Dublin 2 - 2 Cumberland Place
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
3. Setting the Right Tone Phase 2 of Cumberland Place is a magnificent new eight storey over basement office building, adjacent to the recently refurbished existing phase 1 office building. This modern design expands on the original by adding a coffee pavilion to ground level along with 5,376 sq m of grade A office space with views across the city at upper levels. The building is designed to meet LEED Platinum, WiredScore Platinum and Nearly Zero Energy Building (NZEB) standards.
5. Floors Available from 2,454 sq ft - 8,719 sq ft 4 1 5,376 sq m Lifts 3 x 13 Person passenger lifts. Designated Loading Bay Capable of accommodating a 57,868 sq ft 1 x Goods lift / Firefighting lift. medium sized rigid delivery truck. 1 Office Area Café Amenity On-Site 10 1 21 sec 150mm Car Parking Spaces Electric Car Charge Point Average Lift Waiting Time Raised Access Floors 9 134 1 2.85 metres Showers Changing facilities, lockers and Bicycle Spaces Green Roof other ancillary accommodation. Minimum Floor to Ceiling Height With sedum covering.
7. A Vibrant Neighbourhood This is one of the most exciting locations The abundant amenities of Grand in the city. A true meeting of old and Canal Dock are also just a few minutes' new world architecture, commerce walk away with the world famous Bord and politics. Steeped in history, the Gáis Energy Theatre and a plethora of area boasts many noted popular restaurants, cafés and bars stretching establishments referenced in literature from Cumberland Place to Trinity such as James Joyce’s Ulysses. College to the West and the Grand Canal to the East with numerous food It is also close to the birthplace of Oscar markets, canal side eateries and long Wilde who is commemorated with a established bars. statue in the beautiful Merrion Square, a 17th century formal park of almost 12 acres which is less than 2 minutes' walk from Cumberland Place. Merrion Square
9. Government Buildings Merrion Square At the Heart of the City's Cultural District Cumberland Place is located in the heart of original glory including the stunning National Art the Georgian district, near Merrion Square and Gallery just 2 minutes' walk away. Government Buildings. The entire area is well known for its prosperous business, political and cultural The neighbourhood is well serviced by good history. Originally developed in the 1760s by the quality bars, restaurants and hotels including The Duke of Leinster, many local historical buildings have Davenport, The Alex and The Mont, all less than a Luas St. Stephen's Green been recently refurbished and brought back to their minute walk away.
11. A True Centre Neighbours 01. Twitter 08. HubSpot 15. AIG Ireland 20. A&L Goodbody of Business 02. Travelport Digital 09. KBC Bank 16. National Gallery 21. Customs House of Ireland 03. Pinsent Masons 10. William Fry 22. PWC 17. Trinity College Dublin 04. Core Media 11. Chartered Accountants Ireland 23. Department of the Taoiseach 18. Autodesk 05. Stripe 12. Henry J Lyons 19. The Convention 06. Facebook 13. Grant Thornton Centre Dublin 07. RIAI 14. IFSC House Cumberland Place is central to everything in the capital and is surrounded with long established businesses, International Embassies, Government buildings and new technology firms recently attracted to the area. 21 14 13 20 15 19 8 4 3 22 18 17 11 12 6 10 1 16 2 7 9 23 5
13. The Alex Hotel Immediately outside the door are some of the most well known and popular hotel and conferencing venues in Dublin as well as a fine The Ginger Man Pub array of local cafés and popular bars.
15. New Energy. New Ideas. New Business. Cumberland Place promotes a healthy working environment that prioritises employee wellbeing. The development is designed with wellness in mind and pours In addition, there are a wealth of gyms, yoga venues, both natural light and fresh air throughout the building, while health clubs, several swimming pools and superb jogging at the same time accommodating ample space for employee routes, literally on the doorstep of Cumberland Place. wellness with high quality shower facilities and changing rooms. Within a few minutes' walk is Grand Canal Dock which provides The building boasts a generous bicycle store and is located in a range of water sports. Also within 5 minutes' walk will be a an area known for its cycle paths including a superb cycleway new world class facility at George's Dock adjacent the River along the Grand Canal extending westwards towards Kildare Liffey catering for activities such as kayaking and canoeing. and with future development to extend this northside across the Liffey and along the Royal Canal.
17. In the Heart of a Bustling City Red Luas Line Dublin Bus Dublin Bikes Rail / DART Green Luas Line Proposed MetroLink Aircoach/Airlink Taxi (747/757) Restaurants & Cafés Hotels Colleges 01. Steam Café @ The Alex 01. The Alex Hotel 01. American College 02. The Ginger Man 02. The Davenport Hotel 02. Dublin Institute of Design 03. II Caffe Di Napoli 03. The Mont Hotel 03. Trinity College 04. Kennedy's Pub 04. The Draper Rooms 04. College of Psychiatrists of Ireland 05. The Square Ball 05. Pearse St. Suites 05. LA College of Creative Arts 06. 3FE 06. Maldron Hotel Pearse Street 06. CCT College 07. The Cellar Bar 07. Trinity City Hotel 07. Royal College of Surgeons in Ireland 08. Restaurant Patrick Guilbaud 08. The Lombard 09. Pearl Brasserie 09. The Kildare Street Hotel Wellness 10. Etto 10. Buswells Hotel 01. The Space Between 11. Hugo’s Restaurant 11. Cliff Townhouse 02. Dublin Sports Clinic 12. BANG Restaurant & Bar 12. The Shelbourne 03. Trinity College Gym 13. FX Buckley Steakhouse 13. The Merrion Hotel Pembroke Street 04. Core Fitness Club 14. The Marker Hotel 14. Matt The Thresher 05. Merrion Square 15. The Dawson Hotel 15. L’Ecrivain Restaurant 06. Flyfit Macken Street 16. The Westbury 16. Osteria Lucio 07. Educo Gym Pearse Street 17. Il Valentino Bakery & Cafe 08. F45 Training Townsend Street 18. Herbstreet 19. The Ivy 20. One Pico Restaurant 21. Milano 22. Fire Restaurant Dublin 23. The Greenhouse 24. WILDE Restaurant 25. Dax Restaurant
19. Superbly Connected With swift access locally, nationally and internationally, Cumberland Place is superbly located in Dublin’s City Centre. Strategically positioned next to Pearse Street Dart & Rail Station and within minutes' of both Luas Tram Stops. In addition, there is a Dublin Bikes station across the street and numerous bus routes passing within 2 minutes' of the building. Dublin Bikes, Fenian St Cycling Dart Buses Luas Pearse St. Station Served by a number of bus Dawson Street Dublin Bikes 3 min walk routes No. 26, 47, 61, 77A. 10 min walk 1 min walk 2 min walk Port Tunnel Connolly Station Metrolink Airport 10 min drive 17 min walk Tara Street 20 min drive 13 min walk Airport bus routes No. 747, 757. 5 min walk Westland Row
21.
23. Grafton Street The Alex Hotel & The Davenport Hotel Cumberland Place is just a 5 minutes' walk from Grafton Street, one of Europe’s best shopping area as well as a number of beautiful Georgian Merrion Square squares including St. Stephen's Green, Fitzwilliam Square and Merrion Square.
25. Grand Canal Dock In a Living Lab for Smart Technology LEED Platinum Cumberland Place is located within a major Smart City Lab, WiredScore Platinum The Smart Docklands. This is a municipally funded initiative which Hibernia REIT is hugely invested in this Smart enables inhabitants to enjoy new advances City initiative and as part of this, Cumberland in smart lighting, Wi-Fi, integrated transport Place has been designed with a WiredScore systems and live data on everything from rating of Platinum and has as many smart environmental sustainability to the availability technology features built into the design of car parking spaces and free bike schemes and operation of the entire campus. Indeed, via a series of downloadable apps, amongst 1 Cumberland Place was also the first office other innovations. development to achieve a LEED Platinum rating in Ireland.
27. Contemporary Interiors
29. Structure 58,000 sq ft of Modern Light Filled Accommodation Floors Available from 2,454 sq ft to 8,719 sq ft Level IPMS 3 - m2 IPMS 3 - ft2 Penthouse* 603 6,491 Fifth 810 8,719 Fourth 810 8,719 Third 810 8,719 Second 810 8,719 First 804 8,654 Ground 501 5,393 Lower Ground 228 2,454 Office Area 5,376 57,868 *Terrace 183 1,970 Beautifully designed with its bronzed mesh fins facade and aluminium spandrels.
31. Modern Interiors
33. Ground 501 sq m/5,393 sq ft COURTYARD PHASE 2 RECEPTION ENTRANCE MAIN ENTRANCE OFFICE AREA COFFEE SHOP LOADING AREA FENIAN STREET FENIAN STREET N Not to scale. For indicative purposes only.
35. Lower Ground 228 sq m/2,454 sq ft COURTYARD BIKE STORE OFFICE AREA BIKE SHOWERS STORE FENIAN STREET N Not to scale. For indicative purposes only.
37. First 804 sq m/8,654 sq ft OFFICE AREA FENIAN STREET FENIAN STREET N Not to scale. For indicative purposes only.
39. Typical Floor (2ND to 5TH) 810 sq m/8,719 sq ft OFFICE AREA FENIAN STREET FENIAN STREET N Not to scale. For indicative purposes only.
41.
43. Penthouse 603 sq m/6,491 sq ft Terrace 183 sq m/1,970 sq ft OFFICE AREA TERRACE FENIAN STREET FENIAN STREET N Not to scale. For indicative purposes only.
45. Exceeding Expectations All materials and finishes used in the building are to the highest international standards and will add to the premier experience your employees will enjoy when working here.
47. Specification Architectural Specification Structure Windows and doors shall also be Reception manufactured from high performance Means of Escape 1 person per 6 sq m The superstructure is steel framed with seven thermally broken aluminium with pressure Walls levels framed with composite concrete and equalised, discretely self-draining and Internal Climate 1 person per 8 sq m Plasterboard wall linings with skimmed and metal deck floor slabs over ground floor on a internally beaded framing assemblies. painted finish. Sanitary Accommodation 1 person per 8 sq m double bay grid of 9.6m x 7.5m and 6.0m x 7.5m. Main Entrance Doors Floors Structural Grid At ground floor the building facade is set back The entire premises is accessed through a Self finished architectural polished concrete and the loads from above are transferred to generously proportioned single reception screed to ground floor. Dark grey matwell with A double bay grid of 9.6m x 7.5m and 6.0m x the foundations via transfer plate girders at directly off Fenian Street. An expansive black mild steel surround at all entrance doors. 7.5m providing flexible internal office space. first floor level with a substantial structural illuminated canopy outside the entrance depth required given the long cantilevers. over sails a full height glazed facade with Ceiling glass revolving door leading to a substantial Structural soffits and services at ceiling level Floor Loadings External Finishes reception desk and waiting area in with elements of suspended plasterboard and contemporary idiom. A discreet contemporary Office Floors 4.0 kN/sq m 4+1 kN/sq m metal ceiling tiles. Acoustic ceiling panels fixed to Facade secure barrier line leads to the lifts, circulation exposed structural soffit by Ecophon. Reception Area 4.0 kN/sq m 4+1 kN/sq m Provision of aluminium, double glazed curtain area and office space beyond. Plant Areas 7.5 kN/sq m 7.0 kN walling system to span between floors or Roof Columns between head and sill of openings with black, Painted steel columns. opaque powder coated aluminium surrounds The roofs throughout are planted with a sedum Floor Heights and spandrel panels together with vertical, green roof of indigenous grasses to encourage biodiversity, assist in controlling surface water Turnstiles powder coated aluminium perforated panels Reception Ceiling Height 4.45m run-off and mitigate against urban heat 3 new powder coated black turnstiles to face of glazing in random pattern. Ground Floor Ceiling Height 4.30m A ceramic frit is proposed to the top and build-up. by Boon Edam and toughened glass bottom of the glazed sections which will security screens. 1st – 6th Floor Ceiling Height 2.85m fade out from opaque to clear over a height Louvred plant enclosure with black finish flush Typical Floor to Floor Height 3.8m of 450mm in each case. Additional interest with concealed frame & fixings. Reception Desk in terms of the modelling of the facade is Bespoke unit of high quality materials - black, provided by way of bronze coated, vertical U-Values mild steel cladding, concrete effect render, Service Zones steel mesh fins within a slim-line bronzed steel hardwood plywood panels with hardwood External Solid Wall 0.18W/M2K frame which will be mounted perpendicular to lipping’s and Forbo finish to counter top. Raised Access Floor Void 119mm the facade. Floor 0.15W/M2K Typical Floor to Ceiling Height 2,850mm Roof 0.15W/M2K Internal Office Finishes The curtain walling shall be manufactured from Ceiling Zone 555mm Glazing 1.4W/M2K thermally broken aluminium with pressure Walls equalized, discretely self-draining and Spandrels 1.4W/M2K Plasterboard wall linings with skimmed and internally beaded framing assemblies. Frames painted finish. Airtightness 2.75M3/M2 at 50Pa shall be internally reinforced where required to meet wind loads.
49. Floors Stairs Ceiling Bicycle, Electric Bicycle 600 x 600 metal floor tile. Painted plasterboard with 600 x 600 mineral, & Scooter Facilities Walls lay in ceiling tile. Ceiling Plasterboard wall linings with skimmed and 134 secure bicycle parking spaces services 1200 x 300 perforated metal ceiling tile painted finish. Vanity Units by complete bicycle repair stations. Charging perforated body with acoustic pads, with 3000 20mm Silestone Blanco white worktops on stations for electric bicycles & scooters x 300 imperforate metal c-channel. Floors powder coated square steel frame. are provided. Vinyl. Columns Sanitary Fitting Shower and Changing Painted steel columns. Ceiling High quality sanitary ware and fittings Facilities Plasterboard bulkheads with skimmed and throughout. Shower and changing facilities consist Joinery painted finish. of shower rooms, WC’s, drying room, and Flush solid core timber paint grade doors and Joinery changing areas. frames with painted MDF skirtings. Joinery Flush solid core timber paint grade doors Polyester powder coated aluminium glazed and frames. The facilities are supplemented by ironing Lift Lobbies doors & glazed partitions. Painted MDF skirting. station, shoe shining station & expansive Parking Provisions vanity facilities. Walls Balustrades Painted steel. Vehicle set back / parking bays for taxi drop Marmorino with metallic sparkle and anti Facilities are provided at lower ground floor off and collection visible from the reception crack system. level, easily accessible from the main core area. The existing kerb line to the front of the Sanitary Accommodation & the 2 bicycle stores. site will be re-configured and the soft and Floors hard landscaping elements to the south and Self finished architectural polished concrete Toilet Provision Shower Provision east of the site will be replaced to provide screed to ground floor. Semi-solid oak Toilet provisions are calculated on 1 person per an improved environment for both pedestrians Unisex 8 herringbone flooring with clear varnish finish. 8 sq m. Toilet requirements are calculated on a and vehicle users alike. floor by floor basis. Universal 1 Ceiling 10 car parking spaces (located in the existing Total 9 Walls Bespoke suspended copper mesh ceiling car parking area to the rear of the site). There with feature back lighting. Plasterboard wall linings with skimmed and is already provision for 4 all access car parking painted finish. Selected tiling. Mechanical Services spaces in this area. 1 motorcycle parking space Joinery (already provided in the existing car parking Cubicles • Provision of fresh air at a design occupancy Polyester powder coated aluminium glazed area to the rear of the site). of 1 person per 8 sq m via a high efficiency doors & glazed partitions. Lacquered black Venesta Unity High Pressure Laminate thermal wheel heat recovery air handling steel skirting. Washroom System. 1 electric car charging point (already provided unit located at basement level. in the existing car parking area to the rear of the site). • Provision of CO2 sensors for monitoring of Floors fresh air supply. Selected ceramic tiles.
51. • Provision of a toilet extract system via a Design Parameter • Mains Water Supply (MWS) high efficiency plate heat exchanger heat Electrical Services Winter Temperature All Water services feeds to tenant recovery air handling unit located at areas to be provided with flow meters The Electrical CAT A Installation roof level. Outside -4°C connected to landlord BMS. Consists of: • Provision of heating via high efficiency gas Internal Office 21+/- 2°C • Mains Water Services (MWS) fired condensing boilers installed at Toilets 21+/- 2°C The incoming MWS feeds CWS & MWS • Provision of separated metered tenant basement level to generate low break tanks at basement level, for local supply. Two separate tenant boards temperature hot water (LTHW) to provide storage until utilisation. The incoming per floor. heating to landlord spaces and hot Summer Temperature MWS also provides a back-up supply water generation. • Provision of fire alarm repeater Summer Temperature to the RWS storage tank, for topup panels linked to landlord system that • Provision of space heating & cooling during periods of low rain fall. Outside 27°C DB / 19°C WB offers provision for floor and ceiling void via high efficiency air source heat pumps A MWS break tank is also provided detection in line with latest regulations. (complete VRF system) to provide heating Internal Office 21+/- 2°C (15 mins at full run capacity) to allow for and cooling to landlord lift lobbies & • Provision of under floor busbar system boosted MWS to the tenant areas. Toilets 21+/- 2°C with space available for tenants future tenant floor spaces. • Cold Water Services (CWS) incumbent data supplier. • Provision of water services installation Cold water stored in CWS Break Tank (mains, hot and cold water service) to core Fresh Air Supply • WiredScore Platinum building – diverse (located at basement level). The CWS areas and valved and capped metered routes to floorplate via three separate Office 10 l/s.person break is designed to provide for 24hrs mains supply to each tenancy for fibre intake positions. CWS supply to each block. All CWS future connection. Toilets 7 Ac/hr will be boosted throughout Design Criteria • Provision of complete Building Shower 15 Ac/hr the development. Management System (BMS) to control The building shall be designed on the basis • Hot Water Services (HWS) of 1 person per 8 sq m. all primary Mechanical Plant and Acoustic Level HWS water stored in HWS indirect Environmental Systems. calorifiers fed from LPHW system Lighting 8w per sq m Open Plan Office NR 35 (located at basement level). All General Power 25w per sq m HWS will be boosted throughout the The Mechanical CAT A Installation Toilets NR 40 Small Power 25w per sq m development (VIA CWS booster sets). Consists of: Reception Area NR 40 • Provision of fresh air and return air • Recycled Rain Water Services (RWS) Rain water run-off from roof level is Lighting distribution ductwork to the tenant floor space and associated connection to Water Services initially stored in a buried “bulk” Offices 600 x 600 LED landlord fresh air duct. storage tank, below ground. The All sanitary provision throughout the recycled rain water is then pumped Reception Existing Linear LED • Provision of complete VRF system for space development will be provided with the through filtration systems. All RWS will Toilets IP44 Surface Mounted LED heating and cooling. following (as appropriate): be boosted throughout the • Provision of ducted AC units and associated development. A second rain water secondary ductwork, plenum boxes and • Cold Water Supply (CWS) system is provided to provide irrigation Lighting Control grilles around the tenant floor space. • Hot Water Supply (HWS) to the developments green areas. Dali lighting control system to landlord spaces. • Provision of tenant building AG200 VRF outstation. • Hot Water Services Return (HWSR) • Recycled Rain Water Supply (RWS)
53. Standby Power Goods Lift Vegetation Building Materials 250kVA life safety generator serving the campus. Green roof and planting areas will be provided During construction, products and systems 1. Manufacturer – Kone. with native and adaptive plant species produced regionally, containing high levels of Protective Services Installations 2. Internal finishes – brushed stainless steel. prioritized, reducing the need for additional recycled content, and those with sustainable • Fire alarm system. Scottish quad textured steel doors. watering, increasing site biodiversity, and certification are being prioritised, reducing the • L1 addressable fire alarm system. providing visual interest for occupants. buildings ecological footprint. 3. Floor – vinyl finish. 4. Ceiling –Asturias Satin Stainless Steel with Security Systems recessed LED downlighters. Water Efficiency Intruder alarm complete with PIRs and keypad 5. Contract speed – 1.6m/s. Water efficient sanitary fixtures will be in landlord areas. CCTV IP cameras externally specified, to reduce the overall building water 6. Lifts to be arranged in Simplex. and internally in landlord areas. Access control in consumption by 40% over the LEED baseline. In landlord areas and wiring for future access control addition, rainwater harvesting to serve WCs & in tenant spaces. urinals will also be specified within the building. Building Management System Communication Energy Efficiency WiredScore Platinum. BMS system to be provided to each tie into Energy efficient plant and lighting installations, existing system. A BMS graphical front-end along with an efficient thermal envelope interface shall be provided. Earthing will contribute to a 28% reduction in building The BMS system shall monitor and control the energy costs over the ASHRAE baseline, the Accordance with ETCI National Rules for Electrical following: main contribution to the Platinum rating. Installations ET101:2008. 1. Tenant submetering for heating, ventilation & water services. Waste Recycling 2. Plant operation. Passenger Lifts The building will provide excellent waste 3. Temperature & CO2 control in tenant areas. collection facilities that will enable tenants to streamline waste recycling and achieve 1. Manufacturer – Kone. noteworthy landfill diversion rates. 2. Internal finishes – black polyester powder Sustainability coated steel. Half height mirror on rear wall. Healthy Indoor Environment Brushed stainless steel doors & surround to Hibernia REIT’s Cumberland House building front wall. During construction low VOC paints, coatings, Phase 2, located at Fenian Street, Dublin adhesives and sealants along with LEED 3. Floor – Semi-solid oak herringbone flooring will achieve the highly commendable LEED complaint flooring systems are being specified with clear varnish finish. Platinum Award. to prevent the introduction of air pollutants 4. Ceiling – Asturias Satin Stainless Steel with which may cause irritation to occupants. recessed LED downlighters. Key Features Contributing to the LEED 5. Contract speed – 1.6m/s. Transport 6. Lifts to be arranged in Triplex. The building is served by an extensive public transport network system. In addition extensive cycle racks along with showering facilities and changing rooms will be provided in order to promote cycling to the building.
55. About Hibernia Developer and Landlord Hibernia REIT plc is a property The portfolio consists of some 34 investment company launched properties and currently there are by way of an initial public offering more than 56 tenancies. in December 2013 and listed on Euronext Dublin and the London Stock Exchange. The principal activity of the company is to acquire, develop and hold investments in Irish property (primarily Central Dublin office property) with a view to optimising shareholder returns. 1 Windmill Lane, Dublin 2 2 Windmill Lane, Dublin 2 1 Sir John Rogerson’s Quay, Dublin 2 1 Cumberland Place, Dublin 2 Completed in 2017, this new development comprises Over 61,107 sq ft of Grade A office accommodation over 5 Modern and historic architecture combine to create a The first office development to achieve LEED Platinum 130,000 sq ft of Grade A office space over six floors to floors, accessed via a double height reception at ground new 112,882 sq ft workplace development. Completed in rating in Ireland. This 130,000 sq ft building was fully a LEED Gold standard. floor level, completed in 2019. 2019, 1SJRQ has been let to HubSpot. refurbished with 75% of the available space pre-let to Twitter who occupied in late 2016. The fully-let building is part of our award winning 2WML incorporates best international design standards The architects for this project were Henry J Lyons. regeneration of the Windmill Quarter including and achieves BER A3, LEED Gold classification and a innovative public realm thinking and an adaptable Platinum WiredScore. Townhall area.
57. The Team The Agent Developer Contractor MARK SMYTH Mark.Smyth@cbre.com Architects Project Managers ANNE-LOUISE HANNON Annelouise.Hannon@cbre.com +353 1 618 5500 Civil & Structural Engineers M&E Quantity Surveyors BCAR Disclaimer: These particulars are issued by CBRE U.C., registered in Ireland, no. 316570. PSRA Licence No. 001528 on the understanding that any negotiations relating to the property are conducted through them. While every care has been taken in preparing them, CBRE U.C., for themselves and for the vendor/ lessor whose agents they are, give notice that: (i) The particulars are set out as a general outline for guiding potential purchasers/tenants and do not constitute any part of an offer or contract. (ii) Any representation including descriptions, dimensions, references to condition, permissions or licenses for uses or occupation, access and any other details are given in good faith and are believed to be correct, but any intending purchaser or tenant should not rely on them as statements or representations of fact but must satisfy themselves (at their own expense) as to their correctness. (iii) Neither CBRE U.C., nor any of their employees have any LEED AP Branding & Marketing authority to make any or give any representation or warranty in relation to the property.
www.cumberlandplace.ie
You can also read