      floor level, completed in 2019.                            2019, 1SJRQ has been let to HubSpot.                    refurbished with 75% of the available space pre-let to
                                                                                                                                                                                              Twitter who occupied in late 2016.
The fully-let building is part of our award winning                        2WML incorporates best international design standards      The architects for this project were Henry J Lyons.
regeneration of the Windmill Quarter including                             and achieves BER A3, LEED Gold classification and a
innovative public realm thinking and an adaptable                          Platinum WiredScore.
Townhall area.
57.

The Team                                              The Agent
Developer                      Contractor

                                                      MARK SMYTH
                                                      Mark.Smyth@cbre.com
Architects                     Project Managers
                                                      ANNE-LOUISE HANNON
                                                      Annelouise.Hannon@cbre.com

                                                      +353 1 618 5500

Civil & Structural Engineers   M&E

Quantity Surveyors             BCAR

                                                             Disclaimer: These particulars are issued by CBRE U.C., registered in Ireland, no. 316570. PSRA Licence
                                                             No. 001528 on the understanding that any negotiations relating to the property are conducted through
                                                             them. While every care has been taken in preparing them, CBRE U.C., for themselves and for the vendor/
                                                             lessor whose agents they are, give notice that: (i) The particulars are set out as a general outline for guiding
                                                             potential purchasers/tenants and do not constitute any part of an offer or contract. (ii) Any representation
                                                             including descriptions, dimensions, references to condition, permissions or licenses for uses or occupation,
                                                             access and any other details are given in good faith and are believed to be correct, but any intending
                                                             purchaser or tenant should not rely on them as statements or representations of fact but must satisfy themselves
                                                             (at their own expense) as to their correctness. (iii) Neither CBRE U.C., nor any of their employees have any
LEED AP                        Branding & Marketing
                                                             authority to make any or give any representation or warranty in relation to the property.
www.cumberlandplace.ie