Downtown West Mixed-Use Plan (Google Project) - Community Meeting October 19, 2020 - Diridon Station Area
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Interpretation La interpretación en simultáneo para esta reunión se dará en los siguientes idiomas: Español (Francisco) – bajo la opción Español Por favor haz clic en el icono INTERPRETATION en tu barra de herramientas para acceder al idioma deseado Phiên dịch đồng thời cho cuộc họp này sẽ được cung cấp bằng các ngôn ngữ sau: Tiếng Việt (Loan) - theo tùy chọn Tiếng Việt Vui lòng nhấp vào biểu tượng INTERPRETATION trên thanh công cụ của bạn để truy cập ngôn ngữ mong muốn www.sanjoseca.gov/googleproject
Agenda • Staff and Applicant Presentation (6:30 to 7:10) • Staff overview of the project • Applicant presentation • Additional information available at www.sanjoseca.gov/googleproject and video presentations at www.diridonsj.org/fall2020-google • Breakout Group Discussions (7:15 to 8:30) • Community members will be put into a breakout room with a facilitator, note taker, City staff, and applicant representative(s), where they can ask questions and provide comments on the updated submittal • Meeting Adjournment (8:30) www.sanjoseca.gov/googleproject
Project Overview • Plans for transportation, open space, and infrastructure (including District Utilities) • Design Standards and Guidelines as part of the Planned Development zoning and permit • Applications for regulatory changes to enable the project (including land use designation changes to allow housing) www.sanjoseca.gov/googleproject
Project Timeline 2018 Fall 2019 Fall 2020 Spring 2021 Next • Engage • Initial • Submittal of • Draft phases community to application updated Development application with Agreement • Design review understand submitted proposed Design of future concerns and • Public hearings • Start review Standards and buildings and goals to consider the process Guidelines site plans • Adopt project (City • Environmental • Draft Council = final • Building and Memorandum scoping Environmental decision construction of meeting Impact Report maker) permits Understanding with Google • Construction www.sanjoseca.gov/googleproject
Draft Environmental Impact Report (DEIR) Draft EIR is available at: www.sanjoseca.gov/GoogleProject • Public Comment Period: October 7 – November 23 (5:00 PM) • Only written comments will be included in the Final EIR. • Submit comments by: 1) E-mail: shannon.hill@sanjoseca.gov 2) Postal mail, address to: Shannon Hill, Planner III Department of Planning, Building, and Code Enforcement 200 E. Santa Clara Street, T-3 San Jose, CA 95113 www.sanjoseca.gov/googleproject
Questions/comments received in advance (City) • Amount of housing v. jobs • Concerns about homelessness • Concerns about traffic • Green space; emphasis on walking, biking, and transit • Questions about trail connections, building design, and height www.sanjoseca.gov/googleproject
Community Meeting October 19, 2020
Downtown West Update Bhavesh Parikh Laura Crescimano Director of Real Estate Development Co-founder / Principal Downtown West Sitelab Urban Studio Google
VISION FOR DOWNTOWN WEST San José has asked us to step away from a campus or traditional financial district and move towards a central social place. One that acknowledges both the physical and programmatic elements that make communities stronger in the face of the social challenges of our era.
VISION GARDEN ALAMEDA ST. LEO’S AUTUMN- MONTGOMERY DUPONT/ Diridon MCEVOY Station DELMAS PARK ~ 7.3 M sf Office 4,000 Housing Units (studying up to 5,900 units) ~ 500 K sf Active Use (Retail, Cultural, Arts, Education, and Other Active Uses) ~ 15 acres Parks + Plazas + Green Spaces *Illustrative massing reflects the combination of density allowed in project’s zoning and applicable Downtown West design standards and guidelines
VISION FOR DOWNTOWN WEST housing under total housing units affordable DSAP (in project boundary) sf retail, cultural, arts, parks and open acres of expanded education, active uses space riparian habitat sf office of developable area net new for non-office CO2 emissions
VISION FOR DOWNTOWN WEST
*Artist conceptual rendering, subject to change
VISION FOR DOWNTOWN WEST © Baunfire © Baunfire © Baunfire © City © Shae of San Rocco José © Shae Rocco Having a range of Where our communities come Let ecology breathe, Human experiences Lean into San José’s historic essential amenities is the together and make things and everything else define everything from spirit of creativity and key to resilience happen will follow big to small entrepreneurship
PART 03
DOWNTOWN WEST DESIGN STANDARDS AND GUIDELINES *Not a . . . buildings of street improvements different parks, years of phased tailored to context construction
TWO DIFFERENT APPROACHES Design intent Pier 70, San Francisco guides creative solutions Repetitive architecture Integrated “place” vision © Google Maps King’s Cross/St. Pancras, London Limited variety Adapt to new building technology Contextual © Håkan Dahlström © Google Maps responsiveness
Developing within High-level built context land use Maximizing individual Already established General building building streets and parks controls HYBRID PROCESS Comprehensive Setting context in “place” vision advance Flexibility for future priorities Integrating buildings, streets + and advancements open space design *Illustrative massing
PROJECT APPROVAL ✔ Project Review 1 2 3 Sequence Policy Compliance City Design Controls Project Approval Relevant GENERAL PLAN DOWNTOWN DESIGN GUIDELINES DETAILED DESIGNS Documents DOWNTOWN STRATEGY COMPLETE STREETS DESIGN DIRIDON STATION AREA PLAN STANDARDS & GUIDELINES MUNICIPAL CODE
PROJECT APPROVAL ✔ Project Review 1 2 3 4444 Sequence Policy Compliance City Design Controls Project Approvals Conformance Reviews Relevant GENERAL PLAN DOWNTOWN DESIGN GUIDELINES EIR DETAILED DESIGNS Documents DOWNTOWN STRATEGY COMPLETE STREETS DESIGN DEVELOPMENT AGREEMENT DIRIDON STATION AREA PLAN STANDARDS & GUIDELINES PD ZONING (as amended) MUNICIPAL CODE PD PERMIT (DWDSG +) (as amended)
DOWNTOWN WEST DESIGN STANDARDS AND GUIDELINES 01 02 03 04 05 06
PART A
DOWNTOWN WEST Guadalupe River Park Ju lia n St Th e Al am ed a l ai r Tr ve Ri pe Pa lu rk da Av ua e G W Sa Cahill Park n Ca rlo s St Sa St. J ill St o nt Cah hn S t a Cl St ar ery tgom a Mon St m n St Arena Juli an Autu Green Stre et St. Jo hn Stre et Del Monte k Trail Park ato s Cree San Los G Fer nan San Pedro do St Square San ta C lara Stre et Office San Fer nand oS tree Office or Housing t Housing Par k Ave nue Housing or Hotel Discovery Meadow Plaza De Active Use (Retail, Cultural, Arts San Car los Cesar Chavez Stre et Education + Other Active Uses) Downtown West Mixed-Use Framework
LAND USE Active Uses: COMMERCIAL RETAIL / RESTAURANT ARTS CULTURAL ©Google ©Shae Rocco ©StreetCode Academy LIVE ENTERTAINMENT COMMERCIAL RETAIL INSTITUTIONAL COMMUNITY CENTER INSTITUTIONAL CHILDCARE EDUCATION MAKER SPACES NON-PROFIT ©Danny vd Weel ©Rawpixel ©RatnaShaa SMALL-FORMAT OFFICE SPACE ARTS + CULTURAL CHILDCARE + EDUCATION NON-PROFIT, COWORK AND SMALL BUSINESS
LAND USE + BUILDINGS e. Av on c kt o St t. nS Los Ga tum tos Creek Au Diridon Station N. r ve SAP e Ri al up Center ad Gu W. Juli e. W Av an .S HW d Bir an St. Y Ca 28 Active uses along a minimum of rlos 0 30% building frontage St . Frontage requiring an entry to an active use and a minimum 30% active use frontage HWYto87 Frontage requiring an entry an active use Existing structures dedicated to active use
BUILDINGS SAP Center *Illustrative elevation 290’ 180’ Southend Northend 150 S. 40 S. Diridon Station Montgomery Montgomery
BUILDINGS Long facade design Adjacent to creek and open space Adjacent to low-rise context Adjacent to historic resources Project resources
BUILDINGS EXAMPLE St. lara aC Sant E2/E3 Site st We maximum height limit 280’ Los Gato Sta te s Cr Ro e ek ute 87 De lm as Av e. St. ando ern San F st We *Illustrative massing
BUILDINGS EXAMPLE 60’ Tower Separation (DDG) 30’ Riparian Setback from Guadalupe River Lower than 150’ in Height within 200’ from the Lakehouse District Los edge Gato s Cr Average of 20’ Setback e ek for 50% of linear frontage along the Lakehouse District Average De lm 100’ Los Gatos Creek as Av Setback e. St. ando ern San F st We *Illustrative massing
BUILDINGS EXAMPLE Possible Building Form Los Sta Gato te Ro s Cr ute e ek 87 De lm as Av e. St. ando ern San F st We *Illustrative massing
BUILDINGS EXAMPLE *Artist *Artist conceptual conceptual rendering, rendering, subject subject to to change change
Historic adjacency 5-degree massing reduction 15% of building shaping on Preferred materials long-facade Architectural height reference Bird-safe glass Rehabilitation of + Cornice articulation (DDG) (DDG) Historic SJWC 70% Transparency 30% Active Use *Artist conceptual rendering, subject to change
PART B
VARIETY AND CHARACTER BASED ON CONTEXT e. Av on c kt o St Variety in character + 15 acres experience et of open space tre nS um Los Ga tos Diridon ut Creek Station N .A r ve SAP e Ri al up Center uad G W. Juli e d Av Arena Bir an Green West HW Street Completing Los Y W W. 28 .S Gatos Creek Trail an 0 S an Ca ta rlo Arena Cla sS Green East ra Nature-based experiences tre Str et e et HWY 87 Urban-based experiences
OPEN SPACE Range across all open spaces RIPARIAN PLANTING ECOLOGICAL LOS GATOS CREEK COMMUNITY GARDEN PAVILION STRUCTURE OUTDOOR FLEXIBLE LAWN PROMENADE DEMONSTRATION MULTI-USE TRAIL PERFORMANCE SPACE UNDERSTORY PLANTING CREEK OVERLOOK / DOWNTOWN TO DIRIDON EVENT, ROTATING VENDOR, INFORMAL RECREATION PLAZA ART DOG RUN OR DOG VIEWING PLATFORM STATION SHARED-USE PATH OR FOOD TRUCK ACCESS PARK RE-OAKING CREEK FOOTBRIDGE WALKING PATH CANOPY STRUCTURE PICNIC OR BARBEQUE OUTDOOR PROGRAM AREA PROGRAM DECK WATER FEATURE TREE GROVE BOARDWALK NATURE PLAY KIOSK PLAYGROUND
50’ LOS GATOS CREEK PARK 94’ Pa rk Av e Los G atos C re ek Ave Bird W Sa nCa rlo sS t
LOS GATOS CREEK PARK REQUIRED PROGRAMS RIPARIAN PLANTING LOS GATOS CREEK CREEK OVERLOOK / WALKING PATH ECOLOGICAL UNDERSTORY PLANTING ANCHOR PLAZA PROGRAM DECK MULTI-USE TRAIL VIEWING PLATFORM DEMONSTRATION Pa r kA ve Los G atos C re ek W Ave Sa Bird nC ar l os St + COMPLEMENTARY PROGRAMS (2 REQUIRED) NATURE PLAY INFORMAL RECREATION ART KIOSK OUTDOOR PROGRAM AREA PAVILION STRUCTURE
PART C
MOBILITY VT A Lig Diridon Station ht Ra il Caltrain BART (Future) Existing street network ail ight R Transit options (Caltrain rail, VTA light rail, BART) VTA L
MOBILITY VT A Lig Diridon Station ht Ra il Caltrain BART (Future) Existing network Transit options (Caltrain rail, VTA light rail, BART) Proposed network extensions ail ight R Proposed pedestrian routes VTA L
MOBILITY VT A Lig Diridon Station ht Ra il Caltrain BART (Future) Existing bicycle network (Class II, III, IV) Added or upgraded bicycle facilities ail ight R Proposed pedestrian routes VTA L
MOBILITY Unprotected on-street bicycle lane Parking lot and building setback Minimum treatment for pedestrian experience Sidewalk Curb-to-curb Sidewalk
MOBILITY Expanded tree canopy Extended Protected streetscape bikeways Active Streetscape Curb-to-curb Active Streetscape
MOBILITY Extend “Active Streetscape” Dynamic lanes that flex for need PARKLET + SEATING RIDESHARE PICK UP / DROP OFF EXTENDED FURNITURE ZONE SHUTTLE DROP OFF PLANTING ZONES FOOD TRUCK Flexible “curb management”
MOBILITY © Joris Visser © © Nick Falbo © Jurriaan Snikkers © SITELAB Urban Studio ©NACTO
DOWNTOWN WEST DESIGN STANDARDS AND GUIDELINES 01 02 03 04 05 06
PART 04
FEEDBACK sanjoseca.gov/googleproject g.co/sanjose
COMMUNITY ENGAGEMENT INVITATION SHARE YOUR THOUGHTS CONTEXT SHARE YOUR View new illustrations What kinds of programs are After seeing responses from FEEDBACK: depicting the potential you most interested in? In the community, we’ll release bit.ly/dwinsights look and feel of a few looking at these images, updated illustrations, sites within the project. what would you like to see continuing to co-create with for you and your family? the community as the plans develop. Illustrative View Sketch Selects Illustrative view, not final Illustrative view, not final Illustrative view, not final Illustrative view, not final The Gateway The Meander Los Gatos Creek Illustrative Rendering Format Sketch Format Sketch Format
Upcoming Engagement Diridon Station Area Advisory Group (SAAG) Community Partner Events: meeting: Nov. 9 • Vietnamese Community Workshop (VAR, CatalyzeSV): Oct 21 Info sessions/public meetings: • SOMOS Mayfair Cafecitos for Small Businesses (Oct • Parks and Recreation Commission: Nov. 2 29) and Residents (Nov 13) • Historic Landmarks Commission: Nov. 4 • Transit, Walking, and Biking in the Diridon Station • City Council Study Session: Nov. 16 Area (Friends of Caltrain): Nov. 13 • Planning Commission: Dec. 2 • Artists/Creatives Workshop (Catalyze SV + Arts • Airport Land Use Commission: Dec. 16 organizations): Nov 21 Google-hosted engagement: g.co/sanjose • Virtual Open House(s) on the Diridon Station Area (Trinity Episcopal Cathedral): TBD • Diridon Experience Workshop (San Jose Jazz): TBD • African American Community Service Agency events: TBD www.sanjoseca.gov/googleproject
How to provide additional feedback 1. Visit www.diridonsj.org/fall2020-google to submit questions and comments 2. See www.diridonsj.org/fall2020 for additional community engagement events and public meetings occurring this fall 3. Email shannon.hill@sanjoseca.gov for Draft Environmental Impact Report comments www.sanjoseca.gov/googleproject
Website and Contact Information • Project information: www.sanjoseca.gov/googleproject • General Project Questions: James Han, james.han@sanjoseca.gov • Environmental Review: Shannon Hill, shannon.hill@sanjoseca.gov • Utilities/Infrastructure: Vivian Tom, vivian.tom@sanjoseca.gov • Transportation Analysis: Manjit Banwait, manjit.banwait@sanjoseca.gov • Open Space/Parks: Larissa Sanderfer, larissa.sanderfer@sanjoseca.gov • DOT Roadway Analysis: Florin Lapustea, Florin.Lapustea@sanjoseca.gov • Transportation Planning: Eric Eidlin, Eric.Eidlin@sanjoseca.gov • Community Engagement: Lori Severino, lori.severino@sanjoseca.gov • Media inquiries: Cheryl Wessling, cheryl.wessling@sanjoseca.gov www.sanjoseca.gov/googleproject
Live Poll • What topic are you most interested in? • What is your project understanding after seeing the presentation? www.sanjoseca.gov/googleproject
Breakout Meeting Facilitation RAISE HAND FEATURE Meeting Discussion: via Raise Hand feature By Computer/Tablet – please open the Participants window and select the Raise Hand feature at the bottom of the window. By Phone – if you’re calling in please dial *9 to activate the Raise Hand feature. The meeting facilitator (Dave) will recognize you and unmute your mic. Comments received via email before the meeting will be part of the public record and included in the meeting summary. www.sanjoseca.gov/googleproject